AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Docket Number
Attorney(S)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Docket Number
Attorney(S)

ROBERT TIMBERLAKE NEWCOMB, III, SCOTT D. NAFE, GARY T. DAVIS, and wife, KAREN J. DAVIS, and PELHAM JONES, Plaintiffs. v. COUNTY OF CARTERET, UNITED STATES OF AMERICA, GEORGE BROWN, JULIAN M. BROWN, JULIAN BROWN, JR., EARL CHADWICK, TEMPLE CHADWICK, GLORIA DAVIS, RANDY FRYE, NORMAN FULCHER, JOE O'NEAL GARNER, ROBERT GUTHRIE, SAMMY GUTHRIE, GRAY HARRIS, MAUREEN HARRIS, MYRON HARRIS, TAMMY HILL, DAVID N. JONES, LARRY KELLUM, LARRY KELLUM, JR., ROBERT KITTRELL, LEE LAWRENCE, D.A. LEWIS, JEFF LEWIS, MARK LEWIS, THOMAS LEWIS, and wife, DENISE LEWIS, LUKE MIDGETT, RANDY STEVE MILAN, JR., LARRY MOORE, CHARLES NEWKIRK, CRAIG NEWKIRK, BECKY PAUL, THE ANNIE PINER FAMILY LIMITED PARTNERSHIP, ROSALIE CHADWICK PINER, TIMMY POTTER, NINO GIOVANNI PUPATTI, LUTHER ROBINSON, KENNY RUSTICK, THOMAS ALLEN SMITH, THOMAS ALLEN SMITH, JR., JEFFREY TAYLOR, SAMUEL THOMAS and wife CYNTHIA THOMAS, SUSANNE WHITE, KEVIN WILLIAMSON, SONNY WILLIAMSON, MELVIN WILLIS, TERRY WILLIS, ROBERT WAYNE WORKMAN, JR., Defendants.

OPINION

R. GUY COLE, JR., Circuit Judge.

Defendant-Appellant Marvin Jerome Johnson appeals the denial of his motion to suppress a firearm seized during a Terry stop on the ground that the police did not have reasonable suspicion to detain and search him. For the reasons below, we AFFIRM.

I.

Around 10:00 p.m. on April 2, 2006, Johnson, his girlfriend, and a friend went to a public club in Columbia, Tennessee called "Club Karma" that was serving liquor that evening. The day was notable because it was Mule Day, an annual festival in Columbia known for drinking and revelry. A history of violence, including firearm-related offenses, surrounded Mule Day.

Johnson and his companions arrived at the club in a Ford Expedition and parked in the parking lot next to the club. They entered Club Karma and remained inside for several hours. While Johnson was inside Club Karma, the Columbia Police Department SWAT Team investigated the parking lot outside of Club Karma, looking through the windows of automobiles for visible firearms. Peering in the window of the Ford Expedition in which Johnson arrived, Detective Jeremy Thomas Alsup saw an open gym bag on the floor of the front passenger seat. The bag contained a box of ammunition. Detective Alsup could not recall the caliber of the ammunition, and could not determine if there were bullets in the box or if it was empty. He relayed the presence of this box of ammunition to the other officers, and that information eventually reached Detective Frank Jeffrey Duncan.

At some point after midnight, two SWAT Team officers observed Johnson and his companions leaving Club Karma and walking towards the Ford Expedition. Johnson went to the front passenger side of the automobile — where the box of ammunition was located — and opened the door. The officers then confronted Johnson and his companions, ordering them to keep their hands visible. Johnson and his companions complied with this command. Detective Duncan assisted the officers, approaching Johnson and patting him down. As a result, Detective Duncan found a firearm in Johnson's belt. SWAT Team officers then arrested Johnson.

Johnson was subsequently prosecuted for being a convicted felon in possession of a firearm. Johnson moved to suppress the firearm as the fruit of an illegal search, but the district court denied his motion after a suppression hearing. Johnson then entered a conditional guilty plea maintaining his ability to appeal the district court's denial of his motion to suppress. The district court sentenced Johnson to forty-eight months of imprisonment. Johnson timely appealed the denial of his motion.

II.

In examining the denial of a motion to suppress, we review the district court's findings of fact for clear error and its conclusions of law de novo. United States v. Foster, 376 F.3d 577, 583 (6th Cir. 2004). We must view the evidence "in the light most likely to support the district court's decision." United States v. Navarro-Camacho, 186 F.3d 701, 705 (6th Cir. 1999) (internal quotation omitted). Particularly in the context of Terry stops, we give "due weight" to the district court's inferences, as it "is at an institutional advantage, having observed the testimony of the witnesses and understanding local conditions." Foster, 376 F.3d at 583 (internal quotation omitted).

We have articulated a two-part process for evaluating the constitutionality of Terry stops: We first determine "whether there was a proper basis for the stop"; then, if the stop was proper, we assess "whether the degree of intrusion was reasonably related in scope to the situation at hand." United States v. Caruthers, 458 F.3d 459, 464 (6th Cir. 2006) (internal quotations and citations omitted).

A. Basis for the Stop

A Terry stop is a "brief investigatory stop of persons," United States v. Campbell, 549 F.3d 364, 370 (6th Cir. 2008) (internal quotation omitted), that is justified under the Fourth Amendment when an officer has reasonable suspicion "to conclude in light of his experience that criminal activity may be afoot." Terry v. Ohio, 392 U.S. 1, 30, 88 S.Ct. 1868, 20 L.Ed.2d 889 (1968). We look to the hypothetical reasonable officer's assessment of a situation, because a Terry stop requires a "particularized and objective basis for suspecting the particular person of criminal activity." Campbell, 549 F.3d at 371 (internal quotation omitted). We determine whether reasonable suspicion exists based on the totality of the circumstances. United States v. Smith, 263 F.3d 571, 588 (6th Cir. 2001).

Here, the government argues that Tennessee Code section 39-17-1305 (2006) provided the officers with reasonable suspicion to stop Johnson. That law prohibited "a person [from] possessing] a firearm within the confines of a building open to the public where liquor, wine or other alcoholic beverages. . . are served for on premises consumption." Tenn. Code § 39-17-1305 (2006). Because Johnson does not contest that Club Karma was a public establishment serving alcohol, the only question is whether the police had reasonable suspicion to believe Johnson possessed a firearm in Club Karma.

The relevant facts are: (1) the presence of a box of ammunition in the automobile; (2) the location of the automobile in the parking lot of a public establishment serving alcohol; (3) the time of day; and (4) the history of alcohol consumption and firearm-related violence on Mule Day. While a time of day or dangerous location cannot alone provide reasonable suspicion, "police officers are not required to ignore the relevant characteristics of a location [or time] in determining whether the circumstances are sufficiently suspicious to warrant further investigation." United States v. Pearce, 531 F.3d 374, 383 (6th Cir. 2008) (internal quotation omitted).

