Sri Zafir Hussain, Sri R.S Hegde,
Sri H.B Narayan for Petitioner,
Sri H.K Shetty, Sri H.B Datar & R.S Hegde, Advocate for Respondent; Sri N.K Patil Advocates for Respondent
Sri Ashok N. Nayak, HCGP for R-1
Vishwanatha Shetty, J.:—
Since the contentions raised in all these petitions are identical, all these petitions were taken up for final hearing together and disposed of by this common order.
2. The petitioner, in these petitions, were applicants for allotment of sites by the first respondent-Bangalore Development authority (hereinafter referred to as “the BDA”) either pursuant to notification dated 10th of March 1988 in No. BDA/ADM/OA/Allotment/PR 31/87-88, a copy of which has been produced as Annexure-A, or notification dated 15th of October 1988 in No. BDA/ADM/OA/Allotment/PR 47/88-89, a copy of which has been produced as Annexure-B, issued by the BDA inviting applications from the members of the public for allotment of sites in the lay-out notified in the said notifications.
3. For the sake of convenience and since petitions have been argued with reference to the averments made in Writ Petition Nos. 12356 to 12379/1998, the facts, in the course of this order, are referred to generally with reference to the averments made in the said petitions.
4. According to the petitioners, in notification Annexure-A dated 10th of March 1988 and notification Annexure-B dated 15th of October 1988, referred to above, the sital value of the sites of various dimensions, which were notified for allotment, had also been notified; and pursuant to the said notifications, the petitioners had registered their names as prescribed in the said notifications by depositing 12 1/2% of the sital value notified by way of initial deposit; and without any justification, totally on account of negligence and callous attitude on the part of the BDA; and since some of the officials of the BDA were indulging in clandestine dealings, there was a delay of more than nine years in allotting sites to the petitioners. It is the further case of the petitioners that the BDA in total disregard of the commitment made by it in notifications Annexures-A and B assuring to allot sites to the successful allottees at the rate of sital value notified in the said notifications, has enhanced the sital value for nearly more than five times the rates notified in Annexures-A and B. It is also the case of the petitioners that since the BDA is required to notify to the members of the public inviting applications for allotment of sites only after formation of layout under the Bangalore Development Authority Act (hereinafter referred to as “the Act”) and Rule-3 of the Rules framed thereunder, it is not permissible for the BDA to enhance the sital value from the sital value originally fixed and notified in notifications Annexures-A and B. It is also further alleged that 12 1/2% of the sital value deposited by the petitioners towards initial deposit was retained by the BDA without any justification and without awarding any interest to the petitioners for an unreasonable length of time; and on account of higher fixation of the sital value and non-payment of interest on the initial deposit made by the petitioners, the petitioners, who all belong to either middle class or lower middle class sections of the society, are put to irreparable injury and hardship; and since the demand for enhanced sital value is not authorised by law, a direction is required to be given to the BDA not to collect the sital value in respect of the sites allotted to the petitioners in excess of the rates notified in notifications Annexures-A and B; and in cases where the payment has already been made, a direction is required to be given to the BDA to refund the payments since the said payments have been made under protest. The petitioners have also asserted relying upon the estimate given by an Architect and Land Developer, a copy of which has been produced as Annexure-AO, that the cost of forming a site measuring 40′ × 60′ is around Rs. 15,384-60. Further, in the course of hearing of the petitions, the petitioners have also placed materials to show that a site measuring 40′ × 60′ was allotted at Rs. 76,590/- by Jagajyothi House Building Co-operative Society Ltd., Vijayanagar, Bangalore.
5. However, the BDA resisted the claim made by the petitioners, inter alia, contending that the sites notified for allotment in notification Annexure-A came to be allotted to various other persons on the basis of their claim for allotment in preference to the claim of the petitioners; and the formation of layout in three areas notified in notification Annexure-B i.e, Hennur-Bellary Road III Stage, Banashankari IV Stage and Shinivagalu Tank Bed Area, could not be completed and sites could not be formed, as the acquisition of the lands in respect of the said three areas came to be challenged before the Courts and the Court proceedings could not be completed; and though the layouts in the areas notified in notification Annexure-B could not be formed, the BDA taking a compassionate view of the claim of the petitioners and others, in terms of Clause-16 of notification Annexure-B, decided to allot sites to the applicants who had submitted their applications pursuant to the notifications, referred to above, in other layouts, such as, Hosur-Sarjapur, BTM IV Stage and JP Nagar and since the cost of acquisition and formation of the layout had gone up considerably, the BDA was compelled to fix higher sital value and demand the same from the allottees as notified in the communication issued to each of the allottees. It is the case of the BDA that the price fixed to the sites allotted to the petitioners and others, is highly reasonable and has the direct nexus with the cost incurred by the BDA for formation of layouts where the sites have been allotted to the petitioners. It is further asserted that the market value of similar sites on the date of allotment of sites to the petitioners, is much more than the rates at which sites have been allotted to the petitioners. In this connection, the BDA has stated that the auction rate of a corner site for the years 1995-1996, 1996-1997 and 1997-1998 for the layouts mentioned below, is as set out hereunder:
Layout
1995-1996
1996-1997
1997-1998
Rate per Sq. Mtr.
Nagarbhavi
3561
5652
4600
H.S.R
6292
5835
5172
B.T.M
6585
11600
7371
O.M.B.R
3275
-
-
H.B.R
4905
4426
3830
The BDA has also set out in detail the nature of the expenditure incurred by it for development of the layout and other expenditure it was required to meet. It may be useful to extract the statements made in paragraphs 8, 9 and 12 of the Statement of Objections, which read as hereunder:
“8. With regard to the first point, delay in allotment of sites, it is submitted that a notification calling for applications for allotment of 3,200 sites of various dimensions in the following layouts was issued on 15.10.1988:
(a) Hennur-Bellary Road 3rd Stage
1700 sites
(b) Banashankari 4th stage
1150 sites
(c) Shinivagilu Tank Bed area
350 sites
Total No. of sites notified of all dimensions.
