  • Section 37 of the Code of Civil Procedure
  • Order 39 of the Code of Civil Procedure
  • The Specific Relief Act, 1963 (hereinafter referred to as “the Act”)
  • Chapter VII, Section 36 of the Specific Relief Act, 1963
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 34 of the 1963 Act
  • Limitation Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 37 of the Code of Civil Procedure
  • Order 39 of the Code of Civil Procedure
  • The Specific Relief Act, 1963 (hereinafter referred to as “the Act”)
  • Chapter VII, Section 36 of the Specific Relief Act, 1963
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 34 of the 1963 Act
  • Limitation Act
Smart Summary

Factual and Procedural Background

The plaintiff, K.S. Infraspace LLP Ltd., initiated Special Civil Suit Nos. 322 and 323 of 2018 before the Principal Civil Judge, Vadodara, seeking declarations and specific performance against two sister concerns—Ambalal Sarabhai Enterprise and Haryana Containers Ltd.—with respect to 19,685 sq. m. of land in Vadodara, Gujarat. According to the plaintiff, a concluded contract for purchase had arisen from extensive negotiations, culminating in a “final” draft Memorandum of Understanding (MoU) emailed on 30-3-2018, backed by an advance payment of ₹2.16 crores.

The defendants denied the existence of any concluded contract and, citing urgent financial pressures and outstanding income-tax attachments, executed a registered agreement for sale with Neptune Infraspace Pvt. Ltd. (impleaded as Defendant 2) on 31-3-2018, after that purchaser cleared substantial tax dues.

On 18-2-2019 the trial court issued a temporary injunction restraining the defendants from creating third-party interests in the land. The Gujarat High Court affirmed that order on 30-8-2019 (2019 SCC OnLine Guj 2831). The present consolidated appeals challenge the injunction before the Supreme Court of India.

Legal Issues Presented

  1. Whether, on the basis of e-mails and WhatsApp messages exchanged up to 31-3-2018, a prima facie concluded contract existed between the plaintiff and Defendant sister concerns.
  2. Whether the requisites for grant of a temporary injunction in a suit for specific performance—prima facie case, irreparable injury, balance of convenience, and equitable conduct—were satisfied.
  3. Whether delay by the plaintiff in instituting the suit disentitled it to equitable interim relief.

Arguments of the Parties

Appellants / Defendants 1 & 2

  • Negotiations never reached finality; the MoU remained a draft and no acceptance was communicated before the defendants committed to Defendant 2 on 30-3-2018.
  • Severe financial distress required immediate clearance of income-tax dues. Defendant 2 paid ₹17.69 crores and ₹2.20 crores on 30-3-2018, enabling lifting of attachments, and later paid a total of ₹45.84 crores; thus third-party rights and significant equities had intervened.
  • The plaintiff’s acceptance e-mail was received only at 1:13 p.m. on 31-3-2018, after the registered agreement with Defendant 2 was executed.
  • The advance of ₹2.16 crores was refunded via RTGS the same evening. Despite knowledge of these facts, the plaintiff waited seven months—until 1-10-2018—to file the suit, making the injunction inequitable (relying on K.S. Vidyanadam v. Vairavan and other precedents).
  • Defendant 2 is a bona fide purchaser for value without notice of any concluded contract; possession was delivered long before the suit.

