(b) Lands and water rights; ownership; financing
(1) Every such proposal shall include a showing that the organization already holds or can acquire all lands and interests in land (except public and other lands and interests in land owned by the United States which are within the administrative jurisdiction of the Secretary and subject to disposition by him) and rights, pursuant to applicable State law, to the use of water necessary for the successful construction, operation, and maintenance of the project and that it is ready, able, and willing to finance otherwise than by loan and grant of Federal funds such portion of the cost of the project (which portion shall include all costs of acquiring lands, interests in land, and rights to the use of water), except as provided in section 422e(b)(2) of this title as the Secretary shall have advised is proper in the circumstances.
(2) The Secretary shall require each organization to contribute toward the cost of the project (other than by loan and/or grant of Federal funds) an amount equal to 25 percent or more of the allowable estimated cost of the project: Provided, That the Secretary, at his discretion, may reduce the amount of such contribution to the extent that he determines that the organization is unable to secure financing from other sources under reasonable terms and conditions, and shall include letters from lenders or other written evidence in support of any funding of an applicant’s inability to secure such financing in any project proposal transmitted to the Congress: Provided further, That under no circumstances shall the Secretary reduce the amount of such contribution to less than 10 percent of the allowable estimated total project costs. In determining the amount of the contribution as required by this paragraph, the Secretary shall credit toward that amount the cost of investigations, surveys, engineering, and other services necessary to the preparation of proposals and plans for the project as required by the Secretary, and the costs of lands and rights-of-way required for the project, and the $5,000 fee described in section 422c of this title. In determining the allowable estimated cost of the project, the Secretary shall not include the amount of grants accorded to the organization under section 422e(b) of this title.
References in Text
The Federal reclamation laws, referred to in subsec. (a), are defined in section 422b of this title.
For the amendment of section 422e(a) of this title by Pub. L. 94–181, referred to in subsec. (d), see 1975 Amendment note set out under section 422e of this title.
Amendments
1994—Subsec. (e). Pub. L. 103–437 substituted “Committee on Natural Resources of the House of Representatives nor the Committee on Energy and Natural Resources of the Senate” for “House nor the Senate Interior and Insular Affairs Committee”.
1986—Subsec. (b)(1). Pub. L. 99–546, § 304(a), designated existing provisions as par. (1) and substituted “grant of Federal funds” for “grant under this subchapter”.
Subsec. (b)(2). Pub. L. 99–546, § 304(b), added par. (2).
Subsec. (c). Pub. L. 99–546, § 305, inserted provisions which required certification by Secretary relating to soil survey, land classification, or successful irrigability, and investigation of soil for toxic or hazardous irrigation return flows.
1975—Subsec. (d). Pub. L. 94–181, § 1(c), (d), added subsec. (d). Former subsec. (d) redesignated (e).
Subsecs. (e), (f). Pub. L. 94–181, § 1(d), (e), redesignated former subsec. (d) as (e), substituted “(e)” for “(d)”, and redesignated former subsec. (e) as (f).
1971—Subsec. (e). Pub. L. 92–167 substituted in first sentence “project” for “project, whether the proposal involves furnishing supplemental irrigation water for an existing irrigation project, whether the proposal involves rehabilitation of existing irrigation project works, and whether the proposed project is primarily for irrigation”.
1966—Subsec. (a). Pub. L. 89–553, § 1(2), extended project costs to include the cost of means and measures to prevent loss of and damage to fish and wildlife resources and authorized allocation of such costs as may be appropriate among project functions.
Subsec. (b). Pub. L. 89–553, § 1(3), substituted “cost of the project” for “cost of construction” in provision requiring that the organization be ready, able, and willing to finance by other than loan or grant whatever costs the Secretary advises, inserted reference to section 422e(b)(2) of this title as an exception to the costs which the organization must be able to finance other than by loan or grant, and struck out proviso that the contribution by the applicant organization shall not be required in excess of 25 per centum of the costs of the project which, if it were being constructed as a Federal reclamation project, would be properly allocable to reimbursable functions under general provisions of law applicable to such projects.
1957—Subsec. (c). Pub. L. 85–47, § 1(a), changed language generally, and struck out provisions which authorized Secretary to negotiate a contract as provided in section 422e of this title, with the provision that no such contract be executed by him prior to sixty days from date project proposal was submitted to both branches of Congress for committee consideration, and then only if neither committee disapproved proposal within the period, but that if both committees approved he could execute contract, and that if either committee disapproved, he could not proceed unless Congress approved.
Subsecs. (d), (e). Pub. L. 85–47, § 1(b), added subsec. (d) and redesignated former subsec. (d) as (e).
Effective Date of 1986 Amendment
Amendment by sections 304(a) and 305 of Pub. L. 99–546 applicable to all proposals for which final applications are received by Secretary after Jan. 1, 1986, and amendment by section 304(b) of Pub. L. 99–546 applicable to all proposals for which draft applications are received by Secretary after Aug. 15, 1986, see section 310 of Pub. L. 99–546, set out as a note under section 422a of this title.
Retroactive Effect of 1966 Amendment
Amendment by Pub. L. 89–553 not to be applicable to or affect in any way the terms on which any loan or grant was made prior to the effective date of Pub. L. 89–553, Sept. 2, 1966, see section 2 of Pub. L. 89–553, set out as a note under section 422b of this title.