  • SECTION 40 DAMODAR VALLEY CORPORATION ACT 1948
  • ELECTRICITY ACT 2003
  • 2.89 0.00 0.00 0.00 0.00 LRSB complete assembly 0.00 36.58 0.00 0.00 0.00 MAINTENANCE SECTION
  • article 16 and 17 of Employees Provident Funds and Miscellaneous Provisions Act, 1952
  • Regulation 53(2)(iii) read with Regulation 27 Order in Petition No. 575/GT/2020 Page 39 of 176 39
  • 114.11 0.00 C&I SECTION 4 Upgradation of 625.00 25 (2) (c)
  • 16.58 0.00 C&I SECTION 5 Upgradation of 25.00 25 (2) (c)
  • Total 4.57 4.57 5 IT Software Order in Petition No. 575/GT/2020 Page 18 of 176 18 Asset/Work Amount Regulation
  • MAINTENANCE SECTION 1 HYDRAULIC 56.29 25 (2) (a)
  • Regulation 25(2)(a) of Order in Petition No. 575/GT/2020 Page 103 of 176 103 Sr. Head of Work / Claimed Regulations Justification Reasons
  • 131.76 Generation & Order of RTPS dt. Regulation 14(1)(ii) Accessory- 18.10.2017),
  • provisions of sub-section (2) of section 40,
  • Section 40 of DVC Act, 1948, DVC
  • sub-clause (ii) of clause (2) of Regulation 72
  • section 40, Part IV of DVC Act) 3181.47 827.10 885.00 Share of P&G expenses 5024.37 11374.93 2149.25 Share of Common Office Expenditure 185.93 201.34 215.45 Expenses
  • 95.00 0.00 ELECTRICAL SECTION E1SP retrofitting 55.00 25 (2) (a) 128
  • 3(i) of the Regulation 14(1)(iii) PH I Sanction Order
  • MAINTENANCE SECTION 1 Complete BCP 461.73 25 (2) (a)
  • section 40, Part IV of DVC Act) 3181.47 827.10 885.00 Share of Common Office Expenses 81.85 83.96 89.06 Sub-Total (B) 3948.59 1570.46 1439.78 Total Annual
  • provisions contained in Sections 41 and 51 of the 2003 Act
  • Section 12 of the DVC Act, 1948.
  • section 40, Part IV of DVC Act) 946.95 1013.23 1084.16 1160.05 1241.25 Share of P&G 4471.73 4681.93 4902.01 5132.44 5373.70 Share of Common Office Expenditure 235.98 253.26 256.45 220.55 201.03 Expenses
  • Regulation works 3(iii) of the 25(1)(e) of the 2019 Sanction Tariff Regulations, Order
  • 25 (1) (e) 0.00 645.00 0.00 0.00 0.00 Order in Petition No. 575/GT/2020 Page 96 of 176 96 Regulations 2019-20 2020-21 2021-22 2022-23 2023-24 SUB-TOTAL: 1108.82 645.00 0.00 0.00 0.00 TOWNSHIP AND MISCELLANEOUS CIVIL WORK Construction
  • Corporation Act, 1948 (hereinafter referred
  • sections 32 and 33 of the Damodar Valley Corporation Act, 1948,
  • section 32 and 33 of DVC Act, 1948
  • 2019 Tariff Regulations. Additional Capital Expenditure 152. Clauses (1) and (2) of Regulations 25 and Regulation 26 of the 2019 Tariff Regulations,
  • Section 40 of the DVC Act, 1948
  • 44.14 0.00 TOTAL ELECTRICAL SECTION N3umerical 90.00 25 (2) (a)
  • 3(iii) Regulation 25(1)(e) of of the the 2019 Tariff Sanction Regulations, Order
  • 461.73 0.00 C&I SECTION 2 Upgradation of 50.00 25 (2) (c)
  • MAINTENANCE SECTION 1 LRSB 36.58 25 (2) (a)
  • Section 40, Part IV of DVC Act) 218.
  • 0.00 15.00 2.50 2.50 2.50 SUB-TOTAL: 699.46 253.47 5.00 5.00 5.00 CONSTRUCTION OF ROAD Order in Petition No. 575/GT/2020 Page 97 of 176 97 Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
  • Section 14 of the 2003 Act
  • Section 40, Part IV of DVC Act) 118.
  • Regulation Order in Petition No. 575/GT/2020 Page 153 of 176 153 35(1)(1) of the 2019 Tariff Regulations
  • DVC. (d) Section 32 of the DVC Act 1948
  • Regulation Order in Petition No. 575/GT/2020 Page 23 of 176 23
  • Regulation 13 of the 2014 Tariff Regulations. Total 2978.57 2978.57 Order in Petition No. 575/GT/2020 Page 21 of 176 21
  • 461.97 0.00 TG & AUXILIARIES SECTION 9 CPU Butter Fly 103.00 25 (2) (a)
  • 5(4) of the Sanction Regulation 14(1)(ii) Order of RTPS
  • Regulation 25 (1) (e) Order in Petition No. 575/GT/2020 Page 109 of 176 109
  • Area 25 (2) (a) 9.00 0.00 0.00 0.00 0.00 Complete Actuator set for 57.90 0.00 0.00 0.00 0.00 Order in Petition No. 575/GT/2020 Page 95 of 176 95 Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
  • 90.00 0.00 ELECTRICAL SECTION 8 SEL Goose 20.00 25 (2) (c)
  • 1187.75 0.00 C&I SECTION 20 Upgradation of 625.00 25 (2) (c)
  • 9695.02 9776.05 9536.22 (a) Fuel Cost for Working Capital 68. Sub-clauses (i), (ii) and (iii) of Regulation 28(1) of the 2014 Tariff Regulations
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Acts
  • SECTION 40 DAMODAR VALLEY CORPORATION ACT 1948
  • ELECTRICITY ACT 2003
  • 2.89 0.00 0.00 0.00 0.00 LRSB complete assembly 0.00 36.58 0.00 0.00 0.00 MAINTENANCE SECTION
  • article 16 and 17 of Employees Provident Funds and Miscellaneous Provisions Act, 1952
  • Regulation 53(2)(iii) read with Regulation 27 Order in Petition No. 575/GT/2020 Page 39 of 176 39
  • 114.11 0.00 C&I SECTION 4 Upgradation of 625.00 25 (2) (c)
  • 16.58 0.00 C&I SECTION 5 Upgradation of 25.00 25 (2) (c)
  • Total 4.57 4.57 5 IT Software Order in Petition No. 575/GT/2020 Page 18 of 176 18 Asset/Work Amount Regulation
  • MAINTENANCE SECTION 1 HYDRAULIC 56.29 25 (2) (a)
  • Regulation 25(2)(a) of Order in Petition No. 575/GT/2020 Page 103 of 176 103 Sr. Head of Work / Claimed Regulations Justification Reasons
  • 131.76 Generation & Order of RTPS dt. Regulation 14(1)(ii) Accessory- 18.10.2017),
  • provisions of sub-section (2) of section 40,
  • Section 40 of DVC Act, 1948, DVC
  • sub-clause (ii) of clause (2) of Regulation 72
  • section 40, Part IV of DVC Act) 3181.47 827.10 885.00 Share of P&G expenses 5024.37 11374.93 2149.25 Share of Common Office Expenditure 185.93 201.34 215.45 Expenses
  • 95.00 0.00 ELECTRICAL SECTION E1SP retrofitting 55.00 25 (2) (a) 128
  • 3(i) of the Regulation 14(1)(iii) PH I Sanction Order
  • MAINTENANCE SECTION 1 Complete BCP 461.73 25 (2) (a)
  • section 40, Part IV of DVC Act) 3181.47 827.10 885.00 Share of Common Office Expenses 81.85 83.96 89.06 Sub-Total (B) 3948.59 1570.46 1439.78 Total Annual
  • provisions contained in Sections 41 and 51 of the 2003 Act
  • Section 12 of the DVC Act, 1948.
  • section 40, Part IV of DVC Act) 946.95 1013.23 1084.16 1160.05 1241.25 Share of P&G 4471.73 4681.93 4902.01 5132.44 5373.70 Share of Common Office Expenditure 235.98 253.26 256.45 220.55 201.03 Expenses
  • Regulation works 3(iii) of the 25(1)(e) of the 2019 Sanction Tariff Regulations, Order
  • 25 (1) (e) 0.00 645.00 0.00 0.00 0.00 Order in Petition No. 575/GT/2020 Page 96 of 176 96 Regulations 2019-20 2020-21 2021-22 2022-23 2023-24 SUB-TOTAL: 1108.82 645.00 0.00 0.00 0.00 TOWNSHIP AND MISCELLANEOUS CIVIL WORK Construction
  • Corporation Act, 1948 (hereinafter referred
  • sections 32 and 33 of the Damodar Valley Corporation Act, 1948,
  • section 32 and 33 of DVC Act, 1948
  • 2019 Tariff Regulations. Additional Capital Expenditure 152. Clauses (1) and (2) of Regulations 25 and Regulation 26 of the 2019 Tariff Regulations,
  • Section 40 of the DVC Act, 1948
  • 44.14 0.00 TOTAL ELECTRICAL SECTION N3umerical 90.00 25 (2) (a)
  • 3(iii) Regulation 25(1)(e) of of the the 2019 Tariff Sanction Regulations, Order
  • 461.73 0.00 C&I SECTION 2 Upgradation of 50.00 25 (2) (c)
  • MAINTENANCE SECTION 1 LRSB 36.58 25 (2) (a)
  • Section 40, Part IV of DVC Act) 218.
  • 0.00 15.00 2.50 2.50 2.50 SUB-TOTAL: 699.46 253.47 5.00 5.00 5.00 CONSTRUCTION OF ROAD Order in Petition No. 575/GT/2020 Page 97 of 176 97 Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
  • Section 14 of the 2003 Act
  • Section 40, Part IV of DVC Act) 118.
  • Regulation Order in Petition No. 575/GT/2020 Page 153 of 176 153 35(1)(1) of the 2019 Tariff Regulations
  • DVC. (d) Section 32 of the DVC Act 1948
  • Regulation Order in Petition No. 575/GT/2020 Page 23 of 176 23
  • Regulation 13 of the 2014 Tariff Regulations. Total 2978.57 2978.57 Order in Petition No. 575/GT/2020 Page 21 of 176 21
  • 461.97 0.00 TG & AUXILIARIES SECTION 9 CPU Butter Fly 103.00 25 (2) (a)
  • 5(4) of the Sanction Regulation 14(1)(ii) Order of RTPS
  • Regulation 25 (1) (e) Order in Petition No. 575/GT/2020 Page 109 of 176 109
  • Area 25 (2) (a) 9.00 0.00 0.00 0.00 0.00 Complete Actuator set for 57.90 0.00 0.00 0.00 0.00 Order in Petition No. 575/GT/2020 Page 95 of 176 95 Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
  • 90.00 0.00 ELECTRICAL SECTION 8 SEL Goose 20.00 25 (2) (c)
  • 1187.75 0.00 C&I SECTION 20 Upgradation of 625.00 25 (2) (c)
  • 9695.02 9776.05 9536.22 (a) Fuel Cost for Working Capital 68. Sub-clauses (i), (ii) and (iii) of Regulation 28(1) of the 2014 Tariff Regulations

    Damodar Valley Corporation

    CENTRAL ELECTRICITY REGULATORY COMMISSION

    NEW DELHI

    Petition No. 575/GT/2020 Coram:

    Shri I. S. Jha, Member Shri Arun Goyal, Member Shri Pravas Kumar Singh, Member

    Date of Order: 29th April 2023 In the matter of

    Petition for truing up tariff for the period 2014-19 and for determination of tariff for the period 2019-24 in respect of Raghunathpur Thermal Power Station (RTPS) Phase-I Units-1 and 2 (1200 MW)

    And In the matter of

    Damodar Valley Corporation, DVC Towers, VIP Road, Kolkata-700054 ...Petitioner

    Vs

    1. Haryana Power Purchase Centre, Shakti Bhawan, Sector-6, Panchkula-134109

    2. Punjab State Power Corporation Limited, Interstate Billing, Shed No. TI-A, Patiala- 147001

    3. Kerala State Electricity Board, 8thFloor, Vydyuthi Bhawan, Thiruvananthapuram-695004

    4. West Bengal State Electricity Distribution Company Limited, Block 'DJ' Sector-11, Salt Lake City,

    Kolkata-700091 ...Respondents

    5. Damodar Valley Power Consumers Association, 9, A J C Bose Road, 4th Floor, Kolkata - 700017 ....Objector Parties Present:

    Order in Petition No. 575/GT/2020 Page 1 of 176

    1

    Ms. Anushree Bardhan, Advocate, DVC Ms. Srishti Khindaria, Advocate, DVC Shri Manik Rakshi, DVC

    Shri Sandip Pal, DVC

    Shri Samit Mandal, DVC

    Shri Arnab Kr. Sinha, DVC Ms. Suparna Srivastava, Advocate, PSPCL Shri Tushar Mathur, Advocate, PSPCL Ms. Soumya Singh, Advocate, PSPCL Shri Rajiv Yadav, Advocate, DVPCA

    ORDER

    This petition has been filed by the Petitioner, Damodar Valley Corporation, for truing-up of tariff of Raghunathpur TPS, Units-I to II (2 x 600 MW) (in short "the generating station") for the period 2016-19, in terms of Regulation 8(1) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 (in short "the 2014 Tariff Regulations") and for determination of tariff of the generating station for the period 2019-24, in accordance with the provisions of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 (in short 'the 2019 Tariff Regulations').

    2. The Petitioner is a statutory body established by the Central Government under the Damodar Valley Corporation Act, 1948 (hereinafter referred to as the 'DVC Act') for the development of the Damodar Valley, with three participating Governments, namely, the Central Government, the Government of West Bengal and the Government of Jharkhand. The generating station is a non-pit head station, with a total capacity of 1200 MW, comprising of two units of 600 MW each. The date of commercial operation of the units of the generating station are as under:

    Actual COD

    Unit - I 31.3.2016 Unit - II 31.3.2016 Order in Petition No. 575/GT/2020 Page 2 of 176

    2

    Background

    3. The Commission vide its order dated 28.9.2017 in Petition No. 224/GT/2015 had approved the capital cost and the annual fixed charges for the period 2016-19 as under:

    Capital cost allowed (Rs. in lakh)

    2016-17 2017-18 2018-19
    Opening Capital Cost (A) 518014.58 562480.70 596583.70
    Add: Additional Capital Expenditure allowed (B) 44466.13 34103.00 0.00
    Closing Capital Cost (C) = (A) + (B) 562480.70 596583.70 596583.70
    Average Capital Cost (D) = (A+C) / 2 540247.64 579532.20 596583.70

    Annual fixed charges allowed (Rs. in lakh)

    2016-17 2017-18 2018-19
    Depreciation 40481.30 43424.93 44702.61
    Interest on loan 40243.43 38474.79 34730.26
    Return on Equity 25121.52 26927.05 27698.75
    Interest on Working Capital 8893.38 9163.84 9204.43
    O&M Expenses 19524.00 20760.00 22056.00
    Sub-Total (A) 134263.62 138750.61 138392.05
    Additional O&M on account of Ash Evacuation, Mega Insurance, CISF Security and Share of subsidiary activities 0.00 0.00 0.00
    Sinking fund contribution 4180.03 1086.70 1162.77
    Sub-Total (B) 4180.03 1086.70 1162.77
    Total Annual Fixed Charges (C = A+B) 138443.65 139837.31 139554.82

    4. Aggrieved by the said order, the Petitioner has filed Appeal No. 7/2018 before the Appellate Tribunal for Electricity (APTEL) on various issues like Pension & Gratuity contribution, Subsidiary activities etc. and the same is pending. The tariff determined by this order, is however, subject to final decision of APTEL in the said appeal.

    TRUING-UP OF TARIFF FOR THE PERIOD 2014-19

    5. Regulation 8(1) of the 2014 Tariff Regulations provides as follows:

    "(1) The Commission shall carry out truing up exercise along with the Tariff petition filed for the next Tariff period, with respect to the capital expenditure including additional capital expenditure incurred up to 31.3.2019, as admitted by the Order in Petition No. 575/GT/2020 Page 3 of 176

    3

    Commission after prudence check at the time of truing up. Provided that the generating company or the transmission licensee, as the case may be, shall make an application for interim truing up of capital expenditure including additional capital expenditure in FY 2016-17."

    6. In terms of the above Regulation, the Petitioner, in present petition, has claimed the capital cost (in Form 1(I) and the annual fixed charges for the period 2016-19 as under:

    Capital Cost claimed (Rs. in lakh)

    2016-17 2017-18 2018-19
    Opening Capital Cost (A) 536386.92 551536.82 554196.39
    Add: Addition during the year / period (B) 10030.41 3778.35 3953.61
    Less: De-capitalization during the year / period (C)
    Less: Reversal during the year / period (D)
    Less: Undischarged liabilities (E) 951.26 1345.52 535.17
    Add: Discharges during the year / period (F) 6070.75 226.74 1636.91
    Closing Capital Cost (G)=(A+B-C-D-E+F) 551536.82 554196.39 559251.74
    Average Capital Cost (H)=(A+G/2) 543961.87 552866.60 556724.06

    Annual fixed charges claimed (as per Form 1) (Rs in lakh)

    2016-17 2017-18 2018-19
    Depreciation 41232.44 41920.19 42148.72
    Interest on loan 40216.11 33301.86 28644.81
    Return on Equity 32157.06 32683.47 32998.44
    Interest on Working Capital 9696.44 9780.58 9536.42
    O&M Expenses 19524.00 20760.00 22056.00
    Water Charges 295.08 334.97 407.12
    Compensation Allowance 0.00 0.00 0.00
    Sub-Total (A) 143121.13 138781.08 135791.50
    Capital Spares 0.00 70.85 274.28
    DVC's share of savings in interest cost due to loan restructuring 521.76 1601.30 1257.31
    Impact of Pay Revision due to recommendation of 7th Pay Commission 1457.55 1834.53 1292.18
    Impact of GST as change in law 0.00 59.46 170.04
    Interest & Contribution on Sinking Fund (As per section 40, Part IV of DVC Act) 3181.47 827.10 885.00
    Share of P&G expenses 5024.37 11374.93 2149.25
    Share of Common Office Expenditure 185.93 201.34 215.45
    Expenses due to Mega insurance, CISF expenditure & Expenditure for Subsidiary activity 2922.32 3234.59 2772.70
    Sub-Total (B) 13293.40 19204.11 9016.21
    Total annual fixed charges claimed (C = A+B) 156414.53 157985.19 144807.71

    7. The present petition was filed by the Petitioner/ for truing-up of tariff for the Order in Petition No. 575/GT/2020 Page 4 of 176

    4

    period 2016-19 and for determination of tariff for the period 2019-24 of the generating station vide affidavit dated 21.1.2020. Subsequently, the Petitioner vide affidavit dated 15.11.2021 submitted additional information along with the revised forms for 2016-19 tariff period after correction of certain inadvertent errors in the forms. It is observed that the Petitioner while submitting the information vide affidavit dated 15.11.2021, had submitted certain additional information and has revised the Form-1 and Form- 13B. However, the Petitioner has not made the corresponding revisions in the other applicable forms.

    8. The Objector, Damodar Valley Power Consumers Association (DVPCA) has filed its objections vide affidavit dated 19.4.2021 and the Petitioner vide affidavit dated 16.7.2021 has filed its response to the same. The Respondent No.2, PSPCL has filed its reply vide affidavit dated 10.7.2021 and the Petitioner has filed its rejoinder to the said reply. The Respondent No.3, KSEBL has filed its reply vide affidavit dated 18.5.2021 and the Petitioner has filed its rejoinder to the same, vide affidavit dated 16.7.2021. The Petition was heard through video conferencing on 25.5.2021 and the Commission had directed the Petitioner to file certain additional information. The Petitioner, in compliance to the same, has filed the additional information vide affidavit dated 1.7.2021 after serving copies to the Respondents/Objector. The Petition was thereafter heard through video conferencing on 15.3.2022, and the Commission, after directing the Petitioner to file certain additional information, reserved its order in the petition The Petitioner has filed its note of arguments (of the hearing dated 15.3.2022) after serving copy to the Respondents/Objector. The Objector DVPCA has also filed its written note of submissions on 2.5.2022. The Petitioner, in compliance to the directions vide ROP of the hearing dated 15.3.2022, has filed the additional information, vide affidavit dated 19.4.2022 after serving copies on the Order in Petition No. 575/GT/2020 Page 5 of 176

    5

    Respondents/Objector. The Objector, DVPCA has also filed its written note of submissions on 2.5.2022 and the Petitioner has filed its response to the same on 10.5.2022. Considering the submissions of the parties and the documents available on record, we proceed to examine the claims of the Petitioner, in this petition, on prudence check, as stated in the subsequent paragraphs.

    Capital Cost

    9. Regulation 9(3) of the 2014 Tariff Regulations provides as follows:

    "9. Capital Cost:

    (3) The Capital cost of an existing project shall include the following:

    (a) the capital cost admitted by the Commission prior to 1.4.2014 duly trued up by excluding liability, if any, as on 1.4.2014.

    (b) additional capitalization and de-capitalization for the respective year of tariff as determined in accordance with Regulation 14; and

    (c) expenditure on account of renovation and modernisation as admitted by this Commission in accordance with Regulation 15.

    xxx…"

    10. The Commission vide its order dated 28.9.2017 in Petition No. 224/GT/2015 had allowed the closing capital cost of Rs.518014.58 lakh, as on 31.3.2016. However, the Petitioner has sought revision of the opening capital cost, as on 1.4.2016, to Rs.536386.92 lakh (Rs.518014.58 lakh + Rs.3588.32 lakh + Rs.14784.02 lakh) by adding Rs.3588.32 lakh, which is a differential amount between the provisional capital cost of Rs.809390.12 lakh, claimed by the Petitioner in Petition No. 224/GT/2015 and the actual capital cost of Rs.812978.44 lakh, booked in audited accounts. In addition, the Petitioner has prayed for consideration of Rs.14784.02 lakh, which is a difference of notional IDC computed as on station COD of 31.3.2016 and the actual IDC of Rs.287058.32 lakh as per audited accounts.

    11. As regards the differential capital cost of Rs.3588.72 lakh claimed, the Respondents KSEBL and PSPCL have submitted that the Petitioner has not furnished any justification including the auditor's certificate for the additional capital cost claimed Order in Petition No. 575/GT/2020 Page 6 of 176

    6

    over and above the approved capital cost. They have also pointed out that the Petitioner has also not provided complete details of works/assets which were included in the original scope of work and despite the direction of the Commission, the Petitioner has also failed to furnish the details of liquidated damages recovered by it from the contractors, without which its claim for additional capital cost, cannot be adjudicated. As regards the Petitioner's claim towards the allowance of notional IDC of Rs. 14784.02 lakh, as per the order dated 6.5.2015 in Petition No. 229/2010 and order dated 29.4.2019 in Petition No. 12/RP/2015, the Respondents have submitted that notional IDC shall not be allowed before the actual drawl of loan and therefore, the notional IDC for the period when there was no actual drawl of loan may be disallowed.

    12. The matter has been considered. It is observed that the Petitioner has claimed additional capital cost of Rs.3588.32 lakh, as on COD i.e., 31.3.2016. The Commission, on the prudence check of the audited accounts and respective forms submitted by the Petitioner, as part of the Petition, has verified that the actual capitalized expenditure as on COD of the generating station i.e., 31.3.2016 is Rs.812978.44 lakh. Thus, the claims of the Petitioner towards the additional capital cost of Rs.3588.32 lakh is found to be in order. In this background, the Petitioner's claim for additional capital cost of Rs.3588.32 lakh, is allowed.

    13. It is also observed that the Petitioner, in its claim for additional capital expenditure in 2018-19 has adjusted the additional capitalisation by way of rectification entry of (-) Rs.3586.59 lakh towards 'Access Roads'. However, the Petitioner has neither provided any justification for claiming such adjustment nor has linked it to the corresponding positive entry of same amount during the year, previous to the year of rectification entry i.e., 2018-19. In this background, it has been decided Order in Petition No. 575/GT/2020 Page 7 of 176

    7

    to adjust such additional capitalisation in the opening capital cost as on COD i.e.,

    31.3.2016.

    IDC, IEDC and Finance Charges (FC)

    14. As regards the claim for notional IDC of Rs.14784.02 lakh, it is observed that the Petitioner, in Petition No. 224/GT/2015, had not claimed notional IDC. The notional IDC claimed represents the difference between IDC computed, on notional basis, (by considering equity beyond 30% as notional loan) and the actual IDC as per books. The calculations as submitted by the Petitioner towards the claim for notional IDC is found to be in order. However, considering the fact that Commission, vide order dated 28.9.2017 in Petition No. 224/GT/2015, had revised the SCOD of Unit-I and Unit-II as 25.6.2011 and 25.9.2011, respectively after examining at length, the issue of time overrun and accordingly allowed the IDC of Rs.44730.84 lakh up to the revised SCODs as mentioned above. As such, the notional IDC till the revised SCODs can only be allowed as a part of the capital cost, as on station COD. Accordingly, after verifying the computation of IDC, on notional basis, as submitted by the Petitioner, it is observed that, the IDC, including notional IDC, up to the revised SCOD of Unit-I and Unit-II i.e., 25.6.2011 and 25.9.2011, respectively, works out to Rs. 45764.74 lakh, as against the provisionally allowed IDC of Rs.44730.84 lakh, vide order dated 28.9.2017 in Petition No. 224/GT/2015. Accordingly, the additional notional IDC allowed works out to Rs.1033.90 lakh (Rs.45764.74 lakh-Rs.44730.84 lakh) as against the Petitioner's claimed notational IDC of Rs.14784.02 lakh. In this background, the IDC charges of Rs.45764.74 lakh is allowed as against the provisionally allowed IDC of Rs.44730.84 lakh as part of the capital cost.

    15. As regards IEDC charges, the Commission vide its order dated 28.9.2017 in Petition No. 224/GT/2015 had provisionally allowed an amount of Rs.14709.41 lakh as Order in Petition No. 575/GT/2020 Page 8 of 176

    8

    against the IEDC of Rs.33356.00 lakh, claimed by Petitioner. However, while examining the IEDC computations, some minor variations have bene observed, wherein, the IEDC charges are worked out as Rs.14721.06 lakh, as against the provisionally allowed IEDC charges of Rs.14709.41 lakh in the said order. In this background, the IEDC charges of Rs.14721.06 lakh is allowed as part of the capital cost.

    16. As regards Finance Charges (FC), the Petitioner, had claimed the actual FC of Rs.4553.00 lakh, as part of the capital cost, which was provisionally allowed vide order dated 28.9.2017 in Petition No. 224/GT/2015. The Petitioner was directed to furnish the actual break-up of FC during true up and accordingly the Petitioner has revised the actual FC claims from Rs.4553.00 lakh (provisionally allowed in petition No.224/GT/2015 dated 28.9.2017) to Rs.5879.52 lakh. The Petitioner, in justification of the same, has submitted that the additional charges of Rs.1326.52 lakh (i.e.Rs.5879.52 lakhs- Rs.4553 lakh), pertains to DVC Bonds and though the payments were made in the year 2014-15, it was inadvertently missed while filing the tariff petition for this generating station. The Petitioner has also submitted the auditor certificate as the supporting document for its claim. Against the total IDC claim of Rs.301411.47 lakh upto actual COD, the petitioner has been allowed total IDC of Rs.45764.74 lakh which works out to 15.18% of the IDC claimed amount. On the same lines after verifying the Petitioner's claim, the actual FC has been allowed for Rs.892.72 lakh which is 15.18% of the FC claimed amount of Rs.5879.52 lakh (i.e. the same percentage of IDC allowed vis a vis IDC claimed).

    17. Thus, the capital cost, as on COD, allowed for the purpose of truing-up of tariff is as under:

    Order in Petition No. 575/GT/2020 Page 9 of 176

    9

    (Rs. in lakh)

    Capital Cost allowed
    Capital Cost allowed as on COD (A) (Order in Petition No. 224/GT/2015) 518014.58
    Less: IDC allowed (B) (Order in Petition No. 224/GT/2015) 44730.84
    Less: FC allowed (C) (Order in Petition No. 224/GT/2015) 4553.00
    Less: IEDC allowed (D) (Order in Petition No. 224/GT/2015) 14709.41
    Capital Cost as on COD (E = A-B-C-D) (excluding IDC/IEDC/FC allowed in Order in Petition No. 224/GT/2015) 454021.33
    Add: IDC allowed 45764.74
    Add: IEDC allowed 14721.06
    Add: FC allowed 892.72
    Add: Differential capital cost allowed 3588.32
    Add: Rectification entry claimed under additional capital expenditure in 2018-19 (-)3586.59
    Total Capital Cost allowed as on COD (incl. IDC, IEDC, FC) 515401.58

    Additional Capital Expenditure

    18. Regulation 14 of the 2014 Tariff Regulations, provides as under:

    "14. Additional Capitalization and De-capitalization:

    (1) The capital expenditure in respect of the new project or an existing project incurred or projected to be incurred, on the following counts within the original scope of work, after the date of commercial operation and up to the cut-off date may be admitted by the Commission, subject to prudence check:

    (i) Un-discharged liabilities recognized to be payable at a future date;

    (ii) Works deferred for execution;

    (iii) Procurement of initial capital spares within the original scope of work, in accordance with the provisions of Regulation 13;

    (iv) Liabilities to meet award of arbitration or for compliance of the order or decree of a court of law; and

    (v) Change in law or compliance of any existing law:

    Provided that the details of works asset wise/work wise included in the original scope of work along with estimates of expenditure, liabilities recognized to be payable at a future date and the works deferred for execution shall be submitted along with the application for determination of tariff."

    (2) The capital expenditure incurred or projected to be incurred in respect of the new project on the following counts within the original scope of work after the cut-off date may be admitted by the Commission, subject to prudence check:

    (i) Liabilities to meet award of arbitration or for compliance of the order or decree of a court of law;

    (ii) Change in law or compliance of any existing law;

    (iii) Deferred works relating to ash pond or ash handling system in the original scope of work; and

    Order in Petition No. 575/GT/2020 Page 10 of 176

    10

    (iv) Any liability for works executed prior to the cut-off date, after prudence check of the details of such un-discharged liability, total estimated cost of package, reasons for such withholding of payment and release of such payments etc.

    (3) The capital expenditure, in respect of existing generating station or the transmission system including communication system, incurred or projected to be incurred on the following counts after the cut-off date, may be admitted by the Commission, subject to prudence check:

    (i) Liabilities to meet award of arbitration or for compliance of the order or decree of a court of law;

    (ii) Change in law or compliance of any existing law;

    (iii) Any expenses to be incurred on account of need for higher security and safety of the plant as advised or directed by appropriate Government Agencies of statutory authorities responsible for national security/internal security;

    (iv) Deferred works relating to ash pond or ash handling system in the original scope of work;

    (v) Any liability for works executed prior to the cut-off date, after prudence check of the details of such un-discharged liability, total estimated cost of package, reasons for such withholding of payment and release of such payments etc.;

    (vi) Any liability for works admitted by the Commission after the cut-off date to the extent of discharge of such liabilities by actual payments;

    (vii) Any additional capital expenditure which has become necessary for efficient operation of generating station other than coal / lignite based stations or transmission system as the case may be. The claim shall be substantiated with the technical justification duly supported by the documentary evidence like test results carried out by an independent agency in case of deterioration of assets, report of an independent agency in case of damage caused by natural calamities, obsolescence of technology, up-gradation of capacity for the technical reason such as increase in fault level;

    (viii) In case of hydro generating stations, any expenditure which has become necessary on account of damage caused by natural calamities (but not due to flooding of power house attributable to the negligence of the generating company) and due to geological reasons after adjusting the proceeds from any insurance scheme, and expenditure incurred due to any additional work which has become necessary for successful and efficient plant operation;

    (ix) In case of transmission system, any additional expenditure on items such as relays, control and instrumentation, computer system, power line carrier communication, DC batteries, replacement due to obsolesce of technology, replacement of switchyard equipment due to increase of fault level, tower strengthening, communication equipment, emergency restoration system, insulators cleaning infrastructure, replacement of porcelain insulator with polymer insulators, replacement of damaged equipment not covered by insurance and any other expenditure which has become necessary for successful and efficient operation of transmission system; and

    (x) Any capital expenditure found justified after prudence check necessitated on account of modifications required or done in fuel receiving system arising due to non- materialization of coal supply corresponding to full coal linkage in respect of thermal generating station as result of circumstances not within the control of the generating station:

    Provided that any expenditure on acquiring the minor items or the assets including tools and tackles, furniture, air-conditioners, voltage stabilizers, refrigerators, coolers, computers, fans, washing machines, heat convectors, mattresses, carpets etc. brought after the cut-off date shall not be considered for additional capitalization for determination of tariff w.e.f. 1.4.2014:

    Order in Petition No. 575/GT/2020 Page 11 of 176

    11

    Provided further that any capital expenditure other than that of the nature specified above in (i) to (iv) in case of coal / lignite-based station shall be met out of compensation allowance:

    Provided also that if any expenditure has been claimed under Renovation and Modernization (R&M), repairs and maintenance under (O&M) expenses and Compensation Allowance, same expenditure cannot be claimed under this regulation."

    19. The projected additional capital expenditure allowed vide order dated 28.9.2017 in Petition No. 224/GT/2015 is summarized below:

    (Rs. in lakh) 2016-17 2017-18 Cost of Land & Site Development

    Land 0.00 0.00 Rehabilitation & Resettlement (R&R) 100.00 2300.00 Preliminary Investigation & Site Development 0.00 430.00 Social Obligation Programme 153.00 45.00 Green Belt 300.00 100.00

    Total Land & Site Development 553.00 2875.00 Plant & Equipment (Main Plant Package)- 3976.00 1108.00

    EPC

    Water System 4681.00 0.00 Coal Handling Plant (System) 347.80 0.00

    Total Plant & Equipment excluding taxes & 9004.80 1108.00 Duties

    Civil Works

    Township & Colony 5000.00 15091.00 Temporary construction & enabling works 761.00 0.00 (Shifting / Modification of 132/220/400 kV Transmission Lines to Facilitate Rail Infrastructure requirement of RTPS)

    Road & Drainage (Approach Road from SH-37 6000.00 4485.00 to Plant)

    Railway Infrastructure by RITES 20000.00 10506.00

    Total Civil works 31761.00 30082.00 Construction & Pre- Commissioning Expenses

    Operator's Training 80.00 0.00 Office Furniture's 165.00 0.00 Computerization & Networking 250.00 38.00

    Total Construction & Pre- Commissioning 495.00 38.00 Expenses

    Overheads

    Statutory fees, Regulatory charges etc. 64.93 0.00 Establishment 2400.00 0.00

    Contingency 171.00 0.00

    RTPS Dispensary/Hospital 16.40 0.00

    Total Overheads 2652.33 0.00 Total Capital cost excluding IDC & FC 44466.13 34103.00

    Order in Petition No. 575/GT/2020 Page 12 of 176

    12

    20. The Petitioner, in the present petition, has claimed the actual additional capital expenditure, based on the Revised Cost Estimates (RCE) of Rs.939787 lakh, as per sanction order dated 18.10.2017, which conveys the approval of the Board of DVC. It is pertinent to mention that the Commission had allowed capital cost (excluding notional IDC) of Rs.518014.58 lakh, as on COD, against the capital expenditure of Rs.812978.44 lakh, booked till COD, as per audited accounts. As such, the disallowed cost as on COD of the station i.e., 31.3.2016 stands at Rs.294963.86 lakh, reducing the same from the final RCE of Rs.939787.00 lakh, the maximum allowable capital cost works out as Rs.644823.14 lakh (Rs. 939787.00 lakh - Rs.294963.86 lakh), Further, considering the capital cost allowed till COD, the maximum additional capital expenditure is allowable for assets/works of original scope works out to Rs.126808.56 lakh (Rs.644823.14 lakh - Rs.518014.58 lakh). Accordingly, the additional capital expenditure claimed by the Petitioner, for the period 2016-19, is as under:

    (Rs. in lakh)

    Regulations 2016-17 2017-18 2018-19
    Land & Land Rights:
    Cost of land (0111010101) 14 (1) (i) and (ii) 0.00 0.00 879.53
    Total of Land & Land Rights 0.00 0.00 879.53
    Buildings:
    Residential Building (0111020127) 14 (1) (i) and (ii) 2201.06 71.49 226.77
    Hospital Building (0111020119) - - 11.44
    Water Works & Water Supply Sys (0111020134) 14 (1) (i) and (ii) 104.25 0.00 0.00
    Colony Roads (0111020141) 14 (1) (i) and (ii) 202.98 0.00 0.00
    Total of Buildings 2508.30 71.49 238.21
    Road Culverts & Railway Sidings:
    Access road (0111030101) - - 4174.98
    003/01 Access Roads (0111032106) 14 (1) (i) and (ii) 251.00 237.25 -3586.59
    Total of Road Culverts & Rly. Sidings 251.00 237.25 588.39
    Power House Plant & Machinery:
    008/01 Boiler & Accessory Equip. RTPS PH I(0111080701) 14 (1) (i) and (ii) 468.69 341.24 44.51
    008/02 Turbo Generation & Accessory- RTPS PH I(0111080702) 14 (1) (i) and (ii) 788.88 131.76 20.45
    008/03/Electrical Equipment – RTPS PH I(0111080703) 14 (1) (i) and (ii) 1059.07 165.86 25.75

    Order in Petition No. 575/GT/2020 Page 13 of 176

    13

    Regulations 2016-17 2017-18 2018-19
    008/04 Accessory Mechanical Equipment-RTPS PH I(0111080704) 14 (1) (i) and (ii) 519.24 -355.54 12.55
    008/04/02 and 008/04/02/01 Instrumentation & Control (0111080705 and 0111080706) 14 (1) (i) and (ii) 191.79 30.04 57.33
    008/11 Ash Handling Equip. (0111084110) 14 (1) (i) and (ii) 71.57 134.20 0.00
    Oil Equipment (0111080266) 14 (1) (i) and (ii) 9.16 0.00 0.00
    008/15/06 Tools and Plants-RTPS PH I(0111080709) 14 (1) (i) and (ii) 2.43 0.38 0.73
    008/15 Misc. Power Plant Equip-RTPS PH I (0111080708) 14 (1) (i) and (ii) 1155.33 180.93 6.80
    Coal Handling Plant (0111080260) 14 (1) (i) and (ii) 1097.59 621.06 0.00
    008/08/01 Water System -RTPS PH I(0111080707) 14 (1) (i) and (ii) 553.06 444.61 35.24
    Pollution Control Equipment (0111080120) 14 (1) (v) 0.00 0.00 60.31
    Initial Spares embedded in different packages:
    008/01 Boiler & Accessory Equip. RTPS PH I(0111080701) 14 (1) (iii) 733.96 140.67 0.00
    Coal Handling Plant (0111080260) 14 (1) (iii) 71.82 113.66 37.52
    008/08/01 Water System -RTPS PH I (0111080707) 14 (1) (iii) 0.00 8.70 0.00
    008/15 Misc. Power Plant Equip-RTPS PH I (0111080708) 14 (1) (iii) 0.00 0.00 4.20
    Sub-total - Initial Spares embedded in different packages 805.79 263.02 41.72
    Balance Initial Spares procured separately:
    008/02 Turbo Generation & Accessory- RTPS PH I(0111080702) 14 (1) (iii) 81.73 0.00 231.03
    008/01 Boiler & Accessory Equipment RTPS PH I(0111080701) 14 (1) (iii) 0.00 859.92 502.76
    008/03/Electrical Equipment - RTPS PH I(0111080703) 14 (1) (iii) 0.00 0.00 290.82
    008/04 Accessory Mechanical Equipment-RTPS PH I (0111080704) 14 (1) (iii) 0.00 0.00 141.71
    008/15 Misc. Power Plant Equip-RTPS PH I(0111080708) 14 (1) (iii) 0.00 0.00 334.34
    008/08/01 Water System -RTPS PH I(0111080707) 14 (1) (iii) 0.00 0.00 71.96
    Coal Handling Plant (0111080260) 14 (1) (iii) 0.00 161.09 305.07
    Sub-total - Balance Initial Spares procured separately 81.73 1021.01 1877.68
    Total of Power House Plant & Machinery 6804.34 2978.57 2183.06
    Substation Equipment:
    012 Sub Station Equipment (0111125606) 14 (1) (i) and (ii) 4.57 1.12 0.18
    Total of Substation Equipment 4.57 1.12 0.18
    IT Software

    Order in Petition No. 575/GT/2020 Page 14 of 176

    14

    Regulations 2016-17 2017-18 2018-19
    019-Intangible Assets-Engineering Software (0113010202) 14 (1) (i) and (ii) 339.72 0.00 0.00
    Total of IT Software 339.72 0.00 0.00
    Other Assets
    Office Furniture-Steel (O/assets) (0111160101) 14 (1) (i) and (ii) 22.44 1.37 18.02
    Office Furniture-Wooden (O/assets) (0111160102) 14 (1) (i) and (ii) 8.12
    Office Furniture-Elec. (O/assets) (0111160103) 14 (1) (i) and (ii) 0.70 0.00
    Office Equipment (O/assets) (0111160301) 14 (1) (i) and (ii) 66.32 5.95 0.58
    Scientific/lab. Instrument (0111160306) 14 (1) (i) and (ii) 435.63 2.12
    Weighing Machine (O/assets) (0111160315) 14 (1) (i) and (ii) 33.54 8.37
    Residential Furniture. (O/assets) (0111160104) 14 (1) (i) and (ii) 31.81 0.00 11.54
    Miscellaneous (O/assets) (0111160399) 14 (1) (i) and (ii) 1.92 12.73 15.47
    Total of Other Assets 122.49 489.92 64.24
    Grand Total 10030.41 3778.35 3953.61

    21. The Objector, DVPCA has submitted that the Petitioner has not provided appropriate justification and / or documentary evidence in terms of Regulation 14(3) of the 2014 Tariff Regulations. It has also submitted that the Petitioner has claimed certain additional capitalization under Regulation 54 (power to relax) and Regulation 55 (power to remove difficulty) of the 2014 Tariff Regulations, which can be exercised by the Commission in rare cases, but the Petitioner has not presented / cited any extra ordinary circumstance for the same. A comparative table indicating the additional capital expenditure claimed in the petition and the claims that may be allowable, as per DVPCA, is as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Claimed As per DVPCA Claimed As per DVPCA Claimed As per DVPCA
    Land & Site Development - - - - 880 -
    Plant & Equipment (Main Plant Package)-EPC 4266 3976 629 629 168 168
    Water System 558 553 446 - 35 -
    Coal Handling Plant (System) 1098 348 621 - - -

    Order in Petition No. 575/GT/2020 Page 15 of 176

    15

    2016-17 2017-18 2018-19
    Claimed As per DVPCA Claimed As per DVPCA Claimed As per DVPCA
    Total Plant & Equipment excluding taxes & Duties 5921 4877 1696 629 204 168
    Total Initial Spares 888 888 1284 1284 1919 1919
    Township & Colony 2759 2759 309 309 827 827
    Office furniture 122 89 76 - 64 -
    Computerization & Networking 340 250 - - - -
    Total Additional Capital expenditure 10030 8862 3778 2298 3954 2914

    22. The Respondent, PSPCL has submitted that the Petitioner has merely claimed additional capital expenditure for the said years, without providing any justification for delayed payments of the same in the absence of which the claims of the Petitioner cannot be considered by the Commission. In response, the Petitioner has submitted that the additional capitalization claimed, the liability created and discharged has been duly reconciled with the books of account and audited by the Comptroller & Auditor General (C&AG) of India. It has also submitted that justification against each of the items of additional capital expenditure has been furnished along with documentary evidence, wherever necessary. The Petitioner has further submitted that the additional capital expenditure claimed is for ensuring plant's security and safety, based on recommendations from technical audit report, and for ensuring reliable & efficient operation of the generating station.

    23. The matter has been considered. Based on the submissions and documents on the record, RCE dated 18.10.2017 and on prudence check, the claim of the Petitioner for additional capital expenditure claimed for the period 2016-19, is examined and allowed as under:

    2016-17

    Order in Petition No. 575/GT/2020 Page 16 of 176

    16

    (Rs in lakh) Asset/Work Amount Regulation Petitioner Reason for Amount Sr.

    claimed Submission admissibility allowed No.

    2016-17

    1 Buildings

    Residential 2201.06 14 (1) (i) This expenditure The works pertaining to 2201.06 Building and (ii) is towards the Buildings are allowed

    Water Works & 104.25 14 (1) (i) work within the under Regulation 104.25 Water Supply and (ii) original scope 14(1)(ii) of the 2014 Sys (under Sl. No. Tariff Regulations as

    Colony Roads 202.98 14 (1) (i) 5(4) of the this expenditure 202.98 and (ii) Sanction Order incurred is towards the

    of RTPS dt. works which are within

    18.10.2017), as the original scope and

    executed and have been executed

    capitalized within and capitalized within

    the cut-off date the cut-off date.

