(1) No electrical wire shall pass over any storage vessel.
(2) All electrical wires installed within the safety zone of any storage vessel for the storage of flammable compressed gases shall consist of insulated cables of approved type. The cables shall be mechanically continuous throughout and effectively earthed away from the vessels.
(3) For pump rooms used for pumping flammable compressed gases
(i) all electrical motors, distribution boards, switches, fuses, plugs, sockets and other instrumentation shall be of explosion protection construction complying with the requirements of IS/IEC 60079-1 to 11 as amended from time to time and the frames shall be effectively earthed;
(ii) all electrical fixed lamps shall be enclosed in a well glass flameproof fitting conforming to IS/IEC 60079-1 amended from time to time.
(4) All electrical portable hand lamps and other instrumentation shall be of a type approved by the Chief Controller.
(5) Vaporisers for liquefiable gases shall be indirect heating type or atmospheric heating type. The vaporizers for flammable, toxic and corrosive gases shall be of a type approved by the Chief Controller.
32-A. Classification of hazardous area for flammable gases. (1) A hazardous area for flammable gases shall be deemed to be
(a) a zone 0 area if inflammable gases or vapours are expected to be continuously present in the area; or
(b) a zone 1 area, if inflammable gases or vapours are expected to be continuously present in the area under normal operating conditions; or
(c) a zone 2 area, if inflammable gases or vapours are expected to be continuously present in the area only under abnormal operating conditions or failure or rupture of an equipment.
(2) If any question arises as to whether hazardous area is a zone 0 area or a zone 1 area or a zone 2 area, the decision thereon of the Chief Controller shall be final.
32-B. Extent of hazardous area. (1) The extent of hazardous area for liquefied petroleum gas dispenser shall be as under
(i) Entire space within the dispenser enclosure cabinet and forty six centimeters horizontally from the exterior of enclosure cabinet and up to an elevation of one hundred and twenty two centimeters above dispenser base and the entire pit or open space beneath the dispenser shall be zone 1 .
(ii) Up to forty-six centimeters vertically above the surrounding ground level and horizontally beyond forty six centimetres up to six meters on all sides of the dispenser enclosure cabinet shall be zone 2 .
(2) Extent of hazardous area in storage premises of flammable gases shall be as per IS:5572 or any other relevant code accepted by the Chief Controller.
33. Certificate of safety. A certificate of safety in the pro forma prescribed by the Chief Controller and signed by a competent person shall be furnished to the licensing authority before any vessel is used for the storage of any compressed gas or whenever any addition or alteration to the installations or foundations for the vessel is carried out.
Chapter IV
TRANSPORT
34. Application. The rules in this Chapter shall apply to the transport of compressed gas by vehicles.
35. Vehicles for transport of compressed gas. (1) Every vehicle for the transport of compressed gas shall be of a type approved, in writing, by the Chief Controller.
(2) Where approval is sought to a vehicle under sub-rule (1), three numbers of detailed vehicle mounting drawing drawn to scale and a scrutiny fee as specified in Clause B of Schedule I shall be forwarded to the Chief Controller.
(3) If the Chief Controller, after receipt of the drawing under sub-rule (2) and after making such further inquiries as he deems necessary, is satisfied that the vehicle or the special safety fittings, as the case may be, meets with the requirements laid down in these rules, he shall approve the drawing and return to the applicant one copy thereof duly endorsed.
36. Design. (1) Every vessel used for the transportation of compressed gas shall be constructed and tested in accordance with the requirements of Rule 13 and shall meet with the requirements of sub-rules (2), (3), (4), (5), (6), (7) and (8) of this rule.
(2) The design stress shall include an allowance to enable the vessel to withstand shocks normally encountered by movements on road, such as, acceleration and deceleration for a minimum of 3g. when the vessel is self-supporting, the vessel design shall provide for carrying the additional stresses normally carried by the chassis frame. Provision shall be made for distributing the localised stresses arising from attachments to the vessels.
(3) Minimum corrosion allowance and wear and tear allowance of 0.5mm in case of non-toxic non-flammable and flammable gas vessels and 1.5mm in case of toxic and corrosive gas vessels shall be added to the minimum calculated thickness arrived as per the fabrication code. In addition, minimum 10 per cent thinning allowance in case of formed heads shall also be considered.
(4) Mounting of vessels on the chassis or under-frame shall be done in such a manner as to keep the vibrations to the minimum.
(5) All attachments to the vessel shall be protected against accidental damage which may result from collision, over-turning or other operational cause.
(6) All vessels shall be designed to withstand the most severe combined stresses to which they may be subjected to by the pressure of the gas, the pumping pressures and shock loading caused by transport conditions.
