Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Acts
  • Art. 11 of the Indian Limitation Act).10. S. 15(2) of the Indian Limitation Act
  • provisions contained in S. 73 of the Indian Railways Act. Allegation
  • SECTION 73 RAILWAYS ACT
  • Section 80 of the Code of Civil Procedure
  • Indian Partnership Act.
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Judges
Acts
  • Art. 11 of the Indian Limitation Act).10. S. 15(2) of the Indian Limitation Act
  • provisions contained in S. 73 of the Indian Railways Act. Allegation
  • SECTION 73 RAILWAYS ACT
  • Section 80 of the Code of Civil Procedure
  • Indian Partnership Act.
Smart Summary

Structured Summary of the Opinion

Factual and Procedural Background

Plaintiff No. 1 (M/s. Khedut Oil Cake Industries) and Plaintiff No. 2 (M/s. Khedut Oil Traders) are partnership firms said to be registered under the Indian Partnership Act. On June 21, 1969 plaintiff No. 1 tendered 281.20 quintals of refined groundnut oil to Western Railways at Dhoraji Factory Siding for carriage to Delhi Sarai Rohilla. The oil was loaded in tank wagon No. BVOIL-NE-46865 and a railway receipt and invoice were issued; the receipt was endorsed “Please deliver to M/s. Khedut Oil Traders” (i.e., plaintiff No. 2). The train derailed on June 29, 1969 at the Jhilo-Dabla Section; the wagon containing the consignment was derailed. On October 19, 1969 64 quintals of oil were delivered (weighed at railway weigh-bridge) and subsequently 20.90 quintals in damaged condition were delivered. The plaintiffs instituted this suit on August 11, 1972 seeking monetary compensation for non-delivery, delay, deterioration and incidental expenses.

The defendants (railway) contested the suit, denying partnership registration in respect of the plaintiffs, pleading limitation, and asserting that the loss arose out of an accidental derailment for which they were not liable under Section 73 of the Railways Act; allegations of negligence were denied. On these pleadings seven issues were framed and decided by the court.

Legal Issues Presented

  1. Are the plaintiffs registered partnership firms and is the plaint signed, verified and presented by properly authorised persons and the suit otherwise validly instituted?
  2. Whether the suit is barred by time?
  3. Was the loss of the groundnut oil in suit due to the accident, caused by the negligence, misconduct or carelessness of the Railway Authorities or its employees?
  4. Was there any further negligence, misconduct or carelessness in handling the suit consignment after the accident which has led to further loss to the plaintiffs?
  5. Was there unreasonable delay in the delivery of the remaining groundnut oil to the plaintiffs causing loss to the plaintiffs?
  6. Was any of the oil delivered to the plaintiffs contaminated due to the negligence of the defendants and if so, are the plaintiffs entitled to claim damages for the same and to the refund of demurrage or wharfage paid in respect of the same?
  7. To what relief are the plaintiffs entitled: (a) for damages on account of loss in the accident; (b) out of the further negligence thereafter; (c) on account of delay in the delivery of the balance of suit consignment; (d) on account of the contaminated oil and refund of demurrage or wharfage?

Arguments of the Parties

Plaintiffs' Arguments

  • The consignment of 281.20 quintals of refined groundnut oil was booked at railway risk for carriage to Delhi and the plaintiffs are entitled to compensation for non-delivery and damage arising from the derailment and subsequent handling.
  • They alleged negligence by the railway: excessive speed by the driver on a steep curve, repeated accidents at the spot, failure of railway administration to take preventive steps, careless placement of the derailed tank wagon causing oil to flow out downhill, and failure to prevent pilferage.
  • They claimed specific monetary reliefs in the plaint: Rs. 94,771.20 for non-delivery of 197.44 quintals (at Rs. 480/quintal), Rs. 4,714.50 for delay in delivery of 62.86 quintals, Rs. 4,180 for deterioration of 20.90 quintals (sold at Rs. 280/quintal), Rs. 1,525 for demurrage charges, Rs. 500 for expenses of delivery, and Rs. 39,308.80 as interest (figures as pleaded in the plaint).

