Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Judges
Acts
  • SECTION 38 FACTORIES ACT 1948
  • Rule 13 of MSIHC Rules 1989.
  • Rules, 1989 [MSIHC Rules, 1989] and Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996 [CAEPPR Rules, 1996]. Under MSIHC Rules, 1989, Petroleum
  • Compensation Act, 1974,
Smart Summary

Factual and Procedural Background

Proceedings were initiated on a news item in the Indian Express dated 01.07.2020 titled "Tamil Nadu Neyveli boiler blast: 6 dead, 17 injured". The National Green Tribunal (Principal Bench) issued advance notice to TNPCB, CPCB, District Magistrate & Collector, Cuddalore, M/s NLC India Ltd (NLCIL) and the Director of Industrial Safety & Health, Tamil Nadu. An independent Committee (CPCB, TNPCB, District Magistrate Cuddalore, NEERI and IIT Chennai) was constituted to visit the site and report. The Committee visited the site, afforded opportunities to industry and victims, and submitted a report dated 23.10.2020. The Tribunal heard the matter (date of hearing 17.12.2020) and uploaded its order on 22.12.2020. Connected Original Application No. 130/2020 (earlier filed before Southern Zonal Bench) addressed related concerns about environmental clearance, risk assessment and the safety of Units 1–7 of TPS-II.

Legal Issues Presented

  1. Whether there was violation of environmental and industrial safety norms in the Neyveli boiler blast and who is responsible.
  2. What further course of action, including remedial measures, compensation and regulatory oversight, is required to prevent recurrence.
  3. In the connected application: whether Environmental Clearance and related regulatory oversight (including human health/occupational assessment, HIRA/HAZOP and safety management) are inadequate and whether ageing/obsolescent units should be retired.

Arguments of the Parties

Applicant (Original Application No. 130/2020)

  • Environmental Clearance lacked provisions for Human Health/Occupational assessment, risk and safety management as required by Technical Guidance (MoEF 2010) and Standard EC conditions for Thermal Power Plants (19.11.2018).
  • Negligence and repeated similar incidents; Units 1–7 nearing retirement and old/obsolete technology increase safety and environmental risks; risk of further incidents affecting workers and nearby residents.
  • Submitted that no thermal power plant should operate without risk, hazard and safety auditing.

Respondent — M/s NLC India Ltd (NLCIL)

  • Stated that Flue Gas Desulphurization (FGD) has been installed.
  • Contended that recommendations on retirement are only recommendatory and that the technology is not obsolete.
  • Maintained that internal and external teams ensured risk assessment processes and that the plant holds relevant certifications (ISO 45001-2018).

Respondent — Ministry of Environment, Forest & Climate Change (MoEF&CC)

  • Filed an affidavit referencing the regulatory framework (MSIHC Rules, 1989; CAEPPR Rules, 1996) and noted actions being taken in compliance with Tribunal directions (including committees for restoration plan and compensation, and revamping industrial monitoring).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
OA No. 73/2020, In re: Gas Leak at LG Polymers Chemical Plant in RR Venkatapuram Village, Visakhapatnam Tribunal's directions on industrial safety, monitoring and regulatory response in a major industrial incident. Court noted MoEF&CC actions "in compliance with the Tribunal's directions" in OA 73/2020 and considered those measures while directing follow-up action in the present matter.
OA No. 22/2020 (WZ), Aryavart Foundation vs. Yashyashvi Rasayan Pvt. Ltd. & Anr. Order addressing industrial accident and regulatory response. Referenced by the MoEF&CC affidavit as part of a series of similar incident orders informing regulatory measures; court treated these as context for systemic action.
OA No. 43/2020 (EZ), Bonani Kakkar vs. Oil India Limited & Ors. (Baghjan oil well blow out) Order concerning environmental damage and incident response. Included among prior incidents considered by MoEF&CC and the Tribunal in framing required regulatory and remedial responses.
OA No. 106/2020 (Sainor Life Sciences gas leakage) Order relating to gas leakage incident and its consequences. Referenced as part of the pattern of industrial incidents informing the Tribunal's emphasis on monitoring and safety audits.
OA No. 107/2020 (Ammonia gas leakage at Nandyal) Order on industrial gas leakage incident and regulatory oversight. Seen by the Court as part of connected matters prompting systemic regulatory measures.
OA No. 134/2020 (Visakha Solvents Ltd. fire) Order concerning fire at a chemical plant and related relief/response. Included in MoEF&CC affidavit's list of incidents; used as contextual support for Tribunal's directions.
OA No. 272/2020 (Sujapur plastic recycling factory explosion) Order in relation to explosion and fatal injuries in a factory. Part of the set of incidents the Tribunal referenced when considering regulatory improvements.
OA No. 274/2020 (Methane gas leak in sugar factory, Solapur) Order regarding methane gas leak and its effects. Referenced among similar incidents to justify broader regulatory and audit directives.

Court's Reasoning and Analysis

The Tribunal considered the independent Committee report (dated 23.10.2020) and the record. The Committee's factual findings established that on 01.07.2020 cleaning of lignite dust in a box-type girder at 32 ML led to an explosion and fire: six persons died on the spot, further persons subsequently died during treatment, and multiple were injured. The Committee identified causes: open girder openings not closed; lack of SOPs for confined-space cleaning; inadequate training; no work permits; and lack of awareness about smouldering lignite and water-gas formation when water is applied to red-hot lignite.

The Committee assigned primary responsibility to the Occupier of Unit 5 (NLCIL), Divisional Head of Operation & Maintenance and the Safety Officer. It observed violations of statutory safety norms, including provisions of the Factories Act (notably Section 38) and applicable MSIHC Rules, 1989, and recommended remedial and preventive measures (detailed SOPs, training, HAZOP/HIRA, structural studies, use of thermal scanners/endoscopes, explosion vents, confined-space permits, improved housekeeping and emergency planning, and audits).

The Tribunal found the Committee's assessment persuasive: safety protocols and required permits/training were not followed; hazardous gases generation rendered MSIHC Rules applicable; and there were statutory violations. The Tribunal noted compensation and relief already paid/distributed by NLCIL and government orders, and acknowledged deposit of Rs.5 crores with the District Collector in compliance with its earlier order. On OA130, the Tribunal considered submissions on EC, ageing units and safety but refrained from directing retirement of units, accepting NLCIL's position on assessments and certification while mandating strict monitoring and expert audits.

Holding and Implications

HOLDING: The Tribunal disposed of Original Application No. 108/2020 and connected matters after accepting the Committee report and directing implementation of its recommendations. The Tribunal found violations of safety norms (including under the Factories Act, 1948 and MSIHC Rules, 1989) attributable to the occupier and key officers, and confirmed compensation and deposits made by NLCIL.

Implications and directives (direct effect):

  • Direct implementation of remedial measures recommended in the Committee report; further action in terms of that report is directed and the Committee's work is appreciated.
  • Report to be placed on CPCB and State PCB websites for at least six months.
  • If excess funds remain after compliance, the excess may be refunded to the company.
  • Secretaries, Ministries of Power and Coal (in coordination with other Departments/Institutions) are directed to undertake safety audits of similarly placed thermal power stations across the country expeditiously, preferably within six months.
  • In Original Application No. 130/2020 the Tribunal declined to order retirement of Units 1–7 but required adoption, monitoring and auditing of all safety measures; the application is disposed of.

No new legal precedent was pronounced beyond the application of statutory provisions and directions specific to the incidents and remedial measures outlined in the Committee report.

    NEYVELI THERMAL POWER STATION IN TAMIL NADU ON WEDNESDAY DATED 1ST JULY 2020 IN WHICH ATLEAST SIX PEOPLE WERE KILLED AND 17 INJURED IN A BOILER BLAST v. .

    Item Nos. 07&08 Court No. 1

    BEFORE THE NATIONAL GREEN TRIBUNAL

    PRINCIPAL BENCH, NEW DELHI

    Original Application No. 108/2020 (With report dated 23.10.2020) News item published in the "Indian Express"

    dated 01.07.2020 titled

    "Tamil Nadu Neyveli boiler blast: 6 dead, 17 injured"

    WITH

    Original Application No. 130/2020 (Earlier Original Application No. 94/2020(SZ)) (I.A. No. 245/2020, I.A. No. 246/2020& I.A No. 247/2020)

    Meenava Thanthai K.R. Selvaraj Kumar Meenavar Nala Sangam Applicant

    Versus

    Union of India & Ors. Respondent(s) Date of hearing: 17.12.2020

    Date of uploading of order: 22.12.2020

    CORAM: HON'BLE MR. JUSTICE ADARSH KUMAR GOEL, CHAIRPERSON HON'BLE MR. JUSTICE SHEO KUMAR SINGH, JUDICIAL MEMBER HON'BLE DR. SATYAWAN SINGH GARBYAL, EXPERT MEMBER HON'BLE DR. NAGIN NANDA, EXPERT MEMBER

    ORDER

    1. Proceedings in this matter were initiated on the basis of a news item in the "Indian Express" dated 01.07.2020 titled "Tamil Nadu Neyveli boiler blast: 6 dead, 17 injured". Advance notice was issued to the Tamil Nadu Pollution Control Board (TNPCB), Central Pollution Control Board (CPCB), District Magistrate & Collector, Cuddalore, M/s Neyveli Thermal Power Station (NLCIL), Cuddalore and the Director of Industrial Safety and Health Department, Tamil Nadu.

