AMICUS AI
Citation Codes
Neutral Citations
1989 INSC 15
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section [not specified] of [no specific act/article mentioned]
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
1989 INSC 15
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section [not specified] of [no specific act/article mentioned]
Smart Summary

Factual and Procedural Background

Several industrial consumers of electricity in Bihar received “annual minimum guarantee” bills for the years 1973-74 to 1982-83 from the Electricity Supply Division, Forbesganj. Under Clause 4 of their individual supply agreements, a consumer must pay a minimum charge even if it uses less power than the stipulated threshold. Relying on Clause 13, the consumers filed claims before the Chief Engineer, contending that frequent tripping, load-shedding and power-cuts meant the Board had not supplied power as contracted and therefore the minimum guarantee should be reduced proportionately. The Chief Engineer rejected the claims. The consumers then filed writ petitions in the Patna High Court, which quashed the demands altogether, holding that Clause 1 required a continuous supply of electricity and that, in its absence, no minimum guarantee could be charged. The Bihar State Electricity Board challenged that decision in multiple Special Leave Petitions before the Supreme Court.

Legal Issues Presented

  1. Whether Clause 1 of the standard supply agreement obliges the Bihar State Electricity Board to furnish an uninterrupted (continuous) supply of electricity, such that failure to do so eliminates the consumer’s liability to pay the annual minimum guarantee.
  2. How Clause 13—providing for proportionate reduction of the minimum guarantee when supply or consumption is prevented by circumstances beyond the parties’ control—should be interpreted and applied.

Arguments of the Parties

Electricity Board's Arguments

  • “Constant supply” in Clause 1 refers only to technical parameters (voltage, cycles, phases) and does not guarantee an unbroken, continuous flow of power.
  • Clause 4 unambiguously obliges consumers to pay annual minimum guarantee charges irrespective of temporary interruptions.
  • Clause 13 contemplates only a proportionate reduction; the High Court erred in eliminating liability entirely.
  • Cited precedent, including Northern India Iron & Steel Co. v. State of Haryana and Amalgamated Electricity Co. v. Jalgaon Borough Municipality, to support its contractual interpretation.

Consumers' Arguments

  • Clause 1 contemplates a dependable, continuous supply; only when that duty is met does the minimum-guarantee obligation arise.
  • The Board’s admitted failure to supply power for extensive periods defeats the minimum-guarantee demand.
  • In the alternative, if the High Court’s view is not upheld, consumers are at least entitled to a proportionate reduction based on hours of non-supply already recorded and undisputed before the High Court.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Amalgamated Electricity Company Ltd. v. Jalgaon Borough Municipality (1975) 2 SCC 508 Cited by Board’s counsel for general principles governing minimum-guarantee clauses in electricity supply contracts. The judgment notes the citation but does not rely on the case in its reasoning.
Northern India Iron & Steel Co. v. State of Haryana (1976) 2 SCC 877 Established that inability of the Board to supply power due to power-cuts is a circumstance beyond the consumer’s control, warranting a proportionate reduction of demand charges. The Court adopted this principle, holding that consumers are liable only for proportionately reduced minimum-guarantee charges when supply shortfalls occur.
Man Industrial Corp. v. Rajasthan SEB, AIR 1986 Raj 137 Referenced by counsel; specific rule not discussed in the opinion. Mentioned but not analysed or applied by the Court.
Mukand Iron & Steel Works Ltd. v. Maharashtra SEB, AIR 1982 Bom 580 Referenced by counsel; specific rule not discussed in the opinion. Mentioned but not analysed or applied by the Court.

Court's Reasoning and Analysis

The Supreme Court observed that Clause 1 merely specifies technical characteristics of the supply and does not promise an uninterrupted flow of electricity. The pivotal provision is Clause 13, which expressly contemplates situations where either party is prevented from supplying or consuming electricity due to causes beyond its control and mandates a proportionate reduction of both “demand charge and guaranteed energy charge.”

Relying on its earlier decision in Northern India Iron & Steel Co., the Court held that power-cuts, load-shedding and other interruptions are circumstances “beyond the control” of the consumer. Therefore, while the consumer’s obligation to pay the minimum guarantee is not extinguished, it must be adjusted downward in proportion to the hours of non-supply.

The Court concluded that the High Court erred in completely nullifying the minimum-guarantee liability. Instead, the correct approach is to compute a proportionate reduction, to be determined by the Chief Engineer as expressly provided in Clause 13. The hours of non-supply for each disputed year had already been recorded in the High Court’s judgment and were undisputed by the Board; those figures are to guide the recalculation.

Holding and Implications

ALLOWED IN PART – High Court judgment set aside to the extent it absolved consumers from all liability; consumers remain liable for annual minimum-guarantee charges subject to proportionate reduction under Clause 13.

Implications: The Chief Engineer of the Bihar State Electricity Board must recompute the charges for each disputed year on a proportionate basis using the undisputed hours of non-supply identified by the High Court. Until fresh demands are raised on that basis, the Board may not disconnect supply for non-payment of the original bills. The decision clarifies contractual interpretation of minimum-guarantee clauses but does not create a new legal standard beyond reinforcing the principle laid down in Northern India Iron & Steel Co.

