1. The Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010 (herein after “2010 Sharing Regulations”) came in to effect from 1.7.2011.
2. National Load Dispatch Centre as the Implementing Agency has been entrusted with the responsibility for computation of transmission charges and losses for each financial year under the 2010 Sharing Regulations. Further, as per Regulation 17 of the 2010 Sharing Regulations, the Implementing Agency is required to submit the following information after the computation of transmission charges and losses:—
(a) Approved Basic Network Data and Assumptions, if any;
(b) Zonal and nodal transmission charges for the ensuing Application Period;
(c) Zonal and nodal transmission losses data for the ensuing Application Period;
(d) Schedule of charges payable by each constituent for the ensuing Application Period;
(e) YTC detail (information submitted by the transmission licensees covered under these Regulation and computation by Implementing Agency);
(f) Zone wise details of PoC Charges to enable each DIC to see details of transmission lines it is using and whose transmission charges it is sharing.
3. The Implementing Agency in its letter dated 29.12.2018 and 17.01.2019 has submitted following information in compliance with Regulation 17 of the 2010 Sharing Regulations:—
(a) Approved Basic Network Data and Assumptions;
(b) Zonal and nodal transmission charges for the ensuing Application Period;
(c) Zonal and nodal transmission losses data for the ensuing Application Period;
(d) Schedule of charges payable by each constituent for the ensuing Application Period;
(e) Yearly Transmission Charges(YTC) details of ISTS Licensees;
(f) PoC rates and loss percentage computation details;
(g) LTA/MTOA and their commencement schedule.
4. We have examined the basic network data and assumptions, the results of the Load Flow Studies, the Yearly Transmission Charges of the ISTS licensees and the calculation of PoC Charges for demand zone and injection zone (for LTA to target region) submitted by the Implementing Agency. We have also examined the calculation of losses on PoC based on average losses. Final % losses shall be applicable on demand zones and injection zones. We find that the calculations submitted by the Implementing Agency have been done as per 2010 Sharing Regulations and amendments thereof and accordingly, we approve the Basic Network, Load Flow and the Assumptions made for computation of the final PoC rates and final transmission losses, their fitment into slabs and schedule of charges payable by each DIC for the period from January to March, 2019, as submitted by Implementing Agency.
5. The Implementing Agency after computation of PoC rates and transmission losses for each injection zone and demand zone has assigned them to different slabs. We have gone through the details furnished by the Implementing Agency and find the same in order. We have also examined the details of PoC losses in percentage for each demand zone (for withdrawal DICs) and injection zone (for injecting DICs) and its applicable slab as per slabs approved by the Commission and have found them to be in order. The total Monthly Transmission Charge (MTC) considered in this quarter is Rs. 2966.60 Crores.
6. In the light of the above, we approve the following:—
(a) The applicable PoC slab rates for Long Term Access (LTA) and Medium Term Open Access (MTOA) in Rs./MW/month for each demand zone (for withdrawal DICs) and injection zone (for injection DICs having LTA to target region) as per details at Annexure-II. The slabs for POC rates for LTA/MTOA are as follows:—
PoC Slab
(Rs./MW/Month)
I
430668
II
384673
III
338677
IV
292682
V
246686
VI
200691
VII
154695
VIII
108700
IX
62704
(b) The Generation and Demand figures (MW) considered in base case of PoC Q4 2018-19 is given in Annexure-I.
(c) The Reliability Support Charges, HVDC Charges for all Regions and HVDC Charges for Mundra-Mohindergarh are given in Annexure-II.
(d) The applicable PoC slab rates for Short Term Open Access (STOA) in paise per unit for each demand zone (for withdrawal DICs) and injection zone (for injecting DICs) as per the details at Annexure-III to this order. The slabs for POC rates towards STOA are as follows:—
PoC Slab
(paisa/unit)
I
29.31
II
25.98
III
22.65
IV
19.31
V
15.98
VI
12.65
VII
9.31
VIII
5.98
IX
2.65
(e) Reliability Support Charge Rate in respect of STOA as per the details at Annexure-III to this order.
