ORDER
[
1. A report was sought from a joint Committee of CPCB, State PCB and SDM, Barwala, District Hissar, Haryana, with reference to the allegation that waste water was being discharged from the Sewage Treatment Plant (STP) at Barwala into the land of the applicant and other adjoining lands, resulting in damage to the crops, contaminating groundwater, death of the livestock and loss of soil fertility.
2. The matter was considered on 21.01.2020 in light of the report furnished on 27.11.2019, acknowledging the deficiencies and recommending the remedial action as follows:-
1
"Recommendations:
1. PHED to improve operation and maintenance of STP and make arrangement for lying suitable drainage network for disposal of treated effluent.
2. PHED should stop discharging treated sewage into nearby fields at the earliest and give suitable compensation to the complainant for the economic loss due to flooding of agriculture field.
3. Environment compensation to be levied by HSPCB on PHED for period of non-compliance of Barwala STP as per approved guidelines.
4. As per new Tariff Policy of Govt. of India on 28.01.2016 wherein it is mandated that the thermal power plant(s) including the existing plants located within 50 km radius of sewage treatment plant of Municipality / local bodies / similar organisation shall, in the order to their closeness to sewage treatment plant, mandatorily use treated sewage water produced by these bodies and the associated cost on this account be allowed as pass through in the tariff (Annexure-III). Rajiv Gandhi Thermal Power station is located nearby from STP (6-7 km). Rajiv Gandhi Thermal Power Station, Hisar may be directed to mandatorily use treated sewage water from STP as per CPHEEO guidelines on recycle and reuse of treated sewage."
[
3. The matter was then considered on 09.10.2020 in the light of the report of the State PCB filed on 18.09.2020, mentioning the action plan for the remedial action. It was also mentioned that proposal to initiate prosecution and recover compensation has been initiated. The Tribunal accordingly directed that further steps be taken to ensure the STP meets the standards, including those of faecal coliform and the treated sewage may be utilized for non-potable purposes. Operative part of the order is as follows:-
"1to3..xxx………………….……….xxx……………………………….xxx
4. The report filed on 18.09.2020 by the State PCB mentions the action plan prepared by the Public Health Engineering Department (PHED) as follows:-
"(a) Short Term Action Plan for Disposal of Treated Effluent
The efforts for making arrangement for disposal of treated effluent by pursuing the case with Irrigation Department for
2
Irrigation purpose and also arrange the nearby land of Municipal Committee, Barwala for making lagoon/ponding system for disposal of treated effluent of 6 MLD STP, Dhani Garan Road, Barwala from which farmers are ready to lift this treated effluent for Irrigation purpose.
(b) In present scenario no treated effluent is being accumulated on the land of complainant (photographs attached).
Long Term Action Plan for Disposal of Treated Effluent
The existing plant which based on MBBR technology of of BOD > 30 mg/1 which will be upgraded to > 10 mg/1 by commissioning and conversion of this STP by treasury Treatment Plant (TTP) for which already an estimate has been approved for which tendering process is in progress and which will take 24 months. Once the Plant will upgrade the disposal of Treated Effluent will be started through Rajiv Gandhi Thermal Power Plant, Khedar which is 6.0 K.M. far from 6 MLD STP Dhani Garan Road, Barwala as per CPHEEO guideline on recycle and re-used on treated sewerage effluent."
5. The action taken by the State PCB is mentioned as follows:-
"B Action taken by the Board:
1. Sanction for prosecution against the person responsible has been received vide letter No. 4940 dated 16.06.2020. The complaint under section 24, Punishable under section 43 & 48 of Water (Prevention & Control of Pollution), Act 1974 has been prepared and got vetted vide letter No. 5203 dated 09.09.2020 from the Legal Cell (HQ), HSPCB, Panchkula and case will be filed in the Special Environment Court, Kurukshetra against the responsible officers of PHED as soon as the court resumes its working.
2. The Interim Environmental Compensation has been levied against the 06 MLD STP PHED, Dhani Garan, Barwala of Rs. 3,24,99,600/- vide Head Office order dated 77983 dated 13.07.2020 on account of the damage caused by the unit by discharging the environment pollutant in excess of the standard prescribed under EP Rules, 1986."
6. The recommendations in the report are:-
"Public Health Engineering Department through its concerned division must execute the short term and long term measures expeditiously. The District Administration and Irrigation Department may provide requisite assistance for execution of short term measures."
7. In view of the above, let the compensation be deposited with the State PCB for restoration of the environment. The responsibility to deposit the amount will be of the Additional Chief Secretary, PHED
3
within one month. It will be open to the State PCB to proceed with the prosecution for which sanction has already been obtained. It will be open to the Department to recover the amount of damages from the concerned erring officers and also to take Departmental action for serious violations of environmental norms. Further remedial action may now be taken which may be monitored by the Additional Chief Secretary, PHED. The STP must meet standards, including those of fecal coliform. There should be plan for utilization of treated sewage for non-potable purposes. If such use is to be by Rajiv Gandhi Thermal Power Plant, the timeline should not exceed six months."
4. The matter was last considered on 18.06.2021 in light of further report of the State PCB dated 12.04.2021 to the effect that an action plan has been prepared for reduction of the pollutants in the treated effluent and also for utilization of treated sewage for non-potable purposes. The Tribunal noted that though there was an agreement with Thermal Power Plant for use of the treated water which could be implemented so that fresh water, being used by the plant for industrial purposes at the cost of need for drinking purposes, could be saved.
5. The observations of the Tribunal are as follows:-
"7. We have heard learned Counsel for the parties. Learned counsel for the applicant submits that as per report improvement was proposed till 30.04.2021 but there is no further status report showing such improvement. Status of prosecution is also not clear. It is also not clear whether there is any damage to the land of the applicant and if so, extent of such damage. Though 50% EC has been recovered, standards for BOD, SS and FC are still not meeting. While it is stated that the discharge of sewage effluents is not seen on the fields of Applicant but it is not mentioned as to where the same is being discharged. There are contradictory figures of the quantity of effluents being received. With regard to laying pipeline, storing effluent in a pond and its utilisation, no plan is given. Agreement with Thermal Power Plant is necessary. The Power Plant has to comply with the Notification mandating use of treated sewage. PCB needs to ensure compliance by imposing necessary condition on TPP. The PCB also needs to clarify why Consent has not been granted to operator of STP as required under the Water Act. This has to be enforced for all STP Operators/Municipal Bodies.
8. Accordingly, let further steps be taken to ensure compliance and report be filled by PCB in coordination with Urban and Public Health Departments owning the STP. Improvement in water quality be ensured by making the pollution control device effective. The compensation recovered may be utilized for restoration of the environment by preparing an action plan with the approval of the
4
State PCB. Further action may be initiated by the Public Health Engineering Department which may be overseen by the State PCB. A report about the compliance status as on 31.08.2021 on all aspects may be filed before the next date. Secretary UD may also file a report on overall status of performance of existing STPs, particularly with reference to compliance with FC, utilisation of treated sewage, mode of disposal of effluents, Consents granted by PCB and the gaps between Sewage generation and treatment. The reports may be filed by e-mail at judicial-ngt@gov.in preferably in the form of searchable PDF/ OCR Support PDF and not in the form of Image PDF."
6. In pursuance of above, further report has been filed on 18.04.2022 by the Urban Local Bodies Department apart from the report filed on 30.03.2022 by the State PCB. The report of the State PCB is as follows:-
"2. The Status of 6 MLD STP, Barwala, Hisar.
It is submitted that this matter was originally started due to non compliance of this STP. The consent of 6 MLD STP Dhani Gram, Barwala, Hisar has been refused by HSPCB as it is not complying with prescribed standards. The effluent sample of the said STP was collected by HSPCB on 05.01.2022 to check the compliance and it was found not complying with prescribed standards. Further, the PHED has allotted the rectifications work, but it is not found complete with respect to chlorination work to achieve Faecal Coliform standards within prescribed limits as per latest inspection conducted on 01.03.2022. Analysis results of sample collected on 01.03.2022 are awaited.
An oxidation pond of area 4 acre and depth up to 12 feet has been constructed at Gurana Road, 5 km away from STP Barwala for utilization of treated effluent during monsoon season and crop harvesting season. Otherwise treated effluent is used by farmers. Presently, the treated effluent is not meeting requirement for utilization in Rajiv Gandhi Thermal Power Plant, Barwala because 6 MLD STP Barwala is designed for BOD 30 mg/l whereas, the thermal power plant required the water of below 10 mg/l BOD and this issue shall be taken up after the upgradation of STP.
The PHED has also planned the work for upgradation of STPs to achieve BOD standards of 10 mg/l and upgradation shall be completed by 31.12.2023.
3. Gap between quantum of sewage generation and treatment in Haryana.
The State of Haryana can be divided into 3 areas for better understanding and quantum of estimated sewage is given herein after.
5
i. Ghaggar catchment area
291 MLD sewage is generated in 27 towns having outfall in river Ghaggar. There are 62 STPs of 535 MLD treatment capacity in this area so there is excess installed treatment capacity.
ii. Yamuna catchment area
1086 MLD sewage is generated in 34 towns having outfall in river Yamuna. There are 59 STPs of 1074 MLD treatment capacity in this area.
But, there is Gap of 240.5 MLD in the installed treatment capacity at present in comparison to requirement i.e. sewage generation in some towns in catchment of River Yamuna i.e. Samalkha (0.56 MLD), Beri (0.15 MLD), Palwal (9.3 MLD), Faridabad (144.5 MLD) and Gurugram (86 MLD). So, to bridge the GAP, 11 STPs of 273.5 MLD capacity are being constructed and most of them shall be completed by end of year 2023. Detail of each STP is given as under:-
| Sr. No. |
Name of the Town/city |
Executing Deptt. |
Timelines |
Latest progress |
| River Yamuna |
|
|
|
| 1 |
2 MLD STP at Beri, Jhajjar |
PHED |
31.03.2022 |
97% |
| 2 |
10 MLD STP at Kithwari, Palwal |
ULBD |
31.03.2022 |
64% |
| 3 |
15 MLD STP at Jodhpur Road, Palwal |
ULBD |
31.03.2022 |
66% |
| 4 |
2.5 MLD STP at Ferozpur, |
ULBD |
31.03.2022 |
69% |
| 5 |
20 MLD STP at Jhazgarh, Gurugram |
GMDA |
30.06.2023 |
28% |
| 6 |
2 MLD STP at Dhankot, Gurugram |
GMDA |
31.12.2022 |
0% |
| 7 |
2 MLD STP at Bajghera, Gurugram |
GMDA |
30.09.2022 |
21% |
| 8 |
80 MLD STP at Mirjapur, Faridabad |
ULBD |
30.11.2023 |
36% |
| 9 |
100 MLD STP at Partapgarh, Faridabad |
ULBD |
30.11.2023 |
40% |
| 10 |
10 MLD STP at Faridabad, sector- 21 |
ULBD |
30.11.2022 |
52% |
| 11 |
30 MLD STP at Faridabad |
HSVP |
30.06.2022 |
74% |
| Total |
273.5 |
|
|
|
iii. Other areas
117 MLD sewage is generated in 35 towns falling in areas other than river catchment. There are 35 STPs of 225 MLD treatment
6
capacity and there is excess installed capacity at present in this area.
The townwise detail of sewage generated and installed capacity in the State of Haryana is enclosed as (Annexure-1).
4. Compliance status of operational STPs in Haryana:-
The regular monitoring of STPs is being done and samples collected. Based on the analysis report, compliance status is given herein after.
i. STPs in catchment of River Ghaggar
There are total 62 STPs installed in the catchment of river Ghaggar with the capacity of 535 MLD. As per latest status, 20 STPs do not meet the prescribed standards.
ii. STPs in catchment of River Yamuna
There are total 59 STPs installed in the catchment of river Yamuna with the capacity of 1074 MLD. As per latest status,
17 STPs do not meet the prescribed standards.
iii. STPs in other Areas
35 STPs of 225 MLD capacity are installed in the other areas not falling in the catchment of rivers. Out of these 19 STPs do not meet the prescribed standards.
The HSPCB has filed prosecution cases against responsible officers in the past and has started process of initiation of prosecution cases against responsible
authorities for non complying STPs. The details of all existing STPs and action taken by board are enclosed as Annexure-2.
5. Consent status of STPs
The 123 STPs are operating with consent of the board and consent has been refused to 12 STPs. The 5 STPs have applied for consent and case is under process. 16 STPs have not applied for consent. The consent status of each STP has been given in Annexure-2.
6. Under construction STPs
The new STPs are being constructed to replace the existing STPs or meet with increasing requirements of sewage treatment. All STPs are being constructed with SBR technology to meet the stringent standards of 10 mg/l BOD value. 29 STPs of 412.25 MLD capacity is being constructed in Haryana and detail of each STP is given as under:-
| Sr. No. |
Name of the Town/city |
Executin g Deptt. |
Timelines |
Latest progress |
Remarks |
| River Ghaggar |
|
|
|
|
7
| 1 |
12 MLD STP at 12 Cross Road, Ambala |
ULBD |
31.01.2023 |
35% |
New |
| 2 |
0.75 MLD STP at Khatoli |
ULBD |
31.10.2021 |
100% |
New |
| 3 |
0.75 MLD STP at Billa |
ULBD |
31.10.2021 |
100% |
New |
| 4 |
12 MLD STP at Khuda Khurd, Ambala |
ULBD |
31.01.2023 |
40% |
New |
| 5 |
10 MLD STP at Babyal |
ULBD |
31.03.2022 |
95% |
New |
| 6 |
7.5 MLD STP at Shahpur Machhonda |
ULBD |
31.08.2022 |
50% |
New |
| 7 |
1.5 MLD STP at Saketri- STP |
ULBD |
31.03.2022 |
82% |
New |
| 8 |
7.5 MLD STP at Sirsa |
HSVP |
31.01.2022 |
100% |
New |
| 9 |
0.75 MLD STP at Sukhdarshanapur |
ULBD |
31.07.2021 |
100% |
New |
| 10 |
2 MLD STP at Uchana |
PHED |
30.06.2022 |
82% |
Replacement |
| 11 |
1 MLD STP at Ramgarh, PKL |
ULBD |
31.03.2022 |
84% |
New |
| Total |
55.75 MLD |
|
|
|
|
| River Yamuna |
|
|
|
|
| 1 |
8 MLD STP at Shiv Colony, Karnal |
ULBD |
31.07.2022 |
91% |
Replacement |
| 2 |
20 MLD STP at Phooshgarh, Karnal |
ULBD |
31.05.2022 |
92% |
New |
| 3 |
12 MLD STP at Garhi Bohar, Rohak |
ULBD |
31.03.2022 |
97% |
New |
| 4 |
15 MLD STP at Peer Bodhi, Rohak |
ULBD |
30.09.2022 |
60% |
New |
| 5 |
10 MLD STP at Faridabad, sector-21 |
ULBD |
30.11.2022 |
52% |
New |
| 6 |
10 MLD STP at Kithwari |
ULBD |
31.03.2022 |
64% |
Replacement |
| 7 |
15 MLD STP at Jodhpur Road, Palwal |
ULBD |
31.03.2022 |
66% |
Replacement |
| 8 |
2.5 MLD STP at Ferozpur, Palwal |
ULBD |
31.03.2022 |
69% |
Replacement |
| 9 |
15 MLD STP at Sonepat (Aterna) |
HSVP |
30.06.2022 |
66% |
New |
| 10 |
3 MLD STP at Murthal Sonepat |
ULBD |
31.12.2022 |
34% |
New |
| 11 |
20 MLD STP at Jhazgarh |
GMDA |
30.06.2022 |
28% |
New |
| 12 |
2 MLD STP at Dhankot, Gurugram |
Panchaya ts/GMDA |
31.12.2022 |
0% |
New |
| 13 |
2 MLD STP at Bajghera |
Panchaya ts/GMDA |
30.09.2022 |
21% |
New |
| 14 |
10 MLD STP at Rohtak |
HSVP |
30.06.2022 |
92% |
New |
| 15 |
80 MLD STP at Mirjapur, Faridabad |
ULBD |
30.11.2022 |
36% |
Replacement |
| 16 |
100 MLD STP at Partapgarh, Faridabad |
ULBD |
30.11.2022 |
40% |
Replacement |
| 17 |
30 MLD STP at Faridabad |
HSVP |
30.06.2022 |
74% |
New |
8
| 18 |
2 MLD STP at Beri |
PHED |
31.03.2022 |
97% |
Replacement |
| Total |
356.5 MLD |
|
|
|
|
Under upgradation STPs
The existing STPs are being upgraded to meet with stringent standards. The additional components/machinery are being added. The STPs are operating on MBBR technology but now tertiary treatment is being added along with chlorination. 5 existing STPs of 50 MLD capacity are being upgraded as per detail given as under:-
Sr. Name of the Deptt. Present Technology of Timelines Latest No. towns/city capacity present STP and progress (in MLD) proposed technology
after upgradation
River Ghaggar
catchment
MBBR
1 Fatehabad PHED 10 MBBR+TT+ 31.03.2022 87% Chlorination
MBBR Completed
MBBR+TT+ and trial
2 Tohana PHED 10 Chlorination 31.01.2022 run upto
12.05.2022
Technology of Latest Present
Sr. Name of the present STP and progress Deptt. capacity
No. towns/city proposed technology Timelines
(in MLD) after upgradation Total 20
River Yamuna catchment
Sector-25, 92%
1 Rohtak HSVP 10 UASB/SBR 30.06.2022 Sector-36, 98%
2 Bahadurgarh HSVP 10 EPA/SBR 30.06.2022 Singhpura, ULBD 10 MBBR+TT+ 31.03.2022 98%
3 Rohtak Chlorination
Total capacity 30
8. Utilization of treated sewage
There are 156 STPs of capacity 1834.2 MLD. Status of STPs in the state of Haryana with respect to mode of disposal is enclosed as Annexure-3. Most of STPs discharge effluent in drains after treatment.
