AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • S. 4(5)(a) of the Tamil Nadu Buildings (Lease and Rent Control) Act 1960
  • S. 4 of the Rent Control Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • S. 4(5)(a) of the Tamil Nadu Buildings (Lease and Rent Control) Act 1960
  • S. 4 of the Rent Control Act
Smart Summary

Factual and Procedural Background

This opinion disposes of two revision petitions concerning the fixation of fair rent for premises at No. 6 Sarojini St, Mahallingapuram, Madras 34.

C.R.P. 1690 of 1983 was filed by the landlords challenging orders of the Rent Control authorities which, by the appellate authority's computation, fixed the fair rent at Rs. 998 from the date of the petition. C.R.P. 235 of 1983 was filed by the tenant contending that the appellate authority should have confirmed the Rent Controller's order fixing the fair rent at Rs. 815. Both revision petitions are disposed of by this order.

Relevant factual details stated in the opinion:

  • The landlords purchased the premises; the ground floor is admittedly in the occupation of the respondent (tenant) at a monthly rent of Rs. 425.
  • The landlords had initiated eviction proceedings but, without prejudice to those proceedings, petitioned for fixation of fair rent, expressly stating they were not interested in enhancement of rent but sought entitlement to higher rent until eviction.
  • The plot measures 3,000 sq.ft.; the landlords stated the tenant occupied 1,600 sq.ft.; there was also vacant land described (1,400 sq.ft.) and amenities such as an overhead tank, electric motor and water pump.
  • Landlords' computation produced a fair rent of Rs. 2,980 per month (built-up area 1,600 sq.ft., construction cost Rs.125/sq.ft., age 15 years, plus allowances and amenities).
  • The tenant disputed these figures and calculated a fair rent of Rs. 698 per month (built-up area 1,440 sq.ft., land value lower, construction cost Rs.45/sq.ft., age taken as 25 years).
  • The Rent Controller determined the fair rent at Rs. 815 per month based on his assessment (built-up area ~1,400 sq.ft., construction cost taken at Rs.52/sq.ft., age 18 years, land value taken as Rs.50,000 per ground, tenant occupying one-third of building).
  • The Appellate Authority revised the figure to Rs. 998 per month after including additional area items (garage, bath room, porticoes totaling 470 sq.ft.), adding 10% for certain amenities, and making apportionments of land and open space as described in the order.
  • Both the landlords and the tenant challenge the Appellate Authority's finding.

Legal Issues Presented

  1. Whether the Appellate Authority was correct in refusing to make available to the parties the rates adopted by the Public Works Department (P.W.D.) for estimating cost of construction, on the ground that those rates were confidential, when S. 4(5)(a) of the Tamil Nadu Buildings (Lease and Rent Control) Act, 1960 specifically refers to those rates.
  2. How the "total cost" for fixation of fair rent under S. 4 of the Rent Control Act is to be computed — specifically the components of site market value, cost of construction, and cost of amenities and the statutory limits and provisos that apply.
  3. Whether the Rent Control authorities correctly applied S. 4 (including sub-Ss. (2)–(5)) in determining the cost of construction, accounting for amenities, apportioning land and vacant space, and applying depreciation and age, given disputed facts (area, age, amenities) and apparent discrepancies in the rates used.
  4. Whether the orders of the Rent Controller and the Appellate Authority can be upheld in view of procedural failings (non-production of sanctioned plan, sale deed and other documents) and inadequate evidentiary treatment of amenities and P.W.D. rates.

Arguments of the Parties

Landlords' Arguments

  • The landlords submitted a valuation (built-up area 1,600 sq.ft., construction cost calculated at Rs.125 per sq.ft., age 15 years, plus 20% allowance for sanitation and electrification) producing a total cost and a fair rent worked out to Rs. 2,980 per month.
  • They complained that S. 4(5)(a) specifically refers to rates adopted by the Public Works Department for estimation of construction cost, and that the Appellate Authority wrongly refused their application to summon the P.W.D. rates on the ground of confidentiality.
  • They argued implicitly that the P.W.D. rates ought to be made available and used consistently when the Rent Controller determines construction cost.
  • They had stated they were not seeking an enhancement of rent permanently but sought higher interim rent until eviction.

