JUDGMENT
The petitioner challenge Exhibit P18 order of the District Collector, which has directed stoppage of the quarrying operation conducted on the strength of Exhibit P1 quarrying lease issued to one P.M.Basheer and transferred to the petitioner as per Exhibit P19 proceedings of the Director of Mining & Geology. The original lessee is said to be the brother-in-law of the petitioner, who obtained Exhibit P1 lease from the Department of Mining and Geology to carry out quarrying operations in the land owned by the petitioner. The lease has been granted by Exhibit P2 order and the petitioner also was conducting a metal crusher unit in the property, as is evident from Exhibit P3. The consent issued by the Pollution Control Board for operation of the quarry had been varied and the said modified consent is valid till 30.06.2018, as is seen from Exhibit P4. The Explosive Licence is produced at Exhibit P5.
6
WP(C) No.14261 of 2016 - 2 -
2. The petitioner was earlier issued with Exhibit P6 stop memo by the Assistant Engineer, Periyar Valley Irrigation Project [for brevity "PVIP"] for reason of an aqueduct, under the PVIP, having suffered damages resulting in leakage of water for reason of the blasting operations carried on in the quarry. The petitioner was before this Court with W.P.(C) No.31236 of 2013, which was disposed of by Exhibit P7 directing the District Collector, Ernakulam to finalise the proceedings. The District Collector issued stop memo dated 24.11.2015, which was challenged in a further writ petition, numbered as W.P.(C) 36841 of 2015 and produced therein as Exhibit P19. The communication of the District Collector to the Geologist, Mining and Geology Department dated 21.11.2015 [produced as Exhibit P18 in that writ petition] was also challenged. By Exhibit P9 judgment, produced in the present writ petition, it was found that the directions in Exhibit P7 was not complied with and, hence, the District Collector was directed to take appropriate decision within six weeks and the impugned orders were quashed. The said proceedings resulted in Exhibit P18 order being passed, which is challenged by the petitioner.
7
WP(C) No.14261 of 2016 - 3 -
3. A reading of Exhibit P8 would indicate that the inspection of the site by the Additional District Magistrate revealed that the aqueduct is situated within 250 meters of the quarry. It was also reported that the wall of the aqueduct was damaged at many places and it was reported that in all probability the damage caused could be, by reason of the construction being age-old. It was noticed that the Chief Engineer, Irrigation Department had written to the Additional Chief Secretary that the aqueduct was within 250 meters of the quarry and in such circumstance, there ought to have been a No Objection Certificate (NOC) issued by the Irrigation Department. The Chief Engineer had also indicated that though the damage caused to the structure of aqueduct was by reason of its age, noticing the undertaking of the petitioner that any further damage caused due to the quarrying operations would be repaired at the cost and consequence of the petitioner himself; opined that an NOC could be issued. However, the Government refused to grant a NOC , since even if the existing damages were rectified, due to the continued operation of the quarry there would be damages and loss caused to the irrigation work. It was considering
8
WP(C) No.14261 of 2016 - 4 - these facts that Exhibit P18 order was issued by the District Collector.
4. The learned Senior Counsel appearing for the petitioner would contend that even going by the report of the Irrigation Department, the age-old aqueduct was in a state of disrepair, only for reason of passage of time and the quarrying operation had nothing to do with the damage caused. The contention raised on behalf of the Government that Section 40 of the Kerala Irrigation and Water Conservation Act, 2003 [for brevity
"Act of 2003"] prohibits mining and quarrying operation within a radius of one kilometre of an aqueduct, without written permission of the Irrigation Officer, is argued to be not applicable for reason of the Collector having not notified the boundaries of the irrigation work, as is required under sub-section (1) of Section 40.
5. When the matter was heard on an earlier occasion, it was pointed out by the learned Government Pleader and the additional 3rdrespondent impleaded, that there was also a check dam situated within 10 meters of the quarry. This is sought to be refuted by the learned Senior Counsel on the basis of Exhibits P23
9
WP(C) No.14261 of 2016 - 5 - to P25 produced along with the counter affidavit to the impleading petition, respectively issued by the Panchayat, Assistant Executive Engineer, PVIP and Executive Engineer, PVIP.