The State is also in the process to set up system to reuse the treated sewage. The Irrigation Department has submitted the progress report regarding projects of utilization of treated sewage of STPs. The details are as under:-
9
The Govt. has accorded approval to the consolidated project (Ghaggar and Yamuna Action Plan) on 04.01.2020 for Rs. 1098.25 Crore.
Out of these, 35 STPs (20 in Yamuna and 15 in Ghaggar) have been selected for installing micro irrigation system with combined treatment capacity of 338.85 MLD and a project has been sanctioned by Govt. of India namely "STP Micro Irrigation Project under NABARD assisted Micro Irrigation Fund" for Rs. 490 Crores and shall be completed by 2023-
24.
The Administrative Approval of 28 STPs has been accorded by the Govt.
Tenders for around 21 STPs have been floated and tenders for 11 STPs have been approved. Work of these STPs is likely to be started shortly. Estimate of remaining STPs is under process and tender will be called soon. Regarding remaining STPs, the five years action plan will be prepared soon.
The list of projects in 35 STPs is given as under:-
| Sr. No. |
Name of District |
Name of STP |
Capacity of STP (in MLD) |
Treatment technology |
| 1 |
Ambala |
Barara |
6 |
MBBR |
| 2 |
Ambala |
Naraingarh |
5 |
MBBR |
| 3 |
Hisar |
Hansi |
12.5 |
MBBR |
| 4 |
Hisar |
Hisar sec-3 |
10 |
MBBR |
| 5 |
Jind |
Narwana |
5 |
MBBR |
| 6 |
Kaithal |
Gulha |
10 |
SBR |
| 7 |
Kaithal |
Kaithal |
10 |
SBR |
| 8 |
Fatehabad |
Fatehabad |
10 |
MBBR |
| 9 |
Fatehabad |
Tohana |
10 |
MBBR |
| 10 |
Fatehabad |
Jakhal |
3 |
SBR |
| 11 |
Fatehabad |
Ratia |
6.5 |
MBBR |
| 12 |
Panchkula |
Kalka |
4.75 |
MBBR |
| 13 |
Panchkula |
Pinjor |
5 |
MBBR |
| 14 |
Sirsa |
Sirsa |
15 |
SBR |
| 15 |
Panipat |
Panipat |
25 |
SBR |
| 16 |
Charkhi Dadri |
Charkhi Dadri |
5 |
MBBR |
| 17 |
Bhiwani |
Badra |
10 |
MBBR |
| 18 |
Gurugram |
Behrampur |
60 |
MBBR |
| 19 |
Jhajjar |
Jhajjar |
6.5 |
MBBR |
| 20 |
Jhajjar |
Salhwas |
5 |
MBBR |
| 21 |
Rewari |
Rewari |
6.5 |
MBBR |
| 22 |
Rewari |
Rewari |
8 |
MBBR with Dual Mode Filter |
| 23 |
Mahendargarh |
Nangal Chaudhary |
6.5 |
MBBR |
| 24 |
Mahendargarh |
Narnaul |
7.5 |
MBBR |
| 25 |
Rohtak |
Rohtak |
10 |
MBBR |
| 26 |
Bhiwani |
Kairu |
10 |
MBBR |
| 27 |
Jind |
Jind |
15 |
MBBR |
| 28 |
Karnal |
Karnal |
10 |
MBBR |
10
| 29 |
Karnal |
Karnal |
8 |
MBBR |
| 30 |
Yamuna Nagar |
Radaur |
3.5 |
MBBR |
| 31 |
Faridabad |
Ballabgarh |
18 |
MBBR |
| 32 |
Mewat |
Punhana |
4.5 |
MBBR |
| 33 |
Mewat |
Nuh |
3.6 |
MBBR |
| 34 |
Palwal |
Hathin |
4.5 |
MBBR |
| 35 |
Sonipat |
Sector-23 |
10 |
MBBR |
|
TOTAL |
|
338.85 |
|
9. Action plan for non complying STPs.
The stringent standards have been fixed by HSPCB and the norm for Faecal Coliform has been fixed as 100 MPN/100 ML w.e.f. 02.07.2020. The facility for treatment of Faecal Coliform has been set up at 73 STPs and these are complying. The action plan for rest of the STPs is enclosed as Annexure-4. 25 STPs are complying the BOD of 10 mg/l but not complying with norm of Faecal Coliform < 100 MPN/100 ML. However, 43 STPs are
complying norm of 30 mg/l BOD but non complying as per latest fixed norms. 13 STPs are do not meet even the BOD norm of 30 mg/l.
10. Environment Compensation imposed.
The HSPCB has imposed Environment Compensation of Rs.
77.54 Cr. On industries and Rs. 9.74 Cr. on STPs. The Rs.
30.05 Cr. has been received and Rs. 51.03 Cr. is pending for receiving. The action plan shall be proposed for the same.
11. Water Quality of drains.
The status of water quality of drains is being monitored on regular basis. There are 12 drains falling in catchment of river Ghaggar and 11 drains in Yamuna catchment which carry polluted effluent into the river. The trend for last 2 years is enclosed as Annexure-5&6.
12. Conclusion
6 MLD STP at Dhani Gram, Barwala, Hisar shall be upgraded to achieve stringent norms by 31.12.2023 and water shall be utilized for Irrigation. GAP in installed treatment capacity in catchment of River Yamuna in Samalkha, Beri, Palwal, Faridabad and Gurugram shall be cover by year Dec, 2022. Action plan regarding utilization of treated effluent from STPs in Irrigation has been framed and its shall be utilized by Mar, 2024 for 35 STPs.
Action plan for upgradation/rectification is under way for non complying STPs.
HSPCB has already filed prosecution for 8 STPs and is in the process of filing prosecution for rest of the non complying STPs."
11
7. Data given in Annexures to the report is also reproduced below:
Annexure-1
"Status of Estimation of sewage generated and treatment capacity of each town in the State of Haryana Sr. District Name of Town Name of Present Water Sewage Actual No. & Treatment Capacity (in MID) GAPs in No. Deptt. population Consump Generate discharge Existing Under Proposed treatment as in 2021 tion in d (in reaching to construction capacity 2021 (in MID) STPs in No. Cap. No. Cap. No. Cap. at present
MID) 2021 MID
Ghaggar Catchment
| 1 |
Ambala |
Naraingarh |
PHED/HS VP |
28049 |
3.79 |
3.00 |
1.70 |
1 |
3 |
0 |
0 |
1 |
1 |
0 |
| 2 |
Ambala |
PHED/HS VP/ULBD |
375009 |
50.63 |
40.50 |
22.10 |
12 |
44 |
4 |
41.5 |
1 |
5 |
0 |
| 3 |
Fatehabad |
Ratia |
PHED |
42442 |
5.73 |
4.58 |
4.50 |
1 |
6.5 |
0 |
0 |
0 |
0 |
0 |
| 4 |
Tohana |
PHED |
72967 |
9.85 |
7.88 |
8.20 |
1 |
10 |
0 |
0 |
0 |
0 |
0 |
| 5 |
Jhakal Mandi |
PHED |
8897 |
1.20 |
0.96 |
1.50 |
1 |
3 |
0 |
0 |
0 |
0 |
0 |
| 6 |
Fatehabad |
PHED |
102163 |
13.79 |
11.03 |
14.00 |
4 |
33 |
0 |
0 |
0 |
0 |
0 |
| 7 |
Hisar |
Hisar |
PHED/HS VP/ULBD |
350744 |
47.35 |
37.88 |
50.00 |
5 |
82 |
0 |
0 |
3 |
20 |
0 |
| 8 |
Narnaund |
PHED |
19697 |
2.66 |
2.13 |
2.15 |
1 |
4 |
0 |
0 |
0 |
0 |
0 |
| 9 |
Jind |
Narwana |
PHED |
70932 |
9.58 |
7.66 |
7.03 |
3 |
9.25 |
0 |
0 |
0 |
0 |
0 |
| 10 |
Uchana |
PHED |
19210 |
2.59 |
2.07 |
2.75 |
2 |
3.5 |
1 |
2 |
0 |
0 |
0 |
| 11 |
Jind |
PHED/HS VP |
191457 |
25.85 |
20.68 |
20.00 |
4 |
37 |
0 |
0 |
1 |
5 |
0 |
| 12 |
Safidon |
PHED |
39673 |
5.36 |
4.28 |
3.20 |
1 |
9 |
0 |
0 |
0 |
0 |
0 |
| 13 |
Kaithal |
Cheeka |
PHED |
47851 |
6.46 |
5.17 |
5.50 |
1 |
10 |
0 |
0 |
0 |
0 |
0 |
| 14 |
Kaithal |
PHED/HS VP |
178023 |
24.03 |
19.23 |
21.50 |
4 |
37.5 |
0 |
0 |
0 |
0 |
0 |
| 15 |
Kalayat |
PHED |
21317 |
2.88 |
2.30 |
3.50 |
1 |
5 |
0 |
0 |
0 |
0 |
0 |
| 16 |
Pundri |
PHED |
23184 |
3.13 |
2.50 |
3.25 |
1 |
3.5 |
0 |
0 |
0 |
0 |
0 |
| 17 |
Kurukshetra |
Shahbad |
PHED |
52341 |
7.07 |
5.65 |
6.50 |
1 |
11.5 |
0 |
0 |
0 |
0 |
0 |
| 18 |
Pehowa |
PHED |
47729 |
6.44 |
5.15 |
5.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
12
Sr. District Name of Town Name of Present Water Sewage Actual No. & Treatment Capacity (in MID) GAPs in No. Deptt. population Consump Generate discharge Existing Under Proposed treatment as in 2021 tion in d (in reaching to construction capacity
2021 (in MID) STPs in No. Cap. No. Cap. No. Cap. at present
MID) 2021 MID
19 Thanesar PHED/HS 177245 23.93 19.14 18.00 2 40 0 0 0 0 0
VP
20 Panchkula Kalka PHED 37136 5.01 4.01 2.55 2 4.75 0 0 0 0 0
21 Pinjore PHED 32747 4.42 3.54 3.50 1 5 0 0 0 0 0
22 Panchkula PHED/HS 317476 34.74 34.74 4 81 5 4.75 1 8 0 VP/ULBD/
Garrison
23 Sirsa Mandi Dabwali PHED 60402 8.15 6.52 13.50 1 16.5 1 7.5 0 0 0
24 Kalanwali PHED 25241 3.41 2.73 2.50 1 9.5 0 0 0 0 0
25 Sirsa PHED/HS 263476 35.57 28.46 29.50 4 45 0 0 0 0 0
VP
26 Rania PHED 36264 4.90 3.92 2.60 1 6 0 0 0 0 0
27 Ellenabad PHED 52864 7.14 5.71 6.00 1 7.5 0 0 0 0 0
2694537 320.90 291.43 295.77 62 535 11 55.75 7 39 0.00
Yamuna catchment
1 Yamuna nagar Jagadhri PHED 156118 21.08 16.86 18.5 1 24 0 0 0 0 0
2 Yamunanagar PHED 271338 36.63 29.30 43.70 4 65 0 0 0 0 0
3 Radaur PHED 17113 2.31 1.85 2.00 1 3.5 0 0 0 0 0
4 Chhachhrauli PHED 13166 1.78 1.42 1.75 1 3 0 0 0 0 0
5 Ladwa PHED 36064 4.87 3.89 5.00 1 7 0 0 0 0 0
6 Karnal Nilokheri PHED 21702 2.93 2.34 3.50 1 6 0 0 0 0 0
7 Taraori PHED 31387 4.24 3.39 3.80 1 5.5 0 0 0 0 0
8 Indri PHED 21832 2.95 2.36 2.35 1 4 0 0 0 0 0
9 Karnal ULBD 454437 58 44.59 44.59 3 68 2 28 0 0 0
10 Nissing PHED 21095 2.85 2.28 2.30 1 4 0 0 0 0 0
11 Gharaunda PHED 45746 6.18 4.94 4.70 1 7 0 0 0 0 0
13
12 Panipat Panipat PHED 757432 102.25 81.80 42.00 6 120.8 0 0 2 40 0
Sr. District Name of Town Name of Present Water Sewage Actual No. & Treatment Capacity (in MID) GAPs in No. Deptt. population Consump Generate discharge Existing Under Proposed treatment as in 2021 tion in d (in reaching to construction capacity
2021 (in MID) STPs in No. Cap. No. Cap. No. Cap. at present
MID) 2021 MID
/HSVP/UL
BD
13 Samalkha PHED 51489 6.95 5.56 4.00 1 5 0 0 0 0 0.56
14 Sonipat Gohana PHED 82036 11.07 8.86 8.72 2 11.3 0 0 0 0 0
15 Ganaur PHED 45932 6.20 4.96 5.50 1 7 0 0 0 0 0
16 Sonepat ULBD/HS 447270 48.3 48.3 3 62.5 2 18 0 0 0
VP
17 Kharkhoda PHED 29191 3.94 3.15 2.00 1 4.5 0 0 0 0 0
18 Rohtak Maham PHED 25574 3.45 2.76 2.65 1 5 0 0 0 0 0
19 Rohtak PHED/HS 585988 79.11 63.29 49.70 5 93.5 4 47 0 0 0 VP/ULBD
20 Kalanaur PHED 28143 3.80 3.04 2.50 1 3.5 0 0 0 0 0
21 Sampla PHED 25673 3.47 2.77 2.66 1 4 0 0 0 0 0
22 Jhajjar Beri PHED 19953 2.69 2.15 1.72 1 2 1 2 0 0 0.154
23 Bahadurgarh PHED/HS 251291 33.92 27.14 22.60 3 64 0 0 0 0 0
VP
24 Jhajjar PHED 60677 8.19 6.55 6.45 2 10.5 0 0 0 0 0
25 Gurugram Taoru PHED 30216 4.08 3.26 2.60 1 4.5 0 0 0 0 0
26 Gurugram GMDA/UL 1626954 474 474 5 388 1 20 1 25 86
BD
Panchaya 0 0 2 4 0 0 0 ts
MCG 0 0 0 0 0 0 0
27 Nuh PHED 21740 2.93 2.35 2.30 1 3.6 0 0 0 0 0
14
28 Mewat Ferozepur jhirka PHED 33092 4.47 3.57 2.45 1 5 0 0 0 0 0
29 Punahana PHED 33073 4.46 3.57 1.25 1 4.5 0 0 0 0 0
30 Faridabad Faridabad MCF/HSV 1832618 197 197 2 52.5 4 220 0 0 144.5
Sr. District Name of Town Name of Present Water Sewage Actual No. & Treatment Capacity (in MID) GAPs in No. Deptt. population Consump Generate discharge Existing Under Proposed treatment as in 2021 tion in d (in reaching to construction capacity
2021 (in MID) STPs in No. Cap. No. Cap. No. Cap. at present
MID) 2021 MID
P
31 Palwal Palwal PHED 170197 22.98 18.38 9.00 1 9 3 27.5 0 0 9.381
32 Hathin PHED 17404 2.35 1.88 2.08 1 4.5 0 0 0 0 0
33 Hassan Pur PHED 14917 2.01 1.61 1.25 1 3 0 0 0 0 0
34 Hodal PHED 64689 8.73 6.99 4.60 1 9 0 0 0 0 0
Total 7345546.3 402.88 1086.19 1027.52 59 1074.2 19 366.5 3 65 240.59
3
Other areas
1 Gurugram Sohna, Gurgaon PHED 44739 6.04 4.83 4.50 1 6 0
2 Pataudi, PHED 23325 3.15 2.52 2.70 1 4.5 0 Gurgaon
3 Farrukhnagar, PHED 15438 2.08 1.67 1.85 1 3 0 Gurgaon
4 Haily Mandi, PHED 23883 3.22 2.58 2.90 1 5.5 0 Gurgaon
21426 2.89 2.31 2.30 1 4 0
5 Jind Julana, Jind PHED
6 Bhiwani Dhana Road, PHED 223976 30.24 24.19 38.00 4 50 0 Bhiwani
7 Bhiwani PHED
8 Bhiwani PHED
9 Bhiwani PHED
15
10 Charkhi Dadri, PHED 64359 8.69 6.95 6.00 2 10 0 Bhiwani
11 Chirya Road, PHED Charkhi Dadri, Bhiwani
Sr. District Name of Town Name of Present Water Sewage Actual No. & Treatment Capacity (in MID) GAPs in No. Deptt. population Consump Generate discharge Existing Under Proposed treatment as in 2021 tion in d (in reaching to construction capacity
2021 (in MID) STPs in No. Cap. No. Cap. No. Cap. at present
MID) 2021 MID
12 Bawani Khera, PHED 23178 3.13 2.50 2.00 1 4.50 0 Bhiwani
13 Loharu, Bhiwani PHED 15921 2.15 1.72 2.00 1 3.50 0
14 Tosham, PHED 17775 2.40 1.92 1.62 1 3 0 Bhiwani
15 Siwani, Bhiwani PHED 21869 2.95 2.36 2.75 1 14 0
16 Bhiwani HSVP
17 Mohindergarh Mohindergarh PHED 33275 4.49 3.59 2.50 1 6.5 0
18 Ateli Mandi, PHED 8704 1.17 0.94 1.16 1 2 0 Mohindergarh
19 Kanina, PHED 14839 2.00 1.60 0.89 1 3 0 Mohindergarh
20 Rewari Road, PHED 85202 11.50 9.20 5.00 2 13.5 0 Narnaul,
Mohindergarh
21 Near Chinkara Rest House, Rewari Road, Narnaul
22 Rewari Bawal, Rewari PHED 19165 2.59 2.07 2.00 1 3 0
16
23 Rewari PHED 163388 22.06 17.65 20.00 3 30.5 0
24 Rewari PHED
25 Rewari PHED
26 Dharuhera PHED 34665 4.68 3.74 4.00 1 9.5 0
Sr. District Name of Town Name of Present Water Sewage Actual No. & Treatment Capacity (in MID) GAPs in No. Deptt. population Consump Generate discharge Existing Under Proposed treatment as in 2021 tion in d (in reaching to construction capacity
2021 (in MID) STPs in No. Cap. No. Cap. No. Cap. at present
MID) 2021 MID
27 Kosli, Rewari PHED 11389 1.54 1.23 2.00 1 3 0