Tenant's Arguments

  • The tenant disputed most of the landlords' factual and valuation assertions and produced a competing calculation that the fair rent should be Rs. 698 per month (built-up area taken as 1,440 sq.ft., construction cost Rs.45 per sq.ft., age taken as 25 years, cost of site lower, apportioned occupation considered).
  • The tenant contended (through C.R.P. 235 of 1983) that the Appellate Authority should have confirmed the Rent Controller's order fixing the rent at Rs. 815.
  • The tenant argued that, as he occupies only one floor, apportionment of cost should reflect that, and he relied on his engineer's measurements for area (1380 sq.ft. by his engineer in the Rent Control proceedings).

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The court's reasoning proceeds in distinct stages, addressing statutory interpretation, procedural fairness, evidentiary shortcomings and the practical result:

  1. Statutory framework: The court sets out S. 4 of the Rent Control Act and its sub-sections. It explains that "total cost" for the purpose of sub-Ss. (2) (residential — 9% gross return) and (3) (non-residential — 12% gross return) comprises three components: (1) market value of the site; (2) cost of construction of the building; and (3) cost of provision of amenities specified in Schedule I as on the date of application. The first proviso limits the portion of site and vacant land to be taken into account (only that portion on which building stands and up to 50% of appurtenant vacant land), and the second proviso caps amenities (15% residential; 25% non-residential) of the combined site and construction cost.
  2. Role of P.W.D. rates: Sub-S.(5)(a) mandates that the cost of construction must include internal water supply, sanitary and electrical installations and that these are to be determined "with due regard to the rates adopted for the purpose of estimation by the Public Works Department of the Government for the area concerned." The court reads this as contemplating that P.W.D. rates are a relevant factor and that the Rent Controller's discretion is limited by a proviso allowing up to a 30% deviation over the P.W.D. estimate in appropriate circumstances.
  3. Confidentiality error: The Appellate Authority's refusal to make available the P.W.D. rates on the ground that they are "confidential" is held to be plainly erroneous. The court reasons that if the statute requires regard to those rates, parties must know them; judicial determination of construction cost cannot rely on a confidential figure unknown to the parties. Therefore the Appellate Authority's denial was incorrect.
  4. Apparent inconsistency in rates used: The court notes an apparent discrepancy between P.W.D. published/plausible rates (a Mini Technical Handbook figure circa 1981 of Rs. 790 per sq. meter, ~Rs.79 per sq.ft. for land-bearing structures in Madras) and the lower rate actually used by the Rent Controller (Rs.52 per sq.ft.). The order of the Rent Controller supports the inference that Rs.52 was the rate supplied to him. The court finds it improper for rates used by the Rent Controller to differ from the rates fixed by the P.W.D. unless proper explanation and evidence supports such a difference.
  5. Evidentiary and procedural deficiencies: The court identifies multiple defects in the way the Rent Control authorities proceeded:
    • Dispute exists as to area and age of the building (range of figures from parties and experts); landlords typically do not produce sanctioned plans or sale deeds though these documents are likely within their control; failure to produce such material documents justifies adverse inference unless satisfactorily explained or unless acceptable alternative evidence is produced.
    • The Appellate Authority allowed a provisional/ad hoc addition of 10% for amenities (compound wall, overhead tank, electricity etc.) rather than separately determining the cost of each amenity specified in Schedule I as required by sub-S.(4). The court finds this approach improper.
    • The court explains that electrical fittings and installations may be part of the cost of construction under S.4(5)(a) (internal water, sanitary and electrical installations) and that which installations qualify as statutory construction items versus which are amenities in Schedule I is a matter of evidence to be specifically proved and determined.
  6. Overall assessment: Given the errors and the casual fashion in which authorities applied S. 4, including inconsistent rates, undisclosed P.W.D. figures, disputed measurements and unproven amenities, the court concludes that the findings of neither the Rent Controller nor the Appellate Authority can be upheld on the record before it.
  7. Remedy ordered: The court sets aside both orders and remits the matter to the Rent Controller for fresh determination according to law after recording fresh evidence. The Rent Controller is directed to call upon the landlords to file the plan of the house, the sale deed and evidence regarding the age of the building (including obtaining the sanctioned plan from the Corporation). The Rent Controller must make available to the parties the P.W.D. rates before deciding fair rent.
  8. Limited finality as to land valuation: Although both courts accepted a land value figure of Rs.50,000 (per ground), the court notes that it could not determine on what evidence that figure was based. Nonetheless, because that figure is not challenged by either party, the court expressly makes clear that the valuation of the site at Rs.50,000 per ground is not open to fresh agitation on remittal.