(f) Transmission losses as per the details at Annexure-IV. These slabs for each Region shall be applied based on last week's actual Regional Losses. The slabs of loss are as follows:—
PoC Losses Slab
% of Losses
I
V +1.00%
II
V +0.75%
III
V +0.50%
IV
V +0.25%
V
Average Loss
VI
V −0.25%
VII
V −0.50%
VIII
V −0.75%
IX
V −1.00%
7. We also direct the Implementing Agency to publish zonal PoC Rates and zonal transmission losses and associated details which will enable a clear understanding of the calculations used for arriving at these rates, along with underlying network information and base load flows used.
8. In order to ensure smooth changeover of short term transactions from the existing rates to the new rates of sharing of transmission charges, we direct that in respect of the applications made for scheduling of bilateral and collective transactions received on or before the date of issue of this order, short-term open access charges would be payable at the rates applicable for the application period from October-December, 2018 (Q3 of 2018-19) and for applications received after date of issue of this order, the short-term open access charges shall be payable as per the rates approved vide this order. Taking into consideration the application of weekly losses, we direct that the application of the new PoC loss slabs would be made applicable from the Monday immediately following the date of issue of the instant order. The rates/losses as approved vide this order shall remain applicable till notification of the next order.
9. The Implementing Agency is directed to endorse a copy of this order to all DICs and other concerned agencies. The Implementing Agency and the Central Transmission Utility shall also give wide publicity to this order through their websites.
ANNEXURE-I
Demand and Generation considered in Base case of POC Q4 2018-19
Zone Name
Generation (MW) Considered in base case of POC
Drawl (MW) Considered in base case of POC
ACBIL+Spectrum
601
0
AD Hydro
116
0
Adhunik Power
366
0
Andhra Pradesh
5681
8592
APL Mundra
2907
0
Arunachal Pradesh
97
121
Assam
593
1400
Balco
264
0
Bangladesh
0
800
Barh
1103
0
BBMB
1837
0
Bhutan Inj
253
0
Bihar
442
4334
Bongaigaon-NTPC
442
0
BRBCL Nabinagar
384
0
CGPL
2649
0
Chamera I
477
0
Chamera II
268
0
Chamera Pooling Point
204
0
Chandigarh
0
216
Chhattisgarh
2096
3286
Coastal Energy
514
0
D&D
0
307
Dadri
1721
0
DB Power
883
0
Delhi
683
3762
Dhariwal
238
0
Dikchu
53
0
DNH
0
723
Dulhasti
353
0
DVC
3608
2740
EMCO
498
0
Essar Mahan
486
0
Essar Steel
0
632
Farakka
1709
0
GMR Kamalanga
521
0
GMR Warora
442
0
Goa-SR
0
72
Goa-WR
0
470
Gujarat
6083
13547
Haryana
2661
6333
Himachal Pradesh (Ex-AD Hydro)
454
1422
IL&FS
512
0
Jammu & Kashmir
862
2077
Jhabua Power
441
0
Jharkhand
309
1084
JITPL
486
0
JP Nigrie
1059
0
JPL CPP
89
89
JPL Stg-1
494
0
JPL Stg-2
1006
0
Kahalgaon
1923
0
Kaiga
741
0
Karcham Wangtoo
883
0
Karnataka
7507
10838
Kerala
1442
3500
Koldam
699
0
Korba
2146
0
Koteswar
356
0
KSK Mahanadi
1059
0
Kudankulam
1394
0
Kudgi-NTPC
1356
0
Lanco
514
0
Madhya Pradesh
5562
10838
