  • provisions of clauses (a), (b) & (c) of section 8(1) of the Arbitration Act
  • section 8(1)(a) of the Arbitration Act. As I read section 8(1)(a),
  • provisions of section 8(1)(a) of the Arbitration Act,
  • section 8(1)(a) of the Arbitration Act.13.
  • section 8(1)(a) of the Arbitration Act.14.
  • section 8 of the Indian Arbitration Act,
  • provisions of clause (a) of section 8(1)
  • section 8(1)(b) of the Arbitration Act
  • SECTION 8 ARBITRATION ACT
  • section 8(1) Arbitration Act
  • sub-section (2) of section 8
  • sub-section (3) of section 4
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • provisions of clauses (a), (b) & (c) of section 8(1) of the Arbitration Act
  • section 8(1)(a) of the Arbitration Act. As I read section 8(1)(a),
  • provisions of section 8(1)(a) of the Arbitration Act,
  • section 8(1)(a) of the Arbitration Act.13.
  • section 8(1)(a) of the Arbitration Act.14.
  • section 8 of the Indian Arbitration Act,
  • provisions of clause (a) of section 8(1)
  • section 8(1)(b) of the Arbitration Act
  • SECTION 8 ARBITRATION ACT
  • section 8(1) Arbitration Act
  • sub-section (2) of section 8
  • sub-section (3) of section 4
Smart Summary

Structured Summary of the Opinion

Factual and Procedural Background

Two revision applications challenged orders dated 17.12.1979 and 29.7.1980 by which trial Courts, invoking section 8 of the Indian Arbitration Act, appointed arbitrators pursuant to clause 9 (an arbitration clause) in two separate agreements between the applicants (Western Coalfields Ltd. and associated parties) and the opponents.

Civil Revision Application No. 107 of 1980: The parties had an agreement dated 4.6.1976 for transporting sand. Work commenced and concluded on 27.1.1977; the final bill was paid and a bank guarantee for Rs. 50,000 was released. On 16.9.1978 the opponent (M/s Harichand Rai) sent a notice claiming a dispute and called upon applicant No.1 to appoint an arbitrator. Applicants replied on 28.2.1979 contesting that notice. The opponent applied to the learned Judge for appointment of an arbitrator and on 17.12.1979 the Court appointed Shri Kamal D. Kanal as Arbitrator and directed him to file his award within four months.

Civil Revision Application No. 470 of 1980: A transportation contract was executed on 13.4.1978 with Tilakraj Kesarlal Thapar, who was to furnish security of Rs. 57,120. Thapar failed to perform in time; he sent a notice on 1.4.1980 claiming a dispute and entitlement to Rs. 50,000 as damages and asked applicant No.1 to appoint an arbitrator under clause 9. Applicant No.2 repudiated the claim by letter dated 24.4.1980. Tilakraj Thapar applied for appointment of an arbitrator. Although resisted, an order dated 17.12.1979 appointed Shri R.K. Tambe as Arbitrator and directed him to submit his award.

Legal Issues Presented

  1. Whether clause 9 (which required that disputes "shall be referred to an arbitrator nominated by the Managing Director of the Western Coalfields Ltd.") falls within the ambit of section 8(1)(a) of the Arbitration Act — i.e., whether the clause constitutes an arbitration agreement providing that the reference shall be to an arbitrator "to be appointed by consent of the parties" so as to enable the Court to appoint an arbitrator under section 8 when the parties do not concur.
  2. Whether the trial Courts' appointments of arbitrators under section 8 were legally maintainable in the circumstances of these contracts and notices.

Arguments of the Parties

Applicants' (Revision Applicants') Arguments

  • The applicants challenged the trial Courts' orders appointing arbitrators under section 8, arguing (in substance) that the arbitration clause required nomination by the Managing Director and therefore did not amount to appointment "by consent of the parties" under section 8(1)(a).
  • In the first case the applicants had contested the opponent's notice (reply dated 28.2.1979). In the second case applicant No.2 repudiated the claim (letter dated 24.4.1980).
  • Both revision applications challenged the legality of the appointments made by the Courts on identical grounds concerning the interpretation and applicability of section 8(1)(a).