    1

    2. The matter was considered on 08.07.2020 in light of report of the State PCB and response of the NLCIL, acknowledging the death of six persons and injury to 17 persons in the incident in question. The Tribunal considered the note filed by the CPCB based on preliminary report as follows:-

    "4. The CPCB has filed a note based on a preliminary report of the unit in respect of incidents dated 07.05.2020 and 01.07.2020 as follows:

    " Incident Happened on 01.07.2020

    • Unit-5 having capacity of 210 MW of Thermal Power Station-II (TPS-II) was shutdowned for maintenance work at 9.30 hrs on 30.06.2020.

    • Unit-5 boiler left for cooling.

    • Next day on 01.07.2020, at 7.00AM, cleaning activities with water was carried out on the boiler floor and structures.

    • At about 9.45 hrs suddenly explosion followed by fire occurred.

    • On site, 17 persons got injured and hospitalised. 6 persons were found fatal at the boiler zone at 28 metre level.

    • It is informed that the Directorate of industrial Safety & Health is carrying out inspection today i.e. 02.07.2020.

    Incident Happened on 07.05.2020

    1. Fire accident occurred in TPS-II, Unit-6

    2. At 16:41 hrs Unit 6 got tripped due to high furnace pressure.

    3. In meantime information was received from bunker area that there was fire in the conveyor belt and the vicinity at 32 ML. Bunker filling was being carried out at Unit 6 during that time.

    4. At 16:47 hours, Unit 5 also got tripped followed by unit 7 due to drum level very low protection.

    5. The lignite feeding conveyor belt caught fire and about 2 tonnes of lignite loaded in the belt was burnt along with 130 meters length of the belt.

    6. 8 persons were injured and they were rushed to hospital for treatment.

    7. With great efforts the fire was quenched at about 18:30 hours.

    8. A committee has been formed to investigate the incident and report yet to receive.

    9. Directorate of Industrial Safety & Health has issued closure order on 08.05.2020 for unit 6.

    2

    10. The NLC Officer informed that on 14.05.2020, committee has carried out preliminary investigation through VC.

    11. 4 injured person admitted in hospital died during 08 to 14.05.2020 and remaining 4 persons are undergoing treatment."

    3. Apparent cause of accident was fire from the boiler. The Tribunal considered it necessary to require independent verification of facts and payment of interim compensation on the principle of absolute liability, pending further orders. Accordingly, an independent Committee comprising of the CPCB, TNPCB, District Magistrate, Cuddalore, NEERI and IIT Chennai was constituted to visit the site, ascertain facts taking into account the version of the industrial unit and other stake holders and the circumstances and give an independent report on following:

    a. The sequence of events;

    b. Causes of failure and persons and authorities responsible therefor;

    c. The compliance of norms laid down in Technical Guidance Manual for Thermal Power Plants.

    d. Compliance with statutory safety norms including hazard risk management.

    e. Extent of damage to life, human and non-human; public health; and environment - including, water, soil, air;

    f. Steps to be taken for compensation of victims and restitution of the damaged property and environment, and the cost involved; g. Remedial measures to prevent recurrence;

    h. Any other incidental or allied issues found relevant.

    4. The Tribunal directed that the Committee may also prepare restoration plan and finally quantify the compensation required to be

    3

    paid. The Chief Secretary, Tamil Nadu was to identify and take appropriate action against person responsible for failure of statutory regulatory framework. The TNPCB was to ensure that the unit does not commence its operations unless all safety precautions are taken. The Committee constituted by the MoEF&CC in the said case was to take into account the present incident also in the course of preparing its report to be furnished in the said case.

    5. Accordingly, the Committee has given its report dated 23.10.2020. The Committee held its meeting on 02.09.2020, visited the site on 09.09.2020 and 10.09.2020. It gave opportunity to the industry to present its view point. Victims were also given opportunity to place their view point. The Committee examined the relevant documents on record and interacted with the officials at the site. The Committee also looked into the background of the industry, statutory status, process details, status of compliance of pollution control norms and other significant facts.

    6. The conclusion of the Committee are as under:-

    CONCLUSION AS PER SCOPE OF WORK BASED ON NGT

    DIRECTION

    a. The sequence of events;

    The following was the sequence of events revealed by the industry.

    • On 30.06.2020 at 9.31 hrs.: Unit-5, stage - II of Thermal Power StationII (TS-II) was shut downed due to heavy slag discharge for maintenance work and boiler left for forced cooling by deploying ID & FD fans.

    • On 01.07.20, fateful day and at the time of accident, forty- seven (47) persons belong to Boiler housekeeping group were working.

    • On 01.07.2020, at 7.00 AM, under the supervision of Deputy Chief Engineer, E5 level executive in-charge of housekeeping, a team of 10 workmen reached the floor at 15 ML with an intention to remove the lignite dust from the girder. Found that

    4

    the work spot was so hot and found the red hot lignite dust (smoldering) inside the girder at front & right side opening. So dropped the plan of cleaning at 15 ML and decided to clean at

    32 ML.

    • On 01.07.2020, at 7.30 AM, started removing the accumulated lignite dust from the box type girders at 32ML front and rear side of boiler, by engaging 5 workmen on each side using scrappers made of mild steel and Iron pans

    • Around 08:00 hours, four workmen entered inside the rear side girders through right opening and started removing the lignite dust at 32ML. About 100 steel Pans of lignite dust (about 200 kg total) were removed and after completing the work, four workmen came out around 09.30 hours and started taking rest at 28 ML floor. No water washing was carried out.

    • Around 08:00 hours, five workmen were engaged at the front side of boiler for the job of removing the lignite dust from the girders at both the ends. About 30 Iron Pans of lignite dust (about 35 kg total) was removed and the work was going on.

    • Around 09:45 hours, after completion of cleaning work at rear right side of girder at 32ML, housekeeping in-charge, who was overseeing the cleaning works on the same floor had sent one of the workmen, who was engaged in the cleaning work of the girder, inside the rear side girder at 32ML to check and ensure that the lignite dust was fully removed, so that follow-up action of closing of manhole door work can be given to Boiler Maintenance group. When he entered into the girder to carry out the inspection. DCE was near the opening

    • Around 09:53 hours, all of sudden, an explosion took place resulting in fatal injuries to the individual along with 5 other workmen, who all were carrying out cleaning of front side girder at 32ML. Six workmen killed on the spot. The fireball that has leaped out of the girder caused severe burn injuries to those standing nearby box girders at 28ML floor. (Four workmen and Deputy Chief Engineer). 12 employees were also injured at different levels of 0, 15 & 32 ML.

    • Around 09:55 hours, on hearing the blasting sound, fire wing of TS-II unit, Central Industrial Security Force (CISF), NLCIL comprising of 8 fire personnel along with fire tender reached the accident site. Found that fire was at different levels of boiler structures up to 32 ML. Ambulance was called for.

    • By the time, Firefighting personnel from TS-II expansion unit also reached the accident site

    • Immediately the fire personnel swing into action to put off the fire and searched for causalities

    • The Assistant Commandant and three inspectors of Fire reached the accident site and assessed the situation. Requested the additional force from all the seven fire stations and pressed into the operation

    • On receipt of request, fire crews from nearby station namely TS-I, TS-I Expansion, Mine-I, Mine-IA and Mine-II reached the accident site and started their operation

    • DIG, Sr. Commandant, Deputy Commandant and Sector commanders of the industry reached the accident spot and started executing the fire fighting and rescue operation

    5

    • Security personnel of different unit also called and pressed into the operation particularly to control the crowd

    • At around 10:08 hours, the accident was informed to the local administration

    • At around 10:30 hours, CISF Fire personnel put off the fire completely. Eleven fire personnel from New Neyveli Thermal Power Plant (NNTPP) along with the fire tender reached the accident spot and joined the rescue operation

    • Seventeen persons got injured and were sent to the Hospital of M/s. NLCIL for medical treatment

    • After providing initial medical treatment at NLCIL hospital, sixteen persons were sent to Apollo Hospital, Chennai for further and better treatment. One injured person was admitted in NLCIL hospital for treatment of injury on left hand joint.

