Kaufman v. CityPlace South Tower, LLC — Opinion Summary (S.D. Fla. Oct. 20, 2008)

Factual and Procedural Background

Plaintiffs Ira and Dawn Kaufman entered into a purchase and sale agreement to buy Unit 1213 at CityPlace South Tower from Defendant, a developer constructing a condominium project of over 100 units in Palm Beach County, Florida. Because the project exceeds 100 units, the Interstate Land Sales Full Disclosure Act (ILSA), 15 U.S.C. § 1701 et seq., applies. Defendant filed the required documentation with HUD and received a HUD certificate on July 1, 2005. Plaintiffs executed the Contract on or about August 1, 2005, for a purchase price of $683,900 and paid deposits totaling $136,780.

On November 6, 2007, Plaintiffs sought to terminate the Contract and demanded return of their deposits; Defendant did not respond, and Plaintiffs commenced this litigation after removing the state-court action to federal court. The parties agreed there are no material disputed facts. The Plaintiffs allege that a Contract provision (Paragraph 13) precluding buyers from seeking specific performance in the event of seller default violates the ILSA. Plaintiffs seek rescission, return of their deposit, and attorneys' fees. Plaintiffs also assert related claims under Florida law, including violation of the Florida Uniform Land Sales Practice Act and breach of contract; the parties also agreed that, under the Contract, the prevailing party is entitled to attorneys' fees and costs for litigation pertaining to the Contract.

Procedurally, the case was removed from state court to federal court based on diversity jurisdiction. The Court considered cross-motions for summary judgment: Defendant's Motion for Summary Judgment (DE 29) and Plaintiffs' Motion for Summary Judgment (DE 30).

Legal Issues Presented

  1. Whether the Contract's limitation-of-remedies clause (Paragraph 13), which precludes Plaintiffs from seeking specific performance upon Defendant's default, violates the Interstate Land Sales Full Disclosure Act (ILSA).
  2. If the limitation-of-remedies clause violates the ILSA or otherwise is unenforceable, whether the Contract's severability clause (Paragraph 26) preserves the remainder of the Contract.
  3. Under Florida contract law, whether the limitation of specific performance renders the Contract illusory or unenforceable and whether rescission is appropriate.

Arguments of the Parties

Defendant's Arguments

  • The limitation-of-remedies provision (Paragraph 13) does not constitute a violation of the ILSA because Defendant is not claiming an exemption under the ILSA that would be defeated by limiting buyers' remedies.
  • Even if the default provision were problematic, the Contract contains a severability provision (Paragraph 26) that is enforceable under Florida law and would preserve the remainder of the Contract.

