AMICUS AI
Citation Codes
Neutral Citations
2010 INSC 675
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 18(1) of the Telecom Regulatory Authority of India Act, 1997
  • Telecom Act, 1885
  • Section 14(a)(i) read with Section 14-A(1) of the Telecom Regulatory Authority of India Act, 1997
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2010 INSC 675
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 18(1) of the Telecom Regulatory Authority of India Act, 1997
  • Telecom Act, 1885
  • Section 14(a)(i) read with Section 14-A(1) of the Telecom Regulatory Authority of India Act, 1997
Smart Summary

Factual and Procedural Background

The appellant, Shyam Telelink Ltd., received a licence on 4-3-1998 to provide basic telecom services in the Rajasthan circle, with a contractual obligation to start commercial operations within twelve months. Claiming readiness by February 1999, the appellant sought governmental clearance, which was withheld due to unresolved technical and contractual deficiencies. In July 1999 the Union of India offered a “migration package” replacing fixed licence fees with revenue sharing, conditional upon (i) payment of 35% of outstanding dues and (ii) full payment of liquidated damages, alongside withdrawal of all pending litigation. The appellant unconditionally accepted the package on 22-7-1999 and, on 16-8-1999, paid Rs 2.36 crores towards licence fee/interest and Rs 7.30 crores as liquidated damages. Commercial operations ultimately began on 5-6-2000.

In March 2001, the Government raised a further demand of Rs 70 lakhs, completing the capped figure of Rs 8 crores for liquidated damages. Contesting this, the appellant filed Petition No. 24 of 2001 before the Telecom Disputes Settlement and Appellate Tribunal (TDSAT). The Tribunal dismissed the petition on 9-4-2003, prompting the present statutory appeal before the Supreme Court under Section 18(1) of the Telecom Regulatory Authority of India Act, 1997.

Legal Issues Presented

  1. Whether Shyam Telelink Ltd., after unconditionally accepting and acting upon the migration package, could challenge the demand and computation of Rs 8 crores as liquidated damages.
  2. Whether the Government’s refusal to permit commercial launch prior to 5-6-2000 was arbitrary, thereby invalidating the imposition of liquidated damages.

Arguments of the Parties

Appellant’s Arguments

  • It was ready to commence commercial operations in February 1999 and had sought permission; the refusal was arbitrary, illegal and discriminatory.
  • Consequently, recovery of liquidated damages amounting to Rs 8 crores was unjustified and refundable.

Respondent’s Arguments

  • By unconditionally accepting the migration package, the appellant agreed to pay outstanding dues and liquidated damages without demur and is estopped from disputing the demand.
  • The appellant was not technically ready; its own correspondence acknowledged persistent deficiencies, leading to delayed commissioning until 5-6-2000.
  • Actual computation showed liquidated damages of Rs 29.86 crores, but the demand was capped at Rs 8 crores under the licence conditions, of which only Rs 70 lakhs remained unpaid.
  • The petition was time-barred and otherwise not maintainable.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Ambu Nair v. Kelu Nair (1932-33) 60 IA 266; AIR 1933 PC 167 Doctrine that a party cannot approbate and reprobate. Relied on to hold that the appellant, having benefited under the migration package, cannot now dispute its burdens.
Smith v. Baker, 1873 LR 8 CP 350 Illustration of the maxim preventing a party from “blowing hot and cold.” Cited within Ambu Nair quotation to reinforce estoppel against inconsistent positions.
City Montessori School v. State of U.P. (2009) 14 SCC 253 Reaffirmation of the approbate-and-reprobate principle. Referenced as subsequent affirmation of the doctrine applied against the appellant.
New Bihar Biri Leaves Co. v. State of Bihar (1981) 1 SCC 537 Party cannot accept advantageous terms of a contract while rejecting disadvantageous ones. Used to show that unconditional acceptance of the package estops later challenge.
R.N. Gosain v. Yashpal Dhir (1992) 4 SCC 683 Doctrine of election: prohibition on accepting and rejecting the same instrument. Supports finding that appellant is bound by its election to accept the package.
Verschures Creameries Ltd. v. Hull & Netherlands Steamship Co. Ltd. (1921) 2 KB 608 Common-law statement of the benefits-and-burdens rule. Cited to explain that acceptance of benefits carries corresponding obligations.

