ANASTASIA GRIFFITH, ALAN WEISSMAN, MATTHEW D. WOLF, Plaintiff, v. STEINER WILLIAMSBURG, LLC, Defendant.

ORDER GRANTING RESPONDENT'S MOTION AND REQUIRING PETITIONER TO MAKE ELECTION REGARDING UNEXHAUSTED CLAIMS

SUSAN ILLSTON, District Judge INTRODUCTION

This pro se prisoner's action for a writ of habeas corpus pursuant to 28 U.S.C. § 2254 is before the court for consideration of a second exhaustion problem. Several months ago, the court reviewed the petition and ordered Givens to file an amended petition correcting several deficiencies in the original petition and to address an exhaustion problem for Claims 1, 4, and 5. See Order On Initial Review, pp. 2-5. Givens then filed a motion for a stay, a second request for appointment of counsel, and an amended petition. The court denied the motion for a stay, dismissed Claims 1, 4, and 5, and ordered respondent to show cause why the writ should not be granted as to Claims 2, 3, and 6 in the amended petition. See Order To Show Cause And Denying Requested Stay, pp. 2-5.

Respondent then filed a motion to dismiss the amended petition because state court remedies had not been exhausted as to most of the three remaining claims. For the reasons discussed below, the motion to dismiss will be granted in part, and Givens will be required to choose how to deal with the exhaustion problem. The court also will deny Givens' "motion for aquittal (sic) and release from custody," as well as his "motion to grant writ of habeas corpus and motion to dismiss petitioner's indictment."

The failure to exhaust state court remedies for these claims was not noted in the Order On Initial Review because, at the time of that order, the court did not have before it the petition for review. The court's Order On Initial Review addressed the exhaustion problem that petitioner had admitted in his original petition. This order addresses a different exhaustion problem — one that can only be ascertained by comparing the amended petition filed in this court with the petition for review filed in the California Supreme Court.

BACKGROUND

Givens was convicted in Alameda County Superior Court of first degree murder with a drive-by shooting special circumstance, attempted premeditated murder, shooting at an inhabited dwelling, and possession of a firearm by a felon. Sentence enhancement allegations were found true. In 2006, he was sentenced to life without the possibility of parole plus 25 years to life in prison. He also was sentenced to a 7-year upper term for discharging a firearm. He appealed. The California Court of Appeal affirmed the conviction, but found an error in the 7-year upper term sentence and directed the trail court to correct it. Givens' petition for review was denied by the California Supreme Court in 2008. Givens did not file any state habeas petitions before filing this action.

In his petition for review to the California Supreme Court, Givens presented two claims. First, he claimed that his attorney provided ineffective assistance in that he failed to object to evidence that the scene of the crimes was a known high-crime and drug-dealing area. Resp. Ex. B (Petition For Review), pp. 26-27. Second, he claimed that the prosecutor engaged in misconduct in the closing argument by (a) arguing that Givens did not have the support of his mother and grandmother, and (b) vouching for sergeant Longmire's credibility. Id. at 11-12, 16-17.

The Petition For A Writ Of Habeas Corpus Amendment (docket # 12) (hereinafter, the "amended petition") has three cognizable claims: an ineffective assistance of counsel claim with several subparts (Claim 2), a prosecutorial misconduct claim with several subparts (Claim 3), and a claim that the 7-year upper-term sentence for shooting at an inhabited dwelling was imposed without the necessary findings having been found by a jury to be true beyond a reasonable doubt was improper under the rule from Apprendi v. New Jersey, 530 U.S. 466, 488-90 (2000), and Cunningham v. California, 549 U.S. 270 (2007) (Claim 6).

DISCUSSION A. Respondent's Motion To Dismiss

Prisoners in state custody who wish to challenge collaterally in federal habeas proceedings either the fact or length of their confinement are required first to exhaust state judicial remedies, either on direct appeal or through collateral proceedings, by presenting the highest state court available with a fair opportunity to rule on the merits of each and every claim they seek to raise in federal court. See 28 U.S.C. § 2254(b), (c).

The court has compared the petition for review in the California Supreme Court with the amended petition to determine whether all the claims in the latter were included in the former. They were not. Givens presented an ineffective assistance of counsel ("IAC") claim to the California Supreme Court, but it was not the same as any of the subparts of the IAC claim in his amended petition. The IAC claim is unexhausted. Givens presented to the California Supreme Court only part of his prosecutorial misconduct claim, i.e., that the closing argument improperly urged that Givens did not have the support of his mother and grandmother and vouched for sergeant Longmire's credibility. The other subparts of the prosecutorial misconduct claim are unexhausted. Finally, Givens did not present to the California Supreme Court his argument that the sentence violated the Apprendi/Cunningham rule. That claim is unexhausted. To summarize: state court remedies have not been exhausted for any part of the IAC claim, or for most of the prosecutorial misconduct claim (except the challenges to the closing argument), or for the sentencing claim.

In Claim 2 in the amended petition, Givens contended that counsel was ineffective in that he: (a) failed to conduct any investigation of possible defense witnesses (including Sonya Lavender) and others who allegedly provided statements to police; (b) failed to call Givens' girlfriend as an alibi witness; (c) failed to call Givens' mother and grandmother as witnesses; (d) failed to object to the prosecutor's presentation of the firearm that was irrelevant; (e) failed to properly follow the proceedings; and (f) had personal problems and lacked experience.

In Claim 3 in the amended petition, Givens contended the prosecutor engaged in misconduct in that he subpoenaed Givens' mother and grandmother without intending to call them as witnesses; argued that Givens did not have the support of his mother and grandmother (i.e., an exhausted subpart); vouched for sergeant Longmire's credibility (i.e., an exhausted subpart); produced a false witness; introduced a firearm at trail that was not used to commit these crimes; and introduced unauthenticated tapes.

As respondent notes, the claim that the sentence imposed violated the Apprendi/Cunningham rule now appears to be a moot point. Petitioner's challenge to the sentence he received on the conviction for shooting at an inhabited dwelling succeeded on direct appeal. The California Court of Appeal vacated the upper term sentence with instructions to hold a resentencing hearing or modify the sentence to the middle term.
This court observes that the claim appears to be moot (rather than determines that it is moot) because the record before this court does not show whether there was a resentencing/modification as the court of appeal ordered. If the sentencing problem has been resolved, respondent should file an abstract of judgment to so show at the time he files his answer.

Givens' amended petition contains both exhausted and unexhausted claims and therefore is what is referred to as a "mixed" petition. See Rhines v. Weber, 544 U.S. 269, 277 (2005). The court cannot adjudicate the merits of a habeas petition containing any claim as to which state remedies have not been exhausted, such as a mixed petition. See Rose v. Lundy, 455 U.S. 509, 522 (1982); cf. 28 U.S.C. § 2254(b)(2) (petition may be denied (but not granted) notwithstanding failure to exhaust).