Plaintiffs' Arguments

  • Plaintiffs contend that the ILSA requires that the contract "obligates" the seller to perform and that a provision excluding specific performance means Defendant is not truly obligated to complete performance; thus the contract is illusory and falls under ILSA's coverage.
  • Plaintiffs argue that exclusion of specific performance renders the developer's obligation non-binding and therefore non-compliant with the ILSA; they rely on cases such as Stein v. Paradigm Mirsol, LLC and Samara Dev. Corp. v. Marlow.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Celotex Corp. v. Catrett, 477 U.S. 317 (1986) Summary judgment standard — movant entitled to judgment as a matter of law where nonmoving party fails to show essential element. Used to state the standard for granting summary judgment and that failure of proof as to an essential element requires judgment for the movant.
Imaging Bus. Mach., LLC v. BancTec, Inc., 459 F.3d 1186 (11th Cir. 2006) Summary judgment standard (Eleventh Circuit authority cited). Cited in support of the standard for summary judgment.
Adickes v. S.H. Kress Co., 398 U.S. 144 (1970) Movant bears the burden of meeting the summary judgment standard. Cited for the proposition that the moving party must meet the exacting summary judgment standard.
Arrington v. Cobb County, 139 F.3d 865 (11th Cir. 1998) Evidence must be viewed in the light most favorable to the nonmoving party. Used to explain how factual inferences should be considered at summary judgment.
Allen v. Tyson Foods, Inc., 121 F.3d 642 (11th Cir. 1997) Same — view evidence in light most favorable to the nonmoving party. Used as authority for weighing evidence in favor of the nonmoving party at summary judgment.
Earley v. Champion Int'l Corp., 907 F.2d 1077 (11th Cir. 1990) Non-moving party must come forward with evidence of each essential element; conclusory allegations insufficient. Cited to explain that conclusory, uncorroborated allegations will not defeat a supported summary judgment motion.
Anderson v. Liberty Lobby, Inc., 477 U.S. 242 (1986) There must be more than a scintilla of evidence; dispute genuine if reasonable jury could return verdict for non-movant. Quoted to define when a factual dispute is genuine for summary judgment purposes.
Envtl. Def. Fund v. Marsh, 651 F.2d 983 (5th Cir. 1981) Court must not decide factual issues presented by the record; deny motion if record presents factual issues. Cited as authority that factual disputes must be reserved for trial.
Impossible Elec. Techniques, Inc. v. Wackenhut Protective Sys., Inc., 669 F.2d 1026 (5th Cir. 1982) If reasonable minds might differ on inferences from undisputed facts, deny summary judgment. Used to explain the standard for denying summary judgment when reasonable minds could differ.
Rice v. Branigar Org., 922 F.2d 788 (11th Cir. 1991) Describes ILSA's purpose: protect land buyers via disclosure. Quoted to state that the ILSA was designed to protect buyers by requiring developers to disclose material information.
Flint Ridge Dev. Co. v. Scenic Rivers Ass'n, 426 U.S. 776 (1976) Background authority cited in connection with ILSA's purpose. Cited as a supporting authority for the ILSA's protective purpose.
Winter v. Hollingsworth Prop., 777 F.2d 1444 (11th Cir. 1985) ILSA is an anti-fraud statute using disclosure; articulated that exemption exists where seller obligated to erect building within two years. Used to explain ILSA's nature and that a two-year completion obligation can create an exemption from the Act.
Maguire v. S. Homes of Palm Beach, LLC, 2008 WL 2474657 (S.D. Fla. 2008) Used as an example discussing when an obligation is illusory and exemption under ILSA fails. Cited to illustrate that an obligation is illusory where other contract provisions vitiate the apparent obligation.
Stein v. Paradigm Mirsol, LLC, 551 F. Supp.2d 1323 (M.D. Fla. 2008) Examined whether contractual limitation of remedies brought the transaction within ILSA coverage. Cited by Plaintiffs; Court distinguished Stein on the facts and cited it as an example of a contract limiting remedies in a way that implicated ILSA.
Pugliese v. Pukka Dev., Inc., 524 F. Supp.2d 1370 (S.D. Fla. 2007) Another example of ILSA-related contract analysis. Cited as part of a body of cases on the interplay between contract remedies and ILSA coverage.
Samara Dev. Corp. v. Marlow, 556 So.2d 1097 (Fla. 1990) Holds that a contract limiting buyer's remedies to deposit return or specific performance (and excluding damages) was subject to ILSA. Cited and analyzed; Court emphasized Samara's narrow holding and distinguished it from the present Contract.
Dorchester Dev., Inc. v. Burk, 439 So.2d 1032 (Fla. 3d DCA 1983) Illustrates limitations of remedies can defeat exemption where purchaser limited to narrow options. Cited as another example of the "limitation problem" where limited buyer remedies negated an exemption.
Jay Vee Realty Corp. v. Jaymar Acres Inc., 436 So.2d 1053 (Fla. 4th DCA 1983) Florida contract law: parties enjoy freedom to limit remedies but contracts must be reasonable and provide mutuality. Cited to describe Florida law principles governing contractual remedies and mutuality of obligation.
Indian River Colony Club, Inc. v. Schopke Constr. Eng'g. Inc., 592 So.2d 1185 (Fla. 5th DCA 1992) Authority on mutuality and enforceability of contractual remedies under Florida law. Cited in support of the principle that remedies must be mutual and reasonable.
Seaside Cmty. Dev. Corp. v. Edwards, 573 So.2d 142 (Fla. 1st DCA 1991) Contracts' agreed-upon remedies will generally control if they are mutual, unequivocal and reasonable. Quoted to show that mutually agreed remedies are enforceable if reasonable.
Hatcher v. Panama City Nursing Ctr., 461 So.2d 288 (Fla. 1st DCA 1985) Used as quotation source re: remedies being mutual and unequivocal. Cited in support of the Seaside quotation about remedies.
Ocean Dunes of Hutchinson Island Dev. Corp. v. Colangelo, 463 So.2d 437 (Fla. 4th DCA 1985) "Both parties must have genuine, not illusory, obligations." Guidance on mutuality and enforceability. Cited repeatedly to support that contractual obligations must be genuine and that parties can limit remedies if obligations are not illusory.
Weaver v. Opera Tower, LLC, 2008 WL 4145520 (S.D. Fla. 2008) Florida courts allow parties to limit remedies; rescission limited to fraud/accident/mistake, not mere want or failure of consideration. Cited in support of the proposition that rescission is inappropriate absent fraud, accident, or mistake and that limiting remedies is permissible.
Amoco Oil Co. v. Gomez, 125 F. Supp.2d 492 (S.D. Fla. 2000) Supports that parties can agree to limit remedies under Florida law. Cited as authority that Florida courts allow contractual limitation of remedies.
Blue Paper, Inc. v. Provost, 914 So.2d 1048 (Fla. 4th DCA 2005) Authority relating to the enforceability of contractual remedies. Cited as part of Florida law precedent acknowledging parties may limit remedies.
Rondini v. Evernia Prop., 2008 WL 793512 (S.D. Fla. 2008) Cited for breach-of-contract elements under Florida law. Used to state the elements required to prove a breach of contract under Florida law.
Brooks Tropicals, Inc. v. Acosta, 959 So.2d 288 (Fla. 3d DCA 2007) Supports the elements of breach of contract (valid contract, material breach, damages). Cited in stating the Florida law elements for breach of contract.
Webb v. Kirkland, 899 So.2d 344 (Fla. 2d DCA 2005) Rescission ordinarily only for fraud, accident or mistake. Quoted to support that rescission is not warranted for mere failure of consideration absent fraud, accident, or mistake.
Harvey v. Lake Buena Vista Resort, LLC, 568 F. Supp.2d 1354 (M.D. Fla. 2008) Florida law recognizes the validity of force majeure clauses. Cited to support that force majeure extensions in the completion date clause are lawful under Florida law.