Respondent / Plaintiff

  • The cumulative effect of e-mails and WhatsApp exchanges demonstrates final agreement on price, tax liabilities, and other terms; formal execution was a mere formality.
  • The plaintiff never refused to meet the income-tax liabilities; its prompt e-mail of acceptance and protest against the RTGS refund establish readiness and willingness.
  • Defendant 2 was aware of advanced negotiations and therefore cannot claim bona fide purchaser status.
  • Concurrent findings of the trial court and High Court, supported by settled principles in Wander Ltd. v. Antox (India) Pvt. Ltd. and allied cases, should not be disturbed in appeal.
  • The short delay in instituting the suit did not prejudice the defendants; any prejudice can be cured by reimbursing Defendant 2 for tax payments if specific performance is ultimately decreed.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
K.S. Vidyanadam v. Vairavan (1997) 3 SCC 1 Delay is a key factor in suits for specific performance; discretionary relief may be refused if plaintiff is not diligent. Highlighted by defendants; Supreme Court noted seven-month delay as weighing against injunction.
Mandali Ranganna v. T. Ramachandra (2008) 11 SCC 1 Equitable considerations and third-party rights in granting injunctions. Referenced in support of denying injunction where third-party rights had accrued.
Mayawanti v. Kaushalya Devi (1990) 3 SCC 1 Requirements for a concluded contract in suits for specific performance. Invoked by defendants to contest existence of final agreement.
Wander Ltd. v. Antox (India) P) Ltd. 1990 Supp SCC 727 Appellate interference with interlocutory injunctions should be cautious (rule of prudence). Plaintiff relied on it; Court clarified that prudence depends on facts and, in present case, justified interference.
Brij Mohan v. Sugra Begum (1990) 4 SCC 147 Onus on plaintiff to establish mutuality and readiness/willingness. Court held plaintiff failed to show parties were ad idem.
Motilal Jain v. Ramdasi Devi (2000) 6 SCC 420 Conduct and delay as grounds to refuse equitable relief. Court used to stress plaintiff’s inequitable conduct and delay.
Maharwal Khewaji Trust v. Baldev Dass (2004) 8 SCC 488 Guidelines on temporary injunctions in property matters. Cited by plaintiff; not found persuasive in light of facts.
Aloka Bose v. Parmatma Devi (2009) 2 SCC 582 Specific performance and concluded contracts. Relied upon by plaintiff; Court distinguished on facts.
Mademsetty Satyanarayana v. G. Yelloji Rao (1965) 2 SCR 221 Equitable bar where plaintiff’s delay induces defendant to alter position. Applied to show defendants materially changed position after plaintiff’s inaction.
Dalpat Kumar v. Prahlad Singh (1992) 1 SCC 719 Triad of prima facie case, irreparable injury, and balance of convenience for temporary injunction. Forms the analytical framework adopted by Supreme Court.
Agriculture Produce Market Committee v. Girdharbhai R. Chhaniyara (1997) 5 SCC 468 Contracts at “embryo stage” do not constitute concluded contracts. Court analogised present negotiations to “embryo stage”.
M.P. Mathur v. DTC (2006) 13 SCC 706 Specific performance is discretionary; court must assess mutuality and overall conduct. Quoted to emphasise necessity of mutuality, which plaintiff failed to establish.
Gujarat Bottling Co. Ltd. v. Coca Cola Co. (1995) 5 SCC 545 Equitable nature of injunction; party seeking relief must have clean hands. Supported refusal of injunction owing to plaintiff’s delay and conduct.

Court's Reasoning and Analysis

The Supreme Court scrutinised approximately 17 e-mails and numerous WhatsApp exchanges spanning December 2017 to 31-3-2018. It noted that:

  • The expression “final draft” had been used earlier (26-2-2018) and did not by itself prove consensus ad idem.
  • No evidence showed that the plaintiff’s acceptance reached the defendants before they finalised the registered agreement with Defendant 2 on 31-3-2018.
  • Negotiations remained at an “embryo stage”; mutuality of obligations was absent.
  • Key contractual obligation—payment of ₹18.64 crores towards income-tax dues—was never performed by the plaintiff, whereas Defendant 2 discharged that liability immediately.
  • The plaintiff’s seven-month delay in filing suit, despite immediate knowledge of the rival agreement and refund of its advance, undermined equitable relief; during this interval Defendant 2 paid a total of ₹45.84 crores and the vendors utilised ₹36.20 crores, materially altering their position.
  • Applying Dalpat Kumar principles, the Court found: (a) no strong prima facie case, (b) balance of convenience favoured defendants given substantial third-party investment, and (c) any injury to plaintiff was compensable in damages.
  • Equitable considerations, as elaborated in Gujarat Bottling, Motilal Jain and Mademsetty line of cases, required denial of interim relief because of the plaintiff’s conduct.
  • The High Court recognised but failed to address the issue of delay; the trial court ignored it altogether, rendering their orders unsustainable.