3200 sites
9. In this notification, it was mentioned that the persons who had already applied against the March 1988 notification in the prescribed application forms, the initial deposit already paid by them was considered as initial deposit for this notification provided the application was for the same dimension. If the application was for a higher dimension, the difference in the amount of initial deposit was to be paid by the applicant after allotment. It was also clarified that those who had applied against the March 1988 notification but did not intend to apply against this notification may take refund of their initial deposits paid by them earlier, by making an application to the Authority. In all 81,843 applications were received.
12. It is submitted that continuous effort is being made to form more sites and identify sites free from litigation for allotment to the eligible applicants. The Allotment Committee in its meeting held on 14.11.96 decided to allot sites to the petitioners including other eligible applicants as and when sites became available. It was recommended by the Allotment Committee to apply the revised rates as approved by the Authority in its meeting dated 25.9.95 vide subject No. 137/95 to the eligible allottees including the petitioners. Copy of the Resolution No. 137/95 is produced at Annexure-R1. The proceedings of the Allotment Committee was approved by the Authority in toto vide Resolution No. 284/96 dated 11/13.12.96 vide Annexure-R2. Consequently, allotment intimations were issued in respect of 1006 sites during June-July 1997, 120 sites in January 1998 and 455 sites in March 1998. All these allottees were allotted sites at the rates as fixed by the Authority in Sept. 1995.”
6. Sir N.D Ramachandra Rao and other learned Counsel appearing for the petitioners, in support of the contention of the petitioners that the BDA is not entitled to claim the sital value in excess of what is notified in notifications Annexures-A and B, while reiterating the statements made in the petitions, contended that since the sital value has been fixed in notifications Annexures-A and B after taking into account the cost the BDA was required to incur for the purpose of formation of the layout in question it is not permissible to enhance the sital value originally fixed. They pointed out that Chapter-III of the Act provides for formation of a developmental scheme and if Chapter-III of the Act is read along with Rule 3 of the Rules, it makes it clear that the BDA can notify inviting applications for allotment of sites only after the formation of the layout and not before that. In this connection, Sri Rao drew my attention to the provisions in Chapter-III of the Act and more particularly, Section 16 of the Act, which provides as to what are the matters a developmental scheme under Section 15 of the Act is required to provide for, and submitted that the question of the BDA incurring any expenditure subsequent to the issue of the notification calling for applications for allotment of sites by the members of the public does not arise for consideration as all the expenditure was required to be incurred by the BDA before inviting applications. He further pointed out that the delay in implementation of the scheme and non-availability of the sites in the layout notified calling for applications, cannot be a defence for claiming higher sital value from the petitioners. Elaborating this submission, Sri Rao pointed out that when various allottees, who had registered themselves for allotment of sites pursuant to notifications Annexures-A and B along with the petitions are allotted sties at the rates notified in the said notifications, the petitioners cannot be picked up for hostile discrimination and compelled to pay higher sital value for the default of the BDA. Sri Rao further submitted that once the rate is notified in the notification, it is not permissible for the BDA to alter the rates; and Rule-12 of the Rules must be understood as empowering the BDA to alter the sital value only in cases where the dimension of the sites varies at the time of allotment and not under any other circumstances. According to him, the contention raised by the petitioners in these petitions, is fully covered in their favour by the decision of this Court in the case of E.R Manjaiah & Ors. v. Bangalore Development Authority & Ors.* . ILR 1997 KAR 1025. Relying upon Paragraphs 13, 14, 17, 18 and 19 of the said decision, Sri Rao submitted that the action of the respondent in demanding higher sital value from the petitioners is highly unreasonable, arbitrary and discriminatory in nature and violative of the right guaranteed to the petitioners under Article 14 of the Constitution of India. Further, Sri Rao relying upon the observation made by the Supreme Court in the case of S.P Gupta v. President of India . AIR 1982 SC 149. submitted that it is the constitutional obligation of this Court to uphold the Rule of Law and, therefore, this Court should grant the relief sought for by the petitioners.
7. However, strongly countering the arguments of Sri Rao, Sri H.B Datar, learned Senior Counsel appearing along with Sri R.S Hegde, for the Bangalore Development Authority, submitted that there is absolutely no merit in the claim made by the petitioners. He pointed out that the principle laid down by this Court in the case of Manjaiah (supra) has absolutely no bearing to the facts of the present case. It is his further submission that keeping in mind the cost of the formation of the layout in question, the sital value was fixed by the BDA and the sital value fixed is highly reasonable, fair and just and the petitioners cannot have any grievance on that account. It is his further submission that the fixation of the sital value is in the nature of policy decision taken by the BDA keeping in mind the cost of formation of the layout and the obligation of the BDA to allot sites comparatively at a lower cost to the weaker sections of the society and the other expenditure the BDA is required to incur. He also pointed out that in notifications Annexures-A and B, it was made clear that the sital value notified in the said notifications was purely provisional and allotments will be made as per the terms and conditions of the Bangalore Development Authority (Allotment of Sites) Rules, 1984; (hereinafter referred to as “the Rules”) and Rule-12 of the Rules authorises the BDA to alter the sital value notified; and if the altered value is not acceptable to the applicant, it is open to him to decline to accept the allotment made in his/her favour. Sri Datar, in support of his submission that it is not permissible for this Court while exercising the writ jurisdiction under Article 226 of the Constitution of India, to evaluate the sital value fixed by the BDA, relied upon the decision of the Supreme Court in the case of Bareilly Development Authority v. Ajay Pal Singh . AIR 1989 SC 1076. Premji Bai v. Delhi Development Authority . AIR 1980 SC 738. and Awasan Mandal Parijat Uch Ayawarg Sangharsh Samiti Through President v. Rajasthan Housing Board . AIR 1988 SC 2933.. Sri Datar also submitted that out of 1521 allottees, only 167 allottees have approached this Court and out of them, 38 petitioners have already accepted the allotment and made either part payment or full payment of the sital value. It is his submission that the allottees, who have accepted the allotment and made payments, should not be permitted invoking the extraordinary jurisdiction of this Court under Articles 226 and 227 of the Constitution of India; and they are estopped from doing so. He pointed out that the BDA could not complete the formation of layout in the areas notified in notification Annexure-B as the acquisition of the lands came to be challenged before the Court, and therefore there was no laches or negligence on the part of the BDA.