Court's Reasoning and Analysis

The Court proceeded in sequential steps, applying the summary judgment standard and the undisputed facts agreed by the parties.

  1. The Court reiterated the summary judgment standards (Celotex and related authorities), emphasizing that where the parties agree there are no material facts, the Court may decide legal issues as a matter of law.
  2. The Court summarized undisputed facts: Defendant is a developer of a project exceeding 100 units, filed required documentation with HUD, received a HUD certificate (July 1, 2005), and provided the ILSA disclosures to Plaintiffs prior to contract execution. The Contract set a completion date of December 31, 2009 (subject to force majeure). Paragraph 13 disallows Plaintiffs from seeking specific performance but preserves "such rights as may be available under applicable law" otherwise. Paragraph 26 contains a severability provision. The parties agreed Defendant complied with ILSA filing requirements.
  3. On the ILSA issue, the Court explained that the ILSA's exemption for sales under contracts obligating the seller to erect a building within two years is conditioned on the seller being truly "obligated" and that purchasers' remedies may not be limited when a developer claims an exemption. The Court observed that the ILSA does not categorically forbid limiting purchasers' remedies; rather, the restriction on limiting remedies applies when the developer claims a Section 1702 exemption (i.e., when the developer's exemption depends on an unequivocal obligation).
  4. Because both parties agreed Defendant is not exempt under Section 1702 and Defendant complied with ILSA (including HUD filing), the Court held Plaintiffs' contention that the limitation on specific performance renders the Contract illusory for ILSA purposes was a misinterpretation of the Act. The Court distinguished cases cited by Plaintiffs (e.g., Samara, Stein) as involving contracts that limited buyer remedies in ways that implicated the ILSA exemption; those cases did not establish the categorical rule Plaintiffs urged.
  5. The Court then examined Florida contract law to determine if the exclusion of specific performance rendered the Contract illusory or unenforceable apart from ILSA. The Court noted Florida law permits parties to limit remedies so long as remedies are mutual, unequivocal and reasonable and the parties' obligations are genuine (citing Seaside, Ocean Dunes, and other Florida authorities). The Court found the Contract's remedies were fair and reasonable: except for specific performance, Plaintiffs retain all other remedies available under Florida law, Defendant remains obligated to complete construction by the agreed date (subject to force majeure), and the Contract is supported by consideration.
  6. The Court concluded there was no authority to support Plaintiffs' contention that inability to seek specific performance voided the Contract or justified rescission. Rescission is ordinarily limited to cases of fraud, accident, or mistake, and none were alleged. Because Plaintiffs could not show a material breach or an appropriate basis for rescission, their breach-of-contract and related claims failed.
  7. Applying these conclusions, the Court granted Defendant's motion for summary judgment and denied Plaintiffs' motion. The Court also directed Defendant to submit a request for attorneys' fees and costs (per the Contract's prevailing-party clause) by 5:00 p.m. on November 3, 2008.

Holding and Implications

Holding: The Court granted Defendant's Motion for Summary Judgment and denied Plaintiffs' Motion for Summary Judgment. In the Court's words: Defendant is entitled to judgment as a matter of law.

