Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Smart Summary

Structured Summary of the Provided Legal Opinion

Factual and Procedural Background

This is an appeal from a judgment and decree of the High Court of Judicature at Fort William in Bengal in its civil appellate jurisdiction dated 27-3-1945, which reversed a judgment and decree of the same Court in its ordinary original civil jurisdiction dated 14-1-1943.

The dispute arose from an action by the respondent company (the buyers) against the appellant firm (the sellers) claiming damages for breach of a contract for the supply of tin. On 8-12-1941 there was a telephone conversation between N. T. Shaha (for the buyers) and Ranchoredas (for the sellers) in which the buyers' requirements were made known and the sellers contracted to supply. A confirmatory letter from the buyers of the same date recorded purchases for forward delivery of tin: 35 tons at Rs. 215/8 per cwt net and 5 tons at Rs. 218 per cwt net, with delivery instructions to follow.

The parties were experienced merchants with prior dealings in tin. The buyers had government contracts to produce tinned articles and were purchasing tin for use in their factories. The market on 8-12-1941 was rising; there were further purchases that day by the buyers (another 10 tons and later 5 tons) at prices reflecting the rising market.

After the Japanese attacks in December 1941 and the occupation of Penang shortly before 19-12-1941, the sellers were unable to obtain the Penang shipments they had contracted for. On 22-12-1941 the sellers wrote to the buyers stating that, owing to unforeseen trouble in Penang, shipment was not possible and they had "no other alternative but to cancel the contract."

The buyers filed suit on 20-2-1942 alleging wrongful repudiation and claiming damages (initially Rs. 91,850, but the parties subsequently agreed the correct sum if recoverable was Rs. 50,100). The sellers' written statement pleaded that delivery was to be made only when goods arrived from Penang (expressly or alternatively by implication) and relied on other implied conditions.

At trial McNair J. found that the oral evidence of both parties as to express terms was unreliable and that the only dependable record of the contract was the buyers' letter of 8-12-1941. Construing that letter and the surrounding circumstances, he held performance had become impossible owing to non-arrival of Penang tin and dismissed the suit. On appeal to the High Court (civil appellate jurisdiction) the Chief Justice (Sir Harold Derbyshire), with whom Lodge J. agreed, held that the contract was not contingent upon arrival of Penang tin, that the contract had been broken by the defendants on 23-12-1941, and allowed the appeal with costs. The sellers then appealed further (to the court speaking as "Their Lordships" in the provided opinion).

Legal Issues Presented

  1. Whether the contract evidenced by the buyers' letter of 8-12-1941 included, either expressly or by necessary implication, a term that delivery would only be made when Penang tin already ordered by the sellers arrived in Calcutta.
  2. Whether performance of the sellers' obligations became impossible because of the non-arrival of Penang tin (owing to the Japanese occupation), such impossibility constituting a defence to the buyers' claim for damages.
  3. How the words "for forward delivery" in the buyers' confirmatory letter of 8-12-1941 should be construed in the factual context of this transaction.

Arguments of the Parties

Appellants (the sellers)

  • Plead that it was expressly agreed or alternatively to be implied that delivery would only be made when goods arrived from Penang against orders the sellers had placed there.
  • At the appeal in India, counsel for the sellers (Mr. B. C. Ghose) abandoned several specific implied term contentions (a–e in para. 3 of the written statement) and confined the defence to the contention that a condition should be implied that Penang tin already ordered should arrive in Calcutta; counsel also accepted the findings of fact of the trial judge (McNair J.).
  • On further appeal, counsel for the sellers sought to rely on passages of the oral evidence before McNair J., including cross-examination answers, to establish that delivery was to be contingent on arrival from Penang; however, the court declined to entertain this reliance because of the position adopted on the earlier appeal in India.