Moreover, we have noted that the presence of a box of ammunition in an automobile — albeit confirmed through inquiry — is adequate to provide reasonable suspicion that the owner possesses a firearm. See United States v. Isham, 501 F.2d 989, 990-91 (6th Cir. 1974). In Isham, an arrestee asked to lock his automobile before police officers transported him to jail. Id. at 990. Monitoring the arrestee, the officers saw a box of ammunition on the front seat and asked the arrestee if he had a gun. Id. He said that he did. Id. Analyzing this exchange, we noted: "The police suspicion about a weapon (based on the plain view of the ammunition) was . . . turned into something more than probable cause when [the arrestee] admitted that he had a [firearm]." Id. at 991 (emphasis added); accord United States v. Meadows, 571 F.3d 131, 142 (1st Cir. 2009) ("We think it uncontroversial that the discovery of ammunition — but not a gun — in the car from which a suspect fled could. . . lead an officer to reasonably suspect that the fleeing suspect possessed the gun that went with the ammunition.").

Johnson protests, arguing that the circumstances did not warrant a belief that he was behaving in a suspicious or dangerous manner. Johnson objects to the adequacy of the factors here, in particular the background of Mule Day and the connection between the box of ammunition and the firearm. However, "individual factors, taken as a whole, [may] give rise to reasonable suspicion, even if each individual factor is entirely consistent with innocent behavior when examined separately." Smith, 263 F.3d at 588. Furthermore, the factors combined needed only provide the officers with reasonable suspicion that Johnson violated the prohibition on carrying a firearm into an establishment serving alcohol. This level of suspicion "is satisfied by a likelihood of criminal activity less than probable cause, and falls considerably short of satisfying a preponderance of the evidence standard." Campbell, 549 F.3d at 370-71 (internal quotation omitted).

Given this standard, we find that the circumstances here provided the officers with reasonable suspicion to believe Johnson carried a firearm into Club Karma, in violation of Tennessee Code section 39-17-1305 (2006).

B. Degree of Intrusion

The second half of our Terry stop analysis requires us to determine whether the officers' intrusion "was reasonably related in scope to the situation at hand." Caruthers, 458 F.3d at 464 (internal quotation omitted). We do so "by examining the reasonableness of the officials' conduct given their suspicions and the surrounding circumstances." Id. (internal quotation omitted).

During a Terry stop, an officer may perform "a reasonable search for weapons for the protection of the police officer." Terry, 392 U.S. at 27, 88 S.Ct. 1868. This search must be based on the officer's "belie[f] that he is dealing with an armed and dangerous individual." Id. The officer, however, need not be "absolutely certain that the individual is armed; the issue is whether a reasonably prudent man in the circumstances would be warranted in the belief that his safety or that of others was in danger." Id.

Because the statutory violation at issue involves a firearm, the sole question is whether a "reasonably prudent man in the circumstances" would consider Johnson dangerous. Id. We have found the believed presence of a firearm central in permitting a protective search of a suspect due to a reasonable officer's fear of danger. See United States v. Paulino, 935 F.2d 739, 747 (6th Cir. 1991), superseded by statute on other grounds, U.S. Sentencing Guidelines Manual § 3B1.1. The Supreme Court has agreed that "danger may arise from the possible presence of weapons in the area surrounding a suspect." Michigan v. Long, 463 U.S. 1032, 1049, 103 S.Ct. 3469, 77 L.Ed.2d 1201 (1983); see also id. at 1048, 103 S.Ct. 3469 ("[W]e have also expressly recognized that suspects may injure police officers and others by virtue of their access to weapons. . . ."). This conclusion is further justified when the hour is late and alcohol may be involved. See id. at 1050, 103 S.Ct. 3469. Given the suspected possession of a firearm and the circumstances outside Club Karma that night, a reasonable individual would have feared for his safety in confronting Johnson.

Those same safety considerations render Detective Duncan's action — frisking without first asking questions — reasonable. See Caruthers, 458 F.3d at 469 ("[T]he stop was weapons-related, so it was reasonable for [the officer] to secure [the defendant] for safety reasons. . . ."); United States v. Garza, 10 F.3d 1241, 1246 (6th Cir. 1993) ("Courts have generally upheld law enforcement actions taken during investigatory stops, including making such stops with weapons drawn, when those actions are reasonably necessary for the protection of the officers." (internal quotations omitted)); cf. Isham, 501 F.2d at 990-91 (police questioned defendant in custody about presence of firearm after finding box of ammunition).

Because the officers had reasonable suspicion to believe Johnson was armed and dangerous, they could properly pat him down for weapons. Terry, 392 U.S. at 27, 88 S.Ct. 1868. The officers thus did not violate Johnson's Fourth Amendment rights, so the firearm need not be suppressed. See Pearce, 531 F.3d at 383-84.

III

For the foregoing reasons, we AFFIRM the district court's denial of Johnson's motion to suppress.

harbor, and neither Plaintiffs nor Defendants are entitled to judgment as a matter of law on that issue.
4. Pursuant to [Rule 54(b)], the Court finds, and hereby certifies, that, although there remain pending claims, as to the claim that Plaintiffs are entitled to judgment as a matter of law declaring that they have riparian rights into the Marshallberg Harbor as an incident of their ownership of properties abutting the Harbor, subject to the easements of Carteret County, said claim is final and that there exists no just reason for delay.

Based upon these determinations, the trial court ordered that:

1. It is hereby declared and decreed that Plaintiffs and the other property owners whose property abuts Marshallberg Harbor, their heirs, successors and assigns, have riparian rights appurtenant to their properties and as an incident of the ownership of such properties into Marshallberg Harbor, subject to the easements of the County of Carteret dated October 19, 1956, and recorded in Book 173, Page 352, Carteret County Registry, and June 1, 1957, recorded in Book 179, Page 109, Carteret County Registry, respectively.
2. The County of Carteret, by virtue of the aforesaid easements recorded in Book 173, Page 352 and Book 179, Page 109, Carteret County Registry, has the right to control the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor, giving due regard to the riparian rights of the Plaintiffs and the other property owners whose property abuts the harbor, and such reasonable uses as the Plaintiffs and the other property owners whose property abuts the harbor may seek to make of their riparian rights; and the right of the public and all boat owners and boaters to use the waters of the harbor consistent with the purpose and intent of the harbor as expressed in its enabling statute, the River and Harbor Act of 1950 ("Waterway from Pamlico Sound to Beaufort Harbor, NC-Harbor Improvement at Marshallberg"), House Document No. 68, 81 st Congress, 1 st Session. The County of Carteret shall be the arbiter of any dispute concerning the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor between the owners of property abutting the harbor, now and in the future, and the boaters, the general public, and others as disputes may arise.
3. That the Motion of the [Joint Individual] Defendants for Summary Judgment and the [] request by Plaintiffs for Summary Judgment [pursuant to N.C. Gen. Stat. § 1A-1, Rule 56(c)] on the issue of the [Joint Individual] Defendants' claimed public prescriptive easement over the roadways, parking areas, and pathways on or across the lands of the Plaintiffs and other property owners abutting the harbor shall be, and hereby are, denied. That the Motion of the [Joint Individual] Defendants for Summary Judgment [] as to the Plaintiffs' claims for riparian rights to the Marshallberg Harbor, subject to the easements of the County of Carteret, shall be, and is, hereby, denied.
4. At the hearing on the Motions for Summary Judgment, the [Joint Individual] Defendants conceded that such roadways of the harbor (Milton Willis Lane and the dirt/shell road adjacent to Plaintiff Newcomb's property[)] are not "neighborhood public roads" as originally claimed, and Plaintiffs are therefore entitled to judgment as a matter of law on this issue such that such claim shall be, and it is hereby, dismissed, with prejudice.
5. Pursuant to [Rule 54(b)], the Court hereby certifies as final the Plaintiffs' claim and the Court's Order that they are entitled to riparian rights to the Marshallberg Harbor as an incident of their ownership of properties abutting the Harbor, subject to the easements of Carteret County, as set forth in paragraph 1 and as referenced in paragraph (2) of the Order section of this Order, and further certifies that there exists no just reason for a delay on the ruling of Plaintiffs' claims by the Court, and therefore said claim and ruling thereon is immediately appealable to the North Carolina Court of Appeals.