    Total 2508.30 2508.30

    2 Road Culverts & Railway Sidings:

    Access Roads 251.00 14 (1) (i) This expenditure The works pertaining to 251.00 and (ii) is towards the Road Culverts & Rly.

    work within the Sidings are allowed

    original scope under Regulation

    (under Sl. No. 14(1)(ii) as this

    5(4) of the expenditure is towards

    Sanction Order the works within the

    of RTPS dt. original scope which

    18.10.2017), as have been executed

    executed and and capitalized within

    capitalized within the cut-off date.

    the cut-off date.

    Total 251.00 251.00

    3 Powerhouse Plant & Machinery:

    Boiler & 468.69 14 (1) (i) This expenditure The works pertaining to 468.69 Accessory and (ii) is towards the Powerhouse Plant & Equip. RTPS work within the Machinery are allowed

    PH I original scope under Regulation

    Turbo 788.88 (under Sl. No. 14(1)(ii) as this 788.88 Generation & 3(i) of the expenditure is towards

    Accessory- Sanction Order the works within the

    RTPS PH I of RTPS dt. original scope which

    Electrical 1059.07 18.10.2017), as have been executed 1059.07 Equipment - executed and and capitalized within

    RTPS PH I capitalized within the cut-off date.

    Accessory 519.24 14 (1) (i) the cut-off date. 519.24 Mechanical and (ii)

    Equipment-

    RTPS PH I

    Instrumentation 191.79 191.79 & Control

    Ash Handling 71.57 71.57 Equip.

    Oil Equipment 9.16 9.16 Tools and 2.43 2.43

    Plants-RTPS

    PH I

    Misc. Power 1155.33 1155.33 Plant Equip-

    Order in Petition No. 575/GT/2020 Page 17 of 176

    17

    Asset/Work Amount Regulation Petitioner Reason for Amount Sr.

    claimed Submission admissibility allowed No.

    2016-17

    RTPS PH I

    Coal Handling 1097.59 1097.59 Plant

    Water System - 553.06 553.06

    RTPS PH I

    Initial Spares embedded in different packages:

    Boiler & 733.96 14 (1) (iii) This is under the The Initial Spares are 733.96 Accessory original scope allowed under

    Equip. RTPS (under Sl. No. Regulation 14(1)(iii) as

    PH I 3(i) of the this expenditure is

    Sanction Order towards the initial

    of RTPS dt. spares which have

    18.10.2017), as been procured and

    Coal Handling 71.82 14 (1) (iii) capitalized within capitalized within the 71.82 Plant the cut-off date. cut-off date and within

    the ceiling limit as

    prescribed in

    Regulation 13.

    Balance Initial Spares procured separately:

    Turbo 81.73 14 (1) (iii) This expenditure Initial Spares are 81.73 Generation & is towards the allowed under

    Accessory- work within the Regulation 14(1)(iii) of RTPS PH I original scope the 2014 Tariff

    (under Sl. No. Regulations, as the

    3(ii) of the expenditure is towards

    Sanction Order initial spares which

    of RTPS dt. have been procured

    18.10.2017), as and capitalized within

    executed and the cut-off date and is

    capitalized within also within the ceiling

    the cut-off date. limit as prescribed in

    Regulation 13. Of the

    2014 Tariff Regulations

    Total 6804.34 6804.34

    4 Substation Equipment

    Sub St. 4.57 14 (1) (i) This expenditure The works pertaining to 4.57 Equipment and (ii) is towards the substation equipment's work within the are allowed under

    original scope Regulation 14(1)(ii) as

    (under Sl. No. this expenditure is

    3(iii) of the towards the works

    Sanction Order within the original

    of RTPS dt. scope which have been

    18.10.2017), as executed and

    executed and capitalized within the

    capitalized within cut-off date.

    the cut-off date.

    Total 4.57 4.57

    5 IT Software

    Order in Petition No. 575/GT/2020 Page 18 of 176

    18

    Asset/Work Amount Regulation Petitioner Reason for Amount Sr.

    claimed Submission admissibility allowed No.

    2016-17

    019-Intangible 339.72 14 (1) (i) This expenditure The works pertaining to 339.72 Assets- and (ii) is towards the IT Software are allowed

    Engineering work within the under Regulation

    Software original scope 14(1)(ii) as this

    (under Sl. No. expenditure is towards

    5(6) of the the works within the

    Sanction Order original scope which

    of RTPS dt. have been executed

    18.10.2017), as and capitalized within

    executed and the cut-off date.

    capitalized within

    the cut-off date.

    Total 339.72 339.72

    6 Other Assets

    Office 22.44 This expenditure The works pertaining to 22.44 Furniture-Steel is towards the Other Assets are (O/assets) works / materials allowed under Residential 66.32 within the Regulation 14(1)(ii) as 66.32 Furniture. original scope this expenditure is (O/assets) 14 (1) (i) (under Sl. No. towards the works Office 31.81 and (ii) 5(5) of the within the original 31.81 Equipment Sanction Order scope which have been (O/assets) of RTPS dt. executed and

    Miscellaneous 1.92 18.10.2017), as capitalized within the 1.92 (O/assets) executed and cut-off date.

    capitalized within

    the cut-off date.

    Total 122.49 122.49 Total amount 10030.41 claimed

    Total amount allowed 10030.41 2017-18

    (Rs in lakh)

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission admissibility allowed 2017-18

    1 Buildings

    Residential 71.49 14 (1) (i) and This expenditure is The works 71.49 Building (ii) towards the work pertaining to

    within the original Buildings are

    scope (under Sl. No. allowed under

    5(4) of the Sanction Regulation 14(1)(ii)

    Order of RTPS dt. as this expenditure

    18.10.2017), as is towards the

    executed and works within the

    capitalized within the original scope

    cut-off date. which have been

    executed and

    capitalized within

    the cut-off date.

    Total 71.49 71.49

    Order in Petition No. 575/GT/2020 Page 19 of 176

    19

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission admissibility allowed 2017-18

    2 Road Culverts & Railway Sidings

    Access Roads 237.25 14 (1) (i) and This expenditure is The works 237.25

    (ii) towards the work pertaining to Road within the original Culverts & Rly. scope (under Sl. No. Sidings are allowed 5(4) of the Sanction under Regulation Order of RTPS dt. 14(1)(ii) as this 18.10.2017), as expenditure is executed and towards the works capitalized within the within the original cut-off date. scope which have been executed

    and capitalized

    within the cut-off

    date.

    Total 237.25 237.25

    3 Powerhouse Plant & Machinery

    Boiler & 341.24 14 (1) (i) and This expenditure is The works 341.24 Accessory (ii) towards the work pertaining to

    Equip RTPS within the original Powerhouse Plant PH I scope (under Sl. No. & Machinery are

    Turbo 131.76 3(i) of the Sanction allowed under 131.76 Generation & Order of RTPS dt. Regulation 14(1)(ii) Accessory- 18.10.2017), as as this expenditure

    RTPS PH I executed and is towards the

    Electrical 165.86 capitalized within the works within the 165.86 Equipment - cut-off date. original scope

    RTPS PH I which have been

    Accessory (-)355.54 executed and (-)355.54

    Mechanical capitalized within

    Equipment- the cut-off date.

    RTPS PH I

    Instrumentation 30.04 30.04 & Control

    Ash Handling 134.20 134.20 Equip.

    Tools and 0.38 0.38 Plants-RTPS

    PH I

    Misc. Power 180.93 14 (1) (i) and 180.93 Plant Equip- (ii)

    RTPS PH I

    Coal Handling 621.06 This expenditure is 621.06 Plant towards the work

    within the original

    scope (under Sl. No.

    3(ii) of the Sanction

    Order of RTPS dt.

    18.10.2017), as

    executed and

    capitalized within the

    cut-off date.

    Order in Petition No. 575/GT/2020 Page 20 of 176

    20

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission admissibility allowed 2017-18

    Water System - 444.61 This expenditure is 444.61 RTPS PH I towards the work

    within the original

    scope (under Sl. No.

    3(iii) of the Sanction

    Order of RTPS dt.

    18.10.2017), as

    executed and

    capitalized within the

    cut-off date.

    Initial Spares embedded in different packages

    Boiler & 140.67 14 (1) (iii) This is under the The Initial Spares 140.67 Accessory original scope (under are allowed under

    Equip RTPS Sl. No. 3(i) of the Regulation 14(1)(iii) PH I Sanction Order of as this expenditure

    RTPS dt. is towards the initial

    18.10.2017), as spares which have

    capitalized within the been procured

    cut-off date. and capitalized

    Coal Handling 113.66 This is under the within the cut-off 113.66 Plant original scope (under date and within the

    Sl. No. 3(ii) of the ceiling limit as

    Sanction Order of prescribed in

    RTPS dt. Regulation 13 of

    18.10.2017), as the 2014 Tariff

    capitalized within the Regulations

    cut-off date.

    Water System - 8.70 This is under the 8.70

    RTPS PH I original scope (under

    Sl. No. 3(iii) of the

    Sanction Order of

    RTPS dt.

    18.10.2017), as

    capitalized within the

    cut-off date.

    Balance Initial Spares procured separately

    Boiler & 859.92 14 (1) (iii) This is under the The Initial Spares 859.92 Accessory original scope (under are allowed under

    Equip RTPS Sl. No. 3(v) of the Regulation 14(1)(iii) PH I Sanction Order of as this expenditure

    RTPS dt. is towards the initial

    Coal Handling 161.09 18.10.2017), as spares which have 161.09 Plant capitalized within the been procured

    cut-off date. and capitalized

    within the cut-off

    date and within the

    ceiling limit as

    prescribed in

    Regulation 13 of

    the 2014 Tariff

    Regulations.

    Total 2978.57 2978.57

    Order in Petition No. 575/GT/2020 Page 21 of 176

    21

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission admissibility allowed 2017-18

    4 Substation Equipment

    Sub Station 1.12 14 (1) (i) and This expenditure is The works 1.12 Equipment (ii) towards the work pertaining to

    within the original Substation

    scope (under Sl. No. Equipment are

    3(iii) of the Sanction allowed under

    Order of RTPS dt. Regulation 14(1)(ii)

    18.10.2017), as as this expenditure

    executed and is towards the

    capitalized within the works within the

    cut-off date. original scope

    which have been

    executed and

    capitalized within

    the cut-off date.

    Total 1.12 1.12

    5 Other Assets

    Office 1.37 This expenditure is The works 1.37 Furniture-Steel towards the works / pertaining to Other (O/assets) materials within the Assets are allowed Office 0.70 original scope (under under Regulation 0.70 Furniture-Elec. Sl. No. 5(5) of the 14(1)(ii) as this (O/assets) Sanction Order of expenditure is Office 5.95 RTPS dt. towards the works 5.95 Equipment 18.10.2017), as within the original (O/assets) executed and scope which have Scientific/lab. 435.63 capitalized within the been executed 435.63 Instrument cut-off date. and capitalized

    14 (1) (i) and within the cut-off

    Weighing 33.54 (ii) This expenditure is date. 33.54 Machine towards the balance

    (O/assets) construction works

    for two no's of Road

    Weigh Bridges for

    weighment of coal

    transported by road

    to the plant. The work

    is within the original

    scope (under Sl. No.

    3(ii) of the Sanction

    Order of RTPS dt.

    18.10.2017).

    Miscellaneous 12.73 14 (1) (i) and Miscellaneous 12.73 (O/assets) (ii) expenditure involves

    the expenditure for

    various emergency

    activities required to

    maintain the plant

    efficiency and for

    purchasing the

    equipment /

    materials.

    Total 489.92 489.92 Total 3778.35 Amount

    Order in Petition No. 575/GT/2020 Page 22 of 176

    22

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission admissibility allowed 2017-18

    claimed

    Total Amount allowed 3778.35

    2018-19

    (Rs in lakh)

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission Admissibility allowed 2018-19

    1 Land & Land Rights

    Cost of land 879.53 14 (1) (i) and This The works 879.53

    (ii) expenditure is pertaining to Land towards the and Land Rights work within are allowed under the original Regulation 14(1)(ii) scope (under as this expenditure Sl. No. 1 of is towards the the Sanction works within the Order of original scope

    RTPS dt. which have been

    18.10.2017), executed and

    as executed capitalized within and the cut-off date.

    capitalized

    within the cut-

    off date.

    Total 879.53 879.53 Buildings

    Residential Building 226.77 14 (1) (i) and This The works 226.77

    (ii) expenditure is pertaining to Hospital Building 11.44 14 (1) (i) and towards the Buildings are 11.44

    (ii) work within allowed under the original Regulation 14(1)(ii) scope (under as this expenditure Sl. No. 5(4) of is towards the the Sanction works within the Order of original scope RTPS dt. which have been 18.10.2017), executed and as executed capitalized within and the cut-off date.

    capitalized

    within the cut-

    off date.

    Total 238.21 238.21

    2 Road Culverts & Railway Sidings

    Access road 4174.98 14 (1) (i) and This The works 4174.98 (0111030101) (ii) expenditure is pertaining to Road towards the Culverts & Rly.

    work within Sidings are allowed

    the original under Regulation

    Order in Petition No. 575/GT/2020 Page 23 of 176

    23

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission Admissibility allowed 2018-19

    scope (under 14(1)(ii) as this Sl. No. 3(iii) expenditure is and Sl. No. towards the works 5(4) of the within the original Sanction scope which have Order of been executed RTPS dt. and capitalized 18.10.2017), within the cut-off as executed date.

    and

    capitalized

    within the cut-

    off date.

    Access Roads (-)3586.59 Rectification The negative entry 0.00 (0111032106) entry is adjusted with the

    opening capital

    cost as on COD in

    absence of linkage

    with corresponding

    positive entry

    during previous

    years

    Total 588.39 4174.98

    3 Powerhouse Plant & Machinery

    Boiler & Accessory 44.51 14 (1) (i) and This The works 44.51 Equip RTPS PH I (ii) expenditure is pertaining to Turbo Generation & 20.45 towards the Powerhouse Plant 20.45 Accessory-RTPS PH I work within & Machinery are the original allowed under

    Electrical Equipment - 25.75 25.75

    scope (under Regulation 14(1)(ii)

    RTPS PH I

    Sl. No. 3(i) of as this expenditure Accessory Mechanical 12.55 14 (1) (i) and the Sanction is towards the

    12.55

    Equipment-RTPS PH I (ii) Order of works within the Instrumentation & 57.33

    RTPS dt. original scope

    57.33

    Control 18.10.2017), which have been Tools and Plants- 0.73

    as executed executed and

    0.73

    RTPS PH I and capitalized within Misc. Power Plant 6.80 capitalized the cut-off date. 6.80 Equip-RTPS PH I within the cut-

    off date.

    Coal Handling Plant 0.00 This 0.00

    expenditure is

    towards the

    work within

    the original

    scope (under

    Sl. No. 3(ii) of

    the Sanction

    Order of

    RTPS dt.

    18.10.2017),

    as executed and

    capitalized within the cut- off date

    Order in Petition No. 575/GT/2020 Page 24 of 176

    24

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission Admissibility allowed 2018-19

    Water System -RTPS 35.24 This 35.24 PH I expenditure is

    towards the

    work within

    the original

    scope (under

    Sl. No. 3(iii) of

    the Sanction

    Order of

    RTPS dt.

    18.10.2017),

    as executed and

    capitalized within the cut- off date.

    Pollution Control 60.31 14 (1) (v) This The works 60.31 Equipment expenditure is pertaining to toward Pollution control

    installation of equipment is

    one set of allowed under

    CAAQMS Regulation 14(1)(v)

    device to as this expenditure

    comply with is towards the

    the pollution asset which has

    control statues been procured

    / stipulations. and capitalized for

    meeting pollution

    norms/stipulations.

    Initial Spares embedded in different packages

    Misc. Power Plant 4.20 14 (1) (iii) This is under The Initial Spares 4.20 Equip-RTPS PH I the original are allowed under

    scope (under Regulation 14(1)(iii)

    Sl. No. 3(i) of as this expenditure

    the Sanction is towards the initial

    Order of spares which

    RTPS dt. have been

    18.10.2017), procured and

    as capitalized capitalized within

    within the cut- the cut-off date and

    off date. within the ceiling

    Coal Handling Plant 37.52 14 (1) (iii) This is under limit as prescribed 37.52 the original in Regulation 13.

    scope (under

    Sl. No. 3(ii) of

    the Sanction

    Order of

    RTPS dt.

    18.10.2017),

    as capitalized within the cut- off date.

    Balance Initial Spares procured separately: 0.00 Boiler & Accessory 231.03 14 (1) (iii) This is under The Initial Spares 231.03 Equipm RTPS PH I the original are allowed under

    Order in Petition No. 575/GT/2020 Page 25 of 176

    25

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission Admissibility allowed 2018-19

    Turbo Generation & 502.76 scope (under Regulation 14(1)(iii) 502.76 Accessory-RTPS PH I Sl. No. 3(v) of as this expenditure Electrical Equipment - 290.82 the Sanction is towards the initial 290.82 RTPS PH I Order of spares which

    Accessory Mechanical 141.71 RTPS dt. have been 141.71 Equipment-RTPS PH I 18.10.2017), procured and

    as capitalized capitalized within

    Misc. Power Plant 334.34

    within the cut- the cut-off date and

    334.34

    Equip-RTPS PH I off date. within the ceiling Coal Handling Plant 305.07 limit as prescribed 305.07 Water System -RTPS 71.96 in Regulation 13. 71.96

    PH I

    Total 2183.06 2183.06

    4 Substation Equipment

    Substation - Testing 0.18 14 (1) (i) and This The works 0.18 Lab Equipment (ii) expenditure is pertaining to (0111120121) towards the substation

    work within equipment are

    the original allowed under

    scope (under Regulation 14(1)(ii)

    Sl. No. 3(i) of as this expenditure

    the Sanction is towards the

    Order of works within the

    RTPS dt. original scope

    18.10.2017), which have been

    as executed executed and

    and capitalized within

    capitalized the cut-off date.

    within the cut-

    off date.

    Total 0.18 0.18

    5 Other Assets (FA)

    Office Furniture-Steel 18.02 14 (1) (i) and This The works 18.02 (O/assets) (ii) expenditure is pertaining to Other Office Furniture- 8.12 towards the Assets are allowed 8.12 Wooden (O/assets) works / under Regulation

    0.58 materials 14(1)(ii) as this Residential Furniture. 0.58 within the expenditure is

    (O/assets)

    original /scope towards the works

    Office Equipment 2.12

    (under Sl. No. within the original

    2.12

    (O/assets) 5(5) of the scope which have Scientific/lab. 8.37 Sanction been executed 8.37 Instrument Order of and capitalized RTPS dt. within the cut-off

    18.10.2017), date.

    as executed

    and

    capitalized

    within the cut-

    off date.

    Weighing Machine 11.54 This 11.54

    (O/assets) expenditure is

    towards the

    Order in Petition No. 575/GT/2020 Page 26 of 176

    26

    Sr. Asset/Work Amount Regulations Petitioner Reason for Amount No. claimed Submission Admissibility allowed

    2016-17 2017-18 2018-19 Total
    Land 0.00 0.00 879.53 879.53
    Buildings 2508.30 71.49 238.21 2818.00
    Roads, Culverts & Railway Sidings 251.00 237.25 4174.98 4663.22
    Initial Spares 805.79 263.02 41.72 1110.53
    Powerhouse Plant & Machinery 6804.34 2978.57 2183.06 11965.97
    Sub-station Equipment 4.57 1.12 0.18 5.87
    IT Software 339.72 0.00 0.00 339.72
    Other Assets 122.49 489.92 48.76 661.18
    Total 10030.41 3778.35 7524.72 21333.48

    Initial Spares

    Order in Petition No. 575/GT/2020 Page 27 of 176

    27

    25. The Petitioner has submitted that, the Commission vide order dated 28.9.2017 in Petition No. 224/GT/2015 had directed the Petitioner to submit details of the initial spares capitalized under different packages at the time of truing up. The Petitioner has submitted that the total Plant & Machinery cost as per sanction order dated 18.10.2017 is Rs.438198 lakh (Total EPC cost of Rs.472499 lakh - Taxes, Duties, ERV etc. of Rs.30824 lakh - Balance Initial Spares of Rs.3477 lakh). Therefore, the ceiling limit for initial spares can be derived as 4% of the Plant & Machinery cost as per Regulation 13 of the 2014 Tariff Regulations, and the same works out to be Rs. 17528 lakh (4% of Rs. 438198 lakh). The Petitioner has further submitted that the initial spares capitalized up to COD of the generating station is Rs. 9477.07 lakh and up to the cut-off date (i.e., 31.3.2019) is Rs.13568.02 lakh. The actual initial spares capitalized is therefore within the ceiling limit. Hence, the Petitioner has requested to allow the actual capitalization of initial spares up to the cut-off date. The Package-wise break-up of initial spares capitalized up to COD and up to the RTPS cut-off date was submitted along with the Petition.

    26. The matter has been considered. It is observed that, the Petitioner has worked out the ceiling limit of its Initial spares as per Regulation 13 of the 2014 Tariff Regulations @ of 4% of Plant & Machinery cost of Rs.438198 lakh excluding Taxes and Duties as per RCE dated 18.10.2017. However, as per the fourth proviso of Regulation 13, the computation for ceiling limit of initial spares shall be based on the Plant and Machinery (P&M) cost approved as on cut-off date and for this purpose P&M cost shall be arrived at by excluding IDC, IEDC, Land Cost and cost of civil works from the project cost as on cut-off date. In this background, for arriving at the ceiling limit of Initial Spares, the Commission has considered the total P&M cost of Rs. 425136.77 lakh by excluding expenditure allowed under IDC, IEDC, Land Cost Order in Petition No. 575/GT/2020 Page 28 of 176

    28

    and cost of civil works from the project cost approved as on cut-off date, i.e., 31.3.2019. Thus, the ceiling limit of the initial spares up to the cut-off date i.e., 31.3.2019 works out to Rs.17148.70 lakh. Accordingly, the Commission observes that the expenditure on initial spares i.e., Rs.13568.03 lakh as approved by the Commission till cut-off date, is within the ceiling limit of initial spares of Rs.17148.70 lakh. The summary of the Initial spares allowed up to the cut-off date is provided as under:

    (Rs. in lakh)

    Particulars Amount
    Initial Spares as part of Additional Capitalization 4090.96
    Initial Spare part of the Capital Cost as on COD 9477.07
    Total Initial Spares allowed 13568.03
    Total Plant and Machinery cost considered up to the cut-off date 31.3.2019 425136.77
    Initial Spares @4% of the P&M cost {(432326.93-13568.03) x 4/96)} 17148.70
    Initial Spares allowed up to cut-off date 31.3.2019 13568.03

    Un-discharged liabilities

    27. The total addition of undischarged liabilities furnished by the Petitioner for the period 2016-19 is Rs.2831.95 lakh (Rs.951.26 lakh in 2016-17, Rs.1345.52 lakh in 2017-18, and Rs.535.17 lakh in 2018-19). The Petitioner has submitted that IDC and 'Undischarged liabilities' were consolidated and maintained on year-to-year basis, but was not maintained item-wise and thus the additional capital expenditure claimed for each item, is on accrual basis. The Commission vide order dated 28.9.2017 in petition no. 224/GT/2015 had directed the Petitioner to submit details of the undischarged liability towards the works pending. However, it is observed that the Petitioner has not complied with the directions given by the Commission in this present petition. The Commission while verifying the liability statement observed that, the Petitioner has claimed the opening liability of Rs.29747.42 lakh, which included the undischarged Order in Petition No. 575/GT/2020 Page 29 of 176

    29

    liability towards the Earnest Money Deposit of Rs.141.68 lakh. Since the Petitioner has not provided any justification for consideration of such Earnest Money Deposit, while knowing the fact that, such booked cost, which are of the nature of refundable deposit cannot form part of the additional capitalisation. In this background, the Commission has not considered discharge of Rs.141.68 lakh against EMD as part of the opening liability. Thus, the Commission allows the opening liability as Rs.29605.75 lakh instead of Petitioner's claimed opening liability of Rs.29747.42 lakh. It is also observed that information submitted by the Petitioner is not in line with the 2014 Tariff Regulations i.e., item-wise details of undischarged/discharged liabilities has not been furnished. In the absence of item-wise availability of undischarged liability, the same is determined on a pro-rata basis, considering the admitted additional capital expenditure against the claimed additional capital expenditure, during each year of the period 2016-19. Accordingly, as against an un-discharged liability of Rs.2831.95 lakh claimed by the Petitioner, a corresponding amount of Rs.2829.86 lakh, has been allowed.

    Discharge of liabilities

    28. The Petitioner has submitted the year-wise total liability discharged for Rs.7934.40 lakh during the period 2016-19 (Rs.6070.75 lakh in 2016-17; Rs.226.74 lakh in 2017-18; and Rs.1636.91 lakh in 2018-19), instead of the item-wise liability discharges. It is observed that, Petitioner has claimed total of Rs.98.67 lakh discharges towards the Earnest Money Deposit. Since the Petitioner has not provided any justification for consideration of such Earnest Money Deposit, while knowing the fact that, such booked cost, which are of the nature of refundable deposit cannot form part of the additional capitalisation. In this background, the Commission has not considered any discharges towards EMD i.e., of Rs.98.67 lakh during the period 2016- Order in Petition No. 575/GT/2020 Page 30 of 176

    30

    19. It is also observed that information submitted by the Petitioner does not contain the item-wise discharge of liabilities. In the absence of the item-wise availability of liabilities discharged, the same is determined on a pro-rata basis, considering the admitted additional capital expenditure against the claimed expenditure, during each year of the period 2016-19. Accordingly, the discharge of liabilities, allowed as part of additional capital expenditure, corresponding to the assets allowed, are as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    pening Un-discharged liabilities (A) 29605.75 24434.67 25541.06
    dditions during the period 2016-19 (corresponding o allowed additional capital expenditure) (B) 951.26 1345.52 533.08
    ischarges during the period 2016-19 corresponding to allowed additional capital xpenditure) (C) 5981.55 222.03 1632.02
    eversal of Liabilities out of liabilities added during he period 2016-19 (corresponding to allowed dditional capital expenditure) (D) 0.00 0.00 0.00
    et Provisional Adjustment (E) 140.78 17.11 16.55
    losing Un-discharged liabilities (F) = (A+B-C-D- ) 24434.67 25541.06 24425.56

    Additions during the period 2016-19 (corresponding 951.26 1345.52 533.08

    to allowed additional capital expenditure) (B)

    Discharges during the period 2016-19 5981.55 222.03 1632.02

    (corresponding to allowed additional capital

    expenditure) (C)

    Reversal of Liabilities out of liabilities added during 0.00 0.00 0.00

    the period 2016-19 (corresponding to allowed

    additional capital expenditure) (D)

    Net Provisional Adjustment (E) 140.78 17.11 16.55

    Closing Un-discharged liabilities (F) = (A+B-C-D- 24434.67 25541.06 24425.56

    E)

    Capital cost allowed for the period 2016-19

    29. Accordingly, the capital cost approved for the period 2016-19 in respect of the generating station is as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Opening Capital Cost (A) 515401.58 530523.46 533182.57
    Add: Addition during the year / period (B) 10030.41 3778.35 7524.72
    Less: De-capitalization / Assumed Deletion during the year /period (C) 0.00 0.00 0.00
    Less: Undischarged liabilities (D) 951.26 1345.52 533.08
    Add: Discharges during the year /period (E) 5981.55 222.03 1632.02
    Closing Gross Block (F) = (A+B-C-D+E) 530462.27 533117.13 541740.79
    Average Gross Block (F) = (A+F)/2 522931.93 531789.70 537428.96

    Debt-Equity Ratio

    30. Regulation 19 of the 2014 Tariff Regulations provides as follows:

    "19. Debt-Equity Ratio: (1) For a project declared under commercial operation on or after 1.4.2014, the debt-equity ratio would be considered as 70:30 as on COD. If the equity actually deployed is more than 30% of the capital cost, equity in excess of 30% shall be treated as normative loan:

    Order in Petition No. 575/GT/2020 Page 31 of 176

    31

    Provided that

    (i) where equity actually deployed is less than 30% of the capital cost, actual equity shall be considered for determination of tariff:

    (ii) the equity invested in foreign currency shall be designated in Indian rupees on the date of each investment:

    (iii) any grant obtained for the execution of the project shall not be considered as a part of capital structure for the purpose of debt: equity ratio.

    Explanation-The premium, if any, raised by the generating company or the transmission licensee, as the case may be, while issuing share capital and investment of internal resources created out of its free reserve, for the funding of the project, shall be reckoned as paid up capital for the purpose of computing return on equity, only if such premium amount and internal resources are actually utilised for meeting the capital expenditure of the generating station or the transmission system.

    (2) The generating company or the transmission licensee shall submit the resolution of the Board of the company or approval from Cabinet Committee on Economic Affairs (CCEA) regarding infusion of fund from internal resources in support of the utilization made or proposed to be made to meet the capital expenditure of the generating station or the transmission system including communication system, as the case may be.

    (3) In case of the generating station and the transmission system including communication system declared under commercial operation prior to 1.4.2014, debt:

    equity ratio allowed by the Commission for determination of tariff for the period ending 31.3.2014 shall be considered:

    (4) In case of the generating station and the transmission system including communication system declared under commercial operation prior to 1.4.2014, but where debt: equity ratio has not been determined by the Commission for determination of tariff for the period ending 31.3.2014, the Commission shall approve the debt: equity ratio based on actual information provided by the generating company or the transmission licensee as the case may be."

    31. The gross normative loan and equity amounting to Rs.360781.10 lakh and Rs. 154620.47 lakh allocated in the ratio of 70:30 has been considered based on the revised opening capital cost as on COD, as discussed above. Further, the additional capital expenditure admitted as above, has been allocated in the debt-equity ratio of 70:30. Accordingly, the details of debt-equity ratio, in respect of the generating station, as on 1.4.2016 and as on 31.3.2019, are as follows:

    Capital Cost as on 1.4.2016 (Rs. in lakh) % Net Additional Capital Expenditure for period 2016-19 (Rs. in lakh) % Capital Cost as on 31.3.2019 (Rs. in lakh) %
    Debt 360781.10 70% 18437.45 70% 379218.55 70%
    Equity 154620.47 30% 7901.76 30% 162522.24 30%
    Total 515401.58 100% 26339.21 100% 541740.79 100%

    Return on Equity

    Order in Petition No. 575/GT/2020 Page 32 of 176

    32

    32. Regulation 24 of the 2014 Tariff Regulations provides as follows:

    "24. Return on Equity: (1) Return on equity shall be computed in rupee terms, on the equity base determined in accordance with regulation 19.

    (2) Return on equity shall be computed at the base rate of 15.50% for thermal generating stations, transmission system including communication system and run of the river hydro generating station, and at the base rate of 16.50% for the storage type hydro generating stations including pumped storage hydro generating stations and run of river generating station with pondage:

    xxxx"

    33. Regulation 25 of the 2014 Tariff Regulations provides as follows:

    "25. Tax on Return on Equity:

    (1) The base rate of return on equity as allowed by the Commission under Regulation 24 shall be grossed up with the effective tax rate of the respective financial year. For this purpose the effective tax rate shall be considered on the basis of actual tax paid in the respect of the financial year in line with the provisions of the relevant Finance Acts by the concerned generating company or the transmission licensee as the case may be. The actual tax income on other income stream (i.e. income of non-generation or non-transmission business as the case may be) shall not be considered for the calculation of "effective tax rate".

    (2) Rate of return on equity shall be rounded off to three decimal places and shall be computed as per the formula given below:

    Rate of pre-tax return on equity = Base rate / (1-t) Where "t" is the effective tax rate in accordance with Clause (1) of this regulation and shall be calculated at the beginning of every financial year based on the estimated profit and tax to be paid estimated in line with the provisions of the relevant Finance Act applicable for that financial year to the company on pro-rata basis by excluding the income of non-generation or non- transmission business as the case may be and the corresponding tax thereon. In case of generating company or transmission licensee paying Minimum Alternate Tax (MAT)

    "t" shall be considered as MAT rate including surcharge and cess. Illustration.

    (i) In case of the generating company or the transmission licensee paying Minimum Alternate Tax (MAT) @ 20.96% including surcharge and cess: Rate of return on equity = 15.50/(1-0.2096) = 19.610%

    (ii) In case of generating company or the transmission licensee paying normal corporate tax including surcharge and cess:

    (a)Estimated Gross Income from generation or transmission business for FY 2014-15 is Rs 1000 crore.

    (b)Estimated Advance Tax for the year on above is Rs 240 crore.

    (c) Effective Tax Rate for the year 2014-15 = Rs 240 Crore/Rs 1000 Crore = 24%

    (d)Rate of return on equity = 15.50/ (1-0.24) = 20.395%

    (2) The generating company or the transmission licensee as the case may be shall true up the grossed up rate of return on equity at the end of every financial year based on actual tax paid together with any additional tax demand including interest thereon duly adjusted for any refund of tax including interest received from the income tax authorities pertaining to the tariff period 2014-15 to 2018-19 on actual gross income of any financial year. However, penalty if any arising on account of delay in deposit or short deposit of tax amount shall not be claimed by the generating company or Order in Petition No. 575/GT/2020 Page 33 of 176

    33

    the transmission licensee as the case may be. Any under-recovery or over recovery of grossed up rate on return on equity after truing up shall be recovered or refunded to beneficiaries or the long-term transmission customers/DICs as the case may be on year-to-year basis."

    34. The base rate of Return on Equity (ROE), as allowed under Regulation 24 of the 2014 Tariff Regulations, is to be grossed up with the effective tax rate of the respective financial years. Also, in terms of Regulation 25(3) of the 2014 Tariff Regulations, the generating company, shall true up the grossed-up rate of ROE, at the end of every financial year, based on actual tax paid together with any additional tax demand, including interest thereon, duly adjusted, for any refund of tax, including interest received from the income tax authorities, pertaining to the 2016-19 tariff period, on actual gross income of any financial year.

    35. The Respondent KSEBL has submitted that ROR for the period may be allowed only after deducting the disallowed capital expenditure. It has also submitted that as per details furnished by the Petitioner, it is observed that, no tax was paid by Petitioner for the period from 2014-15 to 2017-18. The Respondent has further submitted that the tax paid by the Petitioner for 2018-19 is related to the deferred tax for the period 2012-13, which is not admissible as per Regulation 49 of the 2014 Tariff Regulations. The Respondent has also pointed out that the 2014 Tariff Regulations, stipulates that the rate of ROE, shall be reduced by 1.00% for such period as may be decided by the Commission, if the generating station has not implemented Restricted Governor Mode Operation (RGMO) or Free Governor Mode Operation (FGMO), data telemetry, communication system up to load despatch centre or protection system based on the report submitted by the respective RLDC. The Respondent has added that since the Petitioner has not furnished the details of above mandatory requirements, the rate of ROE may be fixed only based on the achievement of the Order in Petition No. 575/GT/2020 Page 34 of 176

    34

    operation of RGMO/FGMO, data telemetry and communication system. The Objector, DVPCA has submitted that though the Petitioner has considered the effective tax rate of 19.610%, 19.705%, 19.705%, 19.705% and 19.758% for computation of ROE for the period 2016-19, the Audited accounts reveals that the Petitioner has not paid any actual tax during the 2014-18 period. It has stated that for the year 2018-19, it is apparent that the deferred tax liability which gets materialised in the year pertains to the year 2012-13. Referring to Regulation 49 of the 2014 Tariff Regulations, the Respondent, DVPCA has stated that the claim is in contravention to the 2014 Tariff Regulations and ROE is to be allowed at a rate of 15.50% only, without considering any effective tax rate. In response, the Petitioner, has clarified that there is no income tax liability on the Petitioner for the period 2016-19. However, it has sought leave of the Commission, to claim income tax liability, if any, which may arise in future.

    36. The matter has been considered. Since the Petitioner has not been paying any income tax in any of the financial year of the period 2016-19, 'Nil' rate has been considered as the effective tax rate for the purpose of grossing up of ROE, in terms of the 2014 Tariff Regulations. Accordingly, ROE has been worked out as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Normative Equity-Opening (A) 154620.47 159138.68 159935.14
    Addition of Equity due to additional capital expenditure (B) 4518.21 796.46 2587.10
    Normative Equity-Closing (C) = (A) + (B) 159138.68 159935.14 162522.24
    Average Normative Equity (D) = (A+C)/2 156879.58 159536.91 161228.69
    Return on Equity (Base Rate) (E) 15.50% 15.50% 15.50%
    Effective Tax Rate (F) 0.00% 0.00% 0.00%
    Rate of Return on Equity (Pre-Tax) (G) = (E)/(1-F) 15.50% 15.50% 15.50%
    Return on Equity (Pre-Tax) annualized (H) = (D)*(G) 24316.33 24728.22 24990.45

    Interest on Loan

    37. Regulation 26 of the 2014 Tariff Regulations provides as follows:

    Order in Petition No. 575/GT/2020 Page 35 of 176

    35

    "26. Interest on loan capital: (1) The loans arrived at in the manner indicated in regulation 19 shall be considered as gross normative loan for calculation of interest on loan.

    (2) The normative loan outstanding as on 1.4.2014 shall be worked out by deducting the cumulative repayment as admitted by the Commission up to 31.3.2014 from the gross normative loan.

    (3) The repayment for each of the year of the tariff period 2014-19 shall be deemed to be equal to the depreciation allowed for the corresponding year/period. In case of Decapitalization of assets, the repayment shall be adjusted by taking into account cumulative repayment on a pro rata basis and the adjustment should not exceed cumulative depreciation recovered up to the date of de-capitalization of such asset

    (4) Notwithstanding any moratorium period availed by the generating company or the transmission licensee, as the case may be, the repayment of loan shall be considered from the first year of commercial operation of the project and shall be equal to the depreciation allowed for the year or part of the year.

    (5) The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual loan portfolio after providing appropriate accounting adjustment for interest capitalized:

    Provided that if there is no actual loan for a particular year but normative loan is still outstanding, the last available weighted average rate of interest shall be considered Provided further that if the generating station or the transmission system, as the case may be, does not have actual loan, then the weighted average rate of interest of the generating company or the transmission licensee as a whole shall be considered

    (6) The interest on loan shall be calculated on the normative average loan of the year by applying the weighted average rate of interest.

    (7) The generating company or the transmission licensee, as the case may be, shall make every effort to re-finance the loan as long as it results in net savings on interest and in that event the costs associated with such refinancing shall be borne by the beneficiaries and the net savings shall be shared between the beneficiaries and the generating company or the transmission licensee, as the case may be, in the ratio of

    2:1.

    (8) The changes to the terms and conditions of the loans shall be reflected from the date of such re-financing.

    (9) In case of dispute, any of the parties may make an application in accordance with the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, as amended from time to time, including statutory re-enactment thereof for settlement of the dispute:

    Provided that the beneficiaries or the long term transmission customers /DICs shall not withhold any payment on account of the interest claimed by the generating company or the transmission licensee during the pendency of any dispute arising out of re-financing of loan."

    38. The Respondent KSEBL has submitted that the interest on loan for the period may be allowed, only after deducting the disallowed additional capital expenditure. The Objector DVPCA has submitted that the Petitioner has claimed the Interest on loan for Rs.102161.99 lakh for the period 2016-19. It has also submitted that based on Order in Petition No. 575/GT/2020 Page 36 of 176

    36

    aforesaid proposed disallowance on additional capitalization, the loan balances have got changed and as a result interest on loan amount has also undergone change. Thus, the Objector DVPCA has prayed to allow interest on loan to the tune of Rs. 94266 lakh only, as against the claim of Rs.102162 lakh claimed by the Petitioner. In response, the Petitioner has submitted that the additional capitalisation for the period 2016-17 to 2018-19 as submitted by DVPCA, is based on their arbitrary assumptions of disallowance which are devoid of any merits and may be rejected by the Commission.

    39. Considering the submissions of the parties, Interest on loan has been worked out as under:

    a. The gross normative loan of Rs.360781.10 lakh has been considered as on 1.4.2016, in the line with the approved capital cost as on COD as stated above. In addition to this, the loan component towards additional capitalization has been considered as per the approved debt equity ratio.

    b. Cumulative repayment of loan has been considered as 'zero' as on 1.4.2016 since the station COD is 31.3.2016.

    c. Addition to normative loan on account of additional capital expenditure approved above has been considered on year-to-year basis.

    d. Depreciation allowed has been considered as repayment of normative loan during the respective years of the period 2016-19.

    e. In line with the Regulations, the weighted average rate of interest (WAROI) has been calculated by applying the actual loan portfolio existing as on 1.4.2016 along with subsequent additions during the period 2016-19, if any, for the generating station. In case of loans carrying floating rate of interest the rate of interest as provided by the petitioner has been considered for the purpose of tariff. The necessary calculation for interest on loan is as follows:

    (Rs in lakh)

    2016-17 2017-18 2018-19
    Gross opening loan (A) 360781.10 371323.59 373181.99
    Cumulative repayment of loan up to previous year (B) 0.00 39638.37 79960.44
    Net Loan Opening (C) = (A) - (B) 360781.10 331685.22 293221.55
    Addition due to additional capital expenditure (D) 10542.49 1858.40 6036.56
    Repayment of loan during the year (E) 39638.37 40322.07 40687.92
    Less: Repayment adjustment on account of de- capitalization (F) 0.00 0.00 0.00
    Net Repayment (G) = (E) - (F) 39638.37 40322.07 40687.92

    Order in Petition No. 575/GT/2020 Page 37 of 176

    37

    2016-17 2017-18 2018-19
    Net Loan Closing (H) =(C) +(D) -(G) 331685.22 293221.55 258570.20
    Average Loan (I) = (C+H)/2 346233.16 312453.38 275895.87
    Weighted Average Rate of Interest of loan (J) 11.1663% 10.2526% 10.0339%
    Interest on Loan (K) = (I)*(J) 38661.33 32034.57 27683.16

    40. Further, the Petitioner has claimed its share of savings due to loan restructuring (i.e., one-third share) amounting Rs.521.76 lakh, Rs.1601.30 lakh and Rs.1257.31 lakh for the year 2016-17, 2017-18 and 2018-19, respectively, in terms of Regulation 26(7) of the 2014 Tariff Regulations. In this regard, it is observed that the sharing of savings in interest due to re-financing of loan, if any, must be undertaken between the parties, on actual basis, in accordance with the provisions of Regulation 26 (7) of the 2014 Tariff Regulations. However, in case of any dispute, the parties may approach the Commission, in terms of Regulation 26(9) of the 2014 Tariff Regulations.

    Depreciation

    41. Regulation 27 of the 2014 Tariff Regulations provides as follows:

    "27. Depreciation: (1) Depreciation shall be computed from the date of commercial operation of a generating station or unit thereof or a transmission system including communication system or element thereof. In case of the tariff of all the units of a generating station or all elements of a transmission system including communication system for which a single tariff needs to be determined, the depreciation shall be computed from the effective date of commercial operation of the generating station or the transmission system taking into consideration the depreciation of individual units or elements thereof.

    Provided that effective date of commercial operation shall be worked out by considering the actual date of commercial operation and installed capacity of all the units of the generating station or capital cost of all elements of the transmission system, for which single tariff needs to be determined.

    (2) The value base for the purpose of depreciation shall be the capital cost of the asset admitted by the Commission. In case of multiple units of a generating station or multiple elements of transmission system, weighted average life for the generating station of the transmission system shall be applied. Depreciation shall be chargeable from the first year of commercial operation. In case of commercial operation of the asset for part of the year, depreciation shall be charged on pro rata basis.

    (3) The salvage value of the asset shall be considered as 10% and depreciation shall be allowed up to maximum of 90% of the capital cost of the asset: Provided that in case of hydro generating station, the salvage value shall be as provided in the agreement signed by the developers with the State Government for development of the Plant:

    Provided further that the capital cost of the assets of the hydro Order in Petition No. 575/GT/2020 Page 38 of 176

    38

    generating station for the purpose of computation of depreciated value shall correspond to the percentage of sale of electricity under long-term power purchase agreement at regulated tariff:

    Provided also that any depreciation disallowed on account of lower availability of the generating station or generating unit or transmission system as the case may be, shall not be allowed to be recovered at a later stage during the useful life and the extended life.

    (4) Land other than the land held under lease and the land for reservoir in case of hydro generating station shall not be a depreciable asset and its cost shall be excluded from the capital cost while computing depreciable value of the asset.

    (5) Depreciation shall be calculated annually based on Straight Line Method and at rates specified in Appendix-II to these regulations for the assets of the generating station and transmission system:

    Provided that the remaining depreciable value as on 31st March of the year closing after a period of 12 years from the effective date of commercial operation of the station shall be spread over the balance useful life of the assets.

    (6) In case of the existing projects, the balance depreciable value as on 1.4.2014 shall be worked out by deducting the cumulative depreciation as admitted by the Commission upto 31.3.2014 from the gross depreciable value of the assets.

    (7) The generating company or the transmission license, as the case may be, shall submit the details of proposed capital expenditure during the fag end of the project (five years before the useful life) alongwith justification and proposed life extension. The Commission based on prudence check of such submissions shall approve the depreciation on capital expenditure during the fag end of the project.

    (8) In case of de-capitalization of assets in respect of generating station or unit thereof or transmission system or element thereof, the cumulative depreciation shall be adjusted by taking into account the depreciation recovered in tariff by the de- capitalized asset during its useful services."