(7) The loading and unloading rate of the liquefied gas from a road tanker shall be as per the designated differential pressure and flow rate of excess flow valve or internal excess flow valve as the case may be for the size and service as approved by the Chief Controller.
(8) If the cabin height is less than the height of the vessel and the fittings on top of it, a height barrier of adequate strength shall be provided all along with the width of the cabin within the height regulation of road transport authority.
37. Protection of valves and accessories. (1) All valves and accessories shall be safeguarded against accidental damage or interference.
(2) Valves and accessories shall be mounted and protected in such a way that risk of accidental rupture of the branch to which the valve or accessory is connected is minimised.
(3) Valves or accessories situated at the rear of a vehicle shall be protected by the rear cross member of the frame of the vehicle against damage and shall comply with sub-rule (2).
38. Equipment. (1) Piping, fittings, pumps and meters.
(i) all piping, fittings, pumps and meters permanently mounted on the vehicle shall be designed to withstand the most severe combined stresses imposed by the following, namely:
(a) the maximum designed pressure of the vessel;
(b) the super imposed pumping pressure of the shock loading caused by road movements;
(ii) the materials used for vessel equipment shall be sufficiently ductile to withstand rough usage and accidental damage. Brittle materials such as cast iron shall not be used.
(2) Protection of piping and equipment.
(i) all piping and equipment shall be adequately protected to minimise accidental damage which may be caused by rough usage, collision or over-turning;
(ii) any equipment or section of piping in which liquid may be trapped shall be protected against excessive pressure caused by thermal expansion of the contents.
(3) Marking of connections. All connections on the vehicle which require manipulation by the operator of the vehicle should be clearly marked to prevent incorrect operation. The form of this marking should correspond with the operating procedure laid down for the vehicle.
39. Vehicle design considerations. (1) General. The vessels shall be securely attached to the chassis of the vehicle in such a manner as to take care of the forward movement of the vessel due to sudden deceleration of the vehicle.
(2) Design safety requirements Mechanical:
(i) the engine of the vehicle shall be of an internal combustion type;
(ii) where the fuel system is gravity-fed, a quick action cut-off-valve shall be fitted to the fuel feed pipe in an easily accessible and clearly marked position;
(iii) the engine and exhaust system together with all electrical generators, motors, batteries, switchgears and fuses shall be efficiently screened from the vessel or the body of the vehicle by a fire-resisting shield or by enclosure within an approved fire-resisting compartment;
(iv) when the equipment referred to in clauses (i), (ii) and (iii) are mounted forward of the back of the driving cab, the cab can be considered to act as an acceptable shield, provided the back, the roof and the floor of the cab, are of fire-resisting construction for the full width of the cab, without any openings in the back or roof, and that the back extends downwards to the top of the chassis;
(v) when the cab construction does not conform to the equipments mentioned above, a separate fire resisting shield should be installed extending upwards without any openings from the top of the chassis to the top of the vessel;
(vi) in any case, where windows are provided in the shield, they should be fitted in fire-resisting framing with wired glass or other heat-resisting material and shall not be capable of being opened;
(vii) when the equipment referred to in clauses (i), (ii) and (iii) are mounted to the rear of the back of the cab, it shall be contained wholly within an approved fire-resisting compartment;
(viii) in any case where the fuel used to propel a vehicle gives off a flammable vapour at a temperature less than 65 C, the fuel tank shall not be behind the shield unless the following requirements are complied with, namely:
(a) the fuel tank is protected from blows by stout steel guards or by the frames of the vehicle;
(b) the fill pipe of the fuel tank of the vehicle is provided with a cover having locking arrangement;
(c) the fuel feed apparatus placed in front of the fire-resisting shield is used to lift the contents of the fuel tank.
(ix) where a transfer pump is driven by the engine of the vehicle, provision shall be made to stop the engine from outside the cab.
(3) Design safety requirements Electrical:
The following requirements shall be complied with in connection with the electrical and antistatic properties of the vehicle, namely:
(i) The Electrical system shall have
(a) the battery in an easily accessible position;
(b) readily accessible cut-off switch of not less than 300 Amps rating;
(c) wiring so fixed and protected as to minimise accidental damage or undue wear.
(ii) The vessel shall be electrically continuous with the chassis.
(iii) The vehicle shall be provided with a bonding point or bonding cable.
(iv) Tyres shall be of the anti-static type.
(4) Design safety requirements General:
(i) There shall be a clear space of at least 15 cm between the back of the cab and the front of the vessel.