Holding and Implications

Appeals ALLOWED; injunction orders of the trial court and High Court SET ASIDE.

Consequences: the defendants are no longer restrained from dealing with the suit property; the civil suits will proceed on merits, with the Supreme Court expressly reserving all factual and legal issues for trial. No new legal doctrine is created, but the judgment reinforces that in suits for specific performance, prompt action and equitable conduct are critical prerequisites for interim relief.

    Ambalal Sarabhai Enterprise Limited v. Ks Infraspace Llp Limited And Another

    Navin Sinha, J.— The present appeals arise from a common order dated 30-8-2019 2019 SCC OnLine Guj 2831, passed in three separate miscellaneous appeals filed by the appellants before the High Court affirming an order of injunction. K.S. Infraspace LLP Ltd., Respondent 1, filed Special Civil Suit Nos. 322 of 2018 and 323 of 2018 before the Court of Principal Civil Judge at Vadodara against the appellants in Civil Appeal No. 9346 of 2019 (Ambalal Sarabhai Enterprise) and Civil Appeal No. 9347 of 2019 (Haryana Containers Ltd.) respectively, which are sister concerns. The appellant in Civil Appeal No. 9348 of 2019 (Neptune Infraspace Private Ltd.) was impleaded as Defendant 2 in the latter suit. The parties shall be referred to by their respective position in the civil suit, for the sake of convenience.

    2. The plaintiff filed the two suits for declaration and specific performance against the defendant sister concerns with regard to a total area of 19,685 square meters of lands situated in Village Wadiwadi, Subhanpura, District Vadodara in Gujarat. The plaintiff contended that there existed a concluded contract with the defendants after negotiations for sale of the suit lands for a total sum of Rs 31,81,73,076 and 58,26,86,984 respectively. The plaintiff had duly communicated its acceptance of the final draft memorandum of understanding (MoU) dated 30-3-2018. Only the formal execution of contract documents remained as a formality. A sum of Rs 2.16 crores had also been paid as advance. The plaintiff was ready and willing with the balance amount. Alternately, it was claimed that there existed a concluded oral contract between the parties. The defendants had surreptitiously entered into a registered agreement for sale with Defendant 2 on 31-3-2018 and thus the suit and prayer for injunction.

    3. The Principal Civil Judge by order dated 18-2-2019 held that by inference the terms and conditions for sale stood finalised by the e-mail dated 29-3-2018 and 30-3-2018. A token amount of Rs 2.16 crores had already been paid and the plaintiff was ready and willing with the balance amount. Creation of third party rights would lead to further litigation. Thus by an order of temporary injunction the defendants were restrained from executing any further documents including a sale deed or creating further charge, interest or deal with the suit lands in any manner.

    4. The High Court by its order dated 30-8-2019 2019 SCC OnLine Guj 2831 affirmed the order of injunction holding that the communication of acceptance to the draft MoU sent by e-mail dated 30-3-2018 coupled with the exchange of WhatsApp correspondences between the parties amounted to a concluded contract.

    5. We have heard the learned Senior Counsel Shri Kapil Sibal, Shri C.U. Singh and Shri Huzefa Ahmadi, appearing on behalf of Defendants 1 and 2, who are the appellants before us. Shri Sibal, making the lead arguments on behalf of the defendant sister concerns submitted that they had decided to sell the lands in view of financial stringency and their inability to meet financial commitments inter alia leading to attachment of immovable properties by the Income Tax Department for dues of Rs 48,74,45,929 apart from other statutory liabilities, employee related liabilities and business liabilities. The negotiations with the plaintiff did not attain finality but remained at the stage of discussions only. The wavering conduct of the plaintiff to meet the income tax liability of the defendants as part of the consideration amount to facilitate sale by lifting of the attachment, left the defendants with no other choice but to negotiate afresh with Defendant 2. The contention that execution of the agreement remained a formality was disputed. This is evident from the alternative contention in the suit that there existed an oral contract.

