Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Acts
  • S. 4 of the Rajasthan Land Acquisition Act, 1953
  • S. 4 of the Land Acquisition Act (1 of 1894).
  • S. 23 of the Land Acquisition Act
  • S. 4 of the Land Acquisition Act
  • DELHI DEVELOPMENT ACT 1957
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Acts
  • S. 4 of the Rajasthan Land Acquisition Act, 1953
  • S. 4 of the Land Acquisition Act (1 of 1894).
  • S. 23 of the Land Acquisition Act
  • S. 4 of the Land Acquisition Act
  • DELHI DEVELOPMENT ACT 1957
Smart Summary

Analytical Summary of the Opinion (Madan, J.)

Factual and Procedural Background

This special appeal challenges the order dated 15th March, 1994 of the learned Single Judge of the High Court, which had dismissed a writ petition under Article 226 of the Constitution filed by the appellant. The appeal was admitted on 21st March, 1993; arguments were concluded on 4th April, 1994, and a stay granted on 21st March, 1994 was continued until judgment. On 4th April, 1994 the appellant undertook not to make any construction over the disputed land while the stay subsisted.

On 13th May, 1960 the Government of Rajasthan issued a Notification under S.4 of the Rajasthan Land Acquisition Act, 1953 (published in the Gazette on 6th June, 1961) for acquisition of certain land for a stadium and a new High Court building at Jaipur. Khasra No. 35 was mentioned in that Notification with 6 bighas indicated as sought to be acquired. A subsequent Notification dated 3rd May, 1961 (published 11th May, 1961) declared under S.6 that acquisition proceedings should be initiated. Proceedings culminated in an Award dated 9th January, 1964, which included remaining areas of Khasra No. 35 measuring 3 bighas 10 biswas among other lands.

The Award directed allotment of a 1000 sq. yard plot to the appellant (in respect of khasra Nos. 34-38) and, in lieu of land in khasra No. 277, a 2000 sq. yard residential plot. To implement the Award the appellant filed civil suit No. 1177/85 (48/88) in the Munsiff's court; that suit was partly decreed on 14th February, 1992 (granting allotment of 1000 sq. yards) and other claims were dismissed. The appellant filed a writ petition (S.B. Civil Writ Petition No. 2935/92) on 15th July, 1992, which was dismissed by the learned Single Judge on 15th March, 1994; the present special appeal challenges that dismissal.

Legal Issues Presented

  1. Whether the appellant can challenge the validity and legality of the land acquisition proceedings and the impugned Notifications/award after having accepted compensation and after a delay of more than 28 years.
  2. Whether the appellant is precluded from obtaining relief by principles of laches, estoppel, res judicata or constructive res judicata.
  3. Whether the Notifications under the Land Acquisition Act were duly published so as to preclude the appellant from claiming ignorance of acquisition.
  4. Whether alleged procedural defects (for example, sufficiency of description in notifications or local publicity) claimed by the appellant attract the authorities of precedent relied upon by the appellant.

Arguments of the Parties

Appellant's Arguments

  • The 3 bighas 10 biswas in Khasra No. 35 was never made subject matter of acquisition in the Notifications dated 13th May, 1960 and 3rd May, 1961, although it was included in the Award; physical possession remained with the appellant. (para 5(a))
  • The appellant served notices on respondents challenging dispossession on 6th January, 1992 and 3rd March, 1992. (para 5(b))
  • The appellant also relied on precedents concerning deficiencies in publication or notice procedures in acquisitions (case citations summarized below). (paras 18, 19, 22, 23)
  • The appellant claimed illiteracy and ignorance of technical procedural aspects. (para 18)
  • The appellant disputed the genuineness/validity of an affidavit dated 5th January, 1993 (by which he was said to have accepted compensation and parted with possession), arguing that the affidavit had over-writings and thus did not prove surrender of possession. (para 15)

Respondents' Arguments

  • The appellant had already received compensation for the entire land acquired from the Land Acquisition Officer, so he cannot now challenge the legality of the acquisition; subsequent Notifications (including one published 7th January, 1971) included the 3 bighas 10 biswas. (para 11)
  • The appellant, having accepted compensation, is estopped from questioning the acquisition; acceptance of payment was an acknowledgment and precludes belated attack. (para 12, 14)
  • Possession pursuant to the Award was transferred to the then Urban Improvement Trust on 29th June, 1970, and communications from that Trust and payment records show the appellant's compensation and the inclusion of Khasra No. 35 at 3 bighas 10 biswas. (para 7)
  • The appellant had pursued alternative civil remedies (civil suit, appeals) and therefore the acquisition proceedings and related matters could not be challenged before the High Court; principles of res judicata apply. (paras 8, 10, 17)