8. In the light of the rival contentions advanced by the learned Counsel appearing for the parties, the two substantial questions that would arise for consideration are-
(1) Whether the BDA is not entitled to claim the sital value in excess of the sital value notified in notifications Annexures-A and B?
(2) In the event of holding that the BDA is not entitled to claim sital value in excess of the sital value notified in notifications Annexures-A and B, whether such of those, who have already made the payment in excess of the sital value notified, are entitled to seek refund of the payment already made?
(3) Whether the petitioners are entitled for award of interest on 12 1/2% of the sital value deposited by them along with their applications?
9. It may be useful to briefly refer to the provisions of the Act and the Rules and the conditions notified in notifications Annexures-A and B, which will have bearing for the disposal of these petitions, before considering the questions that would fall for my consideration.
(a) Before coming into force of the Act, the formation of layout and allotment of sites in the City of Bangalore was governed by the provisions of the Bangalore Improvement Act, 1945 (hereinafter referred to as “the Improvement Act”) and on coming into force of the Act, the Improvement Act came to be repealed. The Act provides for constitution of the BDA for the purpose of development of the city of Bangalore and areas adjacent thereto. Section 14 of the Act provides that the object of the BDA shall be to promote and secure development of the Bangalore Metropolitan Area and for the said purpose, the BDA shall have the power to acquire, hold, manage and dispose of movable and immovable property, whether within or outside the area of its jurisdiction, to carry out building, engineering and other operations and generally to do all things necessary or expedient for the purpose of such development and for purposes incidental thereto. Section 15 of the Act confers power on the BDA to draw up detailed schemes for the development of Bangalore Metropolitan Area and with the previous approval of the Government, undertake from time to time any work for the development of the Bangalore Metropolitan Area and incur, expenditure thereof and also for the framing and execution of development schemes. Section 16 of the Act provides for the matters that are required to be set out in the scheme formulated by the BDA under Section 15 of the Act. The said Section, on which strong reliance is placed by Sri Rao, reads as follows:
“16. Particulars to be provided for in a development scheme.-
Every development scheme under Section 15 -
(1) shall, within the limits of the area comprised in the scheme, provide for-
(a) the acquisition of any land which, in the opinion of the Authority, will be necessary for or affected by the execution of the scheme;
(b) laying and laying out all or any land including the construction and reconstruction of buildings and formation and alteration of streets;
(c) drainage, water supply and electricity;
(d) the reservation of not less that fifteen per cent of the total area of the layout for public parks and play-grounds and an additional area of not less than ten per cent of the total area of the layout for civic amenities.
(2) may, within the limits aforesaid provide for—
(a) raising any land which the Authority may consider expedient to raise to facilitate better drainage;
(b) forming open spaces for the better ventilation of the area comprised in the scheme of any adjoining area;
(c) the sanitary arrangement required;
(3) may, within and without the limits aforesaid provide for construction of houses”.
Section 17 of the Act provides for the procedure on completion of scheme. Section 18 provides for submission of the Scheme to the Government after consideration of the representation by the BDA. Section 19 of the Act provides for sanctioning of the scheme and publication of the declaration of the sanctioning of the scheme etc.
(b) Rule 3 of the Rules provides that whenever the BDA forms an extension or layout in pursuance of any scheme, the BDA may, subject to the general or specified orders of the Government, offer any or all the sites in such extension or layout for allotment to persons eligible for allotment of sites under the Rules. Rule 3 of the Rules reads as follows:
“3. Offer of sites for allotment
(1) Whenever the Authority forums an extension or layout in pursuance of any scheme, the Authority may, subject to the general or special orders of the Government, offer any or all the sites in such extension or layout for allotment to persons eligible for allotment of sites under these rules.
(2) Due publicity shall be given in respect of the sites for allotment specifying their location, number, the last date for submission of applications and such other particulars, as the Commissioner may consider necessary, by fixing a notice to the Notice Board and the Office of the Authority and any other office as the Commissioner may decide from time to time and by publication in not less than three daily newspapers published in the City of Bangalore in English and in Kannada, having a wide circulation in the city.”
Rule 8 of the Rules provides that every applicant for a site shall register his name on payment of Registration Fee as specified in the table given to the said Rule. Rule 9 of the rules provides that a person, who is registered under Rule 8 of the Rules, has to apply in the prescribed Form No. 2 for allotment of site along with initial deposit of 12 1/2% of the notified cost of the site. Sub-rule (3) of Rule 9 of the Rules further provides that if an application has already been made for allotment of sites in respect of the notification already issued by the BDA and the application is still pending without a decision and fresh applications have been called for, for allotment of further sites, the applicant who has already applied for allotment of a site and paid the initial deposit in response to the first notification, is required to make only fresh application pursuant to the said notification without making additional deposit. Rule 10 of the Rules lays down the eligibility for allotment of a site. Rule 11 of the Rules provides for principles of selection of applicants for allotment of sites and reservation of sites and constitution of a Committee for allotment of sites. Rule 12 of the Rules authorises the BDA to alter the value of the site notified. The said rule reads as follows:
“12. Value of the site. The value of the site notified while inviting applications may be altered by the Authority and an allottee may accept the site at the altered price or decline allotment.”
Rule 13 of the rules provides for conditions of allotment and sale of site. However, in the case of Scheduled Castes, Scheduled Tribes and Backward Tribes, the initial deposit is only 5% of the notified cost of the site and they are given six years' time to pay the balance sital value without interest.
(c) The conditions imposed in notification A and B only incorporate what is provided under the Rules. Since the terms provided under Annexure-A and B are similar, it is suffice to refer to Condition Nos. 1, 8 and 16 of notification Annexure-B, which read as under:
“1. The allotment of sites will be made in accordance with Bangalore Development Authority (Allotment of Sites) Rules, 1984.
