AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Judges
Acts
  • Section 6, read with Section 17 of the 1953 Act
  • [No specific act/article title or section/subsection/year mentioned]
  • Registration Act, Section 17 of the Arbitration Act, 1940, Order 33 Rule 1 of the Code of Civil Procedure
  • Section 17 of the Act
  • The Arbitration Act (no specific section mentioned)
  • Section see Manakchand v. Chaube Manoharlal, Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 49 of the Registration Act, 1908
  • Section [no section/subsection provided], Subsection [no subsection provided] of the [no act/article title provided]
  • Section 46 of the Registration Act, 1908 (implied)
  • Section 5, Subsection 2 of the 1983 Income Tax Act [Not found in the text]
  • Section 4 of the Rajasthan Land Acquisition Act, 1953
  • Section 6 of the 1953 Act
  • Stamps Act
  • Section 23 of the Contract Act, 1872
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Judges
Acts
  • Section 6, read with Section 17 of the 1953 Act
  • [No specific act/article title or section/subsection/year mentioned]
  • Registration Act, Section 17 of the Arbitration Act, 1940, Order 33 Rule 1 of the Code of Civil Procedure
  • Section 17 of the Act
  • The Arbitration Act (no specific section mentioned)
  • Section see Manakchand v. Chaube Manoharlal, Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 49 of the Registration Act, 1908
  • Section [no section/subsection provided], Subsection [no subsection provided] of the [no act/article title provided]
  • Section 46 of the Registration Act, 1908 (implied)
  • Section 5, Subsection 2 of the 1983 Income Tax Act [Not found in the text]
  • Section 4 of the Rajasthan Land Acquisition Act, 1953
  • Section 6 of the 1953 Act
  • Stamps Act
  • Section 23 of the Contract Act, 1872
Smart Summary

Factual and Procedural Background

The appellant–a partnership firm owning 249.60 bighas of land in Rajasthan—faced acquisition proceedings initiated in 1973 for the benefit of the respondent-company. Although the Rajasthan High Court ultimately quashed the acquisition in 1976 (a decision affirmed by the Supreme Court in 1994), the State-sponsored negotiations led to minutes dated 27-11-1978 under which roughly 145 bighas would be sold to the respondent at a price to be fixed by arbitration, the appellant retaining the balance.

An agreement dated 16-2-1979, later superseded on 1-2-1980, provided that a sole arbitrator would only determine the compensation payable for those 145 bighas, leaving the respondent free to accept or reject the price within 45 days. Justice C.B. Bhargava (Retd.) delivered an award on 9-6-1985 valuing the land at Rs 12,18,700. The award was made rule of court on 1-12-1993; the appellant’s SLP was dismissed on 29-3-1994.

On 16-5-1994 the respondent applied to execute the award, seeking a direction that the appellant execute and register a sale-deed. The executing court (ADJ-I, Bharatpur) allowed the application on 5-1-1995, ordering execution of the sale-deed and delivery of possession. The appellant’s revision (C.R. No. 81/1995) remained pending while the respondent, “by abundant caution”, filed Civil Suit No. 60/1996 for specific performance of the 1980 agreement, only to withdraw it unconditionally on 13-2-2006. Ultimately, the High Court dismissed the revision on 4-7-2016. The present appeal challenges that dismissal.

Legal Issues Presented

  1. Whether an arbitration award that merely fixes the price of land can be executed as if it were a decree for specific performance compelling execution of a sale-deed.
  2. Whether the executing court exceeded its jurisdiction by granting relief (transfer of title and possession) not contained in, or flowing directly and necessarily from, the award.
  3. What effect, if any, the respondent’s unconditional withdrawal of its specific-performance suit has on its attempt to enforce the award as a conveyance.
  4. Whether non-registration of the 1-2-1980 agreement and/or the award affects their enforceability regarding transfer of immovable property.

Arguments of the Parties

Appellants’ Arguments

  • The award only determined price; it conferred no right, title or interest in land and contained no mandate to execute a sale-deed. Hence the executing court “went behind” the award.
  • Under the 1-2-1980 agreement the respondent held an option, exercisable within 45 days of the award, to accept or reject the price; thus no concluded contract existed on the award date.
  • Neither the agreement nor the award was registered; instruments affecting immovable property must be registered, rendering execution impermissible.
  • The respondent withdrew its specific-performance suit unconditionally; by Order 23 Rule 1(4) CPC it abandoned that claim and cannot indirectly revive it via execution proceedings.
  • The price (Rs 12.18 lakh) is grossly outdated and inequitable vis-à-vis present market value.
  • The appellants nevertheless are willing to compensate the respondent for litigation costs, per the Supreme Court’s suggestion dated 23-2-2017.

Respondent’s Arguments

  • The Supreme Court should not exercise discretionary power under Article 136 because the appellants voluntarily agreed to sell at a price to be fixed by the arbitrator and the executing court merely enforced that bargain.
  • The appellants never challenged the validity of the 1-2-1980 agreement on grounds such as coercion in any earlier proceedings; it remains binding.
  • Executing courts possess wide powers to interpret an award, underlying agreement and pleadings so as to give full effect to the parties’ intentions.
  • Withdrawal of Civil Suit No. 60/1996 does not amount to admission that execution is impermissible; no estoppel can arise against statutory rights.
  • To put an end to litigation the respondent is even willing to pay Rs 60 lakh to the appellants, reflecting the suggestion recorded on 23-2-2017.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
State of M.P. v. Mangilal Sharma (1998) 2 SCC 510 Executing court cannot grant relief beyond a declaratory decree. Used to show that an award/decree merely declaring rights (price) cannot compel additional acts (sale-deed).
Coal Linker v. Coal India Ltd. (2009) 9 SCC 491 Executing court cannot add interest not granted in the award. Analogy: directing conveyance exceeds scope of award just as adding interest exceeded scope there.
J&K Bank Ltd. v. Jagdish C. Gupta (2004) 10 SCC 568 Executing court cannot go behind the decree to grant promotion not ordered. Cited to reinforce prohibition on expanding relief in execution.
Gurdev Singh v. Narain Singh (2007) 14 SCC 173 Scope of execution confined to decree’s express terms. Relied upon to hold that removal of trees (not decreed) was impermissible; by parity, execution of sale-deed here is impermissible.
Ramesh Kumar v. Furu Ram (2011) 8 SCC 613 Unregistered award affecting immovable property is inexecutable. Cited to emphasise registration defects if award were treated as conveyance.
Bhavan Vaja v. Solanki Hanuji Khodaji Mansang (1973) 2 SCC 40 Executing court may look at pleadings and proceedings to construe an ambiguous decree. Distinguished: present award is unambiguous and lacks direction to convey property.
Meenakshi Saxena v. ECGC Ltd. (2018) 7 SCC 479 Execution must enforce the “verdict of the court”; executing court concerns itself only with execution. Distinguished; unlike a consumer-court decree there was no decree for conveyance here.
Topanmal Chhotamal v. Kundomal Gangaram, AIR 1960 SC 388 When decree terms are ambiguous, executing court may construe them with reference to pleadings. Distinguished on ground that award is not ambiguous but simply silent on conveyance.
Manakchand v. Chaube Manoharlal, 1943 SCC OnLine PC 53 Pleadings can be consulted to interpret ambiguous decrees. Part of discussion distinguishing cases where interpretation, not expansion, is permissible.

