2025 INSC 1112
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 3 of the EP Act
  • Sections 3(1) and 3(2)(v) of the EP Act
  • Section 5, Subsection 2 of the Real Estate (Regulation and Development) Act, 2016 (RERA)
  • Section not specified of RERA (Real Estate Regulation Act)
  • Section 22 of the NGT Act
  • Chapter III of the Act, which deals with the jurisdiction, powers, and procedure of the Tribunal
  • Environment Protection Act, 1986
  • Wild Life (Protection) Act, 1972
  • Air (Prevention and Control of Pollution) Act, 1981 - Section not specified
  • Water (Prevention and Control of Pollution) Act, 1974 - Section not specified
  • Article 21 of the Constitution
  • Section 5, Subsection 2 of the 1983 Income Tax Act (Not mentioned in the text)
  • Section 14 of the NGT Act
  • Section 5, Subsection 2 of the Environment (Protection) Act, 1986
  • Section 20 of the NGT Act
  • Section 3(1) and clause (v) of Section 3(2) of the Environment (Protection) Act, 1986
  • Section 5 of the EP Act, notified on 24.10.2019 under Section 5 of the EP Act
  • The Environmental Protection Act (EP Act)
  • Sections 14, 15, and 2(m) of the NGT Act
  • Our Common Future (Brundtland Report)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2025 INSC 1112
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 3 of the EP Act
  • Sections 3(1) and 3(2)(v) of the EP Act
  • Section 5, Subsection 2 of the Real Estate (Regulation and Development) Act, 2016 (RERA)
  • Section not specified of RERA (Real Estate Regulation Act)
  • Section 22 of the NGT Act
  • Chapter III of the Act, which deals with the jurisdiction, powers, and procedure of the Tribunal
  • Environment Protection Act, 1986
  • Wild Life (Protection) Act, 1972
  • Air (Prevention and Control of Pollution) Act, 1981 - Section not specified
  • Water (Prevention and Control of Pollution) Act, 1974 - Section not specified
  • Article 21 of the Constitution
  • Section 5, Subsection 2 of the 1983 Income Tax Act (Not mentioned in the text)
  • Section 14 of the NGT Act
  • Section 5, Subsection 2 of the Environment (Protection) Act, 1986
  • Section 20 of the NGT Act
  • Section 3(1) and clause (v) of Section 3(2) of the Environment (Protection) Act, 1986
  • Section 5 of the EP Act, notified on 24.10.2019 under Section 5 of the EP Act
  • The Environmental Protection Act (EP Act)
  • Sections 14, 15, and 2(m) of the NGT Act
  • Our Common Future (Brundtland Report)
Smart Summary

Factual and Procedural Background

The appeals were filed by (i) Confederation of Real Estate Developers' Associations of India (CREDAI) in Civil Appeal No. 10043 of 2024, (ii) Godrej Properties Ltd. in Civil Appeal No. 5532 of 2025, and (iii) Sai Sahara Developers Ltd. in Civil Appeal No. 5533 of 2025. They invoked Section 22 of the National Green Tribunal Act, 2010, challenging a final order dated 09.08.2024 passed by the National Green Tribunal (NGT), Central Zone Bench, Bhopal, in Original Application No. 93 of 2024 (CZ).

By the impugned order, the NGT allowed an application filed by Respondent No. 3 and directed the Ministry of Environment, Forest and Climate Change (MoEF&CC) to ensure that all building and construction projects falling wholly or partly within 5 km of (i) protected areas under the Wildlife (Protection) Act, 1972, (ii) critically and severely polluted areas identified by the Central Pollution Control Board (CPCB), (iii) eco-sensitive areas notified under Section 3(2) of the Environment (Protection) Act, 1986, and (iv) inter-State boundaries, be treated as Category A projects and appraised at the Central level by the Sectoral Expert Appraisal Committee (Central EAC). MoEF&CC was further directed either to strictly implement the Environmental Impact Assessment Notification dated 14.09.2006 (EIA 2006 Notification) or issue a clarificatory notification.

In reaching its conclusion, the NGT held that the “General Conditions” (GC) under the EIA 2006 Notification applied to projects listed at items 8(a) (Building and Construction Projects) and 8(b) (Township and Area Development Projects) of the Schedule, and that MoEF&CC’s Notification dated 22.12.2014 inserting a note excluding the GC from items 8(a) and 8(b) had been quashed by the High Court of Kerala in One Earth One Life v. MoEF&CC, thereby reviving the GC’s applicability to those items.

The appellants were not parties before the NGT but asserted that the NGT’s order directly and substantially affected their ongoing and proposed real estate projects across the country, by shifting appraisal from State Expert Appraisal Committees (SEACs) and State Environment Impact Assessment Authorities (SEIAAs) to the Central EAC, allegedly resulting in indefinite delays and a “policy paralysis”.

The judgment also recounts the broader regulatory and litigation context: the issuance of the EIA 2006 Notification (classifying projects into Category A and B, with GC potentially re-categorising certain Category B projects), the MoEF&CC Office Memorandum dated 24.05.2011 clarifying that GC does not apply to items 8(a) and 8(b), and the EIA Notification dated 22.12.2014 (EIA 2014 Notification) that expressly inserted a note stating that GC “shall not apply” to items 8(a) and 8(b). The Kerala High Court, in One Earth One Life, quashed the 2014 Notification on procedural grounds, without deciding the substantive legal position.

Separately, in suo motu proceedings in O.A. No. 1038 of 2018 (based on a news item in “The Asian Age”), the NGT had directed MoEF&CC to frame a mechanism to regulate projects in Critically Polluted Areas (CPA) and Severely Polluted Areas (SPA). Pursuant to that, MoEF&CC issued Office Memoranda on 31.10.2019 and 30.12.2019, and on 13.03.2020 reiterated that projects under items 8(a) and 8(b) continued to be appraised by SEIAA/SEAC, in line with the 24.05.2011 OM. The NGT’s directions in O.A. No. 1038 of 2018 were upheld by this Court by judgment dated 25.02.2022 in a batch of civil appeals.

After the NGT’s order dated 09.08.2024 in the present matter, MoEF&CC issued Notification S.O. 523(E) dated 29.01.2025 (the “2025 Notification”), inserting in Column 5 of Item 8 a note again explicitly providing that “General Conditions shall not apply”, and clarifying the definition of “built-up area”. An Office Memorandum dated 30.01.2025 clarified that the 2025 Notification applied to the State of Kerala as well.

The constitutional validity of the 2025 Notification and the consequential OM dated 30.01.2025 was challenged in Writ Petition (C) No. 166 of 2025, Vanashakti v. Union of India. By order dated 05.08.2025, a coordinate Bench of the Supreme Court partly allowed the writ petition: it upheld the 2025 Notification and the OM, except for Note 1 to Entry 8(a), which exempted certain buildings (industrial sheds, schools, colleges and hostels) from the 2006 EIA regime and was struck down as arbitrary.

In the present judgment (dated 12.09.2025), the Bench notes that the 2025 Notification was issued in the backdrop of the NGT’s 09.08.2024 order now under challenge, and that the issues raised in these civil appeals already stand adjudicated in Vanashakti. The Court therefore decides the appeals in light of that earlier decision.

Legal Issues Presented

  1. Whether the “General Conditions” under the EIA 2006 Notification are applicable to Item 8(a) (Building and Construction Projects) and Item 8(b) (Township and Area Development Projects) of the Schedule, and, if so, whether such projects located within the specified distance (10 km, later reduced to 5 km) of environmentally sensitive areas must be treated as Category A projects requiring appraisal by the Central Expert Appraisal Committee, rather than by State SEACs/SEIAAs.
  2. Given the subsequent 2025 Notification and the Supreme Court’s decision in Vanashakti v. Union of India upholding that notification (except for Note 1 to Entry 8(a)), what is the continuing validity, if any, of the NGT’s order dated 09.08.2024 in O.A. No. 93 of 2024?

Arguments of the Parties

Appellant CREDAI (Civil Appeal No. 10043 of 2024)

  • CREDAI is the apex body of private real estate developers, representing more than 13,000 developers across 230 city chapters in 21 States, and is significantly affected by the NGT order as its members undertake projects under items 8(a) and 8(b) of the EIA 2006 Schedule.
  • The EIA 2006 Notification, issued under Sections 3(1) and 3(2)(v) of the EP Act, classifies projects into Category A (Central EAC) and Category B (SEIAA), with Category B further sub-divided into B1 and B2; item 8(a) is B2 (no EIA report) and item 8(b) is B1 (EIA report required).
  • The Schedule has five columns; Column 5 specifies “Conditions, if any”. For many activities (e.g., items 1(a), 1(c), 1(d), 2(a), 2(b), 3(a), 3(b), 5(d)–5(k), 6(b), 7(d)–7(i)), Column 5 expressly states that the General Conditions apply. By contrast, Column 5 is blank for items 8(a) and 8(b), indicating a deliberate legislative choice that GC should not apply to those items.
  • Reliance was placed on this Court’s judgment in In Re: Construction of Park at Noida Near Okhla Bird Sanctuary (“Okhla Bird Sanctuary”), where, after considering a high-level meeting chaired by the then Prime Minister on 06.07.2006, the Court noted that exclusion of items 8(a) and 8(b) from GC was a conscious decision to promote decentralisation. Paragraph 84 emphasised that the question of GC’s application needed clarity “beyond any debate or dispute”. The subsequent EIA 2014 Notification, which inserted the note “General Conditions shall not apply” against items 8(a) and 8(b), merely made explicit what was already implicit in the 2006 scheme.
  • The NGT, relying on the Kerala High Court’s judgment in One Earth One Life v. MoEF&CC, erroneously held that GC were “undisputably applicable” to items 8(a) and 8(b). The Kerala High Court quashed the 2014 Notification only on procedural grounds (variance from the draft and improper handling of objections), without ruling on the substantive correctness of excluding GC; thus, quashing does not imply that GC revive or that GC had earlier applied.
  • MoEF&CC’s consistent position in Office Memoranda and in its affidavits before the Supreme Court was that items 8(a) and 8(b) do not attract GC and remain within SEIAA/SEAC jurisdiction. The NGT’s assumption that quashing the 2014 Notification automatically revived GC is untenable.
  • The jurisdictional objection: Sections 14, 15 and 2(m) of the NGT Act confine the Tribunal to substantial environmental questions arising in a lis between parties with a demonstrable nexus to the projects. The NGT cannot entertain academic or policy-oriented questions. Reliance was placed on Techi Tagi Tara v. Rajendra Singh Bhandari, where the Supreme Court cautioned against NGT transgressing its statutory mandate.
  • It was contended that Respondent No. 3’s application before NGT lacked a personal grievance and did not seek compensatory, restorative or other relief envisaged under Sections 14 and 15; thus, it was not maintainable and beyond NGT’s jurisdiction.
  • MoEF&CC itself clarified that scrutiny at the State level by SEIAA/SEAC is of the same rigour as that at the Central level and that these bodies are expert bodies constituted under the EIA 2006 Notification. Decentralisation of items 8(a) and 8(b) was a conscious policy to secure timely and effective decision-making. The NGT’s order shifting such projects to the Central level frustrates legislative intent, overburdens the Centre, and causes avoidable delays.
  • The NGT’s reliance on an Office Memorandum dated 31.10.2019 (relating to projects in CPA/SPA) was said to be misplaced, as a later OM dated 13.03.2020 clarified that an earlier OM dated 24.05.2011 continued to govern items 8(a) and 8(b), leaving them within SEIAA/SEAC jurisdiction. The NGT’s order was characterised as lacking jurisdiction, misreading notifications, disregarding legislative intent and binding precedent, and not advancing a genuine environmental objective.

Appellant Godrej Properties Ltd. (Civil Appeal No. 5532 of 2025)

  • Godrej Properties is a public limited company engaged in large-scale real estate development across India, with approximately 239 million sq. ft. of development (79 ongoing and 34 forthcoming projects), many in Mumbai. It is significantly impacted by the NGT order.
  • The appellant adopted the submissions made on behalf of CREDAI.
  • It was submitted that, pursuant to the NGT’s directions, there is presently “no authority competent” to appraise Environmental Clearance (EC) applications for projects under items 8(a) and 8(b). State SEACs/SEIAAs were precluded from appraising such projects, and, as per the Union’s reply affidavit, the Central EAC was also not in a position to appraise them, resulting in a “legal vacuum”.
  • The appellant stated that five projects are directly affected: four are for expansion of existing ECs granted under EIA 2006, and one is a fresh application to SEIAA. To avoid delay, the appellant submitted all five projects to the Central SEAC for appraisal during pendency of the appeal, but as neither SEIAA nor Central SEAC was processing them, the projects were stalled.
  • This “policy paralysis” allegedly affects over 1,469 flat purchasers whose homes have been booked on the strength of existing ECs, and about 613 families undergoing redevelopment and deprived of possession. All projects are registered under the Real Estate (Regulation and Development) Act, 2016 (RERA), under which the appellant has statutory and contractual obligations to complete and deliver units within fixed timelines, failing which it faces interest, penalties and other directions.
  • The appellant argued that the appraisal standstill caused by the NGT’s order has cascading adverse consequences for developers and thousands of homebuyers, without commensurate environmental benefit, and hence the impugned NGT order should be set aside.