On 23 February 2009, the Joint Individual Defendants noted an appeal to this Court from that portion of the trial court's summary judgment order that determined that "`Plaintiffs and the other property owners whose property abuts Marshallberg Harbor, their heirs, successors and assigns, have riparian rights appurtenant to their properties and as an incident of the ownership of such properties into Marshallberg Harbor. . . .'" On 4 March 2009, Plaintiffs noted a cross-appeal to this Court from that portion of the trial court's order (1) awarding Carteret County "`the right to control the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor'" and making Carteret County "`the arbiter of any dispute concerning the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor between the owners of property abutting the harbor, now and in the future, and the boaters, the general public, and others as disputes may arise'" and (2) denying Plaintiffs' request for summary judgment pursuant to Rule 56(c), with respect to "`the issue of the [Joint Individual] Defendants' claimed public prescriptive easement over the roadways, parking areas, and pathways on or across the lands of the Plaintiffs and other property owners abutting the harbor. . . ." On 9 March 2009, the trial court, acting on its own motion, entered an order amending the 26 January 2009 summary judgment order pursuant to N.C. Gen. Stat. § 1A-1, Rule 60(a) (2009). The 9 March 2009 amendment certified as final that portion of the trial court's order finding that Carteret County had the right to control permanent structures in Marshallberg Harbor, determined that "there exist[ed] no just reason for a delay on the ruling of [this] claim[] by the Court," and stated that the trial court's ruling on this claim should be "immediately appealable to the North Carolina Court of Appeals" as authorized by Rule 54(b). On 6 April 2009, the Joint Individual Defendants noted an appeal to this Court seeking review of that portion of the trial court's amended summary judgment order relating to the riparian rights issue in light of the trial court's decision to amend the summary judgment order to certify an additional issue pursuant to Rule 54(b). On 13 April 2009, Plaintiffs noted a cross-appeal from that portion of the trial court's amended summary judgment order awarding Carteret County control over permanent structures in Marshallberg Harbor and making Carteret County "the arbiter of any dispute concerning" such structures in light of the trial court's decision to amend the summary judgment order to certify an additional issue pursuant to Rule 54(b). With certain limited exceptions, the trial court stayed further proceedings and the enforcement of the substantive provisions of the summary judgment order pending the completion of proceedings in the appellate division.

II. Legal Analysis A. Appealability

The summary judgment order was "made during the pendency of an action [and does] not dispose of the case, but instead leave[s] it for further action by the trial court . . . to settle and determine the entire controversy." Carriker v. Carriker, 350 N.C. 71, 73, 511 S.E.2d 2, 4 (1999) (citing Veazey v. City of Durham, 231 N.C. 357, 361, 57 S.E.2d 377, 381 (1950)). Since the trial court's decision to deny summary judgment with respect to the issue of the validity of "the [Joint Individual] Defendants' claimed public prescriptive easement over the roadways, parking areas, and pathways on or across the lands of the Plaintiffs and other property owners abutting the harbor" compels the conclusion that further proceedings must necessarily occur in the Carteret County Superior Court before the entry of final judgment in this case, the trial court's summary judgment order is clearly interlocutory in nature.

As a general matter, "there is no right of immediate appeal from interlocutory orders and judgments." Travco Hotels, Inc. v. Piedmont Natural Gas Co., Inc., 332 N.C. 288, 291, 420 S.E.2d 426, 428 (1992) (citing Goldston v. Am. Motors Corp., 326 N.C. 723, 725, 392 S.E.2d 735, 736 (1990)). The general rule precluding immediate appellate review of interlocutory orders is intended "to prevent fragmentary and premature appeals that unnecessarily delay the administration of justice and to ensure that the trial divisions fully and finally dispose of the case before an appeal can be heard," Bailey v. Gooding, 301 N.C. 205, 209, 270 S.E.2d 431, 434 (1980) (citations omitted), and rests on the understanding that "[t]here is no more effective way to procrastinate the administration of justice than that of bringing cases to an appellate court piecemeal through the medium of successive appeals from intermediate orders." Veazey, 231 N.C. at 363, 57 S.E.2d at 382. However, immediate appellate review of interlocutory orders is available "when the trial court enters a final judgment as to one or more, but fewer than all, claims or parties and certifies there is no just reason for delay" pursuant to Rule 54(b), or when the interlocutory order affects a substantial right under N.C. Gen. Stat. § 1-277(a) (2009) and N.C. Gen. Stat. § 7A-27(d) (2009). Sharpe v. Worland, 351 N.C. 159, 162, 522 S.E.2d 577, 579 (1999) (citing DKH Corp. v. Rankin-Patterson Oil Co., 348 N.C. 583, 585, 500 S.E.2d 666, 668 (1998); Oestreicher v. Am. Nat'l Stores, 290 N.C. 118, 121-22, 225 S.E.2d 797, 800 (1976), abrogated in part by Lovick v. Farris, 2009 N.C. App. LEXIS 686 (2009)). Therefore, we must consider the extent, if any, to which each of the challenged components of the trial court's summary judgment order is properly before the Court in order to evaluate the issues presented for our consideration on appeal.