Opponents' Arguments

  • The opponents submitted that they were entitled, by virtue of section 8 of the Arbitration Act, to have an arbitrator appointed (the trial Courts therefore correctly appointed arbitrators).
  • The opponents relied on an array of precedents (listed in the opinion) to support the proposition that nomination by a specified party or authority can be treated as falling within the ambit of section 8 and/or that the Court may act to appoint arbitrators in similar circumstances.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court in this Opinion
Union of India v. D.P. Singh (AIR 1961 Patna 228) Held that when a party has the sole power under an agreement to appoint the only arbitrator, that nomination is to be deemed to have been made by the consent of both parties. The Court expressed difficulty in agreeing with this view as applied to section 8(1)(a) and did not accept it as determinative for the present clause.
State of Orissa v. Govinda Choudhury (AIR 1969 Orissa 280) Applied a test of implied consent where an authority (Chief Engineer) was to nominate the arbitrator; treated the clause as falling within section 8(1)(a) on the basis of implied consent. The Court noted that State of Orissa proceeded on a basis of implied consent but distinguished it for present purposes and observed that the case did not justify extending section 8(1)(a) to the clause before the Court.
Surendra Pal v. Union of India (AIR 1965 Cal. 183) Listed among authorities relied upon by opponents (no detailed principle extracted in the opinion itself). Cited by opponents; the court did not elaborate further on its application beyond acknowledging citation.
State of Rajasthan v. Mehta Chetan Dass Kishan Dass (1978 Rajasthan L.W. 380) Relied upon observations in earlier cases (including AIR 1961 Patna and 2 SCC 715) to contend applicability of section 8 where appointment was stipulated to be by one party. The Court rejected the proposition (with respect) that such authorities establish that clause (a) of section 8(1) applies where nomination is by one party.
Union of India v. Harpal Dass Madhyani (AIR 1979 Pat. 18) Relied upon for the proposition that section 8 can apply in cases where appointment is stipulated to be by one party. The Court treated this reliance as insufficient to support application of section 8(1)(a) to the present clause and disagreed with that extension.
A.K. Ghosh v. State of West Bengal (1975 1 Cal. L.J. 53) Cited by opponents (no detailed proposition set out in the opinion). Acknowledged among cited authorities; no further role in the Court's reasoning other than being listed by opponents.
Chander Bhan Harbhajan Lal v. The State of Punjab (1977) 2 SCC 715 Considered a case where the Government appointed Settlement Committees and the Supreme Court held section 8 available when a previously appointed committee became incapable of acting (interpreted under clause (b)). The Court observed that Chander Bhan dealt with clause (b) circumstances (incapacity/cessation) and therefore did not support extending clause (a) to nominations by one party in the present context.
India Hosiery Works v. Bharat Woollen Mills Ltd. (Calcutta case) Where the arbitration agreement did not specify the mode of appointment, the agreement was still effective and the Court could make an appointment if parties did not concur. Noted by the Court but treated as distinguishable from the present clause which expressly nominated a specific authority to appoint.
Surendra Nath Paul v. Union of India Used to examine whether exercise of appointment power by an authority exhausts that power and the Court's ability to act; discussed in context of clause (b) and Court's power under section 8. Referred to in distinguishing clause (b) situations from clause (a) questions before the Court.
Brij Bhushan Lal v. Chief Engineer, North Western Zone (AIR 1972 Punj & Haryana 266) Held that section 8(1)(a) is attracted only if the arbitration agreement specifically provides that the appointment of the actual person as arbitrator must have the consent of both parties; nomination by an authority is not enough. The Court relied on this view to support the conclusion that clause 9 (naming the Managing Director as nominating authority) did not fall within section 8(1)(a).
Sunil Mukherjee v. Union of India (AIR 1978 Cal. 37) A Division Bench held section 8 applicable only where the arbitration agreement provides for reference to arbitrators to be appointed by consent of the parties. The Court referenced this authority as supporting the narrower view of section 8(1)(a) adopted in the present opinion.
C. Rai v. Union of India (AIR 1957 Jammu & Kashmir 27) Held that where one party alone had power to appoint an arbitrator, the other party's consent was immaterial and clause (a) confers power on the Court to appoint where there is a provision for appointment by consent and parties do not concur. Cited by the Court in its review of authorities discussing the limits and scope of clause (a).
Union of India v. New India Construction Company (unreported, F.A. No. 128 of 1983, decided 26.10.1983) Unreported decision of a single Judge of this Court; referenced as supporting the interpretation that nomination by the Managing Director does not fall under section 8(1)(a). The Court relied upon this unreported decision to fortify its conclusion that the present arbitration clause did not come within section 8(1)(a).

Court's Reasoning and Analysis

The Court focused on the precise wording of clause 9 and the language of section 8(1)(a) of the Arbitration Act. Clause 9 provided that disputes "shall be referred to an arbitrator nominated by the Managing Director of the Western Coalfields Ltd."

