(i) At Class I and Class II facilities the depth of final cover system shall be at least 36 inches of soil of which a minimum of 12 inches shall be for the support of vegetative cover.
The design of the final cover system shall be such that the infiltration volume of water will be equal to or less than the percolation volume through the bottom liner system or a design which includes a compacted soil layer of at least 24 inches which has a permeability no greater than 1 x -7 10 cm/sec, whichever is less. This design shall be supported by the use of the HELP model or other equivalent method approved by the Commissioner.
An alternate final cover system may be used provided that it is demonstrated to the satisfaction of the Commissioner that the final cover system provides equivalent or superior performance to the minimum performance standard in this subpart.