B. Summary Judgment Standard of Review

Summary judgment is appropriate "if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that any party is entitled to a judgment as a matter of law." N.C. Gen. Stat. § 1A-1, Rule 56(c) (2009). In reviewing an order granting summary judgment, our task is to "determine, on the basis of the materials presented to the trial court, whether there is a genuine issue as to any material fact and whether the moving party is entitled to judgment as a matter of law." Coastal Plains Utils., Inc. v. New Hanover Cty., 166 N.C. App. 333, 340, 601 S.E.2d 915, 920 (2004) (citing Oliver v. Roberts, 49 N.C. App. 311, 314, 271 S.E.2d 399, 401 (1980), cert. denied, 276 S.E.2d 283 (1981)). "All inferences of fact from the proofs offered at the hearing must be drawn against the movant and in favor of the party opposing the motion." Boudreau v. Baughman, 322 N.C. 331, 343, 368 S.E.2d 849, 858 (1988) (citing Page v. Sloan, 281 N.C. 697, 706, 190 S.E.2d 189, 194 (1972)). A trial court's decision granting a summary judgment motion is reviewed on a de novo basis. Virginia Elec. Power Co. v. Tillett, 80 N.C. App. 383, 385, 343 S.E.2d 188, 191, cert. denied, 317 N.C. 715, 347 S.E.2d 457 (1986).

C. Substantive Legal Issues 1. Riparian Rights

First, the Joint Individual Defendants argue that the trial court erred by concluding that Plaintiffs have riparian rights in Marshallberg Harbor. The Joint Individual Defendants contend that riparian rights only attach to natural, as compared to artificial, bodies of water and that, since Marshallberg Harbor was constructed in the 1950s, it is not a natural waterway in which adjoining property owners are entitled to have riparian rights. Based upon controlling authority from this Court, however, we disagree with the Joint Individual Defendants' contention.

As a result of the fact that the trial court's order represents a final judgment with respect to the Plaintiffs' claim to have riparian rights into Marshallberg Harbor and the fact that the trial court certified that there was "no just reason for delay" with respect to this claim, N.C. Gen. Stat. § 1A-1, Rule 54(b), the Joint Individual Defendants' challenge to this portion of the trial court's summary judgment order is properly before this Court on appeal.

"Riparian rights are vested property rights that arise out of ownership of land bounded or traversed by navigable water." Pine Knoll Ass'n v. Cardon, 126 N.C. App. 155, 159, 484 S.E.2d 446, 448 ( citing In re Protest of Mason, 78 N.C. App. 16, 337 S.E.2d 99 (1985), disc. review denied, 315 N.C. 588, 341 S.E.2d 27 (1986) disc. review denied, 347 N.C. 138, 492 S.E.2d 26 (1997)). "`[A]ll watercourses are regarded as navigable in law that are navigable in fact.'" Gwathmey v. State of North Carolina, 342 N.C. 287, 300, 464 S.E.2d 674, 682 (1995) (quoting State v. Baum, 128 N.C. 600, 604, 38 S.E. 900, 901 (1901)). For that reason, riparian rights are available to the owners of property that are adjacent to or encompass bodies of water that are navigable in fact. The riparian rights available to the owners of property "bounded or traversed by water" are derived from "two distinct properties: 1) the principal estate of land extending to the shoreline of [the body of water in question], and 2) the appurtenant estate of submerged land in [the body of water in question] benefitting the principal estate." Weeks v. N.C. Dep't. of Nat. Res. and Cmty. Dev., 97 N.C. App. 215, 225, 388 S.E.2d 228, 234 (citing Capune v. Robbins, 273 N.C. 581, 588, 160 S.E.2d 881, 886 (1968), disc. review denied, 326 N.C. 601, 393 S.E.2d 890 (1990)). According to well-established North Carolina law, riparian owners have "a qualified property in the water frontage belonging, by nature, to their land, the chief advantage growing out of the appurtenant estate in the submerged land being the right of access over an extension of their water fronts to navigable water, and the right to construct wharves, piers, or landings. . . ." Bond v. Wool, 107 N.C. 126, 129, 12 S.E. 281, 284 (1890).

Although Defendants argue that riparian rights only attach to natural, as compared to artificial, bodies of water, this Court has recently concluded, in the context of applying the "public trust" doctrine, that "`[t]he fact that a waterway is artificial, not natural,'" does not determine the extent to which a body of water is navigable. Fish House, Inc. v. Clarke, ___ N.C. App. ___, ___, 693 S.E.2d 208, 211, disc. review denied, ___ N.C. ___, ___ S.E.2d ___, 2010 N.C. Lexis 596 (2010) (quoting Hughes v. Nelson, 303 S.C. 102, 105, 399 S.E.2d 24, 25 (1990)). Instead, this Court stated that "the controlling law of navigability concerning the body of water `in its natural condition' reflects only upon the manner in which the water flows without diminution or obstruction," so that "any waterway, whether manmade or artificial, which is capable of navigation by watercraft constitutes `navigable water' under the public trust doctrine of this state." Id. at ___, 693 S.E.2d at 212. Given that the concept of "navigability" as used in the "public trust" and the riparian rights contexts is identical, and the fact that this Court has rejected the distinction upon which the Joint Individual Defendants rely in the "public trust" context, we hold that the trial court correctly concluded that the extent to which Plaintiffs have riparian rights in Marshallberg Harbor does not hinge upon whether the harbor was natural or manmade. In addition, given that Marshallberg Harbor is clearly "capable of navigation by watercraft," the owners of property bordering the harbor clearly have riparian rights in its waters. As a result, we conclude that the trial court did not err by granting summary judgment in favor of Plaintiffs with respect to the riparian rights issue.

According to the "public trust" doctrine, "the lands under navigable waters `are held in trust by the State for the benefit of the public' and `the benefit and enjoyment of North Carolina's submerged lands is available to all its citizens.'" Parker v. New Hanover Cty., 173 N.C. App. 644, 653, 619 S.E.2d 868, 875 (2005) (quoting State ex rel. Rohrer v. Credle, 322 N.C. 522, 527, 369 S.E.2d 825, 828 (1988). See also N.C. Gen. Stat. § 1-45.1 (2009) (providing the protections available under the "public trust" doctrine extend to "the right to navigate, swim, hunt, fish, and enjoy all recreational activities in the watercourses of the State")).

In addition to challenging the extent to which Plaintiffs were entitled to riparian rights into Marshallberg Harbor, the Joint Individual Defendants have also advanced an argument relating to the nature and extent of any riparian rights that might be available to Plaintiffs. However, given that the trial court's summary judgment order does not address this issue and given that our decision with respect to the extent of Carteret County's authority over permanent structures in Marshallberg Harbor effectively addresses the issues raised by the Joint Individual Defendants' alternative argument, there is no need for us to acquiesce in the Joint Individual Defendants' request that we determine the extent of Plaintiffs' riparian rights in addition to ascertaining whether such rights exist.