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Syed Hasan Rasul Numa v. Union of India, (1991) 1 SCC 401 On publication and procedure under the Delhi Development Act: mandatory modes of publicizing modification in Master-plan (two of three alternatives required) and consequence where mandatory procedure not followed; prejudice to right to have objections considered if publication non-compliant. (para 18) The court held this principle inapplicable because here there was no dispute regarding mode of publication—the notifications were duly gazetted—so the appellant could not claim ignorance after 28 years. (para 18)
Hindustan Oil Mills Ltd. v. Special Deputy Collector (Land Acquisition), (1990) 1 SCC 59 On sufficiency of description in a Section 4 notification: notification need not precisely define the land or owners, but must give clear indication so owners/occupiers can get a fair idea of the acquisition and its impact. (para 27-28) The court held the appellant could not benefit from this authority because he had accepted compensation and had not approached with clean hands; the principle did not aid the appellant. (para 20)
Ratan Singh v. State of Punjab, AIR 1976 P & H 279 (Full Bench) That publicity of substance of a Section 4 notification in the concerned locality simultaneously with or immediately after Gazette publication is essential; delay in local publication may invalidate notifications. (para 22) The court found this judgment inapplicable here because the position (delay in local publication) did not exist in the present case. (para 22)
Jaipur Development Authority v. Radhey Shayam, Civil Appeals Nos. 4209 & 4210 of 1992 (decided 17 Feb 1994) Whether the Collector has power to award land in lieu of compensation; S.11 procedures for objections and award; government policy to allot other suitable land to displaced persons. (para 23) The court held the observations in that case are not attracted to the facts of the present appeal and do not assist the appellant. (para 23)
Aflatoon v. Lt. Governor of Delhi, (1975) 4 SCC 285 Principle that delay and laches disentitle parties to attack notifications when they "sat on the fence" and allowed acquisition to complete; writ petitions liable to be dismissed for laches. (para 33-34) The court relied on this authority to support dismissal on grounds of laches and delay. (para 24)
Ratni Devi v. Chief Commissioner, (1975) 4 SCC 467 Authority affirming limits on challenging provisions such as S.23 and related principles (cited along with Aflatoon). (para 35) Cited as part of a line of Supreme Court authority reinforcing that delay/laches bar belated challenges to acquisition proceedings. (para 35)
Har Avta Singh v. State of Punjab, (1982) 3 SCC 483 Part of authorities cited on limits to belated challenges to acquisition and related doctrines. (para 35) Again cited to support the proposition that delay and related doctrines preclude belated attacks; used cumulatively with other Supreme Court decisions. (para 35)
Ramjas Foundation v. Union of India, (1993) Supp (2) SCC 20 Reiterates Aflatoon: no justification for delay in challenging notifications issued years earlier; writs liable to be dismissed for laches. (para 35-36) Cited as "latest judgment" showing that delay in challenging S.4/S.6 notifications was unacceptable; court said this supports dismissal for laches. (para 36)
Hastimal v. State of Rajasthan, 1973 RLW XXIV 309 (Division Bench of this court) Held that undue delay disentitles a person from seeking remedy under Article 226; exercise of jurisdiction under Article 226 is discretionary. (para 37) The court relied on this state's Division Bench authority to support that undue delay disentitles a person from relief under Article 226. (para 37)

Court's Reasoning and Analysis

The court reviewed the rival contentions and the documentary evidence (including Gazette notifications, the Award of 9th January, 1964, records of payment of compensation, and an affidavit dated 5th January, 1993). The court's reasoning proceeded along these principal lines:

  1. The learned Single Judge had dismissed the writ petition on the ground of laches; the Division Bench considered that conclusion justified and therefore did not need to examine all other submissions on the merits. (para 14)
  2. The appellant had received compensation for the land and, according to the records and a letter from the then Urban Improvement Trust (dated 2nd July, 1970), the area of Khasra No. 35 had been specified as 3 bighas 10 biswas and payment made; the appellant accepted compensation and thereby acquiesced in the acquisition. (paras 7, 14)
  3. There was long unexplained delay (over 28 years) between the Award (1964) and the writ petition (1992). The court emphasized that notifications were duly published in the State Gazette and the Award was likewise published; ignorance after such publication could not be claimed. (paras 12, 19)
  4. Doctrines of estoppel, res judicata and constructive res judicata applied: acceptance of compensation and participation in proceedings disentitled the appellant from challenging the acquisition at a belated stage. (para 16)
  5. The court rejected the appellant's contention that over-writings in an affidavit rendered the affidavit invalid or that re-depositing compensation in 1992 could salvage his position; the court described such attempts as a camouflage and after-thought. (paras 15, 21, 23)
  6. The court examined the appellant's reliance on various authorities concerning defects in notification/publicity and concluded that those authorities were not attracted to the facts here because the notifications had been duly gazetted and no defect in mode of publication was shown. (paras 18, 22-23, 26)
  7. The court applied and followed Supreme Court authorities (Aflatoon and subsequent cases) and this court's own precedents to hold that delay and laches disentitle belated challenges to acquisition proceedings. (paras 24, 35-37)
  8. The Single Judge's finding that the appellant had not come to court with clean hands, had suppressed material facts, and had sought interim relief by concealment was accepted by the Division Bench as a reason to deny equitable relief under Article 226. (para 25)

Holding and Implications

The order of the learned Single Judge dated 15th March, 1994 is affirmed; the special appeal fails and is dismissed. The court ordered the appeal dismissed with no order as to costs. (para 27)

Implications:

  • Direct effect on the parties: The appellant's writ petition remains dismissed and the appellate challenge has failed—the appellant cannot obtain relief in this special appeal. (para 27)
  • The court's decision rests on findings of laches, estoppel, acquiescence (acceptance of compensation and conduct), and related procedural history; the court declined to grant relief in equity because the appellant had delayed more than 28 years and had not approached with clean hands. (paras 14, 16, 23, 25)
  • The opinion does not purport to set aside or to lay down a new legal principle; it applies established principles (laches, estoppel, res judicata and the Supreme Court authorities cited) to the facts. (paras 24, 35-37)

    Chhotelal v. State Of Raj. & Ors.(143)

    Madan, J.:— This special appeal has been preferred in this court against the order, dated 15th March, 1994, passed by learned Single Judge of this court, whereby the learned Single Judge, after examining the legal position and the principles governing the validity of acquisition proceedings, has dismissed the writ petition filed by the appellant under Art. 226 of the Constitution of India. Feeling aggrieved by the impugned order of the learned Single Judge, the present appeal has been preferred.

    2. The above noted special appeal was admitted on 21st March, 1993 and the arguments advanced by the learned counsel for the parties were heard and concluded on 4th April, 1994 with a direction that stay order, dated 21st March, 1994 passed by this court will continue till the pronouncement of judgment in this appeal. On 4th April, 1994 learned counsel for the appellant gave an undertaking on behalf of the appellant not to make any construction over the disputed land during subsistence of the stay order. Brief facts giving rise to the filing of this special appeal are that on 13th May, 1960 the Government of Rajasthan issued Notification under S. 4 of the Rajasthan Land Acquisition Act, 1953 which was published in Rajasthan Gazette, dated 6th June, 1961, for the purported acquisition of land mentioned therein. The purpose of acquisition of the land was indicated to be construction of Stadium and new High Court Building at Jaipur. Khasra No. 35 was also mentioned in the aforesaid Notification but the area sought to be acquired from said khasra No. 35 was indicated as 6 bighas only.

    3. It will be pertinent to mention here that the aforesaid Notification was followed by subsequent Notification, dated 3rd May, 1961, which too was published in Rajasthan Gazette, dated llth May, 1961. This Notification contained the declaration under S. 6 of the Act of 1953 authorising the Land Acquisition Officer to initiate and persue the proceedings for acquisition of the land mentioned in the aforesaid Notification. Pursuant to the aforesaid, the Land Acquisition Officer started the proceedings for acquisition of the aforesaid land which culminated in passing of the Award on 9th January, 1964. This Award related to various lands acquired under the Notification referred to above, including the remaining areas of khasra No. 35 measuring 3 bighas 10 biswas. With regard to acquisition of khasra Nos. 34 to 38 belonging to the appellant, the Land Acquistion Officer directed that a plot of land measuring 1000 sq. yards be allotted to the appellant apart from compensation. It was further directed by the Collector that in lieu of acquisition of the appellant's land in khasra No. 277, a residential plot of land measuring 2000 sq. yards be also allotted to the appellant.