Implications and direct effects:

  • The Plaintiffs' ILSA claims and related Florida-law claims fail as a matter of law on the undisputed record because (a) Defendant complied with ILSA filing requirements and did not assert an ILSA exemption defeated by the limitation on remedies, and (b) under Florida contract law the Contract's limitation of specific performance does not render the Contract illusory or unenforceable.
  • Pursuant to the Contract's prevailing-party clause, the Defendant may recover reasonable attorneys' fees and costs; the Court ordered Defendant to submit its request for attorneys' fees and costs and supporting memorandum by 5:00 p.m. on November 3, 2008.
  • The case was removed from the trial calendar and parties were excused from the scheduled appearance on October 22, 2008.
  • No broader, new legal precedent was announced by this opinion; the Court resolved the parties' cross-motions on the existing record and applied existing Eleventh Circuit and Florida authorities to the undisputed facts.

This summary is strictly limited to the material contained in the provided opinion and does not add information beyond that text.

IRA KAUFMAN and DAWN KAUFMAN, Plaintiffs, v. CITY PLACE SOUTH TOWER, LLC, a Florida limited liability company, Defendant.

ORDER GRANTING DEFENDANT'S MOTION FOR SUMMARY JUDGMENT AND DENYING PLAINTIFFS' MOTION FOR SUMMARY JUDGMENT

DONALD MIDDLEBROOKS, District Judge

THIS CAUSE comes before the Court upon Defendant's Motion for Summary Judgment (DE 29), filed on September 2, 2008; and Plaintiffs' Motion for Summary Judgment (DE 30), filed on September 3, 2008. Having reviewed the record and being otherwise fully advised in the premises, the Court grants summary judgment in favor of Defendant for the reasons stated below.

I. Background

This dispute arises from a condominium purchase and sale agreement ("the Contract") for real property in Florida. Plaintiffs entered into a contract to purchase Unit 1213 at CityPlace South Tower ("the Unit") from Defendant, a corporation that is constructing a condominium development in excess of 100 units in Palm Beach County. Because Defendant plans to develop a project in excess of 100 units, it is subject to the Interstate Land Sales Full Disclosure Act ("ILSA"), 15 U.S.C. § 1701 et seq. Plaintiffs allege that Defendant has violated the ILSA by failing to provide the proper default provisions mandated by the ILSA. Consequently, they seek rescission of the Contract, return of the $136,780 in deposits that they have paid, and reasonable attorney's fees. Additionally, Plaintiffs assert claims for violation of the Florida Uniform Land Sales Practice Act, FLA. STAT. § 498.001 et seq., breach of contract, equitable rescission, and return of deposit, all based on the same Contract flaw.

Plaintiffs assert a claim under the laws as they were in effect at the time that the Contract was executed and the dispute arose. The Act was repealed and/or renumbered effective July 1, 2008.

This action was commenced in state court and subsequently removed to federal court. This Court has diversity jurisdiction pursuant to 28 U.S.C. § 1331(a). The action was subject to removal pursuant to 28 U.S.C. § 1441(a). Buyers are residents and domiciliaries of Texas. Defendant is an LLC with its principal place of business in Palm Beach, Florida.

II. Standard of Review

Summary judgment is appropriate only when there are no genuine issues of material fact and the movant is entitled to judgment as a matter of law. See FED. R. CIV. P. 56(c); Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986); Imaging Bus. Mach., LLC v. BancTec, Inc., 459 F.3d 1186, 1189 (11th Cir. 2006). The moving party bears the burden of meeting this exacting standard. See Adickes v. S.H. Kress Co., 398 U.S. 144, 157 (1970). In applying this standard, the evidence, and all reasonable factual inferences drawn therefrom, must be viewed in the light most favorable to the nonmoving party. See Arrington v. Cobb County, 139 F.3d 865, 871 (11th Cir. 1998); Allen v. Tyson Foods, Inc., 121 F.3d 642, 646 (11th Cir. 1997).

The non-moving party, however, bears the burden of coming forward with evidence of each essential element of their claims, such that a reasonable jury could find in their favor. See Earley v. Champion Int'l Corp., 907 F.2d 1077, 1080 (11th Cir. 1990). The non-moving party "[m]ay not rest upon the mere allegations and denials of [its] pleadings, but [its] response . . . must set forth specific facts showing that there is a genuine issue for trial." FED. R. CIV. P. 56(e). "The mere existence of a scintilla of evidence in support of the [non-movant's] position will be insufficient; there must be evidence on which the jury could reasonably find for the [non-movant]." Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 252 (1986). Further, conclusory, uncorroborated allegations by a plaintiff in an affidavit or deposition will not create an issue of fact for trial sufficient to defeat a well supported summary judgment. See Earley, 907 F.2d at 1081. The failure of proof concerning an essential element of the non-moving party's case necessarily renders all other facts immaterial and requires the court to grant the motion for summary judgment. See Celotex, 477 U.S. at 322.