Defendants' Arguments

  • The defendants denied that the plaintiff firms were duly registered under the Indian Partnership Act (plea in written statement).
  • They contended the suit was time-barred.
  • On merits they pleaded that the loss resulted from an accidental derailment despite reasonable care and foresight, invoking the exceptions under Section 73 of the Railways Act to avoid liability; allegations of negligence by railway employees were denied.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The court addressed each of the seven framed issues sequentially and grounded its conclusions in evidentiary findings and applicable statutory provisions as set out in the record.

Issue No. 1 (Partnership registration and validation of plaint)

  • The court relied on certified entries from the register of firms (Ex. PW 1/1 and Ex. PW 1/36) showing registration of each plaintiff firm and the presence of named registered partners. Witness testimony (PW-1, Mansukhlal) established that the plaint had been signed and verified by authorised, registered partners. On this evidence the court held both plaintiff firms to be duly registered and the plaint properly signed and instituted.

Issue No. 2 (Limitation)

  • The goods were booked on June 21, 1969. The limitation period for suits for non-delivery or delay in delivery is three years, with time running from when goods ought to be delivered (reference made to Article 11 of the Indian Limitation Act in the opinion).
  • The court applied Section 15(2) of the Indian Limitation Act to exclude the period of a statutory notice; plaintiffs had issued notices under Section 80 CPC (dated November 30, 1971), received by the railway on December 1 and December 12, 1971. Counting the excluded notice period, the suit filed on August 11, 1972 fell within the permitted limitation period. The court thus rejected the defendants' plea of limitation.

Issue No. 3 (Causation and negligence of railway authorities)

  • The court observed that 21 wagons were derailed (an admitted fact) and noted that such a derailment is not a normal occurrence. Applying the doctrine of res ipsa loquitur (stated in the opinion), the court concluded that the derailment was prima facie more consistent with negligence by the railway or its employees than with other causes.
  • The presumption of negligence could be rebutted by the defendant, but the defendants produced no explanatory evidence or pleaded exceptions under clauses (a)–(i) of Section 73 of the Railways Act. A suggestion in cross-examination that the event was an “act of God” was not pleaded in the written statement, and no evidence supported that alternative. Because Section 73 makes the railway responsible for loss during transit except under specified exceptions and no exception applied on the record, the court found in favour of the plaintiffs on negligence.

Issue No. 4 (Post-accident handling and pilferage)

  • Given the finding of negligence on Issue No. 3, the court examined post-accident handling. Testimony of PW-1 together with photographs established that no guard was posted and villagers pilfered oil from the derailed tank wagon. The court held that this constituted further negligence or carelessness by the defendants in handling the consignment after the accident, leading to additional loss.

Issue No. 5 (Delay in delivery)

  • Plaintiff testimony indicated that, in normal circumstances, the consignment should have arrived by the end of June 1969. Only 64 quintals were delivered on October 19, 1969 and 20.90 quintals thereafter. The railway offered no explanation (for example, why goods were sent back to Dhoraji before onward despatch to the destination). The court found an unreasonable delay in delivery and decided the issue for the plaintiffs.

Issue No. 6 (Contamination and demurrage/wharfage)

  • Plaintiffs' letters (Ex. PW 1/14 and 1/15) stated the oil had deteriorated and smelled bad and requested that railway draw samples; PW-1's testimony was corroborated by the absence of rebuttal evidence. The court concluded that 20.90 quintals had been contaminated due to the defendants' negligence and that plaintiffs were entitled to damages for deterioration.
  • The plaintiffs produced a receipt (PW 1/23) showing payment of demurrage/wharfage of Rs. 1,525.50. Because plaintiffs had timely asked for sampling and weighment and the railway had been negligent in handling, the court held the railways were not justified in charging wharfage or demurrage under these circumstances and ordered refund of that amount.