Court's Reasoning and Analysis

1. The 1-2-1980 agreement explicitly restricted the arbitrator’s mandate to price-fixation; the award therefore was declaratory, not executory, of transfer.

2. Execution proceedings must remain within the four corners of the award. Directing execution of a sale-deed and delivery of possession created substantive rights not contained in the award, contravening the settled law illustrated by Mangilal Sharma, Coal Linker, J&K Bank and other precedents.

3. The respondent’s independent suit (Civil Suit No. 60/1996) for specific performance was the proper vehicle to obtain conveyance. Its unconditional withdrawal triggered Order 23 Rule 1(4) CPC, amounting to abandonment; the respondent cannot achieve indirectly through execution what it relinquished directly.

4. Non-registration of both the agreement and the award further undermines any attempt to treat them as instruments transferring immovable property, referencing principles in Ramesh Kumar v. Furu Ram.

5. The equities favour neither side; the respondent paid no consideration save for stamp papers, while the appellants deposited Rs 50 lakh pursuant to interim orders. Nonetheless, the Court considered equitable compensation to end the longstanding dispute.

Holding and Implications

ALLOWED. The Supreme Court:

  • Quashed the Rajasthan High Court’s judgment dated 4-7-2016 and the executing court’s order dated 5-1-1995.
  • Held that the arbitration award fixing land price is not executable as a decree for specific performance; execution directions for sale-deed were ultra vires.
  • Directed that the Rs 50 lakh already deposited by the appellants (with accrued interest) plus an additional Rs 10 lakh be paid to the respondent toward litigation costs and expenses, thereby bringing the decades-long litigation to a close.

Implications: The decision reaffirms strict limits on executing courts—execution cannot enlarge the substantive relief granted in an award or decree. It cautions parties that separate contractual remedies (e.g., specific performance) must be pursued directly, and their abandonment cannot be circumvented through execution proceedings. No new legal doctrine is introduced, but existing principles on execution and registration of awards are strongly restated.

    Firm Rajasthan Udyog And Others (S) v. Hindustan Engineering & Industries Ltd. (S).

    Vineet Saran, J.— Leave granted. The question for consideration in the present appeal is as to whether an arbitration award, which determined the compensation amount for the land to be paid under agreement for sale, can be directed to be executed as a suit for specific performance of agreement, when the reference to the arbitrator (as per the agreement) was only for fixation of price of land in question, and the arbitration award was also only with regard to the same.

    2. Briefly stated, the facts of this case are that Appellant 1 is a partnership firm and other appellants are its partners. The appellant firm is owner of 249.60 bighas (approximately 100 acres) of land, which was purchased by the appellant in the year 1966. The dispute in the present appeal relates to a period spreading over four decades. The said land was subject-matter of acquisition, for which a Notification dated 13-3-1973 under Section 4 of the Rajasthan Land Acquisition Act, 1953 (for short “the 1953 Act”), was issued by the State of Rajasthan, which acquisition was for the benefit of the respondent industry. The said notification was challenged by the appellant before the Rajasthan High Court in Writ Petition No. 389 of 1974, which was dismissed by a learned Single Judge of the High Court vide the judgment dated 23-7-1974. Challenging the same, the appellant filed Special Appeal No. 448 of 1974 before the Division Bench of the High Court, during the pendency of which a declaration under Section 6, read with Section 17 of the 1953 Act, was issued by the State of Rajasthan on 13-9-1975. The special appeal challenging the said acquisition was allowed by the Division Bench of the Rajasthan High Court, vide its judgment dated 5-10-1976 1976 SCC OnLine Raj 53, AIR 1978 Raj 31 and the acquisition proceedings were thus quashed. Challenging the said decision of the Rajasthan High Court, respondent Hindustan Engineering & Industries Ltd., as well as the State of Rajasthan, filed separate special leave petitions (Nos. 4199 of 1977 and 1060 of 1978, respectively), which petitions were dismissed by this Court by order dated 29-3-1994.

    3. During the pendency of the said special leave petitions, on the intervention of the then Chief Minister-cum-Minister of Industries of the State of Rajasthan, an agreement was arrived at between the parties herein, as well as the State of Rajasthan, which was recorded in the minutes of the meeting dated 27-11-1978, which was to the effect that out of 249.60 bighas of land belonging to the appellant firm, approximately 104 bighas would be retained by the appellant and the remaining about 145 bighas would be sold to the respondent Company, subject to the fixation of price of land, construction, etc. to be finalised through arbitration.

    4. Pursuant thereto, an agreement dated 16-2-1979 was entered into between the appellant firm and the respondent Company. The said agreement dated 16-2-1979 was superseded by another agreement dated 1-2-1980 executed between the parties.

    5. The matter of determination of price of the land to be sold by the appellant to the respondent Company, was decided by the sole arbitrator, Justice Chandra Bhan Bhargav (Retired), vide his award dated 9-6-1985. In the said award, the arbitrator mentioned that the parties had “referred their dispute regarding determination of compensation of land to me as sole arbitrator”. The salient feature decided in the said award was that the market value of the land to be transferred in favour of the respondent Company would be determined as on 27-11-1978, which was the date on which the parties agreed to transfer the land. In pursuance thereof, the total compensation amount for the land in question was determined by the arbitrator as Rs 12,18,700. The said award was filed before Additional District Judge 1, Bharatpur on 10-6-1985. After the award was passed, the respondent Company, vide its communication dated 15-7-1985 conveyed its acceptance of the award to the appellant by registered post. The same was also conveyed to the arbitrator vide communication dated 18-7-1985.