Court's Reasoning and Analysis

The Supreme Court upheld TDSAT’s findings through the following analytical steps:

  • Lack of readiness in February 1999: Correspondence from the appellant (letters dated 19-7-1999 and 25-8-1999) admitted unresolved “bugs” and absence of a firm launch date. Technical Engineering Centre (TEC) certificates were issued only on 1-6-2000 after replacement equipment was installed, confirming that commercial readiness arose only on 5-6-2000.
  • Non-arbitrariness of permission denial: The licence mandated rectification of technical deficiencies, provision of bank guarantees, and other conditions which the appellant had not met; therefore, refusal of clearance was neither arbitrary nor mala fide.
  • Estoppel through unconditional acceptance: By accepting the migration package and paying Rs 7.30 crores initially (followed by Rs 70 lakhs), the appellant accepted both benefits (migration to revenue sharing) and burdens (liquidated damages). Applying the doctrines of approbation-and-reprobation and election, the Court held the appellant estopped from challenging the demand.
  • Validity and quantum of damages: Computation conformed to licence terms; actual damages far exceeded Rs 8 crores but were contractually capped. No calculation error was shown.
  • Equitable considerations: Permitting the appellant to retain benefits while discarding obligations would allow it to “approbate and reprobate,” contrary to settled law.

Holding and Implications

Appeal Dismissed.

Consequently, the demand of Rs 8 crores towards liquidated damages stands affirmed, and Shyam Telelink Ltd. must bear the burden without refund. The judgment reinforces the principle that parties who accept contractual packages or settlements cannot later contest associated liabilities; however, it sets no new substantive precedent beyond reiterating existing estoppel doctrines.

To access the original judgment, please Sign In or Subscribe.

    Shyam Telelink Limited Now Sistema Shyam Teleservices Limited v. Union Of India .

    T.S Thakur, J.— This appeal under Section 18(1) of the Telecom Regulatory Authority of India Act, 1997 is directed against an order dated 9-4-2003 passed by the Telecom Disputes Settlement and Appellate Tribunal whereby Petition No. 24 of 2001 filed under Section 14(a)(i) read with Section 14-A(1) of the Telecom Regulatory Authority of India Act, 1997 has been dismissed.

    2. The factual matrix giving rise to the appeal may be summarised at the outset.

    3. The appellant, Shyam Telelink Ltd. was granted a licence under the Telecom Act, 1885 on 4-3-1998 for providing basic telecom services in Rajasthan circle. A licence agreement was executed between the parties that, inter alia, required the appellant to start commercial operations within twelve months from the date on which the agreement was executed. The appellant's case before the Tribunal so also before us is that, it was ready to commence commercial operations in the last week of February 1999 and had sought permission of the respondents to do so. Permission was, however, denied on the ground that certain technical deficiencies remained to be removed and certain conditions for the grant of permission remained to be fulfilled.

    4. In the meantime the Union of India appears to have offered a migration package to all the telecom operators in July 1999. Under this package which was offered to the appellant Shyam Telelink Ltd. on 22-7-1999 the fixed licence fee was to stand replaced by a revenue-sharing arrangement w.e.f 1-8-1999 subject to the stipulation that at least 35% of all outstanding dues including interest payable as on 31-7-1999 and liquidated damages in full is paid by the appellant on or before 15-8-1999. Migration package further provided that the company shall have to accept all the conditions stipulated in the package and that all proceedings instituted by the licensee or their associations against the Union of India shall have to be withdrawn.

    5. It is not in dispute that the appellant gave an unconditional acceptance to the migration package on 22-7-1999 nor is it disputed that on 10-8-1999 the respondent advised the appellant that a sum of Rs. 6,74,90,481 was payable towards outstanding licence fee and interest due thereon apart from a sum of Rs. 7.30 crores payable towards liquidated damages that were provisionally determined. The appellant Company was informed that in terms of the migration package at least 35% of the total licence fee along with interest amounting to Rs. 6,74,90,481 had to be paid by it before 16-8-1999 and the balance dues covered by a financial bank guarantee by 30-11-1999. The liquidated damages payable by the appellant Company were demanded in full and had to be paid on or before 16-8-1999.

    6. On receipt of the intimation demanding payment of the amounts mentioned above the appellant Company appears to have prayed for waiver of the liquidated damages on the ground that it could not commence commercial operations by the stipulated date on account of certain procedural delay. That prayer was upon consideration turned down with the result that the appellant paid 35% of the outstanding licence fee and interest amounting to Rs. 2.36 crores on 16-8-1999. It also paid the full amount of Rs. 7.30 crores towards liquidated damages as demanded by the Government. Commercial operations in Rajasthan were finally started by the appellant Company on 5-6-2000. In March 2001 a demand was raised by the respondent for payment of a further amount of Rs. 70 lakhs as liquidated damages for the delay in the commissioning of the service.