    • Fire personnel continues the search operation of accident area and found six bodies as detailed below:

    At the front side of boiler at 28ML:

    All the five persons working inside and outside of the girder, killed on the spot. Two bodies were removed from inside of the girders one each at left and right side. Three bodies were removed from outside of the girders two at left and one from right side.

    At the rear side of boiler at 28ML floor:

    One person who gone inside the girder to check, died on the spot. The Executive, DCE approaching the openings got injured and expired at the Apollo hospital, Chennai on 03.07.20. Four workmen standing at a distance of twenty to twenty-five feet distance on 28 ML floor gratings got severe burn injury.

    • At around 13:30 hours, the entire operation was completed and fire crews except TS-II and TS-II Expansion, returned to their respective station after a briefing by the Senior Commandant.

    • At around 14:55 hours, after getting final clearance, Fire crews of TS-II and TS-II Expansion returned to their respective fire station.

    • At around 12.30 hours a meeting was convened and discussed about the accident and related issues including the treatment, relief measures, compensation and employment on compassionate ground etc. and address the same. The meeting was attended by CMD, Functional Directors, District Collector, Sub Collector, Superintendent of Police, and Revenue Officials. The meeting was continued till evening and could not solve the issue. The meeting was continued on 02.07.20 too and with some local representatives. Finally decided a compensation of Rs. 30 (Rupees thirty lacs) and 5 (Rupees five lacs) lacs to the deceased and injured respectively and a regular job to one of the family member of each deceased.

    6

    • Out of sixteen person undergone treatment in Chennai, nine persons died during treatment on various date. Seven injured discharged after the treatment

    • On 02.07.20 a closure notice was served by Directorate of Industrial Safety and Health to the Unit-V for the lapse of safety, which caused the death and injuries to the employees.

    b. Causes of failure and persons and authorities responsible therefore;

    Causes of failure

    • The openings provided in the Girders were not closed after the completion of structure erection work.

    • Due to lack of knowledge on SOP in carrying out cleaning activities in a confined area as well as technical knowledge about smoldering of accumulated fine lignite dust and probable formation of water gas.

    • Due to lack of knowledge on application of water to the red hot lignite, water gas will be generated. Water gas consists of Carbon monoxide and Hydrogen. When Hydrogen reaches the level of 4% in ambient air, gets exploded with the release of enormous energy spontaneously

    • SOPs for confined space are not followed.

    • Necessary training for the working in confined area was not imparted; awareness program was not conducted for the persons involved in the accident and also in the hazardous areas.

    • No work permit was issued before the girder cleaning Persons and authorities responsible:

    The following officers are mainly responsible for the accident

    • The Occupier of the unit no.: 5, TS-II, M/s. NLCIL

    • Divisional Head of Operation and maintenance of the unit

    • Safety Officer c. The compliance of norms laid down in Technical Guidance Manual for Thermal Power Plants.

    I. Environmental Legislations:

    i. Under the Water Act

    The industry has obtained consent of TNPCB under the Water (P&CP) Act, 1974 with validity up to 31.03.2020 vide Board's Proceeding dt. 01.08.2019 and subsequently extended up to

    7

    30.09.2020 vide TNPCB office orders dated 01.04.2020 and 01.07.2020 in view of the lockdown due to the pandemic Covid19. The industry has been consented to discharge 100 KLD of sewage and 6225 KLD of trade effluent. The industry has provided septic tank/dispersion trench arrangements for the treatment and disposal of sewage.

    The industry has also provided treatment plant for the waste water generated from the canteen and the treated waste water is disposed on land within the premises for gardening.

    The trade effluent generated from Demineralization plant is neutralized in neutralization tank and then treated in a settling tank along with effluent from other sources such as boiler blow down, cooling tower bleed off, floor washings, etc. The settling tank overflow is discharged into an adjacent canal The trade effluent generated from Demineralization plant is neutralized in neutralization tank and then treated in a settling tank along with effluent from other sources such as boiler blow down, cooling tower bleed off, floor washings, etc. The settling tank overflow is discharged into an adjacent canal. The one sample of treated sewage (canteen waste water) and trade effluent were collected by Committee on 10.09.2020 and analyzed in TNPCB Lab. The details of analytical report are furnished below:

    Test results of Treated Sewage (canteen waste water)

    S No Para meter Test Results Standards Remarks
    1 pH 7.21 5.5 to 9.0 All the parameters of the treated sewage adhere to the standards prescribed by the Board.
    2 TSS 12 30
    3 BOD 16 20

    the standards

    prescribed by the

    Board.

    Test results of Treated Trade Effluent

    S. No. Parameter Test Results Standards Remarks
    1. pH 7.20 5.5 to 9.0

    All the parameters

    2. TSS 104 100

    8

    3. TDS 932 2100 are within the

    4. Chlorides 185 1000 Standards except TSS which is marginally

    above the standards.

    5. Sulphate 187 1000
    6. Oil & Grease < 2 10
    7. BOD 21 30
    8. COD 176 250
    9. Total chromium < 0.05 2
    10. Lead < 0.05 0.1
    11. Mercury < 0.003 0.01
    12. Arsenic < 0.01 0.2

    The industry has provided online monitoring system at the outlet of

    the settling tank for the parameters such as Temperature, pH and

    TSS and the same has been connected to the Water Quality Watch,

    TNPCB, Chennai and CPCB server.

    The status of compliance of the conditions of the latest consent

    order is detailed below:

    Sl. No. Condition Compliance status
    1 The unit shall ensure that the treated trade effluent shall satisfy the standards prescribed by the Board before disposal. The test report of the sample collected on 10.09.2020 reveals that all the parameters are within the limits prescribed by the Board except the

    TSS (104 mg/litre) which is

    2 The unit shall maintain the online sensor Thmea rgionnallilnye a mboovneit othrien sgt ansdyasrtde m(1 00 is for pH, Temperature, TSS in the treated mmaign/tlaitirnee)d. and the data are effluent disposal line in good condition transferred to the Water Quality

    and upload the data to Water Quality Watch, TNPC Board, Chennai

    Watch, TNPC Board, Chennai.

    ii. Under the Air Act

    The industry has been issued with consent of the Board under the Air (P&CP) Act, 1981 up to 31.03.2020 vide Board's Proceeding dated 01.08.2019 and extended up to 30.09.2020 vide Board office orders dated 01.04.2020 and 01.07.2020.

    9

    The industry has been consented to let out emission as follows.

    Stack No. Point of emission sources Air Pollution Control measures Height of stack (in m)
    1 Boiler furnace of unit - I Electrostatic Precipitator with stack 170
    2 Boiler furnace of unit – II Electrostatic Precipitator with stack 170
    3 Boiler furnace of unit – III Electrostatic Precipitator with stack 170
    4 Boiler furnace of unit – IV Electrostatic Precipitator with stack 220
    5 Boiler furnace of unit – V Electrostatic Precipitator with stack 220
    6 Boiler furnace of unit - VI Electrostatic Precipitator with stack 220
    7 Boiler furnace of unit - VII Electrostatic Precipitator with stack 220

    The industry has provided Electro Static Precipitators (ESP) with

    stacks of suitable height as air pollution control measures to the

    boilers. The industry has also provided water sprinkler system/

    dust suppression system/ fogging system to suppress fugitive

    emission

    The industry has provided online stack monitoring system for

    parameters PM, SO2 and NOx and connected the same to the Care

    Air Centre (CAC), TNPCB, Chennai and CPCB.

    The NLC has installed Continuous Ambient Air Quality Monitoring

    Stations at the following 5 locations near Thermal Power Station-II

    and the ambient air quality is monitored by the IIT-M, Chennai/NLC

    Lab (NABL accredited) for PM10, PM2.5, SO2, and NOX. Samples are

    being collected from each location on alternate days and analyzed.

    i. Block No 29

    ii. Umangalam

    iii. Mudanai village

    iv. Chinna Kappankulam

    v. Vadakkuvellur The report of analysis of Ambient Air Quality for the period of June 2020 to August 2020 is furnished below.

