A.
Funding and Ranking Rationale
Projects will be placed on the fundable portion of the Priority List according to both priority ranking and readiness to proceed. The term "ready to proceed" means that all loan application requirements established in the Program regulations are met, and all documents necessary for loan award are approved. If a project cannot reasonably be expected to meet the Priority System deadlines, then the project will not be placed on the current year's Priority List but will be placed on the Planning List. It is the Board's judgment with input from the DWSIRLF staff as to when a project is ready to proceed. Loans will be awarded to projects (within available funds) that are above the funding line on the current year's Priority List, that have met all Priority System deadlines and are ready to proceed. Additionally, when potential loan recipients are deciding on the needs for their public water supplies, they should ensure that all public health and state safe drinking water laws are followed. If a state regulation becomes an additional requirement of Mississippi's public water supplies, appropriate planning and design of the project(s) will be necessary in order to receive funding. However, if it is understood that a proposed project is designed to meet specific SDWA compliance requirement(s) unrelated to a state requirement, the Board may waive the state requirement upon request from the potential loan recipient. This waiver would require concurrence from the Bureau of Public Water Supply.
1. Funding Lists and Bypass Procedure
Should any projects on the FFY-2022 Priority List (which are above the funding line) fail to comply with the deadlines in Section D, the project shall be bypassed, and the funds reserved for said project will be released. Released funds will first be made available to listed projects, to ensure that all projects above the funding line meeting priority system deadlines are funded. Any remaining funds will be made available to the highest-ranking project(s) shown below the funding line that is ready for loan award at the time funds become available. If no projects above the funding line are ready for loan award at the time funds become available, projects shown below the funding line will be funded on a first-come, first-served basis as they become ready for loan award and until the released funds are awarded. This same process will continue as each deadline passes and released funds become available.
2. FFY-2022 Green Infrastructure Requirement
The FFY-2022 federal appropriation is not expected to require that a percentage of the funds appropriated for the Revolving Funds be designated for projects that exhibit the elements of green infrastructure, water efficiency improvements, energy efficiency improvements or other environmentally innovative projects. However, projects that wish to be classified in the following elements will be reported as green infrastructure to the EPA through its "Project and Benefits Report Database" and noted in the future annual report. Projects may exhibit one or more of the "green" elements and the details of the project's "green" content will be identified in the business case required for each project if the recipient so chooses.
- Green infrastructure projects include a wide array of practices at multiple scales; green infrastructure projects will manage wet weather and will maintain and restore natural hydrology by infiltrating, evapotranspiring, and harvesting and using storm water. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, it may consist of site- and neighborhood-specific practices, such as bio-retention, trees, green roofs, permeable pavements, and cisterns.
- Water efficiency projects are designed to use improved technologies and practices to deliver equal or better services with less water. It encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future.
- Energy efficiency projects are designed to use improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy.
- Environmentally innovative projects include projects that demonstrate new and/or innovative approaches to deliver services or manage water resources in a more sustainable way.
Projects desiring to be classified as "green" will be judged for eligibility based on the guidance supplied by the EPA and that is available at our website . Systems desiring "Green Infrastructure" classification will be required to present a "business case" establishing justification for the classification request. Guidance for establishing a "business case" is available to assist potential loan recipients in preparation of the documentation.
3. Loan Decreases
Any funds recovered from loan decreases during the year will be used:
a) first to fund bid overruns, if funds from the loan increase reserve are not sufficient to cover the bid overruns;
b) then to ensure that all projects above the funding line meeting the priority system deadlines are funded (for at least the amount shown on the priority list); and
c) then to fund other loans and/or increases on a first-come, first-served basis.
Any funds not obligated for these purposes may be made available for new loan awards ready to proceed on a first-come, first-served basis.
4. Match for Special Appropriations Project (SPAP) Grants
On October 10, 2001, EPA issued policy memorandum DWSRF 02-01 to notify regions and states of a change in policy regarding the use of DWSRF monies for providing local match for SPAP grants. This change in EPA policy will allow the state to use non-federal, non-state match DWSIRLF funds to provide loans that can be used as local match for SPAP grants awarded for drinking water projects.
These non-federal, non-state match DWSIRLF loan funds may be made available to eligible SPAP grant recipients that are on the priority list for use as local match funds for their SPAP grants, provided the grant is for loan eligible work. Such projects will be funded in accordance with the Priority System and until all non-federal, non-state match monies have been obligated or demand for such funds has been met.