2. Carteret County's Right to Control Marshallberg Harbor

In its summary judgment order, the trial court ruled that Plaintiffs' riparian rights were "subject to the easements of the County" and that the easements recorded at Book 173, Page 352, and Book 179, Page 109, in the Carteret County Registry gave Carteret County "the right to control the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structures in the harbor" and made Carteret County "the arbiter of any dispute concerning the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor between the owners of property abutting the harbor, now and in the future, and the boaters, the general public, and others as disputes may arise." On appeal, Plaintiffs contend that this portion of the trial court's summary judgment order was in error because the easements in question did not grant any such authority to Carteret County. We disagree.

a. Appealability

The trial court did not certify the issue of Carteret County's right to control permanent structures in Marshallberg Harbor for immediate review in its initial summary judgment order. However, in its amended summary judgment order, the trial court attempted to add a certification relating to this issue in apparent reliance on its authority to correct clerical errors under N.C. Gen. Stat. § 1A-1, Rule 60(a). A careful review of the relevant authorities establishes that the trial court lacked the authority to amend its summary judgment order in this fashion.

N.C. Gen. Stat. § 1A-1, Rule 60(a), "provides a limited mechanism for trial courts to amend erroneous judgments." Pratt v. Staton, 147 N.C. App. 771, 774, 556 S.E.2d 621, 623 (2001). More specifically, N.C. Gen. Stat. § 1A-1, Rule 60(a), provides that:

[c]lerical mistakes in judgments, orders or other parts of the record and errors therein arising from oversight or omission may be corrected by the judge at any time on his own initiative or on the motion of any party and after such notice, if any, as the judge orders. During the pendency of an appeal, such mistakes may be so corrected before the appeal is docketed in the appellate division, and thereafter while the appeal is pending may be so corrected with leave.

The trial court's amended summary judgment order did not simply correct a clerical error in the original summary judgment order. Instead, the amended summary judgment order worked a substantive modification to the initial summary judgment order. "`A change in an order is considered substantive and outside the boundaries of [N.C. Gen. Stat. § 1A-1,] Rule 60(a) when it alters the effect of the original order.'" Pratt, 147 N.C. App. at 774, 556 S.E.2d at 624 ( quoting Buncombe Cty. ex rel. Andres v. Newburn, 111 N.C. App. 822, 825, 433 S.E.2d 782, 784, disc. review denied, 335 N.C. 236, 439 S.E.2d 143 (1993)). In concluding that a trial court lacked the authority to modify a prior order dismissing certain claims asserted in the plaintiffs' complaint in reliance upon Rule 60(a), for the purpose of adding a certification pursuant to Rule 54(b), this Court stated that:

by adding the trial court's Rule 54(b) certification and establishing grounds for immediate appellate review of an otherwise interlocutory order, the trial court's 10 October 2000 amended order, likewise "altered the substantive rights of the parties." . . . [T]he amended order in the instant case allowed plaintiffs to circumvent the established procedural rules governing the bringing of an appeal and secure appellate review of an otherwise unappealable order. Accordingly, we hold that [N.C. Gen. Stat. § 1A-1,] Rule 60(a) is not an appropriate means for seeking an amendment to an order or judgment to add the trial court's . . . certification [pursuant to Rule 54(b)].

As in Pratt, the trial court in this case lacked the authority to use Rule 60(a) to add a certification pursuant to Rule 54(b) to the initial summary judgment order because that action altered the substance of the initial order. Plaintiffs vigorously contend that the Joint Individual Defendants consented to the inclusion of a certification pursuant to Rule 54(b), with respect to the issue of Carteret County's right to control permanent structures in Marshallberg Harbor and that the Joint Individual Defendants have suffered no prejudice as a result of the trial court's action. However, the limitations on a trial court's authority to amend orders pursuant to Rule 60(a), are jurisdictional in nature, In re C.N.C.B., ___ N.C. App. ___, ___, 678 S.E.2d 240, 243 (2009) (stating that, "[b]ecause the trial court was without jurisdiction pursuant to [N.C. Gen. Stat. § 1A-1,] Rule 60(a)[,] to add the omitted finding of fact, the corrected order must be vacated"), and cannot be overlooked on the grounds of consent, Dep't. of Transp. v. Tilley, 136 N.C. App. 370, 374, 524 S.E.2d 83, 86 (stating that "[d]efendants correctly point out that subject matter jurisdiction cannot be consented to or stipulated to") (citing Stanley, Edwards, Henderson v. Dep't. of Conservation and Dev., 284 N.C. 15, 28, 199 S.E.2d 641, 650 (1973), disc. review denied, 351 N.C. 640, 543 S.E.2d 868, cert. denied, 531 U.S. 878, 148 S.E.2d 129, 121 S. Ct. 186 (2000)), or lack of prejudice. Thus, the trial court lacked the authority to amend the original summary judgment order for the purpose of certifying additional issues for immediate appeal pursuant to Rule 54(b).

As we read the record, Plaintiffs have not cited any alternative basis for the assertion of our appellate jurisdiction over this issue. Further, we do not read Plaintiffs' certiorari petition to encompass that portion of the trial court's order addressing the County's authority over the harbor. As a result, we are compelled to grant the Joint Individual Defendants' motion to dismiss Plaintiffs' appeal from that portion of the trial court's summary judgment order addressing the extent of Carteret County's authority over the permanent structures in Marshallberg Harbor.

Although we have dismissed Plaintiffs' appeal relating to the "harbor control" issue, we conclude that we will grant certiorari on our own motion to permit us to address this question on the merits. We have made this determination for a number of related reasons, including the fact that the parties apparently did agree, at one point, that it would be advantageous for this Court to consider both the issue of whether Plaintiffs had riparian rights into Marshallberg Harbor and the extent to which the County was entitled to control permanent structures in Marshallberg Harbor in the course of an interlocutory appeal from the trial court's summary judgment order, the fact that the Joint Individual Defendants addressed the extent of Plaintiffs' riparian rights in Marshallberg Harbor (a subject which the trial court attempted to resolve by construing the easements originally granted in connection with the construction of Marshallberg Harbor so as to provide that Carteret County would have control over permanent structures in the harbor) in their challenge to the trial court's summary judgment order, and the fact that consideration of this issue on the merits at this time will expedite the ultimate disposition of this case. As a result, we hereby treat the record and briefs as a petition for the issuance of a writ of certiorari directed toward the issue of Carteret County's role in the operation of Marshallberg Harbor pursuant to N.C.R. App. P. 21(a)(1) (2010) and grant that petition.

b. Construction of Easements

The extent to which Carteret County is entitled to control permanent structures in Marshallberg Harbor and to serve as the arbiter of disputes arising from such structures hinges upon the proper interpretation of the easements granted in connection with the harbor's construction. Thus, in order to decide whether the trial court properly granted summary judgment in favor of Carteret County with respect to this issue, we must examine the 19 October 1956 easement from certain landowners to Carteret County and the 25 October 1956 easement from Carteret County to the United States.