Respondents (the buyers)

  • Alleged that during preliminary conversations they informed the sellers they were purchasing to fulfil Government contracts and insisted that tin should be delivered "under all circumstances," and that Ranchoredas agreed to that condition (a position denied by the sellers).
  • Relied upon the buyers' written confirmatory letter of 8-12-1941 as the reliable record of the contract terms ("for forward delivery" and "Our delivery instructions will follow").
  • Maintained that the contract was not conditional on the arrival of Penang shipments and that the sellers wrongfully repudiated the contract on 23-12-1941.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
(1920) 1 KB 8681 at p. 899 — Scrutton L.J. The principle that a court should not imply a contractual term merely because it would be reasonable to do so; an implied term must be so necessary that both parties must have intended it to be part of the contract and only omitted expression because its necessity was obvious. Their Lordships applied this principle to refuse to imply a condition that delivery was contingent upon the arrival in Calcutta of Penang tin already ordered by the sellers, concluding the term was not so necessary that both parties must have intended it.

Court's Reasoning and Analysis

The court proceeded on the footing accepted on the appeal in India—that the findings of fact by the trial judge (McNair J.) were accepted by counsel on appeal and that no express oral terms beyond those reflected in the buyers' letter of 8-12-1941 had been proved. Consequently, the court treated the buyers' letter as the primary record of contract terms.

Construction of the letter: The court construed the phrase "for forward delivery" by its ordinary meaning ("for delivery in the future") and found the subsequent phrase "Our delivery instructions will follow" to be consistent with that ordinary meaning. There was no convincing basis in the written words to read into the contract a limiting condition that delivery depended on arrival of Penang shipments.

On the point of implication, the court relied on the principle articulated by Scrutton L.J. (quoted in the opinion) that an implied term must be necessary in the sense that both parties must have intended it. Applying that test, the court found no sufficient basis to infer that either party (and in particular the buyers) must have intended that delivery should be contingent upon the arrival of already-ordered Penang tin. The buyers had no reliable evidence that they knew the sellers' exact stock position or that the sellers had already ordered a specified quantity from Penang; additionally, the sellers could have procured tin in Calcutta after 8-12-1941.

On the impossibility defence, the court accepted (for the purposes of analysis) that impossibility of performance could be a complete defence but placed the burden of proving impossibility on the sellers. The sellers did not discharge this burden. The court relied on the sellers' own witness (Ranchoredas) who testified that, although securing a large quantity locally at a fixed price might be difficult, it was possible to obtain Penang-quality tin in Calcutta by aggregating small quantities from different dealers; indeed, after 22-12-1941 buyers were able to buy 6 tons in India at a high price.

The court further noted that the sellers adopted an attitude that they were not bound to make any effort to procure the 40 tons after Penang was occupied; Ranchoredas' evidence that "there was no question of buying against the contract" supported the conclusion that the sellers had not established impossibility as a defence.

Given the construction of the written contract, the refusal to imply the contested condition, and the failure of the sellers to prove impossibility, Their Lordships concluded that the Chief Justice of the High Court and his colleague had correctly allowed the appeal in favour of the buyers.

Holding and Implications

HOLDING: Their Lordships advised that the appeal by the sellers should be DISMISSED.

Consequences and immediate implications:

  • The decision upholds the High Court's conclusion that the contract evidenced by the buyers' letter of 8-12-1941 was not conditional upon the arrival in Calcutta of Penang tin already ordered by the sellers.
  • The sellers failed to discharge the burden of proving impossibility of performance caused by the occupation of Penang, so impossibility did not relieve them of liability for breach.
  • The appellants (sellers) were ordered to pay the respondents' (buyers') costs of this appeal.

The opinion does not indicate that a new legal principle was established; it applied existing principles on implication of contractual terms and the allocation of the burden to prove impossibility.

    Pragdas Mathuradas v. Jeewanlal (1929) Ltd.

    Lord Morton of Henryton-

    This is an appeal from a judgment and decree of the High Court of Judicature at Fort William in Bengal in its civil appellate jurisdiction, dated 27 - 3 - 1945, reversing a judgment and decree of the same Court in its ordinary original civil jurisdiction, dated 14th January 1943. The appeal arises out of an action by the respondent company against the appellant firm claiming damages for breach of a contract for the supply of tin.