(ii) The rear of the vessel shall be protected by a robust steel bumper and this bumper shall be
(a) attached so that collision stresses will be transmitted to the frame work of the vehicle or, in the case of an articulated vehicle to the frame work carrying the wheels of the vessel
(b) situated at least 7.5 cm to the rear of the rear-most part of the vessel;
(c) extended on each side of the vehicle to at least the maximum width of the vessel.
(iii) the maximum weight of the liquefied gas for which the vehicle is designed should not exceed the difference in weight between the unladen weight of the vehicle and the maximum gross weight permitted for that class of vehicle under the appropriate transport regulations.
(5) Suitable emergency kit shall be provided in each road tanker for each type of compressed gas.
40. Marking of vehicle. All vehicles shall be conspicuously marked on the vessel to show the product which is being carried.
41. Fire protection. (1) Two serviceable fire extinguishers of suitable size and type shall be provided on each vehicle, one on each side and should be accessible from outside the cab.
(2) A person, while in, or attending, any vehicle conveying flammable gas, shall not smoke or use matches or lighters.
(3) No fire, artificial light or article capable of causing fire or explosion shall be taken or carried on any vehicle carrying flammable gas.
42. Operations. (1) Drivers shall be carefully selected and given appropriate training in driving and safe handling of the equipment and the compressed gas carried in the vehicle.
(2) When loading or discharging of a vehicle takes place within the operator's own premises, a skilled and trained person with requisite knowledge and experience shall be present throughout the operations.
(3) When discharge is in progress, at customers premises, the driver shall remain with his vehicle in such a position so as to be able to stop the discharge immediately in an emergency.
(4) Every vehicle shall be constantly attended to by at least one person who is familiar with the rules in this Chapter:
Provided that nothing in this sub-rule shall apply to vehicles which are left in places previously approved for the purpose by the Chief Controller or Controller authorised by him.
(5) In the event of an over-night stop away from home base, prior arrangements shall be made for the safe parking of the vehicle overnight. In an emergency, a driver may seek the co-operation of the local police in finding suitable parking facilities for his vehicle.
43. Certificate of Safety. A certificate of safety in prescribed pro forma signed by a competent person shall be furnished to the licensing authority before any vehicle is used for the transportation of any compressed gas to the effect that the vehicle meets with the provisions of the rules in this Chapter.
44. Inspection and maintenance of vehicles. It shall be the sole responsibility of the licensee for any vehicle to ensure that it is at all times road-worthy, and that it is in a fit condition to fill, transport and discharge its load safely.
Chapter V
LICENCES
45. Licence for storage of compressed gas. No person shall store any compressed gas in any vessel except under and in accordance with the conditions of a licence granted under these rules.
46. Prior approval of specification and plans of vessels and premises proposed to be licensed. (1) Every person desiring to obtain a licence to store any compressed gas in any vessel shall submit to the Chief Controller or Controller authorised by him
(i) specifications and plans drawn to scale in triplicate clearly indicating
(a) the manner in which the provisions prescribed in these rules shall be complied with;
(b) the premises proposed to be licensed, the area of which shall be distinctly coloured or otherwise marked;
(c) the surrounding area lying within 100 metres from the edge of all facilities which are proposed to be licensed; however, for major installations of flammable or toxic gases including LNG exceeding total capacity of product 50 metric tons or 100 m3 water capacity of each vessel, whichever is less, area lying within 500 metres along with Hazard and Operability (HAZOP) study and a risk analysis report prepared by a reputed agency;
(d) the position, capacity, materials of construction and ground and elevation views of all vessels, all valves and fittings, filling and discharge pumps and fire-fighting facilities where provided and all other facilities forming part of the premises proposed to be licensed;
(e) piping and instrumentation diagram for the vessels, equipments and system proposed to be installed;
(f) any other documents specified by the Chief Controller or Controller; and
(ii) a scrutiny fee as specified in clause (B) of the Schedule I
(2) If the Chief Controller or Controller authorised by him, after scrutiny of the specifications and plans and after making such inquiries as he deems fit, is satisfied that compressed gas can be stored in the premises proposed to be licensed, he shall return to the applicant one copy each of all the specifications and plans signed by him conveying his sanction which may be subject to such conditions as he may specify.
47. No Objection Certificate. (1) An applicant for a new licence other than the licence for storage of non-toxic, non-flammable compressed gases in pressure vessels 11[, license in Form LS-1B installed in the service station licensed in Form XIV under the Petroleum Rules, 2002] and licence in Form LS-2, shall apply to the District Authority with two copies of site plan showing the location of the premises proposed to be licensed under these rules for a certificate to the effect that there is no objection to the applicant's receiving a licence for storage of compressed gas in pressure vessel at the site proposed, and the District Authority shall, if he sees no objection, grant such certificate to the applicant in the format specified in sub-rule (6) of this rule who shall forward it to the Chief Controller with his application.