Issue No. 7 (Reliefs and quantification)

  • The railway receipt (Ex. PW 1.D-1) recorded the actual dispatched quantity as 281 quintals 20 kg (281.20 quintals) and included a note that the tank was fully loaded; this was admitted in the written statement and unrebutted. The court held that 281.20 quintals were actually loaded for carriage.
  • The court accepted that 64 quintals were delivered on October 19, 1969 (noting a later claim that weight was found to be 62.86 quintals but treating 64 quintals as measured at the railway weigh-bridge) and that 20.90 quintals (12 drums) were delivered subsequently. Thus, 84.90 quintals were delivered and there was non-delivery of 196.30 quintals (281.20 − 84.90 = 196.30), as found by the court.
  • On valuation, the plaintiffs sought Rs. 480 per quintal for non-delivery. Evidence showed market rates around late June 1969 varied from Rs. 4,815 to Rs. 4,790 per tonne; the court converted this to a quintal rate and awarded compensation at Rs. 479 per quintal, producing Rs. 94,027.70 for non-delivery.
  • For delayed delivery of 64 quintals delivered in October 1969, the court found plaintiffs sold at Rs. 405 per quintal (corroborated by Ex. PW 1/24) and awarded the difference (declared in the judgment as Rs. 4651-64 in the text of the opinion).
  • For the damaged second consignment of 20.90 quintals, the court accepted the sale at Rs. 280 per quintal (corroborated by bill Ex. P.-1/25) and awarded Rs. 4,180 towards compensation for deterioration.
  • The court disallowed the claimed Rs. 500 for delivery expenses as unjustified.
  • Instead of awarding the claimed sum for interest, the court determined entitlement to statutory interest on the amounts awarded: 9% per annum from 15 October 1969 until the date of the decree, and thereafter 6% per annum until payment. The court then calculated and pronounced a total decree figure (see holding below).

Holding and Implications

Holding: The court entered a monetary decree in favour of the plaintiffs. The core ruling is summarized as follows:

Major Ruling: The plaintiffs succeed on all principal issues; the court grants a decree in their favour and holds the railway liable for loss, delay, deterioration and refund of demurrage/wharfage as found in the judgment.

Specific decretal outcome set out by the court:

  • The court directed payment to the plaintiffs of Rs. 1,04,384.84 (the aggregate award as calculated in the judgment).
  • Interest was ordered at 9% per annum from 15 October 1969 until the date of the decree, and thereafter at 6% per annum from the date of decree until payment.
  • The plaintiffs were awarded costs.

Implications: The direct effect is that the railway must pay Rs. 1,04,384.84 with the specified interest and costs to the plaintiffs. The opinion does not articulate any wider jurisprudential innovation or to have set a new legal precedent; it applies existing statutory provisions (including Section 73 of the Railways Act, provisions of the Indian Limitation Act and Section 80 CPC) and established principles (such as res ipsa loquitur) to the facts and evidence of this case.

Order accordingly.

    Khedut Oil Cake Industries v. Union Of India

    M/s. Khedut Oil Cake Industries, plaintiff No. 1, and M/s. Khedut Oil Traders, plaintiff No. 2, are partnership firms stated to be registered under the Indian Partnership Act. On June 21, 1969 plaintiff No. 1 tendered 281.20 quintals of Refined Ground Nut Oil to the Western Railways at Dhoraji Factory Siding for despatch to Delhi Sarai Rohilla via MRH-RE. The said oil was loaded in tank wagon No. BVOIL-NE-46865 and was booked by the officials of the Western Railway ex Dhoraji Factory Siding to Delhi Sarai Rohilla vide railway receipt No. 289352, invoice No. 46 dated June 21, 1969. The consignee was self. Receipt was however endorsed with the endorsement “Please deliver to M/s. Khedut Oil Traders” i.e in favour of plaintiff No. 2.

    2. The said wagon was part of 806 DN Phulera-Rewari Diesel goods train which derailed at the Jhilo-Dabla Section. The wagon in question was one of the wagons which was also derailed. On October 19, 1969 refined ground nut oil weighing 64 quintals as per weight taken at railway weigh-bridge, was delivered to the plaintiffs. A further delivery of 20.90 quintals of oil, stated to be in badly damaged condition mixed with foreign matters, was made subsequently.

