  • Sec. 4(1) of the Land Acquisition Act
  • Sec. 6 of the Land Acquisition Act
  • Rule 3(B)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Sec. 4(1) of the Land Acquisition Act
  • Sec. 6 of the Land Acquisition Act
  • Rule 3(B)
Smart Summary

Structured Summary of the Opinion — E. Padmanabhan, J.

Factual and Procedural Background

The petitioner filed a writ petition seeking certiorari to call for the records and to quash:

  • The Sec. 4(1) Notification issued by the first respondent under G.O. Ms. No. 474, Housing and Urban Development Department, dated 30.5.1990, insofar as it related to the petitioner's lands in survey No. 390/4, Sholinganallur village.
  • The declaration under Sec. 6 of the Land Acquisition Act made in G.O. Ms. No. 1007, Housing and Urban Development Department, dated 21.6.1991 (published in the Tamil Nadu Government Gazette extraordinary dated 25.6.1991) insofar as it related to the petitioner.

The procedural history and timeline noted by the Court include (as recorded in the opinion):

  • Sec. 4(1) Notification published in the Government Gazette on 30.6.1990, in local dailies on 16.6.1990, and the substance published in the locality on 2.7.1990.
  • An enquiry under Sec. 5-A was conducted on 5.9.1990; objections were forwarded to the Tamil Nadu Housing Board on 6.11.1990; the Housing Board submitted remarks on 3.1.1991 which were forwarded to landowners on 29.1.1991.
  • An enquiry under Rule 3(B) was conducted on 27.2.1991; no further objections were received and the Land Acquisition Officer submitted his report.
  • A Declaration under Sec. 6 was issued in G.O. Ms. No. 1007 dated 21.6.1991; the declaration was published in the Government Gazette and local dailies on 26.8.1991 and the substance was published in the locality on 1.7.1991. An award has also been passed.

The petition was heard by the Court; the Government Advocate placed the file and furnished particulars on instructions from the second respondent.

Legal Issues Presented

  1. Whether the Sec. 6 declaration issued in G.O. Ms. No. 1007 is invalid because more than one year had elapsed from the Sec. 4(1) Notification (i.e., whether the time limit between Sec. 4(1) and Sec. 6 had been breached).
  2. Whether the writ petition should be entertained despite the petitioner’s delay in approaching the Court and, relatedly, whether inordinate delay and laches by the petitioner preclude relief under Article 226.
  3. Whether the existence of other writ petitions filed by other parties against the same acquisition provides a ground for entertaining the petitioner’s petition (i.e., whether the petitioner may rely on earlier petitions filed by others).

Arguments of the Parties

Appellant / Petitioner (as recorded)

  • Main contention: More than one year had elapsed between the Sec. 4(1) Notification and the Sec. 6 declaration, which allegedly rendered the declaration invalid.
  • Further contention: Several other writ petitions had been filed challenging the same acquisition, and the petitioner sought not to be dismissed summarily in limine in view of those pending challenges.

Respondents (as recorded)