Due to a critical one-year statute of limitations on the filing of federal habeas petitions under the Antiterrorism and Effective Death Penalty Act of 1996 ("AEDPA"), see 28 U.S.C. § 2244(d), the court is reluctant to dismiss the mixed amended petition (and possibly cause a later-filed petition to be time-barred) without giving Givens the opportunity to elect whether to proceed with just his exhausted claims, or to try to exhaust the unexhausted claims before having this court consider all his claims. Accordingly, instead of an outright dismissal of the action, the court will allow Givens to choose whether he wants to —

(1) dismiss the unexhausted claims and go forward in this action with only the exhausted claims, or
(2) dismiss this action and return to state court to exhaust all claims before filing a new federal petition presenting all of his claims, or
(3) file a motion for a stay of these proceedings while he exhausts his unexhausted claims in the California Supreme Court.

Givens is cautioned that the options have risks which he should take into account in deciding which option to choose. If he chooses option (1) and goes forward with only his exhausted claims, he may face dismissal of any later-filed petition. See 28 U.S.C. § 2244(b). If he chooses option (2), dismissing this action and returning to state court to exhaust all claims before filing a new federal petition, his new federal petition might be rejected as time-barred. See 28 U.S.C. § 2244(d). If he chooses option (3), he must file a motion in this court to obtain a stay and (if the motion is granted) then must act diligently to file in the California Supreme Court, to obtain a decision from the California Supreme Court on his unexhausted claims, and to return to this court. And under option (3), this action stalls: this court will do nothing further to resolve the case while petitioner is diligently seeking relief in state court.

In Rhines, the U.S. Supreme Court discussed the stay-and-abeyance procedure for mixed habeas petitions. The Court cautioned district courts against being too liberal in allowing a stay because a stay works against several of the purposes of the AEDPA in that it "frustrates AEDPA's objective of encouraging finality by allowing a petitioner to delay the resolution of the federal proceeding" and "undermines AEDPA's goal of streamlining federal habeas proceedings by decreasing a petitioner's incentive to exhaust all his claims in state court prior to filing his federal petition." Rhines, 544 U.S. at 277. A stay and abeyance "is only appropriate when the district court determines there was good cause for the petitioner's failure to exhaust his claims first in state court," the claims are not meritless, and there are no intentionally dilatory litigation tactics by the petitioner. Id. at 277-78. Any stay must be limited in time to avoid indefinite delay. Id. Reasonable time limits would be 30 days to get to state court, as long as necessary in state court, and 30 days to get back to federal court after the final rejection of the claims by the state court. See id. at 278; Kelly v. Small, 315 F.3d at 1071.

As discussed in an earlier order, there is an alternate stay procedure for a petitioner who has some unexhausted claims he wants to present in his federal habeas action. See Order To Show Cause And Denying Requested Stay, pp. 3-4 (discussing Kelly v. Small, 315 F.3d 1063 (9th Cir. 2003), and King v. Ryan, 564 F.3d 1133, 1134 (9th Cir. 2009)). That alternate procedure would not aid Givens here, however, because the currently unexhausted claims do not share a common core of operative facts with the only exhausted claim contained in the amended petition and therefore would not relate back once exhausted. Without relation back, the currently unexhausted claims would be time-barred if he later tried to add them back because this action was filed on or about the last day of the one-year statute of limitations period, 28 U.S.C. § 2244(d).

B. Givens' Motions

Givens filed a "motion to grant writ of habeas corpus and motion to dismiss petitioner's indictment," in which he asserted that the writ should be granted because he was in custody in violation of his constitutional rights. He also filed a motion for acquittal and release from custody, in which he argued that his trial was unfair and the should therefore be released. The motions are DENIED.

When a state prisoner wants to challenge the fact or duration of his imprisonment and seek his release, "his sole federal remedy is a writ of habeas corpus." Preiser v. Rodriguez, 411 U.S. 475, 500 (1973). Givens' amended petition for writ of habeas corpus sets forth the claims which he believes entitle him to a federal writ of habeas corpus. His motions do not advance his cause. He cannot obtain relief in federal court by filing miscellaneous motions that raise the same claims as those in the amended petition. Nor can he circumvent the various rules that apply to petitions and amended petitions by asserting in a motion legal claims that are different from those in the amended petition. His amended habeas petition will be decided in due course, but not until the exhaustion problem discussed in this order are addressed.

CONCLUSION

For the foregoing reasons, respondent's motion to dismiss (docket # 14) is GRANTED, petitioner's "motion to grant writ of habeas corpus and motion to dismiss petitioner's indictment" (docket # 15) is DENIED, and petitioner's "motion for aquittal (sic) and release from custody" (docket # 16) is DENIED.

Petitioner must file no later than January 14, 2011, a notice in which he states whether he elects to (1) dismiss the unexhausted claims and go forward in this action with only the remaining claims, or (2) dismiss this action and return to state court to exhaust all of his claims before returning to federal court to present all of his claims in a new petition, or (3) moves for a stay of these proceedings while he exhausts his state court remedies for the unexhausted claims. If he chooses Option (1) or Option (2), his filing need not be a long document; it is sufficient if he files a one-page document entitled "Election By Petitioner" and states simply: "Petitioner elects to proceed under option ___ provided in the court's Order On Initial Review." Petitioner would have to insert a number in place of the blank space to indicate which of the first two options he chooses. If he chooses Option (3), no later than January 14, 2011, petitioner must file a motion for a stay in which he explains why he failed to exhaust his unexhausted claims in state court before presenting them to this court, that his claims are not meritless, and that he is not intentionally delaying resolution of his constitutional claims. If petitioner does not choose one of the three options or file a motion by the deadline, the court will dismiss the unexhausted claims.

IT IS SO ORDERED.

DATED: December 3, 2010

Co. v. Scenic Rivers Ass'n, 426 U.S. 776, 778, 96 S.ct. 2430, 2433 (1976).

See also, e.g., Long v. Merrifield Town Ctr. Ltd. P'ship, 611 F.3d 240, 244 (4th Cir. 2010) (ILSA "is a remedial statute enacted to prevent interstate land fraud and to protect unsuspecting and ill-informed investors from buying undesirable land."); Winter v. Hollingsworth Props., Inc., 777 F.2d 1444, 1447 (11th Cir. 1985) ("It is not disputed that Congress, in passing the statute, desired to protect purchasers from unscrupulous sales of undeveloped home sites, frequently involving out-of-state sales of land purportedly suitable for development but actually under water or useful only for grazing.").