As should be obvious from an examination of the textual discussion, we agree with Plaintiffs that the 1 June 1957 easement, which grants Carteret County the right "to enter upon, use, manage, improve and maintain" a tract of land located at the head of Marshallberg Harbor "for a public landing open to all on equal terms," has no bearing on the extent, if any, to which the 19 October 1956 and 25 October 1956 easements authorize Carteret County to supervise permanent structures located in the harbor. As a result of our conclusion that the 1 June 1957 easement has no effect on the extent of Carteret County's role in the ongoing regulation of Marshallberg Harbor, we need not address Plaintiffs' contention that the trial court impermissibly expanded the authority granted by the 1 June 1957 easement to include all of Marshallberg Harbor. Instead, we will examine the issues raised by Plaintiffs' challenge to this portion of the trial court's summary judgment order on the basis of an analysis of the relevant easements. Strickland v. Hedrick, 194 N.C. App. 1, 22, 669 S.E.2d 61, 75 (2008) (stating that "`[a]ssuming arguendo that the trial court's reasoning . . . was incorrect, we are not required on this basis alone to determine that the ruling was erroneous'" and that "`[t]he question for review is whether the ruling of the trial court was correct'") (quoting State v. Austin, 320 N.C. 276, 290, 357 S.E.2d 641, 650, cert. denied, 484 U.S. 916, 98 L. Ed. 2d 224, 108 S. Ct. 267 (1987).

"An easement deed, such as the one in the case at bar, is, of course, a contract." Weyerhaeuser Co. v. Carolina Power Light Co., 257 N.C. 717, 719, 127 S.E.2d 539, 541 (1962).

Deeds of easement are construed according to the rules for construction of contracts so as to ascertain the intention of the parties as gathered from the entire instrument at the time it was made. When "there is any doubt entertained as to the real intention," the court should construe the deed of easement with "reason and common sense" and adopt the interpretation which produces the usual and just result.
Brown v. Weaver-Rogers Assocs., Inc., 131 N.C. App. 120, 122, 505 S.E.2d 322, 324 (1998), disc. review denied, 350 N.C. 92, 532 S.E.2d 523 (1999) (citations omitted); see also Lovin v. Crisp, 36 N.C. App. 185, 189, 243 S.E.2d 406, 409 (1978) (stating that the intention of the parties is to be gathered from "the instrument in its totality") (quoting Reynolds v. Sand Co., 263 N.C. 609, 139 S.E.2d 888 (1965)). When deciding the scope of an easement, "consideration must be given to the purposes for which the easement was granted." Shingleton v. State, 260 N.C. 451, 457, 133 S.E.2d 183, 187 (1963) (citing Sparrow v. Tobacco Co., 232 N.C. 589, 61 S.E.2d 700 (1950)). In ascertaining "the intention of the parties as of the time the contract was made," "consideration must be given to the purpose to be accomplished, the subject-matter of the contract, and the situation of the parties." Weyerhaeuser, 257 N.C. at 719, 127 S.E.2d at 541 (citing DeBruhl v. Highway Comm'n, 245 N.C. 139, 144-45, 95 S.E.2d 553, 557 (1956)). In the event that the language of an easement "is clear and unambiguous, effect must be given to its terms, and the court, under the guise of construction, cannot reject what the parties inserted or insert what the parties elected to omit." Id. (citing Hartford Accident Indem. Co. v. Hood, 226 N.C. 706, 710, 40 S.E.2d 198, 201-02 (1946)); see also Stonecreek Sewer Ass'n v. Gary D. Morgan Developer, Inc., 179 N.C. App. 721, 730, 635 S.E.2d 485, 491 (2006) (stating that, in the event that the easement is precisely described, "the plain language . . . and terms control") (citing Williams v. Abernethy, 102 N.C. App. 462, 464-65, 402 S.E.2d 438, 440 (1991), disc. review denied, 361 N.C. 227, 643 S.E.2d 400 (2007)). If, on the other hand, the language in which the easement is couched is ambiguous, it "`may be interpreted by reference to the attendant circumstances, to the situation of the parties, and especially to the practical interpretation put upon the grant by the acts of the parties in the use of the easement immediately following the grant.'" Williams, 102 N.C. App. at 465, 402 S.E.2d at 440 (quoting 2 G. Thompson, Commentaries on the Modern Law of Real Property § 385, at 528). Since an easement holder "may neither change the easement's purpose nor expand the easement's dimensions," Bunn Lake Prop. Owner's Ass'n. v. Setzer, 149 N.C. App. 289, 296, 560 S.E.2d 576, 581 (2002) (citations omitted), he or she "`must not change the use for which the easement was created so as to increase the burden of the servient tract." Swaim v. Simpson, 120 N.C. App. 863, 864, 463 S.E.2d 785, 787 (1995) (quoting I. Patrick K. Hetrick James B. McLaughlin, Jr., Webster's Real Estate Law in North Carolina § 15-21 (4th Ed. 1994)), aff'd, 343 N.C. 298, 469 S.E.2d 553 (1996).

Although the Joint Individual Defendants correctly note that references to other deeds or maps in a deed are properly considered for purposes of construing that instrument, Kelly v. King, 225 N.C. 709, 716, 36 S.E.2d 220, 224 (1945), we do not believe, as the Joint Individual Defendants contend, that the application of this principle to the facts of this case results in the incorporation of House Document No. 68 in its entirety into the deeds of easement that are at issue here. Although we agree that a map referenced in the record as Map. No. PSB-90 would be incorporated into the deeds of easement based on the principal upon which the Joint Individual Defendants rely, we do not believe that consideration of that map has added materially to our analysis of the issues in dispute between the parties.

The 19 October 1956 easement grants "a perpetual right and easement, said easement to include the right to have all necessary dredged materials deposited upon the lands herein affected, all without further charge to the United States Government, to [Carteret County], later to be assigned, transferred or reconveyed to the United States Government, to dredge and construct a channel from the Straits channel, or Core Sound, into and up Sleepy Creek, and into and upon the lands belonging to the undersigned, and to dredge and construct a basin or boat harbor" as shown on Map No. PSB-90. The deed in question specifically states that the United States "proposes to construct a small boat harbor for the boat owners of the people of Marshallberg and any and all other boat owners desiring to use same" and that it was "necessary to obtain from [the] owners [of the land upon which the harbor was to be built] an easement or right-of-way for the purpose of said construction, as well as later maintenance." In granting this easement, the landowners expressly stated a desire to cooperate with "the completion of such a project, with full realization as to the benefit to be received thereby, not only to the said land owners, but to the community and county as well. . . ."

Plaintiffs argue on appeal, based on the language in the 19 October 1956 easement, that "it is the practice of the United States Government to have land owners, in matters of this kind, convey directly to the county in which the development or project is located, the county in such cases later conveying to the United States Government;" other statements in the easement referring to the role of the United States in constructing the harbor; and the fact that the easement grants rights to Carteret County, "later to be assigned, transferred or reconveyed to the United States Government, to" construct the proposed harbor, that it is "clear that it is the United States, not the County, that is in charge of the Harbor project" (emphasis in the original) and "is to retain the rights granted under the Easement." The upshot of Plaintiffs' position concerning the proper construction of the 19 October 1956 easement is that the easement "is limited to the right to dredge the land and construct the channel and Harbor" and "contains no language giving the County any other rights. . . ." We do not, however, find this logic persuasive.