If the record presents factual issues, a court must not decide them; it must deny the motion and proceed to trial. See Envtl. Def. Fund v. Marsh, 651 F.2d 983, 991 (5th Cir. 1981). If reasonable minds might differ on the inferences arising from undisputed facts, then the court should deny summary judgment. See Impossible Elec. Techniques, Inc. v. Wackenhut Protective Sys., Inc., 669 F.2d 1026, 1031 (5th Cir. 1982); see also Anderson Liberty Lobby, Inc., 477 U.S. 242, 248 (1986) ("[T]he dispute about a material fact is genuine,' . . . if the evidence is such that a reasonable jury could return a verdict for the non-moving party").

III. Discussion

A) Facts

The undisputed material facts of the case can be recited as follows: Defendant is a corporation that is constructing a condominium development in excess of 100 units in Palm Beach County. Because Defendant plans to develop a project in excess of 100 units, it is subject to the Interstate Land Sales Full Disclosure Act ("ILSA"), 15 U.S.C. § 1701 et seq. Defendant complied with the filing requirements with the U.S. Department of Housing and Urban Development ("HUD") and subsequently received a HUD certificate on July 1, 2005, thus demonstrating compliance with the ILSA. On or about August 1, 2005, Plaintiffs-Buyers signed a Contract to purchase Unit 1213 at CityPlace South Tower ("the Unit") for $683,900.00 from Defendant-Seller. Prior to the execution of the Contract, Defendant provided Plaintiffs with the necessary disclosure documents required under the ILSA. On November 6, 2007, Plaintiffs provided written notice to Defendant that they sought to terminate the contract. Plaintiffs demanded return of their deposit money, which totaled $136,780. Defendant failed to respond. Plaintiffs subsequently commenced the current litigation, asserting that they may terminate the Contract because it has a provision precluding them from seeking specific performance, which violates the ILSA.

The parties agreed that there are no material disputed facts. See Joint Pretrial Stipulation (DE 37). The facts recited above primarily are taken from the Joint Pretrial Stipulation, and supplemented by information in the pleadings.

Certain clauses contained in the Contract are particularly relevant to the case at bar. Paragraph 7 of the Contract provides that the Unit will be substantially completed by December 31, 2009. Paragraph 13 of the Contract states, in relevant part, that "If Seller defaults under this Agreement, . . . Buyer will have such rights as may be available under applicable law except that Buyer may not seek specific performance of Seller's obligations." Paragraph 26 of the Contract, "Florida Law: Severability," provides that any disputes arising under the Contract would be settled according to Florida law; and if any part of the Contract violates a provision of applicable law, the applicable law will control, while the rest of the Contract (not in violation) will remain in force.

Subject only to extensions resulting from Force Majeure. See Complaint, Exhibit A, Contract, ¶ 7.

See id. at ¶ 13.

See id. at ¶ 26.

Additionally, the parties acknowledge that under the ILSA, Plaintiffs are entitled to recover attorneys' fees incurred for the two ILSA counts alleged in this litigation should Plaintiffs prevail. The parties also agree that under the Contract, the prevailing party is entitled to reasonable attorneys' fees and costs for litigation pertaining to the Contract.

See id. at ¶ 16 ("In the event of any litigation between the parties under this Agreement, the prevailing party shall be entitled to reasonable attorneys', paralegals' and para-professionals' fees and court costs at all trial and appellate levels").

B) Defendant's Motion for Summary Judgment

Defendant argues that all causes of action in the instant litigation fail as a matter of law because (1) the limitation-of-remedies provision, Paragraph 13 of the Contract, does not constitute a violation of the ILSA because Defendant is not exempt under the ILSA; and (2) even assuming that the provision constitutes a violation of the ILSA, the Contract contains a severability provision, Paragraph 26, which is fully enforceable under Florida Law. See Defendant's Motion for Summary Judgment (DE 29), pp. 2-3.