6. The additional 3rdrespondent has impleaded himself claiming to be the voice of the local people in and around the quarry, who were aggrieved with the operations carried on for reason of the damage caused to the residential buildings, the pollution emanating from the operations, the indiscriminate plying of vehicles and also impact on the environment. The additional 3rd respondent has listed out a number of grounds, indicated from (a) to (n), in his affidavit, which, according to the learned Counsel, are in addition to the existence of an aqueduct within 250 meters and a check dam within 10 meters. The learned Counsel would also place reliance on a number of decisions of this Court to urge that the quarry carried on by the petitioner would be a "mine" as defined under the Mines Act, 1952 and the operations would be regulated by the said Act as also the Metalliferous Mines Regulations, 1961; as has been held in Rajmohan Nair And Others v. State of Kerala And Others [ILR 1997 (1) Ker. 268]. The right to life
10
WP(C) No.14261 of 2016 - 6 - guaranteed under Article 21 and the restriction insofar as a quarrying operation affecting such right is urged on the basis of
Thilakan v. Circle Inspector Of Police & Ors. of Police [2008 (1) KLT 141]. The authority of the District Collector to issue orders regulating or even stopping the mining operations is projected on the basis of
Gokuldas v. Geologist [2009 (3) KLT 924]. It is also contended that the decision of the Hon'ble Supreme Court in Deepak Kumar
v. State of Haryana [(2012) 4 SCC 629], which has been elaborately considered in All Kerala River Protection Council v. State of Kerala [2015 (2) KLT 78] also mandates an environmental clearance under the Environmental Impact Assessment notifications [for brevity "EIA notifications"], which the petitioner does not have.
7. The learned Senior Counsel appearing for the petitioner would take serious objection to the additional grounds raised by the additional 3rdrespondent, pointing out that the scope of the writ petition filed by the petitioner is the challenge made to Exhibit P18 and an additional respondent cannot seek to raise the grounds so raised; which have not been considered by the District
11
WP(C) No.14261 of 2016 - 7 - Collector in Exhibit P18 and this Court also would not look into the same. The learned senior counsel would also argue that the additional respondent is a former employee who seeks to wreck vengeance on the petitioner for reason of loss of employment.
8. This Court has to accept the contentions of the learned Senior Counsel insofar as the various other grounds raised by the additional 3rdrespondent in his affidavit filed in support of the impleading petition and also the reply affidavit. It is to be noticed that the writ petition is not of the objector and it is the quarry owner who has come before this Court challenging Exhibit P18 order of the District Collector. If the District Collector's order is not sustainable, then the objector/additional respondent or any from amongst the public could take their remedies with respect to the other grounds before the District Collector or before the appropriate authority. However, as of now the jurisdiction exercised by this Court under Article 226, invoked by the instant writ petition, is confined to the challenge against Exhibit P18 order. Even the ground raised of a check-dam existing, within 10 meters of the quarry, has not been looked into by the District Collector. There is
12
WP(C) No.14261 of 2016 - 8 - also considerable dispute, fuelled further by the contrary stances taken by the authorities themselves as to whether there is a check- dam, or whether its a bridge or a check-dam now in disrepair. This Court however is not satisfied that the additional respondent is motivated for extraneous reasons since, as pointed out by the learned Counsel, the additional respondent had been agitating the cause before the various authorities. There were also writ petitions filed, in earlier instances against the very same quarry, when the petitioner did not raise such a contention.
9. Exhibit P18 order is only on the ground that there is no written permission obtained from the Irrigation Officer under Section 40 of the Act of 2003. Section 40 is extracted hereunder:
"40. Mining or quarrying near certain works etc:-
(1) The Collector shall, in consultation with the Irrigation Officer, by notification, specify the boundaries of an irrigation work.