Holding and Implications

Holding:

The court set aside both orders of the Rent Control authorities and remitted the matter to the Rent Controller for fresh determination according to law after recording fresh evidence.

Direct implications and directions:

  • The Rent Controller must conduct a fresh determination of fair rent in accordance with S. 4 and its sub-sections, recording fresh evidence on contested factual matters (area, age, amenities, apportionment of land etc.).
  • The landlords are to be called upon to produce the sanctioned plan, the sale deed and evidence with regard to the age of the building (including obtaining the sanctioned plan from the Corporation where necessary).
  • The Rent Controller is directed to make available to the parties the rates fixed by the Public Works Department (P.W.D.) which are to be taken into account when determining cost of construction under sub-S.(5)(a).
  • The previously accepted valuation of the site at Rs. 50,000 per ground is not open to fresh challenge on remittal.
  • The revision petitions are disposed of with no order as to costs.

Broader implications: The opinion emphasizes procedural fairness and statutory compliance (particularly transparency as to P.W.D. rates and the need for concrete evidence of plans, deeds and amenity costs) in the fixation of fair rent. The court did not purport to lay down a new binding principle of law beyond the interpretation and application of S. 4 as applied in the facts of this case; the remedy ordered was a factual rehearing with specified directions.

    A. Emberumanar v. K. Raghavan, Sole Prop: Pratap Art Productions

    1. C.R.P. 1690 of 1983 has been filed by the landlords challenging the orders of the Rent Control authorities fixing the fair rent of the premises at Rs. 998 from the date of the petition. C.R.P. 235 of 1983 has been filed by the tenant contending that the appellate authority should have confirmed the order of the Rent Controller fixing the rent at Rs. 815. This order disposes of both the revision petitions.

    2. The petitioners purchased the premies No. 6 Sarojini St, Mahallingapuram, Madras 34, the ground floor of which is admittedly in the occupation of the respondent on a monthly rent of Rs. 425. The landlords had started proceedings for eviction of the tenant, but without prejudice to those proceedings, they filed a petition for fixation of fair rent expressly stating that they are not interested in enhancement of rent, but till they get an order of eviction, they will be entitled to higher rent.

    3. The extent of the site on which the building is situate is 3000 sq.ft. and the built up area in the occupation of tenant is said to be 1600 sq.ft. There is also a vacant land, which was described as schedule a many to be used in common with the others to the extent of 1400 sq.ft. In addition, there is an overhead tank, electric motor and water pump. The value of the site was put at Rs. 96,000 per ground. On the basis of calculations made by the landlords, the fair rent, according to them, is Rs. 2980 per month. A schedule was attached to the petition which described the building as Class-I type-1. The age of the building was said to be 15 years. The built up area was stated to be 1600 sq.ft. The cost of construction calculated at Rs. 125 per sq.ft. came to Rs. 2,00,000. An additional amount of Rs. 40,000 was added on account of allowance for sanitation and electrification at the rate of 20 per cent. The probable cost of the site was calculated at Rs. 21,333. The building has three floors. An addition of 25 per cent was made on account of amenities making allowance for depreciation at 1 per cent for fifteen years. The cost was thus computed at Rs. 2,97,866.

    4. The tenant disputed almost everything and according to him, the fair rent would work to Rs. 698 per month. He calculated the built up area as 1440 sq.ft. and calculated the value of the land at Rs. 12,000. So far as the tenant himself was concerned, he being in occupation of only one floor, the amount properly to be taken into account, according to him, was Rs. 4,000. The tenant calculated the cost of construction at Rs. 45 per sq.ft. and the age of the building as 25 years. Thus the cost of the building was taken at Rs. 59,470. He added 10 per cent on the cost of the site and cost of construction, so as to make the total cost at Rs. 69,817. On the footing that the building was 20 years old, 12 per cent gross returb, according to him, came to Rs. 8,370-04 annually and the monthly rent came to Rs. 698.