ILSA applies to "subdivision[s]," defined as "any land which is located in any State . . . and is divided or is proposed to be divided into lots, whether contiguous or not, for the purpose of sale or lease as part of a common promotional plan." 15 U.S.C. § 1701(3). "While the ILSA's text refers to the sale of `lots,' . . . its protections apply to the sale of condominiums as well." Cruz v. Leviev Fulton Club, LLC, 711 F. Supp. 2d 329, 331 (S.D.N.Y. 2010) (citing cases); see also, e.g., Winter v. Hollingsworth Props., Inc., 777 F.2d at 1448 n. 10 (applying ILSA to condominiums "is a reasonable interpretation of Congress' original intent in enacting the statute and the only defensible interpretation. . . .") (citing cases);Bacolitsas v. 86th 3rd Owner, LLC,

"[C]ommon promotional plan" is defined as

a plan, undertaken by a single developer or a group of developers acting in concert, to offer lots for sale or lease; where such land is offered for sale by such a developer or group of developers acting in concert, and such land is contiguous or is known, designated, or advertised as a common unit or by a common name, such land shall be presumed, without regard to the number of lots covered by each individual offering, as being offered for sale or lease as part of a common promotional plan.
15 U.S.C. § 1701(4).

09 Civ. 7158, 2010 WL 3734088 at *4 (S.D.N.Y. Sept. 21, 2010) ("Though the text of ILSA employs the term `lots' throughout, . . . the statute also governs condominium units.");An v. Leviev Fulton Club, LLC, 09 Civ. 1937, 09 Civ. 3537, 09 Civ. 4706, 2010 WL 3291402 at *1 (S.D.N.Y. Aug. 10, 2010);Bodansky v. Fifth on the Park Condo, LLC, 09 Civ. 4651, 09 Civ. 6433, 2010 WL 334985 at *9 n. 6 (S.D.N.Y. Jan. 29, 2010); Grove Towers, Inc. v. Lopez, 467 So. 2d 358, 360 n. 3 (Fla. Dist. Ct. App.) ("This court, following the lead of other courts, has applied ILSA to sales of condominium units.") (citing cases),appeal denied, 480 So. 2d 1294 (1985).

Unless exempt, a developer must comply with ILSA's registration and disclosure provisions prior to any sale:

It shall be unlawful for any developer or agent, directly or indirectly, to make use of any means or instruments of transportation or communication in interstate commerce, or of the mails —
(1) with respect to the sale or lease of any lot not exempt under section 1702 of this title —
(A) to sell or lease any lot unless a statement of record with respect to such lot is in effect . . .;
(B) to sell or lease any lot unless a printed property report . . . has been furnished to the purchaser or lessee in advance of the signing of any contract or agreement by such purchaser or lessee.
15 U.S.C. § 1703(a)(1)(A)-(B). A "property report" is prepared by the developer and contains "a condensed version of the statement of record filed with HUD," including a legal description of the property, information about the title to the land, and other required disclosures. Bodansky v. Fifth on the Park Condo, LLC, 2010 WL 334985 at *3; see 15 U.S.C. §§ 1705(1)-(12), 1707(a).

If the developer fails to deliver the required property report before the purchaser signs the purchase agreement, the sale "may be revoked at the option of the purchaser . . . within two years from the date of such signing," and the purchaser is entitled to a refund of all monies paid by the purchaser under the contract. 15 U.S.C. § 1703(c), (e). The language of the purchase agreement must include the purchaser's revocation right. 15 U.S.C. § 1703(c).

ILSA also provides that a purchaser "may bring an action at law or in equity" to enforce this right of revocation. 15 U.S.C. § 1709(b).

There are two types of ILSA exemptions: (1) full exemptions, listed in 15 U.S.C. § 1702(a), which relieve a developer from all of ILSA's provisions; and (2) partial exemptions, listed in 15 U.S.C. § 1702(b), which relieve a developer of ILSA's registration and disclosure requirements, but not its anti-fraud provisions.

In the present case, Steiner asserts that the Condominium was exempt from ILSA's registration and disclosure requirements based on the 100 lot exemption in 15 U.S.C. § 1702(b)(1). (See Dkt. No. 20: Steiner Br. at 2, 4, 7-8, 10-11; Dkt. No. 23: Steiner Reply Br. at 2-3.) Section 1702(b)(1) provides that:

Unless the method of disposition is adopted for the purpose of evasion of this chapter, the provisions requiring registration and disclosure . . . shall not apply to —
(1) the sale or lease of lots in a subdivision containing fewer than one hundred lots which are not exempt under subsection (a) of this section.
15 U.S.C. § 1702(b)(1). Since the Condominium contained 123 units (see page 2 above), this exemption would apply only if at least 24 units were exempt under 15 U.S.C. § 1702(a). For this, Steiner relies on the improved lot exemption:
Unless the method of disposition is adopted for the purpose of evasion of this chapter, the provisions of this chapter shall not apply to —
. . . .
(2) the sale or lease of any improved land on which there is a residential, commercial, condominium, or industrial building. . . .
15 U.S.C. § 1702(a)(2). Steiner argues that because it did not sell ninety-nine units before obtaining a temporary certificate of occupancy for all the units, and because all the unsold units now qualify for the improved lot exemption, the 100 lot exemption applies. (Steiner Br. at 2-3, 7-8, 11; Steiner Reply Br. at 2-3.)

While ILSA allows a developer to "stack" exemptions, see 15 U.S.C. § 1702(a)-(b), plaintiffs contend that Steiner's "compliance with ILSA is measured at the time that the plaintiff signed the contract, not at some later date." (Dkt. No. 17: Pls. Br. at 10.) Plaintiffs argue that Steiner should not be allowed to sell lots without complying with ILSA only "to come into compliance at some later date by creating an exemption for future sales of units that, at the time of the Purchase Agreement, fell within the common promotional plan." (Pls. Br. at 11.)

This case boils down to a question of law, i.e., of statutory construction: is the availability of the 100 lot exemption determined at the time the purchaser signed the purchase agreement, or can the developer rely on the exemption until the 100th non-exempt lot is sold?