(2) Not withstanding anything contained in any other law for the time being in force, no person shall, without the written permission of the Irrigation Officer, conduct mining or quarrying operation using explosives within a radius of one kilometre of any bridge, dam, check dam or any other work, structure
13
WP(C) No.14261 of 2016 - 9 - or construction, owned, controlled or maintained by the Government, a local authority or any other authority.
(3) Any person aggrieved by the refusal of permission under sub-section (2) may, within thirty days from the date of receipt by him of the communication of such refusal, file an appeal to the Collector and the Collector shall decide the appeal within sixty days from the date of receipt of the appeal and his decision thereon shall be final:
Provided that an appeal filed after the expiry of thirty days may be admitted by the Collector if he is satisfied that the appellant had sufficient cause for not filing the appeal in time."
10. The learned Senior Counsel would contend that the aqueduct referred to is an irrigation work, as defined in the Act, and such a work is not referred to in sub-section (2) of Section 40. The various structures as mentioned in sub-section (2) of Section 40 has to be considered ejusdem generis and any 'other work' could only mean a bridge, dam or check dam or a similar construction. Alternatively it is also contended that if at all "aqueduct" comes within the definition of "any other work", then there is a mandate on
14
WP(C) No.14261 of 2016 - 10 - the District Collector to specify the boundaries of such work in consultation with the Irrigation Officer, as is seen from sub-section (1); in which event only the prohibition under sub-section (2) would be applicable.
11. Sub-section (1) of Section 40 clothes the District Collector with the power to specify the boundaries of the irrigation work. An "irrigation work" as defined under Section 2(w), which definition need not be extracted, refers to a number of structures/constructions which are intended at setting up, aiding and providing irrigation. The aqueduct under the PVIP through which water is supplied to the general public of the locality, is definitely an "irrigation work" coming within the definition in the Act. While sub-section (1) empowers the Collector to specify the boundaries of an irrigation work, it has to be noticed that the distance rule as noticed in sub-section (2) does not speak of a prohibition only when such a notification is made. Sub-section (2) does not even speak of boundaries of an irrigation work and prohibits conduct of "mining or quarrying operation using explosives within a radius of one kilometre of any bridge, dam,
15
WP(C) No.14261 of 2016 - 11 - check dam or any other work, structure or construction, owned, controlled or maintained by the Government, a local authority or any other authority". Hence, if a boundary is provided with respect to an irrigation work; reading sub-sections (1) and (2) together, the prohibitory distance would have to be measured from such boundary. If not, the prohibitory distance should be measured from the structure or construction itself. On such interpretation, this Court cannot countenance the contention of the petitioner that without a notification, specifying the boundary of an irrigation work, no prohibition can be made under sub-section (2) or a requirement insisted, of a written permission from the Irrigation Officer, for carrying on such mining or quarrying operation.
12. The rule of ejusdem generis also would not come to the aid of the petitioner, since the prohibition is from using explosives within a radius of one kilometre of a bridge, dam, check dam or any other work. What is included in the definition under Section 2(w) are canals, field channels, reservoirs and such like constructions which carry water or store it. Bridge as normally understood would be one connecting land separated by water and
16
WP(C) No.14261 of 2016 - 12 - the other two are reservoirs for storing water, with purpose inter alia of supply of drinking water, irrigation, both essential to sustenance of life and generation of power a prerequisite of today's world. An aqueduct which supplies water to the general public for irrigation and to provide drinking water can only be considered to be a work coming within the Section since the enactment itself deals with irrigation and water conservation; an integral part of which are the reservoirs and the supply lines. Interpreting the provision so, this Court does not see any infirmity in the impugned order of the District Collector. It is made clear that this Court has not considered the other aspects raised by the additional respondent, since those were never considered by the first authority, the District Collector. Those grounds are left open to be agitated by the additional respondent, if need so arise. The writ petition is dismissed, sustaining the impugned order; without any order as to costs.
Sd/-
K.Vinod Chandran Judge.
Vku/-
[ true copy ]
17