Maharashtra
13389
20321
Manipur
93
190
Mauda
1551
0
MB Power
794
0
Meghalaya
230
334
Mizoram
55
85
MPL
898
0
Nagaland
56
117
Naptha Jhakri
1210
0
NCC
1124
0
NLC
1724
0
NSPCL
433
0
NTPC Gadarwara
636
0
NTPC Jajjar
1225
0
NTPL
820
0
Odisha
2743
3715
Palatana
601
0
Parbati-3
229
0
Puducherry
0
334
Punjab
3867
6056
Rajasthan
7969
10468
Ramagundam
391
0
Rampur HEP
354
0
RAPS-C
353
0
RGM-TPS
2146
0
RGPPL
522
0
RIHAND
1875
0
Rihand-WR
604
0
RKM
794
0
Rosa Power
794
0
Sainj HEP
61
0
SASAN
3352
0
Sholapur-NTPC
486
0
Shree Cement
234
0
Sikkim
242
73
Simhadri 1
836
0
Simhadri 2
836
0
Singrauli
1653
0
Sipat
2479
0
SKS Power
175
0
SSP
79
0
Talcher
832
0
Talcher-2
1718
0
Tamilnadu
7087
13188
TARAPUR
1020
0
Teesta
451
0
Teesta III
690
0
Tehri
793
0
Telangana
5150
9574
TPCIL
1129
0
Tripura
235
295
TRN Energy
477
0
Unchahar NTPC
1136
0
URI-1
358
0
URI-2
179
0
Uttar Pradesh
8343
15504
Uttarakhand
1009
1897
Vallur
1102
0
Vindhyachal
3920
0
West Bengal
4969
6538
Annexure-II
PoC Rates for LTA/MTOA billing
Slabs for PoC Rates-Northern Region (January 2019-March 2019)
Srl. No
Name of Entity
PoC Slab Rate (Rs./MW/Month)
Reliability Support Charges Rate (Rs./MW/Month)
HVDC Charges Rate for NR (Rs./MW/Month)
1
Rajasthan
430668
30576
21857
2
Uttarakhand
384673
30576
21857
3
Haryana
292682
30576
21857
4
Uttar Pradesh
246686
30576
21857
5
Delhi
154695
30576
21857
6
Punjab
154695
30576
21857
7
Jammu & Kashmir
108700
30576
21857
8
AD Hydro
62704
30576
21857
9
Chandigarh
62704
30576
21857
10
Himachal Pradesh
62704
30576
21857
Slabs for PoC Rates-Southern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (Rs./MW/Month)
Reliability Support Charges Rate (Rs./MW/Month)
HVDC Charges Rate for SR (Rs./MW/Month)
1
Andhra Pradesh
430668
30576
17965
2
Karnataka
384673
30576
17965
3
Telangana
292682
30576
17965
4
Kerala
154695
30576
17965
5
Sembcorp Energy India Limited
154695
30576
17965
6
Sembcorp Gayatri Power Ltd.
154695
30576
17965
7
Tamil Nadu
154695
30576
17965
8
Goa-SR
62704
30576
17965
9
Pondicherry
62704
30576
17965
Slabs for PoC Rates-North Eastern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (Rs./MW/Month)
Reliability Support Charges Rate (Rs./MW/Month)
HVDC Charges Rate for NER (Rs./MW/Month)
1
Assam
246686
30576
11438
2
Nagaland
200691
30576
11438
3
Manipur
154695
30576
11438
4
Mizoram
154695
30576
11438
5
Meghalaya
108700
30576
11438
6
Arunachal Pradesh
62704
30576
11438
7
Tripura
62704
30576
11438
Slabs for PoC Rates - Western Region (January 2019-March 2019)
Sl. No.
Name of Entity
Slab Rate (Rs./MW/Month)
Reliability Support Charges Rate (Rs./MW/Month)
HVDC Charges Rate for WR (Rs./MW/Month)
HVDC Charges for Mundra - Mohindergarh (amount payable by M/s Adani for 1495 MW LTA to Haryana) (Rs/Month)
HVDC Charges for Champa-Kurukshetra Pole-2 (Rs/Month)
HVDC Charges for Champa-Kurukshetr a Pole - 1 (Rs/Month)
1
DB Power
430668
30576
11438
2
Jindal Power Limited
430668
30576
11438
3
J PL Stage-II
430668
30576
11438
28591500
4
Maharashtra
430668
30576
11438
5
Spectrum Coal & Power
430668
30576
11438
6
TRN Energy Pvt. Ltd.