C) Plaintiffs Motion for Summary Judgment

Conversely, Plaintiffs assert that, as a matter of law, compliance with the HUD filing requirements exempts Defendant from the mandatory two-year completion date, but it cannot exempt Defendant-Seller fromnon-performance by Defendant-Seller at its discretion. Rather, Plaintiffs assert that the ILSA requires that the Contract "obligates" Defendant's performance, and Defendant is not "obligated" to perform if the Contract does not permit specific performance in the event of Defendant's default. Plaintiffs argue that the exclusion of specific performance as a remedy for default "renders the contract illusory, as the obligation of Defendant to complete is non-compliance with [the] ILSA." In support of this proposition, Plaintiffs rely upon Stein v. Paradigm Mirsol, LLC, 551 F.Supp.2d 1323 (M.D. Fla. 2008) and Samara Dev. Corp. v. Marlow, 556 So.2d 1097 (Fla. 1990).

Plaintiffs also cite Infinity Global v. Resort at Singer Island, 2008 WL 1711535 (S.D.Fla. 2008); Rondini v. Evernia Prop., 2008 WL 793512 (S.D. Fla. 2008); and Van Hook v. Residences at Coconut Point, LLC, 2008 WL 2740331 (M.D. Fla. 2008). As in Samara and Stein, the issues presented in Evernia and Van Hook pertained to whether a party-developer was exempt from the ILSA. Infinity Global involved alleged violations of the ILSA by a developer who had allegedly charged too much interest during a cure period. None of the cases provide much helpful guidance for this litigation.

D) Analysis

The ILSA was designed to protect land buyers by requiring that developers disclose material information. Rice v. Branigar Org., 922 F.2d 788, 791 n. 4 (11th Cir. 1991) (citing Flint Ridge Dev. Co. v. Scenic Rivers Ass'n, 426 U. S. 776 (1976)). The Act is an anti-fraud statute utilizing disclosure as its primary tool. Winter v. Hollingsworth Prop., 777 F.2d 1444, 1447 (11th Cir. 1985). Full compliance with the ILSA requires, inter alia, the filing of a "Statement of Record" with the Office of Interstate Land Sales Registration, delivery of a "Property Report" to purchasers, and exposure to liability under the Act's anti-fraud provision. However, the ILSA wholly exempts from its coverage a broad range of transactions and partially exempts from its registration requirements additional categories of transactions. For example, if the seller is obligated under a contract to erect a building within two years, the sale is exempt from the Act. See Winter, 777 F.2d at 1450. But if a contract does not contain a binding obligation to complete a building within two years, compliance with the statute is required. See id.

See 15 U.S.C. § 1704.

See 15 U.S.C. § 1707.

See 15 U.S.C. § 1703(a)(2).

Under Section 1702 of the ILSA, the two year completion exemption applies to "the sale or lease of land under a contract obligating the seller or lessor to erect such a building within a period of two years." 15 U.S.C. § 1702. Much litigation has ensued over the meaning of the word "obligating." Courts have had to determine what contractual language qualifies as an unconditional commitment and what language eviscerates the seller's obligation for purposes of the Section 1702 exemption. That is not the issue here.

Plaintiffs premise their argument on the rule that a real estate contract which limits a buyer's remedies prohibits the underlying transaction from qualifying as exempt under the ILSA. It is wellestablished that, in order for developers to be exempt under the ILSA, they must be "obligated" to complete construction within two years and the purchasers' remedies may not be limited. See, e.g., Winter v. Hollingsworth Prop., 777 F.2d 1444 (11th Cir. 1985); Maguire v. S. Homes of Palm Beach, LLC, 2008 WL 2474657 at *4 (S.D.Fla. 2008); Stein v. Paradigm Mirsol, LLC, 551 F.Supp.2d 1323 (M.D.Fla. 2008); Pugliese v. Pukka Dev., Inc., 524 F.Supp.2d 1370 (S.D.Fla. 2007); SamaraDev. v. Marlow, 556 So.2d 1097 (Fla. 1990); Dorchester Dev., Inc. v. Burk, 439 So.2d 1032 (Fla. 3d DCA 1983). A developer does not have a tangible obligation to complete construction within two years if other provisions of the contract render the apparent obligation illusory. See Maguire, 2008 WL 2474657 at *2. If the obligation is illusory, the contract is subject to the provisions of the ILSA. See Winter, 777 F.2d at 1450; Maguire, 2008 WL 2474657 at *2.

In the case at bar, both parties agree that Defendant is not exempt from the ILSA, and that Defendant has, in fact, complied with the ILSA. Thus, the completion date for construction in the Contract, December 31, 2009, is permissible if that is what the parties desired. Yet Plaintiffs argue that the Default provision of the Contract, which precludes them from seeking specific performance, renders the contract illusory under the ILSA because it releases Defendant from its obligation to construct by a specific date. Plaintiffs misinterpret the ILSA. The Act does not stand for the proposition that purchasers' remedies can never be limited. Rather, the ILSA and relevant case law state that purchasers' remedies cannot be limited if developers claim an exemption under Section 1702 of the Act.