    [2] It is necessary to set out the proceedings in the Courts in India in some detail, as the findings of fact by the learned trial Judge, and the attitude adopted by the appellant firm in regard to these findings of fact, are of great importance. The learned trial Judge (McNair J. stated the events leading up to the action as follows :

    "The plaintiff company sue the defendant firm to damages for breach of contract for the supply of tin On 8 - 12 - 1941 there was a telephone conversation between N. T. Shaha of the plaintiff company and Ran choredas of the defendant firm in which the plaintiff company made known their requirements and the defendant firm contracted to supply them.

    Later the same day the plaintiff company wrote to the defendant firm :

    'Dear Sirs,

    Tin

    We confirm having purchased from you to day tin it blocks, Penang quality, for forward delivery as follows:

    35 tons at Rs. 215/8/ - per cwt. net. 5 tons at Rs. 218/ - per cwt. net. Our delivery instructions will follow."

    The parties are both merchants of standing. They had had previous dealings in various commodities, and from March until September 1941 they had had business transactions in tin totalling some 28 tons.

    It appears that the plaintiff company had contracts with the Government for the supply of tinned article; to the Supply Department, and there is every reason to believe that the plaintiff company were purchasing tin on this occasion for use in their factories in execution of their contracts with the Government

    On 7 - 12 - 1941 the Japanese attacked Pearl Harbour and early on the 8th December it was known in Calcutta that a state of war existed between Japan, Great Britain and the United States of America.

    That morning Mr. H. K. Shab, Managing Director of the plaintiff company instructed Mr. N. T. Shaha, Assistant Secretary of the company, who is in charge of the plaintiff's business in Calcutta to buy 25 tons of tin and Mr. N. T. Shaba telephoned to Mr. Ranohoredas, a partner in the defendant firm. Ranchoredas stated that the market rate was Rs. 216/ - a cwt. He stated further that he would refer to his elder brother, Goberdhone Das, who might be able to give a slightly lower quotation, N. T. Shaha referred to H. K. Shaha and the deal with regard to 25 tons was put through with Ranchoredas at Rs. 216/ - subject to any better price which might be given by Goberdhone. Goberdhone reduced the price to Rs. 215 - 8 - 0 and that is the price mentioned in the confirmatory letter.

    The plaintiff company soon after booked another 10 tons at the same price and about a couple of hours later they decided to buy a further 5 tons which they got at Rs. 218/ - as the market had been rising throughout the day. It is in evidence that the opening rate on the 8th December was Rs. 205 or Rs. 206 and the closing rate was about Rs. 227.

    These facts are undisputed. The plaintiff company however allege that during the preliminary conversation they informed the defendant firm that they were purchasing in order to fulfil Government contracts, that they wanted to cover themselve absolutely against their requirements of tin, and that they insisted that tin should be delivered to them under all circumstances. They state further that Mr. Rauchoredas agreed to those conditions and said that he would deliver goods from ample stocks always at his firm's disposal. These statements and alleged conditions are denied by the defendant firm.

    The market, as I have said, was on the 8th December a rising market, and it continued to rise during the following days when the Japanese armies invaded the Malaya Peninsula. Penang was occupied by the Japanese at some date shortly before the 19th December and the defendant firm were unable to obtain the shipments of Penang tin for which they had contracted with their principal in Penang.

    The defendant firm's case is that they had contracted for the purchase of 100 tons in all from three suppliers in Penang. There was no difficulty on the 8th December with regard to shipment Ships were sailing regularly from Penang and cargo space was available.

    It is clear from the evidence that neither the plaintiff company nor the defendant firm had any apprehension on the 8th December as to the due arrival of shipments from Penang for at any rate another month."

    [3] Their Lordships will hereafter refer to the appellant firm as "the sellers" and to the respondent company as "the buyers."

    [4] Correspondence followed between the parties, but it is only necessary to quote the sellers' latter of 22 - 12 - 1941, which was as follows:

    "48, Strand Road, Calcutta, 22 - 12 - 1841. Messrs. Jeewanlal (1929) Ltd.,

    101, Clive Street,

    Calcutta.

    Re: 40 Tons of Tin Ingots.