Plaintiffs' reading of the 19 October 1956 easement ignores the presence of language clearly establishing that the construction of Marshallberg Harbor was intended to serve public, rather than private, interests. The proposed harbor could only serve the public, as compared to a private, interest in the event that some entity had the right to ensure that the harbor functioned as a public, rather than a private, asset. For that reason, Plaintiffs' argument is inconsistent with the clear language of the 19 October 1956 easement describing the overarching purpose of the Marshallberg Harbor project. In addition, the literal language of the 19 October 1956 easement indicates that the rights granted to Carteret County "include[d] the right to have all necessary dredged materials deposited upon the lands herein affected" "later to be assigned, transferred or reconveyed to the United States Government," for the purpose of constructing the necessary harbor facilities. The presence of the word "include" indicates that the right to "have all necessary dredged materials deposited upon the lands herein" was only part of the rights granted pursuant to the 19 October 1956 easement. On the contrary, the clearly expressed purpose sought to be achieved by the granting of the 19 October 1956 easement was the construction and operation of a harbor "for the boat owners of the people of Marshallberg and any and all other boat owners desiring to use same," an end which could not be achieved solely through the construction and maintenance of a physical facility. The language of the 19 October 1956 easement does not in any way limit the rights granted to Carteret County in order to permit the achievement of that purpose. As a result, after carefully examining the language of that portion of the 19 October 1956 easement, we are convinced that the relevant language does not purport to require the transfer of the entire collection of rights created by the original easement from Carteret County to the United States, but rather contemplates the transfer of the right to "have all necessary dredged materials deposited upon the lands herein affected" so that the United States could "dredge and construct a channel from the Straits channel, or Core Sound, into and up Sleepy Creek, and into and upon the lands belonging to the undersigned, and to dredge and construct a basin or boat harbor. . . ." Since all of the rights granted by the easement were not to be transferred from Carteret County to the United States, the parties clearly contemplated that the County would retain the rights that were not to be subsequently conveyed to the United States. As a result, we are not persuaded that the language of the 19 October 1956 easement should be construed in the narrow manner advocated by Plaintiffs and believe, instead, that the 19 October 1956 easement should be construed to grant Carteret County the rights necessary to permit the construction, maintenance, and oversight of a small boat harbor for the use of the Marshallberg community and the general public.

The language of the 25 October 1956 easement between Carteret County and the United States confirms our interpretation of the 19 October 1956 easement. According to the 25 October 1956 easement, Carteret County conveyed to the United States "the perpetual rights and easement to enter unto, dig, or cut away any or all of the [real property described in the 25 October 1956 easement] as may be required for the construction and maintenance of the aforesaid work or improvement or any enlargement thereof, and to maintain the portion cut away and removed, as part of the navigable waters of the United States." As we understand this language, which does not purport to convey all of the rights granted to Carteret County in the 19 October 1956 easement to the United States, the United States obtained the rights necessary to construct and physically maintain Marshallberg Harbor. However, nothing in the language of the 25 October 1956 easement in any way indicates that Carteret County gave up any right that it had to oversee Marshallberg Harbor stemming from the 19 October 1956 easement, particularly given that the provisions of the 25 October 1956 easement granting the United States certain maintenance rights are not explicitly exclusive. Thus, we do not construe the 25 October 1956 easement as stripping Carteret County of any rights that it may have obtained under the 19 October 1956 easement for the purpose of overseeing the proposed harbor in the interests of the public.

In urging us to reach a contrary conclusion, Plaintiffs point to language in the 25 October 1956 easement requiring "local interests [to] furnish free of cost to the United States of America all necessary rights-of-way for the said improvement," note that the 25 October 1956 easement granted Carteret County "perpetual easements thereon for the purpose of executing and carrying out the aforesaid improvements," and remind us that Carteret County conveyed to the United States the "perpetual rights and easement to enter unto, dig, or cut away any or all of the hereinbefore described tract or land as may be required for the construction and maintenance of the aforesaid work or improvement or any enlargement thereof, and to maintain the portion cut away and removed. . . ." In addition, Plaintiffs point out that the 25 October 1956 easement does not contain any language reserving any rights to Carteret County. Plaintiffs' arguments in reliance upon the language of the 25 October 1956 easement are not persuasive.

Nothing in the language of the 25 October 1956 easement purports to strip Carteret County of any rights granted under the 19 October 1956 easement. On the contrary, the fact that the United States obtained the right to construct Marshallberg Harbor on the property specified in the 25 October 1956 easement does not in any way preclude Carteret County from exercising any rights available to it under the 19 October 1956 easement. In other words, we do not believe that the 25 October 1956 easement conveyed all of Carteret County's easement rights to the United States. Instead, we conclude that the 25 October 1956 easement simply authorized the United States to take certain actions while leaving the rights granted to Carteret County under the 19 October 1956 easement intact.

Thus, for the reasons set forth above, we conclude that the 19 October 1956 easement gave Carteret County broad rights relating to the construction, maintenance, and oversight of Marshallberg Harbor and that nothing in the 25 October 1956 easement stripped Carteret County of those rights. The rights granted to Carteret County under the 19 October 1956 easement were necessary to ensure that Marshallberg Harbor served "boat owners of the people of Marshallberg and any and all other boat owners desiring to use the" harbor. In view of the broad and unambiguous rights granted to Carteret County under the 19 October 1956 easement and the fact that those rights were not disturbed by the 25 October 1956 easement, we conclude that the trial court correctly construed the relevant easements to provide that Carteret County "ha[d] the right to control the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor" and should serve as "arbiter of any dispute concerning the demolition, removal, repair, erection, installation, and use made of any docks, mooring stakes, anchorages, berths, or any permanent structure in the harbor between the owners of property abutting the harbor, now and in the future, and the boaters, the general public, and others as disputes may arise."

In view of the fact that our decision with respect to the "harbor control" issue is based exclusively on what we believe to be the clear and unambiguous meaning of the 19 October 1956 and 25 October 1956 deeds of easement, we have not considered any evidence extrinsic to those documents in making our decision.

3. Prescriptive Easement

The second issue which Plaintiffs seek to raise on appeal stems from the trial court's refusal to grant summary judgment on the prescriptive easement issue. As we have already concluded, the trial court's summary judgment order is interlocutory in nature. Thus, in resolving Plaintiffs' challenge to the trial court's refusal to grant summary judgment in their favor with respect to the prescriptive easement issue, we must first address the extent, if any, to which this component of the trial court's summary judgment order is immediately appealable.