To access the original judgment, please Sign In or Subscribe.

    Bihar State Electricity Board And Another v. Ms Dhanawat Rice And Oil Mills .

    G.L Oza, J.— Leave granted.

    2. These special leave petitions have been filed against the judgment of the High Court of Patna by which several writ petitions were disposed of. All these special leave petitions have been preferred in this Court aggrieved by that judgment. The common question which arises in all these SLPs is that under the agreement arrived at between the consumers and the Bihar State Electricity Board there is a clause for payment of minimum guarantee which indicates that even if the consumer does not consume electricity above the minimum guarantee then it will be incumbent upon the consumer to pay charges for energy which is the annual minimum guarantee provided in the agreement pertaining to industrial units.

    3. The relevant facts are that for the years 1973-1974 to 1982-1983 the bills for annual minimum guarantee were served on the appellants by the Electricity Supply Division, Forbesganj and on receipt thereto the appellants filed their claims as provided under Clause 13 of the agreement on the ground that appellant was not liable to pay any such charges because the appellant did not supply constant electricity as provided in the agreement during the period in question and there were tripping, load-shedding, and power cut which resulted in a great loss to the petitioners and as the supply was not in accordance with the agreement liability to pay annual minimum guarantee bills could not be fastened on the consumer. The Chief Engineer who was the authority under the agreement negatived the claim and so they filed writ petitions in the High Court.

    4. The High Court by the impugned judgment came to the conclusion that under Clause 1 of the agreement it was incumbent for the Electricity Board to supply constant electricity and the consumer will be liable to pay annual minimum guarantee charges only if in spite of the fact that the Board supplies power as contemplated in the agreement and the consumer does not utilise the power then the liability to pay annual minimum guarantee charges will arise and on this basis the High Court quashed the demands made for these years on the basis of annual minimum guarantee as it found that power was not supplied according to the agreement.

    5. Learned counsel appearing for the Electricity Board contended that Clause 1 of the agreement does not in any manner mean that there should be a continuous supply. The term used in clause 1 of the agreement only talks of constant supply of electrical energy at the pressure of volts, cycles, 3 phase, 3 wire etc. but it does not talk of continuous supply without any break and it therefore could not be contended that if there was no supply for a few minutes it will amount to failure on the part of the Electricity Board to provide constant supply. It was contended that the constant supply cannot mean continuous supply. It was also contended that clause 4 of the agreement clearly talks of the payment of annual minimum guarantee charges and therefore it could not be said that because of the power cut or situations beyond the control of the Electricity Board if the power could not be supplied for all the 24 hours every day the respondent consumer can deny the liability to pay annual minimum guarantee bills. It was also contended that in view of clause 13 of the agreement which provides that if there was shortage of supply and that shortage resulted in short supply then the consumer was entitled to a proportionate reduction of the annual minimum guarantee bill as determined by the Chief Engineer, Bihar State Electricity Board and consequently the respondent in this case went to the Chief Engineer who ultimately decided on the basis of facts that respondents were not entitled to any proportionate reduction and it was because of this that the petitions were filed before the High Court. It was contended that the learned Judges of the High Court have failed to appreciate clause 13 of the agreement. Learned counsel also placed reliance on the decisions in Amalgamated Electricity Co. Ltd. v. Jalgaon Borough Municipality (1975) 2 SCC 508, AIR 1975 SC 2235, (1976) 1 SCR 636, Northern India Iron & Steel Co. v. State of Haryana (1976) 2 SCC 877, AIR 1976 SC 1100, (1976) 2 SCR 677, Man Industrial Corp. v. Rajasthan SEB AIR 1986 Raj 137, 1985 Raj LR 830 and Mukand Iron and Steel Works Ltd. v. Maharashtra SEB AIR 1982 Bom 580.

    6. Learned counsel for the respondents on the other hand contended that clause 1 provides for constant supply of power, the variations permitted have been indicated in this clause itself and it is contended that it is only where the Electricity Board discharges its duty to supply power as contemplated in clause 1 and the consumer because of his difficulties is not able to utilise power even up to the level of minimum guarantee that the liability to pay annual minimum guarantee bills could be fastened on the consumer but if the Board fails to discharge its responsibilities as contemplated in clause 1 of the agreement it could not compel the consumer to pay the annual minimum guarantee. It was frankly conceded that in the petition itself originally relief sought was proportionate reduction of the annual minimum guarantee bills but in view of the interpretation of clauses 1, 4 and 13 the High Court came to the conclusion that there is no liability on the consumer to pay annual minimum guarantee bills as the Electricity Board has failed to supply power as contemplated in clause 1 of the agreement. Learned counsel however contended that the Chief Engineer in his order has misunderstood the whole situation but before the High Court the facts were not disputed and in each case average hours of supply per year during the disputed period have been stated which have not been disputed by the Electricity Board and if at all the High Court judgment is not maintained the respondents are entitled to proportionate reduction of the annual minimum guarantee bills in the light of the hours of supply per year which have been stated in the High Court judgment and is not disputed.