    42. Regulation 53(2)(iii) of the 2014 Tariff Regulations provides as follows:

    "53. Special Provisions relating to Damodar Valley Corporation. (1) Subject to clause (2), these regulations shall apply to determination of tariff of the projects owned by Damodar Valley Corporation (DVC).

    (2) The following special provisions shall apply for determination of tariff of the projects owned by DVC:

    (i)xx….

    (ii)xx

    (iii) Depreciation: The depreciation rate stipulated by the Comptroller and Auditor General of India in terms of section 40 of the Damodar Valley Corporation Act, 1948 shall be applied for computation of depreciation of projects of DVC."

    43. The cumulative depreciation as on 1.4.2016 is considered as 'zero' as the station COD is 31.3.2016. The weighted average rate of depreciation calculated (as per Annexure-I to this order) in terms of the Regulation 53(2)(iii) read with Regulation 27 Order in Petition No. 575/GT/2020 Page 39 of 176

    39

    of the 2014 Tariff Regulations, has been considered for calculation of depreciation. Accordingly, depreciation is worked out and allowed as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Average Capital Cost (A) 522931.93 531789.70 537428.96
    Value of freehold land included in average capital cost (B) 13584.56 13584.56 14024.32
    Aggregated Depreciable Value (C)= (A-B)*90% 458412.63 466384.63 471064.17
    Remaining aggregate depreciable value at the beginning of the year (D) = [(C) - (Cumulative Depreciation of Previous year)] 458412.63 426746.26 391103.73
    No. of completed years at the beginning of the year (E) 0.00 1.00 2.00
    Balance useful life at the beginning of the year (F) = 25 - (E) 25.00 24.00 23.00
    Weighted Average Rate of Depreciation (WAROD) (G) 7.58% 7.58% 7.57%
    Combined Depreciation during the year/ period (H) = Minimum of [(A)*(G) or (D)] 39638.37 40322.07 40687.92
    Cumulative depreciation at the end of the year (before adjustment for de-capitalisation) (I) = (H) + (K of the previous year) 39638.37 79960.44 120648.36
    Less: Depreciation adjustment on account of de- capitalisation (J) 0.00 0.00 0.00
    Cumulative depreciation at the end of the year (K) = (I) - (J) 39638.37 79960.44 120648.36

    Operation & Maintenance Expenses

    44. Regulation 29(1) (a) of the 2014 Tariff Regulations provides the following O&M norms for the generating station of the Petitioner:

    (Rs in lakh/MW) 2016-17 2017-18 2018-19

    16.27 17.30 18.38

    45. The O&M expenses claimed by the Petitioner are as follows:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    19524.00 20760.00 22056.00

    46. The normative O&M expenses claimed for the period 2016-19 is in terms of Regulation 29(1)(a) of the 2014 Tariff Regulations and hence allowed.

    Water Charges

    Order in Petition No. 575/GT/2020 Page 40 of 176

    40

    47. The first proviso to Regulation 29(2) of the 2014 Tariff Regulations provide as follows:

    "29 (2) The Water Charges and capital spares for thermal generating stations shall be allowed separately:

    Provided that water charges shall be allowed based on water consumption depending upon type of plant, type of cooling water system etc., subject to prudence check. The details regarding the same shall be furnished along with the petition:

    48. The water charges claimed by the Petitioner is as under:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    295.08 334.97 407.12

    49. The Petitioner has furnished the detailed break-up of the expenses incurred towards water charges along with justifications for the same. The cumulative Water charges claimed is Rs. 1037.17 lakh for the period 2016-19. The details of the water charges incurred has been duly certified by the auditor in the present case.

    50. The matter has been considered. Regulation 29(2) of the 2014 Tariff Regulations, provides for consideration of the actual consumption of water depending upon the type of plant, type of cooling water system etc, subject to prudence check. The Petitioner, has furnished the computation for actual water consumption along with the audited water charges incurred for the period 2016-19. The details of water charges claimed are as under:

    Water Use Quantity of Rate of Water Water Charges water water Charges as apportioned as consumed charges per rate (Rs.in per annual

    3 3

    (M ) (Rs/M ) lakh) accounts (Rs. in lakh)

    2016-17 Industrial 5134403 5.70 292.66 295.08 Domestic 210233 1.15 2.42

    Total 5344635 295.08

    2018-19 Industrial 6799429 5.70 387.57 334.97 Domestic 204494 1.15 2.35

    Total 7003923 389.92

    2019-20 Industrial 8885956 5.70 506.50 407.12 Domestic 208488 1.15 2.40

    Order in Petition No. 575/GT/2020 Page 41 of 176

    41

    Water Use Quantity of water consumed 3 (M ) Rate of water charges 3 (Rs/M ) Water Charges as per rate (Rs.in lakh) Water Charges apportioned as per annual accounts (Rs. in lakh)
    Total 9094444 508.90
    Total for the period 2016 -19 21443003 1193.89 1037.17

    51. It is observed that the water charges determined based on consumption and rate, thereof, are at variance with the apportioned audited water charges. The Petitioner, has however, claimed Water charges for Rs. 1037.17 lakh, as booked in the audited accounts. Accordingly, the audited water charges have been considered. It is also noticed that the water consumption includes domestic water consumption, charges for which are being recovered from its employees. As the water charges for domestic usage are not allowable, the same has been excluded from the audited apportioned water charges. Accordingly, water charges claimed and those allowed are as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Claimed 295.08 334.97 407.12
    Allowed 292.66 332.62 404.72

    Capital Spares

    52. The last proviso to Regulation 29(2) of the 2014 Tariff Regulations provides as follows:

    "29(2) The Water Charges and capital spares for thermal generating stations shall be allowed separately:

    xxxx

    Provided that the generating station shall submit the details of year wise actual capital spares consumed at the time of truing up with appropriate justification for incurring the same and substantiating that the same is not funded through compensatory allowance or special allowance or claimed as a part of additional capitalization or consumption of stores and spares and renovation and modernization."

    53. The Petitioner has claimed total actual expenditure of Rs. 345.13 lakh for capital spares consumed during the period 2016-19 ('nil' in 2016-17, Rs. 70.85 lakh in 2017- 18 and Rs. 274.28 lakh in 2018-19) and has prayed that the capital spares replaced / Order in Petition No. 575/GT/2020 Page 42 of 176

    42

    consumed by the generating station during the period 2016-19 may be allowed.

    54. The Respondent PSPCL has submitted that the Petitioner may be directed to submit the year-wise details of the actual capital spares consumed with appropriate justification for incurring the same. It has stated that though the Petitioner, in Form-17 has provided the break-up and justification for the use of said spares, it has failed to provide any justification for claiming capital spares for such a new plant within the period of 4-5 years of service, when it has already made a claim for initial spares as well. Accordingly, the Respondent has submitted that the claim of the Petitioner may be subjected to strict scrutiny at the time of prudence check. In response, the Petitioner has clarified that the details of capital spares have been furnished in Form- 17 for the period 2016-19. It has also stated that in order to ensure the reliable and efficient operation of the generating station at all times, the units / equipment's are taken under overhaul / maintenance and is inspected regularly for wear and tear and during such works, spares parts of equipment which become damaged / unserviceable are replaced /consumed, so that the machine continue to perform at expected efficiency, on sustained basis. It has also submitted that it has been confirmed in Form-17, that no part of capital spares has been funded through compensatory allowance or special allowance or claimed as part of additional capitalization or stores and spares.

    55. It is pertinent to mention that capital spares comprise of two categories i.e. (i) spares which form part of the capital cost and (ii) spares which do not form part of the capital cost of the project. In respect of capital spares which form part of the capital cost of the project, tariff is being recovered since their procurement and, therefore, the same cannot be allowed as part of additional O&M expenses. Accordingly, only those Order in Petition No. 575/GT/2020 Page 43 of 176

    43

    capital spares, which do not form part of the capital cost of the project, are to be considered. It is pertinent to mention that the term 'capital spares' has not been defined in the 2014 Tariff Regulations. The term capital spares, in our view, is a piece of equipment or a spare part, of significant cost that is maintained in inventory for use in the event that a similar piece of critical equipment fails or must be rebuilt.

    56. It is observed that, the cut-off date of the generating station is 31.3.2019 and all spares capitalized till this date, has been allowed as 'Initial spares' in the capital cost as on COD and additional capitalization post COD. As such, we notice that the expenditure on capital spares consumed and claimed as part of O&M expenses by the Petitioner already form part of the capital cost for the purpose of tariff. In this background, since, the Petitioner has already claimed initial spares as part of the capital cost, as on COD and as additional capitalisation, we are not inclined to allow the capital spares claimed by Petitioner, as part of O&M expenses for the respective years. Accordingly, the O&M expenses allowed for the period 2016-19 is tabulated below:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Installed Capacity (MW) (A) 1200 1200 1200
    O&M Expenses under Regulation 29(1) (Rs in lakh / MW) (B) 16.27 17.30 18.38
    Total O&M Expenses (in Rs. lakh) (C) = (A)*(B) Claimed 19524.00 20760.00 22056.00
    Allowed 19524.00 20760.00 22056.00
    Water Charges (in Rs. lakh) (D) Claimed 295.08 334.97 407.12
    Allowed 292.66 332.62 404.72
    Capital Spares consumed (in Rs. lakh) (E) Claimed 0.00 70.85 274.28
    Allowed 0.00 0.00 0.00
    Total O&M Expenses allowed (F) = (C+D+E) Claimed 19819.08 21165.82 22737.40
    Allowed 19816.66 21092.62 22460.72

    O&M Expenses under Regulation 29(1) 16.27 17.30 18.38

    (Rs in lakh / MW) (B)

    Total O&M Expenses (in Rs. lakh) Claimed 19524.00 20760.00 22056.00

    (C) = (A)*(B) Allowed 19524.00 20760.00 22056.00

    Water Charges (in Rs. lakh) (D) Claimed 295.08 334.97 407.12

    Allowed 292.66 332.62 404.72

    Capital Spares consumed (in Rs. lakh) Claimed 0.00 70.85 274.28

    (E) Allowed 0.00 0.00 0.00 Total O&M Expenses allowed Claimed 19819.08 21165.82 22737.40

    (F) = (C+D+E) Allowed 19816.66 21092.62 22460.72 Operational Norms

    57. The operational norms for the generating station as claimed by the Petitioner are as under:

    Order in Petition No. 575/GT/2020 Page 44 of 176

    44

    2016-17 2017-18 2018-19
    Normative Annual Plant Availability Factor (NAPAF) (%) 60% 60% 60%
    Gross Station Heat Rate (kCal/kWh) 2339.78 2339.78 2339.78
    Auxiliary Power Consumption (%) 5.25% 5.25% 5.25%
    Specific Oil Consumption (ml/kWh) 0.50 0.50 0.50

    (a) Normative Annual Plant Availability Factor (NAPAF)

    58. Regulation 36 of the 2014 Tariff Regulations provides as follows:

    "(A) Normative Annual Plant Availability Factor(a) All Thermal generating stations, except those covered under clauses (b),(c),(d) &(e)- 85%. Provided that in view of the shortage of coal and uncertainty of assured coal supply on sustained basis experienced by the generating stations, the NAPAF for recovery of fixed charges shall be 83% till the same is reviewed.

    The above provision shall be reviewed based on actual feedback after 3 years from

    1.4.2014.

    59. The Petitioner has prayed for consideration of relaxation in NAPAF of the generating station to 60% for the period from 2016-17 to 2018-19, considering the coal shortage scenario, in exercise of the 'power to relax' under Regulation 54 of the 2014 Tariff Regulations.

    60. The Objector DVPCA and the Respondent KSEBL have submitted that the arrangement of adequate coal supply, is the sole responsibility of the Petitioner. They have also submitted that since coal supply is being governed by a separate bilateral Fuel Purchase Agreement (FPA) signed between the Petitioner and Coal Supplier, the beneficiaries are in no way responsible for coal shortage and such burden should not be passed on to the beneficiaries for any lapses, which is attributable to the Petitioner / Coal Supplier. In response, the Petitioner has submitted that it has provided the detailed justification, along with documentary evidence for coal shortage and subsequent PAF loss of RTPS since COD.

    61. The matter has been considered. Considering the nationwide coal shortage Order in Petition No. 575/GT/2020 Page 45 of 176

    45

    scenario, Regulation 36(A) of 2014 Tariff Regulations, provides for relaxed NAPAF of 83% for first three (3) years i.e., from 2014-15 to 2016-17 and for review of the same thereafter. In line with this, the coal availability was reviewed and it was observed that the availability of coal to the thermal generating stations, in the country, became normal and therefore, the NAPAF of 85% for 2017-18 and 2018- 19 has been adopted by the Commission for all thermal generating stations whose tariff is regulated by this Commission. In our view, the non-availability of coal to the generating station of the Petitioner, is a localised or a plant specific issue and cannot be a factor to reduce NAPAF, particularly, keeping in view that arrangement of coal supply is the sole responsibility of the generator (Petitioner). Thus, the Petitioner's claim for considering the NAPAF at 60% cannot be allowed. Accordingly, the NAPAF of 83% for 2016-17 and 85% for 2017-18 and 2018-19 has been allowed in accordance with the provisions of Regulation 36 (A) of the 2014 Tariff Regulations.

    (b) Gross Station Heat Rate

    62. The Petitioner has claimed the Gross Station Heat Rate (GSHR) as 2339.78 kCal /kWh. As the Gross Station Heat Rate claimed by the Petitioner is in accordance with the provisions of Regulation 36(C)(b) of the 2014 Tariff Regulations, the same is allowed.

    (c) Auxiliary Energy Consumption

    63. The Petitioner has claimed Auxiliary Energy Consumption (AEC) of 5.25%. The Regulation 36(E)(a)(ii) of the 2014 Tariff Regulations provides for AEC of 5.25% for coal based generating stations of 500 MW sets and above with Steam driven boiler feed pumps. Since the AEC of 5.25%, is in line with the regulations above, the same is allowed.

    Order in Petition No. 575/GT/2020 Page 46 of 176

    46

    (d) Secondary Fuel Oil Consumption

    64. The Petitioner has claimed secondary fuel oil consumption as 0.5 ml / kWh. Regulation 36(D)(a) of the 2014 Tariff Regulations provides for secondary fuel oil consumption of 0.5 ml/kWh, for coal based generating stations. As the secondary fuel oil consumption claimed by the Petitioner is in line with the 2014 Tariff Regulations, the same is allowed.

    65. Based on the above, the operational norms allowed are as under:

    2016-17 2017-18 2018-19
    Normative Annual Plant Availability Factor (NAPAF) (%) 83% 85% 85%
    Gross Station Heat Rate (kCal/kWh) 2339.78 2339.78 2339.78
    Auxiliary Power Consumption (%) 5.25% 5.25% 5.25%
    Specific Oil Consumption (ml/kWh) 0.5 0.5 0.5

    Interest on Working Capital

    66. Regulation 28 of the 2014 Tariff Regulations provides as follows:

    "28. Interest on Working Capital:

    (1) The working capital shall cover:

    (a) Coal-based/lignite-fired thermal generating stations:

    (i) Cost of coal or lignite and limestone towards stock if applicable for 15 days for pit-head generating stations and 30 days for non-pit-head generating stations for generation corresponding to the normative annual plant availability factor or the maximum coal / lignite stock storage capacity whichever is lower;

    (ii) Cost of coal or lignite and limestone for 30 days for generation corresponding to the normative annual plant availability factor;

    (iii) Cost of secondary fuel oil for two months for generation corresponding to the normative annual plant availability factor and in case of use of more than one secondary fuel oil cost of fuel oil stock for the main secondary fuel oil;

    (iv) Maintenance spares @ 20% of operation and maintenance expenses specified in regulation 29;

    (v) Receivables equivalent to two months of capacity charges and energy charges for sale of electricity calculated on the normative annual plant availability factor; and

    (vi) Operation and maintenance expenses for one month.

    (2) The cost of fuel in cases covered under sub-clauses (a) and (b) of clause (1) of this regulation shall be based on the landed cost incurred (taking into account normative transit and handling losses) by the generating company and gross calorific value of the fuel as per actual for the three months preceding the first month for which tariff is to be determined and no fuel price escalation shall be provided during the tariff period.

    Order in Petition No. 575/GT/2020 Page 47 of 176

    47

    (3) Rate of interest on working capital shall be on normative basis and shall be considered as the bank rate as on 1.4.2014 or as on 1st April of the year during the tariff period 2014-15 to 2018-19 in which the generating station or a unit thereof or the transmission system including communication system or element thereof as the case may be is declared under commercial operation whichever is later.

    (4) Interest on working capital shall be payable on normative basis notwithstanding that the generating company or the transmission licensee has not taken loan for working capital from any outside agency."

    67. The Petitioner has revised its claims for Interest on working capital due to the revision of its P&G contribution claims. Accordingly, the interest on working capital claimed by the Petitioner is as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Cost of Coal / Lignite for Stock and Generation (A) 19757.62 19757.62 19757.62
    Cost of oil for 2 months (B) 312.86 312.86 312.86
    O&M expenses - 1 month (C) 1651.59 1757.91 1871.93
    Maintenance Spares- 20% of O&M expenses (D) 3963.82 4218.99 4492.62
    Receivables - 2 months (E) 46129.04 46367.79 44203.60
    Total Working Capital (F) = (A+B+C+D+E) 71814.93 72415.18 70638.64
    Rate of Interest (G) 13.5% 13.5% 13.5%
    Total Interest on Working capital (H) = (F)x(G) 9695.02 9776.05 9536.22

    (a) Fuel Cost for Working Capital

    68. Sub-clauses (i), (ii) and (iii) of Regulation 28(1) of the 2014 Tariff Regulations provides cost of coal towards stock for 30 days, 30 days of cost of coal towards generation and cost of secondary oil for two months respectively, to be considered for computation of working capital and in terms of Regulation 28(2) of the 2014 Tariff Regulations. Further, the computation of cost of fuel is to be based on the landed price and gross calorific value of the fuel, as per actuals, for the period from January, 2014 to March, 2014. Regulation 30 (6) of the 2014 Tariff Regulations provides as follows:

    "30. Computation and Payment of Capacity Charge and Energy Charge for Thermal Generating Stations:

    (6) Energy charge rate (ECR) in Rupees per kWh on ex-power plant basis shall be Order in Petition No. 575/GT/2020 Page 48 of 176

    48

    determined to three decimal places in accordance with the following formula:

    (a) For coal based and lignite fired stations

    ECR = {(GHR - SFC x CVSF) x LPPF / CVPF+SFC x LPSFi + LC x LPL} x 100 / (100 - AUX)

    (b) xxxxx Where, AUX =Normative auxiliary energy consumption in percentage. CVPF=(a) Weighted Average Gross calorific value of coal as received, in kCal per kg for coal based stations

    (b) Weighted Average Gross calorific value of primary fuel as received, in kCal per kg, per litre or per standard cubic meter, as applicable for lignite, gas and liquid fuel based stations.

    (c) In case of blending of fuel from different sources, the weighted average Gross calorific value of primary fuel shall be arrived in proportion to blending ratio.

    CVSF =Calorific value of secondary fuel, in kCal per ml. ECR = Energy charge rate, in Rupees per kWh sent out.

    GHR =Gross station heat rate, in kCal per kWh.

    LC = Normative limestone consumption in kg per kWh.

    LPL = Weighted average landed price of limestone in Rupees per kg. LPPF =Weighted average landed price of primary fuel, in Rupees per kg, per litre or per standard cubic metre, as applicable, during the month. (In case of blending of fuel from different sources, the weighted average landed price of primary fuel shall be arrived in proportion to blending ratio)

    SFC = Normative Specific fuel oil consumption, in ml per kWh. LPSFi=Weighted Average Landed Price of Secondary Fuel in Rs./ml during the month

    69. Therefore, in terms of the above Regulations, for determination of working capital, the GCV on 'as received 'basis is to be considered. Further, Regulation 30 (7) of the 2014 Tariff Regulations provides as follows:

    "(7) The generating company shall provide to the beneficiaries of the generating station the details of parameters of GCV and price of fuel i.e. domestic coal, imported coal, e-auction coal, lignite, natural gas, RLNG, liquid fuel etc., as per the forms prescribed at Annexure-I to these regulations:

    Provided that the details of blending ratio of the imported coal with domestic coal, proportion of e-auction coal and the weighted average GCV of the fuels as received shall also be provided separately, along with the bills of the respective month:

    Provided further that copies of the bills and details of parameters of GCV and price of fuel i.e. domestic coal, imported coal, e-auction coal, lignite, natural gas, RLNG, liquid fuel etc., details of blending ratio of the imported coal with domestic coal, proportion of e-auction coal shall also be displayed on the website of the generating company. The details should be available on its website on monthly basis for a period of three months."

    Order in Petition No. 575/GT/2020 Page 49 of 176

    49

    70. The Petitioner has furnished the average GCV of coal as 4020.72 kcal/kg on 'as received' basis for the period from January, 2016 to March, 2016.

    71. As stated above, the Petitioner, in Form-15, has considered the average GCV of coal on "as received" basis i.e., from Wagon top, for the period from January 2016 to March 2016, for the purpose of computation of working capital for the period 2016-

    19. Accordingly, the cost for fuel components in working capital has been computed considering the fuel details (price and GCV) as per Form-15 A (Coal), which is 4020.72 kCal/kg. It is observed that the transit & handling loss of coal, GCV and price of primary and secondary fuel claimed by the Petitioner are in line with the regulations. Accordingly, the weighted average cost and GCV of primary and secondary fuel for computation of working capital is allowed as under:

    Allowed
    Weighted Average GCV of Oil (kcal/ltr) 10275.32
    Weighted Average cost of Oil (Rs/kl) 59525.16
    Weighted Average GCV of Coal (kcal/kg) 4020.72
    Weighted Average cost of Coal (Rs/Tonne) 3236.92

    72. Based on the operational norms, GCV and price of primary and secondary fuel allowed as above, the cost of fuel components in working capital is worked out and allowed as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Cost of Coal towards stock (30 days - Corresponding to NAPAF) 13478.48 13803.27 13803.27
    Cost of Coal towards Generation (30 days - Corresponding to NAPAF) 13478.48 13803.27 13803.27
    Cost of Secondary fuel oil 2 months (Corresponding to NAPAF) 432.80 443.22 443.22

    (b) Working capital for Maintenance Spares

    73. The Petitioner has claimed maintenance spares in working capital as under:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    3963.82 4218.99 4492.62

    Order in Petition No. 575/GT/2020 Page 50 of 176

    50

    74. It is noticed that the Petitioner has claimed working capital for maintenance spares by excluding the capital spares. Regulation 28(1)(a)(iv) of the 2014 Tariff Regulations provide for maintenance spares @ 20% of the O&M expense, including water charges and capital spares. Accordingly, the cost of maintenance spares @ 20% of the operation & maintenance expenses including water charges and capital spares, allowed are as follows:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    3963.33 4218.52 4492.14

    (c) Working Capital for O&M Expenses

    75. O&M expenses for 1 month claimed by the Petitioner for the purpose of working capital is as follows:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    1651.59 1757.91 1871.93

    76. It is noticed that the Petitioner has claimed working capital for O & M expenses for one month, by excluding capital spares. However, Regulation 28(a)(vi) of the 2014 Tariff Regulations provides for O&M expenses for one month for coal based generating station as a part of working capital, inclusive of water charges and capital spares. Accordingly, the one-month O&M expenses, inclusive of water charges and capital spares, allowed is as under:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    1651.39 1757.72 1871.73

    (d) Energy Charge Rate (ECR) for Working Capital

    77. The Petitioner has claimed Energy Charge Rate (ECR) ex-bus of 201.51 Paise/ kWh for the generating station, based on the landed cost of coal, GCV of coal & GCV and price of Oil for the preceding three months of 2016-19 for the generating station. Order in Petition No. 575/GT/2020 Page 51 of 176

    51

    The GCV and price of Coal and Oil as claimed by the Petitioner have been allowed under paragraph 77 above. Accordingly, the ECR allowed is as under:

    Unit 2016-19
    Capacity MW 1200
    Gross Station Heat Rate kCal/kWh 2339.78
    Aux. Energy Consumption % 5.25%
    Weighted average GCV of oil Kcal/lit 10275.32
    Average GCV of Coal for Jan to March 2016 Kcal/kg 4020.72
    Weighted average price of oil Rs. /KL 59525.16
    Weighted average price of Coal Rs. /MT 3236.92
    Rate of Energy Charge ex-bus (rounded off to 3 decimals) Rs. /kWh 2.015

    78. Energy charges for 2 months as a part of working capital have been calculated on the following basis:

    a) ECR of Rs. 2.015/kWh as calculated above (rounded off to three places as per Regulation 30(6) of the 2014 Tariff Regulations).

    b) Ex-bus energy (two months), corresponding to the installed capacity of 1200 MW, normative availability of 83% for first year and 85% for last two years, and Auxiliary Energy Consumption of 5.25%.

    79. The Energy Charges for two months for the purpose of working capital has been worked out as under:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Variable Charges - for two months Corresponding to NAPAF (A) 27763.00 28431.99 28431.99
    Fixed Charges – for two months (B) 22273.88 21587.27 21194.61
    Total (C) = (A+B) 50036.88 50019.26 49626.61

    (f) Rate of interest on working capital

    81. In terms of clause (3) of Regulation 28 of the 2014 Tariff Regulations, the rate of Order in Petition No. 575/GT/2020 Page 52 of 176

    52

    interest on working capital has been considered as 13.50% (Bank rate 10.00% + 350 bps). Accordingly, Interest on working capital has been computed as follows:

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Cost of Coal for stock (30 days generation Corresponding to NAPAF) (A) 13478.48 13803.27 13803.27
    Cost of Coal for generation (30 days generation Corresponding to NAPAF) (B) 13478.48 13803.27 13803.27

    Cost of oil for 2 months Corresponding to NAPAF (C) 432.80 443.22 443.22
    Maintenance Spares - 20% of O&M expenses (D) 3963.33 4218.52 4492.14
    Receivables - 2 months (E) 50036.88 50019.26 49626.61
    O&M expenses - 1 month (F) 1651.39 1757.72 1871.73
    Total Working Capital (G) = (A+B+C+D+E+F) 83041.37 84045.26 84040.23
    Rate of Interest (H) 13.50% 13.50% 13.50%
    Total Interest on Working capital (I) = (G)*(H) 11210.58 11346.11 11345.43

    Additional O&M Expenses

    82. The Petitioner has also claimed additional O&M expenses over and above the normative O&M expenses, allowable to the generating station, in accordance with the provisions of the 2014 Tariff Regulations. These expenditure heads include Mega Insurance, Expenses for CISF Security, Impact of GST, Impact of Pay Revision, Share of Pension & Gratuity (P&G) and Share of Subsidiary activities. To examine and decide as to whether the claims of the Petitioner for additional O&M expenses are over and above the normative O&M expenses allowed to the generating station, in terms of the 2014 Tariff Regulations, we rely on the duly audited financial statements of the Petitioner. In the Financial statements, all O&M expenses are covered in Notes to Financial Statements i.e., Note No. 29 under O&M and General administration charges and Note No. 27 of the Annual accounts under Employee Benefit Expenses. Accordingly, we examine the head-wise claims of the Petitioner as detailed in the subsequent paragraphs.

    Order in Petition No. 575/GT/2020 Page 53 of 176

    53

    (A) Mega Insurance Expenses

    83. The Petitioner has claimed total amount of Rs. 536.03 lakh (Rs. 129.75 lakh in 2016-17, Rs. 296.91 lakh in 2017-18 and Rs. 109.37 lakh in 2018-19) during the period 2016-19, towards Mega Insurance expenses, as additional O&M expenses for the generating station. In justification of the same, the Petitioner has submitted that the generating station is in high alert security zone and therefore, the Petitioner has to ensure substantial safeguard measures through Mega Insurance, against damage or destruction of the assets. The Petitioner has also submitted that the Commission in its order dated 13.12.2005 in Petition No. 163/2004 (approval of tariff in respect of Tanda TPS) has allowed expenditure on Mega Insurance.

    84. The Objector, DVPCA has submitted that the Commission in its earlier orders had disallowed the expenditure on Mega Insurance and the same is to be recovered as part of the normative O&M expenses. It has stated that the actual O&M expenses, including the mega insurance expenses for the period 2016-19, is lower than the normative O&M expenses specified under the 2014 Tariff Regulations, and thus, the normative O&M expenses are sufficient to cover such expenses. Accordingly, the Objector has stated that the claim of the Petitioner may not be considered separately. In response, the Petitioner has submitted that the said expenditure is necessitated due to 'substantial increase in the risk profile of power plants' on account of various issues (including lenders covenants), natural calamities, law and order etc, and it protects the customers from any tariff shock, in the event of any substantial loss, arising out of damage or destruction of the power plant. Accordingly, it has prayed that the expenditure may be allowed as an additional pass-through, over and above, the said norms. The Petitioner has further submitted that the Commission in its various orders (i.e., order dated 13.12.2005 in Petition No. 163/2004, order dated 9.7.2013 in Order in Petition No. 575/GT/2020 Page 54 of 176

    54

    Petition No. 269/GT/2012, order dated 29.7.2016 in Petition No. 465/GT/2014, order dated 7.8.2013 in Petition No. 275/GT/2012 and order dated 29.7.2016 in Petition No. 470/GT/2014) while determining tariff had allowed expenses towards Mega Insurance.

    85. The Respondent KSEBL has submitted that the Petitioner may be directed to meet the above expenses from the normative O&M expenses allowed. The Respondent PSPCL submitted that based on the premise that the site-specific norms in case of thermal generating stations may not serve much purpose, as there is a set of advantages and disadvantages associated with every site, which average out, and the proposed norms are also based on multiple stations with wide geographical spread and therefore, such aspects are already factored in the norms. Accordingly, the Respondent has submitted that the claim may not be permitted at the stage of a truing-up of tariff.

    86. The matter has been considered. As regards the submission of the Petitioner that the Commission had allowed expenses towards Mega insurance to Mejia 1, 2 & 3, CTPS 1, 2 & 3 etc, over and above the O&M expenses norms, it is noticed that the grant of Mega insurance was for the period prior to the period 2014-19, and in exercise of its Power to Relax. However, the same was not allowed for other projects of the Petitioner. It is pertinent to mention that the Commission, while specifying the O&M norms for the 2014-19 tariff period, had considered insurance expenses as part of the O&M expense calculations and had factored the same in the said norms. Considering the above, we do not find any reason to allow expenses towards Mega Insurance over and above the O&M expense norms. Accordingly, the expenses claimed towards Mega Insurance is not allowed.

    (B) CISF Security Expenses

    87. The Petitioner has claimed total amount of Rs.6583.19 lakh (Rs. 2107.30 lakh in Order in Petition No. 575/GT/2020 Page 55 of 176

    55

    2016-17, Rs. 2278.29 lakh in 2017-18 and Rs. 2197.61 lakh in 2018-19) during the period 2016-19, towards CISF security expenses, as additional O&M expenses for the generating station. In justification of the same, the Petitioner has made identical submissions:

    (a) The generating station is located in high alert security zone and any untoward situation arising due to the terrorist attack or theft, may cause loss of property and prolonged interruption of generation. The concerned Ministry, from time to time has directed the Petitioner, to take appropriate security arrangements at hydro generating stations, dams etc. and to strengthen the physical security of various generating stations and tighten personal security.

    (b) The Ministry of Home Affairs, GOI, had granted approval for creation of additional security personnel posts to be stationed at the generating station. Thus, accordingly, the Petitioner has deployed CISF personnel in its plants, to ensure adequate security at the plants, as well as to comply with the directives, on security measures. Accordingly, the Petitioner has been incurring expenses towards CISF security for deployment of CISF personnel and associated CISF activities.

    (c) The Commission had allowed the CISF expenses in case of Mejia Thermal Power Station Units-1 to 3 vide order dated 9.7.2013 in Petition No. 269/GT/2012 and order dated 29.7.2016 in Petition No. 465/GT/2014 and for Chandrapura TPS (Units 1 to 3) vide dated 7.8.2013 in Petition No. 275/GT/2012 and order dated 29.7.2016 In Petition No. 470/GT/2014. Accordingly, the Commission may allow the CISF expenses as incurred by and apportioned to the generating station during the period 2014-19 to be recovered in full, in exercise of the 'Power to Relax' under the 2014 Tariff Regulations, similar to the Commission's treatment in the aforesaid orders

    88. The Objector, DVPCA has submitted that the actual O&M expenses, including the security expenses, for the period 2016-19 is lower than the normative O&M expenses specified under the 2014 Tariff Regulations. It has further submitted that the provisions of the 2014 Tariff Regulations, does not allow security expenses over and above the O & M norms. The objector has also stated that CISF security expenses was not claimed by Petitioner in previous tariff order in Petition No. 224/GT/2015 which was disposed of vide order dated 28.9. 2017.

    Order in Petition No. 575/GT/2020 Page 56 of 176

    56

    89. The matter has been considered. As regards the submission of the Petitioner that the Commission had allowed expenses towards CISF security in order dated 29.7.2016 in Petition No. 465/GT/2014 and order dated 29.7.2016 in Petition No. 470/GT/2014, it is observed that the CISF expenses, over and above the O&M expenses norms was allowed only for Mejia Therma Power Station (Units 1-3) and Chandrapur Thermal Power Station (Units-1 to 3) projects of the Petitioner during the 2009-14 tariff period in exercise of the power to relax, but was not allowed for other projects of the Petitioner. Further, the Commission while specifying the O&M expense norms for the period 2016-19, had considered security expenses for the generating station, as part of the O&M expenses and had factored the same in the said norms. Considering the above, we do not find any reason to allow additional O&M expenses towards CISF security.

    (C) Impact of Goods and Service Tax (GST)

    90. The Petitioner has claimed additional O&M expenses of Rs. 59.46 lakh in 2017- 18 and Rs. 170.04 lakh in 2018-19 as impact towards Goods and Service Tax (GST), including the apportioned impact with respect to DVC HQ, during the period 2016-19. The Objector, DVPCA has submitted that the Petitioner's claim is extraneous to the provisions of 2014 Tariff Regulations and various orders of the Commission. In response, the Petitioner has clarified that the Commission in order dated 14.3.2018 in Petition No. 13/SM/2017 and order dated 17.12.2018 in Petition No. 01/SM/2018 had considered the implementation of GST as "change in law".

    91. The submissions have been considered. It is observed that the Commission while specifying the O&M expense norms for the period 2014-19 had considered taxes to form part of the O&M expense calculations and accordingly, had factored the Order in Petition No. 575/GT/2020 Page 57 of 176

    57

    same in the said norms. This is evident from paragraph 49.6 of the SOR (Statement of Objects and Reasons) issued with the 2014 Tariff Regulations, which is extracted hereunder:

    "49.6 With regards to suggestion received on other taxes to be allowed, the Commission while approving the norms of O&M expenses has considered the taxes as part of O&M expenses while working out the norms and therefore the same has already been factored in..."

    92. Further, the escalation rates considered in the O&M expense norms is only after accounting for the variations during the past five years of the period 2016-19, which in our view, takes care of any variation in taxes also. It is pertinent to mention that in case of reduction of taxes or duties, no reimbursement is ordered. In this background, we find no reason to grant additional O&M expenses towards impact of GST.

    (D) Share of Subsidiary Activities

    93. The Petitioner has claimed total amount of Rs.1810.39 lakh (Rs. 685.27 lakh in 2016-17, Rs. 659.40 lakh in 2017-18 and Rs. 465.72 lakh in 2018-19) during the period 2016-19, towards 'Share of Subsidiary activities' as additional O&M expenses. In justification of the same, the Petitioner has submitted that it has been undertaking various subsidiary activities in terms of Section 12 of the DVC Act, 1948. It has also submitted that in terms of the judgment of APTEL dated 23.11.2007 in Appeal No. 273 of 2006 & batch, the expenses with regard to Subsidiary activities are to be allowed as a pass-through element in tariff. The Petitioner has stated that above judgment of APTEL has been affirmed by the Hon'ble Supreme Court vide its judgment dated 23.7.2018 in Civil Appeal Nos. 971-973 of 2008 along with Civil Appeal Nos. 4289 of 2008 (Bhaskar Shrachi Alloys Ltd. Vs. DVC) referred to in (2018) 8 SCC 281. The Petitioner has further submitted that the expenses toward share of subsidiary activities allowed in case of this generating station vide order dated 9.7.2013 in Petition No. 269/GT/2012 and order dated 29.7.2016 in Petition No. 465/GT/2014 and for Order in Petition No. 575/GT/2020 Page 58 of 176

    58

    Chandrapura TPS, Units-1 to 3 vide order dated 7.8.2013 in Petition No. 275/GT/2012 and order dated 29.7.2016 in Petition No. 470/GT/2014, in relaxation of the provisions of the Tariff Regulations. Accordingly, the Petitioner has prayed that the Commission may allow the expenses toward share of subsidiary activities, as incurred and apportioned to the generating station during the period 2016-19 for recovery in full, in exercise of the power to relax' under the 2014 Tariff Regulations.

    94. The Objector, DVPCA has submitted that the Petitioner has also claimed expenses towards subsidiary activities including additional capital, O&M, Return on Equity, Interest on loan and Depreciation. It has submitted that the contribution to subsidiary fund is not allowable as the Return on Equity, Interest on loan and Depreciation, on common assets, have been claimed separately. The Respondent has further submitted that the Commission had dealt with the issue of expenditure of subsidiary activities, while framing the 2014 Tariff Regulations and had specifically disallowed such expenses to be charged as additional O&M expenses, vide order dated 28.09.2017 in Petition No. 224/GT/2015. It has stated that the actual O&M expenses including the share of subsidiary expenses are lower than the normative O&M expenses and thus, there is no requirement of allowing the share of subsidiary expenses additionally. In response, the Petitioner has clarified as under:

    (a) DVC has been undertaking multifarious functions in the Damodar Valley area in terms of Section 12 of the DVC Act, 1948 with the obligation to undertake development of Damodar Valley, which falls in the provinces of West Bengal and Jharkhand. The activities of DVC are not restricted to generation and sale/supply of electricity. The functions of the DVC include promotion and operation of schemes for irrigation, water supply and drainage, flood control and improvement of flow conditions in the Hooghly River, navigation in the Damodar River and its tributaries and channels, afforestation and control of soil erosion and promotion of public health and agricultural, industrial, economic and general well-being in the Damodar Valley under its areas of operation. Thus, DVC is engaged in number of activities which are not commercial in nature and where no significant revenue accrues to DVC.

    Order in Petition No. 575/GT/2020 Page 59 of 176

    59

    (b) DVC cannot generate required revenue from the users of service in regard to schemes such as drainage, flood control, improvement in the flow conditions, navigation, afforestation and control of soil erosion or the promotion of public health and general well-being in the Damodar Valley. The main revenue earning activity performed by DVC is generation and sale of power. DVC is undertaking various activities in a comprehensive manner for the betterment of Damodar Valley and using the revenues earned from various sources including generation and sale of electricity for the above varied purposes for which DVC has been established. In the facts and circumstances mentioned herein above, DVC occupies a special position.

    (c) The activities of DVC are akin to the activities undertaken by the Governments, Central, State or Municipalities. Therefore, it is critical that the expenses incurred by DVC in undertaking the various subsidiary activities be recovered in suitable manner so as to not create financial burden on DVC.

    (d) Section 32 of the DVC Act 1948 allows DVC to incur expenditure on activities other than power, irrigation and flood control. The APTEL's judgment dated 23.11.2007 in Appeal No. 271, 272, 273 and 275 of 2006, had allowed the recovery of these expenses through tariff. The said judgment was upheld by the Hon'ble Supreme Court vide order dated 23.7.2018 in Bhaskar Shrachi Alloys Ltd. vs. Damodar Valley Corporation (2018) 8 SCC 281, whereupon, the Hon'ble Supreme Court has reiterated the fact that the other activities undertaken by DVC are statutory in nature and provided for recovery of related expenses.

    95. The submissions have been considered. The expenses of subsidiary activities include multipurpose dams and other heads. In this regard, Regulation 53 of the 2014 Tariff Regulations provides as under:

    "53. Special Provisions relating to Damodar Valley Corporation:

    (1) Subject to clause (2), this regulation shall apply to determination of tariff of the projects owned by Damodar Valley Corporation (DVC).

    (2) The following special provisions shall apply for determination of tariff of the projects owned by DVC:

    (i) Capital Cost: The expenditure allocated to the object 'power', in terms of sections 32 and 33 of the Damodar Valley Corporation Act, 1948, to the extent of its apportionment to generation and inter-state transmission, shall form the basis of capital cost for the purpose of determination of tariff:

    Provided that the capital expenditure incurred on head office, regional offices, administrative and technical centers of DVC, after due prudence check, shall also form part of the capital cost.

    Order in Petition No. 575/GT/2020 Page 60 of 176

    60

    xxxx

    (iv) Funds under section 40 of the Damodar Valley Corporation Act, 1948: The Fund(s) established in terms of section 40 of the Damodar Valley Corporation Act, 1948 shall be considered as items of expenditure to be recovered through tariff.

    (3) The provisions in clause (2) of this regulation shall be subject to the decision of the Hon'ble Supreme Court in Civil Appeal No 4289 of 2008 and other related appeals pending in the Hon'ble Court and shall stand modified to the extent they are inconsistent with the decision.

    96. It is noticed that the Commission in its various tariff orders in respect of the other generating stations of the Petitioner for the period 2014-19, had observed that as per SOR to the 2014 Tariff Regulations, the site specific norms in case of thermal generating stations may not serve much purpose as there is a set of advantages and disadvantages associated with every site, which average out, and the proposed norms are also based on multiple stations with wide geographical spread and therefore, such aspects are already factored in the norms and accordingly, the additional O&M expenses claimed by the Petitioner, including share of subsidiary activities was not allowed. In this regard the relevant sections of DVC Act 1948 are as follows:

    "32. Expenditure on objects other than irrigation, power and flood control: The Corporation shall have power to spend such sums as it thinks fit on objects authorised under this Act other than irrigation, power and flood control and such sums shall be treated as common expenditure payable out of the Fund of the Corporation before allocation under Section

    33.

    33. Allocation of expenditure chargeable to project on main objects: The total capital expenditure chargeable to a project shall be allocated between the three main objects, namely, irrigation, power and flood control as follows, namely:

    1) expenditure solely attributable to any of these objects, including a proportionate share of overhead and general charges, shall be charged to that object, and

    2) expenditure common to two or more of the said objects, including a proportionate share of overhead and general charges shall be allocated to each of such objects in proportion to the expenditure which, according to the estimate of the Corporation, would have been incurred in constructing a separate structure solely for that object, less any amount determined under clause (1) in respect of that object.

    37. Disposal of profits and deficits. —

    (1) Subject to the provisions of sub-section (2) of section 40, the net profit, if any, attributable to each of the three main objects, namely, irrigation, power and flood control, shall be credited to the participating Governments in proportion to their respective shares in the total capital cost attributed to that object.

    Order in Petition No. 575/GT/2020 Page 61 of 176

    61

    (2) The net deficit, if any, in respect of any of the objects shall be made good by the Governments concerned in the proportion specified in sub-section (1):

    Provided that the net deficit in respect of flood control shall be made good entirely by the Government of West Bengal and the Central Government shall have no share in such deficit."

    97. It is noticed that APTEL vide its judgement dated 23.11.2007 had observed that the expenditure incurred by the Petitioner, on objects other than irrigation, power and flood control, are non-commercial in nature and accrue little or no revenue and is not likely to sub serve the objectives of Section 41 and 51 of the Act and therefore, can be allocated to these three heads as per section 32 and 33 of DVC Act, 1948 and the expenditure so allocated to power object, should be allowed to be recovered through the electricity tariff. Subsequently, the Hon'ble Supreme Court vide its judgment dated 23.7.2018 in Civil Appeal No. 4289 of 2008 and batch thereof, upheld the decision of APTEL as under:

    "55. In so far as the issue of allowance of cost relating to 'other activities' of the Corporation to be recovered through tariff on electricity is concerned, we have taken note of the objection(s) raised in this regard which in sum and substance is that Sections 32 and 33 of the Act of 1948 are in direct conflict with Sections 41 and 51 of the 2003 Act and, therefore, recovery of cost incurred in "other works" undertaken by the Corporation through power tariff is wholly untenable. Apart from reiterating the basis on which we have thought it proper to affirm the findings of the learned Appellate Tribunal on the purport and scope of the fourth proviso to Section 14 of the 2003 Act and the continued operation of the provisions of the Act of 1948 which are not inconsistent with the provisions of the 2003 Act, we have also taken note of the specific provisions contained in Sections 41 and 51 of the 2003 Act which, inter alia, require maintenance of separate accounts of the other business undertaken by transmission/distribution licensees so as to ensure that the returns from the transmission/distribution business of electricity do not subsidize any other such business. Not only Sections 41 and 51 of the 2003 Act contemplate prior approval of the Appropriate Commission before a licensee can engage in any other business other than that of a licensee under the 2003 Act, what is contemplated by the aforesaid provisions of the 2003 Act is some return or earning of revenue from such business. In the instant case, the "other activities" of the Corporation are not optional as contemplated under Sections 41/51 of the 2003 Act but are mandatorily cast by the statute i.e. Act of 1948 which, being in the nature of socially beneficial measures, per se, do not entail earning of any revenue so as to require maintenance of separate accounts. The allowance of recovery of cost incurred in connection with "other activities" of the Corporation from the common fund generated by tariff chargeable from the consumers/customers of electricity as contemplated by the provisions of the Act of 1948, therefore, do not collide or is, in any manner, inconsistent.