    6. The appellant then filed its objections to the award before Additional District Judge 1, Bharatpur and vide order dated 22-11-1988, the objections were allowed and the matter was remanded back to the sole arbitrator. Challenging the said order dated 22-11-1988, the respondent Company filed Civil Revision Petition No. 163 of 1990 before the Rajasthan High Court, which revision petition was allowed on 1-12-1993 1993 SCC OnLine Raj 77, (1994) 1 Arb LR 532 and the award dated 9-6-1985 passed by the arbitrator was affirmed and made rule of the court. Challenging the said order of the Rajasthan High Court, the appellant had filed Special Leave Petition No. 3684 of 1994, which was dismissed by this Court on 29-3-1994. The award thus attained finality.

    7. It was thereafter that on 16-5-1994, the respondent Company filed an application for execution of the award. In the said application, it was stated that “according to the directions contained in the award of the arbitrator, the petitioner Hindustan Corporation Ltd., is required to furnish stamp paper to the respondent for execution of the sale deed_ _ _ _”. The prayer made in the said application was that the appellants herein be directed to take steps and execute the sale deed on the stamp papers filed by the respondent herein and thereafter produce the sale deed before the Sub-Registrar for its registration. In the alternative, it was prayed that if the appellants herein failed to execute the sale deed, the same may be executed by the court. In response to the same, the appellants filed its reply on 19-7-1994 opposing the execution application and specially denied that any such direction for the execution of the sale deed, as has been made in the prayer of the application by the respondent herein, was made in the award of the arbitrator.

    8. By the judgment and order dated 5-1-1995, Additional District Judge I, Bharatpur, exercising its power under Section 17 of the Arbitration Act, 1940, allowed the application of the respondent herein and directed the appellants to execute and register the sale deed and hand over possession of the land in question to the respondent herein. Aggrieved by the judgment of Additional District Judge I, Bharatpur, dated 5-1-1995, the appellants filed Civil Revision Petition No. 81 of 1995 before the Rajasthan High Court.

    9. During the pendency of the civil revision petition filed by the appellants, the respondent Company filed Civil Suit No. 60 of 1996 against the appellants seeking specific performance of the agreement dated 1-2-1980 between the parties i.e. the appellants and the respondent Company. Civil Revision Petition No. 81 of 1995 filed by the appellants remained pending before the Rajasthan High Court, when the respondent Company had filed Civil Suit No. 60 of 1996. Even when the civil suit of the appellants was not decided, the respondent Company sought to withdraw Civil Suit No. 60 of 1996 vide its application dated 6-2-2006. Pursuant thereto, Civil Suit No. 60 of 1996 seeking specific performance of the agreement dated 1-2-1980 was permitted to be unconditionally withdrawn by the respondent Company vide order dated 13-2-2006 passed by the trial court.

    10. It was then, after more than a decade of withdrawal of the suit by the respondent Company, that Civil Revision Petition No. 81 of 1995, challenging the order of Additional District Judge I dated 5-1-1995 was dismissed by the Rajasthan High Court by a detailed order dated 4-7-2016 2016 SCC OnLine Raj 6699. The High Court opined that Civil Suit No. 60 of 1996 was filed by the respondent Company as a matter of abundant precaution but was later withdrawn and mere filing of the civil suit would not amount to admission by the respondent Company that the award and subsequent order based on it, were not suitable and enforceable. Upholding the order of Additional District Judge I dated 5-1-1995, the civil revision petition was dismissed by the Rajasthan High Court. Aggrieved by the said judgment dated 4-7-2016 2016 SCC OnLine Raj 6699, this appeal has been filed by way of special leave petition.

    11. The submission of Mr Sudhir Chandra Agarwala, learned Senior Counsel for the appellants, is that the executing court has travelled beyond the award while passing the order dated 5-1-1995, inasmuch as by the arbitration award dated 9-6-1985 only price of the land in question was determined by the arbitrator and it did not declare, create or confer any right, title or interest in the land in question in favour of the respondent Company. It was contended that by the agreement dated 1-2-1980, the appellants had agreed to sell their land to the respondent Company at the rate to be fixed in future by an arbitrator, and the respondent Company was given an option in the agreement to be exercised within a period of 45 days of the fixing of the price by the arbitrator, either to purchase or decline to purchase the land. Thus, according to the learned Senior Counsel, the agreement dated 1-2-1980 was to result in a concluded contract only after the respondent Company had either given its consent to purchase the land at the price fixed by the arbitrator or declined to do so. It was thus contended that the respondent had not acquired any enforceable right even at the time of the passing of the award, as there did not exist any concluded contract between the parties even at the time of the passing of the award, as the contractual obligations of the parties were to arise subsequent to the passing of the award and only after the respondent Company had exercised its option of purchasing the land at the price fixed by the arbitrator. The learned Senior Counsel contended that the executing court could not have gone behind or beyond the award, and thus could not have considered the agreement dated 1-2-1980 entered into between the parties. The scope of reference to the arbitrator being only with regard to determination of the price of land at which it may be sold by the appellants to the respondent Company, thus in execution of the award, no direction for execution of the sale deed by the appellants in favour of the respondent Company in pursuance of the agreement dated 1-2-1980 could have been issued by the executing court, especially when the suit for specific performance of the agreement dated 1-2-1980 had been withdrawn by the respondent Company on 13-2-2006, which was without any condition.

    12. The learned Senior Counsel for the appellants further submitted that any instrument or award creating right, title or interest in an immovable property would be required to be compulsorily registered under the Registration Act, and the same having not been registered, could not be executable. It was contended that neither the agreement dated 1-2-1980 nor the award dated 9-6-1985, was registered in the present case. It was vehemently urged that when the respondent Company was barred for seeking execution of the agreement dated 1-2-1980 (which was not registered) and also when Civil Suit No. 60 of 1996 filed by the respondent Company for specific performance dated 1-2-1980 was dismissed as unconditionally withdrawn on an application filed under Order 33 Rule 1 of the Code of Civil Procedure by the respondent on 6-2-2006, the execution of the said agreement dated 1-2-1980 (while deciding the application under Section 17 of the Arbitration Act, 1940) in execution of the award determining the price of the land could not have been passed. In the alternative, it was contended that the agreement dated 1-2-1980 was not enforceable also because the same had been obtained by undue influence.