    10

    The AAQM data for the month of June, 2020

    Sl.No. Station PM10 (µg/m3) PM2.5 (µg /m3) SO2 (µg /m3) NOx (µg /m3)
    1. Block 29 50.6 to 57.9 18.2 to 26.7 2.8 to 5.0 14.0 to 28.2
    2. Umangalam 45.6 to 67.4 21.9 to 32.5 1.87 to 3.18 16.1 to 22.4
    3. Mudanai 44.6 to 55.7 19.6 to 29.3 2.56 to 4.04 15.3 to 21.4
    4. Chinna 41.1 to 69.6 21.4 to 36.2 2.14 to 3.26 16.6 to 26.6
    5. Kappankulam Vadakku vellur 65.1 to 76.5 27.3 to 38.4 3.98 to 5.68 24.9 to 36.7

    (µg /m3)

    1. Block 29 50.6 to 57.9 18.2 to 26.7 2.8 to 5.0 14.0 to 28.2

    2. Umangalam 45.6 to 67.4 21.9 to 32.5 1.87 to 3.18 16.1 to 22.4

    3. Mudanai 44.6 to 55.7 19.6 to 29.3 2.56 to 4.04 15.3 to 21.4

    4. Chinna 41.1 to 69.6 21.4 to 36.2 2.14 to 3.26 16.6 to 26.6

    5. Kappankulam Vadakku vellur

    65.1 to 76.5 27.3 to 38.4 3.98 to 5.68 24.9 to 36.7 Standards 100 60 80 80

    The AAQM data for the month of July, 2020

    S. No Station PM10 (µg/m3) PM2.5 (µg /m3) SO2 (µg /m3) NOx (µg /m3)
    . B lock 29 41.5 to 54.4 19.1 to 29.9 4.1 to 6.0 18.3 to 25
    . U mangalam 49.8 to 69.6 20.2 to 33.7 1.98 to 3.25 15.0 to 31.5
    . M udanai 48.8 to 69.1 20.2 to 28.6 2.46 to 3.72 16.2 to 23.6
    . C h inna 45.7 to 57.2 20.5 to 29.4 2.16 to 3.7 16.3 to 26.5
    . Kappankulam V adakku vellur 60.9 to 74.3 28.7 to 36.8 3.78 to 4.95 23.2 to 33.9

    No (µg/m3) (µg /m3) (µg /m3)

    (µg /m3)

    1. B lock 29 41.5 to 54.4 19.1 to 29.9 4.1 to 6.0 18.3 to 25

    2. U mangalam 49.8 to 69.6 20.2 to 33.7 1.98 to 3.25 15.0 to 31.5

    3. M udanai 48.8 to 69.1 20.2 to 28.6 2.46 to 3.72 16.2 to 23.6

    4. C h inna 45.7 to 57.2 20.5 to 29.4 2.16 to 3.7 16.3 to 26.5 Kappankulam

    5. V adakku vellur 60.9 to 74.3 28.7 to 36.8 3.78 to 4.95 23.2 to 33.9 Standards 100 60 80 80

    The AAQM data for the month of August, 2020

    S. No Station PM10 (µg/m3) PM2.5 (µg /m3) SO2 3 NOx (µg /m3)
    1. B lock 29 42.5 -52.2 19.7 to 29.9 2.1 7.5 14.3 - 24.2
    2. U mangalam 58.1 – 68.6 21.3 – 33.7 2.19 – 3.12 16.1 – 30.1
    3. M udanai 43.2 -58.2 20.2 – 29.8 2.15 – 3.19 15 – 22.6
    4. C h inna Kappankulam 42.6 – 56.5 21.1 – 29.1 2.13 – 3.1 17.3 – 26.6

    11

    5. V adakku vellur 59.6 - 69.1 21.1 - 35.1 3.69 - 4.76 21 - 30.6

    Standards 100 60 80 80

    The above data shows that PM10, PM2.5, SO2 and NOx in the ambient air are within the standards prescribed by the Board The CPCB vide its Letter dated 11.12.2017 has given time limit from March 2021 to Dec 2022 for the implementation of Flue Gas Desulphurization (FGD) to control the emission of SO2 (in the units 1 to 7 of TPS II) and for the unit 5, the time limit is up to June 2022. The status of compliance of the conditions of the latest consent order is detailed below:

    Sl. No. Condition Compliance status
    1 The unit shall operate and maintain the Air Pollution Control measures efficiently and continuously so as to satisfy the Emission /Ambient Air Quality standards prescribed by the Board. The unit has provided air pollution control measures for the point and fugitive sources of emission.
    2 The unit shall comply with the emission Standards for Thermal Power Plants as per Ministry’s Notification S.O. 3305(E) dated: 07.12.2015, G.S.R. 593(E) dated: 28.06.2018 and as amended from time to time. The online stack emission data from January to April 2020 shows that PM (67 to 70 mg/ m3), NOx (197 to 253 mg/ m3) were within the standards (100 & 600 mg/ m3 respectively). The SO2 (1336 to 1945 mg/m3) was above the standards (600 mg/m3). For the control of SO2 emission, the CPCB has given time limit up to June 2022 for providing Flue Gas Desulphurization (FGD). [The full month details for May and June 2020 are not available due to server problem.]
    3 The unit shall comply with the MoEF & CC Notifications on Fly Ash Utilization S.O, 763(E) dated14.09.1999, S.0. 979(E) dated 27.08.2003, S.O. 2804(E) dated 3.11.2009, S.O. 254(E) dated 25.01.2016 as amended from time to The industry has provided dry fly ash collection system. The fly ash is disposed to cement industries and brick manufacturers. The bottom ash is sent to Mine-II of NLC India Ltd for back filling in the mined area.

    time.

    12

    4 The unit shall install Flue Gas The industry has initiated action to install FGD Desulphurization (FGD) System system and has informed that tendering based on Lime/Ammonia dosing to process is in progress.

    capture Sulphur in the flue gases to

    meet the SO2 emissions standard of

    100 mg/Nm3 by December 2021,

    September 2021, June 2021, March

    2022, June 2022, September 2022, &

    December 2022 in unit 1, 2, 3, 4, 5, 6

    & 7 respectively so as to comply SO2

    emission limit as reported.

    iii. Solid Waste Management:

    The industry has provided dry fly ash collection system. The industry generates 3150 Tonnes per day of fly ash. The fly ash is disposed to cement industries and brick manufacturers. The bottom ash/slag is sent to Mine-II of NLC India Ltd for back filling in the mined area

    The industry is generating 175 Tonnes per Annum of used/spent oil (Hazardous Waste). The industry has obtained authorization under the Hazardous Waste (Management, Handling and Transboundary Movement) Rules 2008 vide Board's proceeding dated 09.02.2017 with validity up to 08.02.2022.

    iv) Environmental Clearance:

    NLC Thermal Power Station II was commissioned in two stages from 1986 to 1993. The industry has obtained Environmental Clearance in two stages. The Environmental Clearance for the stage II of the TPS-II (units 4,5,6 & 7 - 4 x 210 MW) was obtained on 05.01.1983 from the Ministry of Environment, GoI., New Delhi. The status of the compliance of the conditions of the environmental clearance is detailed below:

    Sl.No. Conditions Compliance

    13

    1. Adequate control equipment would be installed to contain the emissions of pollutants from the stacks in such a way that the ambient concentration of SO2 and particulate matters remain within the desirable limits of 60µg/m3 and 150µg/m3 respectively. he industry has provided lectrostatic Precipitator with stack of uitable height for the boiler. As per the atest CPCB Notification, the AAQ standards prescribed is M10 - 100 µg /m3 M2.5 – 60 µg / m3 O2 - 80 µg / m3 Ox - 80 µg / m3
    2. Appropriate monitoring system should be set up to have regular sampling and analysis of the pollutants in the ambient air. This will help in ascertaining the efficient of the equipment and useful in taking suitable measures to maintain the desired ambient standard. hse p ienrd tuhset rmyo hnaitso rininsgt arlelepdo r5t fnour mJubneers 2 o0f2 0, hoen ptianruaomuse tAerms bPiMen1t0 A, iPr MQ2u.a5l,i ty monitoring tations near the TPS II O2 and NOx are within the rneds ctrhieb eadm lbimieintst (aciorp qyu aofl itthy ei sr empoonrti tored nyc IlIoTs-eMd,) .C hennai/NLC Lab (NABL ccredited).

    d. Compliance with statutory safety norms including hazard risk management.

    M/s NLCIL is a public sector enterprise conferred with status of Navratna Company by Government of India. The following statutes are applicable to this organization:

    1. The Factory Act, 1948

    2. The Tamil Nadu Factory Rules, 1950 and

    3. Manufacture, Storage, Import of Hazardous Chemicals Rules,

    1989.

    The general safety awareness among the workforce and managerial staff found to be satisfactory during the field visits. In addition to that some of the sections of the factories act needs to be looked into, which were one of the contributory factors for the cause of this accident and they are listed as -

    Sec 7A General Duties of Occupier (1) Every occupier shall ensure, so far as is reasonably practicable, the health, safety and welfare of all workers while they are at work in the factory.

    Sec 11 Cleanliness (1) Every factory shall be kept clean and free from effluvia arising from any drain, privy or other nuisance, and (a) in particular- accumulations of dirt and refuse shall be removed daily by sweeping or by any other effective method from the floors

    14

    and benches of workrooms and from staircases and passages, and disposed of in a suitable manner.