    6. The plaintiff's response of acceptance to the final draft MoU dated 30-3-2018 was belated. The plaintiff was well aware all along that the defendants were negotiating with two others also apart from it. The plaintiff knew before 30-3-2018 that the deal with it was not coming through and that the defendant was going ahead with another. The deal with Defendant 2 was finalised by execution of a registered agreement for sale on 31-3-2018 after Defendant 2 had cleared the income tax dues of the sister concerns on 30-3-2018 to the extent of Rs 17.69 crores and Rs 2.20 crores respectively enabling lifting of the attachment orders for the lands by the Income Tax Department on 26-4-2018 followed by further payments by Defendant 2 aggregating Rs 45.84 crores till 16-1-2019. A sum of Rs 36.20 crores, from the sale proceeds has already been utilised by the defendants towards payment of other statutory liabilities and employee related liabilities, etc. It was therefore a bona fide action. The plaintiff's e-mail of acceptance of the draft MoU dated 30-3-2018 as claimed, was not sent by it on 31-3-2018 at 7.43 a.m. but was received by the defendant on 31-3-2018 at 1.13 p.m.

    7. Despite the full awareness and knowledge as far back as 30-3-2018 and refund through RTGS of Rs 2.16 crores on 31-3-2018 itself, the plaintiff published a public notice only on 3-4-2018 advising all concerned not to deal with the property which was duly replied and refuted by another public notice dated 4-4-2018 published by the defendants. The cause of action in the suit is based on the email dated 30-3-2018 coupled with the public notice dated 3-4-2018. Acknowledging the refund also on 31-3-2018, it admits the signing of a registered agreement for sale with Defendant 2 on 31-3-2018 but does not make even a whisper of a suggestion why the suit was filed more than 7 months later. In commercial dealings with high stake matters delay is vital. This specific objection on behalf of the defendant taken before the High Court relying on K.S. Vidyanadam v. Vairavan (1997) 3 SCC 1, has been noticed at para 37 of the judgment but does not find any consideration.

    8. Reliance was also placed on Mandali Ranganna v. T. Ramachandra (2008) 11 SCC 1, to submit that the grant of the injunction was contrary to the basic principles governing injunction more so in a suit for specific performance relying on Mayawanti v. Kaushalya Devi (1990) 3 SCC 1.

    9. Shri Huzefa Ahmadi, learned Senior Counsel appearing on behalf of Defendant 2, submitted that it was a bona fide purchaser for value. The plaintiff was well aware of the simultaneous negotiations with it. Defendant 2 had made substantial payments on 30-3-2018 only after obtaining a written confirmation from the defendant dated 26-3-2018 that it had not signed any other agreement or received payment from another with regard to the subject lands. The registered agreement for sale dated 31-3-2018 was followed by delivery of possession much prior to the institution of the suit. A specific objection with regard to delay was taken in the reply to the injunction application which was not considered.

    10. Dr A.M. Singhvi, learned Senior Counsel appearing on behalf of the plaintiff, submitted that his clients at no stage had declined to meet the income tax liabilities of the defendant sister concerns, as part of the consideration amount. The negotiations were widespread over time both by WhatsApp messages and exchange of e-mails. These collectively have correctly been interpreted to hold a prima facie case in favour of the plaintiff. The terms and conditions of payment, were all finalised which prima facie reflect the existence of a concluded contract. The fact that the e-mail dated 30-3-2018 referred to the enclosure as a draft MoU cannot be decisive as it has to be understood on a cumulative assessment of facts. In any event, the plaintiff had communicated its acceptance without delay and also protested the refund of the advance of Rs 2.16 crores the same day followed by a public notice.