    13. With regard to the price of land as determined in the award of the arbitrator, on merits, it was submitted that the price which was fixed as on 27-11-1978, and not the date on which the sale deed was to be executed. Since the price fixed was a meagre amount of Rs 12.18 lakhs for about 145 bighas (about 55-60 acres) of land, the fixation of the price under the award was highly unreasonable as the present value of the land would be in crores. In the end, the learned Senior Counsel for the appellants submitted that as proposed and recorded in this Court's order dated 23-2-2017 2017 SCC OnLine SC 1962 in this appeal, the appellants were ready to compensate the respondent Company towards costs of litigation and other expenses incurred by it, which the appellants are still ready and willing to pay. While concluding his submission, the learned Senior Counsel reiterated that the executing court had grossly erred and exceeded its jurisdiction in travelling beyond the award, which was only for fixation of the price of land and not execution of the sale deed. It was thus urged that the orders dated 5-1-1985 passed by the executing court and the order dated 4-7-2016 2016 SCC OnLine Raj 6699 passed by the Rajasthan High Court in civil revision petition, be quashed.

    14. Per contra Shri Dushyant Dave and Shri Sidharth Dave, learned Senior Counsel appearing for the respondent Company contended that this is not a case where the Court should exercise its discretionary jurisdiction under Article 136 of the Constitution as the appellants had agreed to sell the land in question in terms of the agreement dated 1-2-1980, at the price to be fixed by the arbitrator, and once the arbitrator had fixed price of land, the execution of the same, as directed by the executing court, was perfectly justified. It was the solemn agreement entered into between the parties in the year 1980, which was sought to be executed after the passing of the award of the arbitrator on 9-6-1985 and by directing execution of sale deed, the executing court has done substantial justice between the parties. It has been contended that the appellants had never filed any suit for declaration that the agreement dated 1-2-1980 was void by virtue of Section 23 of the Contract Act, 1872, nor did it ever raise the challenge to the validity and legality of the agreement while assailing the award or while resisting the execution proceedings. The learned Senior Counsel submitted that it was wrong to allege that the agreement entered into by the appellants was purportedly under coercion. The agreement always remained binding between the parties and was executable after the determination of price of land in question by the arbitrator, and the appellants could not seek to wriggle out of the same on any count. The quantum of price of the land as fixed by the arbitrator could not now be reagitated on the ground that the current market value of the land is very high. It was then contended that the power of the executing court was very wide and it was its duty to give effect to the award of the arbitrator. It was thus urged that the scope and power of the executing court has been held to be wide enough to interpret the award, the agreement upon which the award is based, and also the pleadings. Thus, while considering the above, the executing court was justified in ordering the execution of the agreement and by having done so, it was not only justified and suitable in the facts of the present case, but the court has done complete justice between the parties.

    15. As regards the filing of Civil Suit No. 60 of 1996 for specific performance of the agreement dated 1-2-1980 by the respondent Company, the learned Senior Counsel for the respondent Company has submitted that on receiving legal advice, the said Civil Suit No. 60 of 1996 was withdrawn on 13-2-2006, as the petition for execution of the award was already pending. It has been submitted that the contention that filing of Civil Suit No. 60 of 1996 for specific performance of the agreement dated 1-2-1980 tantamounts to admission on the part of the respondent Company that the award did not envisage direction for execution of sale deed and handing over the possession of the land in question, is wholly misconceived, as in any case, there cannot be any admission against the law. The learned Senior Counsel for the respondent thus contended that the appeal is devoid of merits, and deserves to be dismissed.

    16. In the end, with regard to the order of this Court dated 23-2-2017 2017 SCC OnLine SC 1962 passed in this appeal, giving suggestion to the respondent Company that whether the respondent Company would be satisfied if Rs 60 lakhs was paid to it towards cost of litigation and other expenses made by it and put the controversy to the end, the learned Senior Counsel for the respondent suggested that the respondent Company would be, on the other hand, agreeable to deposit Rs 60 lakhs to be paid to the appellants for putting a quietus to the litigation.

    17. We have heard the learned Senior Counsel for the parties at length and have perused the record.

    18. The learned Senior Counsel for the parties have, in support of their respective submissions, relied on several decisions rendered by this Court, which shall be considered while dealing with their submissions.

    19. The facts of this case, relevant for the purpose of this appeal, may be summarised as follows:

    19.1. In 1966, the appellant firm purchased 249.60 bighas (app. 100 acres) of land.

    19.2. On 13-3-1973, a Notification under Section 4 of the Rajasthan Land Acquisition Act, 1953 was issued for acquisition of the said land for the benefit of the respondent industry.

    19.3. On 23-7-1974, the Rajasthan High Court dismissed the writ petition of the appellant herein, challenging the aforesaid acquisition.

    19.4. On 13-9-1975, a declaration under Section 6 of the 1953 Act issued by the State of Rajasthan.

    19.5. On 5-10-1976 1976 SCC OnLine Raj 53, AIR 1978 Raj 31, a special appeal against the order dated 23-7-1974 passed in writ was allowed by the Division Bench of the Rajasthan High Court and the acquisition proceedings were quashed.

    19.6. In 1977/1978, special leave petitions challenging the judgment dated 5-10-1976 1976 SCC OnLine Raj 53, AIR 1978 Raj 31 were filed by the respondent and State of Rajasthan, which petitions were dismissed by this Court on 29-3-1994.

    19.7. On 27-11-1978, on the intervention of the Chief Minister of the State of Rajasthan, an agreement was arrived at to the effect that out of 249.60 bighas, 104 bighas would be retained by the appellant herein and 145 bighas be sold to the respondent herein, subject to price to be fixed through arbitration.

    19.8. On 16-2-1979, an agreement was entered into between the appellant and the respondent herein.

    19.9. On 1-2-1980, a fresh agreement was entered into between the parties superseding the earlier agreement dated 16-2-1979, whereby it was provided that the price of about 145 bighas of land to be sold to the respondent would be determined through arbitration.