Appellant Sai Sahara Developers Ltd. (Civil Appeal No. 5533 of 2025)

  • Sai Sahara Developers is a partnership firm engaged in real estate development under the trade name “Sai Sahara Developers”, constituted by a partnership deed dated 01.10.2022 at Nashik, Maharashtra. Its projects fall within the regulatory framework affected by the NGT’s order.
  • The appellant contended that the NGT misread the Okhla Bird Sanctuary judgment. A contextual reading of paragraphs 59, 60 and 84 of that judgment shows a clear legislative intent to exempt items 8(a) and 8(b) from GC, and to leave appraisal of such projects at the State level.
  • Determining the level of appraisal is a matter for the legislature and the competent authority under the EIA framework; the NGT lacked jurisdiction to alter the statutory allocation that items 8(a) and 8(b) are to be appraised by SEIAA/SEAC. The absence of any condition in Column 5 for these entries, unlike other entries where GC is explicitly mentioned, reflects a deliberate legislative choice to exclude GC.
  • The Kerala High Court’s judgment quashing the EIA 2014 Notification was said not to alter the legal framework, as the 2014 Notification was only clarificatory. The EIA 2006 Notification itself never extended GC to items 8(a) and 8(b). In any case, the Kerala High Court’s decision has no binding effect beyond its territorial jurisdiction and cannot govern interpretation by the NGT or other High Courts; the principle of stare decisis operates territorially for High Courts.
  • The appellant argued that the NGT’s order, particularly paragraphs 41 and 42, has led to indefinite delays across numerous real estate projects, jeopardising their financial and practical viability and adversely affecting fundamental rights to shelter and livelihood under Article 21 of the Constitution for slum dwellers, society members and homebuyers.
  • It was also contended that the NGT failed to consider crucial Office Memoranda dated 24.05.2011 and 13.03.2020, which clearly stated that GC is inapplicable to projects under items 8(a) and 8(b), and which showed a consistent practice of State-level appraisal. Respondent No. 3 allegedly suppressed these documents before the NGT.
  • On jurisdiction, reference was made to the Preamble and Chapter III of the NGT Act, arguing that NGT is meant to adjudicate on environmental protection, rights enforcement, and relief/compensation for environmental damage, but not to decide abstract policy questions or issue directions in the nature of mandamus to MoEF&CC. Respondent No. 3 was said to have approached NGT suo motu, without a live dispute or locus, seeking reclassification of entire categories of projects, which falls outside the Tribunal’s jurisdiction.
  • The appellant prayed for setting aside the NGT’s order and allowing the appeals.

Intervenor Ricardo Constructions Pvt. Ltd.

  • The Intervenor acquired a stalled real estate project in Mulund (W), Mumbai, via a registered conveyance deed dated 29.06.2019 following SARFAESI proceedings against the earlier promoter. The project involves 10 residential buildings: five completed before the EIA Notification, three with EC dated 03.09.2014, and two new buildings currently proposed.
  • The project site lies 1.06 km from Sanjay Gandhi National Park and Thane Creek Flamingo Sanctuary, placing it within Category A under the EIA 2006 Notification’s GC criteria. The Intervenor applied to the Central EAC on 09.09.2024 and obtained consent from the Maharashtra Pollution Control Board on 02.08.2024. The project cost is estimated at approximately Rs. 980 crores.
  • It was argued that GC under EIA 2006 is inapplicable to building and construction projects. Items 8(a) and 8(b) leave Column 5 blank, while other items specifically mention GC where applicable. This Court in Okhla Bird Sanctuary clarified that GC do not apply to building and construction projects; thus, even before the 2014 amendment, items 8(a) and 8(b) were exempt.
  • The Kerala High Court’s judgment in One Earth One Life was said to quash the 2014 Notification only insofar as it operated in Kerala; High Court judgments are binding only within their territories, as held in East India Commercial Co. Ltd. v. Collector of Customs. The NGT erred in giving nationwide effect to that judgment, thereby stalling projects across India.
  • It was further contended that quashing the 2014 Notification does not automatically revive any earlier regime of GC applicability. Citing the doctrine of eclipse as explained in Bhikaji Narain Dhakras v. State of Madhya Pradesh, it was argued that a law rendered inoperative does not automatically revive without re-enactment or explicit revival.
  • The Intervenor alleged breach of natural justice: the NGT’s order has far-reaching impact but was passed without hearing affected stakeholders such as the Intervenor, violating the principle of audi alteram partem. The Tribunal misinterpreted its jurisdiction and the EIA framework, and its order should be set aside to prevent undue losses and protect developers’ rights.

Respondent No. 1 – Union of India / MoEF&CC

  • The Additional Solicitor General explained that the EIA 2006 Notification (S.O. 1533(E)) mandated prior EC for listed projects, to be granted after the EIA process, and provided GC that re-categorise certain Category B projects as Category A if they are located within specified distances of protected areas, CPAs, eco-sensitive zones, or inter-State/International boundaries.
  • GC applies only where expressly mentioned in Column 5 of the Schedule. Since items 8(a) and 8(b) have no such mention, GC was never applicable to them. An OM dated 24.05.2011 clarified that building and construction projects [8(a)] and township/area development projects [8(b)] do not attract GC even in critically polluted areas and remain within SEIAA jurisdiction.
  • The EIA 2014 Notification (22.12.2014) amended the Schedule to explicitly reaffirm that GC do not apply to items 8(a) and 8(b). The Kerala High Court in One Earth One Life quashed the 2014 Notification solely on technical grounds (variance between draft and final notification and mis-statement about objections), leaving liberty to issue a fresh notification.
  • The NGT’s impugned order directed MoEF&CC either to apply GC to items 8(a) and 8(b) or issue a clarificatory notification, based on a misreading of the Kerala High Court’s judgment; in fact, items 8(a) and 8(b) were never subject to GC under the principal 2006 notification.
  • Pursuant to the NGT’s directions, MoEF&CC prepared a draft clarificatory notification and sought advice from the Ministry of Law and Justice (MoLJ). Relying on B.N. Tiwari v. Union of India, MoLJ opined that since the 2014 Notification had substituted Entry 8 and was quashed, the original entry did not automatically revive; a fresh notification was necessary.
  • Accordingly, after public consultation (receiving 668 responses) and consultation with the Expert Appraisal Committee, MoEF&CC issued the 2025 Notification dated 29.01.2025 explicitly reiterating that GC does not apply to items 8(a) and 8(b). This notification was challenged in Vanashakti v. Union of India (W.P.(C) No. 166 of 2025); an interim ex parte stay was initially granted on 24.02.2025, causing another “legal vacuum” where MoEF&CC was unable to process applications under item 8, but the matter was finally decided by judgment dated 05.08.2025.
  • On the competence of SEIAAs/SEACs, it was submitted that these bodies were created to decentralise decision-making, avoid delays and ensure efficiency. Comprising experts who meet eligibility criteria under Appendix VI of EIA 2006, they are as competent as the Central EAC to appraise projects. Directing all item 8 projects to MoEF&CC would overload the Centre, create inequality and encourage forum-shopping, undermining the timelines and efficiency of the decentralised system.
  • MoEF&CC therefore urged that the NGT’s order dated 09.08.2024, based on an erroneous understanding of the Kerala High Court’s decision, be quashed, that Respondent No. 3 be restrained from forum-shopping, and that the settled position—that items 8(a) and 8(b) are not subject to GC and remain within SEIAA jurisdiction—be reaffirmed.

Respondent No. 3 (Original Applicant before NGT)