8. Initial deposits paid along with applications will not carry any interest. The initial deposit will be refunded to the unsuccessful applicants after finalisation of allotment.
16. The BDA reserves its right to allot sites in any layout other than the ones preferred by the applicant. Owing to unforseen Court litigations and impediments, if any, the BDA also reserves its right to allot sites in any one of its future layouts i.e, in the layouts not advertised at present.”
Re: Question (1):
11. Now, the question that would arise for consideration is that since the BDA has notified the value of the sites in notifications Annexures A and B, which were notified for allotment, whether it is not permissible for the BDA to claim enhanced sital value as has been done in the communication issued to the petitioners? it is the case of the BDA that the sites notified in notification Annexure-A were allotted to various other persons as they had preferential claim than the petitioners at an earlier point of time. Admittedly, the petitioners have not made a grievance of the allotments made to those persons at any point of time. Therefore, I will have to proceed on the basis that the petitioners cannot have any grievance with regard to the allotment made to various persons in respect of the sites notified for allotment by means of notification Annexure-A, though most of the petitioners were also applicants pursuant to notification Annexure-A. Therefore, the only question is whether the petitioners are entitled for allotment of sites only at the rates notified in notification Annexure-B? In notification Annexure-B dated 15th of October 1988, sites were proposed to be allotted in three layouts known as “(i) Hennur-Bellary Road III Stage, (ii) Banashankari IV Stage and (iii) Shinivagalu Tank Bed Area”. In the said notification, the value of various dimensions of sites has been provisionally fixed. It is as follows:
Dimension of Site in feet
Provisional site value
50 × 80
98,000/-
40 × 60
58,000/-
30 × 40
28,000/-
20 × 30
6,750/-
The cost of the sital value fixed in respect of sites allotted to the petitioners is as follows:
Dimension of site in feet
site value
50 × 80
4,83,587/-
40 × 60
2,90,000/-
30 × 40
1,45,000/-
20 × 30
6,750/-
12. No doubt, as claimed by the petitioners, the cost of the sital value now fixed in the communication given to the petitioners allotting sites to them in considerably more than the price notified in notification Anneuxre-B. However, it is necessary to point out that the price quoted in notification Annexure-B is specifically stated as “provisional site value”. Condition-1 of notification Annexure-B makes it clear that allotment of sites would be made in accordance with the allotment of Site Rules, 1984. Condition-16 of the notification had reserved liberty to the BDA to allot site in any layout other than the one preferred by the applicant. The said condition further makes it clear that owing to unforeseen Court litigations and impediment, if any, the BDA has also the right to allot sites in any of its future layouts i.e, layouts not advertised in notification Annexure-B. Admittedly, sites have been allotted to the petitioners in ‘BTM IV Stage, JP Nagar VI Phase and HSR Layout II Stage’. The said three layouts are not the layouts which were notified for allotment of sites in notification Annexure-B. It is the case of the BDA that on account of Court litigation, the BDA could not complete the formation of the layout in three layouts notified in Annexure-B; and under those circumstances, the BDA taking a compassionate view in respect of the claim made by the applicants pursuant to notification Annexure-B, had allotted sites to the petitioners and others in BTM IV Stage, JP Nagar VI Phase and HSR Layout II Stage layouts. In Paragraph-13 of the Statement of Objections, the BDA has set out as to how the BDA was required to incur huge expenditure for formation of the layout and as to how the sital value of the site has considerably gone up. In Paragraph-19 of the Statement of Objections, the BDA has set up the cause for the delay in implementation of JP Nagar I to VI Phase, BTM Layout and JP Nagar VIII Stage, HSR II Stage, BTM 5th Stage etc. In Paragraph-21 of the Statement of Objections, the BDA has set out the details of the Court litigation and unauthorised constructions. In paragraph-22 of the Statement of Objections, the BDA has stated that the BDA's pricing policy of sites is entirely actual cost based and not market driven. In Paragraphs 25, 26, 27, 28, 29 and 30 of the Statement of Objections, the BDA has set out the basis for fixing the rate at Rs. 1,301/- per sq. mtr. In fact, in the course of hearing of the petitioners, Sri Datar submitted that all the records relating to the expenditure incurred by the BDA as claimed by it in the Statement of Objections is before the Court and the Court may peruse the same if it so desires and has any suspicion about the veracity of the statement made by the BDA in the Statement of Objections with regard to the cost incurred by it for the development of the layouts in question. On the basis of the averments made in the Statement of Objections, I have no reason to disbelieve the version of the BDA that the BDA had incurred substantial expenditure for the development of HSR II Stage, JP Nagar VIII Stage and BTM IV Stage layouts as claimed by it. Whether such an expenditure was justified or not, is not a matter on which this Court can examine in this proceedings. If the BDA had to incur substantial expenditure for the formation of layouts, referred to above, out of which sites came to be allotted to the petitioners, I am of the view that it is not permissible for this Court to compel the BDA to peg down the price of the sites allotted to the petitioners at the rates notified in notification Annexure-B merely on the ground that the prices have been notified in notification Anneuxre-B and pursuant to the said notifications, the petitioners had submitted their applications by depositing 12 1/2% of the sital value as initial deposit. In the background of fervent submission made by Sri Rao that the applicants for allotment of sites are either from middle class or lower middle class families, I have given my serious thoughts and considerations to every one of the submissions made by Sri Rao. However, in view of the settled principle of law governing the matter, I find myself unable to accede to the submission of Sri Rao. As noticed by me earlier, the price quoted in notification Annexure-B is only provisional. Now, the sites allotted to the petitioners and others are in different layouts formed by the BDA than the one notified in notification Annexure-B. It is well-known that the cost of the site varies from area to area. Further, the cost of formation of the layout also various from time to time. Various factors contribute to the cost structure of the formation of a layout. The provisional cost fixed in notification Annexure-B is of the year 1988. Sites are allotted in the year 1997/1998. The statement of objections filed by the BDA shows that the fixation of Rs. 1301/- per sq. mtrs., for the site measuring 30′ × 40′, 40′ × 60′ and 58′ × 80′, is fully justified. While so fixing the price, the BDA has taken into account that the price of the site measuring 20′ × 30′ is fixed at Rs. 671/-. The allottees of a site measuring 20′ × 30′ belong to a lower rung of the society. Under these circumstances, if these persons are allotted sites