    4. Consequently for implimentation of the aforesaid Award, the appellant filed civil suit No. 1177/85 (48/88) in the court of Munsiff (East), Jaipur City, Jaipur. The said suit was partly decreed by the judgment and decree, dated 14th February, 1992, giving relief for allotment of plot measuring 1000 sq. yards to the appellant, while remaining claim of the appellant was dismissed. Being aggrieved by the aforesaid order, the appellant preferred a civil appeal before the District Judge, Jaipur City, Jaipur and the appellant simultaneously filed a writ petition in this court under Art. 226 of the Constitution of India which was numbered as S.B Civil Writ Petition No. 2935/92 on 15th July, 1992 which was heard and decided by the learned Single Judge of this court on 15th March, 1994 against which the present appeal has been preferred as indicated above.

    5. During the course of hearing the following contentions were advanced by Shri G.S Bapna, learned counsel for the appellant:—

    (a) That the land measuring 3 bighas 10 biswas falling in khasra No. 35 was never made subject matter of acquisition in Notifications dated 13th May, 1960 and 3rd May, 1961 though included in the Award, dated 9th January, 1964 (Annex. 4 to the writ petition) and physical possession thereof remained with the appellant,

    (b) That the appellant had served two notices on the respondents challenging his dispossession from the land falling in the aforesaid khasras on 6th January, 1992 and 3rd March, 1992,

    (c) That on 28th February, 1992 Revenue Officials such as Patwari, Asstt. Engineer and officers of the Jaipur Development Authority visited appellants' premises at Jaipur over khasra No. 36 and coerced the appellant to sign some documents in proof of handing over possession of the entire piece of land,

    (d) That the aforesaid threat was repeated by Jaipur Development Authority through J.D.A's officials on 2nd April, 1992 regarding appellant's land falling in khasra No. 35 measuring 3 bighas 10 biswas.

    (e) That in absence of acquisition of erstwhile khasra No. 35 measuring 3 bighas 10 biswas by the State Govt. under the aforesaid Act, the respondents have no jurisdiction to dispossess the appellant from the said land. In view of the above contentions the appellant had thus questioned the legality and validity of the action taken by the respondents in seeking dispossession of the appellant from the aforesaid land acquired by the State Government pursuant to the aforesaid Notifications.

    6. While refuting the aforesaid contentions of the appellant, Shri R.D Rastogi, learned counsel for the respondents made the following submissions:—

    (a) That the appellant had already received the compensation from the Land Acquisition Officer in respect of the entire land acquired by the State Government hence it is not open to him to question the legality and propriety of the impugned Notification acquiring the said land. It is true that Notification under S. 4 of the Land Acquisition Act was issued and the land to be acquired was also mentioned. Notification which was issued earlier was only in respect of 6 bighas of land from khasra No. 35 amongst other land falling in different khasra numbers, but one more Notification was issued which was published in Rajasthan Gazette, dated 7th January, 1971 and 3 bighas 10 biswas land which might have been left to be acquired from khasra No. 35 was also included in the Notifications under S. 4 of the Land Acquisition Act and, therefore, it is wrong to say that no power under S. 4 of the said Act was exercised by respondent No. 1 in respect of 3 bighas 10 biswas of land falling in khasra No. 35.

    (b) That the appellant having already received payment of compensation in respect of entire land acquired was estopped from challenging legality and validity of the acquisition of the land in subsequent proceedings by way of writ petition before learned Single Judge of this court and subsequently in appeal before us.

    (c) That the writ petition filed by the appellant was highly belated and deserved dismissal both, on the ground of latches and acquiescence since final Award was passed on 9th January, 1964, whereas civil writ petition No. 3925/92 was filed in this court on 15th July, 1992 after the period of more than 28 years which has not been explained by the appellant.