Most courts that have faced this issue have ruled that the availability of the 100 lot exemption is determined when the purchaser signs the purchase agreement. E.g., First Global Corp. v. Mansiana Ocean Residences, LLC, No. 09-21092-Civ., 2010 WL 2163756 at *4 (S.D. Fla. May 27, 2010) ("For purposes of the 100-lot exemption, the relevant number is the number of units communicated by the developer to the buyer and the purchasing public" and the developer was not entitled to the 100 lot exemption because, "at the time that [the purchaser] contracted to purchase its unit, the only information communicated to [the purchaser], and to the public at-large, was that the [condominium] would consist of 135 units.");Rensin v. Juno-Loudon, LLC, No. 09cv1391, 2010 WL 1381546 at *7 (E.D. Va. Mar. 30, 2010) ("When determining whether or not the subdivision is one `containing fewer than one hundred units,' the number of nonexempt lots in the subdivision should be determined contemporaneously with when the purchaser enters into the purchase agreement for the lot in the subdivision.");Nahigian v. Juno-Loudon, LLC, No. 09cv725, 2010 WL 1381637 at *7 (E.D. Va. Mar. 30, 2010) (same); 200 East Partners, LLC. v.Gold, 997 So. 2d 466, 469 (Fla. Dist. Ct. App. 2008) ("This court finds that because [the developer] failed to perfect an exemption for all units of the 115 lot project prior to the [purchasers] executing their purchase and sale agreement, [the developer] violated ILSA by failing to provide the [purchasers] with a printed property report."); Grove Towers, Inc. v. Lopez, 467 So. 2d at 361 (Developer was not entitled to the 100 lot exemption since "[a]t the time [purchasers] signed the purchase and sale agreement . . ., they were given condominium documents (disclosure statement and declaration of condominium, among others) which stated that [the] Condominium would consist of a total of 108 units.") (fn. omitted).

Two district courts in this Circuit, however, have ruled that a developer is entitled to the 100 lot exemption as long as no more than 99 non-exempt lots are sold. Bodansky v. Fifth on the Park Condo, LLC, 2010 WL 334985 at *4 ("Thus, the Hundred Lot Exemption can still apply to a subdivision containing one hundred or more lots as long as all lots sold above the ninety-nine non-exempt lots maximum will be covered by a § 1702(a) exemption."); Romero v. Borden E. River Realty LLC, No. 09-CV-665, Mar. 16, 2010 N.Y. L.J. 25 col. 3 (E.D.N.Y. Mar. 11, 2010) (following Bodansky). B. The Availability of the 100 Lot Exemption is Determined at the Time the Purchaser Signs the Purchase Agreement

Bodansky and Romero are currently on appeal to the Second Circuit.

"`Statutory interpretation always begins with the plain language of the statute,' which [the court] consider[s] in `the specific context in which that language is used, and the broader context of the statute as a whole.'" ASM Capital, LP v. Ames Dep't Stores, Inc. (In re Ames Dep't Stores, Inc.), 582 F.3d 422, 427 (2d Cir. 2009) (citations omitted), cert. denied, 130 S.ct. 1527 (2010); see, e.g., In re Application of N.Y. Times Co. to Unseal Wiretap Search Warrant Materials, 577 F.3d 401, 406 (2d Cir. 2009) (In construing statutes, a court should "examine the text of the statute itself, interpreting provisions in light of their ordinary meaning and their contextual setting."). "`To ascertain Congress's intent, we begin with the statutory text because if its language is unambiguous, no further inquiry is necessary.'" Clark v. Astrue, 602 F.3d 140, 147 (2d Cir. 2010);see also, e.g., Dobrova v. Holder, 607 F.3d 297, 301 (2d Cir. 2010) ("`[S]tatutory analysis necessarily begins with the plain meaning of a law's text and, absent ambiguity, will generally end there.'") (citations omitted); United States v. Hasan, 586 F.3d 161, 167 (2d Cir. 2009) ("`Where the statute's language is plain, the sole function of the courts is to enforce it according to its terms.'"), cert. denied, 131 S.ct. 317 (2010); Life Receivables Trust v. Syndicate 102 at Lloyd's of London, 549 F.3d 210, 216 (2d Cir. 2008) ("`When a statute's language is clear, our only role is to enforce that language `according to its terms.''").

The Court must "interpret a statute as it is, not as it might be, since `courts must presume that a legislature says in a statute what it means and means in a statute what it says. . . .'" Life Receivables Trust v. Syndicate 102 at Lloyd's of London, 549 F.3d at 216 (quotingConn. Nat'l Bank v. Germain, 503 U.S. 249, 253-54, 112 S.ct. 1146, 1149 (1992));see, e.g., Arlington Cent. Sch. Dist. Bd. of Educ. v. Murphy, 548 U.S. 291, 296, 126 S.ct. 2455, 2459 (2006) ("When the statutory `language is plain, the sole function of the courts — at least where the disposition required by the text is not absurd — is to enforce it according to its terms.'"). "A statute's clear language does not morph into something more just because courts think it makes sense for it to do so." Life Receivables Trust v. Syndicate 102 at Lloyd's of London, 549 F.3d at 217.

"The disclosure requirements of the Land Sales Act [i.e., ILSA] are designed to prevent fraud in interstate land transactions, and the Act should be liberally construed in favor of broad coverage to effectuate its remedial purpose." De Luz Ranchos Inv., Ltd. v. Coldwell Banker Co., 608 F.2d 1297, 1302 (9th Cir. 1979). ILSA's exemptions, on the other hand, should be narrowly construed. See, e.g., Long v. Merrifield Town Ctr. Ltd. P'ship, 611 F.3d 240, 245 (4th Cir. 2010) ("Because [ILSA] is a remedial statute, however, we construe its exemptions narrowly."); Olsen v. Lake Country, Inc., 955 F.2d 203, 206 (4th Cir. 1991) (As a remedial statute, ILSA's exemptions "are to be construed narrowly"), cert. denied, 503 U.S. 972, 112 S.ct. 1587 (1992);Markowitz v. Ne. Land Co., 906 F.2d 100, 105 (3d Cir. 1990) ("[T]he general rule of statutory construction [is] that exemptions from remedial statutes such as [ILSA] are to be narrowly construed."); An v. Leviev Fulton Club, LLC, 09 Civ. 1937, 09 Civ. 3537, 09 Civ. 4706, 2010 WL 3291402 at *1 (S.D.N.Y. Aug. 10, 2010) ("As such, condominium sales are within the scope of the statute and the protections of [ILSA] are to be construed broadly, while the exemptions are to be construed narrowly.").

See, e.g., Dalzell v. Trailhead Lodge at Wildhorse Meadows, LLC, No. 09-cv-02614, 2010 WL 3843464 at *2 (D. Colo. Sept. 27, 2010) ("In light of its remedial objectives, ILSA must be construed in favor of broad coverage."); cf., e.g., Tcherepnin v.Knight, 389 U.S. 332, 336, 88 S.ct. 548, 553 (1967) ("In addition, we are guided by the familiar canon of statutory construction that remedial legislation should be construed broadly to effectuate its purposes.").