(2) Every certificate issued by the District Authority under sub-rule (1) above shall be accompanied by a copy of the plan of the proposed site duly endorsed by him under official seal.
(3) The Chief Controller, may refer an application not accompanied by a certificate granted under sub-rule (1) to the District Authority for his observation.
(4) If the District Authority, either on a reference being made to him or otherwise, intimates to the Chief Controller that any licence which has been applied for should not, in his opinion, be granted, such licence shall not be issued without the sanction of the Central Government.
(5) Notwithstanding anything contained in sub-rules (1) to (4) above, all licences granted or renewed under the said rules prior to the date on which the above provisions come in force, shall be deemed to have been granted or renewed under these rules.
(6) Format of no objection certificate shall be as under
Subject: No objection certificate under the Static and Mobile Pressure Vessels (Unfired) Rules, 2016
No. Date
With reference to your letter no. . dated . and in pursuance of said Rule 47 of the Static and Mobile Pressure Vessels (Unfired) Rules, 2016 there is no objection for granting licence under the said rules to Shri/M/s. ..of address for storage of flammable/toxic/corrosive compressed gases in the premises at Survey No./Gat No./Khasra No .., Village Taluka . District State as shown in the site plan duly endorsed and enclosed herewith.
Signature of the no objection certificate issuing authority with his office seal
(District Authority)
(7) The District authority shall grant no objection certificate or convey his refusal for granting no objection certificate with reasons thereof in writing to the applicant as expeditiously as possible but not later than four months from the date of receipt of application from the applicant.
48. Licence for transport of compressed gas. (1) No compressed gas filled in a vessel shall be transported by a vehicle except under and in accordance with the conditions of a licence granted under these rules.
(2) Nothing in this rule shall apply to the transport of compressed gas filled in a vessel by a railway administration.
49. Grant of licence. (1) A licence prescribed under these rules shall be granted by the Chief Controller or Controller on payment of the fees as specified in clause (A) of the Schedule I.
(2) Every licence granted under these rules shall be subject to the conditions specified therein and shall contain all the particulars which are contained in the Form specified under these rules.
(3) The licensing authority shall issue an authenticated copy of the licence when so applied for by the licensee with a fee as specified in clause (B) of the Schedule I.
(4) When the licensing authority grants a licence in Form LS-1A, LS-1B 12[LS-1C] & LS-2, after conducting inspection of the premises to ensure conformity of the premises to the provisions of the Act and these rules, such authority shall endorse the licence and from the date of such endorsement, the licence shall come into force.
(5) If the licensing authority observes on inspection, that the premises do not conform to the provision of the Act and rules and not fit for endorsement, he shall communicate to the licensee
(i) his direction for rectification of deficiency; or
(ii) reasons for not endorsement of the licence; or
(iii) reasons for revocation of the licence, as the case may be.
50. Application for licence. A person intending to obtain a licence under these rules shall submit to the Chief Controller or Controller authorised by him
(i) an application
(a) in Form AS-1, if the application is in respect of a licence in Form-LS-1A to store compressed gas in pressure vessels and in Form LS-1B to store and dispense Auto LPG as automotive fuel 13[and Form LS-1C to store and dispense Auto LNG as automotive fuel];
(b) in Form AS-2, if the application is in respect of a licence in Form-LS-2 to transport compressed gas in pressure vessel by a vehicle;
(c) in Form AS-3, if the application is in respect of permission to import pressure vessel;
(ii) a certificate of safety under Rule 33 or Rule 43 as the case may be;
(iii) a test and inspection certificate as required under sub-rule (2) of Rule 13;
(iv) four copies of the drawings for the site, layout, installation details (for static vessel) or vehicle mounting (for mobile vessel) and as-built vessel design drawing duly endorsed by the inspector;
(v) licence fee as specified in the clause (A) of the Schedule I;
(vi) no objection certificate from the District Authority in respect of storage of compressed gas in pressure vessels along with the site-plan duly endorsed as per Rule 47;
(vii) copy of the registration certificate of the vehicle issued under the Motor Vehicles Act, 1988 (59 of 1988) and weighment slip in respect of mobile pressure vessels for transport of compressed gas.
51. Period for which licences may be granted or renewed. (1) A licence in Form LS-1A or LS-1B 14[or LS-1C] for the storage of a compressed gas in a pressure vessel shall be granted or renewed subject to a maximum five years and shall remain in force until the 30th day of September of the year up to which the same is granted or renewed.