    19.10. On 9-6-1985, an award passed by the arbitrator fixing price of 145 bighas of land (as on 27-11-1978) to be Rs 12,18,700, which would be the price payable for the land to be sold to the respondent.

    19.11. The appellant herein filed objections to the award before ADJ-1, Bharatpur.

    19.12. On 22-11-1988, ADJ-1, Bharatpur allowed the objections and remanded the matter back to the arbitrator.

    19.13. Challenging the said order, the respondent filed Civil Revision Petition No. 163 of 1993 before the Rajasthan High Court.

    19.14. On 1-12-1993 1993 SCC OnLine Raj 77, (1994) 1 Arb LR 532, civil revision petition was allowed by the Rajasthan High Court and the award dated 9-6-1985, was affirmed and made rule of the court.

    19.15. On 29-3-1994, the special leave petition filed by the appellant against the order dated 1-12-1993 1993 SCC OnLine Raj 77, (1994) 1 Arb LR 532 was dismissed by this Court and the award attained finality.

    19.16. On 16-5-1994, the respondent filed an application under Section 17 of the Arbitration Act for execution of the award dated 9-6-1985.

    19.17. On 6-7-1994, the appellant filed objections to the application for execution of the award.

    19.18. On 5-1-1995, ADJ-1 Bharatpur allowed the application of the respondent and directed the appellant to execute a registered sale deed and hand over the possession of land in question to the respondent.

    19.19. In 1995, the appellant filed Civil Revision Petition No. 81 of 1995 before the Rajasthan High Court, challenging the order of the ADJ-1 Bharatpur dated 5-1-1995 which remained pending till 4-7-2016.

    19.20. On 29-11-1996, the respondent filed Civil Suit No. 60 of 1996 against the appellant seeking specific performance of the agreement dated 1-2-1980.

    19.21. On 6-2-2006, the respondent filed an application to withdraw its Civil Suit No. 60 of 1996.

    19.22. On 13-2-2006, Civil Suit No. 60 of 1996 allowed to be withdrawn unconditionally.

    19.23. On 4-7-2016 2016 SCC OnLine Raj 6699, the impugned order passed by the Rajasthan High Court in Civil Revision Petition No. 81 of 1995 filed by the respondent, whereby order of ADJ-1, Bharatpur dated 5-1-1985 was upheld.

    19.24. On 17-8-2016, the appellant filed this appeal, challenging the judgment dated 4-7-2016 2016 SCC OnLine Raj 6699.

    19.25. On 2-9-2016 2016 SCC OnLine SC 1878, this Court passed stay order in this appeal on deposit of Rs 50,00,000 by the appellant in the Registry of this Court.

    19.26. On 23-2-2017 2017 SCC OnLine SC 1962, this Court recorded a suggestion in the order that whether the respondent would be satisfied to take Rs 60,00,000 towards the cost of litigation and other expenses and put the controversy to an end.

    20. The anchor sheet of the case of the respondent is the agreement dated 1-2-1980 between the parties (i.e. appellant and respondent) as well as the arbitration award dated 9-6-1985.

    21. The relevant portion of the agreement dated 1-2-1980 (superseding the earlier agreement dated 16-2-1979) is reproduced below:

    “…
    and whereas in pursuance of the aforementioned agreement for arbitration, the dispute was agreed to be referred to arbitration by Hon'ble ex-Chief Justice Mr B.P. Beri for determining the quantum of compensation to be paid to Party 2 in respect of land under acquisition in accordance with the provisions of the Rajasthan Land Acquisition Act.
    ***
    and whereas in the course of arbitration proceedings the parties with a view to accommodate each other have agreed to modify the aforementioned agreement to refer the dispute for arbitration in the following manner:
    1. …
    2. That Party 1 Hindustan Development Corporation Ltd. and General Engineering Works expressly abandon the determination of the price by the arbitrator of the area measuring approximately 104 bighas marked, A, B, C, D, E, F, G, H in Plan 1 dated 14-1-1977 and all claims regarding acquisition thereof before all authorities shall be deemed to have been abandoned by Party 1 in respect of the land marked A, B, C, D, E, F, G, H of Plan 1 dated 14-1-1977. Party 1 shall not claim the aforesaid land A, B, C, D, E, F, G, H by way of acquisition or otherwise in future.
    3. That after excluding portion marked, A, B, C, D, E, F, G, H the remaining land under acquisition measures about 145 bighas in ‘L’ shape shown in green colour marked as A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P, Q, R, S, T, U, V, W, X, Y, in the aforesaid plan.
    4. That the arbitrator shall determine compensation for the and referred to in Para 3 above.
    5.-7.***
    8. That the amount of compensation determined by the arbitrator shall be binding on the parties. Provided that in case such amount of compensation is not acceptable to Party 1 it shall have the option of not accepting the same and will not in whatsoever manner be entitled to take the aforementioned land.
    9. In case Party 1 in exercise of the option reserved to it in Para 8 accepts the amount of compensation determined by the arbitrator, it shall within 45 days from the date of the receipt of the copy of the award from the arbitrator communicate to Party 2 as well as to the arbitrator the exercise of its option. The communication to the arbitrator will be considered as sufficient communication, that Party 1 has chosen to exercise its option to purchase the area of the land marked as A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P, Q, R, S, T, U, V, W, X, Y in the plan dated 14-1-1977. Party 2 will be bound to execute the sale deed (the draft whereof is enclosed to this deed of arbitration) within thirty days of the delivery of the stamped deed of transfer, by Party 1 to Party 2 (the stamp duty and registration charges shall be borne by Party 1) and the consideration of the sale deed shall be paid by Party 1 to Party 2 in the presence of the Sub-Registrar, at Bharatpur at the time of registration. Party 2 shall hand over possession simultaneously to Party 1 of the aforesaid land at the time of registration.
    10. That the award of the arbitrator shall be conclusive and binding upon both the parties aforesaid and any proceedings pending anywhere at any stage with regard to the matter of the acquisition of the said land shall be deemed to have been propped for all practical purposes.
    11.-12.***”
    (emphasis supplied)

    22. The salient features of the agreement dated 1-2-1980 are, thus, as under:

    22.1. Reference to be made to the arbitrator was for determining the quantum of compensation for the land (145 bighas) to be paid by the respondent.