430668
30576
11438
7
ACB Ltd.
384673
30576
11438
8
DNH
338677
30576
11438
9
MB Power
338677
30576
11438
2411800
69037932
10
Gujarat
292682
30576
11438
11
D&D
246686
30576
11438
12
Madhya Pradesh
246686
30576
11438
13
Goa-WR
200691
30576
11438
14
Chhattisgarh
108700
30576
11438
15
Chhattisgarh Inj
108700
30576
11438
16
SUGEN
62704
30576
11438
17
Adani Power
346785981
18
Dhariwal Infrastructure Ltd.
55557153
19
KSK Mahanadi Power Co. Ltd.
408508475
20
TRN Energy Ltd.
98042034
21
DB Power Chhattisgarh Ltd.
30638136
22
Maruti Clean Coal & Power Ltd.
61276271
Slabs for PoC Rates - Eastern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (Rs./MW/Month)
Reliability Support Charges Rate (Rs./MW/Month))
HVDC Charges Rate for ER (Rs./MW/Month)
1
Odisha
338677
30576
11438
2
Bihar
292682
30576
11438
3
GMR Kamalanga
292682
30576
11438
4
West Bengal
246686
30576
11438
5
DVC
200691
30576
11438
6
Jharkhand
154695
30576
11438
7
Bangladesh
62704
30576
11438
8
Sikkim
62704
30576
11438
9
West Bengal inj
62704
30576
11438
Annexure-III
PoC Rates for STOA purpose
Slabs for PoC Rates-Northern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (paise/kWh)
Reliability Support Charges Rate (paise/kWh)
1
Haryana Inj
29.31
4.25
2
Rajasthan Inj
29.31
4.25
3
Rajasthan W
29.31
4.25
4
Uttar Pradesh Inj
29.31
4.25
5
Dulhasti
25.98
4.25
6
Uttarakhand W
25.98
4.25
7
Haryana W
22.65
4.25
8
Rihand
22.65
4.25
9
Chamera II
19.31
4.25
10
Karcnam Wangtoo
19.31
4.25
11
Sainj HEP
19.31
4.25
12
Uttar Pradesh W
19.31
4.25
13
Chamera I
15.98
4.25
14
Chamera Pooling Point
15.98
4.25
15
RAAP C
12.65
4.25
16
Rampur HEP
12.65
4.25
17
Rosa Power
12.65
4.25
18
Singrauli
12.65
4.25
19
Delhi W
9.31
4.25
20
Jammu & Kashmir W
9.31
4.25
21
Koldam
9.31
4.25
22
Koteshwar
9.31
4.25
23
Nathpa Jhakri
9.31
4.25
24
Punjab W
9.31
4.25
25
Tehri
9.31
4.25
26
Uttarakhand Inj
9.31
4.25
27
Delhi Inj
5.98
4.25
28
Himachal Pradesh Inj
5.98
4.25
29
Himachal Pradesh W
5.98
4.25
30
Parbati-3
5.98
4.25
31
Unchahar NTPC
5.98
4.25
32
Uri I
5.98
4.25
33
Uri II
5.98
4.25
34
BBMB
2.65
4.25
35
Chandigarh Inj
2.65
4.25
36
Chandigarh W
2.65
4.25
37
Dadri
2.65
4.25
38
Jammu & Kashmir Inj
2.65
4.25
39
Jhajjar
2.65
4.25
40
Punjab Inj
2.65
4.25
41
Sree Cement
2.65
4.25
Slabs for PoC Rates-Western Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (paise/kWh)