    7. It was further contended by the learned counsel for the respondents that pursuant to the Award passed by the Land Acquisition Officer on 9th January, 1964, the possession of the acquired land was also transferred to the then Urban Improvement Trust, Jaipur on 29th June, 1970 and a letter was also written by the Secretary to the then Urban Improvement Trust, Jaipur, dated 2nd July, 1970, to the Land Acquisition Officer, Urban Development Scheme, Jaipur, in which the amount of compensation paid to the appellant was specified and at item No. 2 the area of khasra No. 35 had also been specified as 3 bighas 10 biswas and the Land Acquisition Officer was directed to make payment of the amount awarded and thereafter compensation amount was paid to the appellant for his entire land acquired which included the land referred to above, and the payment having been accepted by the appellant in token of acknowledgment, the same was not open to challenge before this court at such a belated stage.

    8. It was further contended that civil suit was also filed by the appellant earlier in the court of Munsiff (East), Jaipur City, Jaipur for grant of perpetual injunction regarding the aforesaid land with special reference to khasra No. 35 with a prayer to civil court that the appellant may not be dispossessed from the land without alternative and simultaneous allotment of a plot measuring 3000 sq. yards.

    9. It is thus, clear from the above that the appellant had not only persued the civil remedy independently but had also filed writ petition earlier before this court which has since been dismissed by the learned Single Judge and against which the present appeal has been preferred.

    10. It will not be out of place to mention here that regarding the claim of the appellant for compensation in lieu of 1000 sq. yards of land, the appellant had preferred second appeal in this court vide civil second appeal No. 123/92 which is still pending and the matter is subjudice. Regarding remaining 2000 sq. yards of land the matter is still subjudice in view of the fact that an appeal preferred by the appellant is already pending before the District Judge, Jaipur City, Jaipur. The learned counsel for the respondents also argued that in view of the alternative remedy having already been availed of by the appellant, the acquisition proceedings were not open to challenge before this court as the same were barred on the principles of res-judicata.

    11. Learned counsel for the appellant further contended that his client being illiterate, he was not aware of the complexity and technicalities of procedure regarding the land acquisition proceedings.

    12. The appellant's plea regarding belated information or knowledge regarding acquisition of his land was also not available to him in view of the publication of the Notifications under Ss. 4 and 6 of the Act in the Gazette published by the State Government. Even the final Award passed by the Land Acquisition Officer was also published in the Gazette on 9th January, 1964, and the appellant had accepted compensation without any demenour, hence the stand of the appellant was an after-thought and camaflague to improve his own case.

    13. We have heard rival contentions advanced by the learned counsel for the parties and also examined the legal position regarding the controversy at issue.

    14. We are of the considered opinion that the learned Single Judge was justified in rejecting the writ petition on the ground of laches and, therefore, we need not examine the various submissions which have been made on merit.

    15. During the course of hearing learned counsel, for the respondent invited our attention to affidavit, dated 5th January, 1993, and a copy of the agreement by which the appellant had accepted the compensation in lieu of his land acquired falling in khasra Nos. 34 to 38 and wherein he has specifically stated that he has parted with possession of the entire land to the then Urban Improvement Trust, Jaipur and to the Land Acquisition Authorities. Faced with this situation, the learned counsel for the appellant disputed the validity of the aforesaid affidavit furnished by him to Jaipur Development Authority on the ground that since the said affidavit contains over-writings therefore, the possession of land was never taken from the appellant. Learned counsel for the appellant has further argued that on 27th January, 1994 he had filed reply to the re-joinder to the reply of the petitioner to the additional information which was furnished by non-pet. no. 3, J.D.A In this reply the petitioner has contended that claim of the petitioner relating to 3000 sq. yds. land in pursuance of the Award given by the Land Acquisition Officer and that his land had been acquired by respondents without any authority of law.

    16. We are not impressed by this contention, since we are of the view that this is merely a camaflague and an excuse to challenge the genuineness and the validity of the land acquisition proceedings as earlier stated above and the appellant having already received compensation for the land acquired by the State Government and as such having granted acquiescence to the same by his own conduct and acknowledgments and having remained quiet for a period of more than 28 years should not be permitted to question the legality, validity and propriety of the acquisition proceedings. The principles of estoppel, res-judicata and constructive res-judicata are fully attracted to the facts of the present case. We are of the considered opinion that notwithstanding the fact that physical possession of the land remained with the appellant during the pendency of the acquisition proceedings, yet the appellant is not entitled to raise this plea in view of the fact that the land having been validily acquired in pursuance of the Notifications which are duly published in the State Government Gazettes and Award having been passed by the Land Acquisition Officer pursuant thereto, it is not open to the appellant to raise such pleas on flimsy and untenable grounds. In this regard it is very pertinent to mention the observations of the learned Single Judge of this court to the following effect:—

    “The petitioner not only participated in the proceedings which led to the passing of the award but also took compensation meant for the entire land falling in those khasra numbers. He handed over possession of the entire land as early as in the year 1970 and therefore, he cannot now after a period of 30 years question the legality of the acquisition proceedings”.