    5. There is no dispute about the building being class I type-I. The Rent Controller proceeded to determine the cost of construction on the footing that the built up area was 1,400 sq.ft. at Rs. 52 per sq.ft. The cost thus came to Rs. 72,000. The Rent Controller then referred to something in the nature of cost of internal amenities which was calculated at Rs. 72-80. The age of the building was fixed as 18 years. Depreciation at the rate of one per cent on Rs. 50,000 which was the cost of construction was held permissible and the depreciated value of the construction was calculated at Rs. 66,867. The land value was taken as Rs. 50,000 per ground. Having regard to the fact that the tenant was in occupation of 1/3rd of the building, the cost of the ground allowable to the portion in his occupation was worked out at Rs. 14,593. Arriving at the total cost of the land the depreciated value at Rs. 81,450, the fair rent was worked out at Rs. 815 per month.

    6. The landlord challenged the order by way of an appeal. The Appellate Authority, however, proceeded on the footing that the Rent Controller had not taken into account the garage, bath room and the porticoes which totally accounted for 470 sp.ft. He separately calculated their cost at Rs. 40 per sq.ft. Then the total cost of the building was computed at Rs. 91,600. He allowed ten percent on account of amenities in the nature of a compound wall, an overhead tank, electricity etc. The cost of constitution thus came to Rs. 1,00,760. He took the age of the building as 18 years and after deducting the amount of depreciation at Rs. 10,137 he arrived at the deprecited value of Rs. 82,623 Proceeding on the footing that the cost of the land was Rs, 50,000 per ground, the cost allowable to the portion occupied by the tenant was determined at Rs. 12,986. On account of open land, the Appellate Authority found that after deducting 1870 sq.ft. of built up area from the total plot area of 3,000 sq.ft. the rest must be treated as vacant space and since this was more than 50 per cent of the total built up area, only 50 per cent of the open space could be considered for arriving at the land value which was calculated on apportionment at Rs. 4,267. The total figure thus came to Rs. 99,876 and the computation of fair rent was made at Rs. 998 being 1/12th of the 12 per cent of this amount. This finding of the Appellate Authority is now challenged by the landlords and the tenant.

    7. The learned counsel appearing on behalf of the petitioners—landlords has at the threshold made a grievance that though S. 4(5)(a) of the Tamil Nadu Buildings (Lease and Rent Control) Act 1960 specifically referred to the rates adopted for the purpose of estimation of the cost of constructions by the Public works Department of the Government for the particular area in which the premises were situate, the Appellate Authority declined to make these rates available to the landlords on the ground that they are confidential in character. The landlords had made an application to the Appellate Authority being M.P. 1007 of 1982 to send for the necessary records relating to the rates determined by the Public Works Department. This application came to be rejected by the Appellate Authority on 23-9-1982. Apart from holding that it was not mandatory that P.W.2 rate alone was to be taken into consideration by

    "The rates as given by the P.W D. authorities are confidential in nature and the petitioners, therefore, are not entitled to summon the P.W.D. for producing the tables before the Appellate Authority."

    It is obvious that the Appellate Authority was clearly in error in holding the rates specifically referred to in S. 4(5)(a) of the Act were confidential. If the rates fixed by the Public Works Department were required to be taken into account by the Rent Controller, statutorily then surely the parties are entitled to know what those rates are. The cost of construction is essentially a matter of Judicial determination by the Rent Controller. No circumstances which is confidential in character can enter in the judicial determination of a fact which has an imperative relevance in the determination of fair rent.

    8. S. 4 of the Rent Control Act prescribes the mode of determination of fair rent sub-S.(2) of S. 4 deals with fair rent for any residential building which has to be determined at nine percent gross return per annum on the total cost of the building. Sub-S.(3) of S. 4 refers to fair rent for any non-residential building and it is 12 percent gross return per annum on the total cost of the building, sub-Ss.(2) and (3) use the phraseology ‘total cost of such building’. How this total cost for the purpose of sub-Ss. (2) and (3) is to be computed is laid down in sub-S.(4) which runs as follows:—

    "The total cost referred to in sub-S-(2) and sub-S.(3) shall consist of the market value of the site in which the building is constructed, the cost of construction of the building and the cost of provision of any one or more of the amenities specified in schedule I as on the date of application for fixation of fair rent;"

    "Provided that while calculating the market value of the site in which the building is constructed, the Controller shall take into account only that portion of the site on which the building is constructed and of a portion upto 50 per cent, thereof of the vacant land, if any appurtenant to such building the excess portion of the vacant land, being treated as amenity;"

    Provided further that the cost of provision of amenities specified in schedule I shall not exceed—

    (i) in the case of any residential building, fifteen percent; and

    "(ii) in the case of any non-residential building, twenty five per cent, of the cost of site in which the building is constructed, and the cost of construction of the building as determined under this section."