    22.2. Respondent Company was to abandon its claim of approximately 104 bighas of land in favour of the appellant firm.

    22.3. Arbitrator was to determine compensation of 145 bighas of land (meant to be transferred by the appellant to the respondent), which was to be binding on the parties in all respects.

    22.4. If compensation was not acceptable to the respondent Company, it shall have an option of not accepting the same.

    22.5. If respondent accepted the same, it was to communicate to the appellant in 45 days, after which the appellant would be bound to execute the sale deed within 30 days of the delivery of the stamp deeds of transfer by the respondent to the appellant, and the consideration was to be paid before the Sub-Registrar at the time of registration, and the appellant was to simultaneously deliver the possession.

    (Note: In the earlier agreement dated 16-2-1979, the provision was for the respondent to deposit the compensation amount in the bank account of the appellant, if the appellant was unwilling to accept the same, which was to be considered as valid payment.)

    23. In the award dated 9-6-1985 passed by the sole arbitrator, in the opening paragraph it was observed that by the agreement dated 1-2-1980, the parties (i.e. appellant and respondent) had “referred their dispute regarding determination of compensation of land to me as sole arbitrator”. While determining the question of price of land the arbitrator held that “I accordingly hold that the market value of the land shall be determined (as) on 27-11-1978”. This was decided on the basis that the initial minutes of the meeting prior to the agreement were recorded on the said date i.e. 27-11-1978. The operative portion of the said award reads as under:

    “As a result of the above findings, Party 2 (i.e. respondent herein) is entitled to the following amounts as compensation from Party 1 (i.e. appellant herein).
    Construction for land mentioned in Para 3 of Ext. A-1 and shown in green colour in Ext. A-2

    (i) 95 bighas of land @ Rs 9000 per bigha … Rs 8,55,000.00 (ii) 50 bighas of land @ Rs 4500 per bigha … Rs 2,25,000.00 Rs 10,80,000.00 (iii) Solatiam (illegible) on the above amount. … Rs 1,08,000.00 Rs 11,88,000.00 (iv) Compensation for the compound wall … Rs 20,700.00 (v) Compensation for the trees. … Rs 10,000.00 Total Rs 12,18,700.00

    (Rupees twelve lakh eighteen thousand seven hundred). Announced and signed in the presence of the parties.”

    24. It is noteworthy that the reference to arbitrator was only with regard to the determination of price of land of 145 bighas or the compensation to be awarded to the appellant by the respondent for the said land, which is clear from the very observation of the arbitrator in award that the parties had “referred their dispute regarding determination of compensation of land to me as sole arbitrator”, meaning thereby the arbitrator was to declare the price of land/compensation to be paid for the land by the respondent to the appellant, and nothing more.

    25. In the aforesaid facts of this case, the only question which arises for determination by this Court is as to whether the reference to the arbitrator, in terms of the agreement dated 1-2-1980, was merely for fixation of price of land to be sold by the appellant to the respondent in terms of the agreement, and if that be so, could a direction to execute the sale deed have been issued vide order dated 4-7-2016 2016 SCC OnLine Raj 6699, even though Civil Suit No. 60 of 1996 seeking specific performance of agreement dated 1-2-1980 filed by the respondent was unconditionally withdrawn by the respondent on 13-2-2006.

    26. In our considered opinion, in the facts of the present case, the answer to the same would be an emphatic “no”.

    27. There cannot be any doubt that in terms of the agreement dated 1-2-1980, the arbitrator was authorised to only fix the price of the land which was to be sold by the appellant to the respondent as per the aforesaid agreement. In the said agreement dated 1-2-1980, there was an option given to the respondent to either accept the price fixed by the arbitrator and go ahead with the sale deed, or to refuse to get the sale deed executed at the price fixed by the arbitrator. Thus, there was no certainty that the sale was to be executed at the price fixed by the arbitrator. As such, it was the agreement dated 1-2-1980 alone which could have been executed at the price fixed by the arbitrator, in case the respondent agreed to the same.

    28. After the passing of the award by the arbitrator dated 9-6-1985, which was later confirmed and made rule of the court by the Rajasthan High Court on 1-12-1993 1993 SCC OnLine Raj 77, (1994) 1 Arb LR 532 and the special leave petition filed by the appellant against the said order was dismissed on 29-3-1994 and the award had attained finality, the respondent filed Civil Suit No. 60 of 1996 for specific performance of the agreement dated 1-2-1980. It was this suit for specific performance of agreement under which a direction could have been issued for execution of the sale deed in terms of the agreement dated 1-2-1980. However, the same was unconditionally withdrawn on 13-2-2006, on an application filed by the respondent on 6-2-2006. With the withdrawal of such suit for specific performance, the matter with regard to the execution of the sale deed in terms of the agreement dated 1-2-1980 came to an end. The effect of withdrawing Civil Suit No. 60 of 1996 would be that the plaintiff therein (respondent herein) had abandoned its claim of execution of the sale deed in terms of the agreement dated 1-2-1980, which would be clear from the provisions of Order 23 Rule 1(4) CPC.

    29. From the facts of this case, it is clear that the award passed by the arbitrator could not be independently executed, as the same was only for fixation of price of land and not for enforcement of the agreement. The award was only declaratory of the price of the land. As per the agreement, if the respondent agreed to the price so fixed, it could then get the sale deed executed in terms of the agreement dated 1-2-1980 as it had the option of either accepting the price and getting the sale deed executed, or not accepting the price and thus not getting the sale deed executed. This would clearly mean that the award was merely for the declaration of the price of the land, which would be subject to the agreement and it was not necessary for the respondent to get the sale deed executed at the price so determined by the arbitrator. What was thus executable was the agreement, and not the award. The relief granted by the court below for execution of the sale deed in terms of the award, is thus outside the realm of law, as the award did not contemplate the transfer of land in favour of the respondent, but only determined the price of land.

    30. It is also noteworthy that the application for execution of award filed on 16-5-1994 before Additional District Judge I, Bharatpur did not provide for any provision of law under which the same was filed. Though, in Para 2 of the said application, it was mentioned that the award of the arbitrator contained a direction for execution of the award, but in fact there was no such direction issued in the award, in which the arbitrator had only fixed the price of the land and nothing more.