(2) A licence in Form-LS-2 for the transport of the compressed gas in a pressure vessel by a vehicle shall be granted or renewed subject to a maximum five years taken from the date of grant of licence.
(3) Notwithstanding anything contained in sub-rules (1) and (2), the Chief Controller or Controller authorised by him may, if he is satisfied that a licence is required for a specific work, may grant such licence for specific period.
52. Power of licensing authority to alter conditions. Notwithstanding anything contained in Rule 49, the Chief Controller may omit, alter or add to any of the conditions specified in the Form of a licence.
53. Prior approval necessary for alteration in the licensed premises. (1) No alteration shall be carried out in the licensed premises until the plan showing such alteration has been approved in writing by the Chief Controller or Controller authorised by him.
(2) The licensee wishing to carry out any alteration in the licensed premises shall submit to the Chief Controller or Controller authorised by him
(i) three copies of a properly drawn plan of the licensed premises showing in distinct colour or colours the proposed alteration and the reasons thereof;
(ii) piping and instrumentation diagram for the vessels, equipments and system proposed to be installed;
(iii) any other documents specified by the Chief Controller or Controller; and
(iv) a scrutiny fee as specified in clause (B) of the Schedule I.
(3) If the Chief Controller or Controller authorised by him, after scrutiny of the plan showing the proposed alteration and after making such enquiries as he deems fit, is satisfied that the proposed alteration may be carried out, he shall return to the licensee one copy of the plan signed by him and conveying his sanction subject to such condition or conditions as he may specify.
(4) The holder of a licence shall apply to the Chief Controller or Controller authorized by him for the amendment of the licence as soon as the sanctioned alteration has been carried out.
(5) Additions or alterations as approved under sub-rule (3) of this rule shall not be taken into use unless the licence is duly amended.
54. Amendment and Transfer of licence. (1) Amendment of licence. Any licence granted under these rules may be amended by the Chief Controller or Controller authorised by him, provided the licensee submits the following documents to him
(i) an application duly filled in and signed in Form AS-1 or AS-2 as the case may be;
(ii) where any alteration in the licensed premises has been carried out, four copies of the properly drawn plan showing the alterations sanctioned under Rule 53;
(iii) fee for amendment of a licence as specified in clause (B) of the Schedule I;
(iv) a certificate of safety, if required under Rule 33 or Rule 43, as the case may be;
(v) test and inspection certificate of new or modified vessel, if applicable, along with four copies of fabrication or modification drawing of such vessels duly endorsed by Inspector.
(vi) the fabricator's certificate in case of change in prime mover or running gear, as the case may be, in respect of a vehicle for transport of compressed gases.
(vii) the original valid licence sought to be amended along with the approved plan attached to it.
(2) Transfer of licence. A licence granted under these rules may be transferred by the licensing authority before expiry of licence on receipt of
(a) an application duly filled in Form AS-1 or AS-2 as the case may be and signed by the person to whom the licence is sought to be transferred;
(b) letter from the previous licensee giving consent for the transfer of licence;
(c) the original valid licence sought to be transferred together with the approved plan attached to it;
(d) fee as specified in clause (B) of the Schedule I;
(e) no objection certificate of District Authority under Rule 47, if applicable and not obtained earlier for the installation;
(f) four copies of replica of all previously approved site, layout, installation, fabrication, Piping & Instrumentation (P&I) or mounting drawings, as applicable in the name of the transferee;
(g) copy of the Registration Certificate under the Motor Vehicles Act, 1988 (59 of 1988) indicating change of ownership, in respect of mobile pressure vessel;
(h) a certificate of safety under Rule 33 or Rule 43 as the case may be;
55. Renewal of licence. (1) A licence granted under these rules may be renewed by the Chief Controller or Controller authorised by him.
(2) Every licence granted in Form LS-1A, LS-1B 15[LS-1C] and LS-2 under these rules, may be renewed for a maximum period of five years where there has been no contravention of the Act or the rules framed there under or of any conditions of the licence so renewed.
(3) Where a licence which has been renewed for more than one year is surrendered before its expiry, the renewal fee paid for the unexpired portion of the licence shall be refunded to the licencee, provided that no refund of renewal fee shall be made for any financial year during which the Chief Controller receives the renewed licence for surrender.
(4) Every application for renewal of the licence shall be made in Form AS-1 or AS-2, as the case may be, and shall be accompanied by the original licence, which is to be renewed and renewal fee.
(5) Every application for the renewal of a licence shall be made so as to reach the licensing authority on or before the date on which it expires, and if the application is so made, the licence shall be deemed to be in force until such date as the licensing or renewing authority renews the licence or until an intimation that the renewal of the licence is refused has been communicated to the licensee.