The plain language of the 100 lot exemption states that ILSA's registration and disclosure requirements do not apply to the "sale or lease of lots in a subdivision containing fewer than one hundred lots which are not exempt under subsection (a) of this section." 15 U.S.C. § 1702(b)(1) (emphasis added). "For the purposes of [ILSA] the `sale' takes place at the time the purchaser signs the contract and incurs an obligation." Winter v.Hollingsworth Props., Inc., 777 F.2d 1444, 1449 (11th Cir. 1985);see also, e.g., Markowitz v. Ne. Land Co., 906 F.2d at 104 ("We agree with the other circuits that have examined the issue that for purposes of the Act the sale occurs when the purchaser signs the sale agreement and incurs an obligation.").

It is a well settled rule of statutory construction that "Congress' use of a verb tense is significant in construing statutes." United States v. Wilson, 503 U.S. 329, 333, 112 S.ct. 1351, 1354 (1992). Consequently, because the 100 lot exemption was drafted in the present tense, it should apply only to subdivisions that, at the time the purchaser signs the contract, contain less than 100 lots that currently are exempt under 15 U.S.C. § 1702(a), not subdivisions that will, at some time in the future, fit the parameters of the exemption. See Rensin v. Juno-Loudon, LLC, No. 09cv1391, 2010 WL 1381546 at *5 (E.D. Va. Mar. 30, 2010) ("The statute is drafted in the present tense. A Development will be exempt from [ILSA]'s disclosure and reporting requirements if it is a `subdivision containing' fewer than one hundred lots which are currently exempt under § 1702 subsection (a).").

Accord, e.g., Dobrova v. Holder, 607 F.3d at 301; Barscz v.Dir., Office of Workers' Comp. Programs, 486 F.3d 744, 750 (2d Cir. 2007).

Determining the availability of the exemption at the time of the sale is consistent with ILSA's purposes. "Congress designed [ILSA] to protect purchasers of land and to prohibit fraud in land sales by requiring sellers of land, inter alia, to make certain disclosures in advance of a purchaser's signing the sales contract." Ahn v. Merrifield Town Ctr. Ltd. P'ship, 584 F. Supp. 2d 848, 853 (E.D. Va. 2008); see, e.g., Long v. Merrifield Town Ctr. Ltd. P'ship, 611 F.3d at 245 ("These [ILSA] disclosure requirements are designed to protect purchasers by ensuring that `prior to purchasing certain types of real estate, a buyer [is] apprised of the information needed to insure an informed decision.'"); Markowitz v. Ne. Land Co., 906 F.2d at 103 ("`[T]he Interstate Land Sales Full Disclosure Act, . . . as its title suggests, was enacted to insure that, prior to purchasing certain types of real estate, a buyer would be apprised of the information needed to insure an informed decision.'"); Grove Towers, Inc. v. Lopez, 467 So. 2d 358, 361 (Fla. Dist. Ct. App.) ("Since the purpose of the act is to protect purchasers against fraudulent land sales schemes, it is only reasonable that the statute require full disclosure before the purchasers sign a contract.") (citation fn. omitted), appeal denied, 480 So. 2d 1294 (1985).

To achieve its purpose, ILSA's registration and disclosure provisions impose duties that a developer must comply with before the purchaser signs the purchase agreement: The developer must file a "statement of record" with HUD ( 15 U.S.C. §§ 1703(a)(1)(A), 1704-06), must furnish a printed "property report" to the purchaser ( 15 U.S.C. §§ 1703(a)(1)(B), 1707), and may not advertise or promote the property to prospective purchasers with information that is inconsistent with the information in the property report ( 15 U.S.C. § 1703(a)(1)(D)). "All of these strictures are imposed prior to the sale of any lot to purchaser and are designed to provide purchaser with the critical information necessary to his decision to enter into a purchase agreement." Rensin v. Juno-Loudon, LLC, 2010 WL 1381546 at *6.

Additionally, ILSA requires that the purchase agreement itself must notify a purchaser of his rights under ILSA. For example, the purchase agreement must "clearly" state that if the developer fails to timely provide the purchaser with the required property report, the purchaser has the right to revoke the agreement within two years of signing the agreement. See 15 U.S.C. § 1703(c); see also 15 U.S.C. § 1703(b), (d)(1)-(3) (providing other information about revocation rights that must be contained in the purchase agreement).

Thus, ILSA's registration and disclosure provisions make clear that Congress was trying to protect the purchaser at the time of the sale by providing the purchaser with the facts and rights necessary to make an informed decision before incurring obligations under the purchase agreement. See, e.g., Rensin v.Juno-Loudon, LLC, 2010 WL 1381546 at *7 ("Congress designed [ILSA]'s disclosure and reporting requirements, and the right of a potential purchaser to be made aware of these disclosures and their rights of revocation, to take effect prior to and at the time of the signing of a purchase agreement."); Ahn v.Merrifield Town Ctr. Ltd. P'ship, 584 F. Supp. 2d at 854-55 (ILSA's disclosure provisions "reflect Congress's recognition that the need for buyer protection is critical prior to the time the buyer makes the decision to sign and incur obligations. . . ."); Grove Towers, Inc. v.Lopez, 467 So. 2d at 361 ("[I]t is clear that, unless exempt . . ., [developer] was obligated to comply with ILSA's registration and disclosure requirements before [purchaser] signed the purchase and sale agreement.").

Moreover, the availability of the improved lot and "two year" exemptions under 15 U.S.C. § 1702(a)(2) are determined at the time the purchaser signs the purchase agreement. See, e.g.,Winter v. Hollingsworth Props., Inc., 777 F.2d at 1450 ("If at the time the purchaser signs the contract there exists a condominium building or the seller is obligated to erect such a building within two years, the sale is exempt from the Act. If, as in this case, no building exists at the time of contracting and the contract does not contain a binding obligation to complete one within two years, compliance with the statute is required."); see also, e.g., Long v. Merrifield Town Ctr. Ltd. P'ship, 611 F.3d at 242, 245-46 ("We hold that to qualify for the Improved Lot Exemption under § 1702(a)(2) . . . the sales contract must obligate the seller to build and deliver the required structure within two years of the date that the purchaser signs the contract and incurs obligations. . . ."); Ahn v. Merrifield Town Ctr. Ltd. P'ship, 584 F. Supp. 2d at 854 ("[T]he sales contracts here in issue do not merit exemption from [ILSA] because the promise to build within two years is specified to run from the date the seller chooses to ratify the contract, rather than the date the buyer signs and incurs obligations.") (fn. omitted).

These exemptions are defined as follows:

Unless the method of disposition is adopted for the purpose of evasion of this chapter, the provisions of this chapter shall not apply to . . .
(2) the sale or lease of any improved land on which there is a residential, commercial, condominium, or industrial building, or the sale or lease of land under a contract obligating the seller or lessor to erect such a building thereon within a period of two years.
15 U.S.C. § 1702(a)(2).