    Sec 14 Dust and Fumes (1) In every factory in which, by reason of the manufacturing process carried on, there is given off any dust or fume or other impurity of such a nature and to such an extent as is likely to be injurious or offensive to the workers employed therein, or any dust in substantial quantities, effective measures shall be taken to prevent its inhalation and accumulation in any workroom, and if any exhaust appliance is necessary for this purpose, it shall be applied as near as possible to the point of origin of the dust, fume or other impurity, and such point shall be enclosed as far as possible.

    Sec 33 Pits, sumps, openings in floors, etc.- (1) In every factory fixed vessel, sump, tank, pit or opening in the ground or in a floor which, by reasons of its depth, situation, construction or contents, is or may be a source of danger, shall be either securely covered or securely fenced.

    Sec 36. Precautions against dangerous fumes, gases, etc.- (1) No person shall be required or allowed to enter any chamber, tank, vat, pit, pipe, flue or other confined space in any factory in which any gas, fume, vapour or dust is likely to be present to such an extent as to involve risk to persons being overcome thereby, unless it is provided with a manhole of adequate size or other effective means of egress. (2) No person shall be required or allowed to enter any confined space as is referred to in sub-section (1), until all practicable measures have been taken to remove any gas, fume, vapour or dust, which may be present so as to bring its level within the permissible limits and to prevent any ingress of such gas, fume, vapour or dust and unless- (a) a certificate in writing has been given by a competent person, based on a test carried out by himself that the space is reasonably free from dangerous gas, fume, vapour or dust; or (b) such person is wearing suitable breathing apparatus and a belt securely attached to a rope the free end of which is held by a person outside the confined space.

    Sec.37. Explosive or inflammable dust, gas, etc.- (1) Where in any factory any manufacturing process produces dust, gas, fume or vapour of such character and to such extent as to be likely to explode on ignition, all practicable measures shall be taken to prevent any such explosion by-

    (b) Removal or prevention of the accumulation of such dust, gas, fume or vapour.

    (c) Exclusion or effective enclosure of all possible sources of ignition.

    (2) Where in any factory the plant or machinery used in a process such as is referred to in sub-section (1) is not so constructed as to withstand the probable pressure which such an explosion as aforesaid would produce, all practicable measures shall be taken to

    15

    restrict the spread and effect of the explosion by the provisions in the plant or machinery of chokes, baffles, vents or other effective appliances.

    Sec.38. Precautions in case of fire. - (2) Effective measures shall be taken to ensure that in every factory all the workers are familiar with the means of escape in case of fire and have been adequately trained in the routine to be followed in such cases.

    Site observations:

    1. SOPs for confined space are not followed.

    2. Necessary training for the working in confined area was not imparted; awareness program is not conducted for the persons involved in the accident and also in the hazardous areas.

    3. No work permit was issued before the girder cleaning.

    4. Proper maintenance schedules are to be prepared.

    5. Boiler startup and shutdown procedures shall be developed and followed strictly.

    6. Hazard Identification and Risk Assessment shall be renewed.

    7. Periodicity of the Mock Drills and frequency shall be enhanced.

    8. Safety audit was carried out by National Safety Council in the year 2018. The same may be carried out at the earliest.

    9. NLC has prepared onsite emergency plans in 2020 as per Rule 13 of MSIHC Rules 1989. Whereas no evidence was found with regard to full fledged rehearsals on onsite emergency plan. Also, up-dating of telephone numbers in case of superannuation of employees, transfers, promotions shall be carried out as and when required.

    10. Off-site Emergency Plan and rehearsals shall be carried out in coordination with the District Collector to mitigate offsite emergency situations arises, if any.

    Extent of damage of life, human and non-human; public health; and environment including water, soil, air;

    The Committee studied the various short and long-term effects of the fire accident on the surrounding areas. The Committee also examined the immediate impacts of the blast and release of high energy on humans, other non-living beings, environment and their likely impact in the short and longterm.

    Extent of damage to life and human:

    i. Data obtained from the NLC officials and survived witness reveals that, during this incident, 17 personnel were injured and all were sent to NLC GH for medical treatment, after providing initial medical treatment at NLC GH, 16 injured personnel were further sent to Apollo Hospital Chennai for further treatment and one person with minor injury remained admitted at NLC GH for treatment.

    16

    ii. CISF Fire Wing personnel searched the entire affected area of the Boiler and recovered six dead bodies which were trapped at inaccessible/congested and dark areas inside the girders with rigorous efforts.

    iii. The accident took place within the industry premises, no loss or damage to other life except the following.

    Extent of damage to life and human

    S. No. Stages Dead Injured
    1. At the time of accident 6 17
    2. First aid given at NLC Hospital -- 17
    3. Treated at Apollo Hospital for further treatment -- 16
    4. Treated at NLC hospital itself and discharged -- 01
    5. Number of persons dead at later stages during treatment 09 --
    6. Number of persons treated at Apollo hospital and discharged -- 07
    Total 15 08

    Extent of damage to the property; Material damages due to the accident and its estimated cost

    S.

    Material damages Estimated Cost, lacs No.

    1. Girder material 151

    2. Girder works 153

    3. Refractory material 21

    4. LT cables and Automatics 10

    5. Control & Instrumentation 21

    6. Boiler Lift 128

    7. Civil work including removal of debris 170 Total 654

    (Rupees six and half crore)

    Nonoccurrence of damage to non-humans has been ascertained. As far as environmental issue is concerned there was no visible damage to the environment including air, water and soil. Observations is based on the following facts:

    1. As the incident occurred almost in a confined enclosure type i.e., girder.

    17

    2. Within 30-40 minutes fire was engulfed, contained within the work area and did not spread to open environment

    3. Incident occurred at 32 M height (within 20-meter radius), flooring of all levels is steel gratings and entire plant area is covered with concrete flooring.

    4. From the Online data of five Ambient Air Quality stations located surrounding the unit for the month of June and July, 2020 it is observed that the amount of emission discharged due to the accident is not quantifiable and below the detection limit.

    5. Occurrence of healthy vegetation around the plant justifying no damage to vegetation due to this fire accident.

    6. No smoke strain is observed on any of the surfaces

    f. Steps to be taken for compensation of victims and restitution of the damaged property and environment and the cost involved;

    In accordance with the Employee Compensation Act, 1974, the mechanism of calculating the Compensation is

    Compensation = 50% of Monthly wages * Relative factor

    Ministry of Labour and Employment, GoI has notified Rs.15000/- ( Rupees fifteen thousand only ) as monthly wages with effect from 3rd January, 2020 vide Notification S.O.71(E) dt.: 3rd January, 2020. The amount of compensation to be paid to the deceased and injured as per the Employee Compensation Act, 1974 is detailed below:

    Age As On Nature of Date of Employee Sl. No. Name Wages Employment Birth Compensation 01-07-

    2020

    1 2 3 4 5 6 7

    Deceased

    NLCIL 04-10- 10,70,100

    1 Sivakumar.G Employee 53 140363

    1967

    2 Ravichandran C NLCIL 15-5-1970 50 65380 11,48,175 Employee

    NLCIL 01-04- 11,98,500

    3 Vaithiyanathan A M Employee 48 92249

    1972

    NLCIL 07-10- 12,23,025

    4 Jothiramalingam V Employee 47 100641

    1972

    5 Suresh R NLCIL 26/12/1970 49 89274 11,73,525 Employee

    NLCIL 05-02- 9,89,625

    6 Ravichandran K* Employee 56 73107

    1964

    18

    Indcoserve 05-04-

    7 Selvaraj G Society 51 15501 NE

    1969

    Howsicos 04-05-

    8 Elangovan T Society 49 15501 NE

    1971

    Anandapadmanabha Indcoserve 01-01- 9 n T Society 44 15501 NE

    1976

    Private 04-07-

    10 Ramanathan D Contract 46 15501 NE

    1974

    Private 05-07-

    11 Nagaraj P Contract 42 15501 NE

    1978

    Private 09-07-

    12 Silambarasan S Contract 24 15501 NE

    1995

    Private 06-09-

    13 Arunkumar S Contract 26 15501 NE

    1994

    Private 04-05-

    14 Venkatesaperumal K Contract 28 15501 NE

    1992

    Private 11-04-

    15 Padmanaban K Contract 29 15501 NE

    1991

    Total 68,02,950

    *It is reported that Shri. K. Ravichandran, a regular employee also eligible for the Employee Compensation and all other benefits as other deceased. Payment is kept pending since there is a dispute in identifying the legal heir due to dispute within the family. Once it is resolved, the payment will be released to the legal heir/s. Whereas Co-operative Society and Private Contract workers are covered under Employee State Insurance (ESI). Under ESI Act, monthly pension at the rate of 90% of last drawn wages, are admissible to them. The industry extended their service in filing the return for the monthly pension and the same is under process. Whereas Statutory, Non statutory and Total compensation paid by the industry is placed at A8, A9 and A10.

