229 Neb. Admin. Code, ch. 21, § 035 : LABOR, DEPARTMENT OF — DEPARTMENT OF LABOR — POWER BOILERS - EXISTING INSTALLATIONS —21-035 TEXT PDF An opening in the power boiler setting for a blow-off pipe shall be arranged to provide for free expansion and contraction. 229 Neb. Admin. Code, ch. 21, § 035 Amended effective 8/7/2016.