  • Respondent No. 3 submitted that it filed Original Application No. 93 of 2024 before NGT in pursuit of environmental protection, focusing on ensuring that building and construction projects—described as among the most pollution-intensive industries—are subjected to higher scrutiny by sectoral EACs at the Central level, especially where located in CPA, SPA, eco-sensitive zones or protected areas.
  • The NGT was said to have correctly appreciated a statutory mechanism notified on 24.10.2019 under Section 5 of the EP Act, covering both CPA and SPA. While GC expressly refer only to CPA, a cumulative reading of this mechanism and the notification led the NGT to conclude rightly that all projects within CPA/SPA, including building and construction, must be appraised at the Central level by sectoral EACs.
  • In doing so, the NGT relied on Clause 7(i)(III)(i)(d) and Appendix VI of EIA 2006, its earlier decisions in Vkrant Tongad, Karukampally Vijayan Biju, M/s Ardent Steel Ltd., and this Court’s decision in In Re: News Item published in “The Asian Age” (which had led to formulation of the 24.10.2019 mechanism).
  • Respondent No. 3 emphasised that MoEF&CC’s Notification dated 29.01.2025 inserting Note 2 in Item 8 to clarify “General Conditions do not apply” has been challenged in Vanashakti and stayed on 24.02.2025, making the issue of GC applicability sub judice. However, the 24.10.2019 mechanism under Section 5 of the EP Act operates independently of GC and, as upheld by this Court’s judgment dated 25.02.2022 in a batch of civil appeals, continues to mandate that all projects within 5 km of CPA/SPA be treated as Category A and appraised at the Central level.
  • MoEF&CC, in its pleadings before NGT and in written submissions before this Court, was said not to dispute the applicability of the 24.10.2019 mechanism to building and construction projects; excluding only these projects while including all other 37 scheduled activities would defeat the mechanism’s purpose.
  • Respondent No. 3 argued that the EIA 2014 Notification inserting “GC shall not apply” to Entry 8 indicates that GC otherwise applied to building and construction projects, and that its quashing by the Kerala High Court restored GC applicability. Administrative circulars such as OMs dated 24.05.2011 and 13.03.2020, being non-statutory, cannot override a statutory mechanism under Section 5 of the EP Act, with reliance placed on Alembic Pharmaceuticals v. Rohit Prajapati.
  • On jurisdiction, it was argued that objections about NGT exceeding its jurisdiction under Section 14 of the NGT Act were not raised in pleadings and cannot be raised belatedly. In any event, Supreme Court decisions in Mantri Techzone v. Forward Foundation, Municipal Corporation of Greater Mumbai v. Ankita Sinha and Indian Oil Corporation Ltd. v. V.B.R. Menon recognise the NGT’s wide powers to direct effective environmental protection measures.
  • Respondent No. 3 supported the NGT’s purposive interpretation of EIA 2006 in applying GC to building and construction projects, citing Workmen of American Express v. Management and SEBI v. Ajay Agarwal to argue that, where two views are possible, courts should adopt the one that furthers the legislation’s object—in this context, robust environmental protection.
  • It prayed that the appeals be dismissed and the NGT order be upheld; alternatively, it sought a direction that all building and construction projects within 5 km of CPA/SPA notified by CPCB be treated as Category A and appraised at the Central level by the sectoral EAC under the already affirmed 24.10.2019 mechanism.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
In Re: Construction of Park at Noida Near Okhla Bird Sanctuary (“Okhla Bird Sanctuary”) (2011) 1 SCC 744 Highlighted the need to clarify the application of the General Conditions under the EIA 2006 Schedule, noted that construction and township projects were intended to be regulated at the State level, and observed ambiguity regarding built-up area definitions. Cited to support the view that GC were not intended to apply to items 8(a) and 8(b) and that decentralised appraisal by SEIAAs/SEACs was a conscious policy choice; also to explain that the 2025 Notification addressed earlier ambiguity about “built-up area”.
One Earth One Life v. MoEF&CC, High Court of Kerala, W.P.(C) No. 3097 of 2016 (judgment dated 06.03.2024) Quashed the EIA 2014 Notification on procedural grounds: (i) incorrect statement that no objections were received and (ii) impermissible variance between draft and final notification. Referenced as the decision that invalidated the 2014 Notification; the Supreme Court notes it did not decide the substantive issue of GC applicability, yet the NGT treated it as reviving GC for items 8(a)/8(b). The 2025 Notification was later issued “in the backdrop” of this judgment.
Techi Tagi Tara v. Rajendra Singh Bhandari (2017) 11 SCC 734 Cautioned that NGT must remain within its statutory mandate and not entertain policy-oriented or purely academic questions beyond a concrete lis. Invoked by appellants to argue that NGT lacked jurisdiction to entertain Respondent No. 3’s application, which allegedly raised abstract policy issues without a specific claimant or compensatory/restorative relief.
East India Commercial Co. Ltd. v. Collector of Customs, AIR 1962 SC 1893 Held that judgments of a High Court are binding only within its territorial jurisdiction. Cited by the Intervenor and an appellant to argue that the Kerala High Court’s decision in One Earth One Life could not have nationwide binding effect, and that the NGT erred in applying it across India.
Bhikaji Narain Dhakras v. State of Madhya Pradesh, AIR 1955 SC 781 Explained the doctrine of eclipse: a law that becomes inoperative remains dormant and does not automatically revive unless re-enacted or expressly revived. Relied on by the Intervenor to argue that quashing the 2014 Notification does not automatically revive any prior regime making GC applicable to item 8 projects.
B.N. Tiwari v. Union of India, AIR 1965 SC 1430 Addressed the legal effect of quashing a substituted provision and the non-automatic revival of earlier text. MoLJ, as quoted by MoEF&CC, relied on this decision to advise that after the Kerala High Court quashed the substituted Entry 8, the original entry did not automatically revive, necessitating a fresh notification (the 2025 Notification).
Vanashakti v. Union of India, W.P.(C) No. 166 of 2025, judgment dated 05.08.2025 Interpreted the EIA 2006 Schedule and the 2025 Notification; held that GC apply only where expressly provided in Column 5, that items 8(a) and 8(b) never attracted GC under the 2006 regime, and upheld the 2025 Notification (excluding Note 1 to Entry 8(a)) and the OM dated 30.01.2025. Formed the central basis for disposing of the present appeals. The Court reproduces extensive passages and adopts its holdings: that GC are inapplicable to items 8(a)/8(b), that SEIAAs are competent expert bodies, that sustainable development requires balancing environment and development, and that Note 1 to Entry 8(a) is arbitrary and invalid.
Judgment dated 25.02.2022 in Civil Appeals Nos. 2218–2219, 2220–2221, 2434, 2463, 3319–3321 of 2020 Dismissed appeals and upheld NGT’s directions in O.A. No. 1038 of 2018 regarding formulation and implementation of a mechanism for projects in CPAs and SPAs. Cited to show that the Section 5 mechanism dated 24.10.2019 for stringent scrutiny of projects in CPA/SPA areas was approved by the Supreme Court and thus binds all projects, including building and construction, per Respondent No. 3.
In Re: News Item published in “The Asian Age” (NGT O.A. No. 1038 of 2018) NGT suo motu proceedings based on a news report, where the Tribunal noted high pollution in CPA/SPA, temporarily prohibited new activities, and directed MoEF&CC to evolve a mechanism for strict scrutiny of projects. Referred to as the origin of the 24.10.2019 mechanism; Supreme Court notes its directions were subsequently upheld in the 25.02.2022 civil appeals judgment.
Vkrant Tongad (NGT) Earlier NGT decision concerning environmental appraisal (specific details not set out in this judgment). Mentioned as one of the NGT precedents relied upon by Respondent No. 3 to justify the Tribunal’s reasoning on central appraisal for projects in sensitive areas.
Karukampally Vijayan Biju (NGT) Earlier NGT decision (specific legal principle not detailed in the present judgment). Cited by Respondent No. 3 as supporting NGT’s approach to environmental scrutiny under the EIA framework.
M/s Ardent Steel Ltd. (NGT) Earlier NGT decision (precise holding not described here). Invoked by Respondent No. 3 as part of the jurisprudential basis for stricter appraisal of projects in CPAs/SPAs.
Alembic Pharmaceuticals v. Rohit Prajapati (2020) 17 SCC 157 Recognised that non-statutory administrative circulars or Office Memoranda cannot override statutory mechanisms or notifications issued under the EP Act. Cited by Respondent No. 3 to argue that MoEF&CC’s OMs (24.05.2011, 13.03.2020) cannot dilute or override the statutory Section 5 mechanism of 24.10.2019.
Mantri Techzone v. Forward Foundation (2019) 18 SCC 494 Affirmed the NGT’s wide powers to provide effective remedies and directions for environmental protection. Relied on by Respondent No. 3 to counter the appellants’ jurisdictional objection and to support NGT’s power to issue broad directions concerning appraisal of construction projects.
Municipal Corporation of Greater Mumbai v. Ankita Sinha (2022) 13 SCC 401 Reiterated and elaborated on the broad remedial and supervisory jurisdiction of NGT in environmental matters. Cited to support the contention that NGT can issue directions even in the absence of a conventional bilateral lis, so long as substantial environmental questions are involved.
Indian Oil Corporation Ltd. v. V.B.R. Menon (2023) 7 SCC 368 Recognised NGT’s authority to fashion effective remedies for environmental protection. Referenced by Respondent No. 3 in support of NGT’s competence to issue the impugned directions.
Workmen of American Express v. Management (1985) 4 SCC 71 Illustrated purposive interpretation of statutes, favouring constructions that advance remedial objectives. Relied on by Respondent No. 3 to argue that EIA 2006 should be interpreted purposively in favour of stronger environmental safeguards, making GC applicable where that would better serve the Act’s purpose.
SEBI v. Ajay Agarwal (2010) 3 SCC 765 Supported purposive construction of regulatory statutes to further their protective objectives. Cited with American Express to contend that, where two interpretations are possible, courts should prefer the one that furthers environmental protection.
Vellore Citizens' Welfare Forum v. Union of India (1996) 5 SCC 647 Declared “sustainable development” as a balancing concept between development and ecology, recognising it as part of customary international law. Quoted extensively in the Vanashakti extract to emphasise that development and environmental protection are not mutually exclusive and that sustainable development must guide interpretation and application of environmental law.
S. Jagannath v. Union of India (1997) 2 SCC 87 Discussed the conflict between development and ecology and endorsed sustainable development as the guiding principle. Referred to (within the Vanashakti extract and related discussion) as part of the line of cases entrenching sustainable development in Indian environmental jurisprudence.
Consumer Education & Research Society v. Union of India (2000) 2 SCC 599 Applied sustainable development and related environmental principles. Cited among the authorities (in the Vanashakti extract) supporting the balance between environmental protection and developmental needs.
Intellectuals Forum, Tirupathi v. State of A.P. (2006) 3 SCC 549 Reiterated sustainable development and the need to balance ecological concerns with development. Mentioned in the Vanashakti extract to underscore the continuing application of sustainable development in Supreme Court jurisprudence.
Tata Housing Development Company Ltd. v. Aalok Jagga (2020) 15 SCC 784 Applied sustainable development principles in the context of a housing project. Cited to show that courts require mitigation and compensatory measures when environmental harm results from development, while not halting development per se.
State of Uttar Pradesh v. Uday Education and Welfare Trust, 2022 SCC OnLine SC 1469 Emphasised that NGT must apply sustainable development, the precautionary principle, and polluter pays, but must also recognise the need for development and strike a proper balance. Quoted in Vanashakti (paras 117–118) and referred to here to stress that protecting forests and resources must be reconciled with legitimate development requirements.
In Re: Zudpi Jungle Lands (citation not fully provided in text) Consolidated prior Supreme Court decisions on sustainable development, affirming it as a balancing concept between ecology and development. Referenced in the Vanashakti extract as a recent judgment reiterating sustainable development and summarising earlier authorities such as Vellore, Jagannath, Consumer Education, Intellectuals Forum and Tata Housing.

Court's Reasoning and Analysis

The Court first crystallises the core issue: whether the General Conditions (GC) in the EIA 2006 Notification apply to Item 8(a) (Building and Construction Projects) and Item 8(b) (Township and Area Development Projects), and if so, whether such projects within specified distances of sensitive areas must be treated as Category A and appraised by the Central EAC rather than by State SEACs/SEIAAs (para 11).

To address this, the Court recapitulates the statutory and factual background. The EIA 2006 Notification, issued under Section 3 of the EP Act, created a two-tier classification: Category A projects require prior EC from the Central EAC, while Category B projects require EC from the State SEAC and SEIAA (para 13). It also introduced a General Condition: certain Category B projects located within a specified distance (initially 10 km, later 5 km) of protected areas, CPAs, eco-sensitive zones, or inter-State/International boundaries are to be treated as Category A. Column 5 of the Schedule lists the items to which GC applies; significantly, items 8(a) and 8(b) were not subjected to GC (paras 13, 16).

The Court notes that the scope of GC was considered in Okhla Bird Sanctuary, where arguments were raised that the absence of GC in Column 5 for items 8(a) and 8(b) reflected an intent to leave such projects to State appraisal. The Supreme Court in that case referred to a 06–07 July 2006 meeting chaired by the then Prime Minister, where it was decided that construction and township projects would be regulated by States regardless of size, and observed that clarity was required on GC’s application (para 14).

Following Okhla Bird Sanctuary, MoEF issued an OM dated 24.05.2011 clarifying that projects under items 8(a) and 8(b) do not attract GC and hence remain Category B, regardless of their location near CPAs or eco-sensitive areas, to be appraised at the State level (para 15). On 22.12.2014, MoEF&CC issued the EIA 2014 Notification inserting a note under items 8(a) and 8(b) explicitly stating that GC “shall not apply” (para 16).

The High Court of Kerala, in One Earth One Life, quashed the 2014 Notification on two procedural grounds: an incorrect statement that no objections had been received and an impermissible variance between draft and final notification (para 17). The Supreme Court’s present judgment emphasises that this quashing was “on technical ground” as also recognised in the later Vanashakti decision (para 218 of the extract).

The Court also recounts the development of a separate mechanism for CPAs and SPAs. In NGT O.A. No. 1038 of 2018, initiated suo motu based on a news item, the Tribunal on 19.08.2019 directed MoEF&CC to formulate a mechanism for environmental management and project regulation in CPAs/SPAs (para 18). MoEF&CC issued OMs dated 31.10.2019 and 30.12.2019, and on 13.03.2020 reiterated that item 8(a) and 8(b) projects would continue to be appraised by SEIAA/SEAC in accordance with the 24.05.2011 OM (para 18). NGT’s orders in O.A. No. 1038 of 2018 were upheld by this Court in a batch of civil appeals decided on 25.02.2022 (para 19).

Against this background, Respondent No. 3 filed Original Application No. 93 of 2024 before the NGT, asserting that unchecked large-scale construction in CPAs and eco-sensitive zones threatened the right to life and health of residents and should be treated as Category A projects (para 20). By order dated 09.08.2024, the NGT held, inter alia, that GC apply to items 8(a) and 8(b) and directed that building and construction projects within 5 km of protected areas, CPAs, SPAs, eco-sensitive zones or inter-State boundaries be treated as Category A and appraised by the Central EAC (paras 3, 20, 183). The NGT reasoned that once the 2014 Notification excluding GC was quashed by the Kerala High Court, the exclusion no longer survived and GC revived (para 183).

Following the NGT’s order, MoEF&CC issued the 2025 Notification S.O. 523(E) dated 29.01.2025 inserting in Column 5 of Item 8 specific notes clarifying that “General Conditions shall not apply” to items 8(a) and 8(b), and also refining the definition of “built-up area” and other conditions (paras 21, 189–212). An OM dated 30.01.2025 clarified that the notification applies to Kerala as well (paras 21, 44–46).