    7. Aggrieved by the demand of Rs. 8 crores towards liquidated damages out of which the appellant had already paid Rs. 7.30 crores on 16-8-1999 the appellant approached the Tribunal for redress. As mentioned earlier the appellant's case before the Tribunal was that it was ready to commence commercial operations in the last week of February 1999 and had sought permission to do so from the respondent which permission was in an arbitrary, illegal and discriminatory manner refused by the respondent. Recovery of the liquidated damages was, therefore bad, argued the appellant who demanded refund of the entire amount of Rs. 8 crores recovered towards liquidated damages from it.

    8. The respondent contested the petition before the Tribunal, inter alia, on the ground that the appellant-petitioner was not entitled to question any demand arising out of the agreement executed between the parties after it had unconditionally accepted the migration package under which it agreed to deposit without demur the outstanding licence fee as also the liquidated damages payable under the licence agreement. The respondent also asserted that the appellant was not ready with the commissioning of the service as was evident from the admissions made in several communications sent by it to the respondent.

    9. It was further pointed out by the respondent that the computation of actual liquidated damages could be undertaken only after the appellant had commenced commercial operations. The actual charges after such computation were according to the respondent determined at Rs. 29.86 crores but the demand was restricted to Rs. 8 crores in terms of the explicit limitation prescribed under the licence. An amount of Rs. 7.3 crores having already been paid under the migration package, a demand for payment of Rs. 70 lakhs only was raised by the respondent.

    10. It was also asserted by the respondent that the appellant had not disputed calculation of the amount of Rs. 7.3 crores as liquidated damages for non-commissioning of the service at the time of migration package and paid the same with other dues. Having done so, the migration package which contained a specific stipulation that the acceptance of the package “will be deemed as a full and final settlement of all existing disputes whatsoever irrespective of whether they are related to the present package or not” could not be questioned by the appellant-petitioner. The respondent also raised the question of limitation and assailed the maintainability of the petition on that ground.

    11. By its order dated 9-4-2003 impugned in this appeal the Tribunal dismissed the petition filed by the appellant aggrieved whereof the appellant has filed CA No. 7236 of 2003 before this Court.

    12. We have heard learned counsel for the parties and perused the record. A twofold contention was urged in support of the appeal by counsel appearing for the appellant. Firstly, it was contended that the appellant was ready to commence commercial operations in February 1999 i.e within one year of the date on which the agreement was signed between the parties. The fact that the petitioner had applied for the grant of permission to commence commercial operations in Jaipur from 3-2-1999 was according to the appellant sufficient to show its readiness to commence such operations.

    13. There is, in our opinion, no force in that contention. It is not disputed that the actual operations started only on 5-6-2000. The material placed before the Tribunal clearly established that during the intervening period the appellant had been informed by the respondent that clearance for commencing commercial operations could be considered only after the following requirements of the licence agreement were complied with:

    (a) Payment of next instalment of licence fee due on 3-3-1999;
    (b) Provision of performance bank guarantee (PBG) and enhanced financial bank guarantee (FBG) for requisite amount and validity before commencement of succeeding year on 3-3-1999;
    (c) Rectification of deficiencies pointed out by TEC before the commencement of commercial operations;
    (d) Submission of plan in respect of providing direct exchange lines (DEL-s) and village public telephones (VPT-s) as per committed targets failing which liquidated damages (LD-s) are payable; and
    (e) Establishment of a separate bank account (an escrow account as stipulated under Condition 18.6 of the licence agreement).

    14. Material further established that the deficiencies pointed out by TEC could not be rectified by M/s Qualcomm, manufacturer of the equipment purchased by the appellant forcing the latter to go for a new set of equipment from a new vendor in December 1999 which equipment was finally delivered and installed in April 2000. It was only after the installation of the said equipment that fresh test certificates were issued by TEC on 1-6-2000 leading to the start of the commercial operations on 5-6-2000.

    15. The fact that the appellant was not ready to commence commercial operations in February 1999 is evident from its own letter dated 19-7-1999 in which the appellant had clearly admitted that the system was not yet ready for such operations and that the appellant was engaged only in monitoring and testing the credential of the new technology and the related software/hardware. It is also evident from the letter of the appellant dated 25-8-1999 that the appellant was not in a position to indicate any firm date for a formal launch of the service as the system was not yet in a position to do so.