28 Dharuhera HSVP 1 0
5
29 Ambala Barara, Ambala PHED 24613 3.32 2.66 2.34 1 4 0
30 Karnal Assandh, Karnal PHED 33201 4.48 3.59 3.80 1 5 0
31 Hisar Dhani Gram, PHED
49562 6.69 5.35 4.50 1 6 0
Barwala, Hisar
32 Uklana, Hisar PHED 15101 2.04 1.63 3.50 1 6.5 0
33 Hansi, Hisar PHED 99126 13.38 10.71 13.00 3 19.00 0
34 Dhani Kushal, PHED Bhiwani Road,
Hansi
35 Lalpura- Jind PHED Road, Hansi
Total -35 1088118 146.90 117.52 131.31 35 224.5 0
17
Annexure-2 Consent/ Compliance status of existing STPs as per latest samples in the State of Haryana
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| River Ghaggar |
|
|
|
|
|
|
|
| Ambala |
|
|
|
|
|
|
|
| 1 |
3.00 MLD STP Naya Gaon , Unit.I , Ambala City |
PHED |
30.01.2022 |
Complying except Faecal Coliform |
8 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 2 |
3.25 MLD STP Naya Gaon , Unit.II Ambala City |
PHED |
29.01.2022 |
Non- Complying |
18 |
600 |
Consent granted |
Legal action under process and is at various stages of process. |
| 3 |
5 MLD Baldev Nagar , Unit.I , Ambala City |
PHED |
28.01.2022 |
Non- Complying |
16 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 4 |
3.25 Baldev Nagar , Unit.II ,Ambala City |
PHED |
28.01.2022 |
Non- Complying |
12 |
600 |
Consent granted |
Legal action under process and is at various stages of process. |
| 5 |
5 MLD Moti Nagar, Unit.I , Ambala City |
PHED |
29.01.2022 |
Non- Complying |
16 |
800 |
Consent granted |
Legal action under process |
| 6 |
5 MLD STP Moti Nagar, Unit.II , Ambala City |
PHED |
29.01.2022 |
Non- Complying |
12 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 7 |
6 MLD STP Modal Town, Ambala City |
PHED |
29.01.2022 |
Non- Complying |
14 |
300 |
Consent granted |
Legal action under process and is at various stages of process. |
18
| 8 |
3.25 Nasirpur Ambala City |
PHED |
29.01.2022 |
Non- Complying |
14 |
800 |
Consent granted |
Legal action under process and is at various stages of process. |
| 9 |
0.25 MLD Sadopur , Ambala |
PHED |
29.01.2022 |
Complying |
7 |
70 |
Consent granted |
-- |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 10 |
3.00 MLD Devi Nagar , Ambala City |
PHED |
28.01.2022 |
Non- Complying |
14 |
800 |
Consent granted |
Legal action under process and is at various stages of process. |
| 11 |
3 MLD SIP Nariangarh, Ambala |
PHED |
24.01.2022 |
Complying except Faecal Coliform |
6.8 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 12 |
2 MLD SIP Sec.7 , Urban Estate , Ambala City Ambala |
HSVP |
24.01.2022 |
Complying |
7 |
20 |
Consent granted |
-- |
| 13 |
5 MLD SIP Ambala |
|
|
Complying |
|
|
Consent granted |
-- |
| Kurukshetra |
|
|
|
|
|
|
|
| 14 |
25 MLD SIP Ihanesar, Kurukshetra |
PHED |
06.01.2022 |
Complying |
6.5 |
20 |
Consent granted |
-- |
| 15 |
8 MLD SIP Model town, Pehowa Kurukshetra |
PHED |
06.01.2022 |
Non Complying |
16 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 16 |
11.5 MLD SIP Ladwa Road, Shahbad Kurukshetra |
PHED |
06.01.2022 |
Complying |
6.8 |
40 |
Consent granted |
-- |
19
| 17 |
15 MLD SIP Kurukshetra |
HSVP |
06.01.2022 |
Complying |
3.5 |
Absent |
Consent granted |
-- |
| Panchkula |
|
|
|
|
|
|
|
| 18 |
4.5 MLD Kalka Panchkula |
PHED |
19.01.2022 |
Complying except Faecal Coliform |
8.5 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 19 |
0.25 MLD Kalka Panchkula |
PHED |
19.01.2022 |
Complying except Faecal Coliform |
6.5 |
600 |
Consent granted |
Legal action under process and is at various stages of process. |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 20 |
5 MLD SIP Nalagarh Road, Manakpur, Pinjore Panchkula |
PHED |
19.01.2022 |
Complying except Faecal Coliform |
3.5 |
Absent |
Consent granted |
Legal action under process and is at various stages of process. |
| 21 |
18 MLD SIP Panchkula |
HSVP |
21.01.2022 |
Complying except Faecal Coliform |
10 |
600 |
Consent applied |
Legal action under process and is at various stages of process. |
| 22 |
39 MLD SIP Panchkula |
HSVP |
21.01.2022 |
Complying |
6.2 |
80 |
Consent applied |
-- |
| 23 |
15 MLD SIP Sector- 28, Panchkula |
HSVP |
19.01.2022 |
Complying except Faecal Coliform |
7 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 24 |
9 MLD SIP Garrison Engineer, Chandimandir Panchkula |
GE |
19.01.2022 |
Complying except Faecal Coliform |
6.5 |
200 |
Consent refused. |
Legal action under process and is at various stages of process. |
| Jind |
|
|
|
|
|
|
|
20
| 25 |
15 MLD SIP by PHED Jind |
PHED |
18.01.2022 |
Complying |
9.2 |
94 |
Consent granted |
Prosecution filed in Special Environment Court, Kurukshetra on 22.03.2017. |
| 26 |
3.5 MLD Patiala Road , Narwana by PHED |
PHED |
24.01.2022 |
Non- Complying |
21 |
38000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 27 |
3.75 MLD SIP Narwana, Jind by PHED |
PHED |
24.01.2022 |
Non- Complying |
22 |
9400 |
Consent granted |
Prosecution filed in Special Environment Court, Kurukshetra on 22.03.2017. |
| 28 |
02 MLD SIP, PHED , Dablain Road, Narwana, Jind |
PHED |
24.01.2022 |
Non- Complying |
27 |
31000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 29 |
2 MLD SIP Uchana Jind |
PHED |
19.01.2022 |
Non- Complying |
26 |
6500 |
Consent granted |
Legal action under process and is at |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
|
|
|
|
|
|
|
|
various stages of process. |
| 30 |
1.5 MLD SIP Uchana |
PHED |
19.01.2022 |
Non Complying |
22 |
5200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 31 |
5 MLD SIP Jind |
PHED |
18.01.2022 |
Non Complying |
27 |
12000 |
Consent granted |
Prosecution filed in Special Environment Court, Kurukshetra on 22.03.2017. |
| 32 |
7 MLD SIP, Jind |
PHED |
18.01.2022 |
Complying |
7.2 |
88 |
Consent granted |
-- |
| 33 |
9 MLD SIP Safidon , Jind by PHED |
PHED |
18.01.2022 |
Complying |
7.2 |
65 |
Consent granted |
-- |
| 34 |
10 MLD by HUDA Jind |
HSVP |
12.01.2022 |
Complying |
8.4 |
90 |
Consent granted |
-- |
| Kaithal |
|
|
|
|
|
|
|
21
| 35 |
10 MLD SIP Cheeka, Kaithal by PHED |
PHED |
24.01.2022 |
Complying |
6.4 |
86 |
Consent granted |
-- |
| 36 |
10 MLD SIP, Jind Road Kaithal by PHED |
PHED |
22.01.2022 |
Complying |
7.1 |
65 |
Consent granted |
-- |
| 37 |
10 MLD SIP Manas Road, Kaithal by PHED |
PHED |
22.01.2022 |
Complying |
6.5 |
77 |
Consent granted |
-- |
| 38 |
10 MLD Manas Road, Kaithal by PHED |
PHED |
22.01.2022 |
Complying |
7.1 |
91 |
Consent granted |
-- |
| 39 |
5 MLD SIP Kalayat , Kaithal by PHED |
PHED |
22.01.2022 |
Complying |
7.5 |
86 |
Consent granted |
-- |
| 40 |
3.5 MLD SIP Pundri |
PHED |
22.01.2022 |
Complying |
9.2 |
90 |
Consent granted |
-- |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
|
Kaithal |
|
|
|
|
|
|
|
| 41 |
7.5 MLD Kaithal |
HSVP |
22.01.2022 |
Complying |
7.9 |
84 |
Consent refused |
-- |
| Hisar |
|
|
|
|
|
|
|
| 42 |
15 MLD SIP Azad Nagar, Rajgarh Road Hisar |
PHED |
04.01.2022 |
Complying |
8 |
56 |
Consent granted |
-- |
22
| 43 |
40 MLD SIP Rishi Nagar , Hisar |
PHED |
04.01.2022 |
Complying |
7.6 |
90 |
Consent granted |
-- |
| 44 |
4 MLD SIP Narnaund, Hisar |
PHED |
05.01.2022 |
Complying |
8.2 |
90 |
Consent granted |
Legal action under process and is at various stages of process for past violation. |
| 45 |
4 MLD SIP Kaimri Road, Hisar |
PHED |
04.01.2022 |
Non- Complying |
106 |
180000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 46 |
15 MLD SIP Dabara Iosham Road , Hisar |
HSVP |
11.12.2021 |
Complying |
7.1 |
84 |
Consent granted |
-- |
| 47 |
8 MLD SIP Village Dabra, Hisar |
ULBD |
|
Complying |
|
|
Consent granted |
-- |
| Sirsa |
|
|
|
|
|
|
|
| 48 |
15 MLD SIP, Shamsabad patti , Kalania Road, Sirsa |
PHED |
06.01.2022 |
Complying |
7.8 |
72 |
Consent granted |
-- |
| 49 |
5 MLD SIP, Vill. Nattar 1 , Sirsa |
PHED |
06.01.2022 |
Non- Complying |
20 |
4800 |
Consent granted |
Legal action under process and is at various stages of process. |
| 50 |
5 MLD SIP, Vill. Nattar 2 , Sirsa |
PHED |
06.01.2022 |
Non- Complying |
25 |
5600 |
Consent not applied |
Legal action under process and is at |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
|
|
|
|
|
|
|
|
various stages of process. |
| 51 |
7.5 MLD SIP Ellenabad Sirsa |
PHED |
06.01.2022 |
Complying |
7.8 |
68 |
Consent not applied |
-- |
| 52 |
9.5 MLD SIP, Daddu Road,Kalanwali , Sirsa |
PHED |
06.01.2022 |
Complying |
6.5 |
77 |
Consent granted |
-- |
23
| 53 |
6 MLD SIP Rania Sirsa |
PHED |
06.01.2022 |
Complying |
7.2 |
84 |
Consent not applied |
-- |
| 54 |
16.5 MLD SIP Dabwali, Sirsa |
PHED |
06.01.2022 |
Complying |
6.8 |
62 |
Consent granted |
-- |
| 55 |
20 MLD SIP at Kelnia Sirsa |
PHED |
06.01.2022 |
Complying |
8.2 |
84 |
Consent granted |
-- |
| Fatehabad |
|
|
|
|
|
|
|
| 56 |
10 MLD SIP Vill. Bhodia Khera, Bhattu Road, Fatehabad |
PHED |
07.01.2022 |
Non- Complying |
24 |
21000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 57 |
10 MLD SIP Vill.Amani, Iohana, Distt. Fatehabad |
PHED |
07.01.2022 |
Non Complying |
22 |
7200 |
Consent not applied |
Legal action under process and is at various stages of process. |
| 58 |
6.5 MLD SIP Ratia , Fatehabad |
PHED |
07.01.2022 |
Complying |
8.4 |
90 |
Consent not applied |
-- |
| 59 |
5 MLD SIP Kharati Khera Road, Fatehabad |
PHED |
07.01.2022 |
Complying |
6.8 |
74 |
Consent granted |
-- |
| 60 |
3 MLD SIP, Jhakhal Mandi, Fatehabad |
PHED |
07.01.2022 |
Complying |
8.8 |
77 |
Consent not applied |
-- |
| 61 |
8 MLD SIP at Bhuna, Fatehabad |
PHED |
|
Complying |
|
|
Consent not applied |
-- |
| 62 |
10 MLD SIP Majra, |
HSVP |
07.01.2022 |
Complying |
7.2 |
84 |
Consent not applied |
-- |
24
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
|
Fatehabad |
|
|
|
|
|
|
|
| River Yamuna |
|
|
|
|
|
|
|
| Yamuna Nagar |
|
|
|
|
|
|
|
| 63 |
20 MLD STP at Radaur Road, Yamuna Nagar |
PHED |
18.01.2022 |
Complying except Faecal Coliform |
6.2 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 64 |
25 MLD STP at Radaur Road, Yamuna Nagar |
PHED |
18.01.2022 |
Complying |
7.4 |
80 |
Consent granted |
-- |
| 65 |
10 MLD STP at Baddimajra, Yamuna Nagar |
PHED |
18.01.2022 |
Complying except Faecal Coliform |
7 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 66 |
10 MLD STP at Baddimajra, Yamuna Nagar |
PHED |
|
Complying |
|
|
Consent granted |
-- |
| 67 |
24 MLD STP at Parwaloo, Jagadhri Yamuna Nagar |
PHED |
27.01.2022 |
Complying |
7.2 |
80 |
Consent granted |
-- |
| 68 |
3 MLD STP at Chhachhrauli Yamuna Nagar |
PHED |
31.01.2022 |
Complying |
6.8 |
80 |
Consent granted |
-- |
| 69 |
3.5 MLD STP at Radaur Yamuna Nagar |
PHED |
14.01.2022 |
Complying except Faecal Coliform |
6.5 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| Ladwa, Kurukshetra |
|
|
|
|
|
|
|
| 70 |
7 MLD STP at Indri Road, Ladwa Kurukshetra |
PHED |
07.12.2021 |
Complying |
5.8 |
20 |
Consent granted |
-- |
| Karnal |
|
|
|
|
|
|
|
25
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 71 |
4 MLD SIP atIndri, Karnal |
PHED |
13.01.2022 |
Complying |
7.5 |
40 |
Consent granted |
-- |
| 72 |
6 MLD SIP at Nilokheri, Karnal |
PHED |
13.01.2022 |
Complying |
4.2 |
20 |
Consent granted |
-- |
| 73 |
4 MLD SIP atNissing Karnal |
PHED |
13.01.2022 |
Complying |
7.8 |
80 |
Consent granted |
-- |
| 74 |
5.5 MLD SIP at Iarori Karnal |
PHED |
13.01.2022 |
Complying |
6 |
90 |
Consent granted |
-- |
| 75 |
7 MLD SIP at Gharaunda, Karnal |
PHED |
13.01.2022 |
Complying |
6.2 |
40 |
Consent granted |
-- |
| 76 |
10 MLD SIP at Gogharipur Road, karnal |
ULBD |
13.01.2022 |
Complying |
7.5 |
70 |
Consent granted |
-- |
| 77 |
8 MLD SIP atRK Puram, Karnal |
ULBD |
13.01.2022 |
Complying |
7.8 |
40 |
Consent granted |
-- |
| 78 |
50 MLD SIP at Iransport Nagar, Karnal |
ULBD |
13.01.2022 |
Complying |
6.8 |
Absent |
Consent granted |
-- |
| Panipat |
|
|
|
|
|
|
|
| 79 |
35 MLD SIP at Sewah, Panipat |
PHED |
27.01.2022 |
Complying except Faecal Coliform |
7.8 |
200 |
Consent refused |
Legal action under process and is at various stages of process. |
| 80 |
25 MLD SIP at Sewah, Panipat Panipat |
PHED |
27.01.2022 |
Complying except Faecal |
7.6 |
120 |
Consent granted |
Legal action under process and is at various stages of process. |
| 81 |
20 MLD SIP at Jattal Road, Panipat |
PHED |