    3. The plaintiffs made enquiries about the delivery of the goods in question and each time they were informed that the consignment was not received and was not available for delivery. On July 5, 1969 an endorsement to that effect was made on the railway receipt. The plaintiffs, however, came to know of the derailment on July 5, 1969. On the next day a representative of plaintiff No. 2 went to the place of accident and allegedly discovered that a set of 4 wheels of the tank wagon, in which the goods in question were loaded, was lying on one side of the railway line while the other set of the 4 wheels was lying on the other side of the railway track. It appeared that the tank wagon at the time of accident was lying on the railway line crosswise but was subsequently placed near the railway track in a position that the top side of the tank wagon was lying on the sloping space with downward level.

    4. On August 11, 1972 the plaintiffs brought this suit for recovery of Rs. 1,45,000/-. It was averred that the goods had been booked at railway risk rates. The railway track made a steep curve and sloped downwards at the spot at which the accident took place. The driver of the train was driving the train at a highly excessive speed and the derailment was due to negligence and misconduct on the part of the railway and its employees. Several accidents had taken place on the same spot. Railway administration were utterly negligent in not taking any steps to check the occurrence of accidents on that spot. It was further averred that the wagon in question was negligently and carelessly placed in the position, namely its top side lying on the sloping space, with the result that most of the oil flowed out of its mouth which faced downward on the sloping ground. The railway was negligent in not taking any steps to prevent pilferage or to stop flowing down of the oil. It was further alleged that 62.86 quintals and not 64 quintals of oil was delivered only on October 19, 1969. The prices of the oil had considerably fallen down and the plaintiffs suffered loss on account of delay in delivery. It was further averred that 20.90 quintals of oil which was delivered later on, was damaged oil and could be sold only at Rs. 280/- per quintal. In this way the plaintiffs were entitled to Rs. 94,771.20 on account of compensation for non-delivery of 197.44 quintals of ground nut oil at the rate of Rs. 480/- per quintal; a sum of Rs. 4,714,.50 on account of delay in the delivery of 62.86 quintals of oil; a sum of Rs. 4,180/- on account of fall in market price and deterioration in quality of 20.90 quintals of oil delivered later on and a sum of Rs. 1525/- on account of demurrage charges paid by the plaintiffs. A sum of Rs. 500/- was claimed on account of expenses incurred in the process of delivery of available oil and rest of the amount i.e Rs. 39,308.80 was claimed towards interest.

    5. The suit was resisted by the defendants. The allegation that the plaintiff firms were duly registered under the Partnership Act was denied. It was averred that the suit was barred by time. On merits it was alleged that the loss of consignment had occurred because of an accidental derailment in spite of the reasonable foresight and care for the carriage of the goods. The railway administration was thus not liable for the alleged loss in view of the provisions contained in S. 73 of the Indian Railways Act. Allegation of negligence and misconduct on the part of the railway employees were also denied.

    6. On the pleadings of the parties the following issues were framed :—

    “1. Are the plaintiffs registered partnership firms and is the plaint signed, verified and presented by properly authorised persons and the suit otherwise validly instituted?

    2. Whether the suit is barred by time?

    3. Was the loss of the groundnut oil in suit due to the accident, caused by the negligence, misconduct or carelessness of the Railway Authorities or its employees?

    4. Was there any further negligence, misconduct or carelessness in handling the suit consignment after the accident which has led to further loss to the plaintiffs?

    5. Was there unreasonable delay in the delivery of the remaining groundnut oil to the plaintiffs causing loss to the plaintiffs?

    6. Was any of the oil delivered to the plaintiffs contaminated due to the negligence of the defendants and if so, are the plaintiffs entitled to claim damages for the same and to the refund of demurrage or wharfage paid in respect of the same?