    16. The relevant part of the letter reads as under:

    “… at this stage we are unable to indicate any date for formal commissioning of the commercial launch of the service since still there are bugs in the system provided by our supplier. In any case the testing has to continue for monitoring the behaviour of the equipment even after 75% loading of the system which is also being followed by DoT/MTNL, while acceptance testing of the systems. However, we hope to commercialise the services by middle of December 1999, as the supplier is continuously working to resolve the bugs in the software.”

    In the light of the above admission which is the best evidence against the appellant, it is not open to the appellant to argue that it was ready to start commercial operations in February 1999. The Tribunal was, therefore, perfectly justified in holding that the commercial operations were started only on 5-6-2000 and that for the intervening period such operations could not be commenced on account of deficiencies that were attributed entirely to the defects in the system which the appellant had installed.

    17. The Tribunal was also justified in our opinion in holding that the denial of permission to the appellant was neither arbitrary nor mala fide especially when the conditions in the licence agreement requiring the appellant to arrange and install suitable equipment to meet the prevailing technical specifications by the Telecommunication Engineering Centre were not complied with nor were all performance tests required for successful commissioning of the services carried out by the licensor before the services are commissioned for public use.

    18. The argument that the respondent has acted arbitrarily and in a discriminatory manner by overlooking similar deficiencies in the case of other service providers has also been correctly repelled by the Tribunal on the ground that the nature of the deficiencies found in the case of the appellant have not been found similar to those found in other cases where permission was granted. As a matter of fact, the appellant was given an opportunity to implead the other service providers so that the allegation could be examined in detail but the appellant failed to do so nor was any material placed on record to show that any discriminatory treatment was meted out to it. At any rate, so long as the conditions of the agreement entitled the respondents to decline permission to commence commercial operations on account of failure on the part of the appellant to comply with the conditions stipulated in the said agreement, which condition included a defect-free efficient system, the fact that some other service providers were given permission in the peculiar facts of their cases and deficiencies allegedly noticed in their system could not make out a case for the appellant to question the demand raised on the basis of a package which the appellant had accepted unconditionally and pursuant to which acceptance a substantial part of the liquidated damages amounting to Rs. 7.3 crores had been deposited by it without any demur.

    19. The Tribunal has also held and in our view correctly so that the computation of the liquidated damages for non-commencing of the services as well as limiting the same to a total amount of Rs. 8 crores was in conformity with the licence conditions executed between the parties. There is nothing before us to suggest that any error has crept in the computation of liquidated damages nor was any such error pointed out before the Tribunal. As a matter of fact, according to the respondents the amount of damages works out to Rs. 29.86 crores was limited to Rs. 8 crores in explicit terms of the limitation laid down in the licence agreement.

    20. The factual aspects apart, we need to remember that the payment of liquidated damages was an essential condition of the migration package which was offered to the service providers. Unconditional acceptance of the package including the payment of outstanding licence fee with interest due thereon and liquidated damages was a specific requirement of the migration package which was unequivocally accepted by the appellant in terms of the declaration made in the following words:

    “… With reference to Letter No. 842-153/99-VAS (Vol. V) (Pt.) dated 22-7-1999 on the subject noted above, I hereby convey unconditional acceptance on behalf of the licensee with regard to the package proposed for migration of the existing licenses to NTP 1999 Regime on the terms and conditions in the letter under reference….”

    21. The unconditional acceptance of the terms of the package and the benefit which the appellant derived under the same will estop the appellant from challenging the recovery of the dues under the package or the process of its determination. No dispute has been raised by the appellant and rightly so in regard to the payment of outstanding licence fee or the interest due thereon. The controversy is limited to the computation of liquidated damages of Rs. 8 crores out of which Rs. 7.3 crores was paid by the appellant in the beginning without any objection followed by a payment of Rs. 70 lakhs made on 29-5-2001.

    22. Although the appellant had sought waiver of the liquidated damages yet upon rejection of that request it had made the payment of the amount demanded which signified a clear acceptance on its part of the obligation to pay. If the appellant proposed to continue with its challenge to demand, nothing prevented it from taking recourse to appropriate proceedings and taking the adjudication process to its logical conclusion before exercising its option. Far from doing so, the appellant gave up the plea of waiver and deposited the amount which clearly indicates acceptance on its part of its liability to pay especially when it was only upon such payment that it could be permitted to avail of the migration package. Allowing the appellant at this stage to question the demand raised under the migration package would amount to permitting the appellant to accept what was favourable to it and reject what was not. The appellant cannot approbate and reprobate.