    98. In view of the above, the expenses towards the sharing for subsidiary activity is Order in Petition No. 575/GT/2020 Page 62 of 176

    62

    allowed as claimed by the Petitioner during the period 2016-19.

    (E) Impact of Pay Revision and P&G contribution

    99. The Petitioner has claimed expenses pertaining to impact of Pay Revision on account of 7th Central Pay Commission and Pension & Gratuity (P&G), over and above, the normative O&M expenses allowable to the generating station. It is noticed that the Petitioner, in its tariff petitions for truing-up of tariff for the period 2009-14 had made additional claims towards P&G liability based on actuarial valuation. This prayer was, however, rejected by the Commission by its various orders, on the ground that the P&G liability formed part of the O&M expense norms specified under the 2009 Tariff Regulations. Aggrieved by this decision, the Petitioner has filed Appeal Nos.268- 275 of 2016 before APTEL and the same is pending. The Petitioner has made similar prayers in tariff petitions for the period 2014-19, which was also rejected by the Commission on the ground that the Petitioner's contribution to P&G fund is required to be met through the normative O&M expenses, allowed to the generating stations. However, the Commission in order dated 20.9.2016 in Petition No.353/GT/2014 (approval of tariff for Panchet Hydel Power Station, Units-I &II for the 014-19 tariff period) granted liberty to the Petitioner to claim the said relief through a separate application along with all relevant details, so that a holistic view can be taken in the matter, in accordance with law. Accordingly, the Petitioner had filed Petition No.197/MP/2016, wherein P&G contribution of Rs.3228.86 crore and impact of pay revision from January, 2016 as Rs.420.27 crore for 2014-19 was claimed over and above the normative O&M expenses specified under Regulation 29 of the 2014 Tariff Regulations. The Commission, vide its order dated 4.9.2019, while holding that the said petition was maintainable, disposed of the same as under:

    100. "25……The employee expenses, in general, form a considerable part of O&M expenses and includes all types of employee related expenses like Salary, Order in Petition No. 575/GT/2020 Page 63 of 176

    63

    contribution to CPF, gratuity, pension, etc., However, the submission of the Petitioner that no part of P&G contribution related to power business were factored in the O&M expenses during the base years cannot be appreciated in the absence of any supporting details/data being furnished by the Petitioner. As stated, the normative O&M expenses were specified under Regulation 29 of the 2014 Tariff Regulations after giving due consideration of the requirements of various generating companies. The Petitioner DVC has argued that in so far as the liability of pension for its employees is concerned, it is unique and different from those prevalent in other central generating stations regulated by this Commission since the revision of pension from time to time, is based on the decision of the Central Govt. However, the information/details available on record do not support the aforesaid submission of the Petitioner that it incurs extra expenditure on terminal benefits to the employees over and above the normative O&M expenses under the 2014 Tariff Regulations. In the above background and in the absence of any supporting details/data, the prayer of the Petitioner cannot be granted in this order. However, the Petitioner is at liberty to claim the said relief with all relevant information/ documents including the (a) actuarial valuation; (b)actual data duly audited and certified by the auditor and (c) annual accounts of the pension fund, at the time of truing up of tariff in terms of Regulation 8 of the2014 Tariff Regulations.

    26.xxxxx

    27. We notice that subsequently, the Petitioner has implemented the recommendations of the 7th Pay Commission for its employees with effect from 1.1.2016. In view of this, the impact of pay revision, after implementation of the 7th Pay Commission, is required to be examined on actual basis, on prudence check of the information/ details to be submitted by the Petitioner. Accordingly, we direct the Petitioner to furnish the actual impact of pay revision based on the recommendations of the 7th CPC, effective from 1.1.2016, along with details of HRA and transport allowance from July, 2017. The aforesaid details/information shall be furnished by the Petitioner at the time of truing up of tariff and the same will be considered in accordance with law."

    101. Based on the above, the Petitioner, has submitted its claim for P&G contribution and for impact of pay revision, as additional O&M expenses, for the period 2016-19, which are examined below:

    (i) Impact of Pay revision

    102. The Petitioner has claimed total amount of Rs. 4584.26 lakh (Rs. 1457.55 lakh in 2016-17, Rs. 1834.53 lakh in 2017-18 and Rs. 1292.18 lakh in 2018-19) towards impact on account of Pay revision during the period 2016-19, due to recommendations of 7thPay Commission. The Petitioner has also submitted that the Commission, while specifying the 2014 Tariff Regulations, has in the SOR observed that the increase in employee expenses on account of pay revision shall be Order in Petition No. 575/GT/2020 Page 64 of 176

    64

    considered appropriately on case-to-case basis, balancing the interest of generating stations and consumers.

    103. In the present case, the Commission vide ROP of the hearing dated 25.5.2021, directed the Petitioner to furnish the following additional information:

    "True-up for period 2014-19

    "i. Break-up of the actual O&M expenses of the generating station under various subheads (as per Annexure-A enclosed) after including the pay revision impact (employees, CISF and Corporate Centre) and wage revision impact (minimum wages), if applicable. (in both MS Excel and PDF format).

    ii. Break-up of the actual O&M expenses of Corporate Centre/other offices including pay revision impact (as per Annexure-B enclosed) for the generating station along with the allocation of the total O&M expenses to the various generating stations under construction, operational stations and any other offices/business activity, along with basis of allocating such expenditure (in both MS Excel and PDF format).

    iii. Breakup of the pay revision impact claimed in respect of employees of the Petitioner Company, Security personnel stationed at the generating station and Corporate Centre/other offices employee cost allocated to the generating station. (as per Annexure-C enclosed in both MS Excel and PDF format)."

    104. In compliance to the aforesaid directions, the Petitioner vide affidavit dated 1.7.2021, has furnished the information and submitted that additional O&M expenses including P&G liability claimed as elements of Part B of the total annal fixed charges and the same were not considered, while preparing the data as per Annexure-A, i.e., in pay revision. Accordingly, the total O&M expenses claimed by the Petitioner, in respect of the generating station, as per Annexure-A, for the 2016-19 tariff period is as follows:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    9096.43 13036.18 12488.43

    105. The Petitioner has further submitted that in line with the methodology adopted by the Commission, while approving the common office expenditure for the period 1.4.2014 to 31.3.2019 in order dated 27.9.2016 in Petition No.350/GT/2014, the actual O&M expenses of Corporate Centre/ other offices has already been apportioned Order in Petition No. 575/GT/2020 Page 65 of 176

    65

    between O&M expenses of DVC's transmission business & generating stations and is further apportioned to the O&M expenses of various generating stations in operation. The O&M expenses of Corporate Centre / other offices are also apportioned in above manner and considered in Annexure-A. The Petitioner has also stated that it has claimed total Security expenses including the impact of pay revision of the security personnel, however, as per direction of the Commission vide ROP for hearing dated 25.5.2021, the breakup of the impact of pay revision claimed in respect of the Security personnel stationed at the generating station and the apportioned cost of security expenses at Corporate Centre / other offices allocated to the generating station, as per Annexure-C, has been submitted. The Petitioner has further submitted that due to frequent transfer of employees from one generation station to other generating station/ T&D wing, on same post or to the higher post, due to promotion, during the period from 1.1.2016 to 31.3.2019 and due to the delayed implementation of pay revision in DVC, it is difficult to find out the station-wise impact of pay revision. Accordingly, the impact of pay revision of DVC employees has been determined in totality towards Power business and thereafter apportioned to transmission and generation based on the capital cost and further apportioned to various generators, based on their installed capacity, as per methodology adopted by the Commission, while approving the common office expenditure vide order dated 20.9.2016 in Petition No. 352/GT/2014.

    106. DVPCA has submitted that the impact of pay revision claimed by the Petitioner may not be allowed, as the same is to be considered to be within the normative O&M expenses and also actual O&M expenses, including pay revision expenses, are well within the limit of normative O&M expenses. DVPCA has compared the overall claimed O&M expenses by the Petitioner, in its various generation tariff petitions with the overall actual O&M expenses and submitted that the actual O&M expenses are Order in Petition No. 575/GT/2020 Page 66 of 176

    66

    lower than the normative O&M expenses and thus, there is no requirement of allowing pay revision expenses additionally.

    107. In response, the Petitioner has stated that the recovery of impact of pay revision is to be considered and allowed in line with tariff principles enshrined under Section 61(d) of the Act. It has also mentioned that the norms for O&M expenses under the 2014 Tariff Regulations, were determined on the basis of the actual O&M expenses for the years 2008-09 to 2012-13 and the 2014 Tariff Regulations, were notified by the Commission on 21.2.2014 i.e., prior to the implementation of the pay revision (7th CPC). Accordingly, it has submitted that while arriving at the O&M norms for the period 2014-19, the Commission had no occasion to consider the impact of pay revision w.e.f. 1.1.2016. The Petitioner has further submitted that the Commission while specifying the 2014 Tariff Regulations, was of the view that the increase in employee expenses on account of pay revision, in case of central generating stations and private generating stations are to be considered appropriately and therefore, the Commission decided that the said costs shall be examined on case-to-case basis so that the interest of generating stations and consumers remains balanced. Accordingly, the Commission vide its order dated 4.9.2019 in Petition No. 197/MP/2016 had directed the Petitioner to furnish the actual impact of pay revision at the time of truing up of tariff.

    (ii) Share of P&G Contribution

    108. The Petitioner has claimed share of P&G Contribution for the 2016-19 tariff period as under:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    5024.37 11374.93 2149.25

    109. The Petitioner, in terms of the directions contained in order dated 4.9.2019 in Order in Petition No. 575/GT/2020 Page 67 of 176

    67

    Petition No.197/MP/2016, has furnished the following data, duly certified by auditor:

    a. actuarial valuation of pension and gratuity;

    b. actual data as per books of accounts on terminal benefits; and c. annual accounts of pension funds for the period 2014-19.

    110. The Petitioner has further submitted that as per recommendations of the 7th Pay Commission, the Cabinet on 12.9.2017, had cleared the Payment of Gratuity (Amendment Bill 2017), wherein, the upper ceiling of gratuity has been enhanced from the present value of Rs.10 lakh to Rs.20 lakh, effective from 1.1.2016. It has submitted, that since the impact due to enhancement of upper ceiling of gratuity has not been considered / factored by the Commission, while fixing the normative O&M expenses for the period 2014-19, the Commission may consider the impact while considering the P&G contribution for the period 2016-19.

    111. DVPCA has submitted that the Petitioner has claimed normative O&M expenses, in accordance with the 2014 Tariff Regulations and the same is being allowed, the additional expenses claimed by the Petitioner, over and above the normative O&M expenses, under the heads, P&G, Pay revision, Ash Evacuation expenses, CISF Security expenses, Expenditure for subsidiary activities, Mega Insurance expenses, impact of GST on O&M may be disallowed. In response, the Petitioner in its response has clarified as follows:

    a. DVC as a statutory body is required to maintain appropriate scheme for meeting the Terminal Benefits of the employees i.e., Pension (wherever the appointment of employees is on pension basis), Gratuity, Contributory Provident Fund i.e., CPF (wherever the employment of the employees is on Provident Fund contribution basis instead of pension). The CPF scheme being an alternative to the pension scheme, is for those who have not opted or otherwise not eligible for pension scheme and DVC makes contribution to the CPF. In addition to the above, there is also a General Provident Fund (GPF), wherein, fund is contributed only by the employees but not by DVC. Thus, Provident Fund schemes are of two types, namely, the CPF and the

    GPF.

    b. The article 16 and 17 of Employees Provident Funds and Miscellaneous Provisions Act, 1952 provides for administration of Provident Fund Scheme. Order in Petition No. 575/GT/2020 Page 68 of 176

    68

    Accordingly, DVC is maintaining Provident Fund, both CPF and GPF, in respect of each of the employees with individual account of the employees duly reflecting (a) the contribution apportioned to such employees or the contribution made by DVC, wherever applicable, (b) apportionment to such employees, apportionment of the interest earned on the money invested from the Provident Fund Scheme in approved securities and (c) contribution made by the employees to the GPF. Such contributions are maintained in a separate account of each of the employees as per the applicable scheme. c. The Pension & Gratuity Fund accounts are maintained separately by the Trust. The contributions to the Pension and Gratuity Trust are made based on actuarial valuation undertaken from time to time by actuaries appointed for the purpose. The actuarial valuation is in regard to all the employees and workmen of DVC.

    d. No part of the amount related to Pension or Gratuity Fund contribution is used by DVC for its business activities in any of the years commencing from 01.4.2006 i.e., for the period in which the tariff is being determined by this Hon'ble Commission, upon coming into force of the Electricity Act, 2003. The contribution to the Pension & Gratuity Fund made by DVC is considered in the audited accounts of the DVC for the respective financial years.

    e. In regard to the Provident Fund, the amount contributed is maintained by DVC but is dedicated to the benefit of DVC's employees and workmen. As in the case of Pension & Gratuity Fund, no part of the Provident Fund amount is to the account of DVC or to be utilised for the business activities of DVC. In line with the Employees Provident Funds and Miscellaneous Act, 1952, DVC is investing CPF and GPF amount in approved securities and the interest thereof is apportioned to employees. This has been reflected in Schedule 27 with two corresponding entries, namely, interest payable and interest recoverable on investment. DVC is required to duly account for all such interest.

    f. The amount contributed by DVC to the Pension & Gratuity Fund is invested by the Trust in the name of the trust and not in the name of DVC. The interest accrued on this investment is considered as the income of the Trust. No part of the interest income is realized by DVC or appropriated by DVC in any manner and nowhere it is reflected in the audited accounts of

    DVC.

    g. In view of the above, there is a difference between the Pension & Gratuity Contribution of DVC as compared to the Contributory Provident Fund.

    112. The Petitioner has also submitted that the O&M expenses inclusive of employees cost and Contributory Provident Fund will not cover the revenue requirements of the DVC on account of the P&G contribution on following grounds:

    a. The Contributory Provident Fund is in respect of the actual amount of Order in Petition No. 575/GT/2020 Page 69 of 176

    69

    contribution during the relevant year and does not involve adjustments for that year in future years, however, the Pension and Gratuity Contribution is to be constantly adjusted for past period of services also and is dependent on actuary valuation to be undertaken from time to time. The period of past services rendered by the employees of DVC including the deficit amount of contribution in the past in order to meet the pension payment to the employees upon their retirement need to be necessarily considered. Similarly, in case the contribution already made is in excess of the requirement, suitable adjustment is made through actuary valuation. Thus, the contribution to P&G cannot be restricted to current year. b. The amount of Pension & Gratuity contribution in the case of DVC is significantly more in the recent past i.e., from 1.1.2006 onwards, on account of the following factors:

    i. Earlier, as there was no fund maintained for receiving the Pension and Gratuity Contribution, the same was being discharged by DVC on revenue basis pay as you go as in the case of any other Government Department. However, as per the mandate of the Comptroller and Auditor General and in accordance with the directions given by the Central Government, now, DVC has to maintain the Pension and Gratuity Fund. Accordingly, the contributions are being made not only for the present year working of the employees but also for all the past years of services including for persons who have retired from DVC in the past;

    ii. There has been a substantial increase in Pension and Gratuity payment to the employees on account of wage revision pursuant to the decision taken by the Central Government, firstly, in the year 2006 and secondly in the year 2016. These higher contributions to be made are not confined to the current year but also relates to the payment for the past services including the services rendered by the retired employees;

    iii. The liability under Contributory Provident Fund ceases with the year in which it is contributed. There is no actuary valuation or adjustment for upward revision on account of any wage revision etc. however, the pension payment is payable by DVC after the retirement of the employees on a continuous basis along with the revision to the pension from time to time as per the decision of the Central Government applicable to all retired employees; further the pension payment liability continues even after the death of the employee. The family pension needs to be given to the widows and other eligible members under the pension scheme.

    c. Thus, the matter relating to Pension & Gratuity Contribution and other aspects of Terminal Benefit liabilities to the employees including the increase in such Pension and Gratuity contribution on account of actuarial valuation undertaken from time to time cannot be inter-mixed with the normative O&M expenditure provided for in the Tariff Regulations. d. The normative O&M expenses determined by the Commission is based on the normalized actual quantum of expenditure incurred by the Utilities in the Order in Petition No. 575/GT/2020 Page 70 of 176

    70

    past period and escalation of thereof on account of inflation and other factors. Such normative expenditure would consider matters such as contribution to the Provident Fund etc. where the amount of contribution is duly factored as a percentage of the salaries and wages paid to the employees and is adopted by Central Power Sector Utilities who do not maintain a Pension scheme such as NTPC, NHPC etc, however, it cannot be ipso facto adopted for DVC, wherein, some of its employees are under Pension Scheme, as admissible to the Government departments. e. The contribution which DVC has to make towards the Pension and Gratuity Fund from time to time based on the actuarial valuation including for increase in the Pension and Gratuity Contribution related to the past period on account of pay revision, is not factored into in the determination of the employees cost as part of the normative O&M cost decided by this Hon'ble Commission from time to time. These are also not part of any specific tariff elements given in the Regulation 21 and 14 of the 2009 and 2014 Tariff Regulations, respectively.

    f. APTEL and the Hon'ble Supreme Court in the orders dated 23.11.2007 and 23.7.2018 respectively have directed in favour of full recovery of the P&G contribution. Further, the Commission vide order dated 04.09.2019 in Petition no. 197/MP/2016 granted liberty to DVC to claim the Pension and Gratuity contribution along with relevant details at the time of truing up. g. The principle for apportionment of the contribution towards Pension & Gratuity fund to the different generating stations and T&D system of DVC, based on capital cost and installed capacity has been already approved by the Commission for the 2006- 09 period and the same principle has been followed by DVC in its true-up petitions for the period 2014-19. h. As regards linking the recovery of Pension & Gratuity contribution to Plant Availability Factor (PAF), the APTEL in its judgment dated 23.11.2007 had directed for recovery of the entire amount of the Pension & Gratuity contribution from the consumers through tariff. The said judgment of APTEL dated 23.11.2007 was upheld by the Hon'ble Supreme Court vide its order dated 23.7.2018. The State Commissions of West Bengal and Jharkhand in their different orders, had also allowed the full recovery of the Pension & Gratuity contribution of the Petitioner.

    113. Accordingly, the Petitioner has submitted that the contentions of the Objector may be rejected, and the amount claimed towards contribution to Pension & Gratuity for the period 2016-19 may be allowed to be recovered in full, on sharing basis.

    Analysis and Decision

    114. The submissions have been considered. As regards pay revision, it is noticed that the Petitioner has prayed and claimed the impact of pay revision on account of Order in Petition No. 575/GT/2020 Page 71 of 176

    71

    7th pay commission. However, in respect of P&G, it is noted that the Petitioner has primarily not pleaded for impact of pay revision on P&G but have claimed the actual P&G. It is observed that the normative O&M expenses includes a gratuity and CPF of public sector undertakings. Accordingly, the O&M norms under the regulations account for gratuity and a part of pension pertaining to serving employees of Petitioner. However, the Petitioner has the liability of Pension for retired employees as well. Thus, the actual impact of pension needs to be assessed to examine the additional O&M claim by the Petitioner. It is observed that the Petitioner is maintaining the audited accounts of its entire power vertical, which consists of 15 generating stations, transmission system and distribution system, on consolidated basis. In this regard, the Petitioner has submitted that due to frequent transfer of employees from one generation station to other generating station / T&D wing, on same post, or to the higher post, due to promotion during the period from 1.1.2016 to 31.3.2019, delayed implementation of pay revision etc., the Petitioner has expressed its difficulty to provide the station-wise impact of pay revision separately but determined it in totality for Power business and thereafter, apportioned as per methodology adopted by the Commission, while approving the common office expenditure vide order dated 20.9.2016 in Petition No.352/GT/2014.

    115. In view of the above, to assess the impact of pay revision on O&M expenses and P&G contribution, it was decided to adopt a holistic approach i.e., to compare the actual normalised O&M expenses of power vertical of DVC as per audited accounts, with the normative O&M expenses specified under the 2014 Tariff Regulations. In case the normative O&M expenses are in excess of the actual normalised O&M expenses associated with power vertical, the additional expenditure claimed by the Petitioner shall not be allowed and in case of any, under-recovery, if any, to the extent Order in Petition No. 575/GT/2020 Page 72 of 176

    72

    of impact of pay revision and expenses on account of P&G contribution shall be allowed, in relaxation of O&M norms under the 2014 Tariff Regulations.

    116. In order to ascertain the justification for additional O&M expenses, over and above the normative O&M expenses allowed, a comparative analysis of the actual O&M expenses, was undertaken, including the additional normalised claims and the normative O&M expenses allowable under the various tariff petitions for truing up filed by the Petitioner. It is observed that during the period 2014-19, the total normative O&M expenses allowed as per the Tariff Regulations for the various tariff petition (both Generation and Transmission) is Rs.1044745.04 lakh. Further, as per audited financial statements water charges for Rs.38226.00 lakh (in terms of Regulation 29(2) of the 2014 Tariff Regulations) and Ash Evacuation expenses of Rs.61182.00 lakh (as change in law) has been incurred by the Petitioner, during the period 2014-19. However in line with the MoEF&CC notification dated 25.1.2016, the ash transportation charges have been allowed from 26.1.2016 to 31.3.2019 which works out to Rs.39334.64 lakh Since the Petitioner maintains separate accounts for each generating station and the Petitioner is granted liberty to claim the ash evacuation expenses separately, the total amount allowable to the Petitioner against O&M, Water charges and allowable Ash Evacuation charges is Rs.1122305.68 lakh (Rs.1044745.04 lakh + Rs.38226.00 lakh+Rs.39334.64 lakh) whereas, the actual O&M expenses, as per DVC Financial statements for the 2014-19 period is Rs.1219786.00 lakh (including subsidiary activities), which indicates that the actual O&M expenses exceeds the normative O&M expenses, by Rs.97480.32 lakh. However, we note that the actual O&M expenses of Rs.1219786 lakh also includes Provisions for Loss, Doubtful claims & Advances, Doubtful debts, and Shortage/Obsolescence in stores etc. amounting to Rs.77573 lakh, and Rebates & Order in Petition No. 575/GT/2020 Page 73 of 176

    73

    Discount allowed to consumers for Rs.49937 lakh, out of which rebate of Rs.40820 lakh pertain to firm consumers (breakup submitted by the Petitioner vide ROP dated 22.4.2022). When the actual O&M expenses are normalised, by excluding the provisions amounting to Rs.77573 lakh (being a non-cash expenditure and Rebates & Discounts for Rs.40820 lakh pertaining to firm consumers, as stated above, the actual O&M expenses work out to Rs.1101392.70 lakh (i.e., Rs.1219786 - Rs.77573 - Rs.40820.30 lakh). The computation of the normalised actual O&M expenses is as under:

    (Rs. in lakh) 2014-15 2015-16 2016-17 2017-18 2018-19 TOTAL A. ACTUAL O&M AS PER DVC AUDITED FINANCIAL STATEMENTS

    Note No.27- 81960.00 96738.00 126691.00 159010.00 109249.00 573648.00 Employee Benefit Expenses-Power Segment

    93447.00 117668.00 132286.00 169568.00 133169.00 646138.00

    Note No.29-O&M and General Administration Charges-Power Segment

    TOTAL (A) 175407.00 214406.00 258977.00 328578.00 242418.00 1219786.00

    B. PROVISIONS-NOTE NO 29-POWER SEGMENT

    Provision for Loss on 446.00 191.00 6544.00 4293.00 0.00 11474.00 Fixed Assets

    Provision for 4586.00 1308.00 0.00 0.00 0.00 5894.00 Doubtful Claims

    and Advances

    Provision for 205.00 733.00 9126.00 41657.00 8299.00 60020.00 Doubtful Debts

    Provision for 12.00 8.00 13.00 128.00 24.00 185.00 Shortage

    /Obsolescence in

    Stores

    TOTAL (B) 5249.00 2240.00 15683.00 46078.00 8323.00 77573.00

    C. REBATE & DISCOUNT ALLOWED TO FIRM CUSTOMERS (as per Petitioner submission)

    Rebate & Discount 3821.32 8983.93 8766.85 8393.73 10854.47 40820.30 Allowed

    TOTAL (C) 3821.32 8983.93 8766.85 8393.73 10854.47 40820.30

    NORMALISED 166336.68 203182.07 234527.15 274106.27 223240.53 1101392.70

    ACTUAL O&M AS

    PER AUDITED

    STATEMENT OF

    ACCOUNTS (A-B- C):-

    117. A comparison of the normative O&M expenses (including allowable water charges) with the normalized actual O&M expenses in respect of the various truing- up generation and transmission tariff petitions filed by the Petitioner for the period Order in Petition No. 575/GT/2020 Page 74 of 176

    74

    2014-19 and allowed for the period 2014-19 (in this petition) is as under:

    (Rs. in lakh)

    Petition No. Generating Station / Transmission Petitions Normative O&M expenses claimed
    574/GT/2020 Bokaro Thermal Power Station-A 20741.38
    569/GT/2020 Bokaro Thermal Power Station-1-3 64499.08
    565/GT/2020 Chandrapur Thermal Power Station 1-3 56979.30
    570/GT/2020 Chandrapur Thermal Power Station 7-8 67755.00
    573/GT/2020 Durgapur Steel Thermal Power Station 1-2 90740.00
    567/GT/2020 Durgapur Steel Thermal Power Station 3-4 38527.32
    564/GT/2020 Koderma Thermal Power Station 1-2 89118.08
    577/GT/2020 Mejia Thermal Power Station 1-3 85371.30
    205/GT/2020 Mejia Thermal Power Station 4 28457.10
    571/GT/2020 Mejia Thermal Power Station 5-6 67755.00
    568/GT/2020 Mejia Thermal Power Station 7-8 90740.00
    575/GT/2020 Raghunathpur Thermal Power Station 62340.00
    578/GT/2020 Maithon Hydel Station 1-3 10931.64
    566/GT/2020 Panchet Hydel Station 1-2 8830.12
    572/GT/2020 Tilaiya Hydel Station1-2 3991.24
    713/TT/2020 New Elements of Transmission 1154.65 nd Distribution (T&D)
    466/TT/2020 Non-ISTS 400 kV Transmission Lines of Transmission and Distribution (T&D) System 1724.30
    482/TT/2020 Existing Transmission and Distribution (T&D) System (allowed) 255089.53
    (A) Total Normative O&M Expenses allowable 1044745.04
    (B) Water charges as per DVC audited accounts to be considered separately under Regulation 29(2) of 2014 Tariff Regulations 38226.00
    (C) Ash Evacuation expenses allowed under change in law (w.e.f. 26.1.2016 till 31.3.2019 39334.64
    (D) TOTAL (A+B+C): 1122305. 68
    (E) Normalized Actual O&M expenses as per audited financial statement of accounts 1101392.70
    (F) Excess of Normative O&M expenses, Water Charges & Ash Evacuation charges over the normalized actual O&M Expenses (D-E): 20912.98

    143. It is evident from the above, that the total normative O&M expenses allowable in respect of all the generation and transmission tariff petitions of the Petitioner for the period 2014-19 is Rs.1044745.04 lakh, in terms of the 2014 Tariff Regulations. Also, considering the actual water charges of Rs.38226.00 lakh and Ash Evacuation Charges w.e.f. 26.1.2016 of Rs. 39334.64 lakh, the total works out to Rs.1122305.68 lakh, which is higher than the normalised actual O&M expenses of Rs.1101392.70 lakh, as per audited financial statements pertaining to Power segment. Further, as per Order in Petition No. 575/GT/2020 Page 75 of 176

    75

    Regulation 29(2) of the 2014 Tariff Regulations, capital spares are allowable separately. Since the normative O&M expenses including the actual Water charges and Ash Evacuation charges allowed separately, are in excess of the actual O&M expenses in the case of the Petitioner, we are not inclined to allow the impact of pay revision and the contribution towards P&G, Mega Insurance, CISF expenditure etc., during the period 2014-19, as sought by the Petitioner, in this petition.

    Other Additional Claims

    (A) Interest & Contribution on Sinking Fund (As per Section 40, Part IV of DVC Act)

    118. The Petitioner has claimed additional expenditure towards Interest & Contribution on Sinking fund as follows:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Total Contribution and Interest for Debt Borrowing 152.77 163.47 174.91 187.15 200.25
    MTPS5&6 12.22 13.08 13.99 14.97 16.02
    CTPS 7&8 22.18 23.73 25.39 27.17 29.07
    MTPS 7&8 20.99 22.46 24.04 25.72 27.52
    DSTPS 43.37 46.40 49.65 53.13 56.85
    KTPS 47.26 50.57 54.11 57.90 61.95
    RTPS-I 6.75 7.22 7.73 8.27 8.85
    BTPS-A - - - - -
    Total 152.77 163.47 174.91 187.15 200.25

    120. In justification of the claim, the Petitioner has submitted that APTEL vide its judgment dated 23.11.2007 in Appeal No. 273 of 2006 & batch, had allowed the recovery of sinking funds and this judgment has also been affirmed by the Hon'ble Supreme Court vide its by judgement dated 23.7.2018 in Civil Appeal Nos. 971-973 of Order in Petition No. 575/GT/2020 Page 76 of 176

    76

    2008 & batch matters.

    121. The Objector, DVPCA has also submitted that under the 2014 Tariff Regulations, the Petitioner is allowed all expenses related to energy charges and fixed charges and also allows the funding of approved capital cost and interest/ returns on the debt/ equity components `on actual / normative basis, as the case may be. It has further submitted that the loan repayment is provided through higher depreciation for initial 12 years and interest on working capital is allowed on normative basis. The Objector has stated that the creation of funds, without any specific purpose, cannot be allowed to be recovered as an expenditure in tariff, even if it is mentioned in DVC Act and the 2014 Tariff Regulations. It also submitted that the Commission may seek details on the purpose of borrowing such funds, when all expenses related to capital funding and working capital funding are allowed. Accordingly, the Objector has prayed that the claim of the Petitioner may be disallowed. In response, the Petitioner has reiterated the submissions made in the petition. Further, it has also relied upon the APTEL's judgment dated 17.5.2019 in Appeal No.17/2014 & batch (Maithon Alloys Ltd V CERC & Ors) and submitted that, APTEL while rejecting the submissions, observed that there was no double allowance of bonds. The Petitioner also pointed out that the Objector herein has preferred review (Review Petition No. 4 of 2019) against the judgment dated 17.5.2019, before APTEL and the same is pending and since there is no stay of operation of the said order the same is binding on the parties. Accordingly, the Petitioner has prayed that the submissions of the Objector may be rejected.

    122. The matter has been examined. Section 40 of the DVC Act, 1948 provides that the Petitioner shall make provision for depreciation and for reserve and other funds at such rates and on such terms as may be specified by the C&AG in consultation with Order in Petition No. 575/GT/2020 Page 77 of 176

    77

    the Central Government. The APTEL in its judgment dated 23.11.2007 in Appeal No. 271/ 2006 & batch cases, decided as under:

    "E.15 As regards sinking funds which is established with the approval of Comptroller and Accountant General of India vide letter dated December 29, 1992 under the provision of Section 40 of the DVC Act is to be taken as an item of expenditure to be recovered through tariff,

    123. Regulation 53(2)(iv) of the 2014 Tariff Regulations provides as under:

    (iv) Funds under section 40 of the Damodar Valley Corporation Act, 1948: The Fund(s) established in terms of section 40 of the Damodar Valley Corporation Act,1948 shall be considered as items of expenditure to be recovered through tariff.

    124. DVPCA has objected to the claim of the Petitioner and has submitted that neither the provisions of the Electricity Act, 2003 nor the 2014 Tariff Regulations sanction the recovery of cost of generation assets twice over, through (a) allowance of Contribution to Sinking Fund; and (b) Depreciation and allowance of Interest on loan, by treating the amount realized through bonds, as normative debt. Per contra, the Petitioner has, however pointed out that in Appeal No.17/2014 (MAL v CERC & ors.) & batch cases, filed by HT consumers before APTEL, similar submissions raised by the appellants therein, were rejected by APTEL vide its judgment dated 17.5.2019. It is noticed from the said judgment dated 17.5.2019 that similar contention of the Objector herein, have been rejected by APTEL vide its judgement dated 17.5.2019 as under:

    "8.5 We have carefully considered the submissions of learned counsel for the Appellants and learned counsel for Respondent Nos.1 & 2 and also took note of the various judgments relied upon by the parties. While the main contentions of the learned counsel for the Appellants are against the allowance of contribution to sinking fund to DVC and its utilisation, on the other hand, leaned counsel for the Respondents contend that the Central Commission is allowing the same as per settled position of law and its relevant regulations relating to the subject. Learned counsel for the Appellants contended that this Tribunal did not lay down that DVC could be allowed with both interest on loan as well as contribution to sinking fund which tantamount to a particular cost component being allowed twice to a generating company.

    8.6. It is relevant to note that as per Section 40 of DVC Act, 1948, DVC is entitled for provision for depreciation, reserve and other fund. This Tribunal in its judgment dated 23.11.2007 in Appeal No.271 of 2006 & batch has held Order in Petition No. 575/GT/2020 Page 78 of 176

    78

    the admissibility of sinking fund in favour of DVC which has also been upheld by the Hon'ble Supreme Court in its judgment dated 23.7.2018 reported as 2018 (8) SCC 281. Regarding the contention of alleged double counting of learned counsel for the Appellant, we find no such duplication in the considerations and findings of the Central Commission.

    8.7 Further, from the Tariff Regulation of the Central Commission, it is noticed that interest on loan and interest on working capital are distinct elements of the tariff and at no point of time, the repayment of loan capital is considered as a tariff element to be serviced in the tariff. The redemption of bonds from contribution to sinking fund is a special tariff element provided for DVC under Section 40 of the DVC Act, 1948 in addition to tariff elements provided in the Tariff Regulations. This aspect has already been upheld by the Apex court vide its judgment dated 23.7.2018 (stated supra). It is also noted from the tariff regulations that depreciation and interest on loan payable are two different aspects while sinking fund contribution is an additional tariff element admissible only to DVC under the DVC Act. We, therefore, find no force in the contentions of the learned counsel for the Appellants that by allowing depreciation, interests on loan and sinking fund altogether, results into double counting and in turn yields into undue burden on consumers.

    8.8 In view of above facts, we hold that the Central Commission has passed the impugned order in accordance with settled position of law and its Regulations. Thus, the instant case does not give in any manner rise to substantial question of law requiring our intervention / interference"

    125. Though the Objector DVPCA, has filed review against the said judgment before APTEL, no stay of operation of the said judgement. Regulation 53(2)(iv) of the 2014 Tariff Regulations categorically provides that the funds created under Section 40 of the DVC Act, 1948 shall be considered as item of expenditure to be recovered through tariff. It is observed that the sinking funds have been created only for redemption of bonds. Accordingly, the amount claimed by the Petitioner for this generating station is allowed as under:

    (Rs. in lakh) 2016-17 2017-18 2018-19

    3181.47 827.10 885.00

    (B) Share of Common Office Expenditure

    126. The Petitioner has submitted that the expenditure pertaining to common offices such as Direction Office, Central Office, Other Offices, Subsidiary activities, IT centre and R&D caters services to all generating stations as well as composite transmission and distribution systems. In this regard, it is noted that the Petitioner vide affidavit Order in Petition No. 575/GT/2020 Page 79 of 176

    79

    dated 9.9.2022 in Petition No. 567/GT/2020 (DTPS 3 & 4) has updated the additional capital expenditure pertaining to common offices. The revised additional capital expenditure claimed by the Petitioner towards various offices under Common offices is summarised as below:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Central Office 50.86 94.73 43.26 1,263.95 393.86
    R & D 2.72 38.31 0.00 (-)550.49 0.00
    Direction Office 26.85 9.17 68.62 50.07 (-)255.83
    Subsidiary Activities 0.20 1.66 7.37 3.29 0.13
    IT Cell 37.69 0.00 0.00 0.00 185.62
    Other Offices 1.49 30.17 44.63 406.40 62.70
    Total 119.82 174.04 163.88 1173.22 386.48

    127. The head-wise additional capital expenditure claimed by the Petitioner towards common offices is summarised as below:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Land and Land Rights 2.72 0.00 0.00 508.33 70.80
    Buildings 1.49 38.31 0.00 34.91 130.47
    Powerhouse 0.00 0.00 38.84 0.00 5.42
    Sub Station equipment 0.00 8.01 1.15 431.94 52.08
    Other assets, Office Furniture and Personal computer 77.91 128.60 124.77 198.34 29.09
    Cyber Security 0.00 0.00 0.00 0.00 97.85
    EBA 37.69 0.00 0.00 0.00 0.00
    Machinery & equipment 0.00 (-)0.88 (-)0.88 (-)0.01 0.00
    Tower Pole & Fixtures 0.00 0.00 0.00 (-)0.28 0.00
    Assets Held for Disposal 0.00 0.00 0.00 0.00 0.76
    Total 119.82 174.04 163.88 1173.23 386.48

    128. The Petitioner has computed the Return on Equity, Interest on Loan and Depreciation on the Common Assets for the period 2014-19 based on the opening capital cost as on 1.4.2014 for different offices and has apportioned them to each generating stations and T&D system in proportion to the capital cost approved as on 31.3.2014. Further, the Petitioner has allocated the cost of common offices among generating stations of the Petitioner on the basis of installed capacity. The annual fixed charges claimed towards assets of common offices are as under:

    Order in Petition No. 575/GT/2020 Page 80 of 176

    80

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Direction Office 146.09 85.91 107.01 128.92 68.70
    Subsidiary Activities 113.33 113.94 114.21 114.52 114.92
    Other Offices 129.97 132.58 115.82 171.39 207.12
    R&D 319.84 315.43 308.45 248.10 190.53
    IT 43.87 46.34 44.98 43.46 58.84
    Central Office 570.62 562.94 561.83 645.87 771.37
    Total 1323.73 1257.14 1252.29 1352.25 1411.48
    2014-15 2015-16 2016-17 2017-18 2018-19
    Common Office Expenditure apportioned to all generating Stations of DVC 1218.63 1157.33 1152.86 1244.88 1299.41
    Common Office Expenditure apportioned to T&D 105.10 99.82 99.43 107.37 112.07
    Total 1323.73 1257.14 1252.29 1352.25 1411.48

    129. In line with the above, the Petitioner has claimed the apportioned common office expenses for this generating station as under.

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Common Office Expenditure apportioned to RTPS- I 185.93 201.34 215.45

    130. The matter has been considered. It is observed that the Petitioner's claim for common office expenditure is in line with the Commission's methodology and decision in the previous tariff orders in respect of the generating stations of the Petitioner. Accordingly, in order to work out the common office expenditure, to be allowed, we have examined the additional capital expenditure claimed by the Petitioner, as under:

    Land and Land Rights

    131. The Petitioner has claimed additional capital expenditure of Rs.2.72 lakh in 2014-15 and (-) Rs.550.49 lakh in 2017-18 in R&D Centre; & Rs.1058.82 lakh in 2017- 18 and Rs.70.80 lakh in 2018-19 for Central Office, under this head. However, the Petitioner has not furnished any justification for the same. In response to ROP for the hearing dated 10.8.2022 in Petition No. 567/GT/2020 (DTPS 3 & 4), the Petitioner has submitted that these expenses were incurred for transfer of land from R & D to Order in Petition No. 575/GT/2020 Page 81 of 176

    81

    Central Office as per the Govt. of West Bengal (change in the type of land from educational to business), capitalization of land in Ranchi and Kolkata, decapitalization of asset from R&D etc., considering the nature of expenses, the expenditure claimed as additional capitalization and decapitalization is allowed under the 2014 Tariff Regulations.

    Buildings

    132. The Petitioner has claimed total additional capital expenditure of Rs.165.38 lakh during 2017-19 (i.e., Rs 34.91 lakh in 2017-18 and Rs.130.47 lakh in 2018-19) for Central Office; Also, an amount of Rs.1.49 lakh in 2014-15 has been claimed for Other Offices [including Central Relay & Instrumentation Testing Laboratory (CRITL), CMFS, Central Relay & Instrumentation Testing Mobile (CRITM), Central Service Organization (CSO) and Central Load Despatch (CLD)]; and Rs.38.31 lakh in 2015-16 for R&D Centre under this head. The Petitioner vide its affidavit dated 9.9.2022 in revised submissions mentioned that Rs.165.38 lakh pertains to transfer of asset from DAM to central office, stamp paper & registration of a property in Delhi: Rs. 38.31 lakh pertains to expansion of R & D building and Rs.1.49 lakh towards extension of Central Testing Laboratory building; Considering the nature of expenses, the claimed expenditure as additional capitalization is allowed under the 2014 Tariff Regulations.

    Powerhouse Plant & Machinery

    133. The Petitioner has claimed additional capital expenditure of Rs.38.84 lakh in 2016-17 and Rs.5.42 lakh in 2018-19 for Direction Office, towards installation of Rooftop solar power plant at DVC Head Quarters for consumption of solar power for own usage. It is observed that the Petitioner has not justified the need for the work being undertaken and as to how the same would benefit the operations of the Petitioner in general and generating stations in particular. Accordingly, the additional Order in Petition No. 575/GT/2020 Page 82 of 176

    82

    capital expenditure of Rs.38.84 lakh in 2016-17 and Rs.5.42 lakh in 2018-19 for Direction Office is not allowed.

    Machinery & Equipment- Workshop

    134. The Petitioner has claimed an additional capital expenditure of (-) Rs.0.88 lakh in 2015-16, (-) Rs.0.88 lakh in 2016-17 and (-) Rs. 0.01 lakh in 2017-18 in Other Offices [including Central Relay & Instrumentation Testing Laboratory (CRITL), CMFS, Central Relay & Instrumentation Testing Mobile (CRITM), Central Service Organization (CSO) and Central Load Despatch (CLD)], as rectification entry under this head. In view of this, the claims are allowed.

    Sub-Station Equipment

    135. The Petitioner has claimed additional capital expenditure of Rs.8.01 lakh in 2015-16, Rs.1.15 lakh in 2016-17, Rs. 431.94 lakh in 2017-18 and Rs. 52.08 lakh in 2018-19 for Other Offices [including Central Relay & Instrumentation Testing Laboratory (CRITL), CMFS, Central Relay & Instrumentation Testing Mobile (CRITM), Central Service Organization (CSO) and Central Load Despatch (CLD)] and (-) Rs.5.70 lakh in 2017-18 for Direction Office under this head. As regards additional capital expenditure pertaining to Other Offices, the Petitioner has submitted that the expenditure was incurred to upgrade and equip the existing relay testing laboratory for accreditation by the National Accreditation Board for Testing and Calibration. As the additional capital expenditure incurred for NABL accreditation is not covered under the provisions of the 2014 Tariff Regulations, the additional capitalization and decapitalization claimed are not allowed.

    Tower Poles & Fixatures

    136. The Petitioner has claimed additional capital expenditure of (-) Rs.0.28 lakh in Order in Petition No. 575/GT/2020 Page 83 of 176

    83

    2017-18 for Other Offices [including Central Relay & Instrumentation Testing Laboratory (CRITL), CMFS, Central Relay & Instrumentation Testing Mobile (CRITM), Central Service Organization (CSO) and Central Load Despatch (CLD)] under this head as a rectification entry. Accordingly, the same is allowed.

    Cyber Security Devices

    137. The Petitioner has claimed additional capital expenditure of Rs.97.85 lakh in 2018-19 for IT Cell-HQ towards strengthening the IT Cell to safeguard the IT equipment against any cyber threat, with the overall aim to protect data, and network secrecy to ensure smooth functioning of the system. The Petitioner has submitted that the said work is in compliance to the directives of the Ministry of Power (MOP), Government of India (GOI) dated 12.4.2010 and 2.8.2017, with regard to the steps to be taken to prevent cyber-attacks. As the work is in compliance to the directives of MOP, GOI to prevent cyber-attacks, the additional capital expenditure of Rs.97.85 lakh claimed towards procurement of cyber security devices for the period 2014-19 is allowed.

    EBA- Integrated Software

    138. The Petitioner has claimed additional capital expenditure of Rs.37.69 lakh in 2014-15 for IT Cell-HQ for supporting system of the integrated software used to facilitate various functions including material management, finance & accounting. It is noticed that the said work is related to ERP implementation at Head Office and hence, the additional capital expenditure claimed under this head is allowed.

    Other Assets, Office Furniture and Personal Computers

    139. The Petitioner has claimed following additional capital expenditure under the head 'Other Assets', 'Office Furniture' and 'Personal computer' towards procurement Order in Petition No. 575/GT/2020 Page 84 of 176

    84

    of like personal computer, software, hardware, office equipment etc.