    11. Dr Singhvi further submitted that the hurried manner in which the defendants proceeded to finalise the deal on 30-3-2018 itself, manifests the desire of the defendants to cause harm to the plaintiff. Defendant 2 cannot claim to be a bona fide purchaser as it was all along aware of the negotiations taking place between the plaintiff and the defendant sister concerns and that it was at a very advanced stage.

    12. Dr Singhvi framed the question, whether concurrent findings of the Special Civil Judge and the High Court by two detailed well-considered orders were such as to warrant interference so as to dissipate the substratum of the suit. In support of his submissions, Dr Singhvi relied on Wander Ltd. v. Antox (India) (P) Ltd. 1990 Supp SCC 727, Brij Mohan v. Sugra Begum (1990) 4 SCC 147, Motilal Jain v. Ramdasi Devi (2000) 6 SCC 420, Maharwal Khewaji Trust v. Baldev Dass (2004) 8 SCC 488 and Aloka Bose v. Parmatma Devi (2009) 2 SCC 582.

    13. On the aspect of the delay in institution of the suit, relying on Mademsetty Satyanarayana v. G. Yelloji Rao (1965) 2 SCR 221, AIR 1965 SC 1405, it was submitted that the delay did not induce the defendant to do anything further than that already done earlier, to their prejudice. In any event the plaintiff is ready and willing to pay to Defendant 2 the amount of the income tax dues paid by it and proceed with the contract with the defendant sister concerns.

    14. We have been addressed by the counsel for the parties at length, as also have been taken through the several WhatsApp messages and e-mails exchanged. We have also considered the respective submissions. Litigation at the initial stage of injunction, where the claims of the parties are still at a nebulous stage, has stalled the progress of the suit. We are of the considered opinion that at this stage we ought to refrain from returning findings of facts or express any opinion on the merits of the suit, except to the extent necessary for purposes of the present order, so as not to prejudice either party in the suit.

    15. Chapter VII, Section 36 of the Specific Relief Act, 1963 (hereinafter referred to as “the Act”) provides for grant of preventive relief. Section 37 provides that temporary injunction in a suit shall be regulated by the Code of Civil Procedure. The grant of relief in a suit for specific performance is itself a discretionary remedy. A plaintiff seeking temporary injunction in a suit for specific performance will therefore have to establish a strong prima facie case on basis of undisputed facts. The conduct of the plaintiff will also be a very relevant consideration for purposes of injunction. The discretion at this stage has to be exercised judiciously and not arbitrarily.

    16. The cardinal principles for grant of temporary injunction were considered in Dalpat Kumar v. Prahlad Singh (1992) 1 SCC 719, observing as follows :

    “5. … Satisfaction that there is a prima facie case by itself is not sufficient to grant injunction. The Court further has to satisfy that non-interference by the Court would result in “irreparable injury” to the party seeking relief and that there is no other remedy available to the party except one to grant injunction and he needs protection from the consequences of apprehended injury or dispossession. Irreparable injury, however, does not mean that there must be no physical possibility of repairing the injury, but means only that the injury must be a material one, namely, one that cannot be adequately compensated by way of damages. The third condition also is that “the balance of convenience” must be in favour of granting injunction. The Court while granting or refusing to grant injunction should exercise sound judicial discretion to find the amount of substantial mischief or injury which is likely to be caused to the parties, if the injunction is refused and compare it with that which is likely to be caused to the other side if the injunction is granted. If on weighing competing possibilities or probabilities of likelihood of injury and if the Court considers that pending the suit, the subject-matter should be maintained in status quo, an injunction would be issued. Thus the Court has to exercise its sound judicial discretion in granting or refusing the relief of ad interim injunction pending the suit.”