    23. The maxim qui approbat non reprobat (one who approbates cannot reprobate) is firmly embodied in English common law and often applied by courts in this country. It is akin to the doctrine of benefits and burdens which at its most basic level provides that a person taking advantage under an instrument which both grants a benefit and imposes a burden cannot take the former without complying with the latter. A person cannot approbate and reprobate or accept and reject the same instrument.

    24. In Ambu Nair v. Kelu Nair (1932-33) 60 IA 266, AIR 1933 PC 167 the doctrine was explained thus: (IA p. 271)

    “Having thus, almost in terms, offered to be redeemed under the usufructuary mortgage in order to get payment of the other mortgage debt, the appellant, Their Lordships think, cannot now turn round and say that redemption under the usufructuary mortgage had been barred nearly seventeen years before he so obtained payment. It is a well-accepted principle that a party cannot both approbate and reprobate. He cannot, to use the words of Honyman, J. in Smith v. Baker 1873 LR 8 CP 350 LR at p. 357:
    ‘… at the same time blow hot and cold. He cannot say at one time that the transaction is valid, and thereby obtain some advantage, to which he could only be entitled on the footing that it is valid, and at another time say it is void for the purpose of securing some further advantage.’ ”

    25. The view taken in the above decision has been reiterated by this Court in City Montessori School v. State of U.P (2009) 14 SCC 253 To the same effect is the decision of this Court in New Bihar Biri Leaves Co. v. State of Bihar (1981) 1 SCC 537 where this Court said: (New Bihar case (1981) 1 SCC 537)

    “48. It is a fundamental principle of general application that if a person of his own accord, accepts a contract on certain terms and works out the contract, he cannot be allowed to adhere to and abide by some of the terms of the contract which proved advantageous to him and repudiate the other terms of the same contract which might be disadvantageous to him. The maxim is qui approbat non reprobat (one who approbates cannot reprobate). This principle, though originally borrowed from Scots law, is now firmly embodied in English common law. According to it, a party to an instrument or transaction cannot take advantage of one part of a document or transaction and reject the rest. That is to say, no party can accept and reject the same instrument or transaction (per Scrutton, L.J, Verschures Creameries Ltd. v. Hull & Netherlands Steamship Co. Ltd. (1921) 2 KB 608, 1921 All ER Rep 215 (CA); …).”

    26. The decision of this Court in R.N Gosain v. Yashpal Dhir (1992) 4 SCC 683, AIR 1993 SC 352 brings in the doctrine of election in support of the very same conclusion in the following words:

    “10. Law does not permit a person to both approbate and reprobate. This principle is based on the doctrine of election which postulates that no party can accept and reject the same instrument and that:
    ‘… A person cannot say at one time that a transaction is valid and thereby obtain some advantage, to which he could only be entitled on the footing that it is valid, and then turn round and say it is void for the purpose of securing some other advantage.’
    (See Verschures Creameries Ltd. v. Hull and Netherlands Steamship Co. Ltd. (1921) 2 KB 608, 1921 All ER Rep 215 (CA) KB at p. 612, Scrutton, L.J) According to Halsbury's Laws of England, 4th Edn., Vol. 16:
    “1508. Examples of the common law principle of election.—After taking an advantage under an order (for example for the payment of costs) a party may be precluded from saying that it is invalid and asking to set it aside.' ”

    27. In America estoppel by acceptance of benefits is one of the recognised situations that would prevent a party from taking up inconsistent positions qua a contract or transaction under which it has benefited. American Jurisprudence, 2nd Edn., Vol. 28, pp. 677-80 discusses “estoppel by acceptance of benefits” in the following passage:

    “Estoppel by the acceptance of benefits.—Estoppel is frequently based upon the acceptance and retention, by one having knowledge or notice of the facts, of benefits from a transaction, contract, instrument, regulation which he might have rejected or contested. This doctrine is obviously a branch of the rule against assuming inconsistent positions.
    As a general principle, one who knowingly accepts the benefits of a contract or conveyance is estopped to deny the validity or binding effect on him of such contract or conveyance.
    This rule has to be applied to do equity and must not be applied in such a manner as to violate the principles of right and good conscience.”

    28. For the reasons set out by us hereinabove, we have no hesitation in holding that the appellant was not entitled to question the terms of the migration package after unconditionally accepting and acting upon the same.

    29. In the result this appeal fails and is hereby dismissed but in the circumstances without any order as to costs.