    31. In our view, once the respondent had given up its claim of execution of sale deed in terms of the agreement dated 1-2-1980 by withdrawing the suit for specific performance of the agreement (Civil Suit No. 60 of 1996), which was permitted to be withdrawn unconditionally on 13-2-2006, the appellant had abandoned its claim for execution of the sale deed. Thus, in our opinion, the respondent could not be permitted to achieve the goal of execution of sale deed by indirectly claiming for execution of award, when the direct claim for execution of sale deed of the agreement dated 1-2-1980 had been abandoned by the respondent.

    32. At the cost of repetition, it may be mentioned that the specific performance could only be of the agreement dated 1-2-1980 and not of the award dated 9-6-1985. Even the operative portion of the award also does not give any direction for execution of the sale deed. It was after the passing of the award that the respondent could have fallen back on the agreement for execution of the sale deed, which the respondent did by filing the suit for specific performance, but abandoned such claim by withdrawing the suit unconditionally.

    33. The submission of the learned Senior Counsel for the respondent that substantial justice has been done by the Court by directing execution of the sale deed, is not worthy of acceptance. In a civil case, the courts have to follow the law in letter and spirit, which has not been done in the present case, as in law the sale deed could have been directed to be executed in execution of the agreement dated 1-2-1980 and not the award, which was only a declaration, fixing the price of land.

    34. This Court, while considering the question of execution of a decree which only declared the rights of the decree-holder and nothing more, has in State of M.P. v. Mangilal Sharma (1998) 2 SCC 510 held as follows :

    “6. A declaratory decree merely declares the right of the decree-holder vis-à-vis the judgment-debtor and does not in terms direct the judgment-debtor to do or refrain from doing any particular act or thing. Since in the present case decree does not direct reinstatement or payment of arrears of salary the executing court could not issue any process for the purpose as that would be going outside or beyond the decree. The respondent as a decree-holder was free to seek his remedy for arrears of salary in the suit for declaration. The executing court has no jurisdiction to direct payment of salary or grant any other consequential relief which does not flow directly and necessarily from the declaratory decree.”

    35. In Coal Linker v. Coal India Ltd. (2009) 9 SCC 491, where this Court was considering an award of an arbitrator whereby interest was awarded for certain period but not for other period, and executing court had awarded interest for such period also, this Court held as under :

    “16. Admittedly, in the instant case, interest has been granted by the arbitrator in the award for the first two periods. But interest has not been granted by the arbitrator in the award for the last period. As noted above, the appellant awardee herein, filed an application under Section 17 of the Act for pronouncing a judgment in terms of the award. So there is no scope for the executing court to go beyond the award and grant interest for the post-award period which was not granted in the award. Here the executing court has gone beyond the award and thus had gone beyond its jurisdiction and passed a decree which thus becomes a nullity.”

    36. While considering the power of the executing court for granting promotion which was not part of the decree, this Court in J&K Bank Ltd. v. Jagdish C. Gupta (2004) 10 SCC 568 held as under :

    “2. The short question involved in the case is whether the executing court could go beyond the decree by directing that the respondent be promoted to the post of Chief Manager. It is no more res integra that the executing court has no jurisdiction to go behind the decree. It is not disputed that the decree did not contain any direction to promote the respondent to the post of Chief Manager. Under such circumstances, we are of the view that the executing court as well as the High Court Civil Revision No. 92 of 1996 fell in error in issuing directions in execution case that the respondent be promoted to the post of Chief Manager. The order under challenge, therefore, deserves to be set aside. We order accordingly. The appeal is allowed. There shall be no order as to costs.”

    37. Similarly, in Gurdev Singh v. Narain Singh (2007) 14 SCC 173, where the question of execution of a decree prayed for was beyond what was decreed, this Court held as follows :

    “7. We agree with the said contention. A bare perusal of the decree in question would clearly demonstrate that the appellant herein was restrained by a permanent injunction from planting any tree on Khasra No. 17/2 on the one side and Khasra Nos. 218/1 and 17/1 on the other side. The decree did not speak of removal of any tree which had already been planted. The executing court, as noticed hereinbefore, while interpreting the said decree proceeded completely on a wrong premise to hold that there should not be any tree within two karams on either side of the common boundary of the parties. Such an interpretation evidently is not in consonance with the tenor of the decree. A jurisdictional error, thus, has been committed CR No. 4526 of 2004 by the High Court.
    8. It is well settled that executing court cannot go behind the decree. As the decree did not clothe the decree-holder to pray for execution of the decree by way of removal of the trees, the same could not have been directed by the learned executing court in the name of construing the spirit of the decree under execution.”

    It is thus clear that execution of an award can be only to the extent what has been awarded/decreed and not beyond the same. In the present case, the arbitrator in its award had only declared the price of land and nothing more. Thus, the question of execution of a sale deed of the land at the price so declared by the arbitrator in its award, could not be directed.

    38. Even otherwise, there cannot be any equity in favour of the respondent, as neither was any amount paid nor deposited by the respondent. No earnest money was also paid by the respondent. It was only the stamp paper worth Rs 1,21,870, which was deposited by the respondent along with a deposit of Rs 5500 in court at the time of filing of the application on 16-5-1994 for execution of the award.

    39. It is also noteworthy that neither the agreement dated 1-2-1980 nor the award dated 9-6-1985 had been registered under the Registration Act, 1908. This Court in Ramesh Kumar v. Furu Ram (2011) 8 SCC 613 had considered the effect of non-registration of an arbitration award relating to right, title and interest in an immovable property and held as under :

    “46. Thus, the awards are clearly documents which purport or operate to create and declare a right, title or interest in an immovable property of the value of more than Rs 100 which was not the subject of the dispute or reference to arbitration. Therefore, the awards were compulsorily registrable. If they were not registered, they could not be acted upon under Section 49 of the Registration Act, 1908 nor could a decree be passed in terms of such unregistered awards.”

    40. Although, in the present case, the award did not relate to right, title or interest in an immovable property and was only for determination of the price of land, yet if the executing court was to treat the same for execution of sale deed of land (immovable property), it ought to have considered the impact of non-registration of such award, which has not been done in the present case.

