THIS CONSTITUTES THE DECISION AND ORDER OF THE SUPREME COURT, APPELLATE DIVISION, FIRST
DEPARTMENT.
ENTERED: June 18, 2026
Footnotes
4
Footnote 1 The "dewatering" involved the removal of ground water from the Project site. Plaintiff alleges that the dewatering caused large quantities of fine soils to be flushed from under its building into the street, causing cracks and damage to the building's structure, undermining it and causing it to lean. The developer denies these allegations. Footnote 2
The alleged deficiencies relate to 1) the building's lateral force resistance system, which is intended to resist code- prescribed seismic and wind loads, and 2) deficiencies in certain members of the gravity load resisting system. Footnote 3
Contrary to Supreme Court's reasoning, the negligence counterclaim did not involve Administrative Code § 27-1031(b) (1), the predecessor to § 3309.4 of the Building Code. That provision was the basis for plaintiff's first cause of action for strict liability. It was not the basis for the defendant's negligence counterclaim.
Footnote 4
Significantly, as plaintiff points out, the developer fails to cite to a Building Code provision that imposes a duty on plaintiff in favor of the developer. As discussed above, only plaintiff cites to a specific Building Code provision (NY City Bldg Code § BC 3309.4) and that provision imposes a duty of care on the developer, not vice versa.
5