    7. To what relief are the plaintiffs entitled :—

    (a) for damages on account of loss in the accident :

    (b) out of the further negligence thereafter :

    (c) on account of delay in the delivery of the balance of suit consignment;

    (d) on account of the contaminated oil and refund of demurrage or wharfage?”

    Issue No. 1

    7. Ex. PW 1/1 is the certified copy of the entries in the register of firms. It shows that M/s. Khedut Oil Cake Industries was duly registered under the Indian Partnership Act. It further shows that Mansukhlal Punjabhai was one of its registered partners. Mansukhlal, PW-1 deposed that he had signed the plaint at points A and B. From this evidence it has been proved that plaintiff No. 1 was duly registered firm and the plaint had been signed and verified by Mansukhlal who was its registered partner.

    8. Ex. PW 1/36 is the certified copy of the entries in the register maintained by the Registrar of Firms which shows that M/s. Khedut Oil Traders, plaintiff No. 2, was a registered firm. It further shows that Gangji Bhai Dewshi Bhai was one of its registered partners. It has been proved from the statement of Mansukhlal Punja Bhai, PW-1, that the plaint was signed and verified by Gangji Bhai Dewshi Bhai on behalf of the.. plaintiff No. 2. I, therefore, hold that plaintiff No. 2 was also a registered firm and Gangji Bhai Dewshi Bhai, who had filed the suit on behalf of plaintiff No. 2 was its registered partner. The issue is decided in favour of the plaintiffs.

    Issue No. 2

    9. The goods were admittedly booked for carriage on June 21, 1969. The limitation for filing the suit for compensation for non delivery or delay in delivery was three years. Time begins to run from the date when the goods ought to be delivered (See Art. 11 of the Indian Limitation Act).

    10. S. 15(2) of the Indian Limitation Act provides that in computing the period of limitation for any suit of which notice has been given in accordance with the requirement of any law for the time being in force the period of the notice shall be excluded. Notice under Section 80 of the Code of Civil Procedure was necessary in this case. Notice under Section 80 dated November 30, 1971 (copy Ex. PW 1/35) was actually issued by the plaintiffs. It was received by General Manager, Northern Railways on December 1, 1971 and by General Manager, Western Railways on December 12, 1971 (See Ex. PW 1/35 A and PW 1/35B). The plaintiffs were therefore entitled to exclude the notice period. In other words the suit could be filed within three years and two months. Even if the period was counted from June 21, 1969, the date when the goods were booked, the suit filed on August 11, 1972 was well within limitation. Issue is decided against the defendants.

    Issue No. 3

    11. Admittedly the wagon in which the consignment was loaded derailed on June 29, 1969 at Jhilo-Dabla Section. The contention of the plaintiff is that this accident was caused by negligence, misconduct or carelessness of the railway authorities or its employees.

    12. Normal rule is that it was for the plaintiff to prove the negligence. However in some cases this rule causes considerable hardship to the plaintiffs because it may be that the true cause of accident lies solely within the knowledge of the defendant who caused it. This hardship is avoided to a considerable extent by the principle of Res Ipsa Loquitur. It means that an accident may by its nature be more consistent with its being caused by negligence for which the defendant is responsible than by other causes and in such a case the mere fact of accident is prima facie evidence of negligence.

    13. In the present case it has been admitted in the written statement that 21 wagons were derailed. The derailment is not a normal feature. It is more consistent with its being caused by negligence of the defendant or its employees. This fact itself is sufficient to raise the presumption of negligence on the part of the railways. This presumption, however, is not conclusive. Defendant was entitled to rebut this presumption. However, no such evidence has been produced. No reason, whatsoever, for this derailment has been given either in the written statement or in the evidence. In cross-examination of PW 1 a suggestion was made that it was an act of God. No such plea was however raised in the written statement. In any case there is no evidence to prove that it was an act of God.

    14. Section 73 of the Railways Act provides that railway administration shall be responsible for the loss, destruction, damage, deterioration or non-delivery in transit of goods except in cases mentioned in clauses (a) to (i). There is no plea in the written statement that this case falls in any of these exceptions. The provisions contained in section 73, therefore, do not help the defendants at all.