  • The Government Advocate placed the acquisition file and particulars before the Court on instructions from the second respondent.
  • The respondents relied on precedents of the Apex Court establishing that delay and laches in challenging acquisition proceedings are fatal and that courts should generally not quash notification/declaration after subsequent steps (such as award and possession) have become final.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
State of Tamil Nadu v. L. Krishnan, (1996) 1 SCC 250 Delay in challenging acquisition proceedings and laches are fatal; exercise of Art. 226 after award was made was inappropriate. The Court relied on this authority as a principal precedent establishing that delay/laches bar relief and that writs filed after awards/possession are liable to be dismissed.
Aflatoon v. Lt. Governor of Delhi, (1975) 4 SCC 285 Failure to challenge notification/declaration within a reasonable time and the principle that laches of this nature are fatal. Cited as part of the line of authority that laches precludes setting aside acquisition notifications where the objectors did not act promptly.
Trilokchand Motichand v. H.B. Munshi, (1969) 1 SCC 110; 2 SCR 824 Authorities holding delay/laches fatal in acquisition challenges. Used to support the proposition that writ petitions filed after undue delay are liable to be dismissed.
Rabindranath Bose v. Union of India, (1970) 1 SCC 84; 2 SCR 697 Delay and disturbance of third-party rights as a consideration against quashing acquisition notifications. Cited to show that quashing notifications at a late stage can adversely affect third-party rights and therefore is disfavoured.
Municipal Corporation, Greater Bombay v. The Industrial Development Investment Co. Pvt. Ltd., (1996) 11 SCC 501 Delay in filing writ petition is fatal; challenging acquisition after award and possession is normally too late. Relied upon to reinforce the rule that writs brought after significant delay (and after award/possession) should be dismissed for laches.
State of Orissa v. Dhobei Sethi, (1995) 5 Scale 1881 Dismissal of writ petition on account of laches; subsequent purchasers cannot raise objections to validity of acquisition. Referred to for the proposition that laches defeats challenges and that late objections by later parties are not permitted to unsettle acquisition.
State of Maharashtra v. Digambar, A.I.R 1995 S.C.W 3116 Dismissal of writ petition on ground of laches; High Court not justified in quashing notification where delay existed. Cited as an authority where the Supreme Court directed dismissal due to inordinate delay and improper exercise of discretion by the High Court.
Ramjee Foundation v. Union of India, 1993 Supp (2) SCC 20 Retention of possession by authority or delay in passing award are not grounds to challenge Sec. 4(1) / Sec. 6; laches is a ground to dismiss writ petition. Used to support the proposition that procedural delay by the authority does not justify quashing notification and that laches defeats relief.
Ramchand v. Union of India, (1994) 1 SCC 44 Inordinate delay in approaching court after acquisition process is over precludes quashing of notification and declaration. Reiterated to show consistent Supreme Court view against entertaining late challenges.
Bhoop Singh v. Union of India, (1992) 3 SCC 136 Delay/laches and related authorities supporting refusal to quash acquisition after conclusion of proceedings. Cited among cases that establish the principle that delay defeats challenges to acquisition notifications.
Indrapuri Griha Nirman Sahakari Samiti Ltd. v. State of Rajasthan, (1975) 4 SCC 296 Authority cited in the body of jurisprudence holding delay/laches fatal. Included in the chain of decisions relied upon to deny late challenges to acquisition process.
H.D. Vora v. State of Maharashtra, (1984) 2 SCC 337 Part of line of authorities on laches and propriety of quashing notifications. Relied upon as one of the precedents showing that inordinate delay undermines entitlement to relief.
Pt. Girdharan Prasad Missir v. State of Bihar, (1980) 2 SCC 83 Authority cited among cases where delay/laches affected relief in acquisition matters. Used to reinforce the consistent approach of courts in denying late challenges to acquisition proceedings.

Court's Reasoning and Analysis

The Court's analysis proceeded in the following steps (as recorded):

  1. Examination of the statutory timeline: The Court reviewed publication dates and found that the "substance" of the Sec. 4(1) Notification was published in the locality on 1.7.1991 (the opinion records the locality publication date as 1.7.1991) and that the Sec. 6 declaration was published on 26.8.1991. On that basis the Court concluded the Sec. 6 declaration was made within one year of the locality publication of the Sec. 4(1) Notification.
  2. Rejection of the petitioner's primary contention: Because the Sec. 6 declaration fell within one year of the local publication of the Sec. 4(1) Notification, the Court rejected the petitioner's contention that more than one year had elapsed between Sec. 4(1) and Sec. 6 in this case.
  3. Consideration of delay and laches: Independently of the one-year contention, the Court found that there was inordinate delay and laches on the part of the petitioner in approaching the Court, and that such laches would be fatal to the petition.
  4. Reliance on binding precedents: The Court relied on a body of Supreme Court decisions (including State of Tamil Nadu v. L. Krishnan and others enumerated in the opinion) holding that delay and laches in challenging acquisition notifications or declarations are fatal; that courts should not normally quash notifications/declarations after awards are made and possession has been taken; and that such quashing may disturb third-party rights.
  5. Rejection of reliance on other pending petitions: The Court addressed the petitioner's argument that other writ petitions challenging the same acquisition were pending and concluded that the petitioner could not rely on those petitions because the other petitions related to different survey numbers and different parties; mere existence of other petitions filed by others immediately after the Sec. 6 declaration was not a valid excuse for the petitioner's delay.
  6. Conclusion based on facts and law: Given the procedural timeline, absence of a satisfactory explanation for delay, and the line of authority precluding late challenges, the Court held that the petition could not be entertained and was liable to be dismissed for laches.