at a subsidised rate and on account of that, a little higher price is required to be fixed for a bigger site, that cannot be made a grievance by the allottees of such bigger sites. The BDA being an Authority created by the State to cater to the needs of the public, in a society where people are unequivally placed, if the BDA makes an effort to provide a site to those sections of the society, who are less fortunate and who belong to a weaker section of the society at a lessor cost than others, that cannot be a ground to compel the BDA to bring down the price fixed for higher dimension of sites. The purchase of sites made available for allotment by the BDA is at the option of the applicant. There is no element of compulsion involved. If an applicant does not want the site in respect of which he has made an application on the ground that the price fixed is on a higher side, it is open to him to decline the allotment made to him and on that account, he does not suffer from any loss or result in forfeiture of his initial deposit. Rule 12 of the Rules confers power on the BDA to modify the sital value notified. If the members of the public including the petitioners, who have applied for sites pursuant to notification Annexure-B, were told that the allotment of sites are subject to the terms and conditions of the Allotment Rules, and the Allotment Rules authorises the BDA to modify the sital value notified in notification Annexure-B, the said decision of the BDA cannot be dubbed either as unreasonable, arbitrary or discriminatory in nature or negation of rule of law as contended by the learned Counsel for the petitioners so long as the price fixed can be fairly co-related with the expenditure incurred by it for the formation of the layout and the other expenditure the BDA is required to incur. The petitioners, who made the applications pursuant to notification Anneuxre-B and for that matter, notification Annexure-A, cannot be permitted to contend before this Court that the BDA must be compelled to ignore Rule 12 of the Rules and allot sites at the rates provisionally notified merely on the ground that in notifications Annexure-A and B, the sital value has also been notified. This Court, in exercise of its writ jurisdiction, cannot interfere with the discretion exercised by the BDA under Rule 12 of the Rules, so long as the exercise of the said discretion is not either perverse, capricious, arbitrary, unreasonable or discriminatory in pature. In the instant case, on the basis of the materials on record, it is not possible to come to that conclusion. The sital value notified must be read in conjunction with the power of the B.D.A to modify the rate under Rule 12 of the Rules, if the circumstances demands such enhancement or modification. I am unable to accept the submission of Sri Rao that the prices quoted can be enhanced only when the dimension of site varies and not in other cases. It is the case of the BDA only 43 sites measuring 30′ × 40′ were allotted in anticipation of formation of Layout in an area of land measuring 2 Acres 3 guntas in a layout coming within Banashankari IV Stage. Therefore, it is clear that there has not been any large scale allotment of sites in the area notified for allotment pursuant to notification Annexure-B. The persons, who are allotted sites pursuant to notification Annexure-A, had a better claim then the petitioners. Therefore, the petitioners cannot make any grievance on that account and contend that various allottees pursuant to notification Annexure-A, were allotted at the price notified in notification Annexure-A, but similar benefit is not extended to them. Since the persons, who were allotted sites in the areas notified in Annexure-A, had a better claim than the petitioners for allotment of sites and accordingly they have been allotted sites in the said areas, the cases of the petitioners cannot be treated as similar or identical to those who were allotted sites pursuant to notification Annexure-A. The petitioners stand on a different footing and they are not similarly situated. Therefore, there is no discrimination meted out by the BDA on that account. Further if, the petitioners had any grievance with regard to the allotment of sites made to various persons in respect of the areas notified in Annexure-A, the petitioners should have challenged their allotment before this Court earlier. The petitioners having failed to do so, cannot now be permitted to contend before this Court after nine years that the petitioners also are entitled for allotment of sites at the rates at which others were allotted sites in the areas notified in notification Annexure-A. In my view, the principle laid down in Manjaiah's case (supra) strongly relied upon by the learned Counsel for the petitioners, has absolutely no application to the facts of the present case. In Manjaiah's case, a direction was given by this Court to fix the price at the rate notified in notification Annexure-A on the premise that since all the allottees were communicated with the allotment of sites in the areas notified in Annexure-A, merely because there has been delay in completing the process of allotment, a section of the allottees, who are similarly situated, cannot be discriminated against. This is clear from the observations made by this Court in paragraph-17 of the judgment where in it is observed as follows:
“17. It is not disputed that on the basis of Annex-A about 2,500 persons who had applied for the sites were held entitled for allotment of sites including the petitioners. It is not also disputed that a majority of those persons were allotted the sites almost according to the sital value mentioned in Annex-A. It is also admitted that the petitioners along with others were intimated of their entitlement of allotment of a site vide letters issued in September 1988. It is not disputed that the petitioners were willing and prepared to pay the sital value at the time they were intimated about their entitlement. The respondents have not placed on record any document to show that any of the petitioners had any disqualification disentitling him the allotment of a site in the year 1988. No act of commission or omission is attributed to the petitioners, for non-execution of the requisite documents in response to the letters annex-B communicated to them. The petitioners are shown to have been advised not to contact the respondent-authority and were admittedly not communicated about further progress regarding the completion of the allotment formalities for a period of more than 4½ years. A faint attempt is made by the respondents to show that the petitioners were allotted the sites on the sital value as specified in Annex-A has no legs to stand. The classification contemplated by Article 14 cannot be artificial but should apparently be real and effective. The classification resulting in discrimination cannot be left at the whims and caprice of the authority concerned. The discrimination on the basis of classification would not be reasonable if it has been occasioned on account of some acts of commission and omission attributable to the respondent and not justified by them by any definite ground or reason. The conduct of the respondents clearly and unambiguously establishes that they had taken up the case of petitioners very casually and opted to enhance the sital value according to their convenience which ultimately adversely affected the financial position of many including the petitioners.”