    15. I, consequently, hold that the loss of ground nut oil in suit was due to negligence, misconduct or carelessness of the railways or its employees. The issue is decided in favour of the plaintiffs.

    Issue No. 4

    16. In view of the finding on issue No. 3 this issue is not much relevant. However the evidence of PW-1 Mansukhlal read with photographs proves that no one was guarding the said tank wagon and the villagers were pilfering the oil from the tank. I, therefore, hold that there was further negligence or carelessness in handling the suit consignment after the accident which has led to further loss to the plaintiffs. The issue is decided in favour of the plaintiffs.

    Issue No. 5

    17. The goods were booked on June 21, 1969. Mansukhlal (PW-1) has stated that in normal course the goods must have reached the destination by the end of June, 1969. I see no reason to disbelieve him when there is no rebuttal.

    18. Oil weighing 64 quintals was delivered on October 19, 1969 and 20.90 quintals was delivered thereafter. Thus there was undue delay in delivery of these goods. Moreover after the accident, admittedly, the remaining goods were sent back to Dhoraji instead of Delhi Sarai Rohilla, the place of destination. From there the goods were sent back to Sarai Rohilla, Delhi. No explanation is forthcoming why the goods were not sent to Sarai Rohilla Delhi at the first instance. It has been proved that there was unreasonable delay in the delivery of remaining ground nut oil. The issue is decided in favour of the plaintiffs.

    Issue No. 6

    19. Mansukhlal has stated that the second consignment was sold at a low rate of Rs. 280/- per quintal because the quality of oil had deteriorated because of the poor quality of drums in which it was sent. Plaintiffs sent letters Ex. PW 1/14 and 1/15 dated 24th and 25th October, 1969 respectively in which it was clearly stated that the oil had deteriorated and was giving bad smell. In the second letter a request was made to the railways to take out samples from the said drums containing the said oil. This corroborates the statement of PW-1. Moreover there is no evidence in rebuttal. I, therefore, hold that the oil weighing 20.90 quintals had contaminated due to negligence of the defendants or its employees and the plaintiffs were entitled to claim damages for the same.

    20. PW-1, Mansukhlal, has stated that he had to pay Rs. 1525.50 on account of demurrage and wharfage. This finds support from the receipt PW 1/23.

    21. In para 26 of the plaint it was pleaded that the oil in 12 drums was found to be in a very badly damaged condition mixed up with several foreign matters. This fact was brought to the notice of the railway authorities and the railway authorities were requested to assess depreciation in the quality of oil for the purpose of assessing the loss resulting from deterioration in transit of the same. The railway authorities showed utter negligence and carelessness. The letters PW-1/14 and PW-1/15 show that the plaintiffs had intimated the defendants that the quality of the goods had deteriorated; oil was giving bad smell and had certain foreign matters. It was requested that a sample be drawn. They also requested the railway authorities for delivery on weighment free of wharfage charges. In my view the plaintiffs were right in requesting the authorities for drawing samples to find out whether the goods have deteriorated or not and also for asking for the weighment. The railways were not justified in the circumstances to charge any wharfage or demurrage, due to this reasonable request. The plaintiffs were entitled to refund of Rs. 1525.50 paid to the defendants towards wharfage or demurrage. Issue is decided in favour of the plaintiffs.

    Issue No. 7

    22. Ex. PW 1.D-1 is the railway receipt. According to this document actual weight of the goods sent was 281 quintals 20 Kg. This receipt contained a note “Loading and unloading by owner, loaded directly from P/Godown. Hence loading not supervised by Railway Staff. Tank fully loaded, no space left for. Further loading not available. Hence charged accordingly.” PW-1 has stated that 282 quintals of ground not oil was booked by plaintiff No. 1 at Dhoraji and the same was despatched to Delhi Sarai Rohilla Station, According to the note on the railway receipt the tank was fully loaded. This fact was admitted in the written statement. There is no evidence in rebuttal, There is no evidence to show that capacity of the wagon in question was less than 281.20 quintals. In all the circumstances I hold that 281.20 quintals of the oil was actually loaded in the wagon for carriage from Dhoraji to Delhi Sarai Rohilla.