27.01.2022 |
Complying |
7.2 |
Absent |
Consent refused |
Legal action under process and is at various stages of process for past violation. |
26
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 82 |
10 MLD SIP at Jattal Road, Panipat |
PHED |
27.01.2022 |
Complying |
8 |
80 |
Consent refused |
Legal action under process and is at various stages of process for past violation. |
| 83 |
5 MLD SIP at Samalkha, Panipat |
PHED |
27.01.2022 |
Complying except Faecal Coliform |
8 |
200 |
Consent applied |
Legal action under process and is at various stages of process. |
| 84 |
30 MLD SIP at Sec-19, Panipat |
HSVP |
27.01.2022 |
Complying except Faecal Coliform |
6.5 |
110 |
Consent granted |
Legal action under process and is at various stages of process. |
| 85 |
0.8 MLD SIP at Sec-6, Panipat |
HSVP |
27.01.2022 |
Complying |
6 |
60 |
Consent granted |
Legal action under process and is at various stages of process for past violation. |
| Sonepat |
|
|
|
|
|
|
|
| 86 |
4.5 MLD SIP at Kharkhoda Sonepat |
PHED |
27.01.2022 |
Complying except Faecal Coliform |
7.2 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 87 |
7 MLD SIP at Ganaur Sonepat |
PHED |
27.01.2022 |
Complying except Faecal Coliform |
7.6 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 88 |
3 MLD SIP at Gohana Sonepat |
PHED |
27.01.2022 |
Complying except Faecal Coliform |
7 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 89 |
8.3 MLD SIP at Gohana Sonepat |
PHED |
27.01.2022 |
Complying except Faecal Coliform |
7.2 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
27
| 90 |
30 MLD SIP at Rathdana Road, Sonepat |
ULBD |
27.01.2022 |
Complying |
7.5 |
20 |
Consent applied |
Legal action under process and is at various stages of process for past |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
|
|
|
|
|
|
|
|
violation |
| 91 |
25 MLD SIP at Kakroi Road, Sonepat |
ULBD |
27.01.2022 |
Complying |
7.6 |
20 |
Consent applied |
Legal action under process and is at various stages of process for past violation. |
| 92 |
7.5 MLD SIP at Rajiv Gandhi Edu. City, Phase-I, Sonepat |
|
27.01.2022 |
Complying |
6.4 |
Absent |
Consent granted |
-- |
| Rohtak |
|
|
|
|
|
|
|
| 93 |
19.5 MLD SIP at PGI Rohtak |
PHED |
29.12.2021 |
Complying |
7.4 |
68 |
Consent granted |
Prosecution filed in Special Environment Court, Kurukshetra on 25.08.2021 |
| 94 |
40 MLD SIP at Sonaria, Rohtak |
PHED |
28.12.2021 |
Non- complying |
33 |
12000 |
Consent granted |
Prosecution filed in Special Environment Court, Kurukshetra on 02.09.2019. |
| 95 |
3.5 MLD SIP at Kalanaur Rohtak |
PHED |
28.12.2021 |
Non- complying |
33 |
25000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 96 |
5 MLD SIP at Meham Rohtak |
PHED |
28.12.2021 |
Non- complying |
28 |
25000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 97 |
14 MLD SIP at Singhpura, Rohtak |
PHED |
28.12.2021 |
Complying |
7 |
82 |
Consent granted |
Legal action under process and is at various stages of process for past |
| 98 |
4 MLD SIP at Sampla Rohtak |
PHED |
29.12.2021 |
Non- complying |
34 |
9600 |
Consent granted |
Legal action under process and is at various stages of process. |
28
| 99 |
10 MLD SIP at Sec- 25, Rohtak |
HSVP |
30.10.2021 |
Non- complying |
102 |
170000 |
Consent refused |
Legal action under process and is at various stages of process. |
| 100 |
10 MLD SIP at |
PHED |
|
Non |
|
|
Consent not applied |
The SIP is under upgradation under |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
|
Singhpura, Rohtak |
|
|
Complying (Under Maintenance) |
|
|
|
AMRUT Yojna, the effluent is being treated through 14 MLD STP installed in the same premises. |
| Jhajjar |
|
|
|
|
|
|
|
| 101 |
5 MLD STP at Jhajjar |
PHED |
25.12.2021 |
Non Complying |
42 |
68000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 102 |
5.5 MLD STP at Jhajjar |
PHED |
25.12.2021 |
Non Complying |
45 |
94000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 103 |
2 MLD STP at Beri Jhajjar |
PHED |
15.02.2021 |
Non complying |
26 |
4200 |
Consent not applied |
A 03 MLD SBR based STP is complete and has also applied for consent to operate vide application no. 18417652 dt. 03.03.2022 which will be commissioned shortly. |
| 104 |
18 MLD STP at Line Par, Bahadurgarh |
PHED |
31.12.2021 |
Non Complying |
34 |
42000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 105 |
36 MLD STP at Najafgarh road Bahadurgarh |
PHED |
31.12.2021 |
Complying |
9.4 |
12000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 106 |
10 MLD STP at Sec-36, Bahadurgarh |
HSVP |
29.12.2021 |
Non- complying |
42 |
68000 |
Consent granted |
Legal action under process and is at various stages of process. |
29
| Nuh |
|
|
|
|
|
|
|
| 107 |
4.5 MLD STP at Tarou |
PHED |
28.01.2022 |
Complying except Faecal Coliform |
9 |
400 |
Consent Refused |
Legal action under process and is at various stages of process. |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 108 |
4.5 MLD SIP at Punhana |
PHED |
28.01.2022 |
Non Complying |
27 |
800 |
Consent granted |
Legal action under process and is at various stages of process. |
| 109 |
3.6 MLD SIP at Nuh |
PHED |
28.01.2022 |
Complying except Faecal Coliform |
7.6 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 110 |
5 MLD SIP at Ferozpur Jhirka |
PHED |
28.01.2022 |
Non Complying |
14 |
600 |
Consent granted |
Legal action under process and is at various stages of process. |
| Palwal |
|
|
|
|
|
|
|
| 111 |
4.5 MLD SIP at Hathin |
PHED |
21.12.2021 |
Complying except Faecal Coliform |
9 |
500 |
Consent granted |
Legal action under process and is at various stages of process. |
| 112 |
9 MLD SIP at Hodal |
PHED |
21.12.2021 |
Non Complying |
15 |
59400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 113 |
9 MLD SIP at Palwal |
PHED |
21.12.2021 |
Non Complying |
28 |
47000 |
Consent refused |
Legal action under process and is at various stages of process. |
| 114 |
3 MLD SIP at Hassanpur |
PHED |
21.12.2021 |
Non Complying |
17 |
15200 |
Consent granted |
Legal action under process and is at various stages of process. |
| Faridabad |
|
|
|
|
|
|
|
30
| 115 |
45 MLD SIP at Badshahpur, Faridabad |
ULBD |
07.01.2022 |
Non- Complying |
20 |
1200 |
Consent refused |
Two prosecution filed in Special Environment Court, Kurukshetra on 13.07.2020 and 10.08.2020. |
| 116 |
7.5 MLD SIP at Faridabad |
HSVP |
|
Complying |
|
|
Consent refused |
-- |
| Gurugram |
|
|
|
|
|
|
|
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 117 |
50 MLD SIP at Dhanwapur, Gurgaon |
GMDA |
11.01.2022 |
Complying |
5 |
45 |
Consent granted |
-- |
| 118 |
68 MLD SIP at Dhanwapur, Gurgaon |
GMDA |
11.01.2022 |
Complying |
8 |
56 |
Consent granted |
-- |
| 119 |
120 MLD SIP at Behrampur, Gurgaon |
GMDA |
13.01.2022 |
Complying |
7 |
50 |
Consent granted |
-- |
| 120 |
50 MLD SIP at Behrampur, Gurgaon |
GMDA |
13.01.2022 |
Complying |
7.6 |
80 |
Consent granted |
-- |
| 121 |
100 MLD SIP at Dhanwapur, Gurgaon |
GMDA |
11.01.2022 |
Non- Complying |
16 |
2100 |
Consent granted |
Legal action under process and is at various stages of process. |
| Other areas |
|
|
|
|
|
|
|
| Gurugram |
|
|
|
|
|
|
|
| 122 |
6 MLD SIP at Sohna, Gurgaon |
PHED |
23.12.2021 |
Complying |
8 |
90 |
Consent not applied |
Legal action under process and is at various stages of process for past |
| 123 |
4.5 MLD SIP at Pataudi, Gurgaon |
PHED |
13.01.2022 |
Non- Complying |
13 |
80 |
Consent granted |
Legal action under process and is at various stages of process. |
| 124 |
3 MLD SIP at Farrukhnagar, Gurgaon |
PHED |
13.01.2022 |
Non- Complying |
14 |
90 |
Consent granted |
Legal action under process and is at various stages of process. |
31
| 125 |
5.5 MLD SIP at Haily Mandi, Gurgaon |
PHED |
13.01.2022 |
Complying |
6.2 |
40 |
Consent granted |
-- |
| Jind |
|
|
|
|
|
|
|
| 126 |
4 MLD SIP at Julana, Jind |
PHED |
29.11.2021 |
Non- Complying |
25 |
3900 |
Consent granted |
Legal action under process and is at various stages of process. |
| Bhiwani |
|
|
|
|
|
|
|
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 127 |
10 MLD SIP at Dhana Road, Bhiwani |
PHED |
29.12.2021 |
Non- Complying |
20 |
21000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 128 |
10 MLD SIP at Bhiwani |
PHED |
29.12.2021 |
Non- Complying |
21 |
21000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 129 |
15 MLD SIP at Bhiwani, Phase-I |
PHED |
29.12.2021 |
Complying |
6.4 |
90 |
Consent granted |
-- |
| 130 |
15 MLD SIP at Bhiwani, Phase-II |
PHED |
29.12.2021 |
Complying |
6.8 |
94 |
Consent granted |
-- |
| 131 |
5 MLD SIP at Charkhi Dadri, Bhiwani |
PHED |
31.12.2021 |
Non- Complying |
45 |
72000 |
Consent Refused |
Legal action under process and is at various stages of process. |
| 132 |
5 MLD SIP at Chirya Road, Charkhi Dadri, Bhiwani |
PHED |
31.12.2021 |
Non- Complying |
38 |
65000 |
Consent Refused |
Legal action under process and is at various stages of process. |
| 133 |
4.5 MLD SIP at Bawani Khera, Bhiwani |
PHED |
31.12.2021 |
Non- Complying |
22 |
42000 |
Consent granted |
Legal action under process and is at various stages of process. |
32
| 134 |
3.5 MLD SIP at Loharu, Bhiwani |
PHED |
30.12.2021 |
Non- Complying |
16 |
15000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 135 |
3 MLD SIP at Iosham, Bhiwani |
PHED |
30.12.2021 |
Complying |
6.4 |
90 |
Consent granted |
-- |
| 136 |
4 MLD SIP at Siwani, Bhiwani |
PHED |
31.12.2021 |
Non- Complying |
20 |
39000 |
Consent granted |
Legal action under process and is at various stages of process. |
| 137 |
10 MLD SIP at Bhiwani |
HSVP |
30.12.2021 |
Complying |
6.2 |
77 |
Consent granted |
-- |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| Mohindergarh |
|
|
|
|
|
|
|
| 138 |
6.5 MLD SIP at Mohindergarh |
PHED |
30.12.2021 |
Complying |
7.6 |
40 |
Consent granted |
-- |
| 139 |
2 MLD SIP at Ateli Mandi, Mohindergarh |
PHED |
29.12.2021 |
Complying |
7.5 |
60 |
Consent granted |
-- |
| 140 |
3 MLD SIP at Kanina, Mohindergarh |
PHED |
30.12.2021 |
Complying |
7.8 |
40 |
Consent granted |
-- |
| 141 |
7.5 MLD SIP at Rewari Road, Narnaul, Mohindergarh |
PHED |
29.12.2021 |
Complying |
7.5 |
60 |
Consent granted |
-- |
| 142 |
6 MLD SIP at Near Chinkara Rest House, Rewari Road, Narnaul |
MC |
01.12.2020 |
Complying except Faecal Coliform |
|
|
Consent not applied |
Non operational and effluent being treated in 7.5 MLD SIP Narnaul |
| Rewari |
|
|
|
|
|
|
|
| 143 |
3 MLD SIP at Bawal, Rewari |
PHED |
30.12.2021 |
Non- Complying |
17 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
33
| 144 |
6.5 MLD SIP at Rewari |
PHED |
29.12.2021 |
Non- Complying |
130 |
3300 |
Consent granted |
Legal action under process and is at various stages of process. |
| 145 |
8 MLD SIP at Rewari |
PHED |
29.12.2021 |
Non- Complying |
12 |
400 |
Consent granted |
Legal action under process and is at various stages of process. |
| 146 |
16 MLD SIP at Rewari |
PHED |
29.12.2021 |
Complying except Faecal Coliform |
8 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| 147 |
9.5 MLD SIP at Dharuhera |
PHED |
29.12.2021 |
Complying except Faecal Coliform |
8 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Consent status |
Action taken by HSPCB |
| 148 |
3 MLD SIP at Kosli, Rewari |
PHED |
29.12.2021 |
Non- Complying |
25 |
600 |
Consent granted |
Legal action under process and is at various stages of process. |
| 149 |
5 MLD SIP at Dharuhera |
HSVP |
29.12.2021 |
Complying except Faecal |
7.6 |
200 |
Consent granted |
Legal action under process and is at various stages of process. |
| Ambala |
|
|
|
|
|
|
|
| 150 |
4 MLD SIP at Barara, Ambala |
PHED |
27.01.2022 |
Complying |
6.5 |
80 |
Consent granted |
-- |
| Karnal |
|
|
|
|
|
|
|
| 151 |
5 MLD SIP at Assandh, Karnal |
PHED |
13.01.2022 |
Complying |
7.6 |
40 |
Consent granted |
-- |
| Hisar |
|
|
|
|
|
|
|
| 152 |
6.5 MLD SIP at Hansi, Hisar |
PHED |
05.01.2022 |
Non- Complying |
24 |
45000 |
Consent not applied |
Legal action under process and is at various stages of process. |
34
153
6 MLD SIP at Dhani
PHED 05.01.2022 Non- 92 180000 Consent not applied Legal action under process and is at Gram, Barwala, Hisar Complying various stages of process.