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Direction Office 26.85 9.17 29.77 55.79 (-)291.94
    Subsidiary Activities 0.20 1.66 7.37 3.29 0.13
    Other Offices 0.00 23.04 44.36 (-)30.96 10.62
    R&D 0.00 0.00 0.00 0.00 0.00
    IT 0.00 0.00 0.00 0.00 87.77
    Central Office 50.86 94.73 43.26 170.21 222.52
    Total 77.91 128.60 124.77 198.34 29.09

    140. In justification for the same, the Petitioner has submitted that to fulfil the demand of valley area as well as other state utilities and distribution licensees, these items had to be additionally procured for capacity addition during the period 2016-19. The Petitioner has also submitted that the expenditure was essential to cope up with the extra volume of works associated with the huge capacity augmentation program taken up by the Petitioner and for smooth functioning of the offices. Considering the nature of these items, the additional capitalization and decapitalization is not allowed, in terms of first proviso to Regulation 14(3) of the 2014 Tariff Regulations.

    Assets Held for Disposal

    141. The Petitioner has claimed total amount of Rs. 0.76 lakh (negative entry of Rs.

    29.93 lakh in Central office and positive entry of Rs. 30.68 lakh in Direction office) under Asset held for disposal, but has however, not furnished any justification for the same. Accordingly, the additional capitalization and decapitalization under subject head is not allowed.

    142. Accordingly, the item-wise additional capital expenditure allowed towards various offices is summarised below:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Land and Land Rights 2.72 0.00 0.00 508.33 70.80
    Buildings 1.49 38.31 0.00 34.91 130.47
    Road Culverts & Rly. Sidings 0.00 0.00 0.00 (-)0.01 0.00
    Power House Plant & Machinery 0.00 0.00 0.00 0.00 0.00

    Order in Petition No. 575/GT/2020 Page 85 of 176

    85

    2014-15 2015-16 2016-17 2017-18 2018-19
    Machinery & Equipment-Workshop 0.00 (-)0.88 (-)0.88 (-)0.01 0.00
    Sub Station Equipment 0.00 0.00 0.00 0.00 0.00
    Tower Poles & Fixtures 0.00 0.00 0.00 -0.28 0.00
    Cyber Security Assets 0.00 0.00 0.00 0.00 97.85
    EBA - Integrated Software 37.69 0.00 0.00 0.00 0.00
    Other Assets 0.00 0.00 0.00 0.00 0.00
    Assets Held for Disposal 0.00 0.00 0.00 0.00 0.00
    Total 41.90 37.43 (-)0.88 542.94 299.13

    143. Based on the above, the additional capitalization allowed for various offices under common offices during the period 2014-19 is summarised as under:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Direction Office 0.00 0.00 0.00 (-)0.01 0.00
    Subsidiary Activities 0.00 0.00 0.00 0.00 0.00
    Other Offices 1.49 (-)0.88 (-)0.88 (-)0.29 0.00
    R&D 2.72 38.31 0.00 (-)550.49 0.00
    IT 37.69 0.00 0.00 0.00 97.85
    Central Office 0.00 0.00 0.00 1093.73 201.27
    Total 41.90 37.43 (-)0.88 542.94 299.13

    144. It is observed that the Petitioner has worked out ROE by grossing up the rate of ROE with MAT rate. However, as the Petitioner has not been paying any income tax in any of the financial year of period 2014-19, 'Nil' rate has been considered as effective tax rate for respective financial year for the purpose of grossing up of ROE in terms of the provisions of the 2014 Tariff Regulations and the rate of ROE is considered as 15.50% for the period 2014-19. The annual fixed charges for Common offices have been worked out by considering the admitted opening capital cost as on 1.4.2014. The annual fixed charges of Common Offices, as worked out for the period 2014-19, have been apportioned to generating stations / T&D systems, based on the approved capital cost as on 31.3.2014. Accordingly, in line with the decision of the Commission order dated 29.7.2016 in Petition No. 465/GT/2014, the fixed charges have been computed and has been allocated to various generating stations as under:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19
    Depreciation 471.40 407.64 343.93 348.25 368.72

    Order in Petition No. 575/GT/2020 Page 86 of 176

    86

    2014-15 2015-16 2016-17 2017-18 2018-19
    Interest on Loan 140.86 111.83 99.77 67.56 58.18
    Return on Equity 548.59 550.43 551.28 563.88 583.46
    Total 1160.85 1069.90 994.98 979.69 1010.37
    Capital Cost as on 1.4.2014 2014-15 2015-16 2016-17 2017-18 2018-19
    All DVC Generating Stations 2036943.91 1068.68 984.95 915.98 901.90 930.14
    T&D 175678.95 92.17 84.95 79.00 77.79 80.22
    Total 2212622.86 1160.85 1069.90 994.98 979.69 1010.37

    145. As regards the Common office expenditure for the generating station, it is further observed that the Commission vide Order dated 3.10.2016 in Petition No. 207/GT/2015 has observed as under:

    "61. The petitioner has claimed the projected expenditure of Rs. 208.76 lakh during 2014-15, Rs. 194.64 lakh during 2015-16, Rs. 248.00 lakh during 2016-17, Rs. 363.90 lakh during 2017-18 and Rs. 412.33 lakh during 2018-19 and apportioned to Mejia 7&8 towards Common Office Expenditure which includes expenditure on Direction Office, Central Office, Other Offices, subsidiary activities, IT and R&D. The apportioned amount of share of Common Office expenditure includes return on equity, depreciation and interest on loan on the Common assets. The generating station is a new 1000 MW station for which normative O&M as specified under the 2014 Tariff Regulation, includes Corporate Office expenses also and under Corporate Office expenses, depreciation and interest on loan has also been included. Accordingly, the normative O&M expense for 500 MW unit size as allowed to the generating station includes the expenditure for Common Offices in respect of depreciation and interest on loan. As per special provisions relating to DVC generating stations specified under the Regulation 53 of 2014 Tariff Regulations and also as per the order of Tribunal dated 27.11.2007 in Appeal no 273/2006, the Common Office expenditure are to be allowed for the purpose of determination of tariff. The petitioner has furnished the details of total "Office Expenditure" in respect of the generating stations and T&D systems are as under:

    xxx

    The Commission has considered the O&M norms for this generating station as specified for 500 MW units including the expenditure for Common Offices in respect of depreciation and interest on loan. Therefore, only return on equity has been allowed as computed in the above table. Accordingly, return on equity of Rs. 87.01 lakh in 2014-15, Rs. 93.07 lakh in 2015-16, Rs. 115.68 lakh in 2016-17, Rs. 154.82 lakh in 2017-18 and Rs. 175.65 lakh in 2018-19 is allowed as part of share of Common office expenditure and annual fixed charges for the generating station."

    146. The Commission has considered the O&M expense norms for this generating station, as specified for 500 MW and above units, including the expenditure for Order in Petition No. 575/GT/2020 Page 87 of 176

    87

    Common offices in respect of depreciation and interest on loan. Therefore, only ROE has been allowed as computed in the above table. Accordingly, Share of Common office expense computed for RTPS (this generating station) is as under:

    (Rs. in lakh)

    2014-15 2015-16 2016-17 2017-18 2018-19

    Total Common Office 1068.68 984.95 915.98 901.90 930.14 Expenditure for generating

    stations (A)

    Total Common Office 92.17 84.95 79.00 77.79 80.22 Expenditure for T&D (B)

    Total Common Office 1160.85 1069.90 994.98 979.69 1010.37 Expenditure for generating

    stations and T&D C=(A+B)

    Total Depreciation for 471.40 407.64 343.93 348.25 368.72 generating stations and T&D

    (D)

    Total Interest on loan for 140.86 111.83 99.77 67.56 58.18 generating stations and T&D

    (E)

    Total Return on equity on for 548.59 550.43 551.28 563.88 583.46 generating stations and T&D

    (F)

    Total of Depreciation, Interest 1160.85 1069.90 994.98 979.69 1010.37 on Loan and ROE of

    Generating Station and T&D

    (G)

    Return on equity 505.03 506.73 507.51 519.11 537.14 corresponding to the

    generating stations only

    (A/C) *F (H)

    Apportionment of the 0.00 0.00 147.73 145.87 154.23 common office expenditure

    as claimed to the generating

    station including

    depreciation, interest on loan

    and ROE.(I)

    Apportioned amount of only 0.00 0.00 81.85 83.96 89.06

    "Return on Equity"

    corresponding to the generating station (I/A)xH (J)

    (Rs. in lakh)

    Common Office Expenditure 2016-17 2017-18 2018-19

    RTPS Phase1 U 1&2

    81.85 83.96 89.06

    (this generating station)

    147. Accordingly, the annual fixed charges approved for the generating station for the period 2016-19 is summarized below:

    Order in Petition No. 575/GT/2020 Page 88 of 176

    88

    (Rs. in lakh)

    2016-17 2017-18 2018-19
    Depreciation 39638.37 40322.07 40687.92
    Interest on loan 38661.33 32034.57 27683.16
    Return on Equity 24316.33 24728.22 24990.45
    Interest on Working Capital 11210.58 11346.11 11345.43
    O&M Expenses 19524.00 20760.00 22056.00
    Water Charges 292.66 332.62 404.72
    Compensation Allowance 0.00 0.00 0.00
    Sub-Total (A) 133643.28 129523.60 127167.68
    Additional O&M Expenses
    Impact of Pay Revision 0.00 0.00 0.00
    Impact of GST 0.00 0.00 0.00
    Share of Pension & Gratuity Contribution 0.00 0.00 0.00
    Share of Subsidiary Activities 685.27 659.40 465.72
    Mega Insurance Expenses 0.00 0.00 0.00
    CISF Security Expenses 0.00 0.00 0.00
    Interest & Contribution on Sinking Fund (As per section 40, Part IV of DVC Act) 3181.47 827.10 885.00
    Share of Common Office Expenses 81.85 83.96 89.06
    Sub-Total (B) 3948.59 1570.46 1439.78
    Total Annual Fixed Charges (C) = (A) + (B) 137591.86 131094.05 128607.46
    Annual fixed charges allowed vide order dated 28.9.2017 in Petition No. 224/GT/2015 138443.65 139837.31 139554.82

    Note: (1) All figures are on annualized basis. (2) All figures under each head have been rounded.

    The figure in total column in each year is also rounded. As such the sum of individual items may

    not be equal to the arithmetic total of the column

    148. The difference between the annual fixed charges already recovered by the Petitioner and the annual fixed charges determined by this order, shall be adjusted in terms of the provisions of Regulation 8(13) of the 2014 Tariff Regulations.

    DETERMINATION OF TARIFF FOR PERIOD 2019-24

    149. The Petitioner, in this present petition, has also sought the determination of tariff of the generating station for the period 2019-24, in terms of the 2019 Tariff Regulations. Accordingly, the capital cost and the annual fixed charges claimed by the Petitioner for the period 2019-24 are as under:

    Capital Cost claimed (Rs. In lakh)

    Order in Petition No. 575/GT/2020 Page 89 of 176

    89

    Particulars 2019-20 2020-21 2021-22 2022-23 2023-24
    Opening Capital Cost (A) 559251.74 642323.72 656459.47 657339.10 657552.74
    Add: Addition during the year / period (B) 83131.75 14820.33 1704.11 311.58 721.73
    Less: De-capitalization during the year / period (C) 59.77 684.58 824.47 97.94 77.14
    Less: Reversal during the year / period (D) 0.00 0.00 0.00 0.00 0.00
    Less: Undischarged liabilities (E) 0.00 0.00 0.00 0.00 0.00
    Add: Discharges during the year / period (F) 0.00 0.00 0.00 0.00 0.00
    Closing Capital Cost (G) = (A+B-C-D-E+F) 642323.72 656459.47 657339.10 657552.74 658197.33
    Average Capital Cost (H) = (A+G)/2 600787.73 649391.59 656899.28 657445.92 657875.04

    Annual Fixed Charges claimed (Rs. In

    lakh)

    Particulars 2019-20 2020-21 2021-22 2022-23 2023-24
    Depreciation 45484.71 49164.43 49732.83 49774.21 49806.70
    Interest on Loan 27475.27 26137.81 21699.44 16733.98 11747.28
    Return on Equity1 35603.75 38475.94 38918.14 38949.91 38975.22
    Interest on Working Capital 9413.21 9543.05 9559.03 9555.46 9573.81
    O & M Expenses 24312.00 25164.00 26052.00 26964.00 27912.00
    Water Charges 3336.58 3660.22 4026.24 4428.86 4885.09
    Security Expenses 2356.69 2470.33 2589.45 2714.32 2845.20
    Sub-total: A 147982.21 154615.78 152577.14 149120.74 145745.31
    DVC's share of savings in interest cost due to loan restructuring 1691.75 1528.88 1191.38 845.07 527.15
    Interest & Contribution on Sinking Fund (As per section 40, Part IV of DVC Act) 946.95 1013.23 1084.16 1160.05 1241.25
    Share of P&G 4471.73 4681.93 4902.01 5132.44 5373.70
    Share of Common Office Expenditure 235.98 253.26 256.45 220.55 201.03
    Expenses for Ash Evacuation, Mega Insurance and Subsidiary Activities 602.82 631.89 662.36 694.30 727.78
    Sub-total: B 7949.23 8109.19 8096.37 8052.41 8070.92
    Grand Total (A+B) 155931.44 162724.97 160673.50 157173.15 153816.23

    Capital Cost

    150. Clauses (1), (3) and (5) of Regulation 19 of the 2019 Tariff Regulations provide as under:

    "19. Capital Cost:

    Order in Petition No. 575/GT/2020 Page 90 of 176

    90

    (1) The Capital cost of the generating station or the transmission system, as the case may be, as determined by the Commission after prudence check in accordance with these regulations shall form the basis for determination of tariff for existing and new projects.

    xx

    (3) The Capital cost of an existing project shall include the following:

    (a) Capital cost admitted by the Commission prior to 1.4.2019 duly trued up by excluding liability, if any, as on 1.4.2019;

    (b) Additional capitalization and de-capitalization for the respective year of tariff as determined in accordance with these regulations;

    (c) Capital expenditure on account of renovation and modernisation as admitted by this Commission in accordance with these regulations;

    (d) Capital expenditure on account of ash disposal and utilization including handling and transportation facility;

    (e) Capital expenditure incurred towards railway infrastructure and its augmentation for transportation of coal upto the receiving end of generating station but does not include the transportation cost and any other appurtenant cost paid to the railway; and

    (f) Capital cost incurred or projected to be incurred by a thermal generating station, on account of implementation of the norms under Perform, Achieve and Trade (PAT) scheme of Government of India shall be considered by the Commission subject to sharing of benefits accrued under the PAT scheme with the beneficiaries. xx

    (5) The following shall be excluded from the capital cost of the existing and new projects:

    (a) The assets forming part of the project, but not in use, as declared in the tariff petition;

    (b) De-capitalised Assets after the date of commercial operation on account of replacement or removal on account of obsolescence or shifting from one project to another project:

    Provided that in case replacement of transmission asset is recommended by Regional Power Committee, such asset shall be decapitalised only after its redeployment."

    151. The opening capital cost claimed by the Petitioner, as on 1.4.2019, is Rs.559251.74 lakh. However, the closing capital cost of Rs.541740.79 lakh, as on 31.3.2019, as approved by the Commission, in this order, for the period 2014-19, is considered as the opening capital cost as on 1.4.2019, for the purpose of determination of tariff for the period 2019-24, in accordance with the 2019 Tariff Regulations.

    Additional Capital Expenditure

    152. Clauses (1) and (2) of Regulations 25 and Regulation 26 of the 2019 Tariff Regulations, provides as under:

    Order in Petition No. 575/GT/2020 Page 91 of 176

    91

    "25. Additional Capitalisation within the original scope and after the cut-off date:

    (1) The additional capital expenditure incurred or projected to be incurred in respect of an existing project or a new project on the following counts within the original scope of work and after the cut-off date may be admitted by the Commission, subject to prudence check:

    (a) Liabilities to meet award of arbitration or for compliance of the directions or order of any statutory authority, or order or decree of any court of law;

    (b) Change in law or compliance of any existing law;

    (c) Deferred works relating to ash pond or ash handling system in the original scope of work;

    (d) Liability for works executed prior to the cut-off date;

    (e) Force Majeure events;

    (f) Liability for works admitted by the Commission after the cut-off date to the extent of discharge of such liabilities by actual payments; and

    (g) Raising of ash dyke as a part of ash disposal system.

    (2) In case of replacement of assets deployed under the original scope of the existing project after cut-off date, the additional capitalization may be admitted by the Commission, after making necessary adjustments in the gross fixed assets and the cumulative depreciation, subject to prudence check on the following grounds:

    (a) The useful life of the assets is not commensurate with the useful life of the project and such assets have been fully depreciated in accordance with the provisions of these regulations;

    (b) The replacement of the asset or equipment is necessary on account of change in law or Force Majeure conditions;

    (c) The replacement of such asset or equipment is necessary on account of obsolescence of technology; and

    (d) The replacement of such asset or equipment has otherwise been allowed by the Commission.

    26. Additional Capitalisation beyond the original scope

    (1) The capital expenditure, in respect of existing generating station or the transmission system including communication system, incurred or projected to be incurred on the following counts beyond the original scope, may be admitted by the Commission, subject to prudence check:

    (a) Liabilities to meet award of arbitration or for compliance of order or directions of any statutory authority, or order or decree of any court of law;

    (b) Change in law or compliance of any existing law;

    (c) Force Majeure events;

    (d) Need for higher security and safety of the plant as advised or directed by appropriate Indian Government Instrumentality or statutory authorities responsible for national or internal security;

    (e) Deferred works relating to ash pond or ash handling system in additional to the original scope of work, on case to case basis:

    Order in Petition No. 575/GT/2020 Page 92 of 176

    92

    Provided also that if any expenditure has been claimed under Renovation and Modernisation (R&M) or repairs and maintenance under O&M expenses, the same shall not be claimed under this Regulation;

    (f) Usage of water from sewage treatment plant in thermal generating station.

    (2) In case of de-capitalisation of assets of a generating company or the transmission licensee, as the case may be, the original cost of such asset as on the date of decapitalisation shall be deducted from the value of gross fixed asset and corresponding loan as well as equity shall be deducted from outstanding loan and the equity respectively in the year such de-capitalisation takes place with corresponding adjustments in cumulative depreciation and cumulative repayment of loan, duly taking into consideration the year in which it was capitalised."

    153. The year-wise projected additional capital expenditure claimed by the Petitioner for the period 2019-24 are as under:

    (Rs. In lakh)

    Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
    BOILER AND COAL MILL MAINTENANCE SECTION
    Rotor Assembly for ID fan 25 (2) (a) 73.16 0.00 0.00 0.00 0.00
    Rotor Assembly for FD fan 82.60 0.00 0.00 0.00 0.00
    Rotor Assembly for PA fan 70.80 0.00 0.00 0.00 0.00
    Coupling Assembly for ID fan 19.82 0.00 0.00 0.00 0.00
    Coupling Assembly for FD Fan 16.52 0.00 0.00 0.00 0.00
    Coupling Assembly for PA fan 16.52 0.00 0.00 0.00 0.00
    Sky-Climber 76 & 77 63.96 0.00 0.00 0.00 0.00
    Cup-Lock Scaffolding 206.50 0.00 0.00 0.00 0.00
    Support Bearing 25 (2) (a) 73.16 0.00 0.00 0.00 0.00
    Oil Cooler Complete Assembly for ID Fan 4.96 0.00 0.00 5.90 0.00
    Oil Cooler Complete Assembly for FD Fan 1.68 0.00 0.00 2.36 0.00
    Oil Cooler Complete Assembly for PA Fan 4.32 0.00 0.00 5.19 0.00
    Oil Cooler Complete Assembly for Coal Mill 2.66 0.00 0.00 3.13 0.00
    Modified Liner for Coal Mill (4 Sets) 25 (2) (c) 27.26 0.00 0.00 0.00 0.00
    Modified Vane Wheel Assembly for Coal Mill (4 Sets) 40.47 0.00 0.00 0.00 0.00
    Modified Bowl Extension Ring for Coal Mill (4 Sets) 31.39 0.00 0.00 0.00 0.00
    Tube Bending Machine 76 & 77 6.91 0.00 0.00 0.00 0.00
    Portable Tube Bevelling & Facing Machine for Boiler Tube 2.89 0.00 0.00 0.00 0.00
    LRSB complete assembly 0.00 36.58 0.00 0.00 0.00

    MAINTENANCE SECTION

    Rotor Assembly for ID fan 25 (2) (a) 73.16 0.00 0.00 0.00 0.00 Rotor Assembly for FD fan 82.60 0.00 0.00 0.00 0.00 Rotor Assembly for PA fan 70.80 0.00 0.00 0.00 0.00 Coupling Assembly for ID 19.82 0.00 0.00 0.00 0.00 fan

    Coupling Assembly for FD 16.52 0.00 0.00 0.00 0.00 Fan

    Coupling Assembly for PA 16.52 0.00 0.00 0.00 0.00 fan

    Sky-Climber 76 & 77 63.96 0.00 0.00 0.00 0.00 Cup-Lock Scaffolding 206.50 0.00 0.00 0.00 0.00 Support Bearing 25 (2) (a) 73.16 0.00 0.00 0.00 0.00 Oil Cooler Complete 4.96 0.00 0.00 5.90 0.00 Assembly for ID Fan

    Oil Cooler Complete 1.68 0.00 0.00 2.36 0.00 Assembly for FD Fan

    Oil Cooler Complete 4.32 0.00 0.00 5.19 0.00 Assembly for PA Fan

    Oil Cooler Complete 2.66 0.00 0.00 3.13 0.00 Assembly for Coal Mill

    Modified Liner for Coal Mill 25 (2) (c) 27.26 0.00 0.00 0.00 0.00 (4 Sets)

    Modified Vane Wheel 40.47 0.00 0.00 0.00 0.00 Assembly for Coal Mill (4

    Sets)

    Modified Bowl Extension 31.39 0.00 0.00 0.00 0.00 Ring for Coal Mill (4 Sets)

    Tube Bending Machine 76 & 77 6.91 0.00 0.00 0.00 0.00 Portable Tube Bevelling & 2.89 0.00 0.00 0.00 0.00 Facing Machine for Boiler

    Tube

    LRSB complete assembly 25 (2) (a) 0.00 36.58 0.00 0.00 0.00 Order in Petition No. 575/GT/2020 Page 93 of 176

    93

    Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
    (2 NOS.)
    ERV Isolating Valve (USD) 0.00 66.32 0.00 0.00 0.00
    Penion for APH Drive System 0.00 10.86 0.00 0.00 0.00
    MODIFIED LINER FOR COAL MILL (12 Sets) 25 (2) (c) 0.00 81.89 0.00 0.00 0.00
    Modified Vane Wheel Assembly for Coal Mill (12 Sets) 0.00 121.30 0.00 0.00 0.00
    Modified Bowl Extension Ring for Coal Mill (12 Sets) 0.00 94.40 0.00 0.00 0.00
    Boiler Model 76 & 77 0.00 8.14 0.00 0.00 0.00
    APH Gear Box 25 (2) (a) 0.00 42.48 0.00 0.00 0.00
    Hydraulic Actuation Device for ID fan 0.00 0.00 56.29 0.00 0.00
    HFO Pump 0.00 0.00 41.30 0.00 0.00
    LDO Pump 0.00 0.00 16.52 0.00 0.00
    Complete BCP Motor 0.00 0.00 0.00 0.00 461.73
    SUB-TOTAL 745.57 461.97 114.11 16.58 461.73
    TG & AUXILIARIES SECTION
    EH oil conditioning purifier Machine Model No HNP023 76 & 77 34.70 0.00 0.00 0.00 0.00
    Complete set of Trolley Mounted Oil Centrifuge Model No. MAB 206 S-24 32.30 0.00 0.00 0.00 0.00
    MOP of turbine 25 (2) (a) 46.00 0.00 0.00 0.00 0.00
    Journal bearing & thrust bearing assembly of BFP 30.00 0.00 0.00 0.00 0.00
    CPU Butterfly Valve 25 (2) (a) 0.00 103.00 0.00 0.00 0.00
    Emergency oil, Aux oil, Main oil pump assembly of Boiler Feed Pump Turbine 0.00 50.00 0.00 0.00 0.00
    Journal bearings assembly, Thrust bearings assembly with pads of Booster Pump for Boiler Feed Pump 0.00 68.00 0.00 0.00 0.00
    Butterfly Valves for PHE 0.00 140.00 0.00 0.00 0.00
    Trim Assembly for HP Bypass Valves 0.00 134.50 0.00 0.00 0.00
    Trim Assembly for LP Bypass Valve 0.00 395.00 0.00 0.00 0.00
    Hydraulic Jack and Pump set 76 & 77 0.00 23.60 0.00 0.00 0.00
    Induction heater 0.00 8.25 0.00 0.00 0.00
    Stator Water Pump Assembly 25 (2) (a) 0.00 30.10 0.00 0.00 0.00
    Complete assembly of Vacuum Breaker valve 0.00 35.30 0.00 0.00 0.00
    Condenser Vacuum Pump assembly 0.00 200.00 0.00 0.00 0.00
    SUB-TOTAL: 143.00 1187.75 0.00 0.00 0.00
    C&I SECTION

    Order in Petition No. 575/GT/2020 Page 94 of 176

    94

    Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
    Upgradation of Yokogawa Centum DCS 25 (2) (c) 0.00 625.00 625.00 0.00 0.00
    Upgradation of Emerson DEH system 0.00 110.00 110.00 0.00 0.00
    Upgradation / Modification of Rockwell Turbine protection system (Software & IT product) 0.00 10.00 10.00 0.00 0.00
    Upgradation of LVS Controller (Software & IT product) 0.00 15.00 15.00 0.00 0.00
    Upgradation of GEIP PLC HMI system for MRS 0.00 22.00 0.00 0.00 0.00
    Upgradation of Rockwell PLC system 0.00 35.00 25.00 25.00 0.00
    Upgradation of Schneider PLC system 0.00 0.00 25.00 25.00 0.00
    Upgradation of Siemens PLC system 0.00 0.00 25.00 25.00 0.00
    Electronic modules for DCS/DDCMIS 25 (2) (a) 0.00 40.00 25.00 25.00 25.00
    Electronic modules for PLC 0.00 10.00 20.00 20.00 20.00
    Upgradation of VMS system (Software) 25 (2) (c) 0.00 0.00 0.00 50.00 50.00
    SUB-TOTAL: 0.00 867.00 880.00 170.00 95.00
    COAL HANDLING PLANT
    Pump Complete, Type- SP 71; SR-V-EP-R90-2437761 for Haglund’s drives 25 (2) (a) 0.00 14.55 0.00 0.00 0.00
    Complete Pump, SP 250 SR-V-EP-2430562 for Haglund’s drives 0.00 29.59 0.00 0.00 0.00
    Cooling Water Pump, Model: 125/150 GSN 0.00 0.00 5.00 0.00 0.00
    Fluid Coupling, Model: PST 530 0.00 0.00 15.00 0.00 0.00
    Fluid Coupling, Model: PST 660 0.00 0.00 20.00 0.00 0.00
    Gear Box, Model : CKB 355 0.00 0.00 20.00 0.00 0.00
    Gear Box, Model : CKB 315 0.00 0.00 20.00 0.00 0.00
    Gear Box, Model : CKB 250 0.00 0.00 15.00 0.00 0.00
    Gear Box for Apron Feeder, Model : CKD 630 0.00 0.00 0.00 70.00 0.00
    Fluid Coupling, Model: PST 1000 0.00 0.00 0.00 0.00 30.00
    Gear Box, Model : CSB 450 0.00 0.00 0.00 0.00 30.00
    Gear Box, Model : CSB 400 0.00 0.00 0.00 0.00 30.00
    SUB-TOTAL: 0.00 44.14 95.00 70.00 90.00
    ELECTRICAL
    Different LT Motors for Boiler Area 25 (2) (a) 9.00 0.00 0.00 0.00 0.00
    Complete Actuator set for 57.90 0.00 0.00 0.00 0.00

    Order in Petition No. 575/GT/2020 Page 95 of 176

    95

    Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
    different Electrical areas
    Transformer Oil Filter machine 76 & 77 19.00 0.00 0.00 0.00 0.00
    400 KV CT 25 (2) (a) 18.00 0.00 0.00 0.00 0.00
    400 KV CVT 5.00 0.00 0.00 0.00 0.00
    400 KV & 220 KV LA 14.00 0.00 0.00 0.00 0.00
    Numerical Relays 0.00 90.00 0.00 0.00 0.00
    Complete Circuit Breaker, Isolator and CT for 33 kV switchyard 0.00 25.00 0.00 0.00 0.00
    Replacement of HPSVs/Fluorescents with LED light 0.00 15.00 0.00 0.00 0.00
    ESP retrofitting (HV controller) 0.00 0.00 55.00 0.00 0.00
    SAS upgradation 25 (2) (c) 0.00 0.00 85.00 0.00 0.00
    Kits for measuring DCRM of 400 KV Circuit breaker, for Contact resistance measurement of 400 KV isolators, for measurement of third harmonic leakage current of LA 76 & 77 0.00 0.00 50.00 0.00 0.00
    Energy Meter set 25 (2) (a) 0.00 0.00 4.00 0.00 0.00
    LT Motors 0.00 0.00 20.00 0.00 0.00
    Auxiliary Relays for Switchyard 0.00 0.00 10.00 0.00 0.00
    Retrofitting of Actuator 0.00 0.00 50.00 0.00 0.00
    400 KV Isolator Complete Assembly 0.00 0.00 60.00 0.00 0.00
    DC Batteries for 220 V Battery bank 0.00 0.00 10.00 0.00 0.00
    Replacement of HPSVs/Fluorescents with LED light 25 (2) (c), 76 & 77 0.00 0.00 20.00 0.00 0.00
    Complete 400 KV Circuit Breaker Pole 25 (2) (a) 0.00 0.00 0.00 50.00 0.00
    SEL Goose communication upgradation 25 (2) (c) 0.00 0.00 0.00 0.00 20.00
    Retrofitting of Actuator 25 (2) (a) 0.00 0.00 0.00 0.00 30.00
    Transformer Bushings of transformers for 400 KV Switchyard and Transformer yard 0.00 0.00 0.00 0.00 90.00
    DC Batteries for 220 V Battery bank and 48 V Battery Bank swyd 0.00 0.00 0.00 0.00 5.00
    SUB-TOTAL: 122.90 130.00 364.00 50.00 145.00
    WATER SYSTEM
    Water System - Construction of intake well 25 (1) (e) 1108.82 0.00 0.00 0.00 0.00
    Water System - Intake well electro-mechanical works 25 (1) (e) 0.00 645.00 0.00 0.00 0.00

    Order in Petition No. 575/GT/2020 Page 96 of 176

    96

    Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
    SUB-TOTAL: 1108.82 645.00 0.00 0.00 0.00
    TOWNSHIP AND MISCELLANEOUS CIVIL WORK
    Construction of 'B' type quarters (13 blocks) and 'C' type (G+1) (2 blocks) for CISF Complex at DVC, RTPS 25 (1) (e) 17.48 0.00 0.00 0.00 0.00
    Construction of internal road, area development, drain, compound wall, and other misc works at CISF complex, DVC, RTPS 78.56 0.00 0.00 0.00 0.00
    Construction of 11.2 km Inspection Road along the water corridor route from intake pump house to main plant of RTPS. 115.21 0.00 0.00 0.00 0.00
    Balance construction work of Security Boundary wall at CISF complex, DVC, RTPS 25 (1) (e) 96.76 0.00 0.00 0.00 0.00
    Balance construction work of 5,00,000 ltr capacity overhead water tank, DVC, RTPS 106.20 79.27 0.00 0.00 0.00
    Construction of Mini Market Complex at DVC, RTPS 76 & 77 132.16 134.20 0.00 0.00 0.00
    Repairing of Road at Entry and Exit of Weigh Bridge 4 & 5 at RTPS, DVC 11.30 0.00 0.00 0.00 0.00
    Construction of Drain from Railways Sump Pit to PWS Culvert and Guard Pond N- Pit to PWS Culvert at DVC, RTPS 8.40 0.00 0.00 0.00 0.00
    Construction of perimeter fencing around Permanent Store, DVC, RTPS 26 (1) (d) 28.65 0.00 0.00 0.00 0.00
    Construction of Shed (54 m x 25 m) at open cable yard, RTPS, DVC 76 & 77 102.18 0.00 0.00 0.00 0.00
    Procurement of 2 nos. aqua guard (RO+UV,80 ltr capacity) with cooler for Directors Bungalow and Plant inside Canteen, DVC, RTPS 2.56 0.00 0.00 0.00 0.00
    Strengthening of Outside periphery road 0.00 25.00 2.50 2.50 2.50
    Strengthening of Inside periphery road 0.00 15.00 2.50 2.50 2.50
    SUB-TOTAL: 699.46 253.47 5.00 5.00 5.00
    CONSTRUCTION OF ROAD

    Order in Petition No. 575/GT/2020 Page 97 of 176

    97

    Regulations 2019-20 2020-21 2021-22 2022-23 2023-24
    Strengthening and widening of existing coal transportation WBM road 76 & 77 350.00 220.00 0.00 0.00 0.00
    SUB-TOTAL 350.00 220.00 0.00 0.00 0.00
    LAND
    Land 25 (1) (e) 467.00 0.00 0.00 0.00 0.00
    SUB-TOTAL 467.00 0.00 0.00 0.00 0.00
    RAILWAY
    Railway Infrastructure 25 (1) (e) 69025.00 9148.00 0.00 0.00 0.00
    SUB-TOTAL: 69025.00 9148.00 0.00 0.00 0.00
    ROADS
    Uthala Road Bridge 25 (1) (e) 1937.00 0.00 0.00 0.00 0.00
    Four-Lane Road 6009.00 0.00 0.00 0.00 0.00
    Road Over Bridge (ROB) over State Highway-5 2524.00 1863.00 246.00 0.00 0.00
    SUB-TOTAL 10470.00 1863.00 246.00 0.00 0.00
    Total 83131.75 14820.33 1704.11 311.58 796.73

    154. The Respondent PSPCL submitted that the claims of the Petitioner are not within the original scope of work and are largely predictive in nature, with no administrative or technical basis to validate them. It has submitted that the generating station is a new station and has been in operation for only 4 years out of its useful life of 25 years. The Respondent has sought the reason for the Petitioner not arranging for sufficient spares for ensuring operational reliability and equipment efficiency to its optimum level during the commissioning of the station. It has pointed out that, in addition, the Petitioner has failed to set out the reasons for claiming additional capitalization claimed under Regulations 76 and 77 of the 2019 Tariff Regulations, and has put the onus on the Commission to decide and undertake the analysis of its claims. The Respondent has stated that it is well settled law that the power to relax and power to remove difficulty, are to be exercised in rare cases and not ordinarily. It has also stated that the Petitioner has not presented /cited any extra-ordinary circumstances or events which have led to incur such additional capitalization and hence, the items claimed under additional capitalization in terms of Regulations 76 and Regulation 77 may be disallowed. The Respondent KSEBL has submitted that the Order in Petition No. 575/GT/2020 Page 98 of 176

    98

    claim for additional capital expenditure under Regulation 25, 26, 76 and 77 of the 2019 Tariff Regulations, relate to additional capital expenditure after the cut-off date and beyond the original scope, and therefore, the claim of the Petitioner is not in line with the said regulations and also not properly justified. It has also submitted that the Petitioner's claim under Regulation 76 and 77 of the 2019 Tariff Regulations, can only be invoked under the extra-ordinary circumstances and hence, the claim of the Petitioner may be disallowed.

    155. The Objector, DVPCA has submitted the following:

    a. The Petitioner has made claims of expenditure beyond the cut-off date under Force majeure (FM) without satisfying the condition of Regulation 3 (25) and Regulation 25(1)(e) of the 2019 Tariff Regulations. Force Majeure claims have been made without any documents to establish such impact. The Commission had even examined this issue of delay in previous tariff order dated 28.9.2017 in Petition No. 224/GT/2015 and based on the submissions of Petitioner at that time, had approved additional capitalization. However, it appears that Petitioner has attempted to cover up the delay in execution by claiming under Force Majeure event.

    b. The Petitioner has claimed certain expenditure under Replacement of assets (Regulation 25(2)(a)) for RTPS which has achieved COD in 31.03.2016. The Objector has analyzed the de-capitalisation assets and depreciation thereof proposed by Petitioner and submits that the same is not in line with Regulation 25(2)(a). The Petitioner has depreciated only 40% of the asset as against full depreciation to be eligible for replacement of asset. Also, the replacement value of assets is approximately Rs.3500 lakh as against original cost of Rs.1740 lakh. c. The Petitioner has claimed balance expenditure under Power to relax and Power to remove difficulty which cannot be exercised generally to allow additional capitalisation without any detailed technical justification and documentary evidence.

    156. In response to the above, the Petitioner has clarified that the additional capital expenditure claimed for the period 2019-24 is on the following grounds:

    i. For maintaining the minimum level of defined inventory. Order in Petition No. 575/GT/2020 Page 99 of 176

    99

    ii. Technology obsolescence and upgradation / Pool spares or critical spares;

    iii. Critical Tools for plant to ensure reliable and efficient operation.

    157. Accordingly, the Petitioner has submitted that the additional capital expenditure claimed for the generating station is under Regulations 25 and 26 of the 2019 Tariff Regulations. It has stated that detailed justification and supporting documents have been furnished in Form-9 along with the tariff filing forms. The Petitioner has further submitted that all additional capital expenditures proposed by the Petitioner for the generating station are critical to ensure reliable, safe and efficient operation of the station and are therefore unavoidable. Accordingly, the Petitioner has prayed before this Commission to allow the claimed additional capitalization under Regulations 76 and 77 of the 2019 Tariff Regulations, wherever the same could not be claimed under the Regulations 25(2) and 26 of the 2019 Tariff Regulations.

    158. The matter has been considered. Based on the submissions of the parties and documents on record, and on prudence check, the claim of the Petitioner for additional capital expenditure claimed for the period 2019-24, is examined and allowed as under:

    (Rs. In lakh)

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    BOILER AND COAL MILL MAINTENANCE SECTION

    1 ROTOR 73.16 25 (2) (a) The The Petitioner has 0.00 ASSEMBLY Petitioner claimed the

    FOR ID FAN submitted assets/items under

    2 ROTOR 82.60 25 (2) (a) that, such Regulation 25(2)(a) of 0.00 ASSEMBLY claims are the 2019 Tariff

    FOR FD FAN due to Regulations,

    3 ROTOR 70.80 25 (2) (a) unavailability applicable for the 0.00 ASSEMBLY of Spares. replacement of assets

    FOR PA FAN The same is which have fully

    4 COUPLING 19.82 25 (2) (a) required for depreciated. As the 0.00 ASSEMBLY ensuring items are still not fully

    FOR ID FAN reduction in depreciated, the same

    5 COUPLING 16.52 25 (2) (a) downtime cannot be considered 0.00 ASSEMBLY and under Regulations

    FOR FD FAN improved 25(2)(a) of 2019 Tariff Order in Petition No. 575/GT/2020 Page 100 of 176

    100

    Sr. No. Head of Work / Equipment Claimed Regulations Justification by the Petitioner Reasons for admissibility Amount allowed
    2019-20
    6 COUPLING ASSEMBLY FOR PA FAN 16.52 25 (2) (a) operational reliability. Regulations. In addition, the items claimed are in the nature of spares, which can be considered for capitalization only after the same are put to use. Accordingly, the claim of the Petitioner is not allowed at this stage. 0.00
    7 SKY- CLIMBER 63.96 76 & 77 The Petitioner submitted that the claimed assets/works will be required for inspection of boiler first pass during BTLs and short shutdowns. This will help in safe inspection of the boiler first pass and reduce downtime of the boiler. The assets / items claimed could have been part of the original scope of works. Also, in the absence of these assets, it is not clear as to how the inspection of boiler was being carried out from the date of commissioning of boiler to this date. We therefore, find no merit in the claim of the Petitioner. Also, from the submissions of the Petitioner, we find no reason to allow the claim by invocation of Regulation 76 of the 2019 Tariff Regulations. In view of the above, the claim of the Petitioner is not allowed. 0.00
    8 CUP-LOCK SCAFFOLDIN G 206.50 76 & 77 They are required for complete inspection of boiler first pass during AOH/COD providing complete access to the boiler first pass facilitating inspection and maintenance works. 0.00

    Order in Petition No. 575/GT/2020 Page 101 of 176

    101

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    10 SUPPORT 73.16 25 (2) (a) The The Petitioner has 0.00 BEARING Petitioner claimed the

    11 OIL COOLER 4.96 25 (2) (a) submitted assets/items under 0.00 COMPLETE that the Regulation 25(2)(a) of

    ASSEMBLY works are the 2019 Tariff

    FOR ID FAN claimed due Regulations,

    12 OIL COOLER 1.68 25 (2) (a) to applicable for the 0.00 COMPLETE unavailability replacement of assets ASSEMBLY of Spares, which have fully

    FOR FD FAN where the depreciated. As the

    13 OIL COOLER 4.32 25 (2) (a) existing items are still not fully 0.00 COMPLETE spares are depreciated, the same

    ASSEMBLY expected to cannot be considered

    FOR PA FAN be consumed under Regulations

    14 OIL COOLER 2.66 25 (2) (a) by the time. 25(2)(a) of 2019 Tariff 0.00 COMPLETE Thus, the Regulations. In

    ASSEMBLY same is addition, the items

    FOR COAL required for claimed are in the

    MILL ensuring nature of spares,

    reduction in which can be

    downtime considered for

    and capitalization only

    improved after the same are put

    operational to use. Accordingly,

    reliability the claim of the

    Petitioner is not

    allowed at this stage.

    15 MODIFIED 27.26 25 (2) (c) Technology The Petitioner has 0.00 LINER FOR obsolescenc claimed the

    COAL MILL (4 e. They are assets/items under

    Sets) modified and Regulation 25(2)(c) of

    16 MODIFIED 40.47 25 (2) (c) upgraded the 2019 Tariff 0.00 VANE WHEEL spares as Regulations which are ASSEMBLY per OEM applicable for

    FOR COAL recommenda replacement of assets MILL (4 Sets) tion which on the ground of its

    17 MODIFIED 31.39 25 (2) (c) will enhance obsolescence. It is 0.00 BOWL the operating noticed that the

    EXTENSION performance assets/items claimed

    RING FOR of the Coal are in nature of O & M

    COAL MILL (4 Mills. and in the nature of

    Sets) Accordingly, the

    assets/ items claimed

    are not allowed at this

    stage. However, the

    Petitioner may claim

    the same along with

    supporting document

    under relevant

    regulations, after the

    same are put to use

    Order in Petition No. 575/GT/2020 Page 102 of 176

    102

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    and also to substantiate that it is not part of the O & M expenses.

    18 TUBE 6.91 76 & 77 They will be The expenditure 0.00 BENDING required for claimed is in the MACHINE fabrication of nature of tools and

    19 Portable Tube 2.89 76 & 77 bends of tackles required for 0.00 Beveling & boiler maintenance of the

    Facing pressure plant. Accordingly, we

    Machine for parts and for find no reason to

    Boiler Tube their edge allow the asset/items

    preparation. by invoking the

    They are Regulation 76 of the

    PMT item 2019 Tariff

    which will Regulations. Hence,

    help reduce the claim of the

    inventory and Petitioner is not

    downtime of allowed. . the boiler.

    SUB-TOTAL: 745.57 0.00 TG & AUXILIARIES SECTION

    20 EH oil 34.70 76 & 77 It will be The assets / items 0.00 conditioning used to clean claimed could have purifier the been part of the

    Machine Governing original scope of

    Model No EH oil, which works. Also, in the HNP023 will improve absence of these

    equipment assets, it is not clear

    efficiency as to how the O&M

    21 Complete set 32.30 76 & 77 It will be was being carried out 0.00 of Trolley used to clean from the

    Mounted Oil the TDBFP commissioning to this

    Centrifuge lube oil, date. We therefore,

    Model No. which will find no merit in the

    MAB 206 S-24 improve claim of the Petitioner.

    equipment Also, from the

    efficiency submissions of the

    Petitioner, we find no

    reason to allow the

    claim by invocation of

    Regulation 76 of the

    2019 Tariff

    Regulations. In view

    of the above, the

    claim of the Petitioner

    is not allowed

    22 MOP of turbine 46.00 25 (2) (a) It will The Petitioner has 0.00 improve the claimed the

    shutdown assets/items under

    time of Regulation 25(2)(a) of

    Order in Petition No. 575/GT/2020 Page 103 of 176

    103

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    turbine the 2019 Tariff

    23 Journal 30.00 25 (2) (a) It will Regulations, 0.00 bearing & improve the applicable for the thrust bearing shutdown replacement of assets assembly of time of BFP which have fully BFP thus APC depreciated. As the

    items are still not fully

    depreciated, the same

    cannot be considered

    under Regulations

    25(2)(a) of 2019 Tariff

    Regulations. In

    addition, the items

    claimed are in the

    nature of spares,

    which can be

    considered for

    capitalization only

    after the same are put

    to use. Accordingly,

    the claim of the

    Petitioner is not

    allowed at this stage.

