  • provisions of Section 3H(4) of the National Highway Act, 1956 (for brevity, 'the Act'),
  • SECTION 2 ADVOCATES ACT 1961
  • sub-section (1) of section 3A. (2)
  • sub-section (1) of section 3A,
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • provisions of Section 3H(4) of the National Highway Act, 1956 (for brevity, 'the Act'),
  • SECTION 2 ADVOCATES ACT 1961
  • sub-section (1) of section 3A. (2)
  • sub-section (1) of section 3A,
Smart Summary

Structured Summary of the Opinion

Factual and Procedural Background

The petition under Article 226 of the Constitution sought quashing of the order dated 11.11.2009 (P-4) passed by respondent No. 4 (the Competent Authority) and requested that the dispute regarding apportionment of the compensation amount be referred to the District Judge, Amritsar pursuant to Section 3H(4) of the National Highway Act, 1956 ("the Act").

Key factual points drawn from the opinion:

  • On 25.8.2008 (P-1), the Union of India issued a notification under Section 3A of the Act for acquisition of land alongside NH-1 in District Amritsar, including village Budha Theh (Beas). The parcel involved measured 28 Kanals 3 Marlas.
  • On 14.1.2009 a further notification under Section 3D declared acquisition of the specified land.
  • On 25.5.2009 (P-3), the Competent Authority announced an award fixing compensation rates and included para 7 setting out the disbursement procedure and treatment of disputes/encumbrances.
  • The petitioner claimed entitlement to compensation for a plot of 1 Kanal 4 Marlas comprising specified Khasra numbers (77/21 Min. and 78/25 Min.).
  • On 22.10.2009, respondent Nos. 5 to 7 applied to the Land Acquisition Collector (respondent No. 4) claiming to be the only owners in possession of the acquired land and demanded payment of compensation in their favour.
  • On 11.11.2009 (P-4) respondent No. 4 ordered payment of the compensation announced in the award to respondent Nos. 5 to 7 and directed that when partition of the joint Khata takes place the area would be deducted from their share.
  • The petitioner challenged that order before this Court, contending that the Competent Authority should have referred the dispute to the District Judge under Section 3H(4) and that the Competent Authority lacked jurisdiction to decide possession/title or to issue directions in relation to partition and adjustments.
  • The opposite party contended that the order was passed under Section 3H(3) and that the Competent Authority could determine the persons entitled to the deposited amount where several persons claim interest.
  • The Court subsequently partially secured the petitioner's interests by directing respondent Nos. 5 to 7 to furnish a bank guarantee equivalent to the compensation amount (later modified to cover the proportionate amount corresponding to 1 Kanal 4 Marlas).

Legal Issues Presented

  1. Whether the Competent Authority constituted under Section 3A of the Act can determine disputes concerning possession and/or ownership of land acquired under the Act.
  2. Whether the power of the Competent Authority under Section 3H(3) extends to partition of the acquired land and disbursement of compensation in favour of one shareholder by directing revenue authorities to adjust area at the time of partition.
  3. Whether the Competent Authority is obliged, under Section 3H(4) of the Act, to refer any dispute as to apportionment of the compensation amount (or the person entitled to it) to the principal Civil Court of original jurisdiction (the District Judge) for decision.

Arguments of the Parties

Petitioner's Arguments

  • The petitioner claimed entitlement to compensation for 1 Kanal 4 Marlas (specified Khasra numbers).
  • The petitioner contended that respondent No. 4, acting as Competent Authority, was obliged under Section 3H(4) to refer disputes over apportionment to the District Judge rather than determine possession or title.
  • It was submitted that the Competent Authority could not visit the spot to decide possession and title, nor could it issue directions to revenue authorities for deduction at partition, because such adjudication is the exclusive domain of the District Judge.