154 6.5MLDSIPat
PHED 05.01.2022 Non- 17 52000 Consent granted Legal action under process and is at Uklana, Hisar Complying various stages of process.
155
5 MLD SIP at Dhani
PHED 05.01.2022 Non- 21 720 Consent not applied Prosecution filed in Special Environment Kushal, Bhiwani Road, Complying Court, Kurukshetra on 13.03.2020. Hansi
156 7.5MLDSIPat
PHED 05.01.2022 Non- 20 420 Consent not applied Prosecution filed in Special Environment Lalpura- Jind Road, Complying Court, Kurukshetra on 13.03.2020. Hansi
Total Existing STPs- 156 and Total capacity - 1834.2 MLD
35
Annexure-3 Status of mode of discharge of treated sewage in the State of Haryana.
| Sr. No. |
Name and Region of STPs |
Deptt. |
Mode of disposal |
| Ambala |
|
|
| 1 |
3.00 MLD SIP Naya Gaon , Unit.I , Ambala City |
PHED |
In drain |
| 2 |
3.25 MLD SIP Naya Gaon , Unit.II Ambala City |
PHED |
In drain |
| 3 |
5 MLD SIP Baldev Nagar , Unit.I , Ambala City |
PHED |
In drain |
| 4 |
3.25 SIP Baldev Nagar , Unit.II ,Ambala City |
PHED |
In drain |
| 5 |
5 MLD SIP Moti Nagar, Unit.I , Ambala City |
PHED |
In drain |
| 6 |
5 MLD SIP Moti Nagar , Unit.II , Ambala City |
PHED |
In drain |
| 7 |
6 MLD SIP Modal Iown, Ambala City |
PHED |
In drain |
| 8 |
3.25 SIP Nasirpur Ambala City |
PHED |
In drain |
| 9 |
0.25 MLD SIP Sadopur , Ambala |
PHED |
In drain |
| 10 |
3.00 MLD SIP Devi Nagar , Ambala City |
PHED |
In drain |
| 11 |
3 MLD SIP Nariangarh , Ambala |
PHED |
In drain |
| 12 |
2 MLD SIP Sec.7 , Urban Estate , Ambala City Ambala |
HSVP |
In drain |
| 13 |
5 MLD SIP Ambala |
|
CIE obtained. Not |
commissioned yet.
| Kurukshetra |
|
|
| 14 |
25 MLD SIP Ihanesar, Kurukshetra |
PHED |
In Saraswati Drain |
| 15 |
8 MLD SIP Model Iown , Pehowa Kurukshetra |
PHED |
In Saraswati Drain |
| 16 |
11.5 MLD SIP Ladwa Road , Shahbad Kurukshetra |
PHED |
In Saraswati Drain |
| 17 |
15 MLD SIP Kurukshetra |
HSVP |
In Saraswati Drain |
| Panchkula |
|
|
| 18 |
4.5 MLD SIP Kalka Panchkula |
PHED |
In drain |
| 19 |
0.25 MLD SIP Kalka Panchkula |
PHED |
In drain |
| 20 |
5 MLD SIP Nalagarh Road, Manakpur, Pinjore Panchkula |
PHED |
In drain |
| 21 |
18 MLD SIP Panchkula |
HSVP |
In drain |
| 22 |
39 MLD SIP Panchkula |
HSVP |
In drain |
| 23 |
15 MLD SIP Sector- 28, Panchkula |
HSVP |
In Ghaggar River |
| 24 |
9 MLD SIP Garrison Engineer , Chandimandir Panchkula |
GE |
In Ghaggar River |
| Jind |
|
|
| 25 |
15 MLD SIP by PHED Jind |
PHED |
In drain |
| 26 |
3.5 MLD Patiala Road , Narwana |
PHED |
In drain |
| 27 |
3.75 MLD SIP Narwana Jind |
PHED |
In drain |
| 28 |
02 MLD SIP, Dablain Road, Narwana, Jind |
PHED |
In drain |
36
| Sr. No. |
Name and Region of STPs |
Deptt. |
Mode of disposal |
| 29 |
2 MLD SIP Uchana Jind |
PHED |
In drain |
| 30 |
1.5 MLD Uchana |
PHED |
In drain |
| 31 |
5 MLD SIP Jind |
PHED |
In drain |
| 32 |
7 MLD SIP, Jind |
PHED |
In drain |
| 33 |
9 MLD SIP Safidon , Jind |
PHED |
In drain |
| 34 |
10 MLD Jind |
HSVP |
In drain |
| Kaithal |
|
|
| 35 |
10 MLD SIP Cheeka, Kaithal |
PHED |
In drain |
| 36 |
10 MLD SIP , Jind Road Kaithal |
PHED |
In drain |
| 37 |
10 MLD SIP Manas Road, Kaithal |
PHED |
In drain |
| 38 |
10 MLD Manas Road,Kaithal |
PHED |
In drain |
| 39 |
5 MLD SIP Kalayat , Kaithal |
PHED |
In drain |
| 40 |
3.5 Pundri Kaithal |
PHED |
In drain |
| 41 |
7.5 MLD Kaithal |
HSVP |
In drain |
| Hisar |
|
|
| 42 |
15 MLD SIP Azad Nagar, Rajgarh Road Hisar |
PHED |
Hisar Ghaggar Drain |
| 43 |
40 MLD SIP Rishi Nagar , Hisar |
PHED |
Hisar Ghaggar Drain |
| 44 |
4 MLD SIP Narnaund, Hisar |
PHED |
Moth Drain |
| 45 |
4 MLD SIP Kaimri Road, Hisar |
PHED |
Dabra Drain |
| 46 |
15 MLD SIP Dabara Iosham Road , Hisar |
HSVP |
Dabra Drain |
| 47 |
8 MLD SIP Village Dabra |
ULBD |
Into Irrigation drain near Dabra village. |
| Sirsa |
|
|
| 48 |
15 MLD SIP, Shamsabad patti , Kalania Road, Sirsa |
PHED |
Ghaggar River |
| 49 |
5 MLD SIP ,Vill. Nattar 1 , Sirsa |
PHED |
In drain |
| 50 |
5 MLD SIP , Vill. Nattar 2 , Sirsa |
PHED |
In drain |
| 51 |
7.5 MLD SIP Ellenabad Sirsa |
PHED |
Ghaggar River |
| 52 |
9.5 MLD SIP, Daddu Road,Kalanwali , Sirsa |
PHED |
In drain |
| 53 |
6 MLD SIP Rania Sirsa |
PHED |
Rania link Drain |
| 54 |
16.5 MLD SIP Dabwali, Sirsa |
PHED |
In drain |
| 55 |
20 MLD SIP at Kelnia Sirsa |
PHED |
Ghaggar River |
| Fatehabad |
|
|
| Sr. No. |
Name and Region of STPs |
Deptt. |
Mode of disposal |
| 56 |
10 MLD SIP Vill. Bhodia Khera, Bhattu Road, Fatehabad |
PHED |
Rangoi Drain |
| 57 |
10 MLD SIP Vill.Amani, Iohana, Distt. Fatehabad |
PHED |
Rangoi Drain |
37
58 6.5 MLD SIP Ratia , Fatehabad PHED Ghaggar River 59 5 MLD SIP Kharati Khera Road, Fatehabad PHED Rangoi Drain 60 3 MLD SIPJhakhal Mandi, Fatehabad PHED Ghaggar River 61 8 MLD SIP at Bhuna, Fatehabad PHED In drain 62 10 MLD SIP Majra, Fatehabad HSVP In drain
River Yamuna Yamuna Nagar
63 20 MLD SIP at Radaur Road, Yamuna Nagar PHED Ditch drain 64 25 MLD SIP at Radaur Road, Yamuna Nagar PHED Ditch drain 65 10 MLD SIP at Baddimajra, Yamuna Nagar PHED Western Jamuna Canal 66 10 MLD SIP at Baddimajra, Yamuna Nagar PHED Western Jamuna Canal 67 24 MLD SIP at Parwaloo, Jagadhri Yamuna Nagar PHED River Yamuna 68 3 MLD SIP at Chhachhrauli Yamuna Nagar PHED Somb River 69 3.5 MLD SIP at Radaur Yamuna Nagar PHED Ditch drain
Ladwa, Kurukshetra
70 7 MLD SIP at Indri Road, Ladwa Kurukshetra PHED In Rakshi Drain
Karnal
71 4 MLD SIP at Indri, Karnal PHED In drain 72 6 MLD SIP at Nilokheri, Karnal PHED In drain 73 4 MLD SIP at Nissing Karnal PHED In drain 74 5.5 MLD SIP at Iarori Karnal PHED In drain 75 7 MLD SIP at Gharaunda, Karnal PHED In drain 76 10 MLD SIP at Gogharipur Road, karnal ULBD In drain 77 8 MLD SIP at RK Puram, Karnal ULBD In drain 78 50 MLD SIP at Iransport Nagar, Karnal ULBD In drain
Panipat
79 35 MLD SIP at Sewah, Panipat PHED Panipat Drain No. 1 80 25 MLD SIP at Sewah, Panipat Panipat PHED Panipat Drain No. 1 81 20 MLD SIP at Jattal Road, Panipat PHED Nohra Drain 82 10 MLD SIP at Jattal Road, Panipat PHED Nohra Drain 83 5 MLD SIP at Samalkha, Panipat PHED Drain No. 6 84 30 MLD SIP at Sec-19, Panipat HSVP Drain No. 2 85 0.8 MLD SIP at Sec-6, Panipat HSVP Panipat Drain No. 1
Sonepat
86 4.5 MLD SIP at Kharkhoda Sonepat PHED Drain No.6 87 7 MLD SIP at Ganaur Sonepat PHED Drain No. 6
Sr. Name and Region of STPs Deptt. Mode of disposal No.