(6) Where the renewal of a licence is refused, the fee paid for the renewal shall be refunded to the licensee after deducting there from the proportionate fee for the period beginning from the date from which the licence was to be renewed up to the date on which renewal thereof is refused.
(7) The same fee shall be charged for the renewal of a licence for every twelve months as for the grant of such licence, if the application is received within the validity of the licence:
Provided that
(i) if the application with accompaniments required under sub-rule (4) is not received within the time specified in sub-rule (5) but received not later than three months, the licence shall be renewed only on payment of a fee amounting to twice the fee ordinarily payable;
(ii) if such an application with accompaniments is received by the Licensing or renewing authority after three months from the date of expiry of the licence but not later than one year from the date of expiry of the licence, the licence may, without prejudice to any other action that may be taken in this behalf, be renewed on payment of late fee at the rate of one year licence fee for every delay of three months or part thereof:
Provided further that in case of an application for the renewal of a licence for a period of more than one year at a time, the fee prescribed under the first provision, if payable shall be paid only for the first year of renewal.
(8) No licence shall be renewed if the application for renewal is received by the licensing or renewing authority after one year of the date of its expiry and in such case, the applicant has to seek fresh licence by submitting all documents again including fresh no objection certificate from District Authority, if not obtained earlier and late fee for the entire period along with prescribed licence fee.
56. Refusal of licence. The Chief Controller or Controller of Explosives refusing to grant, amend, renew or transfer a licence, shall communicate the reasons thereof to the applicant:
Provided that before refusing the grant, amend, transfer or renewal of licence, the holder of the licence shall be given an opportunity of being heard.
57. Suspension and cancellation of licence. (1) Every licence granted under these rules shall be liable to be suspended or cancelled, by an order of the licensing authority for any contravention of the provisions of the Act or these rules or of any condition contained in such licence, or by an order of the Central Government, if at any time the continuance of the licence in the hands of the licensee is deemed objectionable:
Provided that
(i) before suspending or cancelling a licence under this rule, the holder of the licence shall be given an opportunity of being heard;
(ii) the maximum period of suspension shall not exceed three months; and
(iii) the suspension of a licence shall not debar the holder of the licence from applying for its renewal in accordance with the provisions of Rule 55.
(2) Notwithstanding anything in sub-rule (1) an opportunity of being heard may not be given to the holder of a licence before his licence is suspended or cancelled in case
(i) where the licence is suspended as an interim measure for the violation of the provisions of the Act or these rules, or of any condition contained in such licence or in his opinion such violation is likely to cause imminent danger to the public:
Provided that where a licence is so suspended, the licensing authority shall give the holder of the licence an opportunity of being heard before the order of suspension is confirmed; or
(ii) where the licence is suspended or cancelled by the Central Government, if that Government considers that in the public interest or in the interest of the security of the State, such opportunity should not be given.
(3) The Chief Controller or Controller or the Central Government suspending or cancelling a licence under sub-rule (1), shall communicate the reasons thereof to the licensee except when the licence is suspended under sub-rule (2).
58. Procedure on expiration, suspension or cancellation of licence. The licensee, on the expiration, suspension or cancellation of his licence shall forthwith give notice to the licensing authority and District Authority of the nature and quantity of compressed gas in his possession and shall comply with any directions which the District Authority, in consultation with the licensing authority, may give in regard to its disposal. In case of closure of a unit due to any reasons, the licensee shall notify the District Authority and the licensing authority regarding the kinds and quantities of hazardous gases stored in the premises and shall dispose of the said gas within the period and in the manner as may be specified by the District Authority, in consultation with the licensing authority, if deemed necessary by him.
59. Appeals. (1) (a) An appeal against an order passed by the Controller shall lie with the Chief Controller;
(b) An appeal against an order passed by the Chief Controller shall lie with the Central Government;
(c) An appeal against an order passed by the District Authority shall lie with the authority superior to him.
(2) Every appeal shall be in writing and shall be accompanied by a copy of the order appealed against and shall be presented within sixty days from the date of the order passed.
(3) The action taken by the appellate authority shall conform to the provision of Section 6-F of the Act.
60. Procedure on death or disability of licensee. (1) If a licensee dies or becomes insolvent or is mentally incapable or is otherwise disabled, the person carrying on the business of such licensee shall not be liable to any penalty or confiscation under the Act or these rules for exercising the powers granted to the licensee during such time as may reasonably be required to allow him to make an application for a new licence in his own name for the un-expired portion of the original licence in respect of the year in which the licensee dies or becomes insolvent or mentally incapable or is otherwise disabled:
Provided that nothing in this sub-rule shall be deemed to authorise the exercise of any power under this sub-rule by any person after the expiry of the period of the licence.