    17. We are in full agreement with the above observations of the learned Single Judge of this court. Learned Single Judge has also opined that the appellant had suppressed the material facts from the notice of this court and had not approached the court with clean hands. He has observed that the appellant had thus clearly disentitled himself from any relief in exercise of its jurisdiction under Art. 226 of the Constitution of India because the appellant having secured interim relief from this court by concealment and mis-representation of facts had disentitled himself from any indulgence by this court. The appellant had himself chosen to file civil suit for grant of perpetual injunction against the respondents to the effect that they should give land measuring 3000 sq. yards to the appellant in view of the Award, dated 9th January, 1964. It is further noteworthy to mention that the appellant having already availed the remedy of the civil court in the aforesaid suit and in respect of which he succeeded in getting partial relief, has also challenged the same by way of second appeal which is pending before this court with regard to land measuring 1000 sq. yards and also by filing an appeal before District Judge, Jaipur City, Jaipur in respect of land measuring 2000 sq. yards which is also pending and the decision of the court is still awaited. As we have already stated above that notwithstanding the remedy of civil courts, the appellant had also simultaneously filed a civil writ petition No. 2935/92 which was dismissed by the learned Single Judge of this court vide his order, dated 15th March, 1994, which is the subject matter of the present appeal, before us.

    18. Learned counsel for the appellant placed reliance on a case reported in Syed Hasan Rasul Numa v. Union of India 1991 1 SCC 401 which was a case under Delhi Development Act, 1957 regarding acquisition of land by Delhi Development Authority for town planning. In this case notices were published inviting general objections from the public to the proposed modification in the Master-plan. The Apex Court held that resort to any two of the three alternatives viz. affixing copies of the notice or publishing by beat of drum or advertisement in local newspapers was mandatory. In this case the Apex Court held that there is no right to have the objections. But if delay in filing the objections was due to publication of the notice in non-compliance with the mandatory procedure prescribed by S. 44, prejudice to the right to have the objections considered can be complained of The aforesaid proposition of law laid down by the Apex Court is not attracted to the facts of the present case, in view of the fact that there is no dispute in this case regarding mode of publication of the notifications inasmuch as the said notifications were duly gazetted and ignorance of the same cannot be complained of by the appellant after a delay of more than 28 years.

    19. Reliance has also been placed by the learned counsel for the appellant in the matter of Hindustan Oil Mills Ltd. v. Special Deputy Collector (Land Acquisition) 1990 1 SCC 59. This was a case concerning notification of acquisition issued under S. 4 of the Land Acquisition Act (1 of 1894). The question which arose before the Apex Court was whether the notification which was lacking details as to the area proposed to be acquired and names of the owners could be considered as an effective notification? On examination of the said question the Apex Court held as under:—

    “Though it is true that the notification need not precisely define the nature of the land proposed to be acquired or the persons to whom it is considered to belong, there should be a clear indication in the notification of the land that is proposed to be acquired, from which the owners or occupiers of the land can get a fair idea as to the details of the acquisition and the impact on their rights”.

    20. We are thus of the considered view that the appellant is not entitled to take benefit of the aforesaid observations of the Apex Court inasmuch as he had not approached this court with clean hands and we are fortified in our view by the observations of learned Single Judge of this court who has held that the dipute which the appellant is now seeking to raise about the possession of the land was not a bonafide dispute in his opinion. He has further observed in his order that the petitioner had the full knowledge of the facts and he knew that if he were to disclose all these facts in the writ petition which he filed in the year 1992, the court may non-suit him at the very initial stage itself and that these facts have not been conclusive for making an adjudication on the validity of the contention raised by the petitioner, and further the petitioner has suppressed some facts with the sole object of misleading the court by getting an interim order in his favour on 24th April, 1992.

    21. We are in full agreement with the observations of the learned Single Judge that the action of the appellant in re-depositing the compensation amount in the year 1992 which the appellant had received 28 years earlier by acknowledging the expenses of the same and after three months and 15 days of the issue of notice by learned Single Judge of this court cannot come to the rescue or avail of the appellant.