Holding and Implications

Holding: The writ petition is dismissed.

Direct consequences recorded by the Court:

  • The petition was dismissed for the reasons stated (inordinate delay and laches; Sec. 6 declaration was within one year from the local publication of Sec. 4(1) Notification).
  • No costs were awarded.
  • Writ Miscellaneous Petitions Nos. 25612 and 25613 of 1997 were dismissed.

Implications beyond the immediate parties: The opinion applies established Supreme Court jurisprudence that inordinate delay and laches in challenging land acquisition notifications and declarations are fatal. The Court did not indicate that a new precedent was being created; it relied upon and applied existing authorities to the facts before it. No broader or novel legal principle was announced in this opinion beyond the application of the cited authorities.

    A.L Vellaichamy v. The State Of Tamil Nadu And Another

    E. Padmanabhan, J.:— The petitioner has filed the present writ petition praying for the issue of writ of certiorari to call for the records of the respondents in G.O Ms. No. 474, Housing and Urban Development, dated 30.5.1990, issued by the first respondent under Sec. 4(1) of the Land Acquisition Act and the declaration made under Sec. 6 of the Land Acquisition Act in G.O Ms. No. 1007, Housing and Urban Development Department, dated 21.6.1991 published in the Tamil Nadu Government Gazette extraordinary dated 25.6.1991 and quash the same insofar as it relates to the lands owned by the petitioner comprised in survey No. 390/4 in Sholinganallur village.

    2. Heard, Mr. K.S Viswanathan, learned counsel appearing for the petitioner and Mr. V. Selvanayagam, Government Advocate (Land Acquisition) on his taking notice for the respondents. On notice from this Court, the Government Advocate placed the file and also furnished the particulars on instructions from the second respondent.

    3. Sec. 4(1) Notification was published pursuant to G.O Ms. No. 474, Housing and Urban Development Department, dated 30.5.1990 Sec. 4(1) Notification was published in Government Gazette on 30.6.1990 and it was published in the local dailies on 16.6.1990 The substance of Sec. 4(1) Notification was also published in the locality on 2.7.1990 Enquiry under Sec. 5-A of the Act was conducted on 5.9.1990 and the objections were forwarded to the Tamil Nadu Housing Board on 6.11.1990 The remarks of the Housing Board were submitted on 3.1.1991 and the same was forwarded to the land owners on 29.1.1991 Thereafter, enquiry under Rule 3(B) was conducted on 27.2.1991 As no objection has been received, the Land Acquisition Officer submitted his report.

    4. Thereafter, a Declaration under Sec. 6 was issued in G.O Ms. No. 1007, Housing and Urban Development, dated 21.6.1991 and the same was published in the Government Gazette on 26.8.1991 and in the local dailies on 26.8.1991 and in the locality on 1.7.1991 Award has also been passed.

    5. In the present writ petition, Mr. K.S Viswanathan, learned counsel for the petitioner mainly contended that more than one year has elapsed between Sec. 4(1) Notification and Sec. 6 declaration. This contention cannot be accepted, as Sec. 6 declaration in the present case has been made on 26.8.1991 and it is well within one year from 1.7.1991 on which date the substance of Sec. 4(1) Notification was published in the locality. This contention of the petitioner cannot be accepted. The learned counsel for the petitioner further contended that number of writ petitions were filed challenging the very same acquisition. It is not a ground in favour of the petitioner.

    6. This Court is not in position to entertain this writ petition as there is inordinate delay and the laches on the part of the petitioner will be is fatal.