That is not the position here. As observed by me earlier, sites allotted to the applicants are not in the area notified in notification Annexure-B. The layouts in the areas notified in notification Annexure-B could not be formed and sites could not be made available for allotment in view of the fact that the acquisition of the lands in the said three layouts came to be challenged by the land owners and the proceedings have been kept pending in this Court and other Courts. The contents of notification Annexure-B unlike notification Annexure-A, does not state that sites were available for allotment. In notification Annexure-A, it was notified that “sites available for allotment”, whereas in notification Annexure-B, it is stated that “sites proposed to be allotted”. The sites allotted to the petitioners are in three different areas than those notified in notification Annexure-B. It is in three different localities. May be that the petitioners have waited all these years with a fond hope of getting sites. Atleast they are fortunate enough to secure allotment of sites from the BDA, when the large section of other members of the public are yet to secure sites. However, it is no doubt true as contended by Sri Rao that the BDA was required to formulate the Scheme and form layouts before issuing notifications inviting applications for allotment of sites. In my view, merely because there has been default on the part of the BDA in not strictly complying with the provisions of Chapter-III of the Act and Rule 3 of the Rules, it cannot be a ground to compel the BDA to fix the price at the rate provisionally notified in respect of the layout notified in the notification when the sites allotted are admittedly from different locality and allotments have been made after nearly nine years of notification Annexure-B. If there is any delay on the part of the BDA in forming the layout, the petitioners also can be accused of the same default on their part in not approaching this Court to compel the BDA to discharge its statutory obligations, if any. The petitioners, who had the advantage of 87 1/2% of the sital value and having kept quiet all these years, cannot now be permitted after the sites have been allotted in their favour, that the sital value to be pegged down as notified in notification Annexure-B. Every action of the State and its instrumentality has to be judged from the point of view of reasonableness and fairness. If it is so judged, I am of the view that in the light of the explanation given by the BDA that on account of the Court litigation, it could not complete the formation of the layout in the areas notified in Annexure-B, the action of the BDA in allotting the sites in question at the rate indicated to the petitioners in the communication issued to them is neither unreasonable, unfair or unjust. It cannot be disputed that the price at which sites are allotted, is far less than the market rate of similar sites. Out of 1521 allottees, except petitioners numbering about 167, all the other allottees have accepted the allotment of sites made in their favour. This clearly shows that the price at which the sites have been allotted to the petitioners and others, is much less than the market price of similar sites. I am unable to accept the submission of Sri Rao that there is a violation of Rule of Law by the BDA in not allotting sites at the rates notified in notification Annexure-B and, therefore, this Court should compel the BDA to fix the price of the sites allotted to the petitioners at the rates notified either in notification Annexure-A or in notification Annexure-B. There was no commitment made by the BDA to allot the sites in the layouts in which sites have now been allotted to the petitioners at the sital value notified in Annexure-B. Further, there is also no statutory obligation on the part of the BDA to allot the sites at the sital value notified in Annexure-B. Further, even if there is any laches or negligence on the part of the BDA in completing the layout, that will not enure to the benefit of the petitioners to get the sites allotted at the rates notified in Annexure-B so long as there is no firm commitment made by the BDA to allot the sites at the rate notified in notification Annexure-B. The provisional sital value fixed in notification Annexure-B has to be understood with reference to the right reserved to the BDA to modify the sital value in terms of Rule 12 of the Rules and also to allot sites in an area other than the one notified. It is necessary to point out that the entire matter has to be viewed having regard to the object of constitution of the BDA and the work assigned to it under the Act and the rights of the members of the public to get sites allotted at a subsidised price. The fixation of the price of the sites in the layouts formed by the BDA is generally not amenable for interference by this Court in exercise of its extraordinary jurisdiction under Articles 226 and 227 of the Constitution of India unless the fixation of the sital value is so arbitrary and unreasonable and is violative of the constitutional protection given under Article 14 of the Constitution of India or it has been done in disregard of the provisions of the Act and the Rules framed thereunder. In the view I have taken above, I take assistance from the decision of the decision of the Supreme Court in the case of Barely Development Authority (supra). In the said decision, the Supreme Court, at paragraphs 18 and 19, has observed as follows:
“18. The respondents were under no obligation to seek allotment of houses/flats even after they had registered themselves. Notwithstanding, they voluntarily registered themselves as applicants, only after fully understanding the terms and conditions of the brochure inclusive of Clauses 12 and 13 and Notes 1 and 2 of the General Information Table which we have re-produced above, they are now trying to obtain the houses/flats at the price indicated in the brochure at the initial stage conveniently ignoring the other express conditions by and under which the BDA has reserved its right to change the terms and conditions as and when felt necessary, evidently depending upon the escalation of the prices. One should not lose sight of the fact that the BDA did not compel anyone of the applicants to purchase the flat at the rates subsequently fixed by it and pay the increased monthly installments. On the contrary, the option was left over only to the allottees. In fact, the respondents in Civil Appeal No. 2809 of 1986 except the four above mentioned have unconditionally accepted the changed terms and conditions.
19. Thus the factual position in this case clearly and unambiguously reveals that the respondents after voluntarily accepting the conditions imposed by the BDA have entered into the realm of concluded contract pure and simple with the BDA and hence the respondents can only claim the right conferred upon them by the said contract and are bound by the terms of the contract unless some statute steps in and confers some special statutory obligations on the part of the BDA in the contractual field. In the case before us, the contract between the respondents hand the BDA does not contain any statutory terms and/or conditions. When the factual position is so, the High Court placing reliance on the decision in Ramana Dayaram Shetty's case, AIR 1979 SC 1628, has erroneously held:
‘It has not been disputed that the contesting opposite party is included within the term ‘other authority’ mentioned under Article 12 of the Constitution. Therefore, the contesting opposite parties cannot be permitted to act arbitrarily with the principle which meets the test of reason and relevance. Where an authority appears acting unreasonably this Court is not powerless and a writ of mandamus can be issued for performing its duty free from arbitrariness or unreasonableness.”