    The Hon'ble Minister of Coal, GoI has ordered the payment of compensation of Rs.15 lacs to the deceased and regular employment to one of the family members of the deceased. The Government of Tamilnadu also announced a compensation of Rs.3.0 lacs to fourteen deceased under Chief Minister's Relief Fund and released. Copy of the Order issued to this effect is placed at A11. Thus a sum of Rs.42 lacs has been distributed as a compensation to the fourteen deceased under Chief Minister's Relief Fund by Government of Tamilnadu. A proposal has been sent

    19

    for sanction of compensation for fifteenth deceased one (Shri. K. Ravichandran) and injured too.

    A sum of Rs. 5,17,73,013/- (Rupees five crores seventeen lacs seventy three thousand thirteen only) and Rs. 40 lacs (Rupees forty lacs only) have been distributed to the deceased and injured by M/s. NLCIL towards the compensation respectively. Thus a total of Rs. 5,57,73,013/- (Rupees five crore fifty seven lacs seventy three thousand thirteen only) have been distributed towards the compensation.

    In addition, M/s. NLCIL has deposited an amount of Rs.5 crores (Rupees five crore only) in the SB account of District Collector, Cuddalore on 21st July, 2020 in compliance with the Order dt.8th July, 2020 issued by Hon'ble NGT, Principal Bench, New Delhi.

    In light of above, the Committee is of the opinion that the amount of Compensation paid by the industry is satisfactory. The process of providing regular employment to one of family members of the victims shall be completed within a period of one year.

    Relief measures extended to the victims by the industry:

    Restitution of the damaged property and the cost involved; S. No. Material damages Estimated Cost, lacs

    1. Girder material 151

    2. Girder works 153

    3. Refractory material 21

    4. LT cables and Automatics 10

    5. Control & Instrumentation 21

    6. Boiler Lift 128

    7. Civil work including removal of debris 170 Total 654

    (Rupees six and half crore)

    Restitution of Environment and the cost involved;

    From the Online data of five Ambient Air Quality stations located in the vicinity of the unit for the month of June and July, 2020, it is observed that there is no abnormal data during this period may be due to the discharge of meagre quantity (Below Detection Level) of emission due to the accident. Thus the impact on the Ambient Air quality is not quantifiable may be due to the combustion rather than a fire accident.

    Occurrence of healthy vegetation around the plant justifying no damage to vegetation due to this accident. No smoke strain is observed on any of the surfaces of the plant, within as well as

    20

    outside of the industry premises. Further it is observed that no chance of impact on the soil and water, since the accident occurred within the girder structure from 15 to 32 m elevation, flooring of all levels is steel gratings and entire plant area is covered with concrete flooring.

    Relief measures taken by the industry to the victims of the accident:

    • Rs.10 lacs through cheque and Rs.50,000/- in cash paid to the dependents of six deceased regular employees

    • Rs.5 lacs through cheque and Rs. 50,000/- in cash paid to the dependents of nine deceased Contract workmen/Supervisor.

    • Hon'ble Minister of Coal, Government of India announced Compensation of Rs.15 lacs to the deceased and regular employment to one of the family member of the deceased

    • Counseling session and motivation programs are organized for the family of the deceased to lead the normal life, in association with "Art of Living"

    • Special cell comprising members from the deceased earlier in M/s. NLCIL is formed to extend moral, psychological support, speed up the settlement process of Statutory and non- Statutory benefits and lead a normal life.

    • Medical treatment was given at Super Specialty Apollo Hospital, Chennai to the injured. Free Accommodation, food and transportation were extended to all the family members/attendees during the treatment period

    • NLC doctors and HR executives were deputed to Apollo Hospital, Chennai to supervise, co-ordinate and extend all possible support to the family members/attendees during the treatment period. Spared one number of ambulance for the use of injured persons.

    • Visit to the house of bereaved and injured persons on weekly basis to provide relief measures, assistance in getting certificates from respective agencies and created awareness about various benefits and compensation applicable to them.

    • One Nodal officer was identified to meet the needs of the family members of deceased.

    • Fruit baskets and Health Supplement were provided

    • A special cell has been constituted to support, meet the requirements, coordinate Art of Living program, console, and provide solace

    • As a policy, M/s. NLCIL extend the following facilities to the family of deceased

    • Allotment of quarter as per their choice

    • Posting in the desired units of M/s. NLCIL., Neyveli

    • Arranging well being program

    • Creating avenues for improving their livelihood

    • In claiming compensation from the Authorities

    21

    g. Remedial measures to prevent recurrence;

    1. Safety study, safety audit, HAZOP study and risk assessment shall be carried out by competent agencies.

    2. Girders structural stability study shall be conducted by reputed authorities, like IIT, Structural Engineering Research Institutes, etc.,

    3. All the unwanted openings to be closed completely to prevent lignite dust entering into the box girder, except for maintenance or specific work. It is also essential that before closing the openings, complete removal of lignite deposits by proper cleaning inside the girders (following all the safety norms) is advised.

    4. To avoid spreading lignite dust from furnace, mill house, re- suction duct, suitable dust control, dust extraction and dust suppression system shall be provided to check the fugitive emission.

    5. Suitable and appropriate explosion vent shall be provided in vertical column in consultation with the designers.

    6. Endoscopic camera shall be used to measure the dust level inside the girder to ensure the safety of the unit.

    7. For repair of box girder inside and outside by welding, adequate safety measures to be taken before allowing persons into the girders.

    8. Thermal scanner shall be used to check the hotness and temperature of the girders both inside and outside before carrying out any work inside the girders to remove the lignite dust only with the supervision of NLCIL staff with the safety clearance.

    9. Only trained persons and contract labours shall be allowed.

    10. No person shall be allowed inside the box girder without taking adequate safety procedures like confined space work permit.

    11. The points of origin of lignite dust leakage shall be identified and suitable engineering measures shall be taken to arrest the spillages and the discharge of emission.

    12. SOP shall be modified for the periodic inspection of girder and other structures for the deposition of lignite dust and periodical removal of the same. Without work permit, no work in any nature shall be carried out.

    13. Periodic rigorous housekeeping shall be carried out.

    h. Any other incidental or allied issues found relevant Earlier Incidence of fire in boiler of Unit 6 on 07.05.2020 and conclusion of the committees:

    A fire incident in Unit-6 Boiler of TS-2 was occurred on 07-5-2020 at

    16.41 hrs. In order to analyze the root cause of the incidence and suggest remedial measures to prevent reoccurrence of such incident in future, a committee was constituted which has suggested The committee thoroughly enquired with respective responsible officials and inspected Boilers in Units 5, 6 & 7 and assessed the damages and observed all evidences. All DCS historical data of

    22

    Critical Measurements, Trends and SOE print outs of Units 5, 6 & 7during the incident on 07-05-2020 were collected and analyzed in depth. Reports of six similar incidents occurred earlier in the Units 5 & 6, since 2001 were collected and reviewed critically. After complete analysis of data and evidences, the committee held detailed deliberations on the 2 possibilities for the Fire Incident (i) either due to localized pressurization inside the Boiler Furnace (ii)Explosion inside the horizontal box type girder at 42ML right side. As all the evidences were supporting the theory of Explosion inside the horizontal box type girder, the committee concluded that explosion inside the girder Box, outside the Boiler Furnace as root cause for the fire incident.

    Accordingly, recommendations were given to various working areas viz. Boiler Structural Maintenance, House Keeping, Boiler Maintenance, Lignite Handling System, Operation, Technological Up gradation (Control and Instrumentation) to avoid both possibilities of Boiler Furnace Inside Explosions as well as Boiler Outside Girders Explosion in order to operate the Units safely, without any untoward similar incidents in future.

    In addition, the committee strongly recommended the complete Healthiness Survey of all 07 Units with respect to Boiler Main Structures by Structural Specialist agencies like S̏ tructural Engineering Research Centre"(SERC, CSIR-Chennai). The committee also suggested that extra care should be taken during cleaning by following strict house-keeping measures at all locations especially in the areas of Boiler and Lignite Handling System so that Lignite Dust accumulation is avoided.

    14. CONCLUSION OF THE REPORT:

    The Accident;

    On 1st July 2020, a fire incident referred to as "Tamilnadu Neyveli Boiler Blast: 6 dead and 17 injured", occurred at the 15 ML girder of the Boiler supporting structure of unit - V of Thermal Power Station - II (TS-II), M/s. NLC India Limited, Village Ammeri, Neyveli, Viruthachalam Taluk, Cuddalore District.