    7. Clause 1 of the agreement reads as under:

    “1(a) The Board shall furnish to the consumer and the consumer shall accept at the point of supply mentioned in the Schedule hereto, on and from the date on which the said premises shall be connected with the supply distributing mains and during the continuance of the agreement, a constant supply of electrical energy at the pressure of ... Volts, 50 cycles, 3 phases, 3 wires, alternating current system subject to standard variations as provided in Indian Electricity Rules, 1956 or any other statutory modification thereof as may be in force from time to time for the purpose and up to the maximum specified (hereinafter referred to as the contract demand) and under the conditions laid down in the Schedule.”
    This clause talks of constant supply of electrical energy providing for voltage, cycles, phases and wires. It is clear that it does not talk of continuous supply nor does it talk of non-continuous or intermittent supply. In fact this clause in our opinion is not very material for the decision of the case as the sole controversy pertains to interpretation of clause 13.

    8. Clause 4 of the agreement provides for the minimum guarantee and there is no dispute that if the consumer is not able to utilise electricity even up to the level of minimum guarantee, this clause provides for payment of charges of minimum guarantee. The real controversy pertains to the interpretation of clause 13. In fact in Northern India Iron & Steel Co. case (1976) 2 SCC 877, AIR 1976 SC 1100, (1976) 2 SCR 677 this Court had the occasion to consider a situation of this kind where this Court on this aspect of the matter has observed that where the Electricity Board fails to supply power because of shortage of energy, power cut or any other circumstance as per demand of the consumer according to the contract it will be considered as a circumstance beyond the control of the consumer which prevented it from consuming electricity as per the contract. Their Lordships observed as under:

    “We are, therefore, of the view that the inability of the Board to supply electric energy due to power cut or any other circumstance beyond its control as per the demand of the consumer according to the contract will be reflected in and considered as a circumstance beyond the control of the consumer which prevented it from consuming electricity as per the contract and to the extent it wanted to consume. The monthly demand charge for a particular month will have to be assessed in accordance with sub-clause (b) of clause 4 of the tariff and therefrom a proportionate reduction will have to be made as per sub-clause (f). We hope, in the light of the judgment, there will be no difficulty in working out the figures of the proportionate reduction in any of the cases and for any period. In case of any difference or dispute as to the quantum of the demand charge or the proportionate reduction, parties will be at liberty to pursue their remedy as may be available to them in accordance with law.”
    It appears that reading clause 13 in the present case clearly provides for the contingency and it provides for the failure on the part of the supplier and also failure on the part of consumer in the circumstances like strike, riot, fire, flood, explosion or act of God or any other reason beyond the control of either of the parties. Clause 13 of the agreement reads:
    “If at any time the consumer is prevented from receiving or using the electrical energy to be supplied under this agreement either in whole, or in part due to strikes, riots, fire, floods, explosions, act of God or any other cause-reasonably beyond control or if the Board is prevented from supplying or unable to supply such electrical energy owing to any or all of the causes mentioned above then the demand charge and guaranteed energy charge set out in the schedule shall be reduced in proportion to the ability of the consumer to take or the Board to supply such power and the decision of the Chief Engineer, Bihar State Electricity Board, in this respect shall be final.”
    In view of this language of the clause clearly providing for the proportionate reduction of the annual minimum guarantee bills it could not be doubted that the High Court was not right in coming to the conclusion that the respondents were not liable to pay annual minimum guarantee bills at all. The judgment of this Court also clearly indicated that the respondents consumers are entitled to a proportionate reduction of the minimum guarantee bills. In Clause 13 of the agreement this is clearly stated that the authority competent to determine the proportionate reduction is the Chief Engineer and it appears that it was because of this that the respondents consumers approached the Chief Engineer for consideration. But it appears that the learned Chief Engineer also did not clearly understand the meaning of clause 13. The judgment of the High Court on which reliance is placed have only followed the judgment referred to above.

    9. In our opinion, therefore, the High Court was not right in coming to the conclusion that the respondents were not liable at all to pay annual minimum guarantee charges. In fact they are only entitled to the proportionate reduction. The judgment of the High Court clearly states the hours every year in dispute when the power was not supplied and on this basis the respondents consumers will be entitled to proportionate reduction as ordinarily the consumers are expected to have continuous power supply. It is therefore directed that the Chief Engineer of the Electricity Board on the basis of hours of non-supply as indicated in the High Court judgment and not disputed in the High Court will assess the proportionate reduction of the annual minimum guarantee bills in respect of disputed years indicated above and it is also directed that until this is not done the power supply will not be disconnected on the basis of failure to pay the annual minimum guarantee bills for the periods stated above. However, after the proportionate reduction is made and fresh demand is made. Electricity Board will be entitled to take recourse to the normal procedure if the consumers fail to pay.

    10. In the circumstances no order as to costs.