Further, the Supreme Court, in the case of Premji Bai (supra), at paragraph - 9 and 10, has observed as follows:
“9…….It is difficult to appreciate how Article 14 can be attracted in the circumstances herein above mentioned. Cost price of a property offered for sale is determined according to the volition of the owner who has constructed the property unless it is shown that he is under any statutory obligation to determine cost price according to certain statutory formula. Except the submission that the Authority has a proclaimed policy of constructing and offering flats ‘no profit no loss’ basis which according to Mr. Nariman has a statutory favour in the regulations enacted under the Act, the Authority is under no statutory obligation about its pricing policy of the flats constructed by it. When the flats were offered to the petitioners the price in round figure in respect of each flat was mentioned and surcharge was not separately set out and this price has been accepted by the petitioners. The obligation that regulations are binding on the Authority and have provided for a statutory price fixation formula on ‘no profit no loss’ basis will be presently examined but save this the Authority is under no obligation to fix price of different flats in different schemes albeit in the same income group at the same level or by any particular statutory or binding formula. The Authority having the trapping of a State might be covered by the expression ‘other authority’ in Article 12 and would certainly be precluded from according discriminatory treatment to persons offering to purchase flats in the same scheme. Those who opt to take flats in a particular income-wise area-wise scheme in which all flats came up together as one project, may form a class and any discriminatory treatment in the same class may attract Article 14. But to say that throughout its course of existence the Authority would be bound to offer flats income-group-wise according to the same price formula is to expect the Authority to ignore time, situation, location and other relevant factors, which all enter the price structure. In price fixation executive has a wide discretion and is only answerable provided there is any statutory control over its policy of price fixation and it is not the function of the Court to sit in judgment over such matters of economic policy as must be necessarily left to the Government of the day to decide. The experts alone can work out the mechanics of price determination; Court can certainly not be expected to decide with out the assistance of the experts. (See: Prag Ice & Oil Mills v. Union of India. (1978) 3 SCR 293 at p. 330.) In the leading judgment it has been observed that mechanics of price fixation have necessarily to be left to the executive and unless it is patent that there is hostile discrimination against a class the processual basis of price fixation has to be accepted in the generality of cases as valid. This Court in Avinder Singh v. State of Punjab, (1979) 1 SCR 845, approved the following dictum of Willis on Constitutional Law, page 587.
“The State does not have to tax everything in order to tax something. It is allowed to pick and choose district, objects, persons, methods and even rates for taxation if it does so reasonably — The Supreme Court has been practical and has permitted a very wide latitude in classification for taxation.”
What is forbidden by Article 14 is discrimination amongst persons of the same class and for the purposes of allotment of flats scheme-wise, allottees of flats in the same scheme, not different schemes in the same income bracket, will have to be treated as a class and unless in each such class there is unequal treatment or unreasonable or arbitrary treatment, the complaint that Article 14 is violated cannot be entertained. Therefore, in the State of Gujarat v. Shri Ambica Mills Ltd. Ahmedabad (1974) 3 SCR 760 at page 782, Mathew, J, speaking for the Court observed as under:
“A reasonable classification is one which includes all who are similarly situated and none who are not. The question then is what does the phrase ‘similarly situated’ mean? The answer to the question is that we must look beyond the classification to the purpose of the law. A reasonable classification is one which includes all persons who are similarly situated with respect to the purpose of the law. The purpose of a law may be either the elimination of a public mischief or the achievement of some positive public good.”
Is the classification income-wise, schemewise violative of Article 14 in any manner? The authority formulate income-wise for constructing flats. Petitioners contend that there should be only Income-wise classification wholly ignoring area and time factor for classification. They say that allottees of flats in all MIG Schemes irrespective of area and location and irrespective of when the flats were constructed for one class for determining price of flats. There is no merit in this contention. What are price determinants? Price of land, building material, labour charges and cost of transport, quality and availability of land supervision and management charges are all variable factors that enter into price fixation. Their cost varies time-wise, place-wise, availability wise. All these uncertain factors cannot be overlooked for the purpose of classification. Therefore, it is not possible to hold that allottees of flats in MIG scheme at any place and executed at any time will form one class for the purpose of pricing policy. Only valid basis for classification would be income-wise, area-wise, time-wise, scheme-wise, meaning all flats constructed at or about the same time in same area in one project for particular income-group will form a class. And there is no discrimination amongst them.
10. Pricing policy is an executive policy. If the Authority was set up for making available dwelling units at reasonable price to persons belonging to different income-groups it would not be precluded from devising its own price formula for different income-groups. If in so doing it unformally collects something more than cost price from those with cushion to benefit those who are less fortunate it cannot be accused of discrimination. In this country where weaker and poorer sections are unable to enjoy the basic necessities, namely, food, shelter and clothing, a body like the Authority undertaking a comprehensive policy of providing shelter to those who cannot afford to have the same in the competitive albeit harsh market of demand and supply nor can afford it on their own meager emoluments or income a little more from those who can afford for the benefit of those who need succour, can by no stretch of imagination attract Article 14. People in the MIG can be charged more than the actual cost price so as to give benefit to allottees in flats in LIG, Janata and CPS. And yet record shows that those better off got flats comparatively cheaper to such flats in open market. It is a well recognised policy underlying tax law that the State has a wide discretion in selecting the persons or objects it will tax and that the statute is not open to attack on the ground that it taxes some persons or objects and not others. It is only when within the range of its selection the law operates unequally, and this cannot be justified on the basis of a valid classification that there would be a violation of Article 14. (See: East India Tobacco Co. v. State of Andhra Pradesh, (1963) 1 SCR 404). Can it be said that classification income-wise-cum-scheme-wise is unreasonable? The answer is a firm no. Even the petitioners could not point out unequal treatment in same class. However, a feeble attempt was made to urge that allottees of flats in MIG scheme at Munirka which project came up at or about the same time were not subjected to surcharge. This will be presently examined by aside from that, contention is that why within a particular period, namely, November 1976 to January 1977 the policy of levying surcharge was resorted to and that in MIG schemes pertaining to period prior to November 1976 and later. April 1977 no charge was levied. If a certain pricing policy was adopted for a certain period and was uniformally applied to projects claiming up during that period, it cannot be the foundation for a submission why such policy was not adopted earlier or abandoned later.”