The central interpretive question was whether such a clause could be treated as an agreement that "the reference shall be to one or more arbitrators to be appointed by consent of the parties" so as to invoke section 8(1)(a).

The Court's step-by-step analysis:

  1. The Court read section 8(1)(a) as referring to an arbitration agreement under which the actual appointment of the individual arbitrator(s) is to be made by the consent of the parties — i.e., the consent must relate to the appointment of the individual person(s) selected to act as arbitrator(s).
  2. It distinguished nomination by a specified authority (here, the Managing Director) from an arrangement where the parties jointly appoint or must consent to the actual individual arbitrator. Nomination by one party or authority, according to the Court's reading, is qualitatively different from appointment by the mutual consent of the contracting parties.
  3. The Court reviewed authorities relied upon by the opponents. It observed that some decisions (for example Union of India v. D.P. Singh) treated unilateral nomination by a party as constituting deemed consent; the Court expressed difficulty in accepting that approach in relation to section 8(1)(a).
  4. The Court examined State of Orissa v. Govinda Choudhury and related cases that discussed implied consent and nomination by a technical authority (e.g., Chief Engineer) and noted that those holdings proceeded on a basis of implied consent; however, the Court distinguished such reasoning from the question whether clause 9 fell under clause (a) of section 8(1).
  5. The Court emphasized that many of the authorities relied upon by opponents actually concerned clause (b) circumstances (where an appointed arbitrator or committee became incapable of acting, died, or neglected to act), or were otherwise distinguishable; the outturn was that they did not warrant treating the present clause as one providing appointment by the consent of both parties under clause (a).
  6. The Court found persuasive the line of authority (for example Brij Bhushan Lal and Sunil Mukherjee) holding that section 8(1)(a) is attracted only when the agreement specifically requires the arbitrator to be appointed by the consent of the parties (i.e., consent as to the actual person), and that nomination by an authority is not enough.
  7. Relying also on an unreported single-Judge decision (Union of India v. New India Construction Company, F.A. No.128 of 1983), the Court concluded that clause 9 — which contemplates nomination by the Managing Director — does not come within section 8(1)(a).
  8. Because section 8(1)(a) did not apply, the applications to the trial Courts for appointment of arbitrators were not maintainable under that provision and the trial Courts' orders appointing arbitrators could not be supported on that basis.

Holding and Implications

Holding (core ruling): The revision applications are allowed; the orders passed by the Courts below appointing arbitrators under section 8(1)(a) are set aside and the underlying applications to appoint arbitrators are dismissed.

Implications and direct effects:

  • The trial Courts' appointments of Shri Kamal D. Kanal and Shri R.K. Tambe (orders of 17.12.1979 and 29.7.1980) are set aside because clause 9 (nomination by the Managing Director) does not fall within section 8(1)(a) as interpreted by the Court.
  • There is no order as to costs throughout.
  • In Civil Revision Application No. 470 of 1980, the applicants are permitted to encash the bank guarantee if it is realisable under the contract.
  • The opinion confines its conclusion to the interpretation and application of section 8(1)(a) to the particular arbitration clause before the Court; the Court did not state a broader rule beyond its analysis and did not purport to lay down a novel general precedent beyond the decision in the particular cases before it.

Disposition: Revision applications allowed. (Final line of the opinion: "Revision application allowed.")

    Western Coalfields Ltd. v. Harichand Rai

    1. By these two revision applications, the applicants challenge the orders dated 17.12.1979 and 29.7.1980 by which the trial Courts, acting under section 8 of the Indian Arbitration Act, appointed arbitrators by virtue of clause 9 which was an arbitration clause in two agreements between the applicants and the opponents in the two cases.

    2. In Civil Revision Application No. 107 of 1980, the position was that the parties entered into an agreement on 4.6.1976 for transporting sand for Chanda Rayatwari Colliery which was owned by the applicants. The work commenced and was completed on 27-1-1977. The Final Bill was also paid to the opponent in that case and the bank guarantee for Rs. 50,000/- was also released. However, about one-and-a-half years after that was done, the opponent — M/s Harichand Rai sent a notice dated 16-9-1978 contending that there was a dispute and calling upon applicant No. 1 to appoint an arbitrator for settlement of the alleged dispute. A reply was sent by the applicants on 28-2-1979 contesting the notice. An application was thereafter made by the opponent for appointment of an arbitrator to the learned Judge, and by an order passed on 17.12.1979, Shri Kamal D. Kanal, an Engineer from Nagpur, was appointed as an Arbitrator and he was directed to file his award within four months from the date of the order.