    SUB-TOTAL: 143.00 0.00

    ELECTRICAL

    24 Different LT 9.00 25 (2) (a) Replacement The Petitioner has 0.00 Motors for of Chinese claimed the

    Boiler Area make motor assets/items under

    by Regulation 25(2)(a)

    Indigenous of the 2019 Tariff

    Regulations,

    applicable for the

    25 Complete 57.90 25 (2) (a) Replacement replacement of 0.00 Actuator set of Chinese assets which have

    for different make fully depreciated. As

    Electrical actuators by the items are still not areas Indigenous fully depreciated, the

    for easy same cannot be

    spares considered under

    availability. Regulations 25(2)(a)

    of 2019 Tariff

    Regulations.

    Accordingly, the

    claim of the Petitioner

    is not allowed at this

    stage.

    26 Transformer 19.00 76 & 77 New The assets / items 0.00 Oil Filter procurement claimed could have machine as there is no been part of the Transformer original scope of

    Order in Petition No. 575/GT/2020 Page 104 of 176

    104

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    Oil Filter works. Also, in the machine, it is absence of these required for assets, it is not clear proper as to how the O&M

    maintenance was being carried out of from the

    Transformer. commissioning to this date. We therefore,

    find no merit in the

    claim of the Petitioner.

    Also, from the

    submissions of the

    Petitioner, we find no

    reason to allow the

    claim by invocation of

    Regulation 76 of the

    2019 Tariff

    Regulations. In view

    of the above, the

    claim of the Petitioner

    is not allowed

    27 400 KV CT 18.00 25 (2) (a) The The Petitioner has 0.00 28 400 KV CVT 5.00 25 (2) (a) Petitioner claimed the 0.00 has assets/items under

    submitted Regulation 25(2)(a) of

    that, the the 2019 Tariff

    claims Regulations,

    towards the applicable for the

    29 400 KV & 220 14.00 25 (2) (a) works are the replacement of assets 0.00 KV LA Critical which have fully

    Spares, depreciated. As the

    which is items are still not fully

    required for depreciated, the same

    ensuring cannot be considered

    reduction in under Regulations

    downtime 25(2)(a) of 2019 Tariff

    and Regulations. In

    improved addition, the items

    operational claimed are in the

    reliability. nature of spares,

    which can be

    considered for

    capitalization only

    after the same are put

    to use. Accordingly,

    the claim of the

    Petitioner is not

    allowed at this stage.

    SUB-TOTAL 122.90

    WATER

    SYSTEM

    Order in Petition No. 575/GT/2020 Page 105 of 176

    105

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    30 Water System 1108.82 25 (1) (e) The work is Considering the said 1108.82 - Construction within the works, the

    of intake well original expenditure claimed is

    scope (under allowed under

    Sl. No. 3(iii) Regulation 25(1)(e) of

    of the the 2019 Tariff

    Sanction Regulations,

    Order of However, the

    RTPS dt. Petitioner is directed

    18.10.2017). to furnish the details /

    The left-over documents at the time

    job of M/s of truing up of tariff,

    MBL, the with regard to the

    Construction Force Majeure events

    of Intake claimed in support of

    Well was the same, including

    awarded to the steps taken to

    GPT Infra- mitigate the same.

    projects The Petitioner shall

    Limited in also submit the

    June 2015 breakup of the actual

    with additional capital

    completion expenditure, including

    period of 24 the price variation,

    months and IDC and interest if

    further it was any, paid for the delay

    extended in payment, at the

    upto time of truing up of

    28.2.2020, tariff.

    Work could

    not be

    completed

    within

    original

    contractual

    period due to

    high water

    level in

    Panchet

    Reservoir

    (which was

    under control

    of CWC) and

    due to local

    unrest.

    SUB-TOTAL: 1108.82 1108.82

    TOWNSHIP AND MISCELLANEOUS CIVIL WORKS

    31 Construction of 17.48 25 (1) (e) The work is Considering the said 17.48 'B' type within the works, the

    quarters (13 original expenditure claimed is

    blocks) and 'C' scope (under allowed under

    Order in Petition No. 575/GT/2020 Page 106 of 176

    106

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    type (G+1) (2 Sl. No. 5(4) Regulation 25(1)(e) of blocks) for of the the 2019 Tariff CISF Complex Sanction Regulations, at DVC, RTPS Order of However, the

    32 Construction of 78.56 25 (1) (e) RTPS dt. Petitioner is directed 78.56 internal road, 18.10.2017). to furnish the details / area Work could documents at the time

    development, not be of truing up of tariff,

    drain, completed with regard to the

    compound within Force Majeure events

    wall, and other scheduled claimed in support of

    misc works at time due to the same, including

    CISF complex, local unrest the steps taken to

    DVC, RTPS and land mitigate the same.

    33 Construction of 115.21 25 (1) (e) dispute at The Petitioner shall 115.21

    11.2 km various also submit the Inspection locations. breakup of the actual Road along The work is additional capital the water within the expenditure, including corridor route original the price variation, from intake scope (under IDC and interest if pump house to Sl. No. 5(4) any, paid for the delay main plant of of the in payment, at the RTPS. Sanction time of truing up of

    34 Balance 96.76 25 (1) (e) Order of tariff. 96.76 construction RTPS dt.

    work of 18.10.2017).

    Security Work could

    Boundary wall not complete

    at CISF within

    complex, DVC, scheduled

    RTPS time due to

    35 Balance 106.20 25 (1) (e) local unrest. 106.20 construction

    work of

    5,00,000 ltr

    capacity

    overhead

    water tank,

    DVC, RTPS

    36 Construction of 28.65 26 (1) (d) For safety Considering the 28.65 perimeter /security of nature of subject

    fencing around valuable works, the

    Permanent materials at expenditure claimed is

    Store, DVC, Permanent allowed under

    RTPS Store Regulation 26(1)(d) of

    the 2019 Tariff

    Regulations.

    However, the

    Petitioner is directed

    to furnish supporting

    Order in Petition No. 575/GT/2020 Page 107 of 176

    107

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    documents justifying the claim, at the time of truing up of tariff.

    37 Construction of 132.16 76 & 77 For Considering the 0.00 Mini Market requirement nature of assets, most Complex at of occupants of these could have DVC, RTPS of OD, SD been a part of original

    38 Repairing of 11.30 76 & 77 For smooth scope of works and 0.00 Road at Entry movement of others are in the

    and Exit of coal dumper nature of O & M

    Weigh Bridge due to expenses. In view of

    4 & 5 at RTPS, incomplete this, we find no

    DVC rail link reason to allow the

    39 Construction of 8.40 76 & 77 Incomplete claim by invoking 0.00 Drain from work of TRF Regulation 76 of the

    Railways awarded to 2019 Tariff

    Sump Pit to other agent Regulations.

    PWS Culvert to prevent Therefore, the claims

    and Guard water logging are not allowed.

    Pond N-Pit to in the CHP

    PWS Culvert area

    at DVC, RTPS

    40 Construction of 102.18 76 & 77 To protect 0.00 Shed (54 m x conveyor belt

    25 m) at open from weather

    cable yard, effect

    RTPS, DVC

    41 Procurement 2.56 76 & 77 To provide 0.00 of 2 nos. aqua safe drinking

    guard water at

    (RO+UV,80 ltr Plant inside

    capacity) with canteen and

    cooler for Directors

    Directors Bungalow

    Bungalow and

    Plant inside

    Canteen, DVC,

    RTPS

    SUB-TOTAL: 699.46 442.86

    CONSTRUCTION OF ROAD

    42 Strengthening 350.00 76 & 77 Due to It is noted that the 0.00 and widening incomplete original scope of

    of existing coal rail link, works includes rail link transportation frequent to the plant, which is WBM road dumper yet to be completed.

    movement In order to improve

    needs the coal

    strengthenin transportation, the

    g and Petitioner has

    widening the proposed for widening

    existing coal of existing road. In

    Order in Petition No. 575/GT/2020 Page 108 of 176

    108

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    transportatio this regard, we notice n WBM road that the Petitioner has from new not brought out the Weigh Bridge circumstances and to Track reasons due to which Hopper the rail link has not yet been completed. In

    this context, it is

    noticed that the said

    rail link is proposed to

    be capitalized in this

    year only. After

    completion of the

    same, the widening of

    road would be

    redundant and may

    not yield its full

    potential. Accordingly,

    we are not inclined

    to allow the additional

    capital expenditure on

    alternate

    infrastructure, by

    invoking Regulations

    76 or 77 of the 2019

    Tariff Regulations.

    SUB-TOTAL: 350.00 0.00

    LAND

    43 Land 467.00 25 (1) (e) This It is observed that the 467.00 expenditure Petitioner has claimed

    is towards the expenditure for

    the work land acquisition and

    within the crop compensation

    original under Regulation 25

    scope (under (1)(e) of the 2019

    Sl. No. 1 of Tariff Regulations, for

    the Sanction Force Majeure events.

    Order of However, the nature

    RTPS dt. of the force majeure

    18.10.2017). event/ condition, has

    Expenditure not been mentioned /

    is for Cost of submitted in

    land for justification of the

    acquisition/ same. However,

    direct considering the nature

    purchase/Cro of asset claimed and

    p since it forms part of

    compensatio original scope of

    n. works, the claim is

    allowed under Regulation 25 (1) (e) Order in Petition No. 575/GT/2020 Page 109 of 176

    109

    Sr. No. Head of Work / Equipment Claimed Regulations Justification by the Petitioner Reasons for admissibility Amount allowed
    2019-20
    read with Regulation 76 of the 2019 Tariff Regulations. The Petitioner shall, however, furnish the details of land acquisition / crop compensation and communication/docu ments and the necessary measures taken by it to mitigate the event along with the actual expenditure and interest.
    SUB-TOTAL: 467.00 467.00
    RAILWAY
    44 Railway Infrastructure 69025.00 25 (1) (e) The Petitioner has submitted that the claimed work is within the original scope (under Sl. No. 5(1) of the Sanction Order of RTPS dt. 18.10.2017). Such works towards the railway infrastructure could not be capitalized within the cut-off date due to local unrest as well as non- availability of required land from Govt of WB. Considering the submissions of the Petitioner, the claim for additional capital expenditure is allowed under Regulation 25(1) (e) of the 2019 Tariff Regulations. However, the Petitioner is directed to furnish the details / documents at the time of truing up of tariff, with regard to the Force Majeure events claimed in support of the same, including the steps taken to mitigate the same. 69025.00
    SUB-TOTAL 69025.00 69025.00
    ROADS
    45 Uthala Road Bridge 1937.00 25 (1) (e) The Petitioner It is observed that the Petitioner has claimed 1937.00

    Order in Petition No. 575/GT/2020 Page 110 of 176

    110

    Sr. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2019-20

    46 Four-Lane 6009.00 25 (1) (e) submitted the asset/item for 6009.00 Road that, the various roads and

    47 Road Over 2524.00 25 (1) (e) claimed bridges under 2524.00 Bridge (ROB) works is Regulation 25 (1)(e)

    over State within the of the 2019 Tarif

    Highway-5 original Regulations, towards.

    scope (under Force Majeure events.

    Sl. No. 5(10) However, the

    of the Petitioner has not

    Sanction justified the same

    Order of through documentary

    RTPS dt. evidence. However,

    18.10.2017). considering the nature

    Such works of the assets claimed

    could not be and since the assets

    capitalized form part of the

    within the original scope of

    cut-off date works, the claim is

    due to local allowed under

    interest as Regulation 25 (1) (e)

    well as non- of the 2019 Tariff

    availability of Regulations. The

    required land Petitioner is however

    from govt of directed to furnish the

    WB and details of land

    finalization of acquisition and

    the scheme communication /

    by PWD for documents and the

    ROB over steps taken by it to

    SH5. mitigate the event The

    Petitioner shall also

    submit the breakup

    details of the actual

    additional capital

    expenditure including

    the price variation,

    IDC and interest if

    any, paid for delay in

    payment, at the time

    of truing -up of tariff

    SUB-TOTAL: 10470.00 10470.00 Total amount 83131.75 claimed

    Total amount 81513.68 allowed

    Order in Petition No. 575/GT/2020 Page 111 of 176

    111

    (Rs. in lakh)

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    BOILER AND COAL MILL MAINTENANCE SECTION

    1 LRSB 36.58 25 (2) (a) The The Petitioner has 0.00 COMPLETE Petitioner claimed the

    ASSEMBLY (2 submitted assets/items under NOS.) that the Regulation 25(2)(a) of

    2 ERV 66.32 works are the 2019 Tariff 0.00 ISOLATING claimed due Regulations, which are VALVE (USD) to applicable for

    3 PENION FOR 10.86 unavailability replacement of assets 0.00 APH DRIVE of Spares, which have fully

    SYSTEM where the depreciated. As the

    existing items are still not fully

    spares are depreciated, the same

    expected to cannot be considered

    be consumed under Regulations

    by the time. 25(2)(a) of 2019 Tariff

    Thus, the Regulations. In

    same is addition, the items

    required for claimed are in the

    ensuring nature of spares, which

    reduction in can be considered for

    downtime capitalization only after

    and improved the same are put to

    operational use. Accordingly, the

    reliability. claim of the Petitioner

    is not allowed at this

    stage

    4 MODIFIED 81.89 25 (2) (c) Technology The Petitioner has 0.00 LINER FOR obsolescence claimed the

    COAL MILL . They are assets/items under

    (12 Sets) modified and Regulation 25(2)(c) of upgraded the 2019 Tariff

    5 MODIFIED 121.30 25 (2) (c) spares as per Regulations which are 0.00 VANE WHEEL OEM applicable for

    ASSEMBLY recommendat replacement of assets

    FOR COAL ion which will on the ground of its

    MILL (12 Sets) enhance the obsolescence. It is

    operating noticed that the

    performance assets/items claimed

    of the Coal are in nature of O & M

    6 MODIFIED 94.40 25 (2) (c) Mills. Accordingly, the assets/ 0.00 BOWL items claimed are not

    EXTENSION allowed at this stage. RING FOR However, the Petitioner COAL MILL may claim the same (12 Sets) along with supporting document under

    relevant regulations,

    after the same are put

    to use and also to

    Order in Petition No. 575/GT/2020 Page 112 of 176

    112

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    substantiate that it is not part of the O & M expenses.

    7 Boiler Model 8.14 76 & 77 Replication of The claim for 0.00 the boiler of expenditure for

    RTPS and to education purpose is

    be used as not covered by any

    display and provision of the 2019

    education Tariff Regulations and

    purpose. hence the same shall

    be borne by the

    Petitioner. We also fine

    no reason to allow the

    same in exercise of the

    powers under

    Regulations 76 or 77 to

    consider the claim of

    the Petitioner. Hence,

    the claim of the

    Petitioner is not

    allowed.

    8 APH GEAR 42.48 25 (2) (a) The The Petitioner has BOX Petitioner has claimed the

    submitted assets/items under

    that, the Regulation 25(2)(a) of

    claims the 2019 Tariff

    towards the Regulations, which are

    works are the applicable for

    Critical replacement of assets

    Spares, which have fully

    which is depreciated. As the

    required for items are still not fully ensuring depreciated, the same

    reduction in cannot be considered

    0.00

    downtime under Regulations and improved 25(2)(a) of 2019 Tariff operational Regulations. In reliability. addition, the items claimed are in the

    nature of spares, which

    can be considered for

    capitalization only after the same are put to

    use. Accordingly, the

    claim of the Petitioner

    is not allowed at this

    stage.

    SUB-TOTAL: 461.97 0.00 TG & AUXILIARIES SECTION

    9 CPU Butter Fly 103.00 25 (2) (a) The The Petitioner has 0.00 Valve Petitioner has claimed subject items

    Order in Petition No. 575/GT/2020 Page 113 of 176

    113

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    10 Emergency oil, 50.00 25 (2) (a) submitted under Regulation 0.00 Aux oil, Main that, the 25(2)(a) applicable for oil pump claims the replacement of

    assembly of towards the assets which have fully Boiler Feed works are the depreciated. As the

    Pump Turbine Critical subject items are still

    11 Journal 68.00 25 (2) (a) Spares, not fully depreciated, 0.00 bearings which is the same can't be

    assembly, required for considered under

    Thrust ensuring Regulations 25(2)(a) of

    bearings reduction in 2019, Tariff

    assembly with downtime Regulations. In

    pads of and improved addition, the claimed

    Booster Pump operational items are spares in for Boiler Feed reliability. nature, which can be Pump considered for

    12 BUTTERFLY 140.00 25 (2) (a) capitalization only after 0.00 VALVES FOR the same are put to use

    PHE only. Accordingly, the

    13 TRIM 134.50 25 (2) (a) claim items are not 0.00 ASSEMBLY allowed at this juncture

    FOR HP / stage.

    BYPASS

    VALVES

    14 TRIM 395.00 25 (2) (a) 0.00

    ASSEMBLY

    FOR LP

    BYPASS

    VALVE

    15 Hydraulic Jack 23.60 76 & 77 Reducing downtime 0.00 and Pump set would benefit the

    Petitioner by way of

    increase in availability

    of the project. However,

    16 Induction 8.25 76 & 77 0.00 the same may be met

    heater

    from the incentive so earned. We find no

    merit in exercising the powers under

    Regulation 76 or 77 of the 2019 Tariff

    Regulations, to allow the claim of the

    Petitioner and load the expenditure on

    consumers.

    17 Stator Water 30.10 25 (2) (a) The Petitioner has 0.00 Pump claimed the

    Assembly assets/items under

    Order in Petition No. 575/GT/2020 Page 114 of 176

    114

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    18 Complete 35.30 25 (2) (a) Regulation 25(2)(a) of 0.00 assembly of the 2019 Tariff

    Vacuum Regulations, which are

    Breaker valve applicable for

    replacement of assets

    which have fully

    depreciated. As the

    items are still not fully

    19 Condenser 200.00 25 (2) (a) depreciated, the same 0.00 Vacuum Pump cannot be considered

    assembly under Regulations

    25(2)(a) of 2019 Tariff

    Regulations. In

    addition, the items

    claimed are in the

    nature of spares, which

    can be considered for

    capitalization only after

    the same are put to

    use. Accordingly, the

    claim of the Petitioner

    is not allowed at this

    stage.

    SUB-TOTAL: 1187.75 0.00 C&I SECTION

    20 Upgradation of 625.00 25 (2) (c) The The Petitioner has 0.00 Yokogawa Petitioner has claimed the asserts/ Centum DCS claimed the items under Regulation

    21 Upgradation of 110.00 works due to 25(2)(c) of the 2019 0.00 Emerson DEH Technology Tariff Regulations,

    system Obsolesce. which are applicable for

    22 Upgradation / 10.00 the replacement of 0.00 Modification of assets on the ground of Rockwell obsolescence.

    Turbine However, it is not clear protection as to how

    system obsolescence has

    (Software & IT occurred so early in product) plant life (COD

    23 Upgradation of 15.00 31.3.2016) . The claim 0.00 LVS Controller of the Petitioner is

    (Software & IT therefore not allowed. product) The Petitioner is at

    U2pgradation of 22.00 liberty to claim the 0.00 G4E IP PLC HMI expenditure, if incurred, system for at the time of truing-up

    MRS tariff, along with proper

    25 Upgradation of 35.00 OEM certificates 0.00 Rockwell PLC including the

    system justification as to how

    the obsolete technology

    Order in Petition No. 575/GT/2020 Page 115 of 176

    115

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    was adopted in new station

    26 Electronic 40.00 25 (2) (a) The The Petitioner has 0.00 modules for Petitioner has claimed the

    DCS/DDCMIS submitted assets/items under

    that, the Regulation 25(2)(a) of

    claims the 2019 Tariff

    towards the Regulations, which are

    works are the applicable for

    Critical replacement of assets

    Spares, which have fully

    27 Electronic 10.00 which is depreciated. As the 0.00 modules for required for items are still not fully PLC ensuring depreciated, the same

    reduction in cannot be considered

    downtime under Regulations

    and improved 25(2)(a) of 2019 Tariff

    operational Regulations. In

    reliability addition, the items

    claimed are in the

    nature of spares, which

    can be considered for

    capitalization only after

    the same are put to

    use. Accordingly, the

    claim of the Petitioner

    is not allowed at this

    stage.

    S U B-TOTAL 867.00 0.00

    COAL HANDLING PLANT

    P2ump 14.55 25 (2) (a) The The Petitioner has 0.00 C8o mplete, Petitioner claimed the

    Type- SP 71; submitted assets/items under SR-V-EP-R90- that the Regulation 25(2)(a) of 2437761 for works are the 2019 Tariff Haglund's claimed due Regulations, which are drives to applicable for

    unavailability replacement of assets of Spares, which have fully

    29 Complete 29.59 25 (2) (a) where the depreciated. As the 0.00 Pump, SP 250 existing items are still not fully SR-V-EP- spares are depreciated, the same

    2430562 for expected to cannot be considered Haglund's be consumed under Regulations

    drives by the time. 25(2)(a) of 2019 Tariff

    Thus, the Regulations. In

    same is addition, the items

    required for claimed are in the

    ensuring nature of spares, which

    reduction in can be considered for

    downtime capitalization only after

    Order in Petition No. 575/GT/2020 Page 116 of 176

    116

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    and improved the same are put to operational use. Accordingly, the reliability claim of the Petitioner is not allowed at this

    stage.

    SUB- 44.14 0.00

    TOTAL

    ELECTRICAL SECTION

    N3umerical 90.00 25 (2) (a) The The Petitioner has 0.00 R0e lays Petitioner claimed the

    31 Complete 25.00 25 (2) (a) submitted assets/items under 0.00 Circuit that the Regulation 25(2)(a) of

    Breaker, available the 2019 Tariff

    Isolator and stocks of Regulations, which are CT for 33 kV spares are applicable for

    switchyard expected to replacement of assets be which have fully

    exhausted. depreciated. As the

    Hence, the items are still not fully

    same is depreciated, the same

    required for cannot be considered

    ensuring under Regulations

    reduction in 25(2)(a) of 2019 Tariff

    downtime Regulations. In

    and improved addition, the items

    operational claimed are in the

    reliability nature of spares, which

    can be considered for

    capitalization only after

    the same are put to

    use. Accordingly, the

    claim of the Petitioner

    is not allowed at this

    stage.

    32 Replacement 15.00 25 (2) (a) For low Considering the fact 0.00 of power that the item is in the

    HPSVs/Fluore consumption nature of O&M and

    scents with and better life since the Petitioner has LED light been benefitted in

    terms of the reduced

    auxiliary energy

    consumption, the

    expenditure claimed is

    not allowed. SUB-TOTAL 130.00 0.00

    Order in Petition No. 575/GT/2020 Page 117 of 176

    117

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    WATER SYSTEM

    33 Water System 645.00 25 (1) (e) The work is Considering the said 645.00 - Intake well within the works, the expenditure

    electro- original scope claimed is allowed

    mechanical (under Sl. No. under Regulation works 3(iii) of the 25(1)(e) of the 2019 Sanction Tariff Regulations,

    Order of However, the Petitioner RTPS dt. is directed to furnish 18.10.2017). the details / documents Electro- at the time of truing up mechanical of tariff, with regard to work will be the Force Majeure commenced events claimed in

    after support of the same,

    completion of including the steps construction taken to mitigate the work of intake same. The Petitioner well. shall also submit the

    Construction breakup of the actual work of intake additional capital well could not expenditure, including be completed the price variation, IDC within original and interest if any, paid contractual for the delay in

    period due to payment, at the time of high water truing up of tariff. level in

    Panchet

    Reservoir

    (which was

    under control

    of CWC) and

    due to local

    unrest.

    SUB-TOTAL 645.00 645.00

    TOWNSHIP AND MISCELLANEOUS CIVIL WORK

    34 Balance 79.27 25 (1) (e) The work is Considering the said 79.27 construction within the works, the expenditure work of original scope claimed is allowed

    5,00,000 ltr (under Sl. No. under Regulation capacity 5(4) of the 25(1)(e) of the 2019 overhead Sanction Tariff Regulations, water tank, Order of However, the Petitioner DVC, RTPS RTPS dt. is directed to furnish 18.10.2017). the details / documents Work could at the time of truing up not be of tariff, with regard to completed the Force Majeure

    within events claimed in

    scheduled support of the same,

    Order in Petition No. 575/GT/2020 Page 118 of 176

    118

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    time due to including the steps local unrest. taken to mitigate the same. The Petitioner

    shall also submit the

    breakup of the actual

    additional capital

    expenditure, including

    the price variation, IDC

    and interest if any, paid for the delay in

    payment, at the time of

    truing up of tariff.

    35 Construction of 134.20 76 & 77 For The Petitioner has not 0.00 Mini Market requirement provided any

    Complex at of occupants substantial justification DVC, RTPS of OD, SD for the same. in view of

    this, we are not inclined

    to allow the claim of the

    Petitioner in exercise of

    the powers under

    Regulations 76 or 77 of

    the 2019 Tariff

    Regulations.

    Accordingly, the claim

    of the Petitioner is not

    allowed

    36 Strengthening 25.00 76 & 77 Due to The Petitioner has not 0.00 of Outside incomplete indicated the

    periphery road rail link, circumstances/ reasons frequent on account of which the

    dumper rail link could not be

    movement completed. In the

    needs absence of the

    strengthening information, we are not

    the periphery inclined to allow the

    road claim in exercise of the

    37 Strengthening 15.00 76 & 77 powers under 0.00 of Inside Regulations 76 or 77.

    periphery road Accordingly, the claim of the Petitioner is not

    allowed.

    SUB-TOTAL: 253.47 79.27

    CONSTRUCTION OF ROAD

    S3trengthening 220.00 76 & 77 Due to The Petitioner has not 0.00 a8n d widening incomplete indicated the

    of existing coal rail link, circumstances /

    transportation frequent reasons on account of WBM road dumper which the rail link could

    movement not be completed. In

    needs the absence of the

    strengthening information, we are not

    Order in Petition No. 575/GT/2020 Page 119 of 176

    119

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    and widening inclined to allow the the existing claim in exercise of the coal powers under

    transportation Regulations 76 or 77. WBM road Accordingly, the claim from new of the Petitioner is not

    Weigh Bridge allowed. to Track

    Hopper

    SUB-TOTAL 220.00 0.00

    RAILWAY

    39 Railway 9148.00 25 (1) (e) This is Considering the said 9148.00 Infrastructure balance work works, the expenditure under the claimed is allowed

    original scope under Regulation (under Sl. No. 25(1)(e) of the 2019 5(1) of the Tariff Regulations, Sanction However, the Petitioner Order of is directed to furnish RTPS dt. the details / documents 18.10.2017). at the time of truing up The work for of tariff, with regard to railway the Force Majeure

    infrastructure events claimed in could not be support of the same, capitalized including the steps within the cut- taken to mitigate the off date due same. The Petitioner to local shall also submit the unrest as well breakup of the actual as non- additional capital

    availability of expenditure, including required land the price variation, IDC from govt of and interest if any, paid WB. for the delay in

    payment, at the time of

    truing up of tariff.

    SUB-TOTAL 9148.00 9148.00

    ROADS

    40 Road Over 1863.00 25 (1) (e) The work is The claim of the 1863.00 Bridge (ROB) within the Petitioner is not

    over State original scope covered by Regulation Highway-5 (under Sl. No. 25(1)(e) of the 2019

    5(10) of the Tariff Regulations

    Sanction However, there is delay

    Order of in capitalization of

    RTPS dt. asset due to delay in

    18.10.2017). land acquisition which

    The work is an uncontrollable

    Order in Petition No. 575/GT/2020 Page 120 of 176

    120

    Sl. Head of Work / Claimed Regulations Justification Reasons for Amount No. Equipment by the admissibility allowed

    Petitioner

    2020-21

    could not be factor, provided that the capitalized delay in any way is not within the cut- attributable to the off date due project developer. to non- Keeping in view the availability of submissions of the required land Petitioner, we allow the from govt of expenditure claimed WB and under Regulation 25 (1) finalization of (e) read with the scheme Regulation 76 of the by PWD. 2019 Tariff

    Regulations. The

    Petitioner is directed to

    furnish the details /

    documents at the time

    of truing up of tariff,

    with regard to the Force

    Majeure events claimed

    in support of the same,

    including the steps

    taken to mitigate the

    same.

    SUB-TOTAL 1863.00 1863.00 Total amount 14820.33 claimed

    Total amount allowed 11735.27 (Rs. in lakh)

    Sr. Head of Work / Claimed Regulations Justification Reason for admissibility Amount No. Equipment by the allowed

    Petitioner

    2021-22

    BOILER AND COAL MILL MAINTENANCE SECTION

    1 HYDRAULIC 56.29 25 (2) (a) The The Petitioner has claimed 0.00 ACTUATION Petitioner the assets/items under

    DEVICE FOR submitted Regulation 25(2)(a) of the ID FAN that the 2019 Tariff Regulations,

    works are which are applicable for

    claimed due replacement of assets

    to which have fully

    2 HFO PUMP 41.30 25 (2) (a) unavailabilit depreciated. As the items 0.00 y of Spares, are still not fully

    where the depreciated, the same

    existing cannot be considered

    spares are under Regulations

    expected to 25(2)(a) of 2019 Tariff

    Order in Petition No. 575/GT/2020 Page 121 of 176

    121

    Sr. Head of Work / Claimed Regulations Justification Reason for admissibility Amount No. Equipment by the allowed

    Petitioner

    2021-22

    3 LDO PUMP 16.52 25 (2) (a) be Regulations. In addition, 0.00 consumed the items claimed are in

    by the time. the nature of spares,

    Thus, the which can be considered

    same is for capitalization only after

    required for the same are put to use.

    ensuring Accordingly, the claim of

    reduction in the Petitioner is not

    downtime allowed at this stage. and

    improved

    operational

    reliability

    SUB-TOTAL 114.11 0.00 C&I SECTION

    4 Upgradation of 625.00 25 (2) (c) The The Petitioner has claimed 0.00 Yokogawa Petitioner the asserts/ items under

    Centum DCS has claimed Regulation 25(2)(c) of the

    5 Upgradation of 110.00 25 (2) (c) the works 2019 Tariff Regulations, 0.00 Emerson DEH due to which are applicable for

    system Technology the replacement of assets

    6 Upgradation / 10.00 25 (2) (c) Obsolesce. on the ground of 0.00 Modification of obsolescence. However, it

    Rockwell is not clear as to how

    Turbine obsolescence has

    protection occurred so early in plant

    system life (COD 31.3.2016). The

    (Software & IT claim of the Petitioner is

    product) therefore not allowed.

    7 Upgradation of 15.00 The Petitioner is at liberty 0.00 LVS Controller to claim the expenditure, if (Software & IT incurred, at the time of product) truing-up tariff, along with

    8 Upgradation of 25.00 proper OEM certificates 0.00 Rockwell PLC including the justification system 25 (2) (c) as to how the obsolete

    9 Upgradation of 25.00 technology was adopted in 0.00 Schneider PLC new station

    system

    10 Upgradation of 25.00 0.00 Siemens PLC

    system

    11 Electronic 25.00 25 (2) (a) The The Petitioner has claimed 0.00 modules for Petitioner the assets/items under

    DCS/DDCMIS has Regulation 25(2)(a) of the

    submitted 2019 Tariff Regulations,

    that, the which are applicable for

    claims replacement of assets

    towards the which have fully

    works are depreciated. As the items

    Order in Petition No. 575/GT/2020 Page 122 of 176

    122

    Sr. Head of Work / Claimed Regulations Justification Reason for admissibility Amount No. Equipment by the allowed

    Petitioner

    2021-22

    12 Electronic 20.00 the Critical are still not fully 0.00 modules for Spares, depreciated, the same PLC which is cannot be considered

    required for under Regulations

    ensuring 25(2)(a) of 2019 Tariff

    reduction in Regulations. In addition,

    downtime the items claimed are in

    and the nature of spares,

    improved which can be considered

    operational for capitalization only after reliability. the same are put to use.

    Accordingly, the claim of

    the Petitioner is not

    allowed at this stage.

    SUB-TOTAL 880.00 0.00

    COAL HANDLING PLANT

    13 Cooling Water 5.00 The The Petitioner has claimed 0.00 Pump, Model: Petitioner the assets/items under 125/150 GSN submitted Regulation 25(2)(a) of the

    14 Fluid Coupling, 15.00 that the 2019 Tariff Regulations, 0.00 Model: PST works are which are applicable for 530 claimed due replacement of assets

    25 (2) (a) to which have fully

    15 Fluid Coupling, 20.00 unavailabilit depreciated. As the items 0.00 Model: PST y of Spares, are still not fully

    660 where the depreciated, the same

    16 Gear Box, 20.00 existing cannot be considered 0.00 Model: CKB spares are under Regulations 355 expected to 25(2)(a) of 2019 Tariff

    17 Gear Box, 20.00 25 (2) (a) be Regulations. In addition, 0.00 Model: CKB consumed the items claimed are in 315 by the time. the nature of spares,

    Thus, the which can be considered

    18 Gear Box, 15.00 same is for capitalization only after 0.00 Model: CKB required for the same are put to use. 250 ensuring Accordingly, the claim of

    reduction in the Petitioner is not

    downtime allowed at this stage. and

    improved

    operational

    reliability

    SUB-TOTAL 95.00 0.00

    ELECTRICAL SECTION

    E1SP retrofitting 55.00 25 (2) (a) 128 nos. of The items claimed are in 0.00 (9H V controller) electronic the nature of O&M spares, controllers and cannot be considered

    installed in for capitalization.

    Units-1,2. Accordingly, the claim of

    As these the Petitioner is not

    are Chinese allowed.

    Order in Petition No. 575/GT/2020 Page 123 of 176

    123

    Sr. No. Head of Work / Equipment Claimed Regulations Justification by the Petitioner Reason for admissibility Amount allowed
    2021-22
    item and there lead time is high so required quantity is for day to day maintenanc e and for insurance spare .
    20 SAS upgradation 85.00 25 (2) (c) Some of the hardware items have become defective, software communicat ion failed and most of the items have become obsolete The Petitioner has claimed the asset/item under Regulation 25(2)(c) of the 2019 Tariff Regulations, which are applicable for the replacement of assets on obsolescence. However, the scope of upgradation is not clear. Also, no OEM recommendations for the obsolete items has been placed for consideration. In view of this, the claim of the Petitioner is not allowed. The Petitioner is at the asset at the time of truing up along with proper justification/explanation as why the same are not covered under O&M expenses. 0.00
    21 Kits for measuring DCRM of 400 KV Circuit breaker, for Contact resistance measurement of 400 KV isolators, for measurement of third harmonic leakage current of LA 50.00 76 & 77 The Petitioner submitted that the available stocks of spares are expected to be exhausted. Hence, the same is required for ensuring reduction in downtime and improved The Petitioner has not provided any proper justification for the said claim. Hence, the same is not allowed. Also, there is no merit to allow the claim in exercise of the powers under Regulation 76 or 77 of the 2019 Tariff Regulations. 0.00

    Order in Petition No. 575/GT/2020 Page 124 of 176

    124

    Sr. No. Head of Work / Equipment Claimed Regulations Justification by the Petitioner Reason for admissibility Amount allowed
    2021-22
    operational reliability
    22 Energy Meter set 4.00 25 (2) (a) The Petitioner submitted that, these kits are required to do tests as recommend ed in technical audit As capitalization of spares after cut-off date is not permissible, the claim of the Petitioner, for building inventory, is not allowed. 0.00
    23 LT Motors 20.00 25 (2) (a) Towards the replacemen t of Chinese make motor by Indigenous by phase wise The Petitioner has not submitted proper justification as to why the motors need replacement so early in the plant life The Petitioner has claimed spares under Regulation 25(2)(a) of the 2019 Tariff Regulations, which is applicable if the asset being replaced is fully depreciated. As the asset/ item is not fully depreciated, the same cannot be considered under Regulations 25(2)(a) of the 2019 Tariff Regulations. Hence, the claim of the Petitioner is not allowed. The Petitioner may claim the same at the time of truing up of tariff, with proper justification, if asset is actually replaced. 0.00
    24 Auxiliary Relays for Switchyard 10.00 25 (2) (a) The Petitioner submitted that the As capitalization of spares after cut-off date is not permissible, the claim of the Petitioner, for building 0.00

    Order in Petition No. 575/GT/2020 Page 125 of 176

    125

    Sr. No. Head of Work / Equipment Claimed Regulations Justification by the Petitioner Reason for admissibility Amount allowed
    2021-22
    available stocks of spares are expected to be exhausted. Hence, the same is required for ensuring reduction in downtime and improved operational reliability inventory, is not allowed
    25 Retrofitting of Actuator 50.00 25 (2) (a) Towards the replacemen t of Chinese make actuators by Indigenous for easy spares availability. The Petitioner has not submitted proper justification as to why the motors need replacement so early in the plant life The Petitioner has claimed spares under Regulation 25(2)(a) of the 2019 Tariff Regulations, which is applicable if the asset being replaced is fully depreciated. As the asset/ item is not fully depreciated, the same cannot be considered under Regulations 25(2)(a) of the 2019 Tariff Regulations. Hence, the claim of the Petitioner is not allowed. The Petitioner may claim the same at the time of truing up of tariff, with proper justification, if asset is actually replaced. 0.00
    26 400 KV Isolator Complete Assembly 60.00 25 (2) (a) The Petitioner submitted that the available The Petitioner has claimed the assets/items under Regulation 25(2)(a) of the 2019 Tariff Regulations, which are applicable for 0.00

    Order in Petition No. 575/GT/2020 Page 126 of 176

    126

    Sr. Head of Work / Claimed Regulations Justification Reason for admissibility Amount No. Equipment by the allowed

    Petitioner

    2021-22

    27 DC Batteries 10.00 25 (2) (a) stocks of replacement of assets 0.00 for 220 V spares are which have fully

    Battery bank expected to depreciated. As the items be are still not fully

    exhausted. depreciated, the same

    Hence, the cannot be considered

    same is under Regulations

    required for 25(2)(a) of 2019 Tariff

    ensuring Regulations. In addition,

    reduction in the items claimed are in

    downtime the nature of spares,

    and which can be considered

    improved for capitalization only after

    operational the same are put to use.

    reliability Accordingly, the claim of

    the Petitioner is not

    allowed at this stage.

    28 Replacement 20.00 25 (2) (c), 76 The assets Considering the fact that 0.00 of & 77 required for the item is the nature of

    HPSVs/Fluore the efficient O&M and since the

    scents with operation of Petitioner has been

    LED light the benefitted in terms of the

    generating reduced auxiliary energy

    station consumption, the

    expenditure claimed is not

    allowed.

    SUB-TOTAL 364.00 0.00

    TOWNSHIP AND MISCELLANEOUS CIVIL WORK

    29 Strengthening 2.50 76 & 77 The The Petitioner has not 0.00 of Outside Petitioner provided any proper

    periphery road submitted justification for the said that; the claims. Also, there is no

    outside merit to allow the claims in

    periphery exercise of the powers

    30 Strengthening 2.50 76 & 77 road may under Regulations 76 or 0.00 of Inside damage 77 of the 2019 Tariff

    periphery road due to Regulations. Accordingly, movement claims of the Petitioner are

    of coal not allowed.

    dumper.

    SUB-TOTAL 5.00 0.00

    ROADS

    31 Road Over 246.00 25 (1) (e) The It is observed that there is 246.00 Bridge (ROB) Petitioner delay in capitalization of over State Submitted asset due to delay in land

    Highway-5 that the acquisition which is an

    work is uncontrollable factor as

    within the per Regulations, provided

    original that the delay is not

    Order in Petition No. 575/GT/2020 Page 127 of 176

    127

    Sr. Head of Work / Claimed Regulations Justification Reason for admissibility Amount No. Equipment by the allowed

    Petitioner

    2021-22

    scope attributable to the project (under Sl. developer. However, No. 5(10) of keeping in view the the submissions of the

    Sanction Petitioner, we allow the Order of expenditure claimed RTPS dt. under Regulation 25 (1) 18.10.2017) (e) read with Regulation

    . The work 76 of the 2019 Tariff could not be Regulations. The capitalized Petitioner is directed to within the furnish the details / cut-off date documents at the time of due to non- truing up of tariff, with availability regard to the Force of required Majeure events claimed in land from support of the same, govt of WB including the steps taken and to mitigate the same. The finalization Petitioner shall also submit of the the breakup of actual

    scheme by additional capital

    PWD. expenditure including price variation, IDC and interest

    paid if any for delay in

    payment, for further

    consideration.

    SUB-TOTAL 246.00 246.00 Total amount 1704.11 claimed

    Total amount allowed 246.00 (Rs. In lakh)

    Sr. Head of Work / Claimed Regulations Justification Reason for Amount No. Equipment by the admissibility allowed

    Petitioner

    2022-23

    BOILER AND COAL MILL MAINTENANCE SECTION

    1 OIL COOLER 5.90 25 (2) (a) The Petitioner The Petitioner has 0.00 COMPLETE submitted that claimed spares under

    ASSEMBLY the works are Regulation 25(2)(a) of

    FOR ID FAN claimed due to the 2019 Tariff

    2 OIL COOLER 2.36 unavailability Regulations, which is 0.00 COMPLETE of Spares, applicable if the asset ASSEMBLY where the being replaced is fully FOR FD FAN existing depreciated. As such,

    3 OIL COOLER 5.19 spares are the expenditure on 0.00 COMPLETE expected to be spare assets for ASSEMBLY consumed by building inventory is

    FOR PA FAN the time. not allowed. The Order in Petition No. 575/GT/2020 Page 128 of 176

    128

    Sr. Head of Work / Claimed Regulations Justification Reason for Amount No. Equipment by the admissibility allowed

    Petitioner

    2022-23

    4 OIL COOLER 3.13 Thus, the Petitioner may claim 0.00 COMPLETE same is the same at the time ASSEMBLY required for of truing up with FOR COAL ensuring proper justification, if MILL reduction in put to use.

    downtime and

    improved

    operational

    reliability.

    SUB-TOTAL 16.58 0.00 C&I SECTION

    5 Upgradation of 25.00 25 (2) (c) The Petitioner The Petitioner has 0.00 Rockwell PLC has claimed claimed assets/items

    system the works due under Regulation

    to Technology 25(2)(c) of the 2019

    6 Upgradation of 25.00 Obsolescence Tariff Regulations, 0.00 Schneider PLC which is applicable for

    system the replacement of

    assets on grounds of

    obsolescence.

    7 Upgradation of 25.00 However, it is not 0.00 Siemens PLC clear as to how

    system obsolescence has

    occurred so early in

    8 Upgradation of 50.00 plant life (COD 0.00 VMS system 31.3.2016). The claim (Software) of the Petitioner is therefore not

    allowed. The

    Petitioner is at liberty

    to claim the

    expenditure, if

    incurred, at the time

    of truing-up tariff,

    along with proper

    OEM certificates and

    justification as to how

    the obsolete

    technology was

    adopted in new

    station.

    9 Electronic 25.00 25 (2) (a) The Petitioner The Petitioner has 0.00 modules for has submitted claimed the

    DCS/DDCMIS that, the assets/items under

    claims Regulation 25(2)(a) of

    towards the the 2019 Tariff

    works are the Regulations, which

    Critical are applicable for

    Spares, which replacement of assets

    is required for which have fully

    Order in Petition No. 575/GT/2020 Page 129 of 176

    129

    Sr. Head of Work / Claimed Regulations Justification Reason for Amount No. Equipment by the admissibility allowed

    Petitioner

    2022-23

    10 Electronic 20.00 25 (2) (a) ensuring depreciated. As the 0.00 modules for reduction in items are still not fully PLC downtime and depreciated, the same

    improved cannot be considered

    operational under Regulations

    reliability. 25(2)(a) of 2019 Tariff

    Regulations. In

    addition, the items

    claimed are in the

    nature of spares,

    which can be

    considered for

    capitalization only

    after the same are put

    to use. Accordingly,

    the claim of the

    Petitioner is not

    allowed at this stage.

    SUB- 0.00

    170.00

    TOTAL

    COAL HANDLING PLANT

    11 Gear Box for 70.00 25 (2) (a) The Petitioner The Petitioner has 0.00 Apron Feeder, submitted that claimed the

    Model: CKD the works are assets/items under

    630 claimed due to Regulation 25(2)(a) of

    unavailability the 2019 Tariff

    of Spares, Regulations, which

    where the are applicable for

    existing replacement of assets

    spares are which have fully

    expected to be depreciated. As the

    consumed by items are still not fully

    the time. depreciated, the same

    Thus, the cannot be considered

    same is under Regulations

    required for 25(2)(a) of 2019 Tariff

    ensuring Regulations. In

    reduction in addition, the items

    downtime and claimed are in the

    improved nature of spares,

    operational which can be

    reliability. considered for

    capitalization only

    after the same are put

    to use. Accordingly,

    the claim of the

    Petitioner is not

    allowed at this stage.

    SUB-TOTAL 70.00 0.00

    ELECTRICAL SECTION

    Order in Petition No. 575/GT/2020 Page 130 of 176

    130

    Sr. Head of Work / Claimed Regulations Justification Reason for Amount No. Equipment by the admissibility allowed

    Petitioner

    2022-23

    12 Complete 400 50.00 25 (2) (a) The Petitioner The Petitioner has 0.00 KV Circuit submitted that claimed the

    Breaker Pole the available assets/items under

    stocks of Regulation 25(2)(a) of

    spares are the 2019 Tariff

    expected to be Regulations, which

    exhausted. are applicable for

    Hence, the replacement of assets

    same is which have fully

    required for depreciated. As the

    ensuring items are still not fully

    reduction in depreciated, the same

    downtime and cannot be considered

    improved under Regulations

    operational 25(2)(a) of 2019 Tariff

    reliability. Regulations. In

    addition, the items

    claimed are in the

    nature of spares,

    which can be

    considered for

    capitalization only

    after the same are put

    to use. Accordingly,

    the claim of the

    Petitioner is not

    allowed at this stage.