    Then comes sub-S.(5)(a) of S. 4, which prescribes the manner of determining the cost of construction. S. 4, therefore, contains two different concepts. One concept is the total cost of construction of the building. The total cost of the building is a composite figure consisting of (1) the market value of the site in which the building is constructed; (2) the cost of construction of the building and (3) the cost of provision of any one or more of the amenities specified in schedule I as on the date of application for fixation of fair rent. So far as the first item, namely, the market value of the site is concerned, the first proviso to S. 4 (4) requires that while calculating the market value of the site in which the building is constructed, only that portion of the site at which the building is constructed and 50 per cent thereof of the vacant land appurtenant to such building only is to be taken into account. Any excess of the portion of the vacant land is to be treated as an amenity. The second proviso refers to cost of provision of amenities which in the case of residential building is not to exceed 15 per cent and in the case of non-residential building 25 percent of the cost of the site in which the building is constructed and the cost of the construction of the building as determined under S. 4.

    9. Now so far as the second item, namely the cost of construction is concerned, sub-S.(5) mandates that the cost of construction must include the cost of internal water supply, sanitary and electrical installations. These have to be determined with due regard to the rates adopted for the purpose of estimation by the Public Works department of the Government for the area concerned. It is obvious that when sub-S.(5) (a) refers to the cost being determined with due regard to the rates, it contemplates that the rate fixed by the Public Works department as the cost of construction is a relevant factor. The proviso, however, limits the power of the Rent Controller to fix the cost of construction. The proviso is an attempt to restrict the cost of construction for the purpose of fixation of fair rent to the outer limit of 30 per cent over the estimate made by the Public Works department. A discretion is, given to the Rent Controller to allow or disallow an amount not exceeding 30 per cent of the construction having regard to the nature of the construction of the building. Therefore, when either the landlord or the tenant applies for fixation of fair rent, he will be entitled to know as to what are the rates which are fixed by the Public Works department. Unless these rates are intimated to the parties or at least they are put in the know of these rates, it would be illegal and improper for the Rent Controller to take these rates into consideration for the fixation of fair rent. The appellate authority was, therefore, not right in taking the view that the rates are confidential in character.

    10. Some grievance has been made before me that the rates which are made available by the Public Works department authorities to the Rent Controller are different from those which are prescribed by the Public Works department itself in the Mini Technical Hand book of 1985 which has been made available to me. The grievance is that in 1981, according to this publication which prescribed the rates on buildings in Tamil Nadu, in respect of land bearing structures in Madras City the rate is Rs. 790 per sq., meter which would approximately come to Rs. 79 per sq.ft., but the rates intimated to the Rent Controller were lesser.

    11. There is no material except the order of the Rent Controller, to show what rates were intimated to the Rent Controller, but the order of the Rent Controller does lend support to the argument that the Rent Controller must have been intimated the figure of Rs. 52 because that is the rate which is taken into account for determining the cost of construction. The application in the instant case was made some time in April, 1981 and the learned counsel appearing for the landlords would, therefore be justified to contending that if the plinth area rate of the building is published by the Public Works Department at Rs. 790 per sq., meter, then the rate supplied to the Rent Controller cannot be different from the rate which the Public Works department itself had prescribed. In other words, for the purpose of calculation of the cost of construction, there cannot be a rate different from the rate which is normally fixed by the Public Works department and which finds a place in what is described as Mini Technical Handbook issued by the Association of Engineers and Assistant Engineers Association of the Tamil Nadu Public Works department.

    12. There is, therefore, apparent error in the orders of the Rent Control authorities when they have taken a rate which is different from the one which is prescribed by the P.W.D., authorities themselves. There are other errors in the orders which makes it difficult to dispose of the revision petitions finally and determine the figure of fair rent. There is a dispute with regard to the area and age of the building.