The constitutional validity of the 2025 Notification and the OM was challenged in Vanashakti v. Union of India. The present Bench reproduces at length the coordinate Bench’s reasoning (paras 14–47 of the Vanashakti order). Key points from that reasoning, as adopted here, include:

  • The Schedule to EIA 2006 has five columns, with Column 5 specifying conditions, including any applicability of GC (paras 15–17). On comparison of Column 5 of Entry 8 with several other entries (such as 1(a), 1(c), 1(d), 2(a), 2(b), 3(a), 3(b), 4(b), 4(d), 4(f), 5(d)–5(j), 6(b), 7(c)–7(i)), it is clear that wherever delegated legislation intended GC to apply, Column 5 specifically so states; Column 5 of Entry 8(a) and 8(b) does not so provide (paras 17–19).
  • Applying the literal rule of interpretation, the 2006 Notification does not provide for GC’s applicability to entries 8(a) and 8(b). General Conditions have not been provided for these entries “right from the 2006 notification” (paras 25–27).
  • The NGT’s 09.08.2024 order failed to consider the 2006 Notification “in its correct perspective” and did not have the benefit of the 2025 Notification (para 25, 28). Its conclusion on GC applicability is thus flawed.
  • The coordinated judgment reiterates established Supreme Court jurisprudence on sustainable development and balancing environment with development, citing cases such as Vellore Citizens’ Welfare Forum, Jagannath, Consumer Education & Research Society, Intellectuals Forum, Tata Housing, Uday Education and In Re: Zudpi Jungle Lands (paras 31–34, 117–119, 243–247). It stresses that while environmental protection is crucial and natural resources are held in trust for future generations, development is also necessary and must proceed in a sustainable manner.
  • The coordinate Bench finds that MoEF&CC alone cannot feasibly process all projects nationwide; SEIAAs, being statutory expert bodies constituted by the Central Government under the 2006 Notification, are better placed to assess environmental impact within their respective States/UTs (paras 35–37). It therefore sees “no reason” why SEIAAs should not consider proposals if properly constituted.
  • The 2025 Notification is upheld as clarifying the built-up area definition and GC inapplicability to items 8(a)/8(b), but Note 1 to Entry 8(a), which exempted industrial sheds, schools, colleges and hostels from the 2006 Notification, is struck down as arbitrary and lacking rational nexus with the EP Act’s purpose (paras 40–43, 46).
  • The OM dated 30.01.2025 is upheld as being conducive to environmental interest by extending the notification’s conditions to Kerala (paras 44–45).

After setting out these passages, the present Bench notes that the 2025 Notification was issued “on the basis of the order impugned” in these appeals and that the same notification and OM have already been adjudicated in Vanashakti (para 23). It observes that the issues raised here “already stand adjudicated” and that it is neither necessary nor proper to re-examine them, for reasons of judicial propriety (para 23).

The Court records that in Vanashakti the coordinate Bench accepted the Union’s position that GC were never made applicable to items 8(a) and 8(b), and that wherever GC was intended to apply, Column 5 expressly stated so (para 24). That Bench held that delegated legislation had specifically indicated GC’s applicability in relevant entries, and consequently entries 8(a) and 8(b) did not attract GC (para 24.1). It further held that the NGT had misconstrued the 2006 Notification and that GC were never attracted to projects under items 8(a) and 8(b) (para 24.1).

The coordinate Bench also noted that one aim of the 2025 Notification was to address ambiguity in built-up area requirements identified in Okhla Bird Sanctuary, and reaffirmed the need for sustainable development while recognising SEIAAs as appropriate expert bodies for project appraisal (para 24.2). It ultimately upheld the 2025 Notification (except Note 1) and the OM of 30.01.2025 (para 24.3).

In the present appeals, the Court expressly states: “We are in full agreement with the view so taken by the coordinate Bench in Writ Petition (C) No. 166 of 2025” (para 25). It then draws the consequence that, because the 2025 Notification (excluding Note 1 to Entry 8(a)) has been upheld and now “holds the field”, the NGT’s impugned order dated 09.08.2024—on which the 2025 Notification was based—“does not survive for consideration” (para 25, 280). In effect, the prior NGT order loses operative significance in light of the Supreme Court’s definitive interpretation of the EIA framework and GC inapplicability to entries 8(a) and 8(b).

Holding and Implications

Holding: The Supreme Court fully adopts the reasoning and conclusions of its coordinate Bench in Vanashakti v. Union of India, W.P.(C) No. 166 of 2025. It holds that:

  • The General Conditions under the EIA 2006 Notification are not applicable to projects and activities under Item 8(a) (Building and Construction Projects) and Item 8(b) (Township and Area Development Projects) of the Schedule.
  • The 2025 Notification dated 29.01.2025, which clarifies that GC do not apply to items 8(a) and 8(b) and refines conditions for those entries, stands upheld (save for Note 1 to Entry 8(a), already struck down in Vanashakti), and, together with the OM dated 30.01.2025, “presently holds the field”.
  • In consequence, the NGT’s impugned order dated 09.08.2024 in O.A. No. 93 of 2024—which proceeded on the premise that GC applied to items 8(a) and 8(b) and directed central-level appraisal—“does not survive for consideration”.
  • All the civil appeals are DISPOSED OF in light of the coordinate Bench’s decision, with no order as to costs. Pending applications, if any, are also disposed of (paras 26–27).

Implications:

  • The authoritative legal position is that building and construction projects and township/area development projects covered by items 8(a) and 8(b) are not subject to the General Conditions of the EIA 2006 Notification. Their appraisal remains within the jurisdictional framework prescribed by EIA 2006 and the 2025 Notification, which places them in Category B (B2 for 8(a), B1 for 8(b)) for appraisal by SEIAAs/SEACs, rather than automatically elevating them to Category A due to proximity to sensitive areas.
  • The NGT’s attempt to extend GC to these categories and to mandate Central EAC appraisal for projects within 5 km of protected areas, CPAs, SPAs, eco-sensitive zones or inter-State boundaries is effectively neutralised by the Supreme Court’s acceptance of the 2025 Notification and its express statement that the NGT order does not survive for consideration.
  • Administrative Office Memoranda and the Section 5 mechanism for CPAs/SPAs continue to operate subject to the Supreme Court’s interpretation. However, for items 8(a) and 8(b), any categorisation or appraisal must conform to the 2006 EIA framework as clarified by the 2025 Notification.
  • The decision affirms the role of SEIAAs/SEACs as expert bodies for appraising building and township projects within States/UTs, consistent with the policy of decentralisation. It underscores that environmental regulation must balance ecological protection with the need for development under the principle of sustainable development.
  • No broader doctrinal innovation is announced in this judgment; rather, it aligns the appeals with the already-decided constitutional and statutory questions in Vanashakti. The immediate effect is to remove the uncertainty created by the NGT’s 09.08.2024 order and restore a clear regulatory pathway for ECs in respect of item 8(a)/8(b) projects, under the 2006 EIA regime as amended and clarified by the 2025 Notification (excluding Note 1 to Entry 8(a)).

    CONFEDERATION OF REAL ESTATE DEVELOPERS ASSOCIATION OF INDIA (CREDAI) v. UNION OF INDIA

    1

    2025 INS C 1112 REPORTABLE

    IN THE SUPREME COURT OF INDIA

    CIVIL APPELLATE JURISDICTION

    CIVIL APPEAL NO. 10043 OF 2024

    CONFEDERATION OF REAL ESTATE DEVELOPERS

    ASSOCIATION OF INDIA (CREDAI) ... APPELLANT

    VERSUS

    UNION OF INDIA & OTHERS ... RESPONDENTS

    WITH

    CIVIL APPEAL NO. 5532 OF 2025

    GODREJ PROPERTIES LTD. ... APPELLANT

    VERSUS

    UNION OF INDIA & OTHERS ... RESPONDENTS

    WITH

    CIVIL APPEAL NO. 5533 OF 2025

    SAI SAHARA DEVELOPERS LTD ... APPELLANT

    VERSUS

    UNION OF INDIA & OTHERS ... RESPONDENTS

    2

    J U D G M E N T

    R. MAHADEVAN, J.

    1. We have heard the learned senior counsel appearing for the appellants, including the intervenor, the learned Additional Solicitor General of India appearing for Respondent No. 1, and the learned senior counsel for Respondent No. 3. We have also perused the materials available on record.

    2. The appellants herein are the Confederation of Real Estate Developers' Associations of India1(Civil Appeal No.10043 of 2024), Godrej Properties Ltd. (Civil Appeal No. 5532 of 2025), and Sai Sahara Developers Ltd. (Civil Appeal No.5533 of 2025). These appeals have been preferred under Section 22 of the National Green Tribunal Act, 20102, assailing the final order dated 09.08.2024 passed by the National Green Tribunal, Central Zone Bench, Bhopal 3

    in Original Application No. 93 of 2024 (CZ).

    3. By the impugned order, the NGT allowed the original application filed by Respondent No. 3, and directed Respondent No. 1, Ministry of Environment, Forest and Climate Change4to ensure that all building and construction projects falling wholly or partly within 5 km of the following categories: -

    (i) protected areas notified under the Wildlife (Protection) Act, 1972,

    1 In short, "CREDAI"

    2 In short, "the NGT Act"

    3 In short, "NGT"

    4 In short, "MoEF&CC"

    3

    (ii) critically polluted areas and severely polluted areas identified by Respondent No. 2, Central Pollution Control Board5,

    (iii) eco-sensitive areas notified under Section 3(2) of the Environment (Protection) Act, 19866, and

    (iv) inter-state boundaries shall be treated as 'Category A' projects and appraised at the Central Level by the Sectoral Expert Appraisal Committee 7

    . Respondent No. 1 was further directed either to strictly implement the Environmental Impact Assessment Notification dated 14.09.20068, or to issue a clarificatory notification.

    3.1. In arriving at its conclusion, the NGT held, inter alia, that -

    (i) The "General Conditions" under the EIA 2006 Notification are applicable to projects and activities covered under item 8(a) - Building and Construction Projects, and item 8(b) - Township and Area Development Projects of the Schedule thereto; and

    (ii) The Notification dated 22.12.20149issued by MoEF&CC, inserting a Note under items 8(a) and 8(b) excluding the applicability of the General Conditions, stood quashed by judgment dated 06.03.2024 of the High Court of Kerala in One Earth One Life v. MoEF10 . Consequently, the General Conditions now

    5 In short, "CPCB"

    6 In short, "the EP Act"

    7 In short, "Central SEAC"

    8 In short, "EIA 2006 Notification"

    9 In short, "EIA 2014 Notification"

    10 WP (C) No. 3097 of 2016

    4

    stand revived and are applicable to projects and activities under items 8(a) and 8(b) of the EIA 2006 Notification.

    4. Although the appellants were not parties before the NGT, they are directly and substantially affected by the impugned order, as the findings and directions therein have an adverse bearing on their ongoing and proposed real estate projects, resulting in indefinite delays in execution and completion. The appellants, therefore, invoking their statutory right of appeal under Section 22 of the NGT Act, have approached this court with the instant appeals.

    5. The learned Senior Counsel appearing for the appellant in Civil Appeal No.10043 of 2024 submitted that the appellant - CREDAI - is the apex body of private real estate developers in India, established in 1999 with the objective of transforming the real estate sector and promoting housing and habitat. It represents more than 13,000 developers across 230 city chapters in 21 States, and plays a significant role in policy formation concerning the real estate industry. The members of the appellant undertake projects falling within items 8(a) - Building and Construction Projects, and Item 8(b) - Township and Area Development Projects - of the Schedule to the EIA 2006 Notification.

    5.1. The learned Senior Counsel contended that the "General Conditions"

    (GC) under the EIA 2006 Notification are inapplicable to Items 8(a) and 8(b). The said Notification issued by the MoEF&CC under Sections 3(1) and 3(2)(v)

    5

    of the EP Act, prescribes the process for obtaining environmental clearance for projects and activities listed in its Schedule. Paragraph 2 stipulates that projects under Category A are to be appraised at the Central Level by the Expert Appraisal Committee, whereas Category B projects are to be considered by the State Environment Impact Assessment Authority 11

    . Paragraph 4 further bifurcates Category B into B1 and B2 projects, with B1 projects requiring submission of an EIA report, and B2 projects being exempt.

    5.1.1. It was further submitted that the Schedule itself contains five columns:

    Columns 1 and 2 specify the project/activity; Columns 3 and 4 indicate whether they fall under Category A or Category B; and Column 5 records conditions, if any. Under this framework, Item 8(a) - Building and Construction projects - is classified as B2, and Item 8(b) - Township and Area Development projects - is classified as B1. Crucially, Column 5 against these items contains no stipulation that the General Conditions shall apply. By contrast, wherever the legislature intended the General Conditions to apply, it has expressly so provided - for example, Items 1(a), 1(c), 1(d), 2(a), 2(b), 3(a), 3(b), 5(d) to 5(k), 6(b), and 7(d) to 7(i). The deliberate omission in respect of Items 8(a) and 8(b), it was argued, unmistakably reflects legislative intent.

    5.2. In support of his contention, the learned Senior Counsel placed reliance on the judgment of this Court in In Re: Construction of Park at Noida Near

    11 In short, "SEIAA"

    6

    Okhla Bird Sanctuary12, wherein, this Court, after referring to the minutes of a high-level meeting chaired by the Hon'ble Prime Minister on 06.07.2006, noted that the decision to exclude Items 8(a) and 8(b) from the sweep of the General Conditions was consciously taken to promote decentralisation. Paragraph 84 of the Judgment expressly observed that "the question of application of general condition to the projects/activities listed in the schedule also needs to be put beyond any debate or dispute". Consistent with this, the EIA Notification dated

    22.12.201413

    inserted in Column 5 against Items 8(a) and 8(b), the explicit stipulation: "General Conditions shall not apply".