See Joint Pretrial Stipulation (DE 37). In addition to HUD filing requirements, there are disclosures that must be made to purchasers. Specifically, Section 1703(d) requires that the purchaser of a lot "not exempt under section 1702" shall have a two-year right of revocation if the purchase agreement does not include a description of the lot; a provision ensuring that the seller will give the purchaser notice if the purchaser defaults or breaches the agreement, and the opportunity to cure the default or breach; and a provision that gives a defaulting purchaser the right to recoup any amount paid over 15% of the purchase price. There are no allegations that Defendant has violated these provisions.

In fact, courts are concerned about situations inverse to the one presented here. Courts disfavor contracts in which a purchaser's remedy is limited solely to specific performance, as well as contracts that limit a purchaser's right to sue and/or seek special damages. The cases cited by Plaintiffs in their Motion for Summary Judgment are representative of this problem. In Samara Dev. Corp. v. Marlow, 556 So.2d 1097, 1101 (Fla. 1990), the defendant-developer claimed an exemption under Section 1702 of the ILSA and the contract at issue expressly limited the buyer's remedy to return of deposit or an action for specific performance, while excluding the option of a suit for damages. Samara, 556 So.2d at 1101 (emphasis added). The Florida Supreme Court did not, as Plaintiffs suggest, rule that "failure to permit specific performance upon seller's breach as a matter of law renders the contract illusory." Rather, it was a much narrower holding that a contract limiting a buyer's remedies to recovery of deposit or specific performance upon default by a developer was subject to the ILSA. See Samara, 556 So.2d at 1101.

Courts are concerned because, if the seller breaches an agreement and sells the building to a bona fide third party, and the original purchaser is limited solely to a remedy of specific performance, the original purchaser may be left without his or her money, without the building, and without recourse.

See Plainitffs' Motion for Summary Judgment (DE 30), p. 3.

Similarly, in another case cited by Plaintiffs, Stein v. Paradigm Mirsol, 551 F.Supp.2d 1323 (M.D.Fla. 2008), the main issue was whether the defendant was required to comply with the reporting and disclosure requirements of the ILSA. Judge Steele found that defendant must comply because the contract limited the plaintiffs to either (a) specific performance or (b) direct and actual damages, while not allowing the plaintiffs to seek special damages of any kind. See Stein, 551 F.Supp.2d at 1326, 1330-32 (emphasis added).

The facts of Samara and Stein are easily distinguishable from the case at bar. The Contract between Plaintiffs and Defendant expressly excludes Plaintiffs-Purchasers' right to specific performance as a remedy in the event of Defendant-Seller's default, but includes all other "such rights as may be available under applicable law." Thus, with the exception of specific performance, all other remedies under Florida law remain available. Accordingly, since Defendants have complied with the provisions of the ILSA, Plaintiffs claims under the Act fail.

For another example demonstrating the limitation problem, see Dorchester Dev. Inc. v. Burk, 439 So.2d 1032 (Fla. 3d DCA 1983) (holding that the developer was not exempt from the ILSA where the purchaser expressly was limited to the choice of extending the date of closing or cancelling the agreement if the two-year completion deadline was not met).

See Complaint, Exhibit A, the Agreement, ¶ 7.

The analysis does not end with the ILSA evaluation, however. The Court also must examine whether it is true, as Plaintiffs' claim, that the default provision denying them specific performance renders the entire Contract illusory and otherwise unenforceable, regardless of Defendant's compliance with the ILSA. Defendant contends that the provision is lawful and, even if it is not, the severability clause preserves the rest of the Contract.

Under Florida contract law, parties enjoy the freedom to limit their respective remedies. Nevertheless, a contract must be reasonable and must provide a mutuality of obligation in order to be considered enforceable. See Maguire, 2008 WL 2474657 at *4; see Jay Vee Realty Corp. v. Jaymar Acres Inc., 436 So.2d 1053 (Fla. 4th DCA 1983); Indian River Colony Club, Inc. v. Schopke Constr. Eng'g. Inc., 592 So.2d 1185 (Fla. 5th DCA 1992). Generally, where the parties to a contract have agreed upon a remedy in the event of a breach, their agreement will control, provided the remedy is "mutual, unequivocal and reasonable." See Seaside Cmty. Dev. Corp. v. Edwards, 573 So.2d 142, 147 (Fla. 1st DCA 1991) (quoting Hatcher v. Panama City Nursing Ctr., 461 So.2d 288, 290 (Fla. 1st DCA 1985). Nevertheless, the remedies provided by the parties are susceptible to scrutiny by the courts, to determine whether they are, in fact, mutual and reasonable. Seaside Cmty. Dev. Corp., 573 So.2d at 147; see Ocean Dunes of Hutchinson v. Colangelo, 463 So.2d 437, 440 (Fla. 4th DCA 1985). Although the parties can stipulate to different kinds of remedies, "both parties must have genuine, not illusory, obligations. Ocean Dunes, 463 So.2d at 440.