5. Subsidization from FFY-2022 Federal Appropriation
The FFY-2022 EPA Capitalization Grant mandates a minimum of 20% and maximum 49% of the Grant be provided as additional subsidization to disadvantaged communities. Based on the Grant of $11,842,000, a minimum of $2,368,400 in subsidization is required. The DWSIRLF's subsidization will be in the form of "Principal Forgiveness" (PF) to individual public water supplies that are considered disadvantaged communities, and which received reimbursements with Federal Cap grant funds during the construction of the project. If the amount of PF which a project is eligible exceeds the amount of Federal Cap grant funds which it received, the amount of PF extended will be limited to the amount of Federal Cap grant funds used for reimbursement.
Subsidization may be used over a two-year period. Subsidization remaining from a previous year may be awarded to loans which are eligible for PF over a two-year period. Subsidization for FFY-2022 may be awarded to projects eligible for PF in FFY-2022 and FFY-2023.
Disadvantaged Community Program
During FFY-2022, the following Principal Forgiveness (PF) methodology will be used to meet the requirements of both the America's Water Infrastructure Act of 2018 and the Consolidated Appropriations Act of 2021 for providing subsidy for disadvantaged systems. A minimum of 20% subsidy will be made available and up to 49% can be subsidized to eligible recipients.
The amount of PF for which a potential "Loan Recipient" (LR) may be eligible will be determined by calculating the percentage of the "Median Household Income" (MHI) of the potential LR versus the MHI of the State of Mississippi ($45,081) as a whole.
90% < LR MHI < 100% |
- 15% Principal Forgiveness |
80% < LR MHI < 90% |
- 25% Principal Forgiveness |
70% < LR MHI < 80% |
- 35% Principal Forgiveness |
LR MHI < 70% |
- 45% Principal Forgiveness |
PF will be extended to projects until all mandated subsidy funds are obligated. Due to the limited amount of PF funds, the maximum amount of PF funds a loan recipient may receive for a project will be set at $500,000. The amount of PF given will be assigned at loan award after the project goes to the bid phase. Once this happens, the amount of PF assigned can only change if the project's costs increase, PF is still available, PF assigned has not reached the specified maximum, and the Board approves a waiver allowing additional subsidization. Once subsidy funds are depleted, only standard loans will be made with DWSIRLF funds.
In the event that a LR declines their loan that includes PF, the released PF may be reallocated to other projects for the present fiscal year that are eligible for PF, or the PF may be carried over to projects for the next fiscal year.
If returned PF funds are reallocated to projects awarded during the existing fiscal year. The reallocation of PF will be given first to projects which did not receive their full allowable amount based on the above table up to the maximum allowed limit.
If all projects have received their full allowable amount, returned PF funds may be reallocated to projects awarded PF during the existing fiscal year based on a percentage of the individual LR's initial loan amount to the total loan amount of loans awarded PF during the fiscal year.
In all cases, the amount of PF which is awarded to a project may not exceed the amount of Federal Cap grant funds which the project was reimbursed during the construction of the project.
B.
Priority System Categories
Projects in Category I are funded each year to the extent funds are available. Projects in Categories II through XI are ranked in priority order; that is, all Category II projects are ranked higher than Category III projects, etc. Ranking is established in like manner through all remaining categories. Adjustments are made as necessary to comply with small community set-aside provisions of the Federal SDWA and as established by the Board [Section 1542(a) (2) of SDWA]. As stated previously, the order of Categories II - XI is intended to give highest priority to those projects that address the most serious risks to human health. Projects within each category will be ranked as described in Section C.
1.
Category I - Segmented Projects
This category of projects includes any remaining segments of projects that previously received funding for an integral portion of that project and are necessary for the entire project to be functional. Projects will be funded under this category in order of their regular priority ranking provided they meet the deadlines established in Section D.
In order to maintain continuity, the Board intends to make some amount of funds available for each ongoing-segmented project. Preference in the amount of funds to be provided will be given to the projects that received the earliest loan award for their initial segment.
2.