    17. The negotiations between the plaintiff and the defendant is reflected in approximately 17 e-mails exchanged between them commencing from December 2017 to 31-3-2018. The file size of the attachment to the mails has varied from 48-50-52-48-57-56 KBs indicating suggestions and corrections from time to time. The WhatsApp messages which are virtual verbal communications are matters of evidence with regard to their meaning and its contents to be proved during trial by evidence-in-chief and cross-examination. The e-mails and WhatsApp messages will have to be read and understood cumulatively to decipher whether there was a concluded contract or not. The use of the words “final draft” in the e-mail dated 30-3-2018 cannot be determinative by itself. The e-mail dated 26-2-2018 sent by the defendant at 11.46 a.m. had also used the same phraseology. The plaintiff was well aware from the very inception that the defendant was negotiating for sale of the lands simultaneously with two others. The plaintiff was further aware on 30-3-2018 itself that the deal with it had virtually fallen through as informed to the escrow agent. The fact that a draft MoU christened as “final-for discussion” was sent the same day cannot lead to the inference in isolation, of a concluded contract. There is no evidence at this stage that the acceptance was communicated to the defendant before the latter entered into a deal with Defendant 2 on 30-3-2018 and executed a registered agreement for sale on 31-3-2018. Defendant 2 paid Rs 17.69 crores and Rs 2.20 crores towards the income tax dues of the defendant the same day, as part of the consideration amount. It is only thereafter the plaintiff purports to have communicated its acceptance to the defendant on 31-3-2018 at 1.13 p.m. The prolonged negotiations between the parties reflect that matters were still at the “embryo stage” as observed in Agriculture Produce Market Committee v. Girdharbhai Ramjibhai Chhaniyara (1997) 5 SCC 468. The plaintiff at this stage has failed to establish that there was a mutuality between the parties much less that they were ad idem.

    18. The pleadings in the suit acknowledge the awareness of the plaintiff of the ongoing negotiations with Defendant 2. The advance of Rs 2.16 crores was refunded to the plaintiff in the evening on 31-3-2018 by RTGS. No effort was made by the plaintiff to again remit the sum by RTGS immediately or the next day. Only a public notice was published on 3-4-2018 refuted by the defendant on 4-3-2018. The suit was then filed seven months later on 1-10-2018. The explanation that the plaintiff waited hopefully for a solution outside litigation as a prudent businessman before finally instituting the suit is too lame an excuse to merit any consideration.

    19. In a matter concerning grant of injunction, apart from the existence of a prima facie case, balance of convenience, irreparable injury, the conduct of the party seeking the equitable relief of injunction is also very essential to be considered as observed in Motilal Jain (2000) 6 SCC 420 holding as follows :

    “6. The first ground which the High Court 1990 SCC OnLine Gau 120, (1991) 2 Gau LR 195 took note of is the delay in filing the suit. It may be apt to bear in mind the following aspects of delay which are relevant in a case of specific performance of contract for sale of immovable property:
    (i) delay running beyond the period prescribed under the Limitation Act;
    (ii) delay in cases where though the suit is within the period of limitation, yet:
    (a) due to delay the third parties have acquired rights in the subject-matter of the suit;
    (b) in the facts and circumstances of the case, delay may give rise to plea of waiver or otherwise it will be inequitable to grant a discretionary relief.”

    20. Defendant 2, in addition to the dues of the Income Tax Department as aforesaid, made further payments to the defendant of Rs 25,44,57,769 by 16-1-2019 aggregating to a total payment of Rs 45,84,71,869. The defendants had also proceeded to utilise a sum of Rs 36.20 crores also and had therefore materially altered their position evidently by the inaction of the plaintiff to institute the suit in time and having allowed third party rights to accrue by making substantial investments. In Madamsetty (1965) 2 SCR 221, AIR 1965 SC 1405 it was observed : (AIR p. 1410, para 11)

    “11. … It is not possible or desirable to lay down the circumstances under which a court can exercise its discretion against the plaintiff. But they must be such that the representation by conduct or neglect of the plaintiff is directly responsible in inducing the defendant to change his position to his prejudice or such as to bring about a situation when it would be inequitable to give him such a relief.”