Reliability Support Charges Rate (paise/kWh)
1
DB Power
29.31
4.25
2
GMR Chattisgarh
29.31
4.25
3
JPL Stg-1
29.31
4.25
4
JPL Stg-2
29.31
4.25
5
Maharashtra W
29.31
4.25
6
RKM |
29.31
4.25
7
SKS Power
29.31
4.25
8
TRN Energy
29.31
4.25
9
ACBIL+Spectrum
25.98
4.25
10
Balco
25.98
4.25
11
DNH W
25.98
4.25
12
Gadarwada NTPC
25.98
4.25
13
MB Power
25.98
4.25
14
SASAN
25.98
4.25
15
Essar Mahan
22.65
4.25
16
Gujarat W
22.65
4.25
17
Jhabua Power
22.65
4.25
18
KSK Mahanadi
22.65
4.25
19
Lanco
22.65
4.25
20
Sipat
22.65
4.25
21
D&D W
19.31
4.25
22
Essar Steel W
19.31
4.25
23
Madhya Pradesh W
19.31
4.25
24
Rihand-WR
19.31
4.25
25
Vindhyachal
19.31
4.25
26
Dhariwal
15.98
4.25
27
GMR WARORA
15.98
4.25
28
Goa-WR W
15.98
4.25
29
Korba
15.98
4.25
30
APL Mundra
12.65
4.25
31
JP Nigrie
12.65
4.25
32
Mauda
12.65
4.25
33
Chhattisgarh W
9.31
4.25
34
NSPCL
9.31
4.25
35
Chhattisgarh Inj
5.98
4.25
36
Madhya Pradesh Inj
5.98
4.25
37
Maharashtra Inj
5.98
4.25
38
Sholapur-NTPC
5.98
4.25
39
SSP
5.98
4.25
40
CGPL
2.65
4.25
41
D&Dlnj
2.65
4.25
42
DNH Inj
2.65
4.25
43
Essar Steel Inj
2.65
4.25
44
Goa-WR Inj
2.65
4.25
45
Gujarat Inj
2.65
4.25
46
RGPPL
2.65
4.25
47
Sugen
2.65
4.25
48
TAPS 3&4
2.65
4.25
Slabs for PoC Rates-Eastern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (paise/kWh)
Reliability Support Charges Rate (paise/kWh)
1
Odisha Inj
29.31
4.25
2
Sikkim Inj
29.31
4.25
3
Talcher-2
29.31
4.25
4
Teesta III
29.31
4.25
5
Odisha W
25.98
4.25
6
Barh
22.65
4.25
7
GMR Kamalanga
22.65
4.25
8
JITPL
22.65
4.25
9
Bihar W
19.31
4.25
10
Talcher
19.31
4.25
11
West Bengal W
19.31
4.25
12
BRBCL Nabinagar
15.98
4.25
13
Dikchu
15.98
4.25
14
DVC W
15.98
4.25
15
Kahalgaon
15.98
4.25
16
Teesta
15.98
4.25
17
West Bengal Inj
15.98
4.25
18
DVC Inj
12.65
4.25
19
Jharkhand W
12.65
4.25
20
MPL
9.31
4.25
21
Adhunik Power
5.98
4.25
22
Bangladesh W
5.98
4.25
23
Bhutan Inj
5.98
4.25
24
Bihar Inj
5.98
4.25
25
Farakka
5.98
4.25
26
Bangladesh Inj
2.65
4.25
27
Jharkhand Inj
2.65
4.25
28
Sikkim W
2.65
4.25
Slabs for PoC Rates-Southern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (paise/kWh)
Reliability Support Charges Rate (paise/kWh)
1
Andhra Pradesh W
29.31
4.25
2
Karnataka Inj
29.31
4.25
3
Karnataka W
29.31
4.25
4
Tamilnadu Inj
29.31
4.25
5
Telangana W
19.31
4.25
6
Sembcorp Gayatri Power Ltd.