    Dear Sirs,

    We are in due receipt of your letter dated 22nd instant and in reply have to inform you that the basis of the above business is forward and owing to the unforseen trouble in Penang the shipment it not possible. am each we have no other alternative bat to cancel the contract.

    Yours faithfully,

    Sd. Pragdes Mathurdas."

    [5] On 20 - 2 - 1942 the buyers filed their plaint alleging wrongful repudiation of the contract by the sellers and acceptance of each repudiation by the buyers. A sum of Rs. 91,850 was claimed as damages, but it is now common ground between the parties that if the buyers are entitled to damages, the correct sum is Rs. 50,100. By their written statement the sellers pleaded

    "It was expressly agreed or alternatively there wag implied (sic) that deliver; would only be made at and when goods arrived from Penang against orders placed by the defendant firm there."
    In para. 8 certain other implied conditions were alleged.

    [6] McNair J. heard oral evidence and summed up his view on that evidence as follows:

    "From the surrounding circumstances to which I have referred it appears to me beyond doubt that the plaintiff's recollection is at fault, that they did not inform Ranchoredas prior to the contract that they would require delivery under all circumstances, nor did Ranchoredas give the alleged guarantee that he would deliver from stock. On the other hand it is equally difficult to accept the defendants' story that they streated the test that delivery could only be given on arrival of the tin from Penang.

    We are then left with the letter of the 8th December from which to discover what were the intentions of the parties when using the words 'forward delivery'."

    [7] Their Lordships read this passage as a finding by the learned trial Judge that be could not accept the oral evidence of either party as to the express terms of the contract made on 8 - 12 - 1941, and that the only reliable record of these terms was the letter of that date already quoted. McNair J. then went on to construe tin letter in the light of the surrounding circumstances, and held that "The contract became impossible of performance owing to the non - arrival of tin from Penang." He therefore dismissed the suit with costs.

    [8] The buyers appealed. In the course of his judgment the Chief Justice (Sir Harold Derbyshire) quoted certain paragraphs of the sellers' written statement and continued:

    "In the appeal before this Court Mr. B. C. Ghose for the defendants abandoned the Implied terms (a), (b), (c), (d) and (e) of para. 3 and contended that the condition to be implied in the contract is that Penang tin already ordered by the seller should arrive in Calcutta and said that if this condition could not be implied the defence failed. Mr. Ghose also accepted the findings of fact of McNair J."
    3

    [9] Their Lordships think it is plain that the last sentence involves an acceptance by counsel of the position that the only reliable record of the contract was the letter of 8 - 12 - 1941. In consequence of this acceptance, the Chief Justice (with whose judgment Lodge J. agreed) did not examine the oral evidence in detail. He felt unable to imply the condition put forward by the seller, or to accept the view of McNair J. that the contract became impossible of performance, and stated his conclusions as follows:

    "In my opinion this was a contract for the purchase and sale of 40 tons of Penang tin as set out in the plaintiffs' letter of 8 - 12 - 1941, and Its fulfilment was not contingent upon the arrival of the tin from Penang; further the contract was broken by the defendants on 23 - 12 - 1941 as on which date damages should be computed.

    In my opinion this appeal should be allowed with costs here and below."

    [10] In opening the appeal before this Board, counsel for the sailers referred to a number of passages in the oral evidence given before McNair J. and sought to rely on these passages, and in particular upon an answer given by Mr. H. K. Shaba in cross - examination, as establishing that it was a term of the contract made orally on 8 - 12 - 1941 that the sellers should only be bound to deliver the tin when it arrived from Penang. Their Lordships do not think ii right to entertain this argument, is view of the attitude (already stated) which was adopted by counsel for the sellers at the hearing of the appeal in India. The findings of fact by the trial Judge having been accepted by counsel on toe appeal in India, their Lordships think that the present appeal must proceed upon the footing that no express terms of the contract have been proved other than those set out in the buyers' letter of 8 - 12 - 1941. It is, however, open to the sellers to contend that the term now under discussion is contained in the letter of 8 - 12 - 1941, on its true construction, or must be implied, And that it became impossible for the sellers to fulfil the contract.