Opposite Party's Arguments

  • The opposite party maintained that the impugned order was passed under Section 3H(3) of the Act, which empowers the Competent Authority to determine the persons who, in its opinion, are entitled to receive the amounts deposited where several persons claim an interest.
  • Accordingly, the Competent Authority asserted competence to decide entitlement among competing claimants to the deposited compensation.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The Court's legal analysis proceeded in the following steps, as expressed in the opinion:

  1. The Court examined the text of Sections 3A, 3C, 3D and 3H(1)–(4) of the National Highway Act, 1956, reproducing the provisions in the opinion to frame the statutory scheme relevant to acquisition, objections, declaration, deposit and payment of compensation, and the procedure where several persons claim interest.
  2. The Court observed that the Act is a special statute granting the Central Government power to acquire land for national highways but that many provisions in the Act are akin to corresponding provisions in the Land Acquisition Act, 1894 (the opinion specifically compares Sections 3A/3C/3D to sections 4/5A/6 of the 1894 Act and notes similarity between Sections 3H(3)/(4) and Sections 18/30 of the 1894 Act, as well as other analogies).
  3. Interpreting Section 3H(3), the Court noted that it allows the Competent Authority to determine the persons who, in its opinion, are entitled to receive the deposited amount where several persons claim an interest. The Court emphasized the language and scope of subsection (3) and contrasted it with subsection (4).
  4. The Court stressed that Section 3H(3) does not address a substantive dispute between competing claims to apportionment; such disputes are specifically dealt with by Section 3H(4), which mandates referral to the principal Civil Court of original jurisdiction (i.e., the District Judge) "if any dispute arises as to the apportionment of the amount or any part thereof or to any person to whom the same or any part thereof is payable."
  5. On this textual and comparative reading, the Court concluded that the Competent Authority could not, under the guise of determining entitlement under subsection (3), enter upon adjudication of a genuine dispute as to apportionment or title. Where such a dispute exists, the Competent Authority is obliged to refer the matter to the District Judge under subsection (4).
  6. The Court therefore found that the determination of apportionment between the petitioner and the private respondents was a matter to be decided by adjudication before the District Judge and not by the Competent Authority.
  7. The opinion also records interlocutory and remedial measures already taken by the Court: the order dated 11.11.2009 had been partially given effect to, but the Court had previously directed respondent Nos. 5 to 7 to furnish a bank guarantee equivalent to the compensation paid (later limited proportionately to the amount corresponding to 1 Kanal 4 Marlas) to secure the petitioner's interest pending resolution.

Holding and Implications

DISPOSED OF — The writ petition was disposed of in the terms set out by the Court.

Direct holding and operative directions contained in the opinion (as extracted from the text):

  • The dispute in respect of the specified Khasra numbers (77//21 (0-5), 78//16 Min. (0-19), 78//17 Min. (1-6), 78//25 Min. (0-19)) is referred to the learned District Judge, Amritsar, as the principal Civil Court of original jurisdiction under Section 3H(4) of the Act.
  • The District Judge is to decide the question of apportionment of the compensation amount and determine who is entitled to receive the amount in whole or in part.
  • The Court recommended that the matter be preferably decided within six months from the date the parties appear before the District Judge and directed that three opportunities be provided to each side.
  • The Registry of this Court was directed to send a copy of the judgment to the learned District Judge, Amritsar, who shall issue notices and fix a date for appearance of all parties.
  • The writ petition stands disposed of in the above terms.

Implications: The direct effect is that adjudication of apportionment and entitlement is transferred from the Competent Authority to the District Judge. The opinion does not purport to create or state any new judicial precedent beyond its statutory interpretation and application to the facts of this case.

    Nirmal Singh v. Union Of India And Others

    1. The instant petition filed under Article 226 of the Constitution prays for quashing of order dated 11.11.2009 (P-4) passed by respondent No. 4 and a further prayer has also been made that the dispute regarding apportionment of the amount of compensation be referred to the Court of District Judge, Amritsar, in view of the mandatory provisions of Section 3H(4) of the National Highway Act, 1956 (for brevity, 'the Act'), pertaining to deposit and payment of amount of compensation in respect of the land acquired under the provisions of the Act.

    2. The pivotal question which arises for consideration in the instant petition is whether the Competent Authority constituted under Section 3(a) of the Act would be acting within its competence and jurisdiction by determining the dispute concerning possession and/or ownership of the acquired land. The issue further would be whether the power of the competent authority under sub-section (3) of Section 3-H of the Act extends to partition of the acquired land and disbursement of compensation in favour of one share- holder by issuing direction to the authority to adjust the area of the acquired land as and when partition is to take place. Another issue would be whether the Competent Authority is obliged to make a reference of the dispute to the District Judge under sub-section (4) of Section 3-H of the Act.