88 3 MLD SIP at Gohana Sonepat PHED Wazirpura Drain 89 8.3 MLD SIP at Gohana Sonepat PHED Drain No.8 90 30 MLD SIP at Rathdana Road, Sonepat ULBD Into drain No.6 91 25 MLD SIP at Kakroi Road, Sonepat ULBD Into drain No.6 92 7.5 MLD SIP at Rajiv Gandhi Edu. City, Phase-I, HSVP Horticulture Sonepat
Rohtak
38
| 93 |
19.5 MLD SIP at PGI Rohtak |
PHED |
Rohtak link drain (Sub Drain of KCB drain) |
| 94 |
40 MLD SIP at Sonaria, Rohtak |
PHED |
Drain No. 8 |
| 95 |
3.5 MLD SIP at Kalanaur Rohtak |
PHED |
Mokhra link drain (Sub Drain of drain no. 8) |
| 96 |
5 MLD SIP at Meham Rohtak |
PHED |
Meham Drain |
| 97 |
14 MLD SIP at Singhpura, Rohtak |
PHED |
Drain No. 8 |
| 98 |
4 MLD SIP at Sampla Rohtak |
PHED |
Paksma link drain (Sub Drain of West Jua Drain leading to Mungeshpur Drain). |
| 99 |
10 MLD SIP at Sec-25, Rohtak |
HSVP |
Rohtak link drain (Sub Drain of KCB drain) |
| 100 |
10 MLD SIP at Singhpura, Rohtak |
|
Drain No. 8 |
| Jhajjar |
|
|
| 101 |
5 MLD SIP at Jhajjar |
PHED |
Jhajjar link drain (Sub Drain of Drain No. 8) |
| 102 |
5.5 MLD SIP at Jhajjar |
PHED |
Jhajjar link drain (Sub Drain of Drain No. 8) |
| 103 |
2 MLD SIP at Beri Jhajjar |
PHED |
Baghpur link drain (Sub Drain of Drain No. 8) |
| 104 |
18 MLD SIP at Line Par, Bahadurgarh |
PHED |
Mungeshpur drain |
| 105 |
36 MLD SIP at Najafgarh road Bahadurgarh |
PHED |
Mungeshpur drain |
| 106 |
10 MLD SIP at Sec-36, Bahadurgarh |
HSVP |
Kassar link drain (Sub Drain of KCB drain) |
| Nuh |
|
|
| 107 |
4.5 MLD SIP at Iarou |
PHED |
Into Drain |
| 108 |
4.5 MLD SIP at Punhana |
PHED |
Into Drain |
| 109 |
3.6 MLD SIP at Nuh |
PHED |
Into Drain |
| 110 |
5 MLD SIP at Ferozpur Jhirka |
PHED |
Into Drain |
| 111 |
4.5 MLD SIP at Hathin |
PHED |
Into Drain, |
| 112 |
9 MLD SIP at Hodal |
PHED |
Into Drain |
| 113 |
9 MLD SIP at Palwal |
PHED |
Into Drain |
| 114 |
3 MLD SIP at Hassanpur |
PHED |
Into Drain |
| Faridabad |
|
|
| 115 |
45 MLD SIP at Badshahpur, Faridabad |
ULBD |
Budiya Nallah |
| 116 |
7.5 MLD SIP at Faridabad |
HSVP |
For Green Belt/ Horticultur e I HSVP |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Mode of disposal |
|
|
|
Sectors. |
| Gurugram |
|
|
| 117 |
0 MLD SIP at Dhanwapur, Gurgaon |
GMDA |
Najafgarh Drain |
| 118 |
8 MLD SIP at Dhanwapur, Gurgaon |
GMDA |
Najafgarh Drain |
| 119 |
20 MLD SIP at Behrampur, Gurgaon |
GMDA |
Drain |
| 120 |
0 MLD SIP at Behrampur, Gurgaon |
GMDA |
Drain |
| 121 |
00 MLD SIP at Dhanwapur, Gurgaon |
GMDA |
Najafgarh Drain |
| Other areas |
|
|
| Gurugram |
|
|
39
| 122 |
MLD SIP at Sohna, Gurgaon |
PHED |
Uzina Drain |
| 123 |
.5 MLD SIP at Pataudi, Gurgaon |
PHED |
Indori Nallah |
| 124 |
MLD SIP at Farrukhnagar, Gurgaon |
PHED |
Fatehpuri drain |
| 125 |
.5 MLD SIP at Haily Mandi, Gurgaon |
PHED |
Into Drain |
| Jind |
|
|
| 126 |
MLD SIP at Julana, Jind |
PHED |
Into Drain |
| Bhiwani |
|
|
| 127 |
0 MLD SIP at Dhana Road, Bhiwani |
PHED |
Into Drain |
| 128 |
0 MLD SIP at Bhiwani |
PHED |
Into Drain |
| 129 |
5 MLD SIP at Bhiwani, Phase-I |
PHED |
Into Drain |
| 130 |
5 MLD SIP at Bhiwani, Phase-II |
PHED |
Into Drain |
| 131 |
MLD SIP at Charkhi Dadri, Bhiwani |
PHED |
Into Drain |
| 132 |
MLD SIP at Chirya Road, Charkhi Dadri, Bhiwani |
PHED |
Into Drain |
| 133 |
.5 MLD SIP at Bawani Khera, Bhiwani |
PHED |
Into Drain |
| 134 |
.5 MLD SIP at Loharu, Bhiwani |
PHED |
Into Drain |
| 135 |
MLD SIP at Iosham, Bhiwani |
PHED |
Into Drain |
| 136 |
MLD SIP at Siwani, Bhiwani |
PHED |
Into Drain |
| 137 |
0 MLD SIP at Bhiwani |
HSVP |
Into Drain |
| Mohindergarh |
|
|
| 138 |
.5 MLD SIP at Mohindergarh |
PHED |
Into Drain |
| 139 |
MLD SIP at Ateli Mandi, Mohindergarh |
PHED |
Into Drain |
| Sr. No. |
Name and Region of STPs |
Deptt. |
Mode of disposal |
| 140 |
3 MLD SIP at Kanina, Mohindergarh |
PHED |
Into Drain |
| 141 |
7.5 MLD SIP at Rewari Road, Narnaul, Mohindergarh |
PHED |
Krishnawati river |
| 142 |
6 MLD SIP at Near Chinkara Rest House, Rewari Road, Narnaul |
ULBD |
Not operational |
| Rewari |
|
|
| 143 |
3 MLD SIP at Bawal, Rewari |
PHED |
Sahibi River |
| 144 |
6.5 MLD SIP at Rewari |
PHED |
Sahibi River |
| 145 |
8 MLD SIP at Rewari |
PHED |
Sahibi River |
| 146 |
16 MLD SIP at Rewari |
PHED |
Sahibi River |
| 147 |
9.5 MLD SIP at Dharuhera |
PHED |
Sahibi River |
| 148 |
3 MLD SIP at Kosli, Rewari |
PHED |
Into Drain |
| 149 |
5 MLD SIP at Dharuhera |
HSVP |
Into Drain |
| Ambala |
|
|
40
| 150 |
4 MLD SIP at Barara, Ambala |
PHED |
In drain |
| Karnal |
|
|
| 151 |
5 MLD SIP at Assandh, Karnal |
PHED |
Into Drain |
| Hisar |
|
|
| 152 |
6.5 MLD SIP at Hansi, Hisar |
PHED |
Chitang Drain |
| 153 |
6 MLD SIP at Dhani Gram, Barwala, Hisar |
PHED |
Into Drain |
| 154 |
6.5 MLD SIP at Uklana, Hisar |
PHED |
Into Drain |
| 155 |
5 MLD SIP at Dhani Kushal, Bhiwani Road, Hansi |
PHED |
Bass Drain |
| 156 |
7.5 MLD SIP at Lalpura- Jind Road, Hansi |
PHED |
Chitang Drain |
41
Annexure-4 (List-A) Status of action plan for STPs which are complying except Faecal Coliform
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
| River Ghaggar |
|
|
|
|
|
|
|
| Ambala |
|
|
|
|
|
|
|
| 1 |
3.00 MLD STP Naya Gaon , Unit.I , Ambala City |
PHED |
3 |
30.01.2022 |
Complying except Faecal Coliform |
8 |
200 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| 2 |
3 MLD STP Nariangarh , Ambala |
PHED |
3 |
24.01.2022 |
Complying except Faecal Coliform |
6.8 |
200 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.03.2024. |
| Panchkula |
|
|
|
|
|
|
|
| 3 |
4.5 MLD Kalka Panchkula |
PHED |
4.5 |
19.01.2022 |
Complying except Faecal Coliform |
8.5 |
400 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2024. |
| 4 |
0.25 MLD Kalka Panchkula |
PHED |
0.25 |
19.01.2022 |
Complying except Faecal Coliform |
6.5 |
600 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| 5 |
5 MLD STP Nalagarh Road, Manakpur, Pinjore Panchkula |
PHED |
5 |
19.01.2022 |
Complying except Faecal Coliform |
3.5 |
Absent |
| 6 |
18 MLD STP Panchkula |
HSVP |
18 |
21.01.2022 |
Complying except Faecal Coliform |
10 |
600 |
Estimate for upgradation and renovation of existing STP is under approval. Work is likely to be completed by 31.12.2025. |
| 7 |
15 MLD STP Sector- 28, Panchkula |
HSVP |
15 |
19.01.2022 |
Complying except Faecal Coliform |
7 |
400 |
Estimate for additional arrangements at this STP is under preparation. Work is likely to be completed by 31.05.2023. |
42
| Sr. No |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
| 8 |
9 MLD SIP Garrison Engineer , Chandimandir Panchkula |
GE |
9 |
19.01.2022 |
Complying except Faecal Coliform |
6.5 |
200 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| River Yamuna |
|
|
|
|
|
|
|
| Yamuna Nagar |
|
|
|
|
|
|
|
| 9 |
Radaur Road, Yamuna Nagar |
PHED |
20 |
18.01.2022 |
Complying except Faecal Coliform |
6.2 |
200 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| 10 |
Baddimajra, Yamuna Nagar |
PHED |
10 |
18.01.2022 |
Complying except Faecal Coliform |
7 |
200 |
| 11 |
Radaur Yamuna Nagar |
PHED |
3.5 |
14.01.2022 |
Complying except Faecal Coliform |
6.5 |
400 |
| Panipat |
|
|
|
|
|
|
|
| 12 |
Sewah, Panipat |
PHED |
35 |
27.01.2022 |
Complying except Faecal Coliform |
7.8 |
200 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| 13 |
Sewah, Panipat Panipat |
PHED |
25 |
27.01.2022 |
Complying except Faecal Coliform |
7.6 |
120 |
| 14 |
Samalkha, Panipat |
PHED |
5 |
27.01.2022 |
Complying except Faecal Coliform |
8 |
200 |
| 15 |
Sec-19, Panipat |
HSVP |
30 |
27.01.2022 |
Complying except Faecal Coliform |
6.5 |
110 |
| Sonepat |
|
|
|
|
|
|
|
| 16 |
Kharkhoda Sonepat |
PHED |
4.5 |
27.01.2022 |
Complying except Faecal Coliform |
7.2 |
200 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
43
| 17 |
Ganaur Sonepat |
PHED |
7 |
27.01.2022 |
Complying except Faecal Coliform |
7.6 |
200 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
| 18 |
Gohana Sonepat |
PHED |
3 |
27.01.2022 |
Complying except Faecal Coliform |
7 |
200 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.03.2024. |
| 19 |
Gohana Sonepat |
PHED |
8.3 |
27.01.2022 |
Complying except Faecal Coliform |
7.2 |
200 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.03.2024. |
| 20 |
Tarou |
PHED |
4.5 |
28.01.2022 |
Complying except Faecal Coliform |
9 |
400 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.07.2023. |
| 21 |
Nuh |
PHED |
3.6 |
28.01.2022 |
Complying except Faecal Coliform |
7.6 |
200 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.07.2023. |
| Palwal |
|
|
|
|
|
|
|
| 22 |
Hathin |
PHED |
4.5 |
21.12.2021 |
Complying except Faecal Coliform |
9 |
500 |
Upgradation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| Other areas |
|
|
|
|
|
|
|
| Rewari |
|
|
|
|
|
|
|
| 23 |
Rewari |
PHED |
16 |
29.12.2021 |
Complying except Faecal Coliform |
8 |
200 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| 24 |
Dharuhera |
PHED |
9.5 |
29.12.2021 |
Complying except Faecal Coliform |
8 |
200 |
| 25 |
Dharuhera |
HSVP |
5 |
29.12.2021 |
Complying except Faecal Coliform |
7.6 |
200 |
30.06.2022 |
44
List-B Status of action plan for non complying STPs (10 BOD)
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
| River Ghaggar |
|
|
|
|
|
|
|
| Ambala |
|
|
|
|
|
|
|
| 1 |
3.25 MLD STP Naya Gaon , Unit.II Ambala City |
PHED |
3.25 |
29.01.2022 |
Non- Complying |
18 |
600 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| 2 |
5 MLD Baldev Nagar , Unit.I , Ambala City |
PHED |
5 |
28.01.2022 |
Non- Complying |
16 |
400 |
STP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be upgraded upto 31.12.2023. |
| 3 |
3.25 Baldev Nagar , Unit.II ,Ambala City |
PHED |
3.25 |
28.01.2022 |
Non- Complying |
12 |
600 |
STP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2023. |
| 4 |
5 MLD Moti Nagar, Unit. I , Ambala City |
PHED |
5 |
29.01.2022 |
Non- Complying |
16 |
800 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| 5 |
5 MLD STP Moti Nagar , Unit.II , Ambala City |
PHED |
5 |
29.01.2022 |
Non- Complying |
12 |
400 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| 6 |
6 MLD STP Modal Town, Ambala City |
PHED |
6 |
29.01.2022 |
Non- Complying |
14 |
300 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| 7 |
3.25 Nasirpur Ambala City |
PHED |
3.25 |
29.01.2022 |
Non- Complying |
14 |
800 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.12.2023. |
| 8 |
3.00 MLD Devi Nagar , Ambala City |
PHED |
3 |
28.01.2022 |
Non- Complying |
14 |
800 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.03.2024. |
| Kurukshetra |
|
|
|
|
|
|
|
| 9 |
8 MLD STP Model Town , Pehowa Kurukshetra |
PHED |
8 |
06.01.2022 |
Non Complying |
16 |
400 |
Upgrdation for achieving latest parameters fixed by HSPCB will be completed by 31.03.2024. |
| Jind |
|
|
|
|
|
|
|
| 10 |
3.5 MLD Patiala Road , Narwana by PHED |
PHED |
3.5 |
24.01.2022 |
Non- Complying |
21 |
38000 |
STP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned |
45
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
|
|
|
|
|
|
|
|
upto 31.12.2022. |
| 11 |
3.75 MLD SIP Narwana Jind by PHED |
PHED |
3.75 |
24.01.2022 |
Non- Complying |
22 |
9400 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2022. |
| 12 |
02 MLD SIP, PHED , Dablain Road, Narwana, Jind |
PHED |
2 |
24.01.2022 |
Non- Complying |
27 |
31000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2022. |
| 13 |
2 MLD SIP Uchana Jind |
PHED |
2 |
19.01.2022 |
Non- Complying |
26 |
6500 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.03.2022. |
| 14 |
1.5 MLD Uchana |
PHED |
1.5 |
19.01.2022 |
Non Complying |
22 |
5200 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2022 |
| 15 |
5 MLD SIP Jind |
PHED |
5 |
18.01.2022 |
Non Complying |
27 |
12000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2022. |
| Sirsa |
|
|
|
|
|
|
|
| 16 |
5 MLD SIP ,Vill. Nattar 1 , Sirsa |
PHED |
5 |
06.01.2022 |
Non- Complying |
20 |
4800 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2023. |
| 17 |
5 MLD SIP , Vill. Nattar 2 , Sirsa |
PHED |
5 |
06.01.2022 |
Non- Complying |
25 |
5600 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2023. |
| Fatehabad |
|
|
|
|
|
|
|
| 18 |
10 MLD SIP Vill. Bhodia Khera, Bhattu Road, Fatehabad |
PHED |
10 |
07.01.2022 |
Non- Complying |
24 |
21000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation |
46
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
|
|
|
|
|
|
|
|
and is expected to be commissioned upto 31.03.2022 |
| 19 |
10 MLD SIP Vill.Amani, Iohana, Distt. Fatehabad |
PHED |
10 |
07.01.2022 |
Non Complying |
22 |
7200 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.21. |
| River Yamuna |
|
|
|
|
|
|
|
| Rohtak |
|
|
|
|
|
|
|
| 20 |
Meham Rohtak |
PHED |
5 |
28.12.2021 |
Non complying |
28 |
25000 |
Ihe work for upgradation of existing SIP has been allotted recently and is in progress. Target date : 31.03.2023 |
| Jhajjar |
|
|
|
|
|
|
|
| 21 |
Beri Jhajjar |
PHED |
2 |
15.02.2021 |
Non complying |
26 |
4200 |
New SIP is being constructed to replace this and shall be completed by 31.03.2022. |
| Nuh |
|
|
|
|
|
|
|
|
| 22 |
Punhana |
PHED |
4.5 |
28.01.2022 |
Non Complying |
27 |
800 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. DNII for upgradation under process and expected to be completed by 31.12.23 |
| 23 |
Ferozpur Jhirka |
PHED |
5 |
28.01.2022 |
Non Complying |
14 |
600 |
Io achieve the desired parameters, SIP is to be upgraded for which DNII is under preparation Ihe work for upgradation of SIP will be completed by 30.09.2023 |
| Palwal |
|
|
|
|
|
|
|
| 24 |
Hodal |
PHED |
9 |
21.12.2021 |
Non Complying |
15 |
59400 |
The estimate for renovation and up-gradation of 9 MLD SIP at Hodal has been technically sanctioned and is being sent to WS&Sew. Board for administrative approval. DNII is under preparation for the same. Target date :31/03/2023 |
47
| 25 |
Palwal |
PHED |
9 |
21.12.2021 |
Non Complying |
28 |
47000 |
SIP of 15 MLD capacity on SBR technology in place of existing 9 MLD SIP is under construction by ULB under AMRUI which is likely to be |
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