    3. In Civil Revision Application No. 470 of 1980, the transportation contract between the opponent — Tilakraj Kesarlal Thapar and the applicants was executed on 13.4.1978 Tilakraj Thapar was to furnish a security of Rs. 57,120/-, for due performance of the contract. As he was unable to perform the contract within the time prescribed, the time being of the essence of the contract, a notice was sent to him. In order to avoid forfeiture of the bank guarantee, Tilakraj Thapar sent a notice on 1.4.1980 to the applicants, urging that there was a dispute regarding the contract and that he was entitled to Rs. 50,000/— as damages and asking applicant No. 1 to appoint an Arbitrator, pursuant to clause 9 of the agreement dated 13.4.1978 Applicant No. 2, by his letter dated 24.4.1980, repudiated the claim and Tilakraj Thapar filed an application for appointing an arbitrator. Though this application was resisted, an order came to be passed on 17-12-1979 appointing Shri R.K Tambe as an Arbitrator and directing him to submit his award.

    4. These two orders are being challenged by the two revision applications on identical grounds. The arbitration clause No. 9 in the two agreements runs as follows:

    “ARBITRATION:

    If any dispute, question of controversy, the settlement of which is not herein specifically provided for, shall any time arise between the Western Coalfields Ltd., and the contractor/Contractors, touching this agreement or any clause of anything herein contained on the construction thereof or any matter connected with this agreement or the operation of the same or the rights or duties or liabilities of either party, then and in every such case either party, shall forthwith give to the other notice of such difference and such dispute or difference shall be referred to an arbitrator nominated by the Managing Director of the Western Coalfields Ltd. and the award of such arbitrator shall be final and binding on the parties. Progress of the work shall not be suspended or delayed on account of the reference of any dispute or difference to arbitration under this clause”.

    The trial Courts took the view that the opponents were entitled, by virtue of Section 8 of the Arbitration Act, to appoint an arbitrator. Section 8 of the Arbitration Act reads as follows:—

    “8. (1) In any of the following cases:

    (a) where an arbitration agreement provides that the reference shall be to one or more arbitrators to be appointed by consent of the parties, and all the parties do not, after differences have arisen, concur in the appointment or appointments; or

    (b) if any appointed arbitrator or umpire neglects or refuses to act, or is incapable of acting or dies, and the arbitration agreement does not show that it was intended that the vacancy should not be supplied, and the parties or the arbitrators, as the case may be, do not supply the vacancy; or that the vacancy should not be supplied and as the case may be, the parties or the arbitrators do not supply, or the person designated does not under sub-section (3) of section 4 supply the vacancy, or

    (c) where the parties or the arbitrators are required to appoint an umpire and do not appoint him; any party may serve the other parties or the arbitrators, as the case may be, with a written notice to concur in the appointment or appointments or in supplying the vacancy.

    (2) If the appointment is not made within fifteen clear days after service of the said notice, the Court may, on the application of the party who gave the notice and after giving the other parties an opportunity of being heard, appoint an arbitrator or arbitrators or umpire, as the case may be, who shall have like power to act in the reference and to make an award as if he or they had been appointed by consent of all parties”.

    5. In the instant case, the dispute or difference had to be referred to an arbitrator nominated by the Managing Director of the Western Coalfields Limited. The question that arises is whether by virtue of this clause, it could be said that an arbitrator was to be appointed by consent of the parties so as to invoke the application of section 8(1)(a) of the Arbitration Act. As I read section 8(1)(a), it seems to me that it refers to the actual appointment of the arbitrators by consent, which means that for the appointment of the individual arbitrators, the consent should be available.

    6. On behalf of the opponents, reliance was placed on the observations in Union of India v. D.P Singh . AIR 1961 Patna 228, State of Orissa v. Govinda Choudhury . AIR 1969 Orissa 280, Surendra Pal v. Union of Union of India . AIR 1965 Cal. 183, State of Rajasthan v. Mehta Chetan Dass Kishan Dass . 1978 Rajasthan L.W 380, Union of India v. Harpal Dass Madhyani . AIR 1979 Pat. 18, A.K Ghosh v. State of West Bengal . 1975 1 Cal. L.J 53 and Chander Bhan Harbhajan Lal v. The State of Punjab . 1977 2 SCC 715.