    3. Brief facts of the case are that on 25.8.2008 (P-1), the Union of India-respondent No. 1 issued a notification under Section 3A of the Act for acquisition of land alongside NH-1 from KM 412 plus 380 to KM 431 plus 300 (Jalandhar-Amritsar Section) in District Amritsar in the State of Punjab, including village Budha Theh (Beas) in Tehsil Baba Bakala, District Amritsar (P-1). The land measuring 28 Kanals 3 Marlas was the subject matter of acquisition in the said village. Thereafter on 14.1.2009, another notification under Section 3D of the Act declaring to acquire land measuring 28 Kanals 3 Marlas as mentioned in the Schedule of the said notification (P-2). On 25.5.2009 (P-3), the Competent Authority-cum-Sub Divisional Magistrate, Baba Bakala-respondent No. 3 announced the award fixing the price of the acquired land at the rate of `2,90,90,909/- per acre in respect of the land comprised in plots and at the rate of `1,28,000/- per acre in respect of un-irrigated land. With regard to disbursement of compensation, it was provided under para 7 as under:-

    "(7) Disbursement of compensation under acquisition:
    Owners will be disbursed the compensation as per their share on latest jamabandi of their village. If any mutation is sanctioned during the process of acquisition same will be implemented. Any area under Mortgage, Mortgage money will be deducted from the owner's compensation. If any dispute regarding the ownership of mutation comes up the compensation will be detained till the compromise between the parties of decision of the Competent Court take place."

    4. The claim of the petitioner is that he was entitled to the compensation of plot measuring 1 Kanal 4 Marlas, comprised in Khasra No. 77/21 Min. (0-5) and 78/25 Min. (0-19). However, on 22.10.2009, respondent Nos. 5 to 7 submitted an application before the Land Acquisition Collector-cum-Sub Divisional Magistrate, Baba Bakala-respondent No. 4 claiming themselves to be the only owner in possession of the land comprising in Khasra No. 77//21, 78//25, 78//16, 78//17, situated at village Budhatheh (Beas), Tehsil Baba Bakala, District Amritsar. They demanded disbursement of the compensation in their favour. On 11.11.2009 (P-4), respondent No. 4 passed an order directing that the amount of compensation announced vide award dated 25.5.2009 be paid to respondent Nos. 5 to 7. It was further ordered that as and when partition of the joint Khata takes place then the area be deducted from the share of respondent Nos. 5 to 7. The view of the Competent Authority- respondent No. 4 is discernible from the following para of the order dated 11.11.2009 (P-4), which reads thus:

    " After the spot inspection, it is found that as per the revenue record, the acquired land comprising in Khasra No. 77//21 Min (0-5), 78//16 Min (0-19), 78//17 Min (1-6), 78//25 Min (0-19) is Mustarkha Malkan, in these Khasra Numbers Bawa Gurshran Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow Amarjit Singh got executed sale deeds and the sides of the purchased land are given in the sale deeds and accordingly the boundary wall is raised and tubewell is installed. Boundary wall has a gate. Meaning thereby that they are in possession of the acquired land. Shri Jai Pal Singh, P.C.s., Sub Divisional Magistrate, Baba Bakala has certified the possession in the award announced on 25.05.2000 and he has announced the award in the name of Bawa Gursharan Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh regarding the construction made on Khasra No. 77/21 Min (0-5), 78//16 Min (0-19), 78//17 Min (1-6), 78//25 Min (0-19). The statement of Patwari Halqa, village Budhatheh, Shri Gurdev Singh were recorded at the spot. He has certified the possession of Bawa Gursharan Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh on Khasra No. 77//21 Min (0-5), 78//16 Min (0-19), 78//17 Min (1-6), 78//25 Min (0-19). Shri Nirmal Singh son of Narinder Singh son of Harnam Singh, Shri Suhawa Singh son of Chanda Singh resident of Budhatheh, Shri Narang Singh son of Surain Singh, resident of village Budhatheh submitted objection that the payment of the acquired land be made to them. On the representation of Shri Nirmal Singh, Shri Nirmal Singh, Shri Santokh Singh and Shri Bawa Gursharan Singh were again heard on 11.11.2009. Both the parties made submissions in their favour. Whereas there is joint account of Khasra numbers but Gursharan Singh got executed the sale deeds by mentioning sides and these sides tally with the acquired land. Therefore, the acquired land is in possession of Bawa Gursharan Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh whereas the land in possession of Nirmal Singh son of Narinder Singh son of Harnam Singh is on the second side of G.T. Road because Bawa Gursharan Singh son of Bawa Deljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh have possession as a right and they have raised boundary wall on these Khasra numbers. Therefore, Bawa Gursharan Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh are the affected persons with the acquisition of land. Therefore, they are liable to be paid the compensation of the acquired land. Tehsildar, Baba Bakala is directed that as and when the division of land of joint account is done then the acquired land be deducted from the land in the share of Bawa Gursharan Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh.
    Therefore, the right and possession of Bawa Gursharan Singh son of Bawa Daljit Singh, Kanwarjit Singh son of Bawa Daljit Singh and Poonam widow of Amarjit Singh is proved on the land comprising in Khasra No. 77//21 Min (0-5), 78//16 Min (0-19), 78//17 Min (1-6), 78//25 Min (0-19) and the payment of compensation is made to the affected parties."