    SUB-TOTAL 50.00 0.00

    TOWNSHIP AND MISCELLANEOUS CIVIL WORK

    13 Strengthening 2.50 76 & 77 The Petitioner The Petitioner has not 0.00 of Outside submitted that; provided any proper

    periphery road the outside justification for the

    periphery road said claims. Also,

    may damage there is no merit to

    due to allow the claims in

    14 Strengthening 2.50 76 & 77 movement of exercise of the 0.00 of Inside coal dumper. powers under

    periphery road Regulations 76 or 77

    of the 2019 Tariff

    Regulations.

    Accordingly, claims of

    the Petitioner are not

    allowed.

    SUB-TOTAL 5.00 0.00 Total amount 311.58 claimed

    Total amount allowed 0.00

    Order in Petition No. 575/GT/2020 Page 131 of 176

    131

    (Rs. In lakh)

    Sr. Head of Work / Claimed Regulations Justification by Reason for Amount No. Equipment the Petitioner admissibility allowed

    2023-24

    BOILER AND COAL MILL MAINTENANCE SECTION

    1 Complete BCP 461.73 25 (2) (a) The Petitioner The Petitioner has 0.00 Motor submitted that claimed the

    the works are assets/items under

    claimed due to Regulation 25(2)(a)

    unavailability of the 2019 Tariff

    of Spares, Regulations, which

    where the are applicable for

    existing spares replacement of

    are expected assets which have

    to be fully depreciated. As

    consumed by the items are still not

    the time. Thus, fully depreciated, the

    the same is same cannot be

    required for considered under

    ensuring Regulations 25(2)(a)

    reduction in of 2019 Tariff

    downtime and Regulations. In

    improved addition, the items

    operational claimed are in the

    reliability. nature of spares,

    which can be

    considered for

    capitalization only

    after the same are

    put to use.

    Accordingly, the

    claim of the

    Petitioner is not

    allowed at this

    stage

    SUB-TOTAL 461.73 0.00 C&I SECTION

    2 Upgradation of 50.00 25 (2) (c) The Petitioner The Petitioner has 0.00 VMS system has claimed claimed assets

    (Software) the works due /items under

    to Technology Regulation 25(2)(c)

    Obsolesce. of the 2019 Tariff

    Regulations, which

    is applicable for the

    replacement of

    assets on grounds of

    obsolescence.

    However, it is not

    clear as to how

    obsolescence has

    occurred so early in

    plant life (COD

    31.3.2016). The

    claim of the

    Order in Petition No. 575/GT/2020 Page 132 of 176

    132

    Sr. Head of Work / Claimed Regulations Justification by Reason for Amount No. Equipment the Petitioner admissibility allowed

    2023-24

    Petitioner is therefore not allowed. The Petitioner is at liberty to claim the

    expenditure, if

    incurred, at the time of truing-up tariff, along with proper OEM certificates and justification as to how the obsolete

    technology was

    adopted in new

    station.

    3 Electronic 25.00 25 (2) (a) The Petitioner has 0.00 modules for claimed the

    DCS/DDCMIS assets/items under

    4 Electronic 20.00 Regulation 25(2)(a) 0.00 modules for PLC of the 2019 Tariff Regulations, which

    are applicable for

    replacement of

    The Petitioner assets which have has submitted fully depreciated. As that, the claims the items are still not towards the fully depreciated, the works are the same cannot be

    Critical considered under

    Spares, which Regulations 25(2)(a) is required for of 2019 Tariff ensuring Regulations. In

    reduction in addition, the items downtime and claimed are in the improved nature of spares,

    operational which can be

    reliability. considered for

    capitalization only

    after the same are

    put to use.

    Accordingly, the

    claim of the

    Petitioner is not

    allowed at this

    stage

    SUB-TOTAL 20.00 0.00

    COAL HANDLING PLANT

    Order in Petition No. 575/GT/2020 Page 133 of 176

    133

    Sr. Head of Work / Claimed Regulations Justification by Reason for Amount No. Equipment the Petitioner admissibility allowed

    2023-24

    5 Fluid Coupling, 30.00 25 (2) (a) The Petitioner The Petitioner has 0.00 Model: PST 1000 submitted that claimed subject

    the works are items under

    claimed due to Regulation 25(2)(a)

    unavailability applicable for the

    of Spares, replacement of

    where the assets which have

    existing spares fully depreciated. As

    are expected the subject items are

    to be still not fully

    consumed by depreciated, the

    the time. Thus, same can't be

    6 Gear Box, Model: 30.00 25 (2) (a) the same is considered under 0.00 CSB 450 required for Regulations 25(2)(a)

    ensuring of 2019, Tariff

    reduction in Regulations. In

    downtime and addition, the claimed

    improved items are spares in

    operational nature, which can be

    reliability. considered for

    capitalization only

    after the same are

    put to use only.

    Accordingly, the

    claim items are not

    7 Gear Box, Model: 30.00 25 (2) (a) allowed at this 0.00 CSB 400 juncture / stage.

    SUB-TOTAL 90.00 0.00

    ELECTRICAL SECTION

    8 SEL Goose 20.00 25 (2) (c) Some of the The Petitioner has 0.00 communication hardware claimed assets

    upgradation items have /items under

    become Regulation 25(2)(c)

    defective, of the 2019 Tariff

    software Regulations, which

    communication is applicable for the

    failed and replacement of

    most of the assets on grounds of

    items have obsolescence.

    become However, it is not

    obsolete clear as to how

    obsolescence has

    occurred so early in

    plant life (COD

    31.3.2016). The

    claim of the

    Petitioner is

    therefore not

    allowed. The

    Petitioner is at liberty

    to claim the

    Order in Petition No. 575/GT/2020 Page 134 of 176

    134

    Sr. Head of Work / Claimed Regulations Justification by Reason for Amount No. Equipment the Petitioner admissibility allowed

    2023-24

    expenditure, if incurred, at the time of truing-up tariff, along with proper OEM certificates and justification as to how the obsolete technology was

    adopted in new

    station.

    9 Retrofitting of 30.00 25 (2) (a) The Petitioner The Petitioner has 0.00 Actuator has claimed not submitted

    the works justification as to

    towards the why the actuators

    replacement of need replacement

    Chinese make so early in plant life.

    actuators by Regulation 25(2)(a)

    Indigenous for of the 2019 Tariff

    easy spares Regulations is

    availability with applicable if the

    phase wise. asset being replaced

    is fully depreciated.

    As the asset/ item is

    still not fully

    depreciated, the

    same cannot be

    considered under

    Regulation 25(2)(a)

    of the 2019 Tariff

    Regulations. The

    Petitioner may claim

    the same at the time

    of truing-up of tariff

    with proper

    justification, if

    actually replaced.

    10 Transformer 90.00 25 (2) (a) The Petitioner Since capitalization 0.00 Bushings of submitted that, of spares after the

    transformers for the available cut-off date is not

    400 KV stocks are permissible, the Switchyard and expected to be claim of the Transformer yard exhausted and Petitioner is not

    the same is allowed. The required for Petitioner may claim ensuring the same at the time reduction in of truing up of tariff, downtime and in terms of the improved relevant provisions operational of the Regulations, if

    11 DC Batteries for 5.00 reliability. the same is actually 0.00

    220 V Battery put into service. bank and 48 V

    Order in Petition No. 575/GT/2020 Page 135 of 176

    135

    Sr. Head of Work / Claimed Regulations Justification by Reason for Amount No. Equipment the Petitioner admissibility allowed

    2023-24

    Battery Bank swyd

    SUB-TOTAL 145.00 0.00

    TOWNSHIP AND MISCELLANEOUS CIVIL WORKS

    12 Strengthening of 2.50 76 & 77 The Petitioner The Petitioner has 0.00 Outside periphery submitted that; not provided any road the outside proper justification

    periphery road for the said claims.

    may damage Also, there is no

    due to merit to allow the

    movement of claims in exercise of

    13 Strengthening of 2.50 76 & 77 coal dumper. the powers under 0.00 Inside periphery Regulations 76 or 77

    road of the 2019 Tariff

    Regulations.

    Accordingly, claims

    of the Petitioner are

    not allowed.

    SUB-TOTAL 5.00 0.00 Total amount 721.73 0.00 clamed

    Total amount allowed 0.00 Discharge of Liabilities

    159. The Petitioner has submitted that the entire additional capital expenditure projections submitted under Form-9 are on accrual basis, and un-discharged liabilities, if any, will be submitted on actual basis at the time of truing-up of tariff. Accordingly, the Commission has also not allowed any discharge of liabilities for the period 2019- 24 period. The Petitioner is directed to submit the item-wise and year-wise reconciliation statement, showing the details of such liabilities as per the balance sheet for the period 2019-24, duly certified by the auditor and furnish the break-up of discharges included in the liabilities discharged within the original scope of work or beyond original scope, at the time of truing-up exercise.

    160. Based on the above, the additional capital expenditure allowed for the period 2019-24 is summarized as under:

    Additional Capital Expenditure eligible for Normal ROE

    Order in Petition No. 575/GT/2020 Page 136 of 176

    136

    (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Admitted additions in projected additional capital expenditure (A) 81485.03 11735.27 246.00 0.00 0.00
    Less: De-capitalization considered for assets (B) 0.00 0.00 0.00 0.00 0.00
    Less: Un-discharged Liabilities (C) 0.00 0.00 0.00 0.00 0.00
    Add: Discharges of liabilities (against allowed assets / works) (D) 0.00 0.00 0.00 0.00 0.00
    Net projected additional capital expenditure allowed (on cash basis) (E) = (A-B-C+D) 81485.03 11735.27 246.00 0.00 0.00

    Additional Capital Expenditure eligible for ROE (WAROI) (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Admitted additions in projected additional capital expenditure (A) 28.65 0.00 0.00 0.00 0.00
    Less: De-capitalization considered for assets (B) 0.00 0.00 0.00 0.00 0.00
    Less: Un-discharged Liabilities (C) 0.00 0.00 0.00 0.00 0.00
    Add: Discharges of liabilities (against allowed assets / works) (D) 0.00 0.00 0.00 0.00 0.00
    Net projected additional capital expenditure allowed (on cash basis) (E) = (A-B-C+D) 28.65 0.00 0.00 0.00 0.00

    Capital cost allowed for the period 2019-24

    161. Accordingly, the capital cost approved for the period 2019-24 is as under:

    (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Opening Capital Cost (A) 541740.79 623254.47 634989.74 635235.74 635235.74
    Add: Addition during the year / period (Net of exclusion not allowed) (B) 81513.68 11735.27 246.00 0.00 0.00
    Less: Decapitalization during the year /period (C) 0.00 0.00 0.00 0.00 0.00
    Less: Undischarged liabilities (D) 0.00 0.00 0.00 0.00 0.00
    Add: Discharges during the year /period (E) 0.00 0.00 0.00 0.00 0.00
    Net Additional Capitalization (F) = (B-C-D+E) 81513.68 11735.27 246.00 0.00 0.00
    Closing Gross Block (G) = (A+F) 623254.47 634989.74 635235.74 635235.74 635235.74
    Average Gross Block (H) = (A+G)/2 582497.63 629122.10 635112.74 635235.74 635235.74

    Order in Petition No. 575/GT/2020 Page 137 of 176

    137

    Debt Equity Ratio

    162. Regulations 18 and 72 of the 2019 Tariff Regulations provides as under:

    "18. Debt-Equity Ratio: (1) For new projects, the debt-equity ratio of 70:30 as on date of commercial operation shall be considered. If the equity actually deployed is more than 30% of the capital cost, equity in excess of 30% shall be treated as normative loan:

    Provided that:

    i. where equity actually deployed is less than 30% of the capital cost, actual equity shall be considered for determination of tariff:

    ii. the equity invested in foreign currency shall be designated in Indian rupees on the date of each investment:

    iii. any grant obtained for the execution of the project shall not be considered as a part of capital structure for the purpose of debt: equity ratio.

    Explanation-The premium, if any, raised by the generating company or the transmission licensee, as the case may be, while issuing share capital and investment of internal resources created out of its free reserve, for the funding of the project, shall be reckoned as paid up capital for the purpose of computing return on equity, only if such premium amount and internal resources are actually utilised for meeting the capital expenditure of the generating station or the transmission system.

    (3) The generating company or the transmission licensee, as the case may be, shall submit the resolution of the Board of the company or approval of the competent authority in other cases regarding infusion of funds from internal resources in support of the utilization made or proposed to be made to meet the capital expenditure of the generating station or the transmission system including communication system, as the case may be.

    (3) In case of the generating station and the transmission system including communication system declared under commercial operation prior to 1.4.2019, debt:

    equity ratio allowed by the Commission for determination of tariff for the period ending 31.3.2019 shall be considered:

    Provided that in case of a generating station or a transmission system including communication system which has completed its useful life as on or after 1.4.2019, if the equity actually deployed as on 1.4.2019 is more than 30% of the capital cost, equity in excess of 30% shall not be taken into account for tariff computation; Provided further that in case of projects owned by Damodar Valley Corporation, the debt: equity ratio shall be governed as per sub-clause (ii) of clause (2) of Regulation 72 of these regulations.

    (4) In case of the generating station and the transmission system including communication system declared under commercial operation prior to 1.4.2019, but where debt: equity ratio has not been determined by the Commission for determination of tariff for the period ending 31.3.2019, the Commission shall approve the debt: equity ratio in accordance with clause (1) of this Regulation.

    (5) Any expenditure incurred or projected to be incurred on or after 1.4.2019 as may be admitted by the Commission as additional capital expenditure for determination of tariff, and renovation and modernisation expenditure for life extension shall be serviced in the manner specified in clause (1) of this Regulation."

    xxx

    72. Special Provisions relating to Damodar Valley Corporation: (1) Subject to clause (2), this Regulation shall apply to determination of tariff of the projects owned by Order in Petition No. 575/GT/2020 Page 138 of 176

    138

    Damodar Valley Corporation (DVC).

    (2) The following special provisions shall apply for determination of tariff of the projects owned by DVC:

    xxx

    (ii) Debt Equity Ratio: The debt equity ratio of all projects of DVC commissioned prior to 01.01.1992 shall be 50:50 and that of the projects commissioned thereafter shall be 70:30."

    163. The gross loan and equity amounting to Rs.379265.59 lakh and Rs.162542.40 lakh respectively as on 31.3.2019, as determined in this order, for the period 2014-19 as above, has been considered as gross loan and equity, as on 1.4.2019, in accordance with the Regulation 18 of the 2019 Tariff Regulations. The debt-equity ratio of 70:30 has been applied on year-wise admitted additional capital expenditure for arriving at the additions to loan and equity during each year of the period 2019-24. Accordingly, the details of the debt and equity in respect of the generating station is as follows:

    Capital Cost as on 1.4.2019 (Rs. in lakh) % Additional Capital Expenditure for period 2019-24 (Rs. in lakh) % Capital Cost as on 31.4.2024 (Rs. in lakh) %
    Debt 379218.55 70% 65446.47 70% 444665.02 70%
    Equity 162522.24 30% 28048.49 30% 190570.72 30%
    Total 541740.79 100% 93494.95 100% 635235.74 100%

    Return on Equity

    164. Regulations 30 of the 2019 Tariff Regulations provide as follows:

    "30. Return on Equity: (1) Return on equity shall be computed in rupee terms, on the equity base determined in accordance with Regulation 18 of these regulations.

    (2) Return on equity shall be computed at the base rate of 15.50% for thermal generating station, transmission system including communication system and run-of- river hydro generating station, and at the base rate of 16.50% for the storage type hydro generating stations including pumped storage hydro generating stations and run- of-river generating station with pondage:

    Provided that return on equity in respect of additional capitalization after cut-off date beyond the original scope shall be computed at the weighted average rate of interest on actual loan portfolio of the generating station or the transmission system Provided further that:

    i. In case of a new project, the rate of return on equity shall be reduced by 1.00% for such period as may be decided by the Commission, if the generating station or transmission system is found to be declared under commercial operation without commissioning of any of the Restricted Governor Mode Operation (RGMO) or Free Order in Petition No. 575/GT/2020 Page 139 of 176

    139

    Governor Mode Operation (FGMO), data telemetry, communication system up to load dispatch centre or protection system based on the report submitted by the respective RLDC;

    ii. in case of existing generating station, as and when any of the requirements under (i) above of this Regulation are found lacking based on the report submitted by the concerned RLDC, rate of return on equity shall be reduced by 1.00% for the period for which the deficiency continues;

    iii. in case of a thermal generating station, with effect from 1.4.2020:

    a) rate of return on equity shall be reduced by 0.25% in case of failure to achieve the ramp rate of 1% per minute;

    b) an additional rate of return on equity of 0.25% shall be allowed for every incremental ramp rate of 1% per minute achieved over and above the ramp rate of 1% per minute, subject to ceiling of additional rate of return on equity of 1.00%:

    Provided that the detailed guidelines in this regard shall be issued by National Load Dispatch Centre by 30.6.2019."

    165. Regulation 31 of the 2019 Tariff Regulations provide as under:

    "31. Tax on Return on Equity. (1) The base rate of return on equity as allowed by the Commission under Regulation 30 of these regulations shall be grossed up with the effective tax rate of the respective financial year. For this purpose, the effective tax rate shall be considered on the basis of actual tax paid in respect of the financial year in line with the provisions of the relevant Finance Acts by the concerned generating company or the transmission licensee, as the case may be. The actual tax paid on income from other businesses including deferred tax liability (i.e. income from business other than business of generation or transmission, as the case may be) shall be excluded for the calculation of effective tax rate.

    (2) Rate of return on equity shall be rounded off to three decimal places and shall be computed as per the formula given below:

    Rate of pre-tax return on equity = Base rate / (1-t)

    Where "t" is the effective tax rate in accordance with clause (1) of this Regulation and shall be calculated at the beginning of every financial year based on the estimated profit and tax to be paid estimated in line with the provisions of the relevant Finance Act applicable for that financial year to the company on pro-rata basis by excluding the income of non-generation or non-transmission business, as the case may be, and the corresponding tax thereon. In case of generating company or transmission licensee paying Minimum Alternate Tax (MAT), "t" shall be considered as MAT rate including surcharge and cess.

    Illustration-

    (i) In case of a generating company or a transmission licensee paying Minimum Alternate Tax (MAT) @ 21.55% including surcharge and cess:

    Rate of return on equity = 15.50/(1-0.2155) = 19.758%

    (ii) In case of a generating company or a transmission licensee paying normal corporate tax including surcharge and cess:

    (a) Estimated Gross Income from generation or transmission business for FY 2019- 20 is Rs 1,000 crore;

    (b) Estimated Advance Tax for the year on above is Rs 240 crore;

    (c) Effective Tax Rate for the year 2019-20 = Rs 240 Crore/Rs 1000 Crore = 24%;

    (d) Rate of return on equity = 15.50/ (1-0.24) = 20.395%.

    (3) The generating company or the transmission licensee, as the case may be, shall true up the grossed up rate of return on equity at the end of every financial year based on actual tax paid together with any additional tax demand including interest thereon, Order in Petition No. 575/GT/2020 Page 140 of 176

    140

    duly adjusted for any refund of tax including interest received from the income tax authorities pertaining to the tariff period 2019-24 on actual gross income of any financial year. However, penalty, if any, arising on account of delay in deposit or short deposit of tax amount shall not be claimed by the generating company or the transmission licensee, as the case may be. Any under-recovery or over-recovery of grossed up rate on return on equity after truing up, shall be recovered or refunded to beneficiaries or the long term customers, as the case may be, on year to year basis."

    166. The Respondent PSPCL has submitted that as per Regulation 31(1) of the 2019 Tariff Regulations, the effective tax rate is to be computed based on the actual tax paid in a financial year. It has pointed out that the Commission in its order dated 28.9.2017 in Petition No. 224/ GT/2015 had considered the base rate of 15.50% and an effective tax rate of 0.00% for period 2014-19 since no tax has been paid by the Petitioner. Accordingly, the Respondent has submitted that the Petitioner's claim for an effective tax rate of 21.5488% during the period 2019-24 is completely premature without the actual tax paid during the said year. Hence, it has prayed that the Commission may only allow ROE at the base rate of 15.50% and effective tax rate at 0.00% till the time the Petitioner submits the data of actual tax paid at the time of truing-up.

    167. The Respondent KSEBL has submitted that the 2019 Tariff Regulations stipulates that the rate of ROE shall be reduced by 1.00% for such period as may be decided by the Commission, if the generating station has not implemented Restricted Governor Mode Operations (RGMO) or Free Governor Mode Operation (FGMO), data telemetry, communication system up to load dispatch centre or protection system based on the report submitted by the respective RLDC. The Petitioner has not furnished the details of such mandatory requirements in this instant petition. Hence, the rate of ROE may be fixed only based on the achievement of the operation of RGPM/FGMO, data telemetry and communication system.

    168. The Objector DVPCA has submitted that the Petitioner has considered effective Order in Petition No. 575/GT/2020 Page 141 of 176

    141

    tax rate of 21.5488% for the computation of ROE for the period 2019-24, and the same is premature and needs to be claimed based on the actual tax paid in terms of Regulation 31 of the 2019 Tariff Regulations. As regards the Petitioner's claim for ROE at weighted average rate of interest on actual loan portfolio, DVPCA has submitted that the Petitioner has neither submitted any details of assets nor any justification for claiming the additional capitalisation after cut-off date and beyond the original scope of work.

    169. In response, the Petitioner has submitted that ROE may be computed, without considering the income tax rates for the period 2019-24. However, the Petitioner has craved leave of the Commission to claim the income tax liability, if any, for any year of the period 2019-24 as and when arising in the future. The Petitioner has also submitted that details of assets along with justification has been furnished in Form-9 of the petition.

    170. The matter has been considered. The Petitioner has not been paying any income tax in any of the financial year of the period 2014-19. Also, considering the submissions of the Petitioner above, the effective tax rate has been considered as 'Nil' for the purpose of grossing up of ROE and the rate of ROE has been considered as 15.50% for the period 2019-24. Accordingly, ROE is worked out and allowed as follows:

    (a) Return on Equity at Normal Rate

    (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Normative Equity - Opening A 162522.24 186967.75 190488.33 190562.13 190562.13
    Addition to Equity due to additional capital expenditure B 24445.51 3520.58 73.80 0.00 0.00
    Normative Equity - Closing C = (A+B) 186967.75 190488.33 190562.13 190562.13 190562.13

    Order in Petition No. 575/GT/2020 Page 142 of 176

    142

    2019-20 2020-21 2021-22 2022-23 2023-24
    Average Normative Equity D=Avg. (A,C) 174744.99 188728.04 190525.23 190562.13 190562.13
    Return on Equity (Base Rate) (%) E 15.500% 15.500% 15.500% 15.500% 15.500%
    Tax Rate for the year (%) F 0.000% 0.000% 0.000% 0.000% 0.000%
    Rate of Return on Equity (Pre-Tax) (%) G = E/(1-F) 15.500% 15.500% 15.500% 15.500% 15.500%
    Return on Equity (Pre-Tax) annualized H = (DxG) 27085.47 29252.85 29531.41 29537.13 29537.13

    (b) Return on Equity at WAROI (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Normative Equity - Opening A 0.00 8.60 8.60 8.60 8.60
    Addition to Equity due to additional capital expenditure B 8.60 0.00 0.00 0.00 0.00
    Normative Equity - Closing C = (A+B) 8.60 8.60 8.60 8.60 8.60
    Average Normative Equity D=Avg. (A, C) 4.30 8.60 8.60 8.60 8.60
    Return on Equity (Base Rate) (%) E 10.082% 10.080% 10.077% 10.073% 10.068%
    Tax Rate for the year (%) F 0.000% 0.000% 0.000% 0.000% 0.000%
    Rate of Return on Equity (Pre-Tax) (%) G = E/(1-F) 10.082% 10.080% 10.077% 10.073% 10.068%
    Return on Equity (Pre- Tax) annualized H = (DxG) 0.43 0.87 0.87 0.87 0.87

    Total Return on Equity allowed (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Return on Equity at Normal Rate A 27085.47 29252.85 29531.41 29537.13 29537.13
    Return on Equity at WAROI B 0.43 0.87 0.87 0.87 0.87
    Total Return on Equity allowed C=(A+B) 27085.91 29253.71 29532.28 29538.00 29538.00

    171. The Petitioner is directed to furnish the report of RLDC with regard to the commissioning of any Restricted Governor Mode Operation (RGMO) or Free Governor Mode Operation (FGMO), data telemetry, communication system up to load dispatch centre, along with relevant information regarding the achievement of 'Ramp Order in Petition No. 575/GT/2020 Page 143 of 176

    143

    Rate' in compliance to proviso (i) and (iii) of Regulation 30(2) of the 2019 Tariff Regulations, at the time of truing-up of tariff.

    Interest on Loan

    172. Regulation 32 and 61 of the 2019 Tariff Regulations provides as follows:

    "32. Interest on loan capital: (1) The loans arrived at in the manner indicated in Regulation 18 of these regulations shall be considered as gross normative loan for calculation of interest on loan.

    (2) The normative loan outstanding as on 1.4.2019 shall be worked out by deducting the cumulative repayment as admitted by the Commission up to 31.3.2019 from the gross normative loan.

    (3) The repayment for each of the year of the tariff period 2019-24 shall be deemed to be equal to the depreciation allowed for the corresponding year/period. In case of de- capitalization of assets, the repayment shall be adjusted by taking into account cumulative repayment on a pro rata basis and the adjustment should not exceed cumulative depreciation recovered upto the date of de-capitalisation of such asset.

    (4) Notwithstanding any moratorium period availed by the generating company or the transmission licensee, as the case may be, the repayment of loan shall be considered from the first year of commercial operation of the project and shall be equal to the depreciation allowed for the year or part of the year.

    (5) The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual loan portfolio after providing appropriate accounting adjustment for interest capitalized:

    Provided that if there is no actual loan for a particular year but normative loan is still outstanding, the last available weighted average rate of interest shall be considered; Provided further that if the generating station or the transmission system, as the case may be, does not have actual loan, then the weighted average rate of interest of the generating company or the transmission licensee as a whole shall be considered.

    (6) The interest on loan shall be calculated on the normative average loan of the year by applying the weighted average rate of interest.

    (7) The changes to the terms and conditions of the loans shall be reflected from the date of such re-financing."

    "61. Sharing of saving in interest due to re-financing or restructuring of loan: (1) If re-financing or restructuring of loan by the generating company or the transmission licensee, as the case may be, results in net savings on interest after accounting for cost associated with such refinancing or restructuring, the same shall be shared between the beneficiaries and the generating company or the transmission licensee, as the case may be, in the ratio of 50:50.

    (2) In case of dispute, any of the parties may make an application in accordance with the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for settlement of the dispute:

    Provided that the beneficiaries or the long term customers shall not withhold any payment on account of the interest claimed by the generating company or the transmission licensee during the pendency of any dispute arising out of re-financing of loan."

    Order in Petition No. 575/GT/2020 Page 144 of 176

    144

    173. The Respondent KSEBL and the Objector DVPCA have submitted that since the additional capital expenditure claimed by the Petitioner for period 2019-24, is not in order, the interest on loan for the period may be allowed, only after deducting the additional capital expenditure which were disallowed in this order. In response, the Petitioner has submitted that the contentions of the Respondent and Objector are misconstrued in the matter of interest of loan for the period 2019-24 and may be rejected.

    174. Accordingly, Interest on loan has been worked out as under:

    a. Gross normative loan amounting to Rs. 379218.55 lakh on 31.3.2019 as considered and allowed in this order, for the period 2014-19, has been considered as on 1.4.2019.

    b. Cumulative repayment of Rs. 120648.36 lakh as on 31.3.2019, as considered in in in this order for the period 2014-19, has been considered as on 1.4.2019. c. Accordingly, the net normative opening loan as on 1.4.2019 works out to Rs. 258570.20 lakh.

    d. Weighted average rate of interest on loan, as claimed by the Petitioner has been considered.

    e. The repayments for the respective years of the period 2019-24, has been considered equal to the depreciation allowed for that year. f. Interest on loan has been calculated on the normative average loan of the year by applying the weighted average rate of interest.

    175. Interest on loan has been worked out as follows:

    (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Gross opening loan A 379218.55 436278.13 444492.82 444665.02 444665.02
    Cumulative repayment of loan upto previous year B 120648.36 164748.35 212378.21 260461.62 308554.33
    Net Loan Opening C=(A-B) 258570.20 271529.78 232114.60 184203.40 136110.69
    Addition due to additional capital expenditure D 57059.58 8214.69 172.20 0.00 0.00
    Repayment of loan during the year E 44099.99 47629.86 48083.40 48092.72 48092.72
    Repayment adjustment on account of decapitalization F 0.00 0.00 0.00 0.00 0.00

    Order in Petition No. 575/GT/2020 Page 145 of 176

    145

    2019-20 2020-21 2021-22 2022-23 2023-24
    Ney repayment of the loan during the year G=(E-F) 44099.99 47629.86 48083.40 48092.72 48092.72
    Net Loan Closing H=(C+D -G) 271529.78 232114.60 184203.40 136110.69 88017.97
    Average Loan I=Avg. (C,H) 265049.99 251822.19 208159.00 160157.04 112064.33
    Weighted Average Rate of Interest of loan J 10.0821% 10.0797% 10.0765% 10.0726% 10.0678%
    Interest on Loan K=(IxJ) 26722.70 25383.03 20975.24 16132.03 11282.40

    176. Further, the Petitioner has claimed share of savings due to restructuring of loan from PFC for the period 2019-24, on projection basis, as per Regulation 61(1) of the 2019 Tariff Regulations. In this regard, it is clarified that the sharing of saving in interest due to re-financing or restructuring of loan, if any, must be undertaken between the parties, on actual basis, in accordance with Regulation 61(1) of the 2019 Tariff Regulations.

    Depreciation

    177. Regulations 33 and 72 (2) (iii) of the 2019 Tariff Regulations provides as follows:

    "33. Depreciation: (1) Depreciation shall be computed from the date of commercial operation of a generating station or unit thereof or a transmission system or element thereof including communication system. In case of the tariff of all the units of a generating station or all elements of a transmission system including communication system for which a single tariff needs to be determined, the depreciation shall be computed from the effective date of commercial operation of the generating station or the transmission system taking into consideration the depreciation of individual units:

    Provided that effective date of commercial operation shall be worked out by considering the actual date of commercial operation and installed capacity of all the units of the generating station or capital cost of all elements of the transmission system, for which single tariff needs to be determined.

    (2) The value base for the purpose of depreciation shall be the capital cost of the asset admitted by the Commission. In case of multiple units of a generating station or multiple elements of a transmission system, weighted average life for the generating station of the transmission system shall be applied. Depreciation shall be chargeable from the first year of commercial operation. In case of commercial operation of the asset for part of the year, depreciation shall be charged on pro rata basis.

    (3) The salvage value of the asset shall be considered as 10% and depreciation shall be allowed up to maximum of 90% of the capital cost of the asset:

    Provided that the salvage value for IT equipment and software shall be considered as NIL and 100% value of the assets shall be considered depreciable; Provided further that in case of hydro generating stations, the salvage value shall be as provided in the agreement, if any, signed by the developers with the State Order in Petition No. 575/GT/2020 Page 146 of 176

    146

    Government for development of the generating station:

    Provided also that the capital cost of the assets of the hydro generating station for the purpose of computation of depreciated value shall correspond to the percentage of sale of electricity under long-term power purchase agreement at regulated tariff:

    Provided also that any depreciation disallowed on account of lower availability of the generating station or unit or transmission system as the case may be, shall not be allowed to be recovered at a later stage during the useful life or the extended life.

    (4) Land other than the land held under lease and the land for reservoir in case of hydro generating station shall not be a depreciable asset and its cost shall be excluded from the capital cost while computing depreciable value of the asset.

    (5) Depreciation shall be calculated annually based on Straight Line Method and at rates specified in Appendix-I to these regulations for the assets of the generating station and transmission system:

    Provided that the remaining depreciable value as on 31st March of the year closing after a period of 12 years from the effective date of commercial operation of the station shall be spread over the balance useful life of the assets.

    (6) In case of the existing projects, the balance depreciable value as on 1.4.2019 shall be worked out by deducting the cumulative depreciation as admitted by the Commission upto 31.3.2019 from the gross depreciable value of the assets.

    (7) The generating company or the transmission licensee, as the case may be, shall submit the details of proposed capital expenditure five years before the completion of useful life of the project along with justification and proposed life extension. The Commission based on prudence check of such submissions shall approve the depreciation on capital expenditure.

    (8) In case of de-capitalization of assets in respect of generating station or unit thereof or transmission system or element thereof, the cumulative depreciation shall be adjusted by taking into account the depreciation recovered in tariff by the de- capitalized asset during its useful services.

    xxx

    72. Special Provisions relating to Damodar Valley Corporation: (1) Subject to clause (2), this Regulation shall apply to determination of tariff of the projects owned by Damodar Valley Corporation (DVC).

    (2) The following special provisions shall apply for determination of tariff of the projects owned by DVC:

    xxx

    (iii) Depreciation: The depreciation rate stipulated by the Comptroller and Auditor General of India in terms of section 40 of the Damodar Valley Corporation Act, 1948 shall be applied for computation of depreciation of projects of DVC."

    178. The Respondent KSEBL and Objector DVPCA have submitted that since the additional capital expenditure claimed by the Petitioner for period 2019-24 is not in order, the depreciation for the said period may be allowed only after deducting the additional capital expenditure disallowed by the Commission. The Petitioner in its Order in Petition No. 575/GT/2020 Page 147 of 176

    147

    rejoinder has submitted that the aforesaid contentions are misconstrued in the matter of depreciation for the period 2019-24 and may be rejected.

    179. Accordingly, depreciation has been worked out considering the admitted capital cost of Rs.541740.79 lakh, as on 1.4.2019, and the cumulative depreciation of Rs.120648.36 lakh, as on 31.3.2019, as determined in this order for the period 2014-

    19. Thus, in terms of Regulation 33 and Regulation 72 (2) (iii) of the 2019 Tariff Regulations, depreciation has been worked out and allowed as under:

    (Rs. In lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Average Capital Cost A 582497.63 629122.10 635112.74 635235.74 635235.74
    Value of freehold land B 14491.32 14491.32 14491.32 14491.32 14491.32
    Aggregated Depreciable Value C= [(A- B)x90%] 511205.68 553167.70 558559.27 558669.97 558669.97
    Remaining Aggregate Depreciable value at the beginning of the year D=[(C)- (Cumulative Depreciation of Previous year)] 390557.32 388419.35 346181.06 298208.36 250115.64
    Balance useful life at the beginning of the year E 22.00 21.00 20.00 19.00 18.00
    Weighted Average Rate of Depreciation (WAROD) F 7.57% 7.57% 7.57% 7.57% 7.57%
    Depreciation (annualized) G = [Min (A* F,D)] 44099.99 47629.86 48083.40 48092.72 48092.72
    Cumulative depreciation (at the end of the year) H= [(Cumulative Depreciation of Previous year) +(F)] 164748.35 212378.21 260461.62 308554.33 356647.05
    Less: Depreciation adjustment on account of de- capitalization I 0.00 0.00 0.00 0.00 0.00
    Cumulative depreciation at the end of the year J=(H - I) 164748.35 212378.21 260461.62 308554.33 356647.05

    Operation & Maintenance Expenses

    180. Regulation 35(1)(1) of the 2019 Tariff Regulations provides for the following O&M expenses for 600 MW series generating station:

    Order in Petition No. 575/GT/2020 Page 148 of 176

    148

    (Rs in lakh/MW)

    2019-20 2020-21 2021-22 2022-23 2023-24
    20.26 20.97 21.71 22.47 23.26

    181. The normative O&M expenses claimed by the Petitioner are as follows:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    24312.00 25164.00 26052.00 26964.00 27912.00

    182. As the Petitioner has claimed the normative O&M expenses in accordance with Regulation 35(1)(1) of the 2019 Tariff Regulations, the same is allowed.

    Water Charges, Security Charges and Capital Spares

    183. Regulation 35(1)(6) of the 2019 Tariff Regulations provides as follows:

    "35. Operation and Maintenance Expenses:

    (1) Thermal Generating Station: Normative Operation and Maintenance expenses of thermal generating stations shall be as follows:

    xxx

    (6) The Water Charges, Security Expenses and Capital Spares for thermal generating stations shall be allowed separately after prudence check:

    Provided that water charges shall be allowed based on water consumption depending upon type of plant and type of cooling water system, subject to prudence check. The details regarding the same shall be furnished along with the petition; Provided further that the generating station shall submit the assessment of the security requirement and estimated expenses;

    Provided also that the generating station shall submit the details of year-wise actual capital spares consumed at the time of truing up with appropriate justification for incurring the same and substantiating that the same is not funded through compensatory allowance as per Regulation 17 of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 or Special Allowance or claimed as a part of additional capitalisation or consumption of stores and spares and renovation and modernization."

    Water Charges

    184. In terms of the first proviso to Regulation 35(1)(6) of the 2019 Tariff Regulations, the Petitioner has considered normative water consumption of 3.5 m3/MWh, generation as per NAPAF and has claimed water charges as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    3336.58 3660.22 4026.24 4428.86 4885.09

    185. The Respondent PSPCL has submitted that the water charges are to be allowed separately, based on the details furnished by the Petitioner on the type of the Order in Petition No. 575/GT/2020 Page 149 of 176

    149

    generating station and the actual water consumption, subject to prudence check. It has stated that from the details submitted by the Petitioner for the period 2014-19, it is observed that the Petitioner has projected the water charges for period 2019-24, based on the multiplication of generation in MWh projected in 2019-24, where the normative water consumption of 3.5 m3/MWh based on MoEFCC Notification No. 3305 dated 7.12.2015 and water charge rate of Rs. 10.64/KL. The Respondent has also submitted that the Petitioner has considered the rate of Rs. 5.7/KL for the industrial use and Rs. 1.15/KL for domestic use, for each year of the control period 2016-19 and as against this, the Petitioner has considered a water charge rate of Rs. 10.64/KL for 2019-20, and thereafter, at a yearly escalation rate of 10% for the period 2020-24, wherein, the Petitioner has mentioned that such an increased rate is pursuant to the DVC Office Memorandum dated 23.7.2019. However, the Petitioner has not furnished a copy of the said OM, on the basis of which the water charges are being claimed during the period 2019-24. It has added that such an increase sought by the Petitioner is more than 85%, which is unreasonable and arbitrary and hence, the claim of the Petitioner is liable for scrutiny and prudence check.

    186. The Objector DVPCA has submitted that the actual water charge rate was Rs. 5.7/KL and Rs. 1.15/KL for industrial use and domestic use respectively for each year of the period 2014-19 and accordingly, the weighted average water charge rate works out to Rs. 5.68/KL. DVPCA has stated that, as against this, the Petitioner has considered the water charge rate of Rs. 10.64/KL for the year 2019-20 and thereafter a yearly escalation rate of 10% for the remaining years of the period 2019-24, but has not furnished the relevant OM dated 23.7.2019. DVPCA has also submitted that the increase sought is more than 85% which is arbitrary and therefore the Commission may conduct strict prudence check on arriving at the allowable water charge rate, Order in Petition No. 575/GT/2020 Page 150 of 176

    150

    such that, it is comparable with the rates prevailing in other States, derived at arms' length and there should be no cross-subsidisation of other activities of the Petitioner. DVPCA has added that the arbitrary escalation of 10% ought to be rejected as there is neither any basis for the same nor provided in the 2019 Tariff Regulations.

    187. The Petitioner in its rejoinder has clarified that the water charges of the generating stations, w.e.f. 1.4.2019 and escalation thereof, are governed by the water tariff as notified by DVC vide OM dated 23.7.2019.

    188. The matter has been considered. It is observed that the Petitioner has submitted OM dated 23.7.2019, as part of the additional information and accordingly, the same has been considered. In view of the above, and considering the MOEF&CC norms, generation as per NAPAF and water charges rate of Rs 10.64/KL and annual escalation of 10% thereof, as per OM dated 23.7.2019, the water charges for the period 2019-24 is allowed as under:

    Units 2019-20 2020-21 2021-22 2022-23 2023-24
    Projected Gross Generation @ 85% load factor MU 8959.68 8935.20 8935.20 8935.20 8959.68
    Normative Specific Water Consumption as per MoEFCC stipulations Cubic Meter/ MWh 3.50 3.50 3.50 3.50 3.50
    Normative Water Consumption as per MoEFCC's Norms Cubic Meter 31358880 31273200 31273200 31273200 31358880
    Rate of Water Charges Rs. / Cubic Meter 10.64 11.70 12.87 14.16 15.58
    Total Normative Water Charges (in Rs. lakh) 3336.58 3660.22 4026.24 4428.86 4885.09

    189. The Petitioner is however, directed to submit the detailed justification for the high rate of the water charges along with comparison in rate from alternative sources at the time of truing-up of tariff.

    Security Expenses

    Order in Petition No. 575/GT/2020 Page 151 of 176

    151

    190. The Petitioner has claimed the following security expenses, on projection basis, for the period 2019-24 in terms of the second proviso to Regulation 35(6) of the 2019 Tariff Regulations.

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    2356.69 2470.33 2589.45 2714.32 2845.20

    191. It is observed that the Petitioner has escalated the actual Security expenses of Rs. 2248.27 lakh for the year 2018-19 at the CAGR rate of 4.82% per annum, to claim the projected Security expenses for the period 2019-24. The Petitioner has also submitted that the escalation of Security expenses has been proposed to accommodate the year-on-year growth of salary expenditure and associated CISF activities, that are primarily governed by the CISF Rules.

    192. The Objector DVPCA has submitted that the actual O&M expenses including, P&G expenses, Pay Revision expenses, CISF security expenses, Ash evacuation expenses, expenditure for Subsidiary activities, Mega Insurance expenses, GST on O&M, etc. are lower than the normative O&M expenses for the period 2014-19. Thus, DVPCA has submitted that there is no requirement for separate allowance of CISF security expenses, as they are covered under normative O&M expenses, and separate allowance of the same would lead to unjust enrichment of the Petitioner. It has also stated that the past analysis of all stations of the Petitioner would reveal that the CISF Man/MW ratio varies between the stations, ranges from 0.19 to 3.96 person/MW and the cost of CISF personnel/MW, also varies from station to station and ranges from Rs. 24084/- per annum, in case of Maithon HS (hydel) to a high of Rs. 237083/- per annum in case of RTPS (this generating station). DVPCA has also pointed out that the OM issued by CISF/MHA pertain to previous control periods and no other document is provided for during the period 2019-24. In response, the Order in Petition No. 575/GT/2020 Page 152 of 176

    152

    Petitioner has submitted that the actual Security expenses for 2018-19 has been escalated at 4.82% (which is the CAGR of normative O&M expenses of RTPS Phase-I from 2018-19 to 2023-24) per annum to obtain the projected figures for the period 2019-24. The Petitioner has also submitted that the escalation of Security expenses has been proposed to accommodate the year-on-year growth of salary expenditure and associated CISF activities that are primarily governed by the CISF Rules.

    193. The matter has been considered. It is observed that the Security expenses for 2018-19 is Rs. 2248.27 lakh and the same is considered along with an annual escalation rate of 4.82%, as proposed by the Petitioner for the period 2019-24. Accordingly, the Security expenses claimed by the Petitioner as above, is allowed. The Petitioner shall, at the time of truing up of tariff, furnish the actual security expenses incurred along with the justification and the same shall be assessed in terms of Regulation 35(1)(6) of the 2019 Tariff Regulations.

    Capital spares

    194. The Petitioner has not projected any capital spares for the period 2019-24 and submitted that it will claim the same during the truing-up of tariff, on actual basis. The last proviso to Regulation 35(1)(6) of the 2019 Tariff Regulations provides for considering capital spares after prudence check, on consumption basis, at the time of truing-up of tariff. In line with this, the Petitioner is at liberty to claim the actual spares at the time of truing up of tariff. The Petitioner is therefore directed to confirm / substantiate that the capital spares have not been funded through compensatory allowance or Special Allowance or claimed as a part of additional capitalisation or consumption of stores and spares and renovation and modernization during the true- up.