|
|
|
|
|
|
|
|
commissioned by 31/03/2022. |
| 26 |
Hassanpur |
PHED |
3 |
21.12.2021 |
Non Complying |
17 |
15200 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| Faridabad |
|
|
|
|
|
|
|
| 27 |
Badshahpur, Faridabad |
ULBD |
45 |
07.01.2022 |
Non- Complying |
20 |
1200 |
New SIPs are being constructed and shall be completed by Nov. 2022. |
| Gurugram |
|
|
|
|
|
|
|
| 28 |
Dhanwapur, Gurgaon |
GMDA |
100 |
11.01.2022 |
Non- Complying |
16 |
2100 |
For achieving the revised parameters fixed by HSPCB, the tender for construction of tertiary treatment unit for 75 MLD is under approval and likely to be completed by 30.06.2023. |
| Other areas |
|
|
|
|
|
|
|
| Gurugram |
|
|
|
|
|
|
|
| 29 |
Pataudi, Gurgaon |
PHED |
4.5 |
13.01.2022 |
Non- Complying |
13 |
80 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and tender for upgradation has been called and if allotted work is likely to be completed by 31.07.2023. |
| 30 |
Farrukhnagar, Gurgaon |
PHED |
3 |
13.01.2022 |
Non- Complying |
14 |
90 |
No plan. Show Cause Notice issued. |
| Jind |
|
|
|
|
|
|
|
| 31 |
Julana, Jind |
PHED |
4 |
29.11.2021 |
Non- Complying |
25 |
3900 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2022 |
| Bhiwani |
|
|
|
|
|
|
|
48
| 32 |
Dhana Road, Bhiwani |
PHED |
10 |
29.12.2021 |
Non- Complying |
20 |
21000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. Work for up gradation of SIP (MBBR) has been allotted and will be completed by 31.12.2022 |
| 33 |
Bhiwani |
PHED |
10 |
29.12.2021 |
Non- Complying |
21 |
21000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. Work for up gradation of |
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
|
|
|
|
|
|
|
|
SIP (MBBR) has been allotted and will be completed by 31.12.2022 |
| 34 |
Bawani Khera, Bhiwani |
PHED |
4.5 |
31.12.2021 |
Non- Complying |
22 |
42000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. Iender called for upgrdatation of SIP (MBBR) but no agency came forward to participate in tender process. So, the fresh DNII is in process. Upgradation is expected to be completed by 31.12.23 |
| 35 |
Loharu, Bhiwani |
PHED |
3.5 |
30.12.2021 |
Non- Complying |
16 |
15000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. Iender called for upgrdatation of SIP (MBBR) but no agency came forward to participate in tender process. So, the fresh DNII is in process. Upgradation is expected to be completed by 31.12.23 |
| 36 |
Siwani, Bhiwani |
PHED |
4 |
31.12.2021 |
Non- Complying |
20 |
39000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. Iender called for upgrdatation of SIP (MBBR) but no agency came forward to participate in tender process. So, the fresh DNII is in process. Upgradation is expected to be completed by 31.12.23 |
| Rewari |
|
|
|
|
|
|
|
49
| 37 |
Bawal, Rewari |
PHED |
3 |
30.12.2021 |
Non- Complying |
17 |
200 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned Upto 31.12.2022. |
| 38 |
Rewari |
PHED |
8 |
29.12.2021 |
Non- Complying |
12 |
400 |
Defects of few units has been got rectified. Now plant is working properly and complying the parameter |
| 39 |
Kosli, Rewari |
PHED |
3 |
29.12.2021 |
Non- Complying |
25 |
600 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto |
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
|
|
|
|
|
|
|
|
31.12.2023. |
| Hisar |
|
|
|
|
|
|
|
| 40 |
Hansi, Hisar |
PHED |
6.5 |
05.01.2022 |
Non- Complying |
24 |
45000 |
STP is designed for 30 mg/l BOD. The estimate for upgrdation to 10 mg/l BOD has been approved and DNIT is under preparation and the upgrdation is expected to be completed by 31.12.2023. |
| 41 |
Uklana, Hisar |
PHED |
6.5 |
05.01.2022 |
Non- Complying |
17 |
52000 |
Deficiency has been rectified; plant is now complying and re sampling has been asked from concerned regional office. |
| 42 |
Dhani Kushal, Bhiwani Road, Hansi |
PHED |
5 |
05.01.2022 |
Non- Complying |
21 |
720 |
STP designed for 30 mg/ltr BOD due to which non complying for 10 mg/ltr. DNIT for upgradation under process and expected to be completed by 31.12.23 |
| 43 |
Lalpura- Jind Road, Hansi |
PHED |
7.5 |
05.01.2022 |
Non- Complying |
20 |
420 |
STP designed for 30 mg/ltr BOD due to which non complying for 10 mg/ltr. DNIT for upgradation under process and expected to be completed by 31.12.23 |
50
List-C Status of action plan for non complying STPs (30 BOD)
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
| River Ghaggar |
|
|
|
|
|
|
|
| Hisar |
|
|
|
|
|
|
|
| 1 |
4 MLD SIP Kaimri Road, Hisar |
PHED |
4 |
04.01.2022 |
Non-Complying |
106 |
180000 |
No action plan has been submitted by the Deptt. However, HSPCB has initiated process of prosecution against the responsible officers. |
| River Yamuna |
|
|
|
|
|
|
|
| Rohtak |
|
|
|
|
|
|
|
| 2 |
Sonaria, Rohtak |
PHED |
40 |
28.12.2021 |
Non-complying |
33 |
12000 |
Ihe work allotted to agency to treat the effluent of the SIP upto the latest prescribed standards of HSPCB which is in progress. Target date : 28.02.2022 |
| 3 |
Kalanaur Rohtak |
PHED |
3.5 |
28.12.2021 |
Non-complying |
33 |
25000 |
Ihe work for upgradation of existing SIP has been allotted on 14.04.2021 and is in progress. Target date : 31.12.2022. |
| 4 |
Sampla Rohtak |
PHED |
4 |
29.12.2021 |
Non-complying |
34 |
9600 |
As per the concerned department, the SIP is under upgradation and the same will be completed by 31.12.2021 |
| 5 |
Sec-25, Rohtak |
HSVP |
10 |
30.10.2021 |
Non-complying |
102 |
170000 |
Under upgradation and shall be completed by 30.06.2022. |
| Jhajjar |
|
|
|
|
|
|
|
| 6 |
Jhajjar |
PHED |
5 |
25.12.2021 |
Non Complying |
42 |
68000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. DNII for upgradation under process and expected to be completed by 31.12.23 |
| 7 |
Jhajjar |
PHED |
5.5 |
25.12.2021 |
Non Complying |
45 |
94000 |
SIP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. DNII for upgradation under process and expected to be completed by 31.12.23 |
| 8 |
Line Par, |
PHED |
18 |
31.12.2021 |
Non Complying |
34 |
42000 |
The plant will be made complying as per latest |
51
| Sr. No . |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
|
Bahadurgarh |
|
|
|
|
|
|
norms by 15.11.21. |
| 9 |
Sec-36, Bahadurgarh |
HSVP |
10 |
29.12.2021 |
Non-complying |
42 |
68000 |
Work for up-gradation of STPs is in progress and likely to be completed by 31.05.2022. |
| Other areas |
|
|
|
|
|
|
|
| 10 |
Charkhi Dadri, Bhiwani |
PHED |
5 |
31.12.2021 |
Non-Complying |
45 |
72000 |
Estimate is under preparation for repair & renovation of STP and main trunk sewer line. So, the upgrdation is expected to be completed by 31.12.2023 |
| 11 |
Chirya Road, Charkhi Dadri, Bhiwani |
PHED |
5 |
31.12.2021 |
Non-Complying |
38 |
65000 |
STP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr. Tender called for upgrdatation of STP (MBBR) but no agency came forward to participate in tender process. So, the fresh DNIT is in process. Upgradation is expected to be completed by 31.12.23 |
| Rewari |
|
|
|
|
|
|
|
| 12 |
Rewari |
PHED |
6.5 |
29.12.2021 |
Non-Complying |
130 |
3300 |
STP designed for 30 mg/ltr BOD due to which non compliant for 10 mg/ltr and is Under upgradation and is expected to be commissioned upto 31.12.2023. |
| Hisar |
|
|
|
|
|
|
|
| 13 |
Dhani Gram, Barwala, Hisar |
PHED |
6 |
05.01.2022 |
Non-Complying |
92 |
180000 |
Upgradation work in proposal and shall be completed by 31.12.2023. |
52
List-D Status of action plan for non complying STPs (Non Complying Under Maintenance)
| Sr. No. |
Name and Region of STPs |
Deptt. |
Existing STP and Capacity (MLD) |
Date of sampling |
Latest Compliance Status |
BOD (mg/l) |
Faecal Coliform (MPN/ 100 ml) |
Action plan with target date |
| Rohtak |
|
|
|
|
|
|
|
| 1 |
Singhpura, Rohtak |
PHED |
10 |
|
The STP is under upgradation under AMRUT Yojna, the effluent is being treated through 14 MLD STP installed in the same premises and shall be completed by 31.03.2022. |
|
|
The STP is under upgradation under AMRUT Yojna, the effluent is being treated through 14 MLD STP installed in the same premises and shall be completed by 31.03.2022. |
| Mohindergarh |
|
|
|
|
|
|
|
| 2 |
Near Chinkara Rest House, Rewari Road, Narnaul |
ULBD |
6 |
01.12.2020 |
Non operational and effluent being treated in 7.5 MLD STP Narnaul |
|
|
This STP is not operational due to no sewage reaching to this STP. Effluent being treated in 7.5 MLD STP Narnaul. |
53
8. The report of the Urban Local Bodies Department is as follows:-
"3. That with reference to issue of estimation of sewerage generation and gap in treatment, the status report is as under:-
The estimation of sewage generation &, gap in treatment for Faridabad, Karnal 86 Sonepat is annexed at Annexure- R-
2. For remaining towns, the information is to be provided by the Public Health Engineering Department/Gurugram Metropolitan Development Authority, for which, a separate status report has been filed by Haryana State Pollution Control Board. As per the reports submitted by Municipal Corporation, Faridabad, Karnal & Sonepat, there is a gap in treatment capacity in Faridabad town only. Further, in Sonepat town the treatment capacity of existing STPs is sufficient but utilization of STPs is below designed capacity. The strategy to meet out the gap is as under: -
Faridabad Town :- The total sewage generation in Faridabad town is approx. 197 MLD. At present only 1 STP of
45 MLD at Badshahpur is operational. 3 STPs of capacity 190 MLD are under construction and progress of these STPs is as under:-
| Sr. No. |
Town/ City |
Capacity (MLD) |
Progress upto the March, 2022 |
Likely date of completion |
| 1 |
Sec-21, Faridabad |
10 |
65% |
30.11.2022 |
| 2 |
Mirzapur, Faridabad |
80 |
38% |
30.11.2022 |
| 3 |
Partapgarh, Faridabad |
100 |
41% |
30.11.2022 |
|
|
190 |
|
|
Sonepat Town:- Sewage generation of Sonepat town is approx. 48.3 MLD. At present there are 2 STPs of total capacity of 55 MLD.
i. Kakroi Road, Sonepat (25 MLD):- The main trunk sewer line of this STP was settled down and at present only
10 MLD sewerage is reaching to this STP. The work of Cured in Place Pipe (CIPP) lining is in progress which was to be completed by 31.03.2022 however the work has been delayed because the ground water level at the site is at a depth of 25 feet 86 sewer line in which CIPP lining is to be done is at 25 to 40 feet depth. Therefore agency is facing difficulties in dewatering of ground water. It was also observed during desilting work, that the RCC sewer pipe which is to be cured is deteriorated at some other locations also. The work of CIPP lining is likely to be completed upto
31.05.2022.
ii. Rathdana Road, Sonepat (30 MLD):- At time of earlier status report, approx. 13 MLD sewage was reaching to this STP. The sewage at 18 locations was to be tapped
54
with main sewer line. Out of the 18 locations, sewage has been tapped at 5 locations and work at 13 locations is in progress which is likely to be completed by 31.07.2022. It is also pertinent to mention here that 7 MLD additional sewage has been diverted to the STP from Jan to March,
2022.
4. That with reference to the performance of existing STPs, the status report is as under:-There are 7 no. existing STPs under the jurisdiction of Urban Local Bodies, Department. The compliance status of existing STPs is as under:-
| Sr. No. |
Name of STPs |
Capacity (in MLD) |
Capacity utilization (in MLD) |
Compliance Status |
Remarks |
| . |
ogharipur oad, Karnal |
10 |
7 |
Complying including FC |
|
| . |
K Puram, arnal |
8 |
3 |
Complying including FC |
|
| . |
ransport agar, arnal |
50 |
46 |
Complying including FC |
|
| . |
athdana oad, onepat |
30 |
20 |
Complying including FC |
|
| . |
akroi Road, onepat |
25 |
10 |
Complying including FC |
|
| . |
abra, Hisar |
8 |
3 |
Complying including FC |
|
| . |
adshapur, aridabad |
45 |
30 |
Non-complying |
|
|
|
176 |
119 |
|
|
Badshapur, Faridabad:- 45 MLD STP was commissioned in 2011 with design outlet parameters BOD 30 mg/L and COD 250mg/ L. The STP is complying except faecal coliform parameter as per its designed parameters. But is non- complying as per latest report based on the new parameters BOD of 10 mg/ L and COD 50mg/L fixed by HSPCB. For achieving the latest parameters prescribed by HSPCB, the STP has to be upgraded by means of a Tertiary Treatment Plant or refurbishment. Tender for hiring of expert consultants to check the feasibility of upgradation of the STP and preparation of its DPR is under process of approval.
5. That with reference to the issue of under construction STPs, it is submitted that Urban Local Bodies Department, Haryana is constructing 32 nos. of STPs having capacity
380.5 MLD. The progress of under construction STPs upto March 2022 is as under:-
i. Yamuna Catchment Area:
55
Sr. Town/City Capacity Progress Likely date Current Status No. (MLD) upto the of
March, 2022 completion
1 Shiv Colony, 8 91% Karnal
The STPs were to be completed by 28.02.2022. The delay caused to complete the project is totally attributable to the agency due to slow Progress of work. A notice no. 3886/EEIIA/CK dated 08.04.2022 is served upon the agency to deposit penalty of Rs 12.00 Crores on account of delay. The work is going on at site which may take 5 months for
2 Phooshgarh, 20 completion of entire project i.e. upto Karnal 92% 31.08.2022.
3 Garhi Bohar, 12 Work has been completed and STPs are Rohtak 100% under trail run.
4 Singhpura, Rohtak 10 100%
5 Makroli in place of 15 30.09.2022 Peer Bodhi, Rohtak 65%
6 Murthal Sonepat 3 31.12 .2022 36%
7 Sec-21, Faridabad 10 65% 30.11.2022 Mirzapur,
8 80 38% 30.11.2022 Faridabad
9 Partapgarh, 100 41% 30. 11.2022 Faridabad
10 Agwanpur in place 10 70% The STPs were to be completed by of Kithwari, Palwal 31.03.2022. The agency is responsible for delay in completion of STPs. A notice
11 Jodhpur Road, 15 under Clause-II has been issued to the Palwal 67% agency and penalty of Rs. 12.79 Crore has
12 Ferozpur, Palwal
2.5 70% been proposed on agency for delay. The work of STPs is likely to be completed by
30.09.2022.