    The accident took the life of six persons on the spot and subsequently nine persons while undergoing treatment at Super Specialty Hospital i.e., Apollo Hospital, Chennai. Sixteen persons were hospitalized at Apollo Hospital, Chennai and one person treated at NLC hospital itself. Besides causing damage to the industry's properties viz., boiler supporting structure, lift and cable. Fire fighting, Rescue and evacuation operations during the accident were carried out by the Fire wing of Central Industrial Security Force (CISF) unit, NLC, Neyveli. On hearing the blast sound, fire wing of

    23

    TS-II reached the spot immediately without waiting for an emergency call and swing into action.

    The Hon'ble Minister of Coal, GoI has ordered payment of compensation of Rs.15 lacs to the deceased and regular employment to one of the family members of the deceased. The Government of Tamilnadu also announced a compensation of Rs.3.0 lacs to fourteen deceased under Chief Minister's Relief Fund and released. Thus a sum of Rs.42 lacs has been distributed as compensation to the fourteen deceased under Chief Minister's Relief Fund by Government of Tamilnadu. A proposal has been sent for sanction of compensation for fifteenth deceased one and injured too. A sum of Rs. 5,17,73,013/- (Rupees five crores seventeen lacs seventy three thousand thirteen only) and Rs. 40 lacs (Rupees forty lacs only) have been distributed to the deceased and injured by M/s. NLCIL towards the compensation respectively. Thus a total of Rs.5,57,73,013/- (Rupees five crore fifty seven lacs seventy three thousand thirteen only) have been distributed towards the compensation.

    In addition, M/s. NLCIL has deposited an amount of Rs.5 crores (Rupees five crore only) in the SB account of District Collector, Cuddalore on 21st July, 2020 in compliance with the Order dt.8th July, 2020 issued by Hon'ble NGT, Principal Bench, New Delhi. Hon'ble NGT, Principal Bench, New Delhi constituted an Independent Committee to submit a report with a detailed term of reference.

    The Committee visited the accident site with and without witnesses, heard the version of the industry, examined the records and had extensive discussions with all the stakeholders.

    Reasons for the Fire Accident/Blast The Committee has identified the following as the main causes behind the blast followed by the fire accident:

    - No separate SOP was created for the periodic housekeeping including cleaning of girders. - No work permit was issued

    - The safety protocols were not followed. The Process Safety Management (PSM) systems were not implemented.

    - Trained manpower was not deployed - Safety awareness program was not conducted

    24

    - Failure to submit HAZOP & Risk Assessment Reports - The Onsite Emergency plan did not take into account any likely scenario of hydrogen gas generation on applying water to smoldering (lignite dust in hot condition) and such a case was never considered for emergency mock drill.

    Root Cause: In the light of the above, the Committee is of the view that the root causes of the accident in the girder of boiler supporting structure can be attributed to insufficient knowledge amongst staff, insufficient knowledge of the chemical properties of lignite, especially formation of water gas when water is applied on the lignite in hot conditions, poor safety protocol, poor safety awareness, inadequate risk assessment and response, poor process safety management systems and failure in conducting awareness programs among all the employees and workers about handling the smoldering.

    Possible root cause of Analysis has been represented through Fish Bone Diagram. The diagram is placed at A12. Onsite Emergency Plan:

    Lack of awareness for water gas generation: The Onsite emergency plan prepared by NLC lacked any measures to combat smoldering but only provided for fire occurrences and other accident scenarios. The NLC had no Emergency Plan to tackle the smoldering and water gas generation. To avoid recurrence of such incidences in future, M/s NLCIL is advised to take the following preventive measures.

    1. Carry out HIRA study of processes to assess the inherent risk associated with the different activities in process.

    2. HAZOP study shall be conducted.

    3. Strict Safety precautions to be taken before resuming operation of the units in accordance with the advisory issued by the Chairman, CPCB vide L.No.: B-29014/IPC- I/MSIHC/2020 dt 8th May, 2020 (A13)

    4. SOPs and SMPs of all the processes may be prepared or revised and strict adherence to the standing procedures must be ensured.

    5. SOP for handling of lignite and lignite dust in hot condition, is silent. The procedures of handling lignite and lignite dust in the hot condition may be incorporated in the SOP.

    6. Training to workforce should be further strengthened on need- based requirements.

    7. Safety Audit should be done strictly at prescribed intervals.

    8. Approved emergency plan should be regularly updated and followed

    9. Awareness program shall be conducted to the workforce before commencing the activity

    25

    10. Rigorous Housekeeping protocol shall be followed."

    7. An affidavit has been filed on behalf of the MoEF&CC on 23.11.2020 covering eight matters of incidents arising out of the leakage of hazardous gases, relating to different such incidents in the last six months1. The affidavit refers to the regulatory framework for enforcement of Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 [MSIHC Rules, 1989] and Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996 [CAEPPR Rules, 1996]. Under MSIHC Rules, 1989, Petroleum and Explosives Safety Organization (PESO) is the nodal agency to approve the sites of industrial installation and isolated storage. The PESO and CIFs while giving site-specific 1 i. Present matter AND

    ii Order dated 01.06.2020, relating to incident of gas leak dated 07.05.2020 in LG Polymers India Pvt. Limited at Vishakhapatnam, resulting in death of 11 persons and injuries to more than 100, apart from other damage (OA No. 73/2020, In re: Gas Leak at LG Polymers Chemical Plant in RR Venkatapuram Village Visakhapatnam in Andhra Pradesh);

    iii. Order dated 08.06.2020, relating to incident dated 03.06.2020 in a chemical factory,

    Yashyashvi Rasayan Pvt. Ltd. at Dahej, District Bharuch, Gujarat resulting in deaths and injuries and other damage (OA No. 22/2020(WZ) (Earlier OA 22/2020)(WZ), Aryavart Foundation through its President vs. Yashyashvi Rasayan Pvt. Ltd. & Anr.);

    iv. Order dated 02.07.2020, in relation to incident of oil well blow out on 27.05.2020 at Baghjan in the Tinsukia District of Assam resulting in deaths, injuries and damage to the environment (OA No. 43/2020(EZ), Bonani Kakkar vs. Oil India Limited & Ors.).

    v. Order dated 06.07.2020, relating to incident dated 30.06.2020 on account of gas leakage at Sainor Life Sciences factory at Parawada in industrial area on the outskirts of Vishakhapatnam (OA No. 106/2020, News item published in the local daily "Economic Times" dated 30.06.2020 titled "Another Gas Leakage at Vizag Factory kills two, critically injures four…");

    vi. Order dated 06.07.2020, relating to accident of Ammonia gas leakage at Nandyal in Kurnool District, Andhra Pradesh in Spy Agro Industry on 26.06.2020 resulting in death of one person and injury to three workers. (OA No. 107/2020, In Re: News item published in the local daily "Indian Express Sunday Express" dated 28.06.2020 titled

    "Gas Leak in Agro Company Claims life of one")

    vii. Order dated 23.07.2020, in relation to incident of fire engulfed the chemical plant of

    Visakha Solvents Ltd, Vizag on 13.07.2020 at Ramky CETP Solvents building in Pharma City resulting in injuries (OA No. 134/2020, News item published on

    1 3.07.2020 in the local daily named "India Today" titled "Massive fire engulf Vizag chemical plant, explosions heard, injuries reported"). viii. Order dated 18.12.2020, in relation to incident of explosion in a plastic recycling factory at Sujapur in Malda on 1.12.2020 resulting in death of six persons, including two minors and serious injuries to four persons (OA No. 272/2020, News item published in the "Times of India" dated 20.11.2020 entitled "Six killed as blast tears through Malda Plastic recycling factory"). ix. Order dated 18.12.2020, in relation to incident of methane gas leak in a sugar factory called Lokenete Bapurao Patil Agro Industries Ltd. in Mohol Taluka of Solapur District, Maharashtra on 21.11.2020 resulting in deaths and injuries and other damage (OA No. 274/2020, News item published in the "Indian Express" dated 23.11.2020 entitled "Maharashtra: Two Killed, eight injured in methane gas leak in sugar factory").

    26

    approvals to industrial units and isolated storage are expected to ensure preparation of onsite emergency plans and safety reports by units, review the details of mock-drills conducted and implementation of Standard Operating Procedures (SOPs) of industrial operation by the unit from industrial safety point of view. The MoEF&CC is undertaking the following actions, in compliance with the Tribunal's directions on the matter in M/s LG Polymers case, OA 73/2020 and other connected matters:

    • Committees have been constituted for 'Preparation of Restoration Plan' through CPCB and District Administration, and 'Finalization of Compensation'.

    • Action is being taken for revamping of industrial monitoring mechanism, in line with the previous directions of Hon'ble NGT O.A. No. 73/2020, Gas Leak at LG Polymers Chemical Plant in RR Venkatapuram Village, Visakhapatnam in Andhra Pradesh.