    5. The grievance of the petitioner is that the impugned order dated 11.11.2009 has been passed by respondent No. 4 in his capacity as Competent Authority designated by respondent Nos. 1 and 2, under Section 3-H(4) of the Act, which in fact required him to make a reference of the dispute for decision to the Principal Civil Court of original jurisdiction i.e. District Judge, Amritsar. The petitioner has also submitted that in case of dispute the Competent Authority-respondent No. 4 could not have visited the spot to determine the possession and title of the parties which is only within the domain of the District Judge, Amritsar. The Competent Authority could also not issue any direction to the revenue authorities for deduction of the share belonging to respondent Nos. 5 to 7 at the time of partition proceedings. It amounts to adjudication, which is the sole domain of the District Judge.

    6. However, the stand taken by the opposite party is that the order has been passed under sub-section (3) of Section 3-H of the Act, which vests the Competent Authority like respondent No. 4 to determine the persons who were entitled to receive the amount payable to each of them in case several persons claim to be interested in the amount deposited under sub-section (1) of Section 3-H of the Act in order to determine which of the persons would be entitled.

    7. In order to resolve the controversy it would be first necessary to read Sections 3A, 3C, 3D and 3H(1) to (4) of the Act, which are reproduced as under:-

    "3A. Power to acquire land, etc.-
    (1) Where the Central Government is satisfied that for a public purpose any land is required for the building, maintenance, management or operation of a national highway or part thereof, it may, by notification in the Official Gazette, declare its intention to acquire such land.
    (2) Every notification under sub-section (1) shall give a brief description of the land.
    (3) The competent authority shall cause the substance of the notification to be published in two local newspapers, one of which will be in a vernacular language."
    "3C. Hearing of objections.-
    (1) Any person interested in the land may, within twenty-one days from the date of publication of the notification under sub-section (1) of section 3A, object to the use of the land for the purpose or purposes mentioned in that sub-section.
    (2) Every objection under sub-section (1) shall be made to the competent authority in writing and shall set out the grounds thereof and the competent authority shall give the objector an opportunity of being heard, either in person or by a legal practitioner, and may, after hearing all such objections and after making such further enquiry, it any, as the competent authority thinks necessary, by order, either allow or disallow the objections.
    Explanation.- For the purposes of this sub- section, "legal practitioner" has the same meaning as in clause (i) of sub-section (1) of section 2 of the Advocates Act, 1961 (25 of 1.961).
    (3) Any order made by the competent authority under sub-section (2) shall be final." "3D. Declaration of acquisition.-
    (1) Where no objection under sub-section (1) of section 3C has been made to the competent authority within the period specified therein or where the competent authority has disallowed the objection under subsection (2) of that section, the competent authority shall, as soon as may be, submit a report accordingly to the Central Government and on receipt of such report, the Central Government shall declare, by notification in the Official Gazette, that the land should be acquired for the purpose or purposes mentioned in sub-section (1) of section 3A.
    (2) On the publication of the declaration under sub-section (1), the land shall vest absolutely in the Central Government free from all encumbrances.
    (3) Where in respect of any land, a notification has been published under sub-section (1) of section 3A for its acquisition but no declaration under sub-section (1) has been published within a period of one year from the date of publication of that notification, the said notification shall cease to have any effect:
    Provided that in computing the said period of one year, the period or periods during which any action or proceedings to be taken in pursuance of the notification issued under sub-section (1.) of section 3A is stayed by an order of a court shall be excluded.
    (4) A declaration made by the Central Government under sub-section (1) shall not be called in question in any court or by any other authority." "3H. Deposit and payment of amount.-
    (1) The amount determined under section 3G shall be deposited by the Central Government in such manner as may be laid down by rules made in this behalf by that Government, with the competent authority before taking possession of the land.
    competent authority shall on behalf of the Central Government pay the amount to the person or persons entitled thereto.
    (3) Where several persons claim to be interested in the amount deposited under sub- section (1), the competent authority shall determine the persons who in its opinion are entitled to receive the amount payable to each of them.
    (4) If any dispute arises as to the apportionment of the amount or any part thereof or to any person to whom the same or any part thereof is payable, the competent authority shall refer the dispute to the decision of the principal civil court of original jurisdiction within the limits of whose jurisdiction the land is situated.
    (5) and (6) xxx xxx xxx"