    41. In support of his contention that the powers of the executing court are wide enough, the learned Senior Counsel for the respondent has relied on the decision of this Court in Bhavan Vaja v. Solanki Hanuji Khodaji Mansang (1973) 2 SCC 40, wherein it has been held that :

    “20. … For construing a decree it can and in appropriate cases, it ought to take into consideration the pleadings as well as the proceedings leading up to the decree. In order to find out the meaning of the words employed in a decree the court, often has to ascertain the circumstances under which those words came to be used. That is the plain duty of the executing court and if that court fails to discharge that duty it has plainly failed to exercise the jurisdiction vested in it.”

    42. The question in the present case is different, which is as to whether the execution of an award could have been directed in the absence of there being any direction in the award for execution of the sale deed, which direction could have been given only in the case of execution of the agreement dated 1-2-1980. The question under consideration in the aforesaid case was that of a decree which was under execution, whereas there was no such decree passed by any court which was to be executed in the present case. The facts of the present case are thus distinguishable from those in the aforesaid case.

    43. The learned Senior Counsel for the respondent has also relied on the decisions of this Court rendered in Meenakshi Saxena v. ECGC Ltd. (2018) 7 SCC 479 as well as Topanmal Chhotamal v. Kundomal Gangaram AIR 1960 SC 388, which in our opinion are both distinguishable on facts. In Meenakshi Saxena (2018) 7 SCC 479, there was a clear verdict of the Consumer Court, which was to be executed by the Court. In para 17 of the said judgment, this Court held that : (Meenakshi Saxena case (2018) 7 SCC 479)

    “17. The whole purpose of the execution proceedings is to enforce the verdict of the court. Executing court while executing the decree is only concerned with the execution part of it but nothing else. The court has to take the judgment in its face value.”

    In Topanmal AIR 1960 SC 388, the decree under consideration was against the partnership firm and was to be executed against the personal assets of the partners. In para 4 of the said judgment, this Court held that : (AIR p. 390)

    “4. At the worst the decree can be said to be ambiguous. In such a case it is the duty of the executing court to construe the decree. For the purpose of interpreting a decree, when its terms are ambiguous, the Court would certainly be entitled to look into the pleadings and the judgment : see Manakchand v. Chaube Manoharlal 1943 SCC OnLine PC 53, (1943-44) 71 IA 65, AIR 1944 PC 46. In the plaint in the Agra suit, Suit No. 205 of 1949, not only relief was asked for against the firm, but also a personal decree was claimed against Defendants 2 to 6.”

    In the present case, the Court is concerned about execution of the award and not the agreement. In the award passed by the arbitrator, the price of land was fixed, which was to be executed in terms of the agreement dated 1-2-1980, and that too at the option of the respondent. Thus, there could be no direction to execute the sale deed at the price fixed in the award, that too in a petition for execution of the award, without there being any prayer for execution of the agreement dated 1-2-1980.

    44. Going behind the decree for doing complete justice would not mean that the entire nature of the case could be changed, and what was not awarded in favour of the respondent, could be granted by the executing court. It was only after the respondent had exercised its right to purchase the land at the price fixed by the arbitrator that a right to enforce the agreement could have arisen in favour of the respondent. The award of the arbitrator, in the present case, in itself was not a conclusive contract between the parties, which could be executed.

    45. For the reasons given hereinabove, we are of the definite opinion that the impugned judgment of the Rajasthan High Court dated 4-7-2016 passed in Rajasthan Udyog v. Hindustan Engg. & Industries Ltd. 2016 SCC OnLine Raj 6699, upholding the order of Additional District Judge dated 5-1-1995 is liable to be quashed, and is hereby quashed, and this appeal deserves to be allowed.

    46. Now what is to be next considered by this Court is as to whether any compensation is to be awarded in favour of the respondent, keeping in view the interim order passed by this Court on 2-9-2016 2016 SCC OnLine SC 1878, which is reproduced below : (Rajasthan Udyog case 2016 SCC OnLine SC 1878, SCC OnLine SC paras 1-2)

    “1. Issue notice returnable within eight weeks.
    2. There shall be stay of operation of the impugned judgment 2016 SCC OnLine Raj 6699 subject to the petitioner depositing a sum of Rs 50,00,000 (Rupees fifty lakh only) before the Registry of this Court within six weeks hence.”

    In terms of the said order, the petitioner has deposited Rs 50,00,000 with the Registry of this Court, which has been directed to be placed in a short-term fixed deposit account.

    47. Then on, 23-2-2017 2017 SCC OnLine SC 1962, this Court passed the following order : (Rajasthan Udyog case 2017 SCC OnLine SC 1962, SCC OnLine SC paras 1-2)

    “1. In the course of hearing, it was put to Mr Gopal Jain, learned Senior Counsel for the respondent, whether by virtue of the award passed by the learned arbitrator, could the respondent become the owner of the property, more so when the award has not been registered as per the Stamps Act. Additionally, it was also put to him whether when the suit for specific performance of the contract was withdrawn, could he get right, title and interest on the basis of the award passed by the arbitrator, who had entered into reference on the basis of intervention by an authority who wanted that the parties should negotiate and arrive at a settlement.
    2. Be it noted, prima facie, the award relates to quantification of the price and, therefore, the issue that would arise for consideration is whether determination of price creates any right, title and interest in the respondent. Apart from all these questions, a suggestion was given to the learned counsel for the respondent as to whether he would, apart from money he claims to have deposited before the District Court, be satisfied to take Rs 60,00,000 for the cost of litigation and other expenses made by him and put the controversy to an end.”
    (emphasis supplied)

    When the aforesaid facts were put to the learned counsel for the parties, Mr Sudhir Chandra Agarwala, learned Senior Counsel appearing for the petitioner, agreed to pay such amount towards costs of litigation and other expenses to the respondent, as may be fixed/determined by this Court.

    48. In our view, in the aforesaid facts and circumstances of this case, we are of the opinion that the amount so deposited by the appellant, in terms of the interim orders 2017 SCC OnLine SC 1962 2016 SCC OnLine SC 1878 2016 SCC OnLine SC 1879 passed by this Court, along with interest accrued thereon, shall be paid to the respondent, and besides this a further sum of Rs 10,00,000 shall also be paid by the appellant to the respondent within six weeks from today, which all would be towards the costs of litigation and other expenses incurred by the respondent. With this, a quietus would be put to the long-drawn litigation between the parties.

    49. Accordingly, this appeal stands allowed in terms of the directions given hereinabove.