    195. Based on the above discussion, the O&M expenses allowed under Regulation Order in Petition No. 575/GT/2020 Page 153 of 176

    153

    35(1)(1) of the 2019 Tariff Regulations and water charges, security expenses and capital spares allowed under Regulation 35(1)(6) of the 2019 Tariff Regulations, are summarised below:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Installed Capacity (MW) 1200.00 1200.00 1200.00 1200.00 1200.00
    O&M Expenses under Regulation 35(1) in Rs lakh / MW 20.26 20.97 21.71 22.47 23.26
    Total O&M Expenses (A) Claimed 24312.00 25164.00 26052.00 26964.00 27912.00
    Allowed 24312.00 25164.00 26052.00 26964.00 27912.00
    Water Charges (B) Claimed 3336.58 3660.22 4026.24 4428.86 4885.09
    Allowed 3336.58 3660.22 4026.24 4428.86 4885.09
    Security Expenses (C) Claimed 2356.69 2470.33 2589.45 2714.32 2845.20
    Allowed 2356.69 2470.33 2589.45 2714.32 2845.20
    Capital Spares (D) Claimed 0.00 0.00 0.00 0.00 0.00
    Allowed 0.00 0.00 0.00 0.00 0.00
    Total O&M Expenses as allowed (including Water Charges and Security Expenses) (D=A+B+C) Claimed 30005.27 31294.54 32667.69 34107.18 35642.30
    Allowed 30005.27 31294.54 32667.69 34107.18 35642.30

    allowed (including Water Charges and Security Expenses) (D=A+B+C)

    Operational Norms

    196. The provisions of Regulation 49 of the 2019 Tariff Regulations providing for operational norms for the generating station are as follows:

    "Norms of operation for thermal generating station

    49. The norms of operation as given hereunder shall apply to thermal generating stations:

    (A) Normative Annual Plant Availability Factor (NAPAF)

    (a) For all thermal generating stations, except those covered under clauses (b), (c), (d), & (e) - 85% ;

    xxx

    (C) Gross Station Heat Rate:

    xx

    (b) Thermal Generating Stations achieving COD on or after 1.4.2009:

    (i) For Coal-based and lignite-fired Thermal Generating Stations:

    1.05 X Design Heat Rate (kCal/kWh) Where the Design Heat Rate of a generating unit means the unit heat rate guaranteed Order in Petition No. 575/GT/2020 Page 154 of 176

    154

    by the supplier at conditions of 100% MCR, zero percent make up, design coal and design cooling water temperature/back pressure.

    Provided that the design heat rate shall not exceed the following maximum design unit heat rates depending upon the pressure and temperature ratings of the units:

    Pressure Rating (Kg/cm2) 150 170 170

    SHT/RHT (0C) 535/535 537/537 537/565

    Type of BFP Electrical Driven Turbine Driven

    Turbine Driven

    Max Turbine Heat Rate (kCal/kWh) 1955 1950 1935

    Min. Boiler Efficiency Sub-Bituminous Indian Coal 0.86 0.86 0.86 Bituminous Imported Coal 0.89 0.89 0.89

    Max. Design Heat Rate (kCal/kWh) Sub-Bituminous Indian Coal 2273 2267 2250 Bituminous Imported Coal 2197 2191 2174 Pressure Rating (Kg/cm2) 247 247 270 270 SHT/RHT (0C) 537/565 565/593 593/593 600/ 600 Turbine Turbine Turbine

    Type of BFP Turbine Driven

    Driven Driven Driven

    Max Turbine Heat Rate

    1900 1850 1810 1800

    (kCal/kWh)

    Min. Boiler Efficiency Sub-Bituminous Indian Coal 0.86 0.86 0.865 0.865 Bituminous Imported Coal 0.89 0.89 0.895 0.895

    Max. Design Heat Rate (kCal/kWh) Sub-Bituminous Indian Coal 2222 2151 2105 2081 Bituminous Imported Coal 2135 2078 2034 2022 Provided further that in case pressure and temperature parameters of a unit are different from above ratings, the maximum design heat rate of the unit of the nearest class shall be taken:

    Provided also that where heat rate of the unit has not been guaranteed but turbine cycle heat rate and boiler efficiency are guaranteed separately by the same supplier or different suppliers, the design heat rate of the unit shall be arrived at by using guaranteed turbine cycle heat rate and boiler efficiency:

    Provided also that where the boiler efficiency is lower than 86% for Sub-bituminous Indian coal and 89% for bituminous imported coal, the same shall be considered as 86% and 89% for Sub-bituminous Indian coal and bituminous imported coal respectively, for computation of station heat rate:

    xx

    (D) Secondary Fuel Oil Consumption:

    (a) For Coal-based generating stations other than at (c) below: 0.50 ml/kWh xx

    (E) Auxiliary Energy Consumption:

    (a) For Coal-based generating stations except at (b) below:

    Order in Petition No. 575/GT/2020 Page 155 of 176

    155

    S. No. Generating Station With Natural Draft cooling tower or without cooling tower
    (i) 200 MW series 8.50%
    (ii) 300 MW series and above
    Steam driven boiler feed pumps 5.75%
    Electrically driven boiler feed pumps 8.00%

    Provided that for thermal generating stations with induced draft cooling towers

    and where tube type coal mill is used, the norms shall be further increased by 0.5%

    and 0.8% respectively:

    Provided further that Additional Auxiliary Energy Consumption as follows shall

    be allowed for plants with Dry Cooling Systems:

    Type of Dry Cooling System (% of gross generation)
    Direct cooling air cooled condensers with mechanical draft fans 1.0%
    Indirect cooling system employing jet condensers with pressure recovery turbine and natural draft tower 0.5%

    197. The Operational norms claimed by the Petitioner are as follows:

    Parameter
    Normative Annual Plant Availability Factor (NAPAF) (%) 85.00
    Gross Station Heat Rate (kcal/kwh) 2350.98
    Auxiliary Power Consumption (%) 5.75
    Specific Oil Consumption (ml/kwh) 0.50

    198. The Petitioner has sought liberty to claim relaxation of NAPAF as per Regulations 76 and 77 of the 2019 Tariff Regulations, for unforeseen event or uncontrollable factors.

    199. The matter has been considered. We find no merit in the claim of the Petitioner to seek relaxation in NAPAF and hence the same is not allowed. It is observed that the Petitioner has submitted that the generating station is of 600 MW units with natural draft cooling. The operational norms are in line with the Regulations 49(A), 49(C), 49(D) and 49(E) of the 2019 Tariff Regulations and hence allowed along with the GCV and cost of primary and secondary fuel as under:

    Parameter
    Normative Annual Plant Availability Factor (NAPAF) (%) 85.00
    Gross Station Heat Rate (kcal/kwh) 2350.98
    Auxiliary Power Consumption (%) 5.75
    Specific Oil Consumption (ml/kwh) 0.50

    Order in Petition No. 575/GT/2020 Page 156 of 176

    156

    Interest on Working Capital

    200. The Petitioner has claimed weighted average GCV and Cost of coal as 3937.42 kCal/kg and Rs. 3514.89/MT, respectively, and those of Secondary fuel oil as 10189.55 kCal/L and Rs. 46823.52/KL. Accordingly, Interest on Working Capital as claimed by the Petitioner is as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Cost of Coal/Lignite for Stock and Generation (A) 26059.58 25988.38 25988.38 25988.38 26059.58
    Cost of oil for 2 months (B) 349.60 348.65 348.65 348.65 349.60
    O&M expenses - 1 month (C) 2500.44 2607.88 2722.31 2842.26 2970.19
    Maintenance Spares - 20% of O&M (D) 6001.05 6258.91 6533.54 6821.44 7128.46
    Receivables – 45 days (E) 43207.25 43991.65 43735.21 43297.67 42942.85
    Total Working Capital (F) = (A+B+C+D+E) 78117.93 79195.46 79328.08 79298.39 79450.68
    Rate of Interest (G) 12.05% 12.05% 12.05% 12.05% 12.05%
    Total Interest on Working capital (H) = (F)x(G) 9413.21 9543.05 9559.03 9555.46 9573.81

    201. Regulation 34(1)(a) of the 2019 Tariff Regulations provides as under:

    "34. Interest on Working Capital: (1) The working capital shall cover:

    (a) For Coal-based/lignite-fired thermal generating stations:

    (i) Cost of coal or lignite and limestone towards stock, if applicable, for 10 days for pit- head generating stations and 20 days for non-pit-head generating stations for generation corresponding to the normative annual plant availability factor or the maximum coal/lignite stock storage capacity whichever is lower; (ii) Advance payment for 30 days towards cost of coal or lignite and limestone for generation corresponding to the normative annual plant availability factor;

    (iii) Cost of secondary fuel oil for two months for generation corresponding to the normative annual plant availability factor, and in case of use of more than one secondary fuel oil, cost of fuel oil stock for the main secondary fuel oil;

    (iv) Maintenance spares @ 20% of operation and maintenance expenses including water charges and security expenses;

    (v) Receivables equivalent to 45 days of capacity charge and energy charge for sale of electricity calculated on the normative annual plant availability factor; and

    (vi) Operation and maintenance expenses, including water charges and security expenses, for one month."

    202. Regulations 34(3) and 34(4) of the 2019 Tariff Regulations provide as under:

    "(3) Rate of interest on working capital shall be on normative basis and shall be considered as the bank rate as on 1.4.2019 or as on 1st April of the year during the tariff period 2019-24 in which the generating station or a unit thereof or the transmission system including communication system or element thereof, as the case Order in Petition No. 575/GT/2020 Page 157 of 176

    157

    may be, is declared under commercial operation, whichever is later:

    Provided that in case of truing-up, the rate of interest on working capital shall be considered at bank rate as on 1st April of each of the financial year during the tariff period 2019-24.

    (4) Interest on working capital shall be payable on normative basis notwithstanding that the generating company or the transmission licensee has not taken loan for working capital from any outside agency."

    a) Fuel Cost and Cost of Liquid Stock for Working Capital

    203. The Petitioner has claimed the following fuel components as part of working capital, based on the price and GCV of coal as received and secondary fuel oil for the preceding three months from October 2018 to December 2018:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Cost of coal for 50 days 26059.58 25988.38 25988.38 25988.38 26059.58
    Cost of Secondary fuel oil 2 months 349.60 348.65 348.65 348.65 349.60

    204. Regulation 34(2) of the 2019 Tariff Regulations provides that the computation of cost of fuel as part of Interest on Working (IWC) is to be based on the landed price and GCV of fuel as per actuals, for the third quarter of preceding financial year in case of each financial year for which tariff is to be determined.

    205. Regulation 43(2) of the 2019 Tariff Regulations provides as under:

    "(2) Energy charge rate (ECR) in Rupees per kWh on ex-power plant basis shall be determined to three decimal places in accordance with the following formulae:

    (a) For coal based and lignite fired stations:

    ECR = {(SHR - SFC x CVSF) x LPPF / CVPF+SFC x LPSFi + LC x LPL} x 100 / (100 - AUX)

    (b) For gas and liquid fuel based stations:

    ECR = SHR x LPPF x 100 / {(CVPF) x (100 - AUX)} Where,

    AUX = Normative auxiliary energy consumption in percentage. CVPF = (a) Weighted Average Gross calorific value of coal as received, in kCal per kg for coal-based stations less 85 Kcal/Kg on account of variation during storage at generating station;

    (b) Weighted Average Gross calorific value of primary fuel as received, in kCal per kg, per litre or per standard cubic meter, as applicable for lignite, gas and liquid fuel based stations;

    (c) In case of blending of fuel from different sources, the weighted average Gross calorific value of primary fuel shall be arrived in proportion to blending ratio:

    CVSF = Calorific value of secondary fuel, in kCal per ml; Order in Petition No. 575/GT/2020 Page 158 of 176

    158

    ECR = Energy charge rate, in Rupees per kWh sent out; SHR = Gross station heat rate, in kCal per kWh; LC = Normative limestone consumption in kg per kWh; LPL = Weighted average landed cost of limestone in Rupees per kg; LPPF = Weighted average landed fuel cost of primary fuel, in Rupees per kg, per litre or per standard cubic metre, as applicable, during the month. (In case of blending of fuel from different sources, the weighted average landed fuel cost of primary fuel shall be arrived in proportion to blending ratio);

    SFC= Normative specific fuel oil consumption, in ml per kWh;

    LPSFi= Weighted Average Landed Fuel Cost of Secondary Fuel in Rs./ ml during the month:

    Provided that energy charge rate for a gas or liquid fuel based station shall be adjusted for open cycle operation based on certification of Member Secretary of respective Regional Power Committee during the month."

    206. In line with the above Regulations, a margin of 85 kCal/kg in weighted average Gross Calorific value (GCV) of coal on 'as received' for coal based generating stations on account of variation during storage at the generating station has been considered for computation of IWC. Accordingly, the GCV and price of fuel as claimed by the Petitioner and as allowed by the Commission are provided as under:

    Claimed Allowed
    Weighted average price of coal (Rs./MT) 3514.89 3514.89
    Weighted average GCV of coal (kCal/kg) 3937.42 3852.42*
    Weighted average price of oil (Rs./kl) 46823.52 46823.52
    Weighted average GCV of oil (kCal/l) 10189.55 10189.55

    *After adjustment of 85kcal/kg as per Regulation 43(2)(b)

    207. In this background, based on the operational norms, GCV and price of Coal and Oil allowed as above, the fuel components of working capital have been worked out and allowed as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Cost of coal for 20 days 10479.17 10479.17 10479.17 10479.17 10479.17
    Cost of coal for generation for 30 days 15718.75 15718.75 15718.75 15718.75 15718.75
    Cost of Secondary fuel oil 2 months 349.60 348.65 348.65 348.65 349.60

    208. In the present petition, the computation of working capital is based on the GCV, and fuel cost furnished for third quarter of the year 2018-19. However, Regulation 34

    (C) (2) of the 2019 Tariff Regulations, provides that the cost of fuel shall be based on Order in Petition No. 575/GT/2020 Page 159 of 176

    159

    the landed fuel cost (taking into account normative transit and handling losses, in terms of Regulation 39 of these Regulations) by the generating station and gross calorific value of the fuel, as per actual weighted average for the third quarter of preceding financial year, in case of each financial year for which tariff is to be determined. In terms of above, the fuel cost computed as above is, based on the actual data to be furnished by Petitioner, for each year, at the time of truing-up of tariff.

    b) Energy Charges for 45 days for Working Capital

    209. The Petitioner has claimed Energy Charge Rate (ECR) of 224.68 Paise/kWh based on the weighted average price and GCV of coal as received, during the preceding three months i.e., October 2018, November 2018 and December 2018 as under:

    Unit Claimed
    Energy Charge Rate Secondary fuel Rs./kWh 0.0234
    Energy Charge Rate Primary fuel Rs./kWh 2.094
    Total Energy Charge Rate –ex-bus Rs./kWh 2.247

    210. Based on the operational norms and the price and GCV of the oil and price and GCV of coal [after adjusting margin of 85kCal/kg allowable as per Regulation 43(2)(b) of the 2019 Tariff Regulations], received at the generating station, during the period of three months i.e., October 2018, November 2018 and December 2018, the ECR, for the purpose of working capital, has been worked out and allowed as under:

    Gross Station Heat Rate (kcal/kwh) 2350.98
    Auxiliary Power Consumption (%) 5.75
    Specific Oil Consumption (ml/kwh) 0.50
    Weighted average price of coal (Rs./MT) 3514.89
    Weighted average GCV of coal (kCal/kg) 3852.42*
    Weighted average price of oil (Rs./kl) 46823.52
    Weighted average GCV of oil (kCal/l) 10189.55
    Energy Charge Rate ex-bus (Rs./kWh) 2.296

    *After adjustment of 85kcal/kg as per Regulation 43(2)(b)

    211. Energy charges for 45 days, on the basis of weighted average GCV and Order in Petition No. 575/GT/2020 Page 160 of 176

    160

    weighted average cost, for the purpose of interest on working capital, is worked out as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    23838.40 23838.40 23838.40 23838.40 23838.40

    c) Working Capital for Maintenance Spares

    212. The Petitioner has claimed the maintenance spares in the working capital as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    6001.05 6258.91 6533.54 6821.44 7128.46

    213. Maintenance spares for the purpose of interest on working capital in accordance with the regulation, has been worked out as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    6001.05 6258.91 6533.54 6821.44 7128.46

    d) Working Capital for Receivables

    214. Receivables equivalent to 45 days of capacity charge and energy charges for the purpose of working capital has been worked out and allowed as follows:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Variable Charges (45 days) 23838.40 23838.40 23838.40 23838.40 23838.40
    Fixed Charges (45 days) 16849.20 17531.42 17176.99 16759.08 16305.54
    Total 40687.60 41369.82 41015.39 40597.48 40143.94

    e) Working Capital for O&M Expenses

    215. The O&M expenses for 1 (one) month claimed by the Petitioner for the purpose of working capital is allowed as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    2500.44 2607.88 2722.31 2842.26 2970.19

    g) Rate of Interest for Working Capital

    Order in Petition No. 575/GT/2020 Page 161 of 176

    161

    216. Regulation 34(3) of the 2019 Tariff Regulations provides for the rate of interest on working capital considered on projection basis, for the period 2019-24 as 12.05% (i.e., 1-year SBI MCLR of 8.55% as on 1.4.2019 + 350 basis points). As the tariff of the generating station for the period 2019-24, is being determined during the year 2023-24, the SBI MCLR as on 1.4.2020 (7.75%), as on 1.4.2021 (7.00%) and as on 1.4.2022 (7.00%) is also available. Since the rate of interest on working capital is subject to revision at the time of truing-up of tariff, based on the bank rate as on 1st April of each financial year, we find it prudent to allow the rate of interest as on 1.4.2020,1.4.2021 and 1.4.2022, for the subsequent financial years. Accordingly, the rate of interest for the year 2019-20 is 12.05%, 2020-21 is 11.25%, 2021-22 ,2022-23 is 10.50% and for the subsequent years the rate of interest of 10.50% has been considered (i.e., 1year SBI MCLR of 8.55% as on 1.4.2019 + 350 basis points, 1-year SBI MCLR of 7.75% as on 1.4.2020 + 350 basis points; 1-year SBI MCLR of 7.00% as on 1.4.2021 + 350 basis points; and 1year SBI MCLR of 7.00% as on 1.4.2022 + 350 basis points). Accordingly, Interest on working capital is allowed as follows:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24 Working Capital for non-pit-head Thermal Generating Station

    A Working Capital for Cost of 10479.17 10479.17 10479.17 10479.17 10479.17 Coal towards Stock - 20 days

    B Working Capital for Cost of 15718.75 15718.75 15718.75 15718.75 15718.75 Coal towards Generation - 20

    days

    C Working Capital for Cost of 349.60 348.65 348.65 348.65 349.60 Secondary fuel oil - 2 months

    D Working Capital for 6001.05 6258.91 6533.54 6821.44 7128.46 Maintenance Spares @

    20% of O&M expenses

    E Working Capital for 40687.60 41369.82 41015.39 40597.48 40143.94 Receivables - 45 days

    F Working Capital for O&M 2500.44 2607.88 2722.31 2842.26 2970.19 expenses - 1 month

    G Total Working Capital 75736.62 76783.18 76817.81 76807.75 76790.12 (A+B+C+D+E+F)

    H Rate of Interest 12.05% 11.25% 10.50% 10.50% 10.50% Order in Petition No. 575/GT/2020 Page 162 of 176

    162

    2019-20 2020-21 2021-22 2022-23 2023-24
    I Interest on Working capital (G x H) 9126.26 8638.11 8065.87 8064.81 8062.96

    Additional Claims

    217. In addition to the Depreciation, Interest on Loan, Return on Equity, O&M Expenses, Water Charges, Security Expenses, Interest on Working Capital, share of savings in interest cost due to loan restructuring and Special Allowance in accordance with the 2019 Tariff Regulations, the Petitioner has also claimed expenditure towards Interest & Contribution on Sinking Fund (As per section 40, Part IV of DVC Act), Share of P&G contribution, Share of Common Office expenditure, Ash Evacuation expenses, Mega Insurance Expenses and Expenditure for Subsidiary activity as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Interest & Contribution on Sinking Fund (As per section 40, Part IV of DVC Act) 946.95 1013.23 1084.16 1160.05 1241.25
    Share of P&G 4471.73 4681.93 4902.01 5132.44 5373.70
    Share of Common Office Expenditure 235.98 253.26 256.45 220.55 201.03
    Expenses due to Mega insurance & expenditure for Subsidiary activity 602.82 631.89 662.36 694.30 727.78
    Total 6257.48 6580.31 6904.98 7207.34 7543.77

    Interest & Contribution on Sinking Fund (As per Section 40, Part IV of DVC Act)

    218. The Petitioner has claimed expenditure towards Interest & Contribution on Sinking Fund as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    946.95 1013.23 1084.16 1160.05 1241.25

    219. The Petitioner has allocated sinking fund contribution and interest for DVC Bonds of Rs. 3100 crore amongst the generating stations of the Petitioner, as under:

    (Rs. in crore)

    Particulars 2019-20 2020-21 2021-22 2022-23 2023-24
    Total Contribution and Interest for Debt Borrowing 214.27 229.27 245.32 262.49 280.87
    MTPS5&6 17.14 18.34 19.63 21.00 22.47
    CTPS 7&8 31.10 33.28 35.61 38.10 40.77

    Order in Petition No. 575/GT/2020 Page 163 of 176

    163

    Particulars MTPS 7&8 2019-20 29.45 2020-21 31.51 2021-22 33.71 2022-23 36.07 2023-24 38.60
    DSTPS 60.83 65.08 69.64 74.51 79.73
    KTPS 66.29 70.93 75.89 81.20 86.89
    RTPS-I 9.47 10.13 10.84 11.60 12.41
    BTPS-A - - - - -
    Total 214.27 229.27 245.32 262.49 280.87

    220. The Respondent KSEBL has submitted that the Commission vide order dated 3.10.2016 in Petition No. 207/GT/2015 had disallowed the interest on sinking fund and only contribution to the funds was allowed. The Objector, DVPCA has submitted that the linkage of Bonds has to be established with each specific generating station. It has also stated that the allocation of Principal cannot be the norm, as different power plants of the Petitioner, supply power to different entities/ beneficiaries. DVCPA has further submitted that neither the provisions of Electricity Act, 2003 nor the 2019 Tariff Regulations, sanction the recovery of cost of generation assets twice over through a) allowance of Contribution to Sinking Fund; and b) Depreciation and allowance of Interest on Loan by treating the amount realised through bonds as normative debt. It has pointed out that in the past tariff orders relating to the old plants of the Petitioner, the Commission had treated the amount realised through bonds as normative debt, and accordingly proceeded to grant interest thereon over and above the allowance of contribution to Sinking Fund in terms of Regulation 72(2)(iv) of the 2019 Tariff Regulations. It has stated that Regulation 72(2)(iv) of the 2019 Tariff Regulations, will be applicable only in such cases, where normative debt is not allowed, for funding capital cost, and the Petitioner cannot be allowed both, contributions to Sinking Fund, as well as depreciation and interest on loan, by treating the funds realised through bond issue as normative loan. DVPCA has also submitted that Petitioner is allowed all expenses related to Energy Charges and Fixed Charges including capital cost, IDC, time over and cost overrun to the extent permissible under the 2019 Tariff Order in Petition No. 575/GT/2020 Page 164 of 176

    164

    Regulations. It has added that the Commission also allows funding of the approved capital cost and interest/ returns on the debt/ equity components on actual / normative basis and also the loan repayment, which is taken care of through higher depreciation for initial 12 years. DVPCA has further submitted that the creation of funds without any specific purpose cannot be allowed to be recovered as expenditure in tariff, even if it is mentioned in the DVC Act and/ the 2019 Tariff Regulations. Accordingly, DVPCA has submitted that the Petitioner may be directed to submit details on the purpose of borrowing of such funds, when all expenses related to capital funding and working capital funding are allowed.

    221. In response, the Petitioner has reiterated that the matter related to Sinking Fund has been settled by APTEL in the appeals relating to the period 2007 to 2019, in favour of the Petitioner, which was subsequently, upheld by the Hon'ble Supreme Court vide its judgement dated 23.7.2018 in BSAL. v. DVC & ors (2018) 8 SCC 281. The Petitioner has further submitted that though Review Petition No. 4 of 2019 has been filed by the DVPCA in the matter of Maithon Alloys Ltd. vs CERC & Ors., there is no stay of the above decision of APTEL and therefore for all purposes the same is binding on all the parties.

    222. We have examined the matter. Section 40 of the DVC Act provides that the Petitioner shall make provision for depreciation and for reserve and other funds at such rates and on such terms as may be specified by the C&AG in consultation with the Central Government. It is observed that the sinking funds have been created only for redemption of bonds. Accordingly, the amount approved for this generating station is as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    946.95 1013.23 1084.16 1160.05 1241.25

    Order in Petition No. 575/GT/2020 Page 165 of 176

    165

    Share of P&G Contribution

    223. The Petitioner has claimed P&G contribution, over and above, the normative O&M expenses, on projection basis, as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    4471.73 4681.93 4902.01 5132.44 5373.70

    224. DVPCA has reiterated its submissions made on this issue for the period 2014-

    19. It has a lso pointed out that the projected P&G contribution for the period 2019- 24, has been claimed by considering a yearly escalation of 4.70% on the Actuarial value, as on 31.3.2019 i.e., Rs.619420.12 lakh and the same has been apportioned to various stations, based on apportionment on Plant capacity basis. The Objector has also stated that the P&G contribution claimed in 2019-20 is higher by 108% than the P&G contribution claimed in 2018-19. It has further stated that the Petitioner has not furnished any justification for claiming such higher amount in 2019-20. DVPCA has further pointed out that during the process of framing the 2019 Tariff Regulations, all the generating companies including the Petitioner, had submitted the operational data for the past years, including O&M expenses, which also included the contribution towards P&G. It has added that the normative O&M expenses specified under Regulation 35 of the 2019 Tariff Regulations was only after giving due consideration to the requirement of the various generating companies including P&G contribution. In response, the Petitioner has reiterated its submissions in the matter of P&G fund in terms of its response to the objections raised in the period 2014-19.

    225. The matter has been considered. It is observed that the normative O&M expenses includes a portion of contribution towards gratuity and pension, which is not separately quantifiable for the Petitioner. It is also noted that under the heading P&G contribution for the period 2014-19, the actual O&M expenses including P&G during Order in Petition No. 575/GT/2020 Page 166 of 176

    166

    the period 2014-19 are lower than the O&M expense norms allowable under the 2014-

    19 Tariff Regulations. Further, the normative O&M expenses determined by the Commission, while framing the 2019 Tariff Regulations, are based on the information furnished by various generating stations. In view of this, we are not inclined to allow P&G contribution for the period 2019-24.

    Mega Insurance Expenses and Share of Subsidiary activity

    226. The Petitioner has claimed projected expenditure towards Mega Insurance and Share of Subsidiary activities, as additional O&M expenses as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Mega Insurance Expenses 114.65 120.17 125.97 132.04 138.41
    Share of Subsidiary activities 488.18 511.72 536.39 562.26 589.37
    Total 602.82 631.89 662.36 694.30 727.78

    227. The Respondent KSEBL has submitted that the claim for expenses towards ash evacuation, mega insurance and subsidiary activities ought to be rejected, as such expenses are already built in the normative O&M expenses, which are in the nature of a price-cap. It has therefore submitted that these expenses ought to be met from the normative O&M expenses allowed to the Petitioner and cannot be allowed separately.

    Mega Insurance Expenses

    228. The Petitioner has claimed total Rs. 631.24 lakh in the period 2019-24 towards Mega Insurance expenses under Regulations 76 and 77 of the 2019 Tariff Regulations. The Objector, DVPCA has submitted that the Petitioner has not referred to any extraordinary factors that have necessitated additional insurance cover for its units. It has also submitted that any comprehensive insurance is always cost effective in comparison to individual insurance policies and hence, it is not clear as to how mega insurance could lead to additional O&M expenses. The Petitioner in its rejoinder Order in Petition No. 575/GT/2020 Page 167 of 176

    167

    has reiterated its submissions made in its petition for the period 2014-19, on this issue.

    229. The matter has been considered. It is observed that, the Commission while specifying the O&M norms for the period 2019-24 had considered and factored the 'insurance expenses' as part of its calculations for O&M expense norms. Since the said regulations have been notified after extensive stakeholder consultations, we find no reason to exercise the power under Regulation 76 or Regulation 77 of the 2019 Tariff Regulations and grant relief to the Petitioner. In view of this, claim of the Petitioner under this head is not allowed.

    Share of Subsidiary Activities

    230. The Petitioner has claimed total amount of Rs. 2687.91 lakh during the period 2019-24 towards Share of Subsidiary activities under Regulations 76 and 77 of the 2019 Tariff Regulations. The Objector, DVPCA has submitted that the Petitioner has also claimed contribution to subsidiary funds and has claimed the Return on Equity, Interest on Loan and Depreciation on the common assets namely Direction Office, Subsidiary Activities, Other Offices, R&D, IT Centre and Central Office for the period 2019-24 under the nomenclature "share of common office expenditures". As such, the contribution to subsidiary fund is not allowable as the Return on Equity, Interest on Loan and Depreciation on the common assets have already been claimed separately. The Objector has further submitted that the Commission, in its order dated 28.9.2017 in Petition No. 224/GT/2015, had disallowed the expenditure on subsidiary activity and the same was to be recovered as part of the normative O&M expenses. The Objector, has also submitted that it has demonstrated that the actual O&M expenses, including the expenditure on subsidiary activity, for the period 2014-19, have been lower than the normative O&M expenses specified under the 2014 Tariff Regulations. Similarly. Order in Petition No. 575/GT/2020 Page 168 of 176

    168

    the normative O&M expenses provided under the 2019 Tariff Regulations would be sufficient to cover such expenses for the period 2019-24. In response, the Petitioner has reiterated its submissions in the matter of expenses for subsidiary activities made in its replies relating to the period 2014-19.

    231. The matter has been considered. It is noted from the judgments of APTEL dated 23.11.2007 and the judgment dated 23.7.2018 of the Hon'ble Supreme Court that the apportioned expenditure associated with subsidiary activities can be recovered through electricity tariff. Since the amount claimed is small, we are not allowing the share of subsidiary activities at this juncture, however, the Petitioner, may at the time of truing up of tariff for the period 2019-24, furnish the actual audited apportioned expenditure associated with subsidiary activities for consideration of the Commission.

    Share of Common Office Expenditure

    232. The Petitioner has submitted that the projected expenditure pertaining to common office expenditure such as Direction Office, Central Office, Other Offices, Subsidiary activities, IT centre and R&D caters services to all generating stations as well as composite transmission and distribution systems. The Petitioner has stated that it has allocated the cost of common offices amongst its generating stations, based on the installed capacity, and has claimed additional capital expenditure as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Direction Office 0.00 0.00 0.00 0.00 0.00
    Subsidiary Activities 0.00 0.00 0.00 0.00 0.00
    Other Offices 132.00 66.39 222.42 15.52 0.00
    R&D 0.00 0.00 0.00 0.00 0.00
    IT 960.00 1240.00 0.00 0.00 0.00
    Central Office 0.00 0.00 0.00 0.00 0.00
    Total 1092.00 1306.39 222.42 15.52 0.00

    Order in Petition No. 575/GT/2020 Page 169 of 176

    169

    233. The head-wise, additional capital expenditure claimed by the Petitioner towards various offices is as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Sub Station equipment 132.00 66.39 222.42 15.52 0.00
    Network Access Controller and Data Centre 960.00 1240.00 0.00 0.00 0.00
    Total 1092.00 1306.39 222.42 15.52 0.00

    234. The Petitioner has computed the Return on Equity, Interest on Loan and Depreciation on the Common Assets for the period 2019-24, based on the opening capital cost as on 1.4.2019, for different offices, and has apportioned them to each generating stations and T&D system, in proportion to the capital cost, claimed as on 31.3.2019. Further, the Petitioner has allocated the cost of common offices, amongst its generating stations, on the basis of installed capacity. Accordingly, the annual fixed charges claimed for assets of common offices are as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Direction Office 60.21 60.21 60.21 60.21 60.21
    Subsidiary Activities 114.93 114.93 114.93 114.93 114.93
    Other Offices 219.28 231.91 250.29 265.43 151.45
    R&D 183.01 175.44 167.87 165.66 165.66
    IT 149.74 319.41 407.60 394.52 381.44
    Central Office 809.38 747.16 668.93 435.29 435.29
    Total 1536.55 1649.04 1669.83 1436.05 1308.98
    2019-20 2020-21 2021-22 2022-23 2023-24
    Common Office expenditure apportioned to all DVC generating stations 1423.20 1527.40 1546.65 1330.11 1212.42
    Common Office expenditure apportioned to T&D 113.35 121.65 123.18 105.93 96.56
    Total 1536.55 1649.04 1669.83 1436.05 1308.98

    235. In line with the above, the Petitioner has claimed apportioned common office expenses, for this generating station as under:

    Order in Petition No. 575/GT/2020 Page 170 of 176

    170

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    235.98 253.26 256.45 220.55 201.03

    236. The matter has been considered. It is observed that the common office expenditures are associated with the various offices of the Petitioner, but not to subsidiary activities. In order to work out the common office expenses to be allowed as a part of determination of tariff for the period 2019-24, we have examined the additional capital expenditure claimed by the Petitioner. The Petitioner has claimed projected additional capital expenditure during the period 2019-24 as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    1 Fully automated microprocessor-based portable CT&PT Analyzer (CRITL) 35.00 0.00 0.00 0.00 0.00
    2 10 kV Digital Insulation Tester (CRITM) 17.00 0.00 0.00 0.00 0.00
    3 Relay Test Kit (CRITL) 80.00 0.00 0.00 0.00 0.00
    4 Dielectric Frequency Response Analysis (DFRA) Test Kit (CRITL) 0.00 36.17 0.00 0.00 0.00
    5 Flash Point of Transformer Oil Measurement Kit (CRITL) 0.00 4.70 0.00 0.00 0.00
    6 3-Phase Portable Power Source (CRITM) 0.00 21.00 21.00 0.00 0.00
    7 Laptop (CRITM) 0.00 4.52 4.52 0.00 0.00
    8 Fully Automatic Three Phase Transformer Test Kit (CRITM) 0.00 0.00 75.58 0.00 0.00
    9 Swift Frequency Response Analysis (SFRA) Test Kit (CRITL) 0.00 0.00 21.72 0.00 0.00
    10 Furan Test Kit (CRITL) 0.00 0.00 60.00 0.00 0.00
    11 3-Phase Portable Reference Standard Meter (0.02 Class) (CRITM) 0.00 0.00 39.60 0.00 0.00
    12 Line Impedance Measurement Kit 0.00 0.00 0.00 15.52 0.00
    13 Network Access Controller, Next Generation Firewall (NGFW) and Networking Switches 160.00 40.00 0.00 0.00 0.00
    14 Data Centre (Hardware & Licenses) 800.00 1200.00 0.00 0.00 0.00
    Total 1092.00 1306.39 222.42 15.52 0.00

    237. As regards additional capital expenditure claimed for fully automated microprocessor-based portable CT&PT Analyser and 10 kV Digital Insulation Tester, the Petitioner has submitted that CT&PT analyser is required for replacement of the existing 220 KV & 132 KV CTs in DVC grid with 0.2 Accuracy Class CTs, as per CEA guidelines. As regards Relay Test Kit (CRITL); Dielectric Frequency Response Order in Petition No. 575/GT/2020 Page 171 of 176

    171

    Analysis (DFRA) Test Kit (CRITL); Flash Point of Transformer Oil Measurement Kit(CRITL); 3-Phase Portable Power Source (CRITM); Laptop (CRITM); Fully Automatic Three Phase Transformer Test Kit (CRITM); Swift Frequency Response Analysis (SFRA) Test Kit (CRITL); Furan Test Kit (CRITL); 3-Phase Portable Reference Standard Meter (0.02 Class) (CRITM); and Line Impedance Measurement Kit, the Petitioner has submitted that these items are required to facilitate testing, condition monitoring of various power equipment's and smart meters. As regards additional capital expenditure claimed for Network Access Controller, next generation Firewall (NGFW) and networking Switches, the Petitioner has submitted that in order to comply with cyber security guidelines, of MOP, GOI, NCIIPC network security layer are proposed to be established, so that access to the system is provided to authenticated users only. As regard claim for Data centre, the Petitioner has submitted that the procurement of hardware and licenses for Oracle to host EBA and other DVC applications, website, Firewall, Managed Back-up services, Load Balancer, IPS and Log Servers, IT infrastructure servers like DHCP, Ex-Bus, DNS, Virtualization, Security Appliances and storage in a DRC at different seismic zone, has been planned to be completed during the years 2019-20 and 2020-21.

    238. The matter has been considered. It is observed that the items mentioned under the head 'Substation Equipment's' are required for the efficient functioning of the substations (including generating stations' switchyards) and therefore, the claim is allowed. As regards Network Access Controller, next Generation Firewall (NGFW), Networking switches and Data Centre, it is observed that the proposed additional expenditure is for measures taken to strengthen cyber security, in terms of the MOP, GOI guidelines dated 12.4.2010 and therefore the claim is allowed. Further, considering the nature of works, additional capitalization claimed against the head 'IT Order in Petition No. 575/GT/2020 Page 172 of 176

    172

    Equipment' are allowed. The Petitioner is however, directed to furnish additional information regarding the total expenditure incurred on this count, the segregated claims during the periods 2014-19 and 2019-24, the expenditure envisaged in future etc., along with supporting documents, at the time of truing-up of tariff.

    239. Based on the above, the total additional capital expenditure allowed under Common Office expenses for the period 2019-24, is summarised below:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Sub Station Equipment 132.00 66.39 222.42 15.52 0.00
    Network Access Controller and Data Centre 960.00 1240.00 0.00 0.00 0.00
    Total 1092.00 1306.39 222.42 15.52 0.00

    240. It is observed that that the Petitioner has worked out Common Office expenses for various offices, including Subsidiary activities. However, expenses of subsidiary activities will be dealt at the time of truing-up of tariff for the period 2019-24.

    241. Accordingly, the annual fixed charges for Common offices have been worked out by considering the opening capital cost as on 1.4.2014. The annual fixed charges for Common Offices, as worked out has been apportioned to the generating stations / T&D systems of the Petitioner, based on approved capital cost as on 31.3.2014 and the same is subject to truing-up for the period 2019-24. Accordingly, the share of common office expenses, worked out and allocated to the generating station are as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Depreciation 458.06 357.82 300.14 310.67 232.58
    Interest on Loan 91.10 136.51 163.38 148.52 135.87
    Return on Equity 517.46 553.96 577.23 580.86 581.10
    Total 1066.62 1048.29 1040.75 1040.05 949.55

    Order in Petition No. 575/GT/2020 Page 173 of 176

    173

    (Rs. in lakh)

    Capital Cost as on 1.4.2014 2019-20 2020-21 2021-22 2022-23 2023-24
    All DVC Generating stations 2036943.91 981.93 965.06 958.12 957.47 874.16
    T&D 175678.95 84.69 83.23 82.63 82.58 75.39
    Total 2212622.86 1066.62 1048.29 1040.75 1040.05 949.55

    242. As regards the common office expenditure for the generating station, it is observed that the Commission vide its order dated 3.10.2016 in Petition No. 207/GT/ 2015 had observed the following:

    "61. The petitioner has claimed the projected expenditure of Rs. 208.76 lakh during 2014-15, Rs. 194.64 lakh during 2015-16, Rs. 248.00 lakh during 2016-17, Rs. 363.90 lakh during 2017-18 and Rs. 412.33 lakh during 2018-19 and apportioned to Mejia 7&8 towards Common Office Expenditure which includes expenditure on Direction Office, Central Office, Other Offices, subsidiary activities, IT and R&D. The apportioned amount of share of Common Office expenditure includes return on equity, depreciation and interest on loan on the Common assets. The generating station is a new 1000 MW station for which normative O&M as specified under the 2014 Tariff Regulation, includes Corporate Office expenses also and under Corporate Office expenses, depreciation and interest on loan has also been included. Accordingly, the normative O&M expense for 500 MW unit size as allowed to the generating station includes the expenditure for Common Offices in respect of depreciation and interest on loan. As per special provisions relating to DVC generating stations specified under the Regulation 53 of 2014 Tariff Regulations and also as per the order of Tribunal dated 27.11.2007 in Appeal no 273/2006, the Common Office expenditure are to be allowed for the purpose of determination of tariff. The petitioner has furnished the details of total "Office Expenditure" in respect of the generating stations and T&D systems are as under:

    ……

    The Commission has considered the O&M norms for this generating station as specified for 500 MW units including the expenditure for Common Offices in respect of depreciation and interest on loan. Therefore, only return on equity has been allowed as computed in the above table. Accordingly, return on equity of Rs. 87.01 lakh in 2014-15, Rs. 93.07 lakh in 2015-16, Rs. 115.68 lakh in 2016-17, Rs. 154.82 lakh in 2017-18 and Rs. 175.65 lakh in 2018-19 is allowed as part of share of Common office expenditure and annual fixed charges for the generating station."

    243. Since, the Commission has considered the O&M norms for this generating station as specified for 500 MW units including the expenditure for Common Offices in respect of depreciation and interest on loan, only ROE has been allowed as computed in the above table. Accordingly, the share of Common office expense computed for Order in Petition No. 575/GT/2020 Page 174 of 176

    174

    this generating station, is as under:

    (Rs. in lakh)

    2019-20 2020-21 2021-22 2022-23 2023-24
    Total Common Office Expenditure for generating stations (A) 981.93 965.06 958.12 957.47 874.16
    Total Common Office Expenditure for T&D (B) 84.69 83.23 82.63 82.58 75.39
    Total Common Office Expenditure for generating stations and T&D C=(A+B) 1066.62 1048.29 1040.75 1040.05 949.55
    Total Depreciation for generating stations and T&D (D) 458.06 357.82 300.14 310.67 232.58
    Total Interest on loan for generating stations and T&D (E) 91.10 136.51 163.38 148.52 135.87
    Total Return on equity on for generating stations and T&D (F) 517.46 553.96 577.23 580.86 581.10
    Total of Depreciation, Interest on Loan and ROE of Generating Station and T&D (G) 1066.62 1048.29 1040.75 1040.05 949.55
    Return on equity corresponding to the generating stations only (A/C) *F (H) 476.38 509.98 531.40 534.74 534.96
    Apportionment of the common office expenditure as claimed to RTPS including depreciation, interest on loan and ROE. (I) 162.81 160.02 158.87 158.76 144.94
    Apportioned amount of only “Return on Equity” corresponding to the generating station (I/A)x H (J) 78.99 84.56 88.11 88.67 88.70
    Common Office Expenses 2019-20 2020-21 2021-22 2022-23 2023-24
    RTPS (this generating station) 78.99 84.56 88.11 88.67 88.70

    Annual Fixed Charges allowed

    244. Based on the above discussion, the annual fixed charges allowed for the generating station is summarized as follows: (Rs. in lakh)
    2019-20 2020-21 2021-22 2022-23 2023-24
    Depreciation 44099.99 47629.86 48083.40 48092.72 48092.72
    Interest on loan 26722.70 25383.03 20975.24 16132.03 11282.40
    Return on Equity 27085.91 29253.71 29532.28 29538.00 29537.99
    Interest on Working Capital 9126.26 8638.11 8065.87 8064.81 8062.96
    O&M Expenses 24312.00 25164.00 26052.00 26964.00 27912.00
    Water Charges 3336.58 3660.22 4026.24 4428.86 4885.09
    Security Expenses 2356.69 2470.33 2589.45 2714.32 2845.20
    Special Allowance 0.00 0.00 0.00 0.00 0.00
    Sub-Total (A) 137040.13 142199.26 139324.48 135934.73 132618.37
    Interest & Contribution on Sinking Fund 946.95 1013.23 1084.16 1160.05 1241.25
    Order in Petition No. 575/GT/2020 Page 175 of 176

    175

    2019-20 2020-21 2021-22 2022-23 2023-24
    Share of P&G 0.00 0.00 0.00 0.00 0.00
    Share of Common Office Expenditure 78.99 84.56 88.11 88.67 88.70
    Mega Insurance Expenses 0.00 0.00 0.00 0.00 0.00
    Share of subsidiary activities 0.00 0.00 0.00 0.00 0.00
    Sub-Total (B) 1025.93 1097.79 1,172.27 1,248.72 1,329.96
    Total Annual Fixed Charges (C=A+B) 138066.07 143297.05 140496.75 137183.45 133948.32

    Note: (1) All figures are on annualized basis. (2) All figures under each head have been rounded. The figure in total

    column in each year is also rounded. As such the sum of individual items may not be equal to the arithmetic total of

    the column.

    245. The annual fixed charges approved as above are subject to truing up in terms of Regulation 13 of the 2019 Tariff Regulations.

    Application Fee and Publication expenses

    246. The Petitioner has sought the reimbursement of filing fee paid by it for filing the tariff petition for the period 2019-24 and for publication expenses. The Petitioner shall be entitled for reimbursement of the filing fees and publication expenses in connection with the present petition, directly from the beneficiaries on pro-rata basis in accordance with Regulation 70(1) of the 2019 Tariff Regulations.

    247. Similarly, RLDC Fees & Charges paid by the Petitioner in terms of the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Dispatch Centre and other related matters) Regulations, 2019, shall be recovered from the beneficiaries. In addition, the Petitioner is entitled for recovery of statutory taxes, levies, duties, cess etc. levied by the statutory authorities in accordance with the 2019 Tariff Regulations.

    248. Petition No. 575/GT/2020 is disposed of in terms of the above.

    Sd/- Sd/- Sd/- (Pravas Kumar Singh) (Arun Goyal) (I.S. Jha) Member Member Member

    Order in Petition No. 575/GT/2020 Page 176 of 176