15.98
4.25
7
Simhadri 1
15.98
4.25
8
IL&FS
12.65
4.25
9
Kerala W
12.65
4.25
10
NTPL
12.65
4.25
11
Sembcorp Energy India Ltd.
12.65
4.25
12
Coastal Energy
9.31
4.25
13
Kudankulam
9.31
4.25
14
Simhadri 2
9.31
4.25
15
Tamilnadu W
9.31
4.25
16
Andhra Pradesh Inj
5.98
4.25
17
Goa-SR W
5.98
4.25
18
Kaiga
5.98
4.25
19
Kudgi-NTPC
5.98
4.25
20
NLC
5.98
4.25
21
Puducherry W
5.98
4.25
22
Ramagundam
5.98
4.25
23
Goa-SR Inj
2.65
4.25
24
Kerala Inj
2.65
4.25
25
Puducherry Inj
2.65
4.25
26
Telangana Inj
2.65
4.25
27
Vallur
2.65
4.25
Slabs for PoC Rates-North Eastern Region (January 2019-March 2019)
Srl. No.
Name of Entity
PoC Slab Rate (paise/kWh)
Reliability Support Charges Rate (paise/kWh)
1
Bongaigaon-NTPC
29.31
4.25
2
Ranganadi
29.31
4.25
3
Arunachal Pradesh Inj
25.98
4.25
4
Palatana
19.31
4.25
5
Assam W
15.98
4.25
6
Mizoramlnj
15.98
4.25
7
Nagaland W
15.98
4.25
8
Manipur W
12.65
4.25
9
Mizoram W
12.65
4.25
10
Assam Inj
9.31
4.25
11
Meghalaya W
9.31
4.25
12
Arunachal Pradesh W
5.98
4.25
13
Nagaland Inj
5.98
4.25
14
Tripura Inj
5.98
4.25
15
Manipurlnj
2.65
4.25
16
Meghalaya Inj
2.65
4.25
17
Tripura W
2.65
4.25
Annexure-IV
Slabs for PoC Losses-Northern region (January 2019-March 2019)
Srl. No.
Zone
Slab w.r.t Weighted Average
1
RAPP C
I
2
Rajasthan W
I
3
Rihand
I
4
Rajasthan Inj
I
5
Singrauli
I
6
Uttarakhand W
I
7
Himachal Pradesh W
I
8
Uttar Pradesh W
III
9
Shree Cement
III
10
Chandigarh W
IV
11
Uttar Pradesh Inj
V
12
Tehri
V
13
Koteshwar
V
14
Karcham Wangtoo
V
15
Uttarakhand Inj
VI
16
Himachal Pradesh Inj
VI
17
Jammu & Kashmir W
VI
18
Uri I
VI
19
Haryana W
VII
20
Rampur HEP
VII
21
Nathpa Jhakri
VII
22
BBMB
VII
23
Unchahar
VII
24
Parbati III
VIII
25
Jammu & Kashmir Inj
VIII
26
Chamera II
VIII
27
Uri II
VIII
28
Rosa Power
VIII
29
Sainj HEP
VIII
30
Delhi W
IX
31
Dulhasti
IX
32
Punjab W
IX
33
Chamera Pooling Point
IX
34
Chamera I
IX
35
Punjab Inj
IX
36
Haryana Inj
IX
37
Dadri
IX
38
Jhajjar
IX
39
Delhi Inj
IX
40
Chandigarh Inj
IX
41
Koldam
IX
Slabs for PoC Losses-Western Region (January 2019-March 2019)
Srl. No.