Given that ILSA's registration and disclosure provisions focus on the time the sale occurs — that is, when the purchaser signs the purchase agreement — the exemptions also should depend on this point in time. See Rensin v. Juno-Loudon, LLC, 2010 WL 1381546 at *7 ("It follows that if the duties and rights imposed by the Act vest prior to (or contemporaneously with) entering into a purchase agreement, the specifically delineated exemptions should also be examined at the time the parties enter into the purchase agreement."); see also First Global Corp. v. Mansiana Ocean Residences, LLC, No. 09-21092-Civ., 2010 WL 2163756 at *2 (S.D. Fla. May 27, 2010) (ILSA "is a remedial statute intended to protect consumers from unscrupulous sales practices. . . . [I]n this respect, the time for determining whether a particular project or unit is entitled to one of the statutory exemptions of the ILSA is when the buyer purchases the unit.").

In determining whether the 100 lot exemption applies here, this Court will consider how many non-exempt lots the developer publicly was offering to sell at the time plaintiffs entered into their Purchase Agreements. See, e.g., Long v. Merrifield Town Ctr. Ltd. P'ship, 611 F.3d at 248 (Where purchase agreements did not satisfy the two year exemption, "the 100 Lot Exemption also could not have applied to the plaintiffs' contracts because there were more than 100 non-exempt units."); First Global Corp. v.Mansiana Ocean Residences, LLC, 2010 WL 2163756 at *4 ("For purposes of the 100-lot exemption, the relevant number is the number of units communicated by the developer to the buyer and the purchasing public" and the developer was not entitled to the 100 lot exemption because "at the time that [the purchaser] contracted to purchase its unit, the only information communicated to [the purchaser], and to the public at-large, was that the [condominium] would consist of 135 units."); Rensin v. Juno-Loudon, LLC, 2010 WL 1381546 at *7 ("When determining whether or not the subdivision is one `containing fewer than one hundred units,' the number of nonexempt lots in the subdivision should be determined contemporaneously with when the purchaser enters into the purchase agreement for the lot in the subdivision."); Grove Towers, Inc. v.Lopez, 467 So. 2d at 361 (Even though the condominium contained only 98 units when it was completed, the developer was not entitled to the 100 lot exemption since "[a]t the time [the purchasers] signed the purchase and sale agreement . . ., they were given condominium documents (disclosure statement and declaration of condominium, among others) which stated that [the] Condominium would consist of a total of 108 units.") (fn. omitted).

When plaintiffs Griffith and Weissman signed their Purchase Agreements, the Condominium was publicly announced as consisting of 123 units. (See pages 2-3 above.) Therefore, the Condominium was not exempt from ILSA's registration and disclosure provisions under the 100 lot exemption unless 24 units were exempt at that time. In order to exempt these units, Steiner relies on the improved lot exemption since these units now have temporary certificates of occupancy. (See pages 12-13 above.) At the time of plaintiffs' Purchase Agreements, however, the Condominium was under construction and none of the units had a TCO. (See page 3 above.) Because there were more than 99 non-exempt lots at the time of plaintiffs' Purchase Agreements, Steiner is not entitled to the 100 lot exemption. Steiner failed to provide the plaintiffs with a property report before they signed their Purchase Agreements (see pages 3-4 above), thereby violating ILSA and entitling plaintiffs to revoke their Purchase Agreements.

Steiner could have availed itself of the 100 lot exemption if, in its contracts for the first 24 lots, it contracted to erect the building within two years, i.e., using the § 1702(a)(2) two year exemption along with the § 1702(b)(1) 100 lot exemption.See, e.g., First Global Corp. v. Mansiana Ocean Residences, LLC, 2010 WL 2163756 at *2 ("[I]f a project consists of 123 units, a developer can sell 24 of the units under an obligation to construct a building on the property within two years, i.e. qualifying for the two-year exemption, and the remaining 99 units would then qualify under the 100-lot exemption."). Steiner, however, did not contract in the plaintiffs' Purchase Agreements to construct the building within two years.

C. This Court Respectfully Disagrees With Judge Cote's Bodansky Decision

Steiner urges this Court to follow Judge Cote's decision inBodansky v. Fifth on the Park Condo, LLC, 09 Civ. 4651, 09 Civ. 6433, 2010 WL 334985 (S.D.N.Y. Jan. 29, 2010), in ruling that the 100 lot exemption applies as long as no more than 99 non-exempt lots are sold. (Dkt. No. 20: Steiner Br. at 3, 11-12; Dkt. No. 23: Steiner Reply Br. at 4-5.) In Bodansky, Judge Cote found that "[t]he plain meaning of the text [of 15 U.S.C. § 1702(b)(1)] is that as long as the `subdivision' contains `fewer than one hundred' non-exempt lots, then the Act's registration and disclosure requirements do not apply to the sale of lots in that subdivision."Bodansky v. Fifth on the Park Condo, LLC, 2010 WL 334985 at *4. Judge Cote held that the 100 lot exemption did not have to be satisfied at the time of the plaintiffs' purchase agreement, finding that nothing in § 1702(b)'s text required determination "at the time of sale of any particular lot." Bodansky, 2010 WL 334985 at *4-5. Therefore, Judge Cote concluded, "the Hundred Lot Exemption can still apply to a subdivision

containing one hundred or more lots as long as all lots soldabove the ninety-nine non-exempt lots maximum will be covered by a § 1702(a) exemption." Bodansky, 2010 WL 334985 at *4.

This Court respectfully declines to follow Bodansky. Allowing a developer to rely on the 100 lot exemption until it sells more than 99 non-exempt lots would significantly weaken ILSA's disclosure and revocation protections. ILSA gives a purchaser only two years from signing the Purchase Agreement to revoke the sale based on the developer's failure to provide timely disclosure of the property report. 15 U.S.C. § 1703(c). If the developer refuses to return the purchaser's money, the purchaser may "bring an action" to enforce ILSA's revocation rights, see 15 U.S.C. § 1709(b), "within three years" of signing the contract, 15 U.S.C. § 1711(b). Under Bodansky, however, the condominium would be exempt until the developer sold the 100th non-exempt lot. (See pages 14-15 above.) If the developer did not sell the 100th lot until more than two years after a purchaser had bought a lot, the purchaser would have lost ILSA's revocation right. As the Rensin court noted:

As noted above, Bodansky is on appeal to the Second Circuit.