    8. It is true that the Act is a special statute which has clothed the Central Government with the power to acquire any land for a public purpose, which is required for building, maintenance, management or operation of a national highway or part thereof. But many provisions of the Act are akin to the provisions of the Land Acquisition Act, 1894 (for brevity, 'the 1894 Act'). A perusal of Sections 3A, 3C and 3D of the Act would show that they are similar to sections 4, 5a and 6 of the 1894 act respectively in their contents and intendment. Even Section 3H(3) and (4) of the Act are somewhat similar to Sections 18 and 30 respectively of the 1894 Act. Likewise, further provisions like Sections 3H and 3G of the Act are equivalent to sections 16 and 11 of the 1894 act. Then it follows that the Competent Authority under the Act designated by respondent Nos. 1 and 2 would not be clothed with the power to adjudicate the claim of apportionment made by the parties in respect of the land for which notifications for acquisition have been issued under the Act. Under sub-section (3) of Section 3H of the Act, the Competent Authority may determine the persons who would be entitled to receive the amount payable to each of them where several persons make claim in respect of the amount deposited under sub-section (1) of Section 3H of the Act. This Section does not talk about any dispute between several claims, which in fact, has been specifically dealt with in sub-section (4) of Section 3H of the Act. Sub-section (4) of Section 3H of the Act opens with the words 'If any dispute arises as to the apportionment of the amount or any part thereof or to any person to whom the same or any part thereof is payable', then the Competent Authority nominated by the State Government like respondent No. 4 is under obligation to refer the dispute to the decision of the principal Civil Court of original jurisdiction within the limits of whose jurisdiction the land is situated. Therefore, we are of the view that under the garb of power to determine the persons who in the opinion of the Competent Authority would be entitled to receive the amount of compensation, which is in dispute, the Competent Authority could not have entered upon adjudication of the dispute and a reference should have been made to the Court of competent jurisdiction. Once the aforesaid legal position is clear from the reading of the provisions itself, the consequence of determining the apportionment between the petitioner and the private respondents have to be left to the adjudication of the District Judge.

    9. It also deserves to be noticed that order dated 11.11.2009 (P-4), which is subject matter of challenge in the instant petition, has been partially given effect to, inasmuch as, the interests of the petitioner have been secured. Accordingly, on 3.3.2010 when the matter came up for consideration, this Court directed respondent Nos. 5 to 7 to furnish a bank guarantee equivalent to the amount of compensation disbursed to them, to the satisfaction of the learned District Judge, Amritsar. Since the controversy between the petitioner and respondent Nos. 5 to 7 is in respect of 1 Kanal and 4 Marlas of land only, therefore, on an application filed by respondent Nos. 5 to 7, order dated 3.3.2010 was modified and they were required to furnish bank guarantee equivalent to the amount of compensation proportionate to 1 Kanal 4 Marlas of land, out of the total compensation disbursed to them, to the satisfaction of the learned District Judge, Amritsar, vide order dated 16.7.2010.

    10. In view of the above, the dispute in respect of Khasra Nos. 77//21 (0-5), 78//16 Min. (0-19), 17 Min. (1-6), 25 Min. (0-19), which are shown in the name of Nirmal Singh and others, who are stated to be the owner/interested persons, is referred to the learned District Judge, Amritsar, as it is a Principal Civil Court of original jurisdiction in terms of Section 3H(4) of the Act. The learned District Judge shall decide the question of apportionment of the amount of compensation and shall also determine the question as to who is entitled to receive the amount of compensation in whole or in part. The needful shall be done preferably within a period of six months from the date when the parties would appear before the learned District Judge by providing three opportunities to each side. The Registry is directed to send a copy of this judgment to the learned District Judge, Amritsar, who shall fix a date of appearance after issuing notices to all the parties.

    11. The writ petition stands disposed of in the above terms.