    22. Learned counsel for the appellant also placed reliance on Full Bench judgment of Punjab Haryana High Court in the matter of Ratan Singh v. State of Punjab AIR 1976 P & H 279. In this case the learned Full Bench of P. & H. High Court while examining the validity of notification under S. 4(1) of the Act and S. 5A (i) of the said Act, held that to make the notification valid it is essential to give publicity of its substance in concerned locality simultaneously with or immediately after its publication in official Gazette. The substance of the notification in the concerned locality was published with a delay of 29 days after the publication in the official Gazette, it was held that notifications issued under Ss. 4 & 6 of the Act could not be sustained. This is not the position here in the present appeal before us and, therefore, no benefit of the said judgment can be taken by the appellant.

    23. Learned counsel for the appellant also placed reliance on the judgment of the Apex Court in the matter of Jaipur Development Authority v. Radhey Shayam Civil Appeal No. 4209 and 4210 of 1992, decided by the Apex Court on 17th February, 1994. In the said appeals the question which arose for consideration before the Apex Court was whether the Collector had power under any provisions of the Act to award land in lieu of compensation from the acquired lands or any other lands. S. 11 of the said Act postulates that the Collector shall proceed to enquire into objections which any person interested in the land may make to the measurement of the land acquired or respective interest of the persons claiming the compensation and then he shall make the Award. It was contended before the Apex Court that the Government has formulated a policy to allot any other suitable land to the displaced persons and a request was made to give suitable directions in this regard. We are of the view that the aforesaid observations of the Apex Court are not attracted to the facts of the present case and findings recorded by the learned Single Judge of this court deserve to the maintained.

    24. Shri R.D Rastogi, learned counsel for the respondents placed reliance upon the Constitution Bench judgment of the Apex Court in the matter of Aflatoon v. Lt. Governor of Delhi 1975 4 SCC 285 wherein their Lordships of the Supreme Court held on the issue concerning latches and delay regarding validity of the notification concerning land acquisition. In para 11 of the said judgment it was held as under:—

    “To have sat on the fence and allowed the Govt. to complete the acquisition proceedings on the basis that the notification under S. 4 and the declaration under S. 6 were valid and then to attack the notification on grounds which were available to them at the time when the notification was published would be putting a premium on dilatory tactics. The writ petitions are liable to be dismissed on the ground of latches and delay on the part of the petitioners”.

    25. Their Lordships of the Supreme Court further observed in the said judgment that the validity of S. 23 of the Land Acquisition Act is also not open to challenge on the ground of inadequacy of compensation payable under it since such challenge is precluded by Art. 31(5) of the Constitution of India. The aforesaid view of the Apex Court was again affiremed in the matter of Ratni Devi v. Chief Commr. 1975 4 SCC 467 and subsequently in the matter of Har Avta Singh v. State of Punjab 1982 3 SCC 483 and in the matter of Ramjas Foundation v. Union of India 1993 Supp 2 SCC 20. In the aforesaid latest judgment of Ramjas Foundation (supra) the observations of their Lordships of the Supreme Court in para 14 are very significant wherein their Lordships have observed as under:—

    “Thus, we find no justification at all for the delay in not challenging the notification issued under S. 4 on 13.11.1959 till 1973. Even notifications under S. 6 of the Act were issued in 1968 and 1969 but not challenged till 1973. As already mentioned above in Aflatoon's case ((1975) 4 SCC 285 : AIR 1974 SC 2077) (supra) a Constitution Bench of this court has clearly held that even after the declaration under S. 6 of the Act published in 1966, the appellants had approached with their writ petitions in 1970 when the notices under S. 9 were issued to them the writ petitions were liable to be dismissed on the grounds of laches and delay”.

    26. We are also fortified in our views from observations of this court in the matter of Hastimal v. State of Rajasthan 1973 RLW XXIV 309 wherein the Division Bench of this court while dealing with the question of delay and laches held that exercise of power being discretionary under Art. 226 of the Constitution of India, undue delay will disentitle a person from seeking remedy under Art. 226 of the Constitution of India. Apart from the question of delay we are of the considered view that even on merits of the case the appellant is not entitled to succeed.

    27. For the aforesaid reasons and also keeping in view the legal position and facts and circumstances of the case, the order of the learned Single Judge, dated 15th March, 1994, is affirmed and consequently this appeal fails and is dismissed with no order as to costs.