7 Del. Admin. Code § 1352-E-7.0 : Natural Resources and Environmental Control —Division of Waste and Hazardous Substances —Tank Management Section —Aboveground Storage Tanks — LEAK REPORTING AND CORRECTIVE ACTION REQUIREMENTS FOR ABOVEGROUND STORAGE TANKS —E-7.0 - Remedial Action Work Plan Requirements TEXT PDF 7.1 General Remedial Action Requirements 7.1.1 At any point after reviewing the information contained in the hydrogeologic investigation report, the Department may require the Owner and Operator to submit additional information or to develop and submit a RAWP for responding to contaminated soils, surface water and groundwater. 7.1.2 The RAWP shall address the contamination of soils, groundwater and surface water, including all occurrences of NAPL resulting from a release, and shall be submitted to the Department in a timeframe specified by the Department. The RAWP shall provide for adequate protection of human health, safety and the environment, and shall establish cleanup goals for the site. 7.1.3 The Owner and Operator shall modify any RAWP that does not provide for adequate protection of human health, welfare, safety and the environment, as necessary to meet the requirements of PART E, Section 8.0 . 7.1.4 The RAWP shall include sufficient design information that demonstrates that the remedial technology shall meet the cleanup goals approved by the Department and shall include an estimated time to cleanup completion for the remediation method proposed in the RAWP. 7.1.5 A RAWP shall propose a remedial action method for the site that shall: 7.1.5.1 Reduce the contaminant levels at the site to meet the cleanup goals proposed in the remedial action work plan and approved by the Department; or 7.1.5.2 Reduce the contaminant levels to achieve the cleanup goals established by the Department; or 7.1.5.3 Monitor the site over time to provide technically based assurance that the site contamination is controlled under natural conditions and that those conditions will not now, or at some future time, adversely impact human health, safety or the environment. 7.1.6 The Department shall approve the RAWP when satisfied that implementation of the RAWP provides for measures considered adequate to protect human health, safety, and the environment. 7.1.7 The RAWP shall be organized in report form and signed by a professional geologist or professional engineer registered in the State of Delaware as required in 24Del.C. Ch. 36 and the Delaware Board of Registration of Geologists Regulations and 24 Del.C. Ch. 28. 7.1.8 The RAWP shall be of site specific design and shall be based on the results of the hydrogeologic investigation, or contain appropriate investigatory steps if submitted without a prior hydrogeologic investigation having been completed. 7.1.9 The RAWP may propose a phased approach to site remediation. If data can justify site closure, Owner and Operator may request site closure in accordance with the requirements of PART E, Section 8.0 . Remedial action will be considered complete only upon the Department's evaluation and approval of a satisfactory closure request. 7.1.10 The RAWP shall include a summary of past efforts and a description of any new or continued efforts to effectively remove NAPL as described in PART E, Section 4.0 . 7.2 Quality Assurance and Quality Control Requirements 7.2.1 Owners and Operators shall develop and implement a site specific Quality Assurance/Quality Control (QA/QC) plan for the activities to be carried out during implementation of the RAWP and the QA/QC plan shall be included in the RAWP submitted to the Department. 7.3 Site Safety Requirements 7.3.1 Owners and Operators shall develop a site-specific health and safety plan which shall be included in the RAWP and shall cover all remedial action tasks. The health and safety plan shall, at a minimum, address site worker protection levels, protection of persons living near the site, and site access control during the remediation. 7.4 Implementation and Reporting Schedule 7.4.1 Upon approval of the RAWP by the Department, the Owners and Operators shall implement the RAWP, including any modifications to the RAWP made by the Department, within the timeframe approved by the Department. 7.4.2 Owners and Operators shall monitor, evaluate and report to the Department the results of implementing the remedial action at a minimum of once every three (3) calendar months, or within the time schedule approved in the RAWP. Copies of all records documenting the transport and disposal of any free product, contaminated water and soil, or other waste that is generated at the site while investigation and remedial action work is being performed shall be included in each report. 7.4.3 Owners and Operators shall submit a remedial action progress report to the Department once every twelve (12) calendar months that includes an evaluation of the effectiveness of the remedial action to determine whether additional measures must be implemented to meet the cleanup goals established in the RAWP. The evaluation shall include an estimate of time to remedial action completion. 7.4.4 Owners and Operators shall submit recommendations for optimization and improvement as needed to achieve the cleanup goals established in the RAWP, as part of each remedial action progress report. 7.5 Post Remedial Monitoring 7.5.1 Upon completion of remedial action activities the Owners and Operators shall perform four (4) consecutive quarters of groundwater sampling or other sampling schedule as approved by the Department to ensure the contaminant plume is stable and shrinking and that rebounding does not occur. 7 Del. Admin. Code § 1352-E-7.0 20 DE Reg. 815 (4/1/2017) (Final)