Zone
Slab w.r.t Weighted Average
1
Essar Mhan
II
2
ACB+Spectrum Coal and Power Limited
III
3
Vindhyachal
III
4
DNH W
III
5
JPL Stg-2
III
6
MB Power
III
7
GMR Chhattisgarh
III
8
Dhariwal
III
9
TRN Energy
III
10
Gadarwada
III
11
GMR Warora
IV
12
DB Power
IV
13
Korba
IV
14
Chhattisgarh W
IV
15
Lanco
IV
16
Sipat
IV
17
Maharashtra W
IV
18
JP Nigrie
IV
19
Madhya Pradesh W
IV
20
JPL Stg-1
IV
21
RKM
IV
22
Jhabua Power
IV
23
Rihand-WR
IV
24
SKS Power
IV
25
Goa-WR W
V
26
Mauda
V
27
Chhattisgarh Inj
V
28
Sasan UMPP
V
29
Essar Steel W
V
30
Balco
V
31
Coastal Gujarat Power Limited
V
32
Gujarat W
V
33
APL Mundra
V
34
KSK Mahanadi
VI
35
Maharashtra Inj
VI
36
D&D W
VI
37
Sholapur NTPC
VI
38
NSPCL, Bhilai
VII
39
SSP
VII
40
Madhya Pradesh Inj
VII
41
Gujarat Inj
VIII
42
Tarapur Atomic Power Station 3&4
VIII
43
RGPPL
VIII
44
Goa-WR Inj
IX
45
D&D Inj
IX
46
DNH Inj
IX
47
Essar Steel Inj
IX
48
Sugen
IX
Slabs for PoC Losses-Eastern Region (January 2019-March 2019)
Srl. No.
Zone
Slab w.r.t Weighted Average
1
Teesta
I
2
Talcher Stg-2
I
3
Teesta III
I
4
Dikchu
I
5
Bihar W
III
6
Sikkim Inj
III
7
Talcher
IV
8
Odisha W
IV
9
Orissa Inj
IV
10
Injection from Bhutan
IV
11
JITPL
V
12
GMR Kamalanga
V
13
Kahalgaon
V
14
Jharkhand W
V
15
BRBCL
V
16
West Bengal W
VI
17
Barn
VI
18
Maithon Power Limited
VI
19
Farakka
VI
20
DVC Inj
VI
21
Aadhunik Power
VI
22
DVC W
VI
23
Bihar Inj
VII
24
West Bengal Inj
VII
25
Jharkhand Inj
VII
26
Bangladesh W
VIII
27
Sikkim W
VIII
28
Bangladesh Inj
IX
Slabs for PoC Losses-Southern Region (January 2019-March 2019)
Srl. No.
Zone
Slab using Weighted Average
1
Kerala W
I
2
Karnataka W
III
3
Coastal Energy
III
4
NTPL
III
5
Kaiga
IV
6
Kudankulam
IV
7
Kerala Inj
V
8
Thermal Powertech
V
9
Tamilnadu W
V
10
Ramagundam
V
11
Karnataka Inj
V
12
Telangana W
V
13
IL&FS
V
14
Sembcorp Gayatri Power Ltd.
V
15
Kudgi NTPC
V
16
Andhra Pradesh W
VI
17
NLC
VI
18
Simhadri 2
VII
19
Pondicherry W
VII
20
Andhra Pradesh Inj
VII
21
Tamilnadu Inj
VII
22
Telangana Inj
VII
23
Simhadri 1
VII
24
Vallur
VIII
25
Goa-SR W
VIII
26
Pondicherrylnj
IX
27
Goa-SR Inj
IX
Slabs for PoC Losses-North Eastern Region (January 2019-March 2019)
Srl. No.
Zone
Slab w.r.t Weighted Average
1
Arunachal Pradesh W
I
2
Mizoram W
II
3
Mizoram Inj
II
4
Ranganadi
II
5
Meghalaya W
III
6
Bongaigaon
III
7
Palatana
IV
8
Assam W
V
9
Manipur W
VI
10
Arunachal Pradesh Inj
VI
11
Nagaland W
VII
12
Assam Inj
VII
13
Manipurlnj
VII
14
Tripura Inj
VIII
15
Tripura W
IX
16
Meghalaya Inj
IX
17
Nagaland Inj
IX