    7. In Union of India v. D.P Singh, it was observed that it is inherent in a case where a party has the sole power under an agreement to appoint the only arbitrator, that the nomination of the arbitrator by the party who is given the sole power to appoint him shall be deemed to have been made by the consent of both the parties and hence it was not necessary to make any express provision that the appointment should be made by the consent of the parties. Reliance was placed by the learned Judge for this view on the observations in India Hosiery Works v. Bharat Woollen Mills Ltd.,8. But a look at the arbitration agreement in the Calcutta case would show that there what was agreed was that all disputes whatsoever arising in or out of or in connection with the said contract or arising in any way whatsoever in connection with any other contract for the supply of goods by the Company to the Buyers shall be referrred to arbitration at Calcutta. The decision of its Tribunal of Arbitration shall be final and binding on both parties, either of whom may make the same a Rule of Court. There was nothing in the agreement to exclude the First Schedule, and the question was how that single arbitrator was to be chosen, and it was held that an arbitration agreement, neither specifing the number of arbitrations, nor specifying the mode of appointment, was perfectly effective, and where the parties do not concur in making an appointment, it could be made by the Court. Considering the plain meaning, which is obvious from the provisions of section 8(1)(a) of the Arbitration Act, I find it difficult to agree with the view taken by the learned Judge in AIR 1961 Patna 228.

    8. In State of Orissa v. Govinda Choudhury (Supra), it was observed that the crucial test as to whether consent could be implied in the agreement itself was to find out if any discretion was left to one of the parties to the agreement to object to the actual selection of arbitrator when the the option was exercised. There, the arbitrator was to be nominated by the concerned Chief Engineer. The learned Judge followed the test as prescribed in Surendra Nath Paul v. Union of India (Supra). There the arbitrator under the arbitration clause was to be the Secretary to the Government of India, Ministry of Works, Housing and Supply and if the Secretary to the Government of India was unable or unwilling to act, the arbitrator was to be some other person appointed by the Secretary to the Government of India. In fact, as the facts stated there would show that the dispute had been referred to the Secretary to the Government of India, but no reply was received from him and then an application was made to the Court for the appointment of an arbitrator under Section 8 of the Arbitration Act. During the pendency of the application, the Secretary Secretary appointed an arbitrator. The question raised was, once the power was exercised by the Secretary by appointing one Shri Desai as the arbitrator, his power was exhausted, and this contention was negatived. The position is made clear by the observations in paragraph No. 17 of the report that if it were to be held that the power of the Secretary was exhausted after the appointment of Shri Desai and the second appointment of Shri Iyer could not be made, still there appeared to be no impediment to arbitration because the Court in the circumstances can make an appointment of the Arbitrator under section 8(1)(b) of the Arbitration Act. It is apparent from the observations in para — 6 in AIR 1969 Orissa 280 (State of Orissa v. Govinda Choudhury) that the Court proceeded on the basis that there was an implied consent amongst both the parties that the concerned Chief Engineer would make the selection out of the two groups referred to in the arbitration clause and, therefore, the agreement came within the ambit of section 8(1)(a) of the Act.

    9. In State of Rajasthan v. Mehta Chetan Dass Kishan Dass, (Supra), the learned Judge relied on the observations in AIR 1961 Patna 228 and (1977) 2 SCC 715 : AIR 1977 SC 1210. Reliance was placed on those very cases also in AIR 1979 Patna 18 (Union of India v. Harpal Dass Madhyani), and it, therefore becomes necessary to understand what was the proposition laid down by their Lordships of the Supreme Court in Chander Bhan Harbhajan Lal. v. The State of Punjab (Supra). There the arbitration clause in a contract for construction work provided that in the matter of dispute, the case shall be referred to the Settlement Committee consisting of a Superintending Engineer, an officer of the Finance Department of the rank of at least Deputy Secretary and an Accounts Officer, all to be nominated by the Government for arbitration whose decision will be final. On a dispute arising the State Government appointed the first committee who took up the dispute but before the conclusion of its work the Government unilaterally abolished the committee and subsequently appointed the second committee who entered upon arbitration and passed the award. The appellant thereupon challenged the validity of the award and got it set aside through a civil suit and the second committee also ceased to function. Thereafter the Government gave notice under section 8(1) Arbitration Act to the appellant to concur in the appointment of a fresh committee to arbitrate the matter and the appellant not having replied, applied under section 8(2) of the Act and the Court appointed the fresh committee suggested by the Government. Their Lordships observed that on their finding that the Government was entitled to appoint a committee under a new agreement, the Government could have very well appointed a committee by itself without coming to Court. But may be by way of abundant caution, the Government came to the Court and the Court appointed a committee as suggested by the State. It was found that under section 8, the Court was entitled to act and appoint a committee, and when the second Settlement Committee ceased to function the Committee became incapable of acting and, therefore, it was within the competency of the Court to proceed to appoint a new committee. It was, therefore, observed that equally untenable was the contention that section 8 was not applicable to cases where the condition stipulated the appointment of a Settlement Committee by one of the parties. It is apparent that their Lordships were considering a case which fell under section 8(1)(b) of the Arbitration Act which enabled the Court, if any appointed arbitrator or umpire neglected or refused to act, or was incapable of acting or died, to serve notice on the other parties or arbitrators. The provisions of clauses (a), (b) & (c) of section 8(1) of the arbitration act are disjunctive and sub-section (2) of section 8 applies to any of the three contingencies mentioned therein.