    • Consideration of the Technical and Administrative / Regulatory Framework Recommendations given by the High-Power Committee (HPC), which also include general recommendations on operation of hazardous industries/industries handling hazardous chemicals as well as industries operating in residential areas is under examination.

    8. We have heard learned Counsel for the parties and perused the record before us. The question for consideration is whether there is violation of environmental safety norms and further course of action required.

    9. The report shows that the cause of the incident is failure of the staff handling the situation which did not have the knowledge of the

    27

    SOPs and of the process. The staff was not given due training and requisite work permits. Thus, the Occupier, the Head of the Operation and Maintenance and the Safety Officer are mainly responsible for the accident. There is violation of safety norms under Section 38 of the Factories Act, 1948. There is also violation of the Manufacture, Storage, Import of Hazardous Chemicals Rules, 1989. In the process, the hazardous gases are generated, attracting the said Rules. It is mandatory to prepare on-sight and off-sight emergency plan and holding of mock drills once in six months. Standard operating procedure has not been followed nor appropriate training given to the staff handling the process. Safety protocols have not been followed. It would have been desirable that the standards operating procedures were duly explained to the handling staff in vernacular language as a part of process of awareness.

    10. We are informed that the compensation has been paid as follows:

    28

    Statement of Compensation so far paid as on 16.12.2020 for incidents on 01.07.2020 Deceased

    Sr. Name Nature of Gratuity Employee EDLI DRF Funer Solatiu Solatium GPA Grand Total Subject to aximum No. Employm (In Rs.) Compn. (In Rs.) (In Rs.) al m-1 (In -2 of Rs. 30.0 Lakh (In Rs.) ent (In Rs.) (In Rs.) (In Rs.)

    Rs.)

    1 Sivakumar. G Regular 2000000 1070100 602000 1050000 17000 0 0 1200000 5939100

    2 Vaithiyanathan A M Regular 2000000 1198500 602000 1050000 17000 0 0 600000 5467500

    3 Jothiramalingam V Regular 2000000 1223025 602000 1050000 17000 0 0 600000 5492025

    4 Ravichandran C Regular 980700 1148175 602000 1050000 17000 0 0 600000 4397875

    5 Suresh R Regular 2000000 1173525 602000 1050000 17000 0 0 500000 5342525

    6 Ravichandran K Regular 1425587 989625 301000 1050000 17000 0 500000 4283212

    7 Selvaraj G Society 241461 0 224922 550000 272076 1500000 2788459

    8 Anandapadmanabhan T Society 232518 0 458179 550000 264887 1500000 3005584

    9 Elangovan T Society 250404 0 412603 550000 291189 1500000 3004196

    10 Padmanaban K Contract 0 0 390494 550000 624190 1500000 3064684

    11 Venkatesaperumal K Contract 0 0 0 550000 740139 1500000 2790139

    12 Arunkumar S Contract 0 0 409070 550000 493688 1500000 2952758

    13 Silambarasan S Contract 0 0 378584 550000 531756 1500000 2960340

    14 Nagaraj P Contract 0 0 0 550000 627407 1500000 2677407

    15 Ramanathan D Contract 0 0 365804 550000 547273 1500000 2963077 Sub Total -A 57128881

    Injured

    Sr. Name Nature of Gratuity Employee EDLI DRF Funer Solatiu Solatium GPA Grand Total Subject to No. Employm (In Rs.) Compn. (In Rs.) (In Rs.) al m-1 (In -2 maximum of Rs. 5.0 Lakh (In ent (In Rs.) (In Rs.) (In Rs.) Rs.)

    Rs.)

    16 Selvakumar.S Contract 0 0 0 0 0 0 500000 500000

    17 Sengamalai G. Indcoser 0 0 0 0 0 0 500000 500000

    18 Jayaseelan K Indcoser 0 0 0 0 0 0 500000 500000

    19 Velmurugan J. Indcoser 0 0 0 0 0 0 500000 500000

    20 Govindan Indcoser 0 0 0 0 0 0 500000 500000

    21 Vekatesan A R Indcoser 0 0 0 0 0 0 500000 500000

    22 Manikandan S Contract 0 0 0 0 0 0 500000 500000

    23 Mohan Raj P Contract 0 0 0 0 0 0 500000 500000 Sub Total-B 4000000

    Grant Total (A+B) 61128881

    29

    11. Further amount of Rs. 5 crores stands deposited with the Collector, in compliance of order of this Tribunal.

    12. We direct further action in terms of the Report, including the remedial measures to be adopted for future. If there is any excess amount available in deposit, after due compliances on the subject, the same may be refunded to the company. We place on record our appreciation for the task executed by the Committee. This observation may be conveyed to the members of the Committee by the CPCB. The report of the Committee may be placed on the websites of the CPCB and the State PCB for the purposes of reference for atleast six months.

    13. We also direct the Secretaries, Ministries of Power and Coal, Government of India, in coordination with such other Departments/Institutions as may be necessary, to undertake safety audit of similarly placed thermal power stations, throughout the country expeditiously, preferably within six months, to avoid recurrence of such incidents in future.

    The application is disposed of.

    Original Application No. 130/2020

    1. This application is on the same subject and was first filed before the Southern Zonal Bench, NGT and then transferred to the Principal Bench. On 08.07.2020, the Applicant was required to serve the affected parties.

    2. The Applicant has stated that the Environmental Clearance (EC) did not have a provision for carrying out Human Health/Occupational assessment Risk and safety management, as has been subsequently

    30

    mandated in the Technical Guidance document of MoEF, 2010 and the Standard EC conditions for Thermal Power Plants dated 19.11.2018. There is negligence, as similar incidents had earlier also happened. The National Electricity Plan, 2018 shows that Units 1 to 7 of the Thermal Power Plant-II are nearing retirement by 2022. The Old and obsolete technology used in these Units, which are more than 25 years old now, has aggravated safety and environmental issues more so when in last few years there have been numerous accidents. If the Unit 1 to 7 of Thermal Power Plant -II are not shut down, there is likelihood of many more incidents which could jeopardise the safety and human/occupational health of the Community members be it those who are working in the Plant or those who are residing nearby. The purpose of hazard identification and risk assessment in thermal power plant is to identify physical, chemical, biological and environmental hazards in the plant, analyse the event sequences leading to those hazards and calculate the frequency and consequences of hazardous events. Therefore, no Thermal Power Plant should be allowed to run without its risk, hazard as well as safety auditing. The overall regulatory framework is under the Ministry of Environment, Forest and Climate Change which has to ensure that Thermal Power Plants, which have outlived their respective lives, need to be shut down. Frequent blasting incidents show that there are serious lacunae in the monitoring of Environmental Parameters of Respondent No. 1's units specially those related to emergency preparedness, occupational health, risk management, safety norms and Human Health Environment issues.

    3. Reply has been filed to the application by the NLCIL. It is stated that FGD has been installed. The recommendation of the Central Electricity Authority about retirement of the units is recommendatory.

    31

    The technology is not obsolete. The internal and external teams have ensured that the entire Risk assessment processes are foolproof. Hence, there is enhanced risk management at the plant. The unit is operating consistent with occupational health, risk management assessment and safety or workmen parameters. It carries out audits and to ensure compliance of all the aforementioned parameters, it is certified ISO:

    45001-2018, superseding the earlier certification of OHSAS 18001-2007. Our attention has also been drawn to the letter of the PWD, Director of Boilers as follows:-

    "With reference to the above and based on the final report of RLA study carried out by M/s. IRC Engineering Services India Pvt. Ltd., New Delhi and the report submitted by M/s. NLC Ltd., Neyveli on the Remnant Life Assessment of Boiler Ry. No. T-4977, your boiler is considered fit for further continued operation for a period of six years, provided all the operating parameters and chemical regime are kept within standard/design condition.

    You are requested to make necessary arrangement to carry out next RLA Study on or before the completion of the validity period (i.e. Oct, 2024) as per the latest proviso of Regulation 391 A of Indian Boiler Regulations, 1950."

    4. In view of above, while we refrain from directing retirement of the unit, all safety measures may be duly adopted which may be regularly monitored and audited by teams of Experts on the subject and also by the Regulators.

    The application is disposed of. All pending IAs will also stand disposed of accordingly.

    A copy of this order be forwarded to the Secretaries, MoEF&CC, Ministries of Power and Coal, Government of India, the Chief Secretary,

    Tamil Nadu, the CPCB, TNPCB and District Magistrate, Cuddalore by e- mail for compliance. Adarsh Kumar Goel, CP

    32

    S.K. Singh, JM Dr. S.S. Garbyal, EM Dr. Nagin Nanda, EM December 22, 2020 Original Application No. 108/2020 and connected matter