(2) A fee as specified in clause (B) of Schedule I shall be charged for a new licence for the un-expired portion of the original licence granted to any person applying for it under this rule.
61. Loss of licence. When a licence granted under these rules is lost or accidentally destroyed, a duplicate may be granted on the submission of written request explaining the circumstances under which the licence was lost or destroyed, along with copy of police complaint, two sets of drawings identical with those attached to the licence and on payment of a fee as specified in clause (B) of Schedule I.
62. Display of information in licensed premises and production of licence on demand. (1) In the licensed premises, the particulars of licence, operating instructions and emergency telephone numbers of local fire service, police and supplier of compressed gas shall be conspicuously displayed.
(2) The licensee shall produce the licence or its authenticated copy when called upon to do so by any of the officers specified in Rule 70.
63. Compliance of instruction of licensing authority. If the licensing authority calls upon the holder of the licence by a notice in writing to execute any repairs in the licensed premises which are, in the opinion of such authority, necessary for the safety of the premises, the holder of the licence shall execute the repairs within such periods as may be specified in the notice.
64. Procedure on reports of infringement. Whenever any report is made to the District Authority by the Chief Controller or Controller of an infringement of the Act or of these rules, the District Authority shall take immediate action and shall inform the Chief Controller or the Controller, as the case may be, of the action taken by him on such report.
65. Executive control over authorities. Every authority, other than the Central Government, acting under this Chapter shall perform its duties subject to the control of the Central Government:
Provided that nothing in this rule shall be deemed to affect the powers of executive control of the Chief Controller over the officers subordinate to him.
Chapter VI
EXEMPTIONS
66. Powers to exempt. The Central Government may, on the recommendation of the Chief Controller, in exceptional cases, by order and for reasons to be recorded in writing, exempt storage and transportation of any compressed gas in any vessel from all or any of the provisions of these rules on such conditions, if any, as may be specified in the order.
Chapter VII
ACCIDENTS AND INQUIRIES
67. Recording of incidents and notice of accident. (1) The licensee shall maintain records of all incidents connected with storage, transportation or handling of compressed gases and shall produce the same to the inspecting officer on demand.
(2) The notice of an accident required to be given under sub-section (1) of Section 8 of the Act shall be given forthwith
(i) to the Chief Controller or Controller under whose jurisdiction the premises is located by fax or e-mail followed by a letter giving particulars of the occurrence within twenty-four hours;
(ii) to the District Authority; and
(iii) to the officer-in-charge of the nearest police station by the quickest means. Pending the visit of the Chief Controller or Controller or until instruction is received from the Chief Controller or Controller that he does not wish any further investigation or inquiry to be made, all wreckage and debris shall be left untouched except in so far as its removal may be necessary for the rescue of persons injured, and recovery of the bodies of any persons killed by the accident or in the case of railways, for the restoration of through communication.
68. Inquiry into accidents. (1) Whenever a District Magistrate, a Commissioner of Police or a Magistrate subordinate to a District Magistrate holds an inquiry under sub-section (1) of Section 9 of the Act, he shall adjourn such an inquiry unless the Chief Controller or a Controller authorised by him is present to watch the proceedings or the Magistrate has received written information from the Chief Controller that he does not wish to send a representative.
(2) The Magistrate shall, at least fourteen days before holding the adjourned inquiry, send to the Chief Controller notice in writing of the time and place of holding the adjourned inquiry.
(3) Where an accident has been attended with loss of human life, the Magistrate, before the adjournment, may take evidence to identify any body and may order the internment thereof.
(4) The Chief Controller or his representative shall be at liberty at any such inquiry to examine any witness.
(5) Where evidence is given at an inquiry at which the Chief Controller or an officer nominated by him is not present, of any neglect as having caused or contributed to the explosion or accident or of any defect in or about or in connection with any installation or any vehicle appearing to the Magistrate or Jury to require a remedy, the Magistrate shall send to the Chief Controller notice in writing of the neglect or defect.
69. Inquiry into more serious accidents. (1) Whenever an inquiry is held under Section 9-A of the Act, the persons holding such inquiry shall hold the same in open court in such manner and under such conditions as they may think most effectual for ascertaining the causes and circumstances of the accident, and enabling them to make the report under this rule:
Provided that where the Central Government so directs the inquiry may be held in camera.
(2) Persons attending as witnesses before the court under sub-rule (1) shall be allowed such expenses as are paid to witnesses attending before a civil court subordinate to the High Court having jurisdiction in the place where the inquiry is held and in case of any dispute as to the amount to be allowed, the question shall be referred to the local Magistrate who, on a request being made to the court, shall ascertain and certify the proper amount of such expenses.