    10. On behalf of the opponent, reliance-was placed on the observations of their Lordships which are as follows:—

    “Equally untenable is the contention that section 8 is not applicable to cases where the condition stipulates the appointment of a settlement committee by one of the parties”.

    That submission there was made relying on the wording of the section that any party may serve the other parties or the arbitrators, as the case may be, with a written notice to concur in the appointment or appointments or in supplying the vacancy. Their Lordships observed that this part of the section, no doubt, contemplates two parties, but the section cannot be read as not being applicable where the agreement provides for the nomination of the committee by one of the parties, for the section itself, says that any party may serve the other parties. “May serve the other parties” will include in serving other parties in cases in which the service on the other parties is not contemplated.

    But what is overlooked is that these observations were made in respect of the provisions which would apply to any one of the three clauses (a), (b) & (c) and not particularly to clause (a). Their Lordships were clearly not considering the provisions of clause (a) of section 8(1) and the proposition laid down in the State of Rajasthan v. Mehta Chetan Das (Supra) and Union of India v. MIS Harpal Dass (Supra) with respect, cannot be accepted.

    11. On the other hand, it was held in Brij Bhushan Lal v. Chief Engineer, North Western Zone . AIR 1972 Punj & Haryana 266 that section 8(1)(a) will be attracted only if the arbitration agreement specifically provides that the appointment of the actual person as an arbitrator must have the consent of both the parties. It will not be enough if the parties agree only to the person or authority who will subsequently appoint an arbitrator, even if he is told to make only that one who had some special qualifications without, of course, mentioning the particular individual. This was also the view taken in Sunil Mukherjee v. Union of lndia . AIR 1978 Cal. 37 where a Division Bench of that Court held that section 8 was applicable only in a case where the arbitration agreement provided for reference to arbitrators to be appointed by consent of parties. In C. Rai. v. Union of India . AIR 1957 Jammu & Kashmir 27 where the arbitration agreement provided that one of the parties alone had the power to appoint an arbitrator, it was held that the other party's consent or no consent was immaterial and that clause (a) of section 8(1) gives power to a Court to appoint an arbitrator on failure of the parties to do so, where there is a provision in the arbitration agreement for appointment of an arbitrator by consent of the parties, and all the parties do not concur in the appointment of an arbitrator.

    12. It follows, therefore, that clause (a) of section 8(1) will have application only when the agreement provides that the arbitrators are to be appointed by the consent of the parties, which means that the individual arbitrators are to be appointed by consent, which is quite different from their nomination by one of the parties, in pursuance of the express terms of the agreement. I am fortified in this by an unreported decision of a learned single Judge of this Court in Union of India v. New India Construction Company . F.A No. 128 of 1983 decided on 26.10.1983. Having regard to the language, of the arbitration clause here under which the dispute or difference had to be referred to an arbitrator nominated by the Managing Director of the Western Coalfields Limited, it would not come within the purview of section 8(1)(a) of the Arbitration Act.

    13. In this view of the matter, the orders passed by the learned Judges of the Courts below in the two cases cannot be supported. The applications were clearly not maintainable under section 8(1)(a) of the Arbitration Act.

    14. In the result, both the revision applications are allowed. The orders passed by the Courts below are set aside and the applications are dismissed. There will, however, be no order as to the costs throughout.

    In Civil Revision Application No. 470 of 1980, there will be an order permitting the applicants to encash the bank guarantee, if it is realisable under the contract.

    Revision application allowed.
    Use AI to get other relevant cases.

    Comments

    Western Coalfields Ltd. v. Harichand Rai
    (Jul 16, 1984)