    23. In para 21 of the plaint it was stated that the first consignment was delivered and it weighed 64 quintals at the railway weigh-bridge. In para 22 it was stated that later its weight was found to be 62.86 quintals only. The defendants in their written statement averred that the oil weighed 64 quintals at the railway weigh-bridge. In view of the admitted fact that the weight of the oil was 64 quintals at the railway weigh-bridge I think the plaintiffs must themselves be held responsible for the shortage, if any, at the time of its sale. I, therefore, hold that 64 quintals of oil was delivered in the first instalment.

    24. In para 25 it was admitted that further delivery of 12 drums containing 20.90 quintals of oil was made in the second instalment. This fact has not been disputed. Thus it has been proved that out of 281.20 quintals only 84.90 quintals of the oil had been delivered and there was non-delivery of 196.30 quintals.

    25. The plaintiffs have claimed compensation at the rate of Rs. 480/- per quintal. Mansukhlal, PW-1 has stated that normally the oil should have reached in the end of June, 1969 and that the rate in those days was Rs. 480/- per quintal. PW-2 is the Office Secretary of Vegetable Oil Traders' Association (Regd.). He deposed that on 24th June, 1969 the rate of ground nut oil varied from Rs. 4815 to 4790/- per tonne. Keeping in view this evidence I think it would be reasonable if I allow compensation at the rate of Rs. 479/- per quintal. The amount would come to Rs. 94,027.70.

    26. The plaintiffs has claimed Rs. 4,714.50 as compensation for late delivery of 64 quintals of oil which was delivered on October 19, 1969. I have already held that there was unreasonable delay in delivery of remaining ground nut oil to the plaintiffs. The plaintiffs were, therefore, entitled to compensation on account of fall in the market price because of the belated delivery.

    27. It has already been held that the market rate of ground nut oil was Rs. 479/- per quintal in the end of June, 1969. The plaintiffs have stated that prices had gone down in October, 1969. The oil was sold at the rate of Rs. 405/- per quintal. This finds corroboration from PW 1/24. The plaintiffs were, therefore, entitled to Rs. 4651-64.

    28. The plaintiffs claimed a sum of Rs. 4,180/- for the second consignment of 20.90 quintals of oil. I have already held above that this consignment had been damaged and the damage was caused due to negligence of the defendant. The plaintiffs have stated that this oil was sold to Bharat Oil Traders on November 4, 1969 at Rs. 280/- per quintal. This finds corroboration from bill Ex. P.-1/25. The plaintiffs were, therefore, entitled to Rs. 4180/- towards compensation on account of fall in market price and deterioration in quality of 20.90 quintals of oil.

    29. I have already allowed full compensation for the goods not delivered. The plaintiffs were, therefore, not entitled to any amount on account of further negligence on the part of the defendant in not protecting the wagon which had been derailed.

    30. The plaintiffs have claimed a sum of Rs. 500/- towards expenses incurred in the process of delivery of oil. In my view there was no justification for this claim. This is not allowed.

    31. The plaintiffs have claimed a sum of Rs. 39,208/- towards interest. The plaintiffs, in my view, are entitled to interest on the amount awarded above. I think it would be reasonable if interest was allowed at 9% p.a from 15th October, 1969 till the date of decree and thereafter at 6% per annum.

    32. I, consequently, hold that plaintiffs are entitled to Rs. 1,04,384.84 with interest on this amount at 9% per annum from October 15, 1969 till the date of decree and at 6% per annum from the date of decree till payment.

    33. In conclusion I pass a decree for Rs. 1,04,384.84 with interest on this amount at 9% per annum from October 15, 1969 till the date of decree and 6% per annum from the date of decree till payment and costs.

    Order accordingly.