    11. Turning to the terms of the letter of 8 - 12 - 1941, their Lordships are quite unable to construe the words "for forward delivery" as [having any meaning other than their ordinary meaning "for delivery in the future," There is no contest to alter or enlarge the meaning of these words, and the subsequent sentence "Our delivery instructions will follow" are entirely consistent with the words bearing their ordinary meaning.

    12. Further, their Lordships see no good reason for implying the condition that Penang tin already ordered by the sellers should arrive in Calcutta. As Scrutton L. J. said in (1920) 1 KB 8681 at p. 899:

    "The Court. . . ought not to imply a term merely because it would be a reasonable term to include if the parties bad thought about the matter, or because one party, if he had thought about the matter, would not have made the contract unless the term was included; it must be such a necessary term that both parties must have intended that it should be a term of the contract, and have only not expressed it because its necessity was so obvious that it was taken for granted."

    13. Their Lordships cannot find that the term in question was such a necessary term that both parties must have intended it to be a term of the contact. So far as the buyers were concerned, there is no reliable evidence that they either knew or cared whether the tin which they required would be supplied from a consignment already ordered by the sellers from Penang. They may have thought that the sellers already had 40 tons of Penang tin in stock or would buy it in India. In fact the sellers had only a small quantity in stock, but there is no accepted evidence that the buyers were informed of this fact, or of the fact that the sellers had ordered 105 tons of tin from Penang. The figure 105, and not the figure 100, appears to be correct, from the documents. Moreover, it is quite clear, from undisputed evidence, that on and after 8th December, the sellers might have supplemented their stocks by buying tin in Calcutta. There is thus no ground for concluding that the buyers must have intended the term in question to be a term of the contract. On the contrary it seems unlikely that the buyers, who had Government orders to carry out, would have agreed that the sellers should only be bound to deliver the tin if and when a consignment already ordered by them should arrive in Calcutta. As to the sellers, it is extremely likely that they intended to supply the 40 tons in question from the 105 tons which they had ordered from Penang; but even in their case it is by no means clear that they must have intended this to be a term of the contract. The findings of the learned trial Judge show that on 8th December the sellers had no apprehension as to deliveries from Penang, and they may have been willing to contract for forward delivery without specifying the precise source of supply.

    14. As the term in question is not proved to form part of the express contract, and cannot be implied, the only remaining question is whether it became impossible for the sellers to fulfil the contract when the Japanese occupied Penang. Their Lordships are willing to assume that impossibility of performance would be a complete defence in the present case, and that it is still open to the sellers to rely on this defence, notwithstanding the admissions of Mr. Ghose. Even so, the burden of proving impossibility rested on the sellers and clearly that burden was never discharged. It will be sufficient to quote the following passage from the evidence of Mr. Ranchoredas:

    Q.-Could you get ready Penang tin in December is Calcutta any large quantity ?

    A.-It is not impossible, but it could be secured by taking one ton from one dealer, another ton from another, in that way. But usually it could not be secured. This quantity of goods could not be secured at a particular pries or at a little higher or lower price than a particular fixed price.

    Q.-You said about a particular price. What do you mean ?

    A.-The abnormal price was very high.

    Q-You know it has been stated that yon, daring December, supplied goods of Penang quality la Calcutta. Is that correct ?

    A.-Yes. After that us our source at Penang was no more available to us, we purchased little quantities here in the market and supplied to customers.

    Q.-Were those contracts with customers ready or forward ?

    A.-Contracts for ready goods.

    [15] It may also be noted that shortly after 22nd December the buyers were able to bay 6 tons of tin in India at an average price of rs. 304 per cent. In fact, the sellers took up the attitude that they were not bound to make any effort to deliver the 40 tons, after the Japanese had occupied Penang. Mr. Ranchoredas said in evidence

    "There was no question of buying against the contract. The contract was for forward delivery and as the goods did not arrive we are not bound to give them."

    [16] The result is that in their Lordships' view the learned Chief Justice and his colleague arrived at the right conclusion, and their Lordships will humbly advise His Majesty that this appeal should be dismissed. The appellants must pay the respondents' costs of this appeal.

    Appeal dismissed.