    Similar view has been expressed in Mandali Ranganna (2008) 11 SCC 1.

    21. We are therefore of the considered opinion that in the facts and circumstances of the present case, and the nature of the materials placed before us at this stage, whether there existed a concluded contract between the parties or not, is itself a matter for trial to be decided on basis of the evidence that may be led. If the plaintiff contended a concluded contract and/or an oral contract by inference, leaving an executed document as a mere formality, the onus lay on the plaintiff to demonstrate that the parties were ad idem having discharged their obligations as observed in Brij Mohan (1990) 4 SCC 147. The plaintiff failed to show the same on admitted facts. The draft MoU dated 30-3-2018 in Clause C contemplated payment of the income tax dues of Rs 18.64 crores as part of the consideration amount only whereafter the agreement was to be signed relating back to the date 29-3-2008. Had this amount been already paid or remitted by the plaintiff, entirely different considerations would have arisen with regard to the requirement for execution of a written agreement remaining a mere formality. Needless to state the balance of convenience is in favour of the defendants on account of the intervening developments, without furthermore, inter alia by reason of the plaintiff having waited for seven months to institute the suit. The question of irreparable harm to a party complaining of a breach of contract does not arise if other remedies are available to the party complaining of the breach. The High Court has itself observed that from the negotiations between the parties that “some rough weather was being reflected between the plaintiff and the defendant …”. The Special Civil Judge failed to address the issue of delay. The High Court noticed the arguments of the defendants with regard to delay in the institution of the suit but failed to deal with it.

    22. In M.P. Mathur v. DTC (2006) 13 SCC 706, this Court observed :

    “14. The present suit is based on equity. … In the present case, the plaintiffs have sought a remedy which is discretionary. They have instituted the suit under Section 34 of the 1963 Act. The discretion which the court has to exercise is a judicial discretion. That discretion has to be exercised on well-settled principles. Therefore, the court has to consider—the nature of obligation in respect of which performance is sought, circumstances under which the decision came to be made, the conduct of the parties and the effect of the court granting the decree. In such cases, the court has to look at the contract. The court has to ascertain whether there exists an element of mutuality in the contract. If there is absence of mutuality the court will not exercise discretion in favour of the plaintiffs. Even if, want of mutuality is regarded as discretionary and not as an absolute bar to specific performance, the court has to consider the entire conduct of the parties in relation to the subject-matter and in case of any disqualifying circumstances the court will not grant the relief prayed for (Snell's Equity, 31st Edn., p. 366).”

    23. Wander Ltd. 1990 Supp SCC 727 prescribes a rule of prudence only. Much will depend on the facts of a case. It fell for consideration again in Gujarat Bottling Co. Ltd. v. Coca Cola Co. (1995) 5 SCC 545, observing as follows :

    “47. … Under Order 39 of the Code of Civil Procedure, jurisdiction of the Court to interfere with an order of interlocutory or temporary injunction is purely equitable and, therefore, the Court, on being approached, will, apart from other considerations, also look to the conduct of the party invoking the jurisdiction of the Court, and may refuse to interfere unless his conduct was free from blame. Since the relief is wholly equitable in nature, the party invoking the jurisdiction of the Court has to show that he himself was not at fault and that he himself was not responsible for bringing about the state of things complained of and that he was not unfair or inequitable in his dealings with the party against whom he was seeking relief. His conduct should be fair and honest.”

    24. The aforesaid discussion leaves us satisfied to conclude that in the facts and circumstances of the present case, the grant of injunction to the plaintiff is unsustainable. Resultantly the orders of injunction are set aside. Nothing in the present order shall be deemed or construed as any expression of opinion or observation by us at the final hearing of the suit which naturally will have to be decided on its own merits. The High Court has already given directions to expedite the hearing of the suit and we reiterate the same.

    25. The appeals are allowed.