    5.3. It was also submitted that the NGT, relying on the Kerala High Court's judgment in One Earth One Life v. MoEF (supra), erroneously concluded in Paragraph 40 of the impugned order that the General Conditions are

    "undisputably applicable" to Items 8(a) and 8(b).

    5.4. According to the learned Senior Counsel, the EIA 2014 Notification was merely clarificatory, issued pursuant to this Court's directions in Okhla Bird Sanctuary, reaffirming what was already implicit in the scheme of the EIA 2006 Notification - namely, that the General Conditions were never intended to apply to Items 8(a) and 8(b). The absence of such stipulation in Column 5 against these entries itself establishes this position.

    12 (2011) 1 SCC 744

    13 In short, "EIA 2014 Notification"

    7

    5.5. It was further submitted that the Kerala High Court set aside the EIA 2014 Notification only on procedural grounds, i.e., deviation from the draft notification and inadequate consideration of objections. The High Court did not pronounce upon the substantive correctness of the clarification or the underlying legal position. In fact, the consistent view of the MoEF&CC, as reflected in several Office Memoranda and its Counter Affidavit before this Court, was that Items 8(a) and 8(b) are exempt from the General Conditions. The NGT's assumption that the quashing of the EIA 2014 Notification automatically revives the applicability of General Conditions is, therefore, untenable.

    5.6. Thereafter, the learned Senior Counsel drew our attention to paragraph 41 of the impugned order, whereby the NGT issued consequential directions. It was urged that since those directions rest entirely on the erroneous finding in paragraph 40, they are without legal foundation and defeat the very purpose of decentralization - a purpose expressly recognized by this Court in Okhla Bird Sanctuary.

    5.7. Regarding the maintainability of the application, the learned Senior Counsel argued that the jurisdiction of the NGT under Sections 14, 15, and 2(m) of the NGT Act, is confined to substantial environmental questions arising in a lis between parties, and not to academic or abstract issues. Reliance was placed on Techi Tagi Tara v. Rajendra Singh Bhandari 14

    , wherein this Court

    14 (2017) 11 SCC 734

    8

    cautioned against the NGT transgressing its statutory mandate by entertaining policy-oriented or academic questions.

    5.7.1. On this basis, it was submitted that the application of Respondent No. 3 before the NGT was not maintainable, as it was not founded on any personal grievance or demonstrable nexus with the projects concerned. Sections 14 and 15 contemplate reliefs such as compensation, restitution of property, or restoration of the environment - all of which necessarily presuppose the existence of a claimant seeking redress. In the absence of such a claim, the proceedings were beyond the NGT's jurisdiction.

    5.8. The learned Senior Counsel further pointed out that Respondent No. 1 - MoEF&CC - in its pleadings, categorically clarified that the scrutiny conducted at the State Level by SEIAA / SEAC is of the same rigour as that undertaken by the Central EAC. These bodies, though constituted by the Central Government, are manned by experts meeting the eligibility criteria under the EIA 2006 Notification, and are fully competent to appraise projects and grant environmental clearances.

    5.9. It was submitted that the decentralization of Items 8(a) and 8(b) to the State Level was a conscious legislative choice, designed to secure timely and effective decision-making. The NGT's order directing such projects to be

    9

    shifted to the Central Authority, frustrates legislative intent, overburdens the Centre, and causes avoidable delays.

    5.10. It was also argued that the NGT's reliance on Respondent No. 3's submission, premised on the Office Memorandum dated 31.10.2019, is misplaced. That Memorandum dealing with projects in critically polluted areas15 and specially polluted areas16is inapplicable to projects under Items 8(a) and 8(b). The subsequent Office Memorandum dated 13.03.2020 clarified that the earlier Memorandum dated 24.05.2011 would continue to govern projects under Items 8(a) and 8(b), which would remain within the jurisdiction of SEIAA / SEAC. The order in O.A. No. 1038 of 2019, which formed the basis of the 31.10.2019 Memorandum, did not direct any change in the appraisal process for such projects.

    5.11. In conclusion, it was urged that the impugned order of the NGT is vitiated by want of jurisdiction, misreading of statutory notifications, disregard of legislative intent, and failure to follow binding precedent. The order, apart from causing grave prejudice to stakeholders, does not advance any genuine or substantial environmental objective, and accordingly, deserves to be set aside.

    6. The learned Senior Counsel appearing for the appellant in Civil Appeal No. 5532 of 2025 submitted that the appellant - Godrej Properties Ltd.- is a public limited company forming part of the Godrej Industries Group, which has

    15 In short, "CPA"

    16 In short, "SPA"

    10

    diversified business interests including real estate development. The appellant is amongst the fastest growing luxury real estate developers in the country, with a portfolio of approximately 239 million square feet of development comprising 79 ongoing projects and 34 forthcoming projects across India. A substantial portion of its customer base is located in Mumbai.

    6.1. The learned Senior Counsel adopted the submissions advanced on behalf of CREDAI.

    6.2. It was further submitted that pursuant to the directions issued by the NGT, there is presently no authority competent to appraise applications for Environmental Clearance in respect of projects falling under Items 8(a) and 8(b) of the Schedule. By virtue of the impugned order, the State SEACs have been precluded from granting Environmental Clearance for such projects; and, as stated by the Union of India in its reply affidavit in CA. No. 10043 of 2024, the Central Authority is also not in a position to appraise these projects.

    6.3. It was also pointed out that this policy paralysis has severely prejudiced the appellant's ongoing projects as well as hundreds of homebuyers. Of the five projects presently under consideration, four pertain to expansion of Environmental Clearances already granted under the EIA 2006 Notification, while one project involves a fresh application filed before the SEIAA. During the pendency of the present appeal, in order to avoid delay and protect the interests of stakeholders, the appellant submitted all five projects to the Central

    11

    SEAC for appraisal. However, as matters stand, neither the State SEIAA nor the Central SEAC is appraising the projects, leaving the appellant without any effective remedy.

    6.4. The learned Senior Counsel further submitted that as a direct consequence, more than 1,469 flat purchasers are affected, whose homes are at stake, since the appellant has already created third party rights on the strength of the Environmental Clearances initially granted by the SEIAA. Additionally, approximately 613 families whose houses are being redeveloped by the appellant are indefinitely deprived of possession. All these projects are registered under the Real Estate (Regulation and Development) Act, 2016 (RERA). The appellant is therefore bound by statutory as well as contractual obligations to complete construction and hand over possession within the prescribed timelines. Non-compliance would expose the appellant to serious consequences under RERA, including liability to pay interest for delayed possession, imposition of penalties, and directions to ensure timely completion and delivery of flats. In effect, the appraisal process for projects under Items 8(a) and 8(b) has come to a complete standstill by reason of the impugned order, resulting in cascading adverse consequences not only for the appellant but also for thousands of innocent stakeholders.

    7. The learned Senior Counsel appearing for the appellant in Civil Appeal No.5533 of 2025 submitted that the appellant - Sai Sahara Constructions -is a

    12

    partnership firm engaged in the business of purchase and sale of land and construction of residential and commercial buildings under the trade name "Sai Sahara Developers". The firm was constituted by a Partnership Deed dated 01.10.2022 at Nashik, Maharashtra.

    7.1. It was contended that the NGT passed the impugned order based on a fundamentally flawed reading of the Okhla Bird Sanctuary judgment. A contextual interpretation of paragraph 84, alongside paragraphs 59 and 60 of the judgment, makes it clear that the legislative intent was to exempt Items 8(a) and 8(b) under the EIA 2006 Notification from the operation of the General Conditions. The authority to determine the level of appraisal lies exclusively with the legislature and the competent authority under the EIA framework. Since State-level appraisal for these items is expressly mandated, the NGT lacked jurisdiction to alter this statutory scheme. The omission of any condition in Column 5 for Items 8(a) and 8(b), unlike other entries, reflects a deliberate legislative choice to exclude the General Conditions. This interpretation is further supported by the plain language of the Notification and multiple Office Memoranda issued by MoEF&CC. Accordingly, by reinterpreting an unambiguous statutory scheme, the NGT overstepped its jurisdiction, contrary to the principle of strict interpretation and the binding precedent in Okhla Bird Sanctuary.

    7.2. The learned Senior Counsel further submitted that the Kerala High Court's judgment quashing the EIA 2014 Notification does not alter the existing

    13

    legal framework, as the 2014 Notification was purely clarificatory. The original EIA 2006 Notification never extended the General Conditions to Items 8(a) and 8(b), which deal with building and construction projects. Moreover, the Kerala High Court's decision has no binding effect outside its territorial jurisdiction and cannot determine the interpretation of law by other High Courts or by this Tribunal. The principle of stare decisis operates only within the territorial limits of the concerned Court. Paragraphs 41 and 42 of the impugned order, however, led to indefinite delays not only in the appellant's project but also in numerous real estate projects across the country. Such delays jeopardise the financial and practical viability of these projects, and the blanket suspension of environmental clearances has had a cascading impact on housing development, thereby infringing the fundamental rights to shelter and livelihood under Article 21 of the Constitution for thousands of affected persons, including slum dwellers, society members, and homebuyers.

    7.3. It was also contended that the impugned order failed to consider the Office Memoranda dated 24.05.2011 and 13.03.2020, which clearly stated that the General Conditions are inapplicable to projects under Items 8(a) and 8(b) of the Schedule. These Memoranda reaffirmed that, since the inception of the EIA 2006 Notification, such projects have consistently been appraised at the State level by SEAC/SEIAA. However, Respondent No. 3 suppressed these crucial documents and failed to place them before the NGT, leading to their non- consideration in the impugned order.

    14

    7.4. On the issue of jurisdiction, learned Senior Counsel referred to the Preamble of the NGT Act, which emphasizes that the Tribunal is constituted for the effective and expeditious disposal of cases relating to environmental protection and conservation of natural resources, including the enforcement of legal rights relating to the environment and the grant of relief and compensation for damages to persons and property.

    7.4.1. Reference was also made to Chapter III of the Act, which deals with the jurisdiction, powers, and procedure of the Tribunal. In particular, Sections 14 and 15, confine its jurisdiction to civil cases involving a substantial question relating to the environment, and to disputes capable of settlement through relief, compensation, or restitution. On a combined reading of these provisions, it was submitted that the Tribunal's jurisdiction does not extend to abstract policy issues or to directions in the nature of mandamus against the MoEF&CC.

    7.5. It was further submitted that in the present case, Respondent No. 3 approached the Tribunal suo motu, without any existing lis or locus, seeking directions to classify and appraise certain building and construction projects as Category A at the Central level and to extend the General Conditions to Item 8 of the Schedule. Such directions fall outside the Tribunal's jurisdiction. The Notification under challenge in WP (C) No. 166 of 2025 is purely clarificatory, reaffirming the pre-existing legal position that the General Conditions do not apply to Items 8(a) and 8(b).

    15

    7.6. In view of the above submissions, the learned Senior Counsel prayed that the impugned order of the NGT be set aside and the present appeal allowed.

    8. The learned Senior Counsel appearing for the Intervenor - Ricardo Constructions Pvt., Ltd., submitted that the Intervenor became the lawful owner of the project pursuant to a registered conveyance deed dated 29.06.2019, executed after the erstwhile promoter failed to complete the development and defaulted on loan repayments, leading to SARFAESI proceedings in 2019. The project is situated at Village Mulund, Jata Shankar Dosa Marg, Mulund (W), Mumbai, on plots bearing CTS Nos. 661/1/4 to 661/1/8. The Intervenor planned an expansion comprising 10 residential buildings. Out of these, 5 buildings (1A, 3, 4, 7, 8) were completed prior to the EIA Notification; 3 buildings (5, 6, 9) obtained Environmental Clearance on 03.09.2014; and 2 new buildings (1B and

    2) are presently proposed. The project enjoys excellent connectivity, being 0.39 km from Mulund Railway Station and 14 km from Mumbai International Airport, with hospitals, schools, colleges, and banks in close proximity. Since the project site is located 1.06 km from Sanjay Gandhi National Park and Thane Creek Flamingo Sanctuary, it falls within Category A under the EIA 2006 Notification. Accordingly, the Intervenor applied to the Expert Appraisal Committee (EAC) on 09.09.2024 and also obtained Consent to Establish and Operate from the Maharashtra Pollution Control Board on 02.08.2024, valid up to 02.08.2025. The estimated project cost is approximately Rs. 980 crores.