    13. One thing which I have repeatedly noticed in the Rent Control applications made for fixation of fair rent is that the land lord who must normally be in possession of the sanctioned Corporation map, if he has constructed the building, does not pro duce the plan or the map. If he has purchased the property, then one expects the landlord to produce the sale deed which will give the necessary details with regard to the price for which the property has been purchased and the dimensions of the plot on which the house has been constructed. Normally, the vendor would pass on to the purchaser the sanctioned plan also. Many times the sanctioned plan or some plan forms an annexutre to the sale deed. It is noticed that the landlord does not produce the material documents which are in his possession. He withholds the material particulars which are within his special knowledge which can help the Rent Control authorities to arrive at the correct conclusion with regard to the age of the building and the area of the building and the plot and these matters are left to be determine on vague oral evidence. Often, though the Engineers are examined by the parties, the plans and measurements and the notes made by them are not produced on record. If these material documents are not produced by the landlord on the tenant the Rent Controller would be entitled to draw an adverse inference unless an acceptable explanation is given for non-production of the documents or unless proper acceptable evidence is adduced with regard to matters which would have been proved by the production of the original documents.

    14. In the instant case, there is a dispute about the area of the building itself. The tenant's engineer had put the area of the building as 1380 sq.ft. The landlords in their petition have put the built up area as 1600 sq.ft. the best thing for the landlords would have been to put on second the sanctioned plan from the Municipality or the Corporation which would, in a sense, be conclusive evidence of the area of the building. Then the landlord in their petition referred to some schedule amenities which are in the form of an overhead tank, mosaic flooring, and electric motor pump. Neither the appellate authority nor the Rent Controller has applied his mind to in respect of these amenities. The existence and the extent of some of them have to be proved by the landlords, sub-S.(4) of S. 4 requires ‘the cost of provision of anyone or more of the amenities specified in schedule I as on the date of application for fixation of rent’ to be included in the total cost. The Appellate Authority has permitted an ad hoc addition of ten per cent in respect of ‘compound wall, overhead tank electricity etc’. This is hardly a proper way of determination of total cost when the statute requires the cost of each amenity specified in schedule. I to be separately determined. If the landlord fails to give positive evidence of the cost of providing the amenities, the Rent Controller would be justified in ignoring the cost of such amenities. The Appellate Authority has also failed to see that the facility of having electrical fit tings and installations by itself cannot be treated as an amenity in schedule I, The cost of construction includes the cost of obtaining water supply, sanitary and electrical installations. Therefore, which electrical installations fall under S. 4(5) (a) and which electrical installation is in the nature of amenity in schedule I is a matter of evidence, to be separately proved and separately determined by the Rent Controller. The whole litigation with regard to fixation of fair rent has thus been dealt with by the authorities in a most casual fashion. The Rent Control authorities have proceeded to determine fair rent without any reference to what is required to be done under the provisions of S. 4 In this state of affairs, it is not possible to uphold the findings of any one of the two authorities. It is, therefore, not necessary to go into the challenge made to the computation of the value of the items which are material for the determination of fair rent. The whole case needs reconsideration in the light of what is said in the judgment. This matter must go back to the Rent Controller for a proper decision in regard to the different amount in the nature of cost of construction cost of land and the cost of amenities in schedule-1.

    15. In so far as the cost of land is concerned, again it is true that both the courts have accepted the value of Rs. 50,000, but it has not been possible to find out on what evidence this has been determined. It is however not necessary to go into the correctness of this figure because that figure is not challenged by either of the parties.

    16. I, therefore, set aside both the orders of the Rent Control authorities. The matter is remitted back to the Rent Controller for fresh determination according to law after recording fresh evidence. The Rent Controller will call upon the landlords to file the plan of the house, the sale deed and evidence with regard to the age of the building which will be proved by the sanctioned plan which can easily be obtained from the Corporation. The Rent Controller will also make available to the parties the rates which have been fixed by the Public Works department before he proceeds to decide the question of fair rent. It is expressly made clear that the question of valuation of the site at Rs. 50,000 per ground is not open to any fresh agitation.

    17. The revision petitions are disposed of accordingly No costs.