ORDER:
Shorn of unnecessary details, the facts of the case are that the complainant purchased O General Split 18 CGTA SR No.T025346 OD T014824 (Split ACT) along with Stabilizer from respondent No.1 cash memo No.GI-304 dated 17.8.2020 for the consideration of Rs.56,501/-. Respondent No.2 is the manufacturing of the said A.C. The respondents issued the guarantee card/Certificate of said AC at the time of purchasing the A.C. in which they fully assured her that they are fully responsible for the said A.C. and to replace the same if any defect is occurred. The above said A.C. is not working properly and is not giving proper cooling. The complainant moved a complaint through telephone on 31.5.2021 to respondent No.1 to remove the defect. Mechanic of respondent No.1 visited the premises of the complainant to check the said A.C. on 1.6.2021 and after checking gas was filled on 2.6.2021. But after few days, the said
2
A.C. became defective and was not giving cooling properly. The complainant again moved a complaint on 16.6.2021 to respondent No.1. Mechanic of respondent No.1 visited the premises of the complainant, who said that the gas was leaked from another side. He again visited on 21.6.2021. He checked the A.C. thoroughly and suggested that cooling system will be changed. On 21.6.2021 leaked original coal had been changed with another one. On 1.10.2021 a Mechanic came to the premises of the complainant and he filled up the gas but the A.C. again became defective. On 15.4.2022 a Mechanic of the Company visited and he suggested that the gas is to be filled. The said A.C. is lying defective and is not working. The complainant approached the respondents a number of times to remove the said defect or to replace the A.C. with new one. But the respondents never paid any heed to the request of the complainant and has not replaced the A.C. The complainant got issued legal notices to the respondents on 9.5.2022 demanding replacement of above said A.C. but all in vain. Now, the respondents totally refused to replace the said A.C. or to return the price of the same. Alleging deficiency in service on the part of the respondents the present
3
complaint has been filed directing them to replace the said A.C. along with Stabilizer and to pay Rs.50,000/-, as compensation, on account of mental tension, physical agony and harassment and litigation expenses.
2. Notices were issued to the OPs. OP No.1 appeared and filed its separate reply admitting therein that the complainant purchased O General Split 18 CGTA SR No.T025346 OD T014824 (Split AC) along with stabilizer from respondent No.1, vide Cash Memo No.G1-304 dated 17.8.2020 for a consideration of Rs.56,501/- and respondent No.2 is the manufacturer of the said A.C. It is, however, submitted that warranty of 5 years for PCV, warranty of 10 years for compressor and warranty of 1 year for rest of the parts including gas was given to the complainant on 17.8.2020. There was no mechanical defect in the AC and further no manufacturing defect was found in the product. All services were provided to the complainant free of costs in the presence of the complainant. After expiry of warranty of 1 year of gas, respondent No.1 also provided free services to the complainant and no charges were demanded for filling gas in the AC. Even at present respondent No.1 is ready to fill gas in the A.C. but the
4
complainant is pressurizing to change the A.C. with new one for which answering respondent has no right to do so as the same is the duty of the Company, who manufactured the product. Denying any deficiency in service or adoption of unfair trade practice on its part, a prayer for dismissal of the complaint was made.
3. OP No.2 did not appear despite service and it was proceeded against ex parte, vide order dated 25.5.2023.
4. During the pendency of the present complaint, Parminder Kaur, complainant, died on 21.4.2023 and her husband; namely, Rajinder Singh Tiwana has been impleaded as her L.R.
5. In support of the complaint, the husband of the complainant has placed on record his own affidavit as Ex.C-1 and documents i.e. copy of death certificate of the complainant as Ex.C-2, copy of order for late entry of death as Ex.C-3, copy of invoice dated 17.8.2020 as Ex.C-4, copy of certificate dated 17.8.2020 as Ex.C- 5, copies of job sheets as Ex.C-6 to Ex.C-9, copy of Invoice dated 18.8.2020 as Ex.C-10, copy of warranty card as Ex.C-11, copy of legal notice as Ex.C-12 and postal receipts Ex.C-13 to Ex.C-16.
5
6. OP No.1 has filed his written version and suffered a statement that the same may be read as his evidence as Ex.OP1.
7. Heard. The entire record has been perused.
8. Admittedly, the complainant purchased one O-General A.C. Model No.18 CGTA SR No.T025346 OD T014824 from OP No.1 on 17.8.2020 for Rs.56,501/- as per Ex.C-4 along with Stabilizer by paying Rs.7,000/- on 18.8.2020 as per Ex.C-10. The grievance of the complainant was that the A.C. is not giving proper cooling and is not working properly.
9. From the perusal of the record, it emerges out that the complainant died during the pendency of the complaint and her husband, Rajinder Singh Tiwana, has been impleaded as her L.R. The complainant lodged a number of complaints to OP No.1 regarding the aforesaid defects as per Ex.C-6 to Ex.C-9. The gas was filled many times as per Ex.C6, Ex.C-8 and Ex.C-9 by Service Engineers of the OPs. They even changed the leaked coil of the A.C. with new one as per Ex.C-7 but still the A.C. in question was not giving effective cooling. The Service Engineers of the OPs tried to rectify the defect but they did not bring the satisfactory relief to the complainant.