(Emphasis supplied)
In the case of Bareilly Development Authority (supra), the Supreme Court has laid down that the persons, who have made their offer with their eyes wide open, as per the terms and conditions of the notification issued, should not be permitted to challenge the higher cost demanded towards the cost of escalation. The said principle, in my view, fully applies to the facts of the present case. Similarly, in the cast of Premji Bai (supra), the Supreme Court has observed that the pricing policy is essentially matter on which the Authority will have to take a decision and it is not permissible for this Court to substitute its views under Article 226 of the Constitution. Therefore, if the BDA taking into account the cost it had to incur towards the development of the layout and other costs, has fixed the price for the sites in question at Rs. 1301/- per sq. mtrs. I do not find any justification to interfere with the said fixation of price, by this Court in exercise of its writ jurisdiction. Further, it is not permissible for this Court in the matter of fixation of sital value, to substitute its views, howsoever, much, the Court may feel sympathetic towards the allottees and may like to respond to their problems. It is a matter on which the Authorities, which have better equipment, information and knowledge and which are entrusted with the development of the layout and allotment of sites, are required to apply their mind and fix the price taking not consideration several relevant factors. However, it is necessary to point out that the observations made by me above should not be understood as this Court laying down that it has no power to interfere with the fixation of price when the prices fixed are totally unrelated to the cost factor and even if it is fixed totally on account of extraneous and irrelevant considerations and in violation of mandate of any constitutional provisions and provisions of the Act and the Rules framed thereunder.
15. Further, it is also necessary to deal with one other submission of Sri Rao based on the assertion that the BDA has notified the names of the petitioners on the notice Board as allottees of sites. With regard to this claim of the petitioners, it is the case of the BDA that out of 167 petitioners, the names of only 37 persons were notified. I am of the view that the same would not confer any right on the petitioners to get allotment of the sites at the rates notified in notification Annexure-B. What has been notified is that the persons notified are notified for allotment of sites. There is no commitment made in so far as the sital value of the sites to be allotted is concerned; and therefore, it will be highly unreasonable to direct the BDA to allot the sites at the rate provisionally notified in notification Annexure-B, which price was tentatively fixed keeping in mind the cost of formation of layout in the year 1988 when the sites are allotted in the year 1997-1998. This Court cannot ignore the fact situation that the BDA is an Authority created under the Act for the purpose of formation of layout and allotment of sites to the members of the public considerably at a lower cost and it has to generate its own funds. If any direction is given to bring down the sital value as claimed by the petitioners, it would necessarily have serious consequences with regard to the financial position of the BDA and inturn, it will certainly enhance the sital value of the sites to be allotted to the members of the public in the next allotments. Therefore, unless the petitioners are able to show that any of their rights are violated, this Court in exercise of its writ jurisdiction cannpt grant relief to the petitioners. I do not find any violation of rule of law by the B.D.A which would enure to the benefit of the petitioners. If the petitioners felt that the BDA was taking unduly longer time in discharging its statutory functions and on that account, rights guaranteed to them were being violated, it was open to them to approach this Court to compel the BDA to discharge its statutory duties. The petitioners having failed to do so and having kept quiet all these years, and had the benefit of 87 1/2% of the sital value with them, cannot now be permitted to seek a direction to the BDA to allot sites at the rate notified in notification Annexure-A or notification Annexure-B in respect of sites allotted in different layouts in the year 1997-1998. Therefore, I am of the view that the learned Counsel cannot derive any assistance from the observations made by the Supreme Court in the case of S.P Gupta (supra). Therefore, I do not find any justification to grant the relief sought for by the petitioners. Consequently, the first question is answered against the petitioners.
Re: Question (2):
16. Since the first question is answered against the petitioners, the question of directing the BDA to refund the sital value in excess of the price fixed in notifications Annexures-A and B, to such of those petitioners who have paid, does not arise for consideration. Therefore, I find it unnecessary to consider question (2) referred to above.
Re: Question (3):
17. The only other question which remains to be considered is, whether, having regard to the facts and circumstances of the case, the BDA should be directed to award interest on 12 1/2% of the sital value deposited by the petitioners on an initial deposit?
18. Sub-rule (1) of Rule 9 of the Rules provides for initial deposit of 12 1/2% of the notified cost of the site. Clause-8 of notification Annexure-B provides that initial deposit paid along with, the application will not carry any interest and the initial deposit will be refunded to the unsuccessful applicants after finalisation of allotment. Further, sub-rule (3) of Rule 8 of the Rules provides that the applicant may, if he has not been allotted a site, claim refund of the Registration Fee paid by him after deduction of 10% towards service charges. Therefore, it is clear that it is permissible to an applicant to seek refund of the initial deposit of 25% of the notified cost of the site at any time along with the Registration Fee paid subject to deduction of 10% towards service charges. All the petitioners are allottees of the sites. If the conditions for allotment of sites provide that initial deposit of 12 1/2% of the sital value notified is required to be deposited and notification Annexure-B provides that the said deposit shall not carry any interest, I am of the view that it is not permissible for this Court in exercise of its jurisdiction under Articles 226 and 227 of the Constitution of India to compel the BDA to pay interest on the initial deposit made by the petitioners. The parties are bound by the provisions of the Rules and also the terms and conditions of notification Annexure-B. This Court cannot dverlook the fact that while fixing the sital value, the BDA also would have taken into account the initial deposit made by the petitioners available with it. Therefore, I am of the view that the petitioners are not entitled for a direction to the BDA for payment of interest on the initial deposit made by them.
18. In the light of the discussion made above, these petitions are liable to be rejected. However, since the time granted to the petitioners to pay the sital value has expired, having regard to the facts and circumstances of the case, I am of the view that it is fair and reasonable to direct the BDA to give another six months' time from today to the petitioners to pay the balance sital value subject to their liability to pay the interest as per the Rules and also subject to the condition a request in writing is made on that behalf by the petitioners within four weeks from today.
19. In the light of the above conclusion, these petitions are rejected subject to the time granted to the petitioners to pay the balance sital value as directed above.
20. However, no order is made as to costs.