The Court finds that the agreed-upon remedies in the Contract between Plaintiffs and Defendant are fair and reasonable. The Court finds no authority the proposition that Plaintiffs' inability to exercise specific performance effectively voids the Contract, or, for that matter, justifies the harsh remedy of rescission. In fact, Florida courts allow parties to a contract to limit the remedies available in the event of breach. See Weaver v. Opera Tower, LLC, 2008 WL 4145520 (S.D.Fla. 2008); Amoco Oil Co. v. Gomez, 125 F.Supp.2d 492 (S.D.Fla. 2000); Blue Paper, Inc. v. Provost, 914 So.2d 1048, 1052 (Fla. 4th DCA 2005); Ocean Dunes of Hutchinson Island Dev. Corp. v. Colangelo, 463 So.2d 437, 440 (Fla. 4th DCA 1985) ("`[S]auce for the goose is sauce for the gander.' The parties can stipulate to different kinds of'sauces,' but both parties must have genuine, not illusory, obligations").

In the case at bar, the Contract between Plaintiffs and Defendant constitutes an agreement on the part of the Defendant-Developer to convey, and on the part of the Plaintiffs-Purchasers to pay for Unit 1213 at CityPlace South Tower. It is an enforceable and binding contract, supported by valid consideration. See Ocean Dunes, 463 So.2d at 437-40. Defendant cannot breach at will; it must complete construction by December 31, 2009, subject only to extensions resulting from force majeure. In the event of a default by Defendant, Plaintiffs have all remedies available under Florida law except for specific performance. If Plaintiffs default, Defendant can resell the Unit and keep money for liquidated damages, but Defendant will return any amount greater than 15% of the Purchase Price that Plaintiffs have paid.

See Complaint, Exhibit A, Contract, ¶ 7. Force majeure clauses are lawful in Florida. See Harvey v. Lake Buena Vista Resort, LLC, 568 F.Supp.2d 1354 (M.D.Fla. 2008).

See Complaint, Exhibit A, Contract, ¶ 13.

See id.

The contract flaw alleged in Plaintiffs' Complaint is not a true flaw and does not violate the ILSA. Plaintiffs' other claims also fail as a matter of law. Under Florida law, to succeed on a breach of contract claim, the plaintiff must establish (1) the existence of a valid contract; (2) a material breach of the contract; and (3) damages. Rondini v. Evernia Prop., 2008 WL 793512 at *3 (S.D.Fla. 2008); see Brooks Tropicals, Inc. v. Acosta, 959 So.2d 288, 292 (Fla. 3d DCA 2007). For the reasons noted above, there is no breach of contract in the instant litigation. Moreover, rescission ordinarily is granted only for "fraud, accident or mistake and not because of the mere want or failure of consideration." Weaver v. Opera Tower, LLC, 2008 WL 4145520 (S.D.Fla. 2008) (quoting Webbv. Kirkland, 899 So.2d 344, 346 (Fla. 2nd DCA 2005). There are no allegations of fraud, accident, or mistake in this case.

IV. Conclusion

Having carefully reviewed the record and considered the parties' arguments, the Court finds that Defendant is entitled to judgment as a matter of law.

Accordingly, it is hereby

ORDERED AND ADJUDGED that Defendant's Motion for Summary Judgment (DE 29) is GRANTED and Plaintiffs' Motion for Summary Judgment (DE 30) is DENIED.

Pursuant to the Contract, the parties agreed that the prevailing party is entitled to reasonable attorneys' fees and costs for litigation pertaining to the Contract. Therefore, it is further ORDERED AND ADJUDGED that Defendant shall submit its request for attorneys' fees and costs along with a memorandum of law supporting its entitlement to the relief by 5:00 p.m. on November 3, 2008.

See Complaint, Exhibit A, Contract, at ¶ 16.

This case has been removed from the Trial Calendar. Parties no longer are required to appear on Wednesday, October 22, 2008.

DONE AND ORDERED.