(3) All expenses incurred in or about in inquiry or investigation under this rule shall be deemed to be part of the expenses of the Petroleum and Explosives Safety Organisation in carrying the Act into execution.
Chapter VIII
POWERS
70. Powers of inspection, search, seizure, detention and removal. (1) Any of the officer specified in the first column of the Table below may exercise the powers mentioned in sub-section (1) Section 7 of the Act in the areas specified in the corresponding entry in the second column of that Table:
| Officers |
Areas |
| (1) |
(2) |
| The Chief Controller or Controller authorised by Chief Controller |
The whole of India. |
| All District Magistrates |
Their respective districts. |
| All Magistrates subordinate to the District Magistrate |
Their respective jurisdictions. |
| The Commissioners of Police |
Their respective jurisdictions. |
| Deputy Commissioners of Police subordinate to the Commissioners of Police. |
The respective areas over which their authority extends. |
| All police officers not below the rank of a Sub-Inspector. |
The respective areas over which their authority extends. |
Provided that the powers of removal and destruction under clause (d) of sub-section (1) of Section 7 of the Act shall not be exercised by any Magistrate or police officer except under and in accordance with the instructions of the Chief Controller or Controller authorised by him.
(2) Every facility shall be afforded to the officers specified in sub-rule (1) to ascertain that these rules are being duly observed.
71. Protection of action taken in good faith. (1) No suit, prosecution or other legal proceedings shall lie against the Central Government or Chief Controller or Controller for anything which is done in good faith or intended to be done in pursuance of these rules.
(2) No suit or other legal proceeding shall lie against the Central Government or Chief Controller or Controller for any damage caused or likely to be caused by anything which is done in good faith or intended to be done in pursuance of these rules.
72. Repeal and Savings. (1) The Static and Mobile Pressure Vessels (Unfired) Rules, 1981 are hereby repealed.
(2) Notwithstanding such repeal
(i) all licences granted or renewed under the said rules and all fees imposed or levied thereof shall be deemed to have been granted, renewed or imposed or levied, as the case may be, under the corresponding provision of these rules; and
(ii) all approvals given and all powers conferred by or under any notification or rule shall, so far as they are consistent with the Act and these rules, be deemed to have been given or conferred by or under these rules.
Appendix I
[See Rule 4(3)]
Application seeking approval of fabrication shop for pressure vessels, vapourisers or fittings
1. Applicants name and full address with telephone no. and E-mail.
2. Whether the applicant has manufactured any unfired pressure vessel, vapouriser or fittings thereof. Yes/No
If yes
(i) date from which such vessels/vapouriser/fittings were manufacture;
(ii) for whom the vessels/vapouriser/fittings were fabricated and there approximate numbers;
(iii) details of the vessels/vapouriser/fittings manufactured.
3. Specifications of Code proposed to be adopted for the manufacture of the vessels/vapouriser/fittings.
4. Organisational set-up with specific reference to qualifications and experience of the personnel engaged in the manufacture of vessels/vapouriser/fittings.
5. Organisational set-up of the inspecting personnel engaged by the applicant.
6. Process of manufacture of vessels/vapourizer/fittings, beginning with raw material and ending with the finished vessels/vapouriser/fittings
7. Quality control checks or tests carried out at each stage of manufacture of vessels/vapouriser/fittings
8. (i) Details of the equipment installed for chemical analysis and mechanical tests.
(ii) Details of templates or gauges provided to check or test.
(iii) Steps taken to check the accuracy of testing and checking equipment and frequency of such checking.
9. Equipments available for carrying out non-destructive examination such as radiography, gamma ray, ultrasonic tests, other quality and performance tests.
10. List of machinery provided for manufacturing vessels/vapouriser/fittings
11. Name and address of the independent inspecting authority.
12. Records and certificate of tests
(i) Pro forma of records for various tests carried out by the inspecting and certifying organisation; and
(ii) Pro forma of tests and inspection certificate issued by the independent inspecting authority.
13. Whether the fabrication shop is certified under ISO or equivalent certification, (if so, documentary evidence thereof to be attached)
14. List of relevant codes, specifications and technical literature available
Signature ..
Date: .
Name and designation
Appendix II-A
[See Rules 2(viii) and 2 (xxviii)]
Qualification and Experience of Inspector or Competent Person
| Sl. No. |
Rule under which competency is recognised |
Qualification and other requirements |
Experience for the purpose |
Minimum facilities |
| 1. |
Rules 6(1) and 13(2) |
(1) Degree in chemical or Mechanical or