6
10. We observed from service reports adduced by the complainant that the defect relating to the leakage of gas occurred within a year from the date of its purchase and the same was acknowledged by the Service Engineer of OP No.2. Leakage of gas affects cooling. As per Section 2(10) of the Consumer Protection Act, 2019 'defect' means any fault, imperfection or shortcoming in the quality, quantity, potency, purity or standard which is required to be maintained by or under any law for the time being in force. Goods are considered to be defective even if after rectifying the defect, it continues to persist.
11. We place reliance upon the judgment of Hon'ble National Consumer Disputes Redressal Commission, New Delhi, in "Tata Motors Jivan Tara Building v. Rajesh Tyagi" 2013 SCC Online NCDRC 1021 (2014)1CPJ 132, wherein it has been held that whenever a brand new vehicle is sold to a consumer, there is an implied contract that the vehicle being sold does not suffer from and will not suffer from any kind of fault or imperfection, shortcoming in the quality, quantity, potency and standard which is required to be maintained. The aforesaid observation was made by the Hon'ble National Consumer Disputes Redressal
7
Commission, New Delhi in the light of vehicle but it applies to all cases of goods.
12. The A.C. was purchased by the complainant for comfort but she had to suffer harassment on account of non-removal of defects. Same defect occurred time and again. It was repaired by the OPs but same problem still persists. If a product requires frequent services and needs replacement of parts during warranty period, it can be implied that it is having manufacturing defect. The OPs continued in filling up gas since the first complaint was made to them. It is, thus, proved that OPs have sold a defective product to the complainant and failed to remove the defects. We deem it appropriate to refer judgment of Hon'ble National Consumer Disputes Redressal Commission, New Delhi in
"Mandovi Motors (P) Ltd. v. Praveen Chandra Shetty" 2013 SCC Online NCDRC 854, wherein it has been held that if the vehicle purchased suffers from defects even after the repeated replacement of defective parts and after detailed testing by the technical experts, then, replacement of new vehicle or refund of amount can be ordered by Consumer Commissions besides ordering compensation for injustice suffered by the complainant.
8
13. As the said A.C. has developed some gas related defects, so the complainant did not enjoy the comfort of A.C. continuously. The complainant enjoyed it for few months only since its date of purchase i.e. August, 2020 and after that first defect occurred on 31.5.2021 as per Ex.C-6. So, we deem it appropriate that 25% of the purchase price of the A.C. and Stabilizer shall be reasonable to be deducted towards depreciation.
14. As a corollary of our above discussions and keeping in view the facts of the present case, the OPs are held liable for deficiency in service by not able to repair the A.C. Therefore, it is held that there are inherent defects in the A.C. and as such, the complainant is held entitled for refund of depreciated value of A.C. and Stabilizer.
15. Accordingly this complaint is partly allowed and the complainant is directed to return the A.C. along with Stabilizer to OP No.1 within a period of 15 days from the date of receipt of certified copy of this order and OP Nos.1 and 2 are directed to refund the depreciated value of the A.C. and the Stabilizer i.e. Rs.47,626/- (after deducting 25% from the price of A.C. and Stabilizer) within a period of 30 days from the date of receipt of
9
the A.C. and the Stablilizer failing which the same shall be paid by them along with interest at the rate of 8% per annum from today till date of actual payment. OPs are also directed to pay a sum of Rs.10,000/- to the complainant as composite compensation. Both opposite parties Nos.1 and 2 shall be liable jointly and severally. Copies of this order be sent to the parties free of cost as per Rules. File be indexed and consigned to record room.
16. The complaint could not be decided within the statutory period for want of effective quorum.
(SANJEEV BATRA)
PRESIDENT
(SHIVANI BHARGAVA)
MEMBER
(MANJIT SINGH BHINDER)
MEMBER
Pronounced on : 12.03.2024 bansal
10
CC 75 of 2022 Present:-
For the complainant : Shri Jaswinder Singh Grewal, Advocate. For OP No.1 : Shri Damandeep Singh, Advocate. For OP No.2 : Ex parte.
Vide our separate detailed order of even date, this complaint is partly allowed and the complainant is directed to return the A.C. along with Stabilizer to OP No.1 within a period of 15 days from the date of receipt of certified copy of this order and OP Nos.1 and 2 are directed to refund the depreciated value of the A.C. and the Stabilizer i.e. Rs.47,626/- (after deducting 25% from the price of A.C. and Stabilizer) within a period of 30 days from the date of receipt of the A.C. and the Stablilizer, failing which the same shall be paid by them along with interest at the rate of 8% per annum from today till date of actual payment. OPs are also directed to pay a sum of Rs.10,000/- to the complainant as composite compensation. Both opposite parties Nos.1 and 2 shall be liable jointly and severally. Copies of this order be sent to the parties free of cost as per Rules. File be indexed and consigned to record room.
2. The complaint could not be decided within the statutory period for want of effective quorum.
(SANJEEV BATRA)
PRESIDENT
(SHIVANI BHARGAVA)
MEMBER
(MANJIT SINGH BHINDER)
MEMBER
Pronounced on : 12.03.2024 bansal
11