    16

    8.1. It was submitted that the General Conditions under the EIA 2006 Notification, are inapplicable to Building and Construction Projects. Items 8(a) and 8(b) of the Schedule expressly leave Column 5 (Conditions, if any) blank, whereas in other categories, where General Conditions apply, the same are specifically mentioned. This Court in Okhla Bird Sanctuary clarified that General Conditions do not apply to Building and Construction Projects. Hence, even prior to the 2014 amendment, Items 8(a) and 8(b) stood exempt from General Conditions.

    8.2. Learned Senior Counsel further pointed out that the Kerala High Court in

    One Earth One Life v. MoEF (supra) quashed the EIA 2014 Notification only insofar as it operated within the State of Kerala. That judgment has no application beyond the territorial jurisdiction of that High Court. Reliance was placed on the decision of this Court in East India Commercial Co. Ltd. v. Collector of Customs17, wherein, it was held that judgments of High Courts are binding only within their respective territorial jurisdiction. The NGT, therefore, erred in extending the effect of the Kerala High Court's judgment across the country, thereby stalling thousands of projects nationwide without legal justification.

    8.3. It was further urged that the quashing of the 2014 Notification does not result in automatic revival of the pre-existing regime of General Conditions. It is a settled principle that annulment of a law or notification does not ipso facto

    17 AIR 1962 SC 1893

    17

    revive an earlier law unless there is an express provision to that effect. Reference was made to the Doctrine of Eclipse as explained in Bhikaji Narain Dhakras v. State of Madhya Pradesh 18

    , which holds that a law rendered inoperative is not obliterated but remains in a dormant state, and does not automatically revive unless re-enacted or specifically revived. Since there was no such revival in the present case, the General Conditions cannot be applied to Item 8 projects.

    8.4. Finally, it was contended that the impugned order of the NGT is vitiated by breach of the principles of natural justice. The order has a far-reaching impact on construction projects across the country, including the Intervenor's project, yet no opportunity of hearing was afforded to affected stakeholders. This omission amounts to a clear violation of the principle of audi alteram partem. The NGT, by misinterpreting the scope of its jurisdiction and the EIA Notification, has exceeded its authority. Hence, the impugned order deserves to be set aside by this Court to rectify the legal error, prevent undue losses, and safeguard the rights of lawful project developers.

    9. Per contra, the learned Additional Solicitor General of India, appearing for Respondent No.1, made the following submissions:

    9.1. The Ministry, in exercise of its powers under Section 3(1) and clause (v) of Section 3(2) of the Environment (Protection) Act, 1986, issued S.O. 1533(E) dated 14.09.2006 (principal notification) mandating prior Environmental

    18 AIR 1955 SC 781

    18

    Clearance (EC) for projects listed in the Schedule thereto. The EC is granted following the Environmental Impact Assessment (EIA) process laid down in the notification, as amended from time to time.

    9.2. The EIA 2006 Notification prescribes "General Conditions" (GC), which provide for the re-categorization of certain Category 'B' projects as Category 'A' where they are located, wholly or partly, within 5 km or 10 km, as the case may be, of: (i) Protected Areas under the Wild Life (Protection) Act, 1972, (ii) Critically Polluted Areas notified by CPCB, (iii) Notified Eco-Sensitive Areas, or (iv) Inter-State / International boundaries. However, GC applies only where expressly mentioned in Column 5 of the Schedule. Since no such reference was made in respect of items 8(a) and 8(b), the General Conditions were never applicable to them. This was clarified by an Office memorandum dated 24.05.2011, which specifically stated that Building and Construction Projects [8(a)] and Township / Area Development Projects [8(b)] do not attract GC, even in critically polluted areas and hence, remain within SEIAA jurisdiction.

    9.3. A further Notification dated 22.12.2014 amended the EIA 2006 Notification to explicitly reaffirm that GC did not apply to items 8(a) and 8(b). However, the High Court of Kerala in One Earth One Life v. MoEF&CC

    (supra), quashed the 2014 Notification on the sole technical ground that the final notification differed from the draft, while leaving liberty to the Ministry to issue a fresh notification.

    19

    9.4. Subsequently, the NGT, by the impugned order dated 09.08.2024, directed Respondent No.1 either to comply with the provisions relating to GC applicability to Items 8(a)and 8(b) or issue a clarificatory notification. That order proceeded on a misreading of the Kerala High Court's judgment. In fact, Items 8(a) and 8(b) were never subject to GC, even under the principal notification.

    9.5. Pursuant to the NGT's directions, the Ministry prepared a draft clarificatory notification, which was referred to the Ministry of Law and Justice (MoLJ) for vetting. MoLJ opined that since the 2014 Notification had substituted Entry 8, and the Kerala High Court had quashed the substituted entry, the original entry did not automatically revive. Relying on B.N.Tiwari v. Union of India19

    MoLJ advised that a fresh notification was necessary to reinsert the provision. A legal vacuum thus arose, necessitating issuance of a fresh notification. Accordingly, a draft notification dated 07.11.2024 was published, inviting objections and suggestions. After considering 668 responses and consulting the Expert Appraisal Committee, the Ministry finalized and issued a notification dated 29.01.2025, explicitly reiterating that GC does not apply to items 8(a) and 8(b).

    9.6. This notification was challenged in Vanashakti v. Union of India [W.P.

    (C) No. 166 of 2025], wherein this Court granted an exparte stay on 24.02.2025.

    19 AIR 19 65 SC 1430

    20

    Consequently, another legal vacuum has arisen, and the Ministry is unable to process any application under item 8.

    9.7. On the competence of SEIAAs and SEACs, it was submitted that these bodies were constituted to decentralize decision-making, avoid delays, and ensure efficiency in granting ECs. SEACs comprise experts of comparable standing to members of Central EACs, with eligibility criteria prescribed in Appendix VI of the EIA 2006 Notification. Both SEIAAs and SEACs, being constituted by the Central Government are technically competent to appraise projects under Item 8. Directing that such projects be appraised only by MoEF&CC would create inequality, encourage forum-shopping, and overburden MoEF&CC, thereby frustrating the timelines prescribed under EIA 2006 Notification and undermining the efficiency of the decentralized system.

    9.8. In these circumstances, it was urged that the NGT's order dated 09.08.2024, founded on an erroneous interpretation of the Kerala High Court's decision, be quashed, that Respondent No. 3 be restrained from engaging in forum-shopping, and that the settled position - that Items 8(a) and 8(b) are not subject to GC and remain within SEIAA jurisdiction - be reaffirmed.

    10. The learned Senior Counsel for Respondent No. 3 however, submitted that Original Application No. 93 of 2024 was filed before the NGT in pursuance of Respondent's commitment to environmental protection, particularly to ensure that Building and Construction Projects - among the most pollution-intensive

    21

    industries in the country - are subjected to higher scrutiny by sector-specific Expert Appraisal committees (EACs) at the Central Level. Such projects, especially those located in CPA, SPA, Eco-Sensitive Zones or Protected Areas, demand rigorous appraisal by experts with relevant domain expertise.

    10.1. It was urged that the NGT correctly appreciated the statutory mechanism notified on 24.10.2019 under Section 5 of the EP Act, which covers both CPA and SPA areas. While the General Conditions expressly refer only to CPA areas, a cumulative reading of the mechanism and the notification led the Tribunal to rightly conclude that projects within CPA/SPA, including Building and Construction Projects, must be appraised at the Central level by sectoral EACs. In so holding, the NGT relied on Clause 7(i)(III)(i)(d), Appendix VI of EIA 2006, its earlier decisions in Vkrant Tongad, Karukampally Vijayan Biju, M/s.Ardent Steel Ltd., and this Court's decision in In Re: News Item published in 'The Asian Age'.

    10.2. It was further submitted that subsequent to the impugned order, MoEF&CC issued Notification dated 29.01.2025 inserting Note 2 in Item 8 to clarify that "General Conditions do not apply". That notification has been challenged in Vanashakti v. Union of India [WP (C) No. 166 of 2025], and operation thereof has been stayed by this Court on 24.02.2025. Hence, the issue of GC applicability is sub judice. Even so, the mechanism dated 24.10.2019 operates independently of GC applicability. That mechanism issued under Section 5 of the EP Act and upheld by this Court's judgment dated 25.02.2022

    22

    in a batch of Civil Appeals (CA Nos. 2218-2219, 2220-2221, 2434, 2463, 3319- 3321 of 2020), continues to mandate that all projects within 5 km of CPA/SPA be treated as Category A and appraised at the Central Level.

    10.3. The learned Senior Counsel further placed reliance on the suo motu proceedings in OA No. 1038 of 2018 [News item in 'The Asian Age' by Sanjay Kaw] wherein, the NGT noted the grave environmental impact of high pollution in CPA/SPA, temporarily prohibited new activities, and directed MoEF&CC to evolve a mechanism for stringent scrutiny of projects in such areas. The Ministry thereafter issued the 24.10.2019 mechanism. Since this Court has affirmed the same, it has attained finality and binds all projects, including Building and Construction.

    10.4. It was emphasized that MoEF&CC itself, in its counter before the Tribunal and written submissions before this Court, did not dispute applicability of the mechanism to Building and Construction Projects. Thus, it is implicit that such projects are included. Excluding them alone while all other 37 activities in the Schedule remain covered, would defeat the object of the mechanism and the environmental protection mandate.

    10.5. It was further submitted that the EIA 2014 Notification inserting Note 2 to Entry 8 (excluding GC) itself shows that GC otherwise applied to Building and Construction projects. This amendment was struck down by the Kerala High Court in One Earth One Life v. MoEF (supra). Likewise, the 29.01.2025 Notification has been stayed by this Court. Hence, GC continues to apply.

    23

    Administrative circulars such as OMs dated 24.05.2011 and 13.03.2020, being non-statutory, cannot override a statutory mechanism under Section 5 of the EP Act [See: Alembic Pharmaceuticals v. Rohit Prajapati20]

    10.6. On jurisdiction, it was submitted that the plea regarding excess of jurisdiction by the NGT under Section 14 of the NGT Act was not raised in the pleadings and hence, cannot be urged belatedly. In any event, this Court in

    Mantri Techzone v. Forward Foundation21, Municipal Corporation of Greater Mumbai v. Ankita Sinha22and Indian Oil Corporation Ltd v. V.B.R. Menon23, has affirmed the wide powers of the NGT to direct effective measures for environmental protection.

    10.7. It was finally urged that the NGT's purposive interpretation of EIA 2006 Notification, in holding GC applicable to Building and Construction Projects, is consistent with this Court's approach in Workmen of American Express v. Management24and SEBI v. Ajay Agarwal25

    . Where two interpretations are possible, that which furthers the object of environmental protection must prevail.

    10.8. Accordingly, it was prayed that the appeals be dismissed, the impugned NGT order upheld, or in the alternative, this Court may direct that all Building and Construction projects within 5 km of CPA/SPA as notified by CPCB, be

    20 (20 20 ) 17 SCC 157

    21 (2019) 18 SCC 494

    22 (2022 ) 13 SCC 401

    23 (2023 ) 7 SCC 368

    24 (1985) 4 SCC 71

    25 (2010) 3 SC 765

    24

    treated as Category A and appraised at the Central level by the Sectoral EAC, in terms of the mechanism dated 24.10.2019, which already stands affirmed by this Court.

    11. On the basis of the submissions advanced by the parties, the core issue that arises for determination in these appeals is whether the General Conditions under the EIA 2006 Notification, are applicable to Item 8(a) (Building and Construction Projects) and Item 8(b) (Township and Area Development Projects) of the Schedule thereto, and, if so, whether such projects - when situated within 10 km (subsequently reduced to 5 km) of environmentally sensitive areas - are required to be appraised as Category A projects by the Central Expert Appraisal Committee, rather than being considered by the State Expert Appraisal Committees (SEACs) and the State/UT Environment Impact Assessment Authorities (SEIAAs).

    12. At this stage, it would be apposite to briefly advert to the background in which the present appeals have been instituted.