    7. In this respect, the learned Government Advocate relied upon the judgment of the Apex Court reported in State of Tamil Nadu v. L. Krishnan, (1996) 1 SCC 250 : A.I.R 1996 S.C 497 : [1996 (1) Indian Civil Cases 140(SC)]. In the said judgment, the Apex Court held thus:

    “There is yet another and a very strong fact or militating against the writ petitioner. Not only did they fail to file and objections in the enquiries held under Sec. 5-A, they also failed to act soon after the declarations under Sec. 6 were made. As stated above, the declaration under Sec: 6 were made in the year 1978 and the present writ petitions were filed only sometime in the year 1982-83 when the awards were about to be passed. It has been pointed out in Aflatoon, (1975) 4 SCC 285 : A.I.R 1974 S.C 2077, that laches of this nature are fatal. Having held that the public purpose specified in the Notification concerned therein is not vague. Mathew, J made the following observations (At pp. 2080-81)” assuming for the moment that the public purpose was not sufficiently specified in the notification, did the appellants made a grievance of it at the appropriate time? If the appellant had really been prejudiced by the non-specification or the public, purpose for which the plots in which they were interested are needed, they should have taken steps to have the Notification quashed on the ground within a reasonable time. They did move in the matter even after the declaration under Sec. 6 was published in 1966. They approached the High Court with their writ petitions only in 1970 when the notice under Sec. 9 were issued to them Nor do we think that the petitioners in the writ petitions should be allowed to raise this plea in view of their conduct in not challenging the validity of the Notification even after the publication of the declaration under Sec. 6 in 1966. Of the two writ petitions, one is filed by one the appellants. There was apparently no reason why the writ petitioners should have waited till 1972 to come to this Court for challenging the validity of the Notification issued in 1959 on the ground that the particulars of the public purpose were not specified. A valid Notification under Sec. 4 is sine qua non for initiation of proceedings for acquisition of property. To have sit on the fence and allowed the Government to contemplate the acquisition proceedings on the basis that the Notification under Sec. 4 and the declaration under Sec. 6 were valid and then to attack the Notification on grounds which were available to them at the time when the notification was published would be putting a premium on dilatory tactics. The writ petitions are liable to be dismissed on the ground of laches and delay on the part of the petitioners (see: Trilokchand Motichand v. H.B Munshi, (1969) 2 S.C.R 824; (1969) 1 SCC 110 : A.I.R 1970 S.C 898 and Rabindranath Bose v. Union of India, (1970) 2 S.C.R 697 : (1970) 1 SCC 84 : AIR 1970 SC 470. From the counter-affidavit filed on behalf of the Government, it is clear that the Government have allotted a large portion of the land after the acquisition proceedings were finalised to co-operative housing societies. To quash the notification at their stage would disturb the rights of third parties who are not before the Court”.

    41. The above observations speak for themselves and are fatal to the writ petitioners.”

    8. Subsequently also the Apex Court in Municipal Corporation, Greater Bombay v. The Industrial Development Investment Company Private Limited, (1996) 11 SCC 501 : A.I.R 1997 S.C 482 analysed the entire case law and held that delay in filing the writ petition is fatal. The Apex Court held thus:

    “23. The next question is: whether the High Court was right in issuing the writ after long lapse of time? The respondents, admittedly, approached the High Court after delay of 4 years; that too after award was made and possession was taken from the owner. It is seen that the declaration was published as long back as on May, 3, 1979. Earlier to that after the draft plan was published, notice was given to all the parties. The respondents, who claim to be the tenants, had not raised the little finger in making any objection to the proposed scheme or the revised plan. The award was made on February 24, 1983, possession was taken on March 4, 1983, and on the same day it stood transferred to the B.M.C The writ petition came to be filed thereafter on July 4, 1983. The learned Single Judge dismissed the writ petition on the ground of laches.

    “24. In State of Tamil Nadu v. Krishnan, (1996) 1 SCC 250 : A.I.R 1995 S.C.W 4390, a Bench of three Judges of this Court has held that “the delay in challenging Notification was fatal and the writ petitions were liable to be dismissed “on the ground of laches.” Exercise of power under Art. 226 of the Constitution, after award was made, was held to have been wrongly made. Delay to make award was not a ground to quash the acquisition proceedings.