The trial court correctly refrained from certifying the prescriptive easement issue for immediate review pursuant to Rule 54(b), given that a refusal to grant summary judgment is not, as a general proposition, a final judgment with respect to a particular claim or party. In addition, Plaintiffs have wisely refrained from arguing that the trial court's refusal to grant their motion for summary judgment with respect to the prescriptive easement issue affected a substantial right given this Court's decision that a party's right to hold property free from such an encumbrance does not affect such a right. Miller v. Swann Plantation Dev. Co., 101 N.C. App. 394, 396, 399 S.E.2d 137, 139 (1991) (stating that "[w]e simply fail to see how defendants' claimed right to hold title to the property free from [an] encumbrance `will clearly be lost or irremediably adversely affected' if the order is not reviewed before final judgment") (quoting Blackwelder v. Dept. of Human Resources, 60 N.C. App. 331, 335, 299 S.E.2d 777, 780 (1983)). Instead, Plaintiffs argue that the relevant portion of the trial court's summary judgment order is immediately appealable based on principles such as those enunciated in Moses v. State Highway Comm'n, 261 N.C. 316, 317, 134 S.E.2d 664, 665 (stating "when, as here, the parties desire an answer to a question which is fundamental in determining their rights, is also of public importance, and when decided will aid State agencies in the performance of their duties, we will in the exercise of the supervisory jurisdiction given us, answer the question") (citations omitted), cert. denied, 379 U.S. 930, 13 L. Ed. 2d 342, 85 S. Ct. 327 (1964)). See also Edwards v. City of Raleigh, 240 N.C. 137, 139, 81 S.E.2d 273, 275 (1954), Stanback v. Stanback, 287 N.C. 448, 453, 215 S.E.2d 30, 34 (1975) (stating that appellate courts will review trial court orders "not otherwise appealable, when such review will serve the expeditious administration of justice;" that "[s]uch discretion is not intended to displace the normal procedures of appeal, but inheres to appellate courts under our supervisory power to be used only in those rare cases in which normal rules fail to administer to the exigencies of the situation;" and that, "[w]hen discretionary review is allowed, the question of appealability becomes moot") (citing Howland v. Stitzer, 240 N.C. 689, 692, 84 S.E.2d 167, 170 (1954); Ward v. Martin, 175 N.C. 287, 289-90, 95 S.E. 621, 623 (1918); Wachovia Bank Tr. Co. v. Morgan, 9 N.C. App. 460, 466, 176 S.E.2d 860, 864 (1970); 2 McIntosh, North Carolina Practice and Procedure § 1782(7) (Phillips Supp. 1970); and Furr v. Simpson, 271 N.C. 221, 222-23, 155 S.E.2d 746, 748 (1967)). However, as the citations to Edwards, 240 N.C. at 139, 81 S.E.2d at 275 (referring to the Supreme Court's authority "`to issue any remedial writs necessary to give it a general supervision and control over the proceedings of the inferior courts'") (quoting N.C. Const. Art. IV, sec. 8), and Furr, 271 N.C. at 223, 155 S.E.2d at 748 (stating that "[a]ppellee's contention that this appeal should be dismissed as premature . . . is rendered feckless by our order allowing certiorari") (citing Williams v. Bd. of Educ., 266 N.C. 761, 764, 147 S.E.2d 381, 383 (1966)), make clear, the principles upon which Plaintiffs rely do not constitute separate grounds for assuming appellate jurisdiction over appeals from interlocutory orders, but rather refer to this Court's authority to issue a writ of certiorari in order to permit review of interlocutory orders that are not appealable as a matter of right. N.C. Gen. Stat. § 7A-32(c) (2009). As a result, Plaintiffs are not entitled to seek immediate appellate review of the trial court's decision with respect to the prescriptive easement issue as a matter of right and must instead rely on their alternative request for the issuance of a writ of certiorari.

In seeking the issuance of a writ of certiorari, Plaintiffs argue that the prescriptive easement issue involves important questions of considerable interest to the public, that the prescriptive easement issue is inexorably intertwined with the other issues that are before the Court, and that a decision in their favor with respect to this issue would expedite the final resolution of this case. On the other hand, the Joint Individual Defendants, in opposing Plaintiffs' certiorari petition, emphasize that immediate appellate review of a trial court's order denying summary judgment should only be afforded in "extraordinary circumstances," Moore v. Moody, 304 N.C. 719, 720, 285 S.E.2d 811, 812 (1982), and argue that there is nothing "extraordinary" about the trial court's refusal to grant summary judgment with respect to the prescriptive easement issue. We agree with the Joint Individual Defendants.

The issues raised by Plaintiffs' challenge to the trial court's ruling on the prescriptive easement issue are exceedingly fact-intensive in nature. As the voluminous record that has been presented to us establishes, a proper determination of the correctness of the trial court's ruling would require consideration of a large amount of information concerning events and conditions at Marshallberg Harbor over an extended period of time. In our judicial system, most factual determinations are reserved for juries; the ultimate effect of the trial court's decision is to leave resolution of this issue for the jury, which will be able to hear all relevant witnesses and make any necessary credibility determinations. We do not find any of Plaintiffs' arguments in favor of departing from our general practice of declining to review most orders denying requests for summary judgment on an interlocutory basis to be persuasive. Although, as Plaintiffs point out, a decision in their favor on the prescriptive easement issue would end the present litigation, similar considerations would support the issuance of a writ of certiorari in virtually any case in which a trial court refuses to grant summary judgment. In addition, while there can be no doubt that the public interest will almost always be served by the expeditious resolution of litigation, there are benefits to be obtained from the fuller development of the record available as the result of the examination and cross-examination of witnesses. Furthermore, the routine allowance of interlocutory appeals would have a tendency to delay, rather than advance, the ultimate resolution of matters in litigation. Veazey, 231 N.C. at 363, 57 S.E.2d at 382. Finally, we are not persuaded that the factual matters that must be examined in order to resolve the prescriptive easement issue in this case are so inextricably intertwined with the other issues that are before the Court on appeal that proceeding to decide whether the trial court properly denied summary judgment with respect to the prescriptive easement issue would be advisable. Thus, for all of these reasons, we conclude, in the exercise of our discretion, that Plaintiffs' request for certiorari review of the prescriptive easement issue should be denied.

III. Conclusion

As a result, we conclude that the trial court correctly granted summary judgment in Plaintiffs' favor with respect to the riparian rights issue and in favor of Carteret County with respect to the question of how issues related to permanent structures in Marshallberg Harbor should be decided. In addition, we conclude that Plaintiffs do not have the right to appeal from the trial court's refusal to grant summary judgment with respect to the prescriptive easement issue as a matter of right and that Plaintiffs' request for the issuance of a writ of certiorari concerning that issue should be denied. Thus, the trial court's summary judgment order should be, and hereby is, affirmed in part and Plaintiffs' appeal from the trial court's refusal to grant summary judgment with respect to the prescriptive easement issue should be, and hereby is, dismissed.

AFFIRMED IN PART; DISMISSED IN PART.

Judges HUNTER and GEER concur.

Use AI to get other relevant cases.

Comments

NEWCOMB v. COUNTY OF CARTERET, COA09-1254 (N.C.App. 11-2-2010)
(Nov 1, 2010)