    13. On 14 September 2006, the Union of India, in exercise of powers conferred under Section 3 of the EP Act, issued the EIA 2006 Notification. The Notification classified projects into two categories: Category A, requiring prior environmental clearance from the Central Expert Appraisal Committee (EAC), and Category B, requiring clearance from the State Expert Appraisal Committee (SEAC) and the State Environment Impact Assessment Authority (SEIAA). The

    25

    Schedule to the Notification contains a General Condition (GC), under which projects falling in Category B would be treated as Category A if located within a specified distance of certain environmentally sensitive areas. Column 5 of the Schedule, titled "Conditions, if any," enumerates the items to which the GC applies. Significantly, Items 8(a) [Building and Construction Projects] and 8(b) [Townships and Area Development Projects] were not subjected to the GC under the Schedule. The General Condition stipulated that projects situated within 10 km (subsequently reduced to 5 km) of the following would be treated as Category A:

    • Protected Areas notified under the Wildlife Protection Act, 1972;

    • Critically Polluted Areas as identified by CPCB;

    • Notified Eco-sensitive Zones; and

    • Inter-State or International Boundaries.

    14. The scope of the GC arose for consideration before this Court in Okhla Bird Sanctuary. While examining whether the GC under the EIA 2006 Notification extended to projects under Items 8(a) and 8(b), this Court noted the contention that since Column 5 does not expressly apply the GC to these items, the legislative intent was to leave such projects within the jurisdiction of the States. Reference was also made to the meeting of 6 - 7 July 2006 chaired by the then Prime Minister, wherein it was decided that construction and township projects would be regulated at the State level, irrespective of their size. The Court further observed that greater clarity was required, both in the description

    26

    of projects under Items 8(a) and 8(b), and in the application of the GC. The following extract from paragraph 84 is apposite:

    "… question of application of the general condition to the projects/activities listed in the Schedule also needs to be put beyond any debate or dispute".

    15. Pursuant to the above, the MoEF issued an Office Memorandum dated 24 May 2011 clarifying that projects under Items 8(a) and 8(b) of the EIA 2006 Notification do not attract the GC. Consequently, building and construction projects and township and area development projects would remain in Category B, irrespective of their location vis-à-vis critically polluted or eco-sensitive areas, and would continue to be appraised at the State level.

    16. Thereafter, on 22 December 2014, the MoEF&CC issued Notification S.O. 3252(E) amending the Schedule to the EIA 2006 Notification by inserting a Note to Items 8(a) and 8(b), expressly stipulating that the GC shall not apply to building, construction, township and area development projects.

    17. The validity of the EIA 2014 Notification was challenged before the High Court of Kerala in One Earth One Life v. MoEF&CC (supra). By judgment dated 6 March 2024, the High Court quashed the Notification on two grounds:

    (i) that the final notification erroneously recorded that no objections had been received, despite objections having been submitted; and (ii) that there existed impermissible variance between the draft and final notification.

    27

    18. Meanwhile, in suo motu proceedings initiated on the basis of a newspaper report (News item published in "The Asian Age" authored by Sanjay Kaw, O.A. No. 1038 of 2018), the NGT by order dated 19 August 2019, directed formulation of a mechanism for environmental management of CPAs and SPAs, and for regulation of projects in such areas. Pursuant thereto, the MoEF&CC issued Office Memoranda dated 31 October 2019, and 30 December 2019, and on 13 March 2020, reiterated that projects under Items 8(a) and 8(b) would continue to be appraised by the SEIAA / SEAC in terms of the earlier OM of 24 May 2011.

    19. The orders of the NGT in O.A. No. 1038 of 2018 were assailed before this Court in a batch of Civil Appeals (CA Nos. 2218-2219 of 2020 and connected cases). By a common judgment dated 25 February 2022, this Court dismissed the appeals and upheld the directions issued by the NGT.

    20. Subsequently, Respondent No. 3 instituted Original Application No. 93 of 2024 before the NGT, contending that unregulated proliferation of large-scale construction projects in critically polluted and eco-sensitive areas posed grave risks to the right to life and health of local residents, and that such projects ought to be treated as Category A. By its order dated 9 August 2024, the NGT disposed of the application, holding inter alia that the GC under the EIA 2006 Notification applies to Items 8(a) and 8(b). The Tribunal directed the MoEF&CC to ensure that all building and construction projects falling wholly

    28

    or partly within 5 km of protected areas, CPAs, SPAs, eco-sensitive zones, or inter-State boundaries be treated as Category A projects requiring appraisal by the Central EAC. In doing so, the Tribunal reasoned that, since the EIA 2014 Notification had been quashed by the Kerala High Court, the exclusion of Items 8(a) and 8(b) from the GC no longer survived. It is this order of the NGT that is assailed in the present appeals.

    21. In the aftermath of the impugned order, the MoEF&CC issued Notification S.O. 523(E) dated 29 January 2025, once again inserting in Column 5 of Item 8 a Note expressly providing that "General Conditions shall not apply". The Notification records that it was issued in the backdrop of the Kerala High Court judgment dated 6 March 2024 and the NGT's order dated 9 August 2024. A consequential Office Memorandum dated 30 January 2025 was issued, clarifying that the Notification would apply to the State of Kerala.

    22. The constitutional validity of Notification S.O. 523(E) dated 29 January 2025, together with the consequential Office Memorandum dated 30 January 2025, was challenged in Writ Petition (C) No. 166 of 2025, Vanashakti v. Union of India, before this Court. By order dated 5 August 2025, this Court partly allowed the writ petition. The relevant paragraphs read as follows:

    "14. For considering the rival submissions, it will be appropriate to refer to the particulars of the schedule to the 2006 Notification, which is extracted hereinbelow.

    29

    "SCHEDULE

    LIST OF PROJECTS OR ACTIVITIES REQUIRING PRIOR

    ENVIRONMENTAL CLEARANCE

    Project or Activity Category with threshold limit Conditions if any

    (1) A B

    Mining, extraction of natural resources and power generation (for a specified production capacity)

    (1) (2) (3) (4) (5)

    15. It can thus be seen that the Schedule has five columns. In the first column, serial number of the project or activity is mentioned. In the second column the details of the activity are mentioned. In the third column the projects which are approved by the MoEF&CC are mentioned. In the fourth column, the projects which are approved by the SEIAA are mentioned and the fifth and the last column deals with the conditions, if any, which would be applicable.

    16. The projects with which we are concerned in the present lis are at Entry 8 of the Schedule, which reads thus:-

    Project or Activity Category with threshold limit Conditions if any

    (1) A B

    Mining, extraction of natural resources and power generation (for a specified production capacity)

    (1) (2) (3) (4) (5)

    8 Building / Construction projects /Area Development projects and Townships
    8(a) Building and Construction projects > 20000 sq. mtrs and < 1,50,000 sq. mtrs. of built- up areas # # (built up area for covered construction; in the case of facilities open to the sky, it will be activity area)
    8(b) Townships and Area Development projects Covering an area > 50 ha and or bilt up area > 1,50,000 sq. mtrs++ ++ All projects under item 8(b) shall be appraised as Category B1

    30

    17. If we compare column 5 of Entry 8 to Entry 1(a) which deals with mining of minerals and slurry pipelines (coal lignite and other ores) passing through national parks/sanctuaries/coral reefs/ecologically sensitive areas, Entry 1(c) which deals with river-valley projects, Entry 1(d) which deals with the Thermal Power Plants, Entry 2(a) which deals with Coal washeries, Entry 2(b) which deals with Mineral beneficiation, Entry 3(a) which deals with Metallurgical industries (ferrous & non-ferrous), Entry 3(b) which deals with Cement plants, Entry 4(b) which deals with Coke oven plants, Entry 4(d) which deals with Choir-alkali industry, Entry 4(f) which deals with Leather/skin/hide processing industry, Entry 5(d) which deals with manmade fibers manufacturing, Entry 5(e) which deals with petrochemical based processing, Entry 5(f) which deals with synthetic organic chemicals industry, Entry 5(g) which deals with distilleries, Entry 5(h) which deals with integrated paint industry, Entry 5 (i) which deals with pulp & paper industry, Entry 5(j) which deals with sugar industry, Entry 6(b) which deals with isolated storage and handling of hazardous chemicals, Entry 7(c) which deals with industrial estates/parks, complexes/areas, Export Processing Zones (EPZs), Special Economic Zones (SEZs), Biotech parks, leather complexes, Entry 7(d) which deals with common hazardous waste treatment, storage and disposal facilities, Entry 7(e) which deals with ports, harbours, break waters, dredging, Entry 7(f) which deals with highways, Entry 7(g) which deals with Aerial ropeways, Entry 7(h) which deals with common effluent treatment plants, Entry 7(i) which deals with common municipal solid waste management facility, column 5 specifically provides that General Conditions shall apply.

    18. It is thus clear that wherever the delegated legislation required the General Conditions should be applied, the notification specifically provided for the same.

    19. It can clearly be seen that Entry 8(a) and 8(b) of the Schedule do not provide for applicability of General Conditions, however, they provide for some other conditions as can be seen from the 2025 notification. Project or Activity Category with threshold Conditions if any limit

    (1) A B

    Mining, extraction of natural resources and power generation (for a specified production capacity)

    (1) (2) (3) (4) (5)

    8 Building / Construction projects /Area Development projects and Townships 8(a) Building and > 20000 sq. The term "built up

    Construction mtrs and < area" for the purpose

    projects 1,50,000 sq. of this notification is

    31

    mtrs. of built- up areas defined as the built up or covered area on all floors put together, including its basement and other service areas, which are proposed in the building or construction projects. Note 1. The projects or activities shall not include industrial shed, school, college, hostel for educational institution, but such buildings shall ensure sustainable environmental management, solid and liquid waste management, rain water harvesting and may use recycled materials such as fly ash bricks. Note 2. “General Conditions” shall not apply.
    8(b) Townships and Area Development projects Covering an area > 50 ha and / or built-up area > 1,50,000 sq. m. A project of Township and Area Development Projects covered under this item shall require an Environment Impact Assessment report and be appraised as Category ‘B1’ project. Note. “General

    32

    Conditions" shall not apply.

    20. Insofar as 2014 notification is concerned, the same, as fairly accepted by Shri Shankaranarayan, learned senior counsel appearing on behalf of the petitioner, was quashed and set aside by the Kerala High Court on 06th March, 2024 in WP(C) No. 3097 of 2016 on a technical ground, since the procedural formalities for publication of the notification was not found in consonance with the final notification.

    21. Insofar as the judgment and order of the learned NGT dated 08th December, 2017 is concerned, what has been set aside is (i) clause 14(8) of the 2016 notification which provided for establishment of the Environmental Cell at the level of State Governments or local authorities, (ii) the provisions relating to exclusion of Consent to Operate and Consent to Establish under Water (Prevention and Control of Pollution) Act, 1974 and Air (Prevention and Control of Pollution) Act, 1981 in clause 14 of 2016 notification and (iii) Appendix-XVI to the said notification relating to constitution and functioning of the said Environmental Cell.

    22. It is thus clear that the issue that arises for consideration in the present lis was not an issue for consideration before the learned NGT. In any case, the Environmental Cell at the level of a municipal body cannot be equated with SEIAA, which is a statutory body constituted by the Central Government under a statute namely the Environment (Protection) Act, 1986. The learned NGT was, therefore, justified in holding that an important task of granting environmental clearances cannot be entrusted to a body at the municipal level. However, at the cost of repetition, it is observed that the SEIAA is a statutory body comprising of experts.

    23. Insofar as the order dated 26th November, 2018 passed by the Delhi High Court granting stay is concerned, the said order considered the 2018 notifications dated 14th and 15th November, 2018 vide which the area of 20,000 sq.mtr., was increased to 50,000 sq.mtr for Building or Construction projects or Area Development projects and Townships and from 20,000 sq.mtr to 1,50,000 sq.mtr for industrial sheds, educational institutions, hospitals and hostels for educational institutions.

    24. By the impugned notification, however, there is no variation with regard to the built-up area of 20,000 sq.mtr. and 1,50,000 sq.mtr for Building and Construction projects and with regard to Townships and Area Development projects having an area of 50 ha. to 1,50,000 sq.mtr which was provided in the 2006 notification.

    33

    25. Insofar as the second judgment of the learned NGT dated 9th August, 2024 is concerned, no doubt that the learned members of the NGT have referred to the General Conditions, we, however, find that the learned NGT has not considered the 2006 notification in its correct perspective.

    26. It is a settled principle of law that while interpreting any legislation including a subordinate legislation, the first principle that has to be adopted is the literal rule of interpretation. Applying literal interpretation to the 2006 notification, it would be clear that said notification does not provide for applicability of the General Conditions to projects in Entry 8(a) and 8(b) of the Schedule. As already observed hereinabove, wherever the delegated legislation wanted the General Conditions to be made applicable it has been specifically provided in column 5 of the projects/activities.