Category II - Previous Year Certified Projects
Priority for this category will be given to the previous year Category II projects to the maximum extent practicable. This category of projects includes projects that:
(1) were listed immediately below the funding line on the previous year's Priority List within an amount of approximately 25% of that year's total available funds;
(2) met all Priority System deadlines in the previous fiscal year; and
(3) were not funded due to lack of DWSIRLF funds or did not receive an assurance of CDBG, ARC, RUS, or other match funding in the previous fiscal year. Within this category, projects will be ranked according to the current Priority Ranking Criteria.
3.
Category III - Primary Drinking Water Standards
This category includes projects to facilitate compliance with Primary Drinking Water Standards. To qualify for this category, projects must correct deficiencies resulting in non-compliance with the primary drinking water standards. Depending on the nature of the project, additional treatment requirements may be necessary as part of the proposed project.
4.
Category IV - One Well
This category includes projects to provide additional water supply to systems that have neither a backup well nor an MSDH-approved emergency tie-in to another system to ensure safe drinking water; thereby protecting the health of the existing population. Depending on the nature of the project, additional treatment requirements may be necessary as part of the proposed project.
5.
Category V - Pressure Deficiencies
This category includes projects to correct documented deficiencies that result in existing systems routinely failing to maintain minimum acceptable dynamic pressure. Experience has shown that failure of water systems to maintain minimum acceptable dynamic pressure is the major cause of system contamination in mississippi. System contamination that results from inadequate water system pressure is considered by the msdh to be one of the most serious drinking water-related threats to public health in mississippi
6.
Category VI - Source Water Protection Projects
This category includes projects to manage potential sources of contaminants/pollutants and/or prevent contaminants/pollutants from reaching sources of drinking water. To be eligible for loan participation, potential contaminants/pollutants and source water protection areas must have been identified in the public water systems source water assessment plan report (swapr) prepared by the mississippi department of environmental quality's groundwater planning branch (deq-gpb). If the public water system has not received its swapr from the deq-gpb yet, or has documentation that may change its swap, it shall provide in the facilities plan suitable documentation of potential sources of contaminants/pollutants that is acceptable to the deq-gpb before the project will be deemed eligible.
The projects will be ranked: first in order of the highest source water classification that would be negatively impacted by source water contaminants; secondly, within each classification in order of the public water systems susceptibility assessment ranking as determined by the deq-gpb; and thirdly, within each susceptibility assessment ranking in order of the highest number of connections served by the public water system. Source water classifications will be ranked in the following order: surface water sources; shallow (generally % 300' in depth) unconfined water wells; shallow (generally % 300' in depth) confined water wells; and deep confined water wells.
7.
Category VII - System Capacity Expansion to Serve Existing Unserved Residences/Businesses
This category includes projects to either expand existing system capacity or construct a new drinking water system to ensure safe drinking water (source, treatment and/or distribution) to serve existing residences/businesses in currently unserved areas.
8.
Category VIII - Back-up Water Supply Sources Projects
This category includes projects to provide additional supply to systems with insufficient back-up water supply sources to ensure safe drinking water, and thereby protect the health of the existing population. As a minimum, a system using ground water should be able to lose any one of the wells supplying the system and still maintain minimum acceptable dynamic pressure throughout the entire system.
9.
Category IX - Existing Facilities Upgrades (Meeting Primary Standards)
This category includes projects to rehabilitate, replace, protect or upgrade deteriorated, worn, aged or obsolete equipment, facilities, etc., to assure continued, dependable operation of water systems where such systems are already meeting Primary Drinking Water Standards. Depending on the nature of the project, additional treatment requirements may be necessary as part of the proposed project.
10.
Category X - Fluoride Addition
This category is for projects that either rehabilitate existing fluoride treatment facilities at well or treatment plant sites or add new facilities to existing well or treatment plants.
11.
Category XI - Secondary Drinking Water Standards Projects
This category includes projects to provide treatment that brings systems into compliance with Secondary Drinking Water Regulations. Depending on the nature of the project, additional treatment requirements may be necessary as part of the proposed project.
12.
Category XII - Consolidation Projects
This category includes projects to consolidate separate systems into a single system for purposes other than those related to Categories II through IX. Consolidation will also be considered in establishing priority ranking within all categories, as described in the Priority Ranking Criteria in Section C.
13.
Category XIII - Other
This category includes projects that do not meet the criteria of any other listed category and have been determined loan eligible in accordance with the DWSIRLF loan program regulations.