[A] purchaser's rights to full disclosure of the rights of revocation and complete information in the form of the property report could be vitiated simply by a developers' stated (but unfulfilled) intention to later sell sufficient lots to builders, therefore bypassing Congress' intent to protect potential purchasers through pre-purchase disclosure. For example, if a development contained 150 lots for sale and the developer claimed an intention to sell 51 lots to builders, the purchaser of the first lot, "Lot 1," would not be notified of his right of revocation with seven days (per § 1703(b)) or two years (per § 1703(c)), nor would purchaser be provided with the required property report prior to entering into the agreement (per §§ 1703(a)(1)(B), 1707). Three years later, if the developer had failed to sell any lots to builders and sold the 100th non-exempt lot to an individual homebuyer, the development would be subject to [ILSA]. The purchasers of the first 99 lots, however, would not have benefit[t]ed from the full disclosure and reporting requirements of the Act prior to purchasing their lots, nor would they have been able to exercise the rights of revocation that Congress intended to protect them. . . . This reading of the statute goes against its plain meaning as well Congress's clear intent to require developers to provide "full disclosure" of information to potential purchasers, submit a property report to HUD, and alert purchasers to their rights of revocation prior to the purchaser entering a purchase agreement.
Rensin v. Juno-Loudon, LLC, No. 09cv1391, 2010 WL 1381546 at *7 (E.D. Va. Mar. 30, 2010). In other words, instead of narrowly construing the 100 lot exemption, Bodansky enlarged it by allowing a developer, in certain circumstances, to render the purchaser unable to invoke ILSA revocation rights even where the property is no longer exempt.

Steiner argues that such a factual situation is not present before the Court and thus should not be a basis for the Court's decision. (Steiner Br. at 16 n. 5; Steiner Reply Br. at 5 n. 3.) While Steiner did complete the building within two years, it was not contractually obligated to do so, and plaintiffs could have had their Purchase Agreements and deposits held by Steiner for years, with no revocation right, under Steiner's interpretation of the exemptions. Such a conclusion is not acceptable to this Court. Moreover, Steiner's interpretation would appear to make the two year exemption totally superfluous. Under Steiner's view of § 1702(a)-(b), a developer could sell 99 units and wait well beyond two years to complete the building and sell the 100th and subsequent units. An interpretation that makes part of a statute superfluous should not be adopted by the Court. See, e.g., APWU v. Potter, 343 F.3d 619, 626 (2d Cir. 2003) ("`[A] basic tenet of statutory construction . . . [is] that [a text] should be construed so that effect is given to all its provisions, so that no part will be inoperative or superfluous, void or insignificant, and so that one section will not destroy another unless the provision is the result of obvious mistake or error.'"); State St. Bank Trust Co. v. Salovaara, 326 F.3d 130, 139 (2d Cir. 2003) ("It is well-settled that courts should avoid statutory interpretations that render provisions superfluous: `It is our duty to give effect, if possible, to every clause and word of a statute.'" (quoting Duncan v. Walker, 533 U.S. 167, 174, 121 S.ct. 2120, 2125 (2001)).

Additionally, Bodansky failed to address the 100 lot exemption's present tense language, instead noting that "the text does not specify the point in time at which the number of non-exempt lots `contain[ed]' in a subdivision must be measured." Bodansky v. Fifth on the Park Condo, LLC, 2010 WL 334985 at *5. Bodansky's reading of the exemption is contrary to the statute's language, as discussed at pages 17-18 above.

Steiner, however, argues that the present tense of the 100 lot exemption is insignificant since the Dictionary Act, 1 U.S.C. § 1, provides that "`[i]n determining the meaning of any Act of Congress, unless the context indicates otherwise[,] . . . words used in the present tense include the future as well as the present.'" (Steiner Reply Br. at 5, quoting 1 U.S.C. § 1.) After adding the future tense, the 100 lot exemption would apply to a subdivision that, at some future point, would contain less than 100 lots that are, or that will be, exempt under 15 U.S.C. § 1702(a). Steiner argues that Bodansky "interpreted ILSA and its exemptions in precisely the manner dictated by the Dictionary Act and consist[ent] with the canons of statutory interpretation." (Steiner Reply Br. at 5, fn. omitted.)

This argument is unavailing. In Rowland v. Cal. Men's Colony, Unit II Men's Advisory Council, 506 U.S. 194, 113 S.ct. 716 (1993), the Supreme Court explained the Dictionary Act's usage of the phrase "unless the context indicates otherwise":

"Context" here means the text of the Act of Congress surrounding the word at issue, or the texts of other related congressional Acts, and this is simply an instance of the word's ordinary meaning: "[t]he part or parts of a discourse preceding or following a `text' or passage or a word, or so intimately associated with it as to throw light upon its meaning." Webster's New International Dictionary 576 (2d ed. 1942). While "context" can carry a secondary meaning of "[a]ssociated surroundings, whether material or mental," ibid., we doubt that the broader sense applies here. The Dictionary Act uses "context" to give an instruction about how to "determin[e] the meaning of a[n] Act of Congress," a purpose suggesting the primary sense. If Congress had meant to point further afield, as to legislative history, for example, it would have been natural to use a more spacious phrase, like "evidence of congressional intent," in place of "context."
If "context" thus has a narrow compass, the "indication" contemplated by 1 U.S.C. § 1 has a broader one. The Dictionary Act's very reference to contextual "indication" bespeaks something more than an express contrary definition, and courts would hardly need direction where Congress had thought to include an express, specialized definition for the purpose of a particular Act; ordinary rules of statutory construction would prefer the specific definition over the Dictionary Act's general one. Where a court needs help is in the awkward case where Congress provides no particular definition, but the definition in 1 U.S.C. § 1 seems not to fit. There it is that the qualification "unless the context indicates otherwise" has a real job to do, in excusing the court from forcing a square peg into a round hole.
Rowland v. Cal. Men's Colony, Unit II Men's Advisory Council, 506 U.S. at 199-200, 113 S.ct. at 720. The Supreme Court also clarified that "`indicates' certainly imposes less of a burden than, say, `requires' or `necessitates,'" and that "this exception from the general rule would be superfluous if the context `indicate[d] otherwise' only when use of the general definition would be incongruous enough to invoke the common mandate of statutory construction to avoid absurd results." Id. at 200, 113 S.ct. at 720 (fn. omitted).

The text surrounding § 1702(b)(1)'s 100 lot exemption indicates that using the Dictionary Act to incorporate the future tense would be "forcing a square peg into a round hole." ILSA's registration and disclosure provisions impose duties that a developer must comply with before the purchaser signs the Purchase Agreement, and ILSA requires the Purchase Agreement to notify the purchaser of his revocation and other ILSA rights. (See page 19 above.) It is clear from these provisions that ILSA is protecting the purchaser at the time of the purchase, ensuring that the developer provides the purchaser with the information needed to make an informed purchase decision. If the 100 lot exemption is read to allow future compliance, as in Bodansky, ILSA's disclosure requirements would no longer protect the purchaser at the time of the sale.

Additionally, including the future tense would allow a condominium to remain exempt as long as it is possible that, one day in the indefinite future, the condominium would contain less than 100 non-exempt units. This reading of the exemption would vitiate ILSA's revocation rights which might expire before the one hundredth lot was sold. (See pages 24-25 above.)