    27. At the cost of repetition, we observe that insofar as the projects/activities at Entries 8(a) and 8(b) are concerned, General Conditions have not been provided for right from the 2006 notification.

    28. It is further to be noted that the judgment dated 09th August, 2024 passed by the learned NGT did not have the benefit of considering the 2025 notification.

    29. We, therefore, see no reason to accept the request of the learned senior counsel for the petitioner to keep the present matter pending in order to await the judgment of the coordinate Bench.

    30. In any case, the validity of 2025 notification is not being considered by the Coordinate Bench.

    31. No doubt that the courts have consistently insisted upon protecting environment and consistently held that the natural resources are held in trust by the present generation for the future generations. However, at the same time, the courts have also consistently taken into consideration the need for developmental activities.

    32. A country cannot progress unless the development takes place. As such, this Court in a catena of decisions has adopted the principle of sustainable development. Some of the notable decisions of this Court are Vellore Citizens' Welfare Forum v. Union of India and Others, Jagannath v. Union of India and Others3, Consumer Education & Research Society v. Union of India and Others, Intellectuals Forum, Tirupathi v. State of A.P. and Others, Tata Housing Development Company Limited v. Aalok Jagga and Others and State of Uttar Pradesh and Others v. Uday Education and Welfare Trust and Others.

    33. A reference in this respect can also be made to the recent judgment of this Court rendered In Re: Zudpi Jungle Lands, wherein all the earlier judgments of

    34

    this Court have been considered by a coordinate bench, to which one of us (B.R. Gavai, CJI.) was a party. It would be apposite to refer to paragraphs 117, 118 and 119 of the said judgment:

    "117. Another aspect that needs to be considered is the balance between environmental protection and the need for sustainable development. It will be apt to refer to paras 87-88 of the judgment of this Court in the case of State of Uttar Pradesh v. Uday Education and Welfare Trust (2022 SCC OnLine SC 1469), which read thus:

    "87. It cannot be disputed that Section 20 of the NGT Act itself directs the learned Tribunal to apply the principles of sustainable development, the precautionary principle and the polluter pays principle. Undisputedly, it is the duty of the State as well as its citizens to safeguard the forest of the country. The resources of the present are to be preserved for the future generations. However, one principle cannot be applied in isolation of the other.

    88. It is necessary that, while protecting the environment, the need for sustainable development has also to be taken into consideration and a proper balance between the two has to be struck."

    118. Much prior to that, this Court, in the case of Vellore Citizens' Welfare Forum v. Union of India and others (1996) 5 SCC 647 : 1996 INSC 952, had an occasion to consider the conflict between the development and ecology. This Court observed thus:

    "10. The traditional concept that development and ecology are opposed to each other is no longer acceptable. "Sustainable Development" is the answer. In the international sphere,

    "Sustainable Development" as a concept came to be known for the first time in the Stockholm Declaration of 1972. Thereafter, in 1987 the concept was given a definite shape by the World Commission on Environment and Development in its report called "Our Common Future". The Commission was chaired by the then Prime Minister of Norway, Ms G.H. Brundtland and as such the report is popularly known as "Brundtland Report". In 1991 the World Conservation Union, United Nations Environment Programme and Worldwide Fund for Nature, jointly came out with a document called "Caring for the Earth" which is a strategy for sustainable living. Finally, came the Earth Summit held in June 1992 at Rio which saw the largest gathering of world leaders ever in the history — deliberating and chalking out a blueprint for the survival of the planet. Among the tangible achievements of the Rio Conference was the signing of two conventions, one on biological diversity and another on climate change. These conventions were signed by 153 nations. The delegates also approved by consensus three non-

    35

    binding documents namely, a Statement on Forestry Principles, a declaration of principles on environmental policy and development initiatives and Agenda 21, a programme of action into the next century in areas like poverty, population and pollution. During the two decades from Stockholm to Rio "Sustainable Development" has come to be accepted as a viable concept to eradicate poverty and improve the quality of human life while living within the carrying capacity of the supporting ecosystems. "Sustainable Development" as defined by the Brundtland Report means

    "Development that meets the needs of the present without compromising the ability of the future generations to meet their own needs". We have no hesitation in holding that "Sustainable Development" as a balancing concept between ecology and development has been accepted as a part of the customary international law though its salient features have yet to be finalised by the international law jurists."

    119. The principle of Sustainable Development as a balancing concept between ecology and development has been accepted as a part of the Customary International Law by this Court in various judgments including S. Jagannath v. Union of India (1997) 2 SCC 87 : 1996 INSC 1466, Consumer Education & Research Society v. Union of India and Others (2000) 2 SCC 599 : 2000 INSC 81, Intellectuals Forum, Tirupathi

    v. State of A.P. (2006) 3 SCC 549: 2006 INSC 101 and Tata Housing Development Company Limited v. Aalok Jagga (2020) 15 SCC 784 :

    2019 INSC 1203."

    34. It is thus clear that the courts have taken a view that while development is permitted to be undertaken, it is also required that a precaution is needed to be taken so that the least damage is caused to the environment and ecology. The courts have also insisted upon the mitigation and compensatory measures so as to compensate the loss which is caused to the environment and ecology on account of the damage that would be caused by the developmental activities.

    35. As already submitted by the learned Additional Solicitor General of India, it is not possible for the MOEF&CC to consider the projects from all the states of the country. We are in agreement with the same. In any case, we are of the considered opinion that the SEIAA is a body of experts constituted/appointed by the Central Government itself and it is better equipped to undertake study qua environmental impact of proposed projects in the respective state/union territory.

    36

    36. We, therefore, see no reason as to why the SEIAA should not be permitted to consider the proposal pertaining to the respective States/Union Territories, if it is a properly constituted body in accordance with the statute.

    37. As a matter of fact, the 2006 notification itself provides for the constitution and appointment of members of SEIAA. From paragraph 3 of the said notification it can be seen that the SEIAA consists of three members out of which one shall be the Member Secretary, who is required to be a serving officer of the concerned State Government or Union Territory administration familiar with environmental laws and other two members shall either be a professional or expert fulfilling the eligibility criteria given in Appendix VI to the notification; one of them who is an expert in the Environmental Impact Assessment process, shall be the Chairman of the SEIAA. The procedure as to how the SEIAA shall conduct impact assessment and arrive at a decision is also prescribed under the said notification.

    38. Another reason that is given for issuance of 2025 notification is that the 2006 notification was somewhat ambiguous with regard to the built up area as was observed by this Court in the case of In Re: Construction of Park at Noida near Okhla Bird Sanctuary.

    39. Accordingly, in the 2025 notification, the "built up area" has been specifically defined to be the built up or covered area on all floors put together including the basement and other service areas, which are proposed in the building or construction project.

    40. While we are inclined to uphold the impugned notification, we are of the considered view that the exemption of applicability of 2006 notification, by way of Note 1 in column 5 of Entry 8(a) of the impugned notification, to the projects or activities for industrial shed, school, college and hostel for educational institution does not appear to be in tune with the purpose for which the Environment Protection Act has been enacted.

    41. Ms. Bhati, learned Additional Solicitor of India, submits that the detailed guidelines have been provided so as to ensure that the industrial shed, school, college and hostel for educational institution shall adhere to the environmental aspects. Moreover, we find that no mechanism like the impact assessment to be done by an expert body like SEIAA has been provided in the said guidelines.

    42. It cannot be gainsaid that if any construction activity for an area of more than 20,000 sq. mtr. is to be carried out, it will naturally have an effect on the environment and ecology, even if the building is for industrial shed or for educational purpose, including hostels etc. There is neither any rational nexus with the object to be achieved by excluding such buildings from the rigors of the

    37

    notification. We, therefore, see no reason to discriminate the other buildings with the buildings constructed for industrial or educational purposes.

    43. It is by now common knowledge that education is no more exclusively a service oriented activity and that it has in fact become a flourishing and thriving industry. We, therefore, see no reason behind the exemption of 2006 notification to the industrial or educational buildings by way of Note 1 in Column 5 of the 2025 notification.

    44. Insofar as the clarification by O.M. dated 30th January, 2025, is concerned, it only clarifies that the 2025 notification would also be applicable to the State of Kerala.

    45. It can thus be seen that the clarificatory O.M. dated 30th January, 2025, which has also been impugned in the present petition, rather than being adverse to the environmental interest is conducive to the environmental interest, inasmuch as it also makes the conditions applicable to the State of Kerala.

    46. Therefore, while upholding the impugned notification dated 29th January, 2025, we hold that Note 1 to Entry 8(a) is arbitrary and liable to be quashed and set aside.

    47. In the result, we pass the following order:

    i. The Writ Petition is partly allowed;

    ii. The notification dated 29th January, 2025 excluding Note 1 to Entry 8(a) is upheld;

    iii. Note 1 to Entry 8(a) of the notification dated 29th January, 2025 is quashed and set aside;

    iv. The O.M. dated 30th January, 2025 issued by the MoEF&CC is also upheld; and

    v. In the facts and circumstances, no orders as to costs."

    23. Notably, the latest notification dated 29.01.2025 was issued by Respondent No. 1 on the basis of the order impugned in these appeals. The said Notification, together with the consequential official Memorandum dated 30.01.2025 was challenged before this Court in Writ Petition (C) No. 166 of 2025. By order dated 05.08.2025, this Court partly allowed the writ petition by upholding the Notification and the Office Memorandum, save and except Note 1

    38

    to Entry 8(a), which was struck down. The decision so rendered has a direct bearing on the present appeals. Since the issues raised herein already stand adjudicated, it is neither necessary nor proper for us to re-examine them afresh. In the interest of judicial propriety, therefore, we are inclined to dispose of the present appeals in light of the aforesaid judgment.

    24. In the order dated 05.08.2025, this Court had already taken note of the pendency of the present appeals. It was the categorical stand of Respondent No. 1 therein that, from inception, the General Conditions were never made applicable to the projects or activities covered under Items 8(a) and 8(b) of the Schedule to the EIA 2006 Notification; and wherever their application was intended, Column 5 of the Schedule expressly so provided. It was further submitted that the 2025 Notification was issued in the backdrop of this Court's decision in Okhla Bird Sanctuary, wherein, it had been observed that General Conditions were inapplicable to Entries 8(a) and 8(b), though certain clarifications were required to put the controversy at rest.

    24.1. Upon considering the matter, this Court held that wherever the delegated legislation intended the General Conditions to apply, the Schedule itself made a specific provision, and consequently Entries 8(a) and 8(b) did not attract the applicability of the General Conditions. With respect to the impugned order dated 09.08.2024 of the NGT, this Court found that the Tribunal had failed to construe the EIA 2006 Notification in its correct perspective. A plain reading of

    39

    the Notification revealed that the General Conditions were never attracted to projects falling under Items 8(a) and 8(b).

    24.2. This Court also observed that one of the reasons for issuing the 2025 Notification was the ambiguity concerning the built-up area requirement, as noted in Okhla Bird Sanctuary. While reaffirming the consistent approach of courts in protecting the environment and safeguarding natural resources as trustees for future generations, the Court emphasized the necessity of balancing such concerns with the principle of sustainable development. It was further held that the SEIAA, being an expert body constituted by the Central Government, was best suited to assess the environmental impact of projects within the respective States and Union Territories.

    24.3. Accordingly, while upholding the 2025 Notification, this Court set aside Note 1 in Column 5 of Item 8(a), holding that the exclusion of projects such as industrial sheds, schools, colleges, and hostels for educational institutions was inconsistent with the object and scheme of the Environment Protection Act, 1986. With respect to the OM dated 30.01.2025, it was further held that the 2025 Notification would apply to the State of Kerala as well. Thus, the 2025 Notification (excluding Note 1 to Entry 8(a)) and the OM dated 30.01.2025 were upheld, and the writ petition was allowed in part.

    25. We are in full agreement with the view so taken by the coordinate Bench in Writ Petition (C) No. 166 of 2025. In consequence, the impugned order dated 09.08.2024 of the NGT, on the basis of which the 2025 Notification was

    40

    subsequently issued and which has been upheld by this Court, does not survive for consideration. The 2025 Notification, excluding Note 1 to Entry 8(a), presently holds the field.

    26. All these appeals are, accordingly, disposed of. There is no order as to costs.

    27. Pending Application(s), if any, stand disposed of.

    .....................................J.

    [J.B. PARDIWALA]

    .....................................J.

    [R. MAHADEVAN]

    NEW DELHI

    SEPTEMBER 12, 2025.