    25. In State of Orissa v. Dhobei Sethi, (1995) 5 Scale 1881, it was held that on account of laches on the part of the petitioner, the writ petition was liable to be dismissed. It was also held therein that subsequent purchaser cannot raise any objection for the validity of the acquisition. The High Court was therefore, held unjustified in issuing the writ and quashing the Notification and declaration under Secs. 4(1) and 6 respectively.

    26. In State Of Maharashtra v. Digambar., A.I.R 1995 S.C.W 3116, another Bench of three Judges directed dismissal of the writ petition on the ground of laches and held that the High Court had not judiciously and reasonably exercised its discretion in passing the Notification under Sec. 4(1) of the Act.

    27. In The Ramjee Foundation v. Union of India, 1993 Supp (2) SCC 20 : A.I.R 1993 S.C 852 : A.I.R 1992 S.C.W 3460, a Bench of three Judges had held that mere retaining the possession or delay on the part of the authority to pass award are not grounds to challenge the Notification under Sec. 4(1) and declaration under Sec. 6 and the latches was held to be ground to dismiss the writ petition. Accordingly this Court, allowed the appeal and dismissed the writ petition.

    28. In Ramchand v. Union of India, (1994) 1 SCC 44 : A.I.R 1993 S.C.W 3479, another Bench of three Judges of this Court had held that because of in ordinate delay in approaching the Court after entire process of acquisition was over pursuant to Notification under Sec. 4(1) and declaration under Sec. 6, the Court was not justified in quashing the same. Same view was reiterated in Bhoop Singh v. Union of India, (1992) 3 SCC 136 : AIR 1992 SC 1414 : A.I.R 1992 S.C.W 1476, Aflatoon v. Lt. Governor of Delhi, (1975) 4 SCC 285 : A.I.R 1974 S.C 2077, Indrapuri Griha Nirman Sahakari Samiti Ltd. v. State of Rajasthan, (1975) 4 SCC 296 : AIR 1974 SC 2085, H.D Vora v. State of Maharashtra, (1984) 2 SCC 337 : AIR 1984 SC 866 and Pt. Girdharan Prasad Missir v. State of Bihar, (1980) 2 SCC 83 : A.I.R 1979 NOC 191.

    29. It is thus well-settled law that when there is inordinate delay in filing the writ petition and when all steps taken in the acquisition proceedings have become final, the Court should be clothed to quash the Notifications. The High Court has, no doubt, discretionary powers under Art. 226 of the Constitution to quash the Notification under Sec. 4(1) and declaration under Sec. 6. But, it should be exercised taking all relevant factors into pragmatic consideration. When the award was passed and possession was taken, the Court should not have exercised its power to quash the award which is a material factor to be taken into consideration before exercising the power under Art. 226. The fact that no third party rights were created in the case, is hardly a ground for interference. The Division Bench of High Court was not right in interfering with the discretion exercised by the learned Single Judge dismissing the writ petition on the ground of laches.”

    There is no escape for the petitioner in the light of the said pronouncement of the Apex Court.

    9. However, Mr. K.S Viswanathan, learned counsel for the petitioner vehemently contended that already writ petitions are pending challenging the very same Notification and this writ petition should not be dismissed in limine. To satisfy myself I sent for the records. As already held, the Declaration has been made within one year from the 4(1) Notification. The petitioner cannot rely upon the earlier writ petitions filed by others as the acquisition in relation to various survey numbers related to various parties and merely because some of them have filed writ petitions, immediately after issue of Sec. 6 Declaration that cannot be a ground for the petitioner nor it can be an excuse. There is no explanation at all for the delay and the laches on the part of the petitioner will be fatal. In the circumstances, this petition is dismissed. No costs. Consequently, W.M.P Nos. 25612 and 25613 of 1997 are dismissed.

    10. Petition dismissed.

    Use AI to get other relevant cases.

    Comments

    A.L Vellaichamy v. The State Of Tamil Nadu And Another
    (Oct 29, 1997)