Moreover, Congress used express language when it intended that the availability of an ILSA exemption be determined at a time other than the purchase date. See, e.g., 15 U.S.C. § 1702(b)(2) (exemption determined by how many lots will be sold within twelve months of first sale); 15 U.S.C. § 1702(b)(5)(c), (e) (exemption determined in part by whether, "at the time of closing," certain specified events have taken place). Had Congress intended that the 100 lot exemption could be determined by future compliance, it would have expressly so stated. See, e.g., Duncan v.Walker, 533 U.S. at 173, 121 S.ct. at 2125 ("It is well settled that `[w]here Congress includes particular language in one section of a statute but omits it in another section of the same Act, it is generally presumed that Congress acts intentionally and purposely in the disparate inclusion or exclusion.'");accord, e.g., Bates v. United States, 522 U.S. 23, 29-30, 118 S.ct. 285, 290 (1997);Smaldone v. Senkowski, 273 F.3d 133, 137 (2d Cir. 2001), cert. denied, 535 U.S. 1017, 122 S.ct. 1606 (2002).

The Dictionary Act provisions do not apply to the 100 lot exemption since ILSA's exemptions, revocation and statute of limitations provisions indicate that the exemption only should apply to subdivisions that are exempt at the time of sale. Since the 100 lot exemption is written in the present tense, this Court declines to follows Bodansky.

Moreover, according to Bodansky, the number of units being offered for sale at the time of the purchase is irrelevant in determining whether a subdivision contains fewer than one hundred non-exempt lots. Bodansky v. Fifth on the Park Condo, LLC, 2010 WL 334985 at *4 ("Plaintiffs' argument that the Hundred Lot Exemption applies only if at the time a purchase agreement is signed, fewer than one hundred non-exempt lots are offered for sale in the subdivision is unsupported by the text of the statute."). In calculating how many non-exempt lots are contained in a condominium, Bodansky considers only the amount of non-exempt units that have been sold. See Id. at *5 ("As long as a developer does not enter into contracts to sell more than ninety-nine non-exempt lots in the subdivision, it may take advantage of the Hundred Lot Exemption."). If this is what Congress had intended, the exemption should have been drafted to exempt the sale of lots "in a subdivision where fewer than one hundred lots which are not exempt under subsection (a) have been sold." By focusing on how many lots are "contained" in a subdivision, Congress made clear that it was counting all non-exempt lots in the subdivision, not only the ones that have been sold.

Bodansky also noted that its holding that the 100 lot exemption applies until the 100th non-exempt lot is sold "is consistent with the regulations issued by HUD pursuant to its authority to promulgate `rules and regulations' under ILSA." Bodansky v. Fifth on the Park Condo, LLC, 2010 WL 334985 at *5 (quoting 15 U.S.C. § 1718). Under HUD's regulations, the 100 lot exemption is available "if, since April 28, 1969, the subdivision has contained fewer than 100 lots, exclusive of lots which are exempt from jurisdiction under § 1710.5." 24 C.F.R. § 1710.6. Bodansky noted that, "[l]ike the statutory text on which it is based, [this HUD regulation] contains no requirement that the determination of which units in a condominium `are exempt from jurisdiction under § 1710.5' occur at the time of sale of a particular lot." Bodansky, 2010 WL 334985 at *5. Bodansky interpreted this HUD regulation to allow a developer to rely on the 100 lot exemption for "as long as the development contains fewer than one hundred non-exempt units,i.e., units sold prior to completion." Bodansky, 2010 WL 334985 at *5.

24 C.F.R. § 1710.5 references a "listing of the statutory exemptions" under ILSA.

Bodansky further noted that its holding is supported by that fact that, under HUD regulations, "a developer's eligibility for exemptions under ILSA is `self-determining.'" Bodansky, 2010 WL 334985 at *6. Pursuant to HUD's regulations, "a developer is not required to file notice with or obtain the approval of the Secretary in order to take advantage of an exemption." 24 C.F.R. § 1710.4(d). Rather, "[i]f a developer elects to take advantage of an exemption, the developer is responsible for maintaining records to demonstrate that the requirements of the exemption have been met." 24 C.F.R. § 1710.4(d). It is hard to see how this regulation supports Bodansky's holding, however, since it provides only that a developer does not need HUD's pre-approval before using an exemption. This would be true whether the exemption is determined at the time of the sale or at some future point.

When faced with an administrative agency's interpretation of a statute, the Supreme Court has provided a two-step process for reviewing the agency's construction of the statute. See, e.g.,Chevron U.S.A. Inc., v. Natural Res. Def. Council, Inc., 467 U.S. 837, 842-44, 104 S.ct. 2778, 2781-82 (1984). The first step is to determine whether Congressional intent is clear. Id. at 842, 104 S.ct. at 2781. "If the intent of Congress is clear, that is then end of the matter; for the court, as well as the agency, must give effect to the unambiguously expressed intent of Congress." Id. at 842-43, 104 S.ct. at 2781. If Congressional intent is ambiguous, the second step is to determine if the agency's regulations are "arbitrary, capricious, or manifestly contrary to the statute." Id. at 844, 104 S.ct. at 2782.

As discussed in Section II.B. above, in this Court's opinion, Congress' intent is clear from the 100 lot exemption's unambiguous language: the exemption applies only if, at the time of the sale, the subdivision contains fewer than one hundred non-exempt lots. To the extent HUD's regulations imply otherwise, no deference is required. See, e.g., Gen. Dynamics Land Sys., Inc. v. Cline, 540 U.S. 581, 600, 124 S.ct. 1236, 1248 (2004) ("Even for an agency able to claim all the authority possible under Chevron, deference to its statutory interpretation is called for only when the devices of judicial construction have been tried and found to yield no clear sense of congressional intent."); Chevron U.S.A. Inc., v. Natural Res. Def. Council, Inc., 467 U.S. at 843 n. 9, 104 S.ct. at 2781 n. 9 ("If a court, employing traditional tools of statutory construction, ascertains that Congress had an intention on the precise question at issue, that intention is the law and must be given effect.").

Bodansky also cited to HUD's interpretive guidelines in further support of its holding. See Bodansky, 2010 WL 334985 at *6-7. To the extent these guidelines allow a developer to rely on the 100 lot exemption until more than 99 non-exempt lots are sold, no deference is required since, as noted in the text above, this interpretation conflicts with Congress' intent.

CONCLUSION

For the reasons stated above, plaintiffs' summary judgment motion (Dkt. No. 15) is GRANTED and Steiner's summary judgment motion (Dkt. No. 18) is DENIED.

SO ORDERED.

DATED: New York, New York

December 3, 2010