13 Dev Colony, 15 25% 31.01.2023 Panipat
14 Barsat Road 25 10% 31.01.2023 Panipat
15 Bhandhwari, 1 The work of construction of STP has been completed. Gurugram Pumping station to connect the sewage of Bandhwari to STP is yet to be constructed which is likely to be completed by 31.07.2022.
16 Gadoli Kalan, 1 STP completed and recently made functional. Gurugram
17 Baliawas (against The work of construction of STP has been completed. Gwalpahadi) , 1 Pumping station to connect the sewage of Baliawas to STP Gurugram is yet to be constructed which is likely to be completed by
31.07.2022.
18 Mohmadpur 2 STP completed and recently made functional. Jharsa, Gurugram
19 Darbaripur, 1 STP completed and recently made functional. Gurugram
56
| 20 |
arai Alavvardi, Gurugram |
1 |
STP completed and recently made functional. |
|
Total |
332.5 |
|
|
|
ii. Ghaggar Catchment Area Sr. Town/City Capacity Progress Likely date of Current Status No. (MLD) upto completion
March,
2022
1 12 Cross Road, Ambala 12 31.01.2023 Sadar 35%
2 Khuda Khurd, Ambala 12 31.01.2023 Sadar 40%
3 Babyal, Ambala Sadar 10 31.03.2022 Work of construction of
STP has been
completed
except electrical
95% wirings and
connection
which is likely to
be completed
within 15 days.
4 Shahpur Machhonda, 7.5 31.08.2022 Ambala Sadar 50%
5 Saketri-STP, Panchkula 1.5 31.03.2022 The overall 98% work has been
completed at site.
98% STP will be
commissioned by
30.06.2022
6 Ramgarh, Panchkula 1 31.03.2022 The overall 99% work has been
99% completed at
site. STP will be
commissioned
by 30.06.2022
7 Billa, 0.75 Panchkula STPs have been completed in all respects. Trail run has also been done. Application to grant Consent to operate (CTO) was submitted to HSPCB which has been got rejected due to non-installation of flow meter and online monitoring device. MC is in the
8 Khatoli, Panchkula 0.75 process to install the flow meter and online monitoring devices on the STPs and application to grant CTO will be resubmitted to HSPCB
9 Khagesara & Toka, 0.5 accordingly. Panchkula
10 Nanga.186 0.5 Allipur,
Panchkilla
11 Kot, Panchkula 0.75
12 Sukhdarshanp ur-STP, 0.75 Panchkula
Total 48
57
6. That it is relevant to mention here that all the existing STPs in the State of Haryana are with Public Health Engineering Department/ Haryana Shehri Vikas Pradhikaran/Gurugram Metropolitan Development Authority except in Sonepat, Faridabad, Karnal 86 one at Dabra, Hisar. The STPs in Sonepat, Faridabad, Karnal 86 one at Dabra, Hisar are being maintained by the concerned Urban Local Bodies. In addition, some stand alone STPs are also being maintained by Municipal Corporation, Gurugram. The action plan for treated waste water for Faridabad, Sonepat, Karnal and Gurugram is as under:-
i. Municipal Corporation, Karnal Action Plan for Optimum utilization of Treated Waste Water.
At present the treated waste water from 3 STPs in Karnal is being discharged into 3 drains namely Mundi Garhi Drain, Barota Drain and Indri Escape Drain from where the treated waste water is being used by farmers partially. To reuse 50 MLD treated waste water in Karnal, Irrigation Department has prepared a "Treated Waste Water Micro Irrigation Project". The cost of this project is approximate Rs. 56.18 Crore. Approximate 6000 Acres agriculture land of 11 villages will be benefited by this project. The detail of villages is as under:-
| Sr. No. |
Name of village |
Sr. No. |
Name of village |
| 1. |
Uncha Sewana |
2. |
Kutail |
| 3. |
Mubarikabad |
4. |
Kalraun |
| 5. |
Kairwali |
6. |
Fazilpur Majra |
| 7. |
Amritpur Kalan |
8. |
Pipalwali |
| 9. |
Ganjogarhi |
10 |
Ranwar |
| 11. |
Rasupur Khurd |
- |
- |
Work has been allotted by Irrigation 86 water Resources Department,
Karnal to the agency and work of laying of pipe line is in progress at
site. The project is likely to be completed by March, 2024.
ii. Municipal Corporation, Sonepat Action Plan for Optimum utilization of Treated Waste Water from 30 MLD Rathdhana Road STP. Sr. Year Percentage of Usage Remarks No. TWW from STP Activities
proposed
to be reused
58
| 1 |
30.06.2022 |
10% (1.6 MLD) |
Construction activities via water tanker after completion of pump house. |
Sump well with the head of 75 mtr is under construction under AMRUT Scheme, where 5 Pump sets are to be installed with capacity of 66 litter per second (LPS). Timeline for this work is 30.06.2022 and approx. 10% of the TWW will be used in construction activities after completion of Pump House/ sump well. |
| 2 |
30.11.2022 |
50% (8 MLD) |
In Agriculture for Irrigation purpose & In Green areas of MC Sonepat. |
For this purpose total length of 9238 mtr was proposed to be laid. Out of which 7953 mtr length has been laid. Remaining length of DI pipe will be laid by 30.11.2022 and treated water will be reused for Irrigation & horticulture purpose. |
| 3 |
30.09.2024 |
100 % (16 MLD) |
In the Green Area of MC Sonepat after completion of pipe network all around the city |
A proposal is being prepared to reuse the treated water in all parks/green belts in MC area. The pipe lines for this purpose will be connected to main line as mentioned above in point no. 2. |
A Consultancy agency is being hired for the preparation of DPR for
the usage of TWW of 25 MLD STP Kakroi Road, Sonepat.
iii. Municipal Corporation, Gurugram Sr. Year Usages Plan for usage of treated waste Remarks No in water
. %age as per Govt. Policy
1 2022 25% (a) For Horticulture purposes Out of 49 nos. Decentralized (31.01.22) and filling of water bodies Micro STPs 40 nos. Micro STPs are functioning out of
and which 2 MLD treated water
johads=00.25+2.075=2.32 is being used in parks and MLD greenbelts, while the electric
connection will got be
(b) Sprinkling of Recycled water released to be remaining 10 micro STPs after that about
from the STP of the GMDA on 0.5 MLD additional treated the road berms and trees for water will be used after suppression of dust pollution 30.04.2022 =0.5 MLD,
2 2022 - (i) For Horticulture, construction (31.03.22) activity, sprinkling on roads 13 KM pipe line has been purposes and filling of water laid covering 70 parks and bodies and johads = 7 MLD 2 MLD treated waste water is being reused. The work
of laying of remaining
water pipe line for reuse of
additional 5 MLD treated
waste water is in progress
and likely to be completed
by 30.05.2022.
59
iv. Municipal Corporation, Faridabad
At present only 1 STP of 45 MLD capacity at Badshahpur is working and approx. 30 MLD water is being treated per day. Out of this, 8 MLD water is being used for horticulture/agriculture purposes. Approx. 200 MLD treated waste water will be available upto June 2023 from following STPs:
Sr. Location of Capacity Status Department No. STP
1 Badshahpur 45 MLD Working MCF
2 Partapgarh 100 MLD Under MCF construction
3 Mirzapur 80 MLD Under MCF construction
4 Sector-21 10 MLD Under Faridabad construction Smart City
Limited
Total 235 MLD
For preparation of action plan for use the treated waste water, Municipal Corporation, Faridabad is in process for hiring of consultant agency. Bids have also been invited for the same.
7. That with regard to mode of disposal of treated effluents from existing STP, the status report is as under:-
The mode of disposal of treated effluents from existing STPs is as under:-
| Sr. No. |
Name of STP |
Existing STP and Capacity (MLD) |
Capacity utilization (in MLD) |
Mode of disposal |
| 1 |
50 MLD STP Karnal |
50 |
46 |
Into Mundi Garhi Drain |
| 2 |
10 MLD STP at Gogari Road, Karnal |
10 |
7 |
Into Barota Drain |
| 3 |
8 MLD STP RK Puram, Karnal |
8 |
3 |
Into Indri Escape Drain |
| 4 |
30 MLD STP Rathdana Road , Sonepat |
30 |
20 |
Into drain No.6 |
| 5 |
25 MLDSTP Kakrai Road, Sonepat |
25 |
10 |
Into drain No.6 |
| 6 |
8 MLD STP, Dabra, Hisar |
8 |
3 |
Into Irrigation drain near Dabra village. |
| 7 |
Badshapur, Faridabad |
45 |
30 |
Into Budiya Nallah |
60
Total 176 119
8. That the status report regarding consent to operate for existing STP from HSPCB is as under:-
| Sr. No. |
Name of the MC |
Name of the town/ city |
Existing STP and Capacity (MLD) |
Status of Consent to Operate (CTO) from HSPCB |
| 1 |
Karnal |
Near Sector-4, Transport Nagar, Karnal |
50 |
Consent to operate has been received from HSPCB, Haryana. |
| 2 |
Karnal |
Gogharipur Road, Karnal |
10 |
Consent to operate has been received from HSPCB, Haryana. |
| 3 |
Karnal |
RK Puram, Karnal |
8 |
Consent to operate has been received from HSPCB, Haryana. |
| 4 |
Faridabad |
Badshapur |
45 |
Consent to operate has been rejected by HSPCB, Haryana. The CTO will be reapplied after upgradation of STP. |
| 5 |
Sonepat |
Rathdana Road, Sonepat |
30 |
Consent to operate has been received from HSPCB, Haryana. |
| 6 |
Sonepat |
Kakroi Road, Sonepat |
25 |
Consent to operate has been received from HSPCB, Haryana. |
| 7 |
Hisar |
Dabra |
8 |
Consent to operate has been received from HSPCB, Haryana. |
9. From the above, it is seen that there are still gaps in treatment of sewage and also utilization of the treated sewage. On being asked, learned Counsel for the State submitted that inspite of agreement, thermal power plant is not using treated water as its quality is not upto the mark.
10. It is seen that Barwala STP is designed for 6 MLD. If made properly functional, treated water quality should be fit to be utilized by the Power Plant. This may require coordination between the Plant, the Urban Development and the Power Departments in the State. Further, disposal of sewage on the agriculture land should be as per consent terms. Proper maintenance of oxidation pond conveyance system must be ensured. It is further seen from the status report filed by HSPCB that there are still
61
unresolved issues about disposal of treated sewage into drains, planning of new STPs and corresponding gaps (as given in Annexure-1), compliance of STPs with BOD and FC and ultimately utilisation of treated sewage. The consolidated information needs to be studied by the CPCB to undertake performance analysis of satisfactorily operating STPs, particularly for FC. Further, for maximising use of treated sewage, PCB may identify potential industrial clusters, major industrial sectors and other bulk users to tie-up each STP with the User group. In this regard, provisions of 'The Haryana Water Resources (Conservation, Regulation and Management) Authority (Amendment) Act, 2022' may be strictly followed. CPCB may also assist HSPCB in this regard. The Tribunal vide order dated 09.03.2022 in OA No. 29/2020(WZ), Suraj Pradip Ajmera vs. Aurangabad Municipal Corporation directed as follows:
"10. During the hearing, suggestion has emerged that an interaction be held at the level of Chief Secretary, Maharashtra with inclusion of Secretary, Urban Development, Maharashtra and Technical Experts as may be decided by them including from IIT, Bombay, Regional Officer, CPCB and Member Secretary, State PCB to consider possibility of laying pipeline upto the industrial area for transporting treated sewage to the industrial areas so that the same can be utilized for industrial purpose. Industries Association may be associated in the project of sewage treatment and can bear a part of the cost out of Corporate Social/Environmental Responsibility, depending upon the financial capacity of the member industries. This may result in a permanent and long-lasting cheaper solution. If successful, this experiment may be tried appropriately at such other locations in the State as found appropriate and also customized different locations. The Committee may also study such models elsewhere in the country which reportedly have been successful. The Committee may also consider any other viable strategies for sewage treatment and interception and diversion of sewage, use of appropriate effective and economical technology, making group housing societies Zero Liquid Discharge (ZLD) by recycling treating sewage, after treatment in decentralized manner and utilizing the treated sewage for horticulture, flushing, cleaning or other non- drinking purposes. This strategy may help in augmenting availability of potable water particularly in drought affected areas of Aurangabad Region in Maharashtra where potable water had to be transported by trains in the past. The Secretary, Urban Development may act as nodal agency who may call for a meeting within one month."
62
11. Another significant issue relates to accidents in the course of cleaning and maintenance of sewerage systems.1In terms of directions of the Hon'ble Supreme Court in Delhi Jal Board v. National Campaign for Dignity & Rights of Sewerage & Allied Workers, (2011) 8 SCC 568, the State needs to put in place effective mechanism for ensuring safety of the workers employed for maintaining and cleaning the sewage system.
12. The Tribunal has considered the issue of utilization of treated sewage to save potable water for drinking purposes inter-alia vide order dated 21.09.2020 in O.A. No. 148/2016 Mahesh Chandra Saxena vs. South Delhi Municipal Corporation & Ors. By the said order, the data of utilization of treated water as given in the CPCB report dated 15.05.2020 and further report dated 16.09.2020 was noted showing huge gap in reuse of treated water, which resulted in potable water being used even for purposes for which treated water could be used. The Tribunal directed all States/UTs to ensure 100% utilization of treated water for secondary purposes, which may be monitored by Central Monitoring Committee headed by Secretary, Ministry of Jal Shakti and assisted by CPCB, NMCG and Ministry of Urban Development.
63
13. Accordingly, the authorities in State of Haryana may ensure 100% use of treated water for non-potable purposes. Water Resource Authority set up in Haryana may also be associated in monitoring compliance. Further monitoring at the level of CMC may continue as already directed, as above. We also direct:
i. Barwala STP be made compliant so that treated water is used for Power Plant, apart from use for agricultural purpose, without damage to the crops of the fields where such disposal takes place.
ii. Secretary, UD, HSPCB and Haryana Water Resource Authority may review the status of completing STP upgradation and setting up of new STPs in terms of designing and utilization of STPs.
iii. CPCB may monitor some of the STPs, particularly those complying with FC and coordinate with the HSPCB about identifying potential users of treated water and working out necessary action plan.
14. In terms of earlier order of this Tribunal dated 21.09.2020 in OA No. 593/2017, Paryavaran Suraksha Samiti & Anr. vs Union of India & Ors., all the States/UTs are required to give their consolidated reports with regard to status of compliance of directions of the Hon'ble Supreme Court in Paryavaran Suraksha Samiti & Anr. vs Union of India & Ors.2The reports can be on the pattern of present report of the State PCB with suitable modifications as may be decided by the CPCB. CPCB may coordinate with all the States/UTs after designing a format for the purpose.
64
15. HSPCB may file compliance report in four months with the Registrar General of NGT by e-mail at judicial-ngt@gov.in preferably in the form of searchable PDF/OCR Support PDF and not in the form of Image PDF. If found necessary, the R.G. may place the matter before the Bench for any further direction.
Subject to above, the application is disposed of.
A copy of this order be forwarded to Chief Secretary, Haryana, Secretary, Urban Development and Secretary, Power, Haryana and Chairman, Water Resource Authority, Haryana by e-mail for compliance. A copy of this order be also forwarded to CPCB, Chief Secretaries of all States/UTs and all State PCBs/PCCs by e-mail for compliance. I.A. No. 230/2021 also stands disposed of.
Adarsh Kumar Goel, CP
Sudhir Agarwal, JM
Dinesh Kumar Singh, JM
Prof. A. Senthil Vel, EM
Dr. Vijay Kulkarni, EM
April 19, 2022
Original Application No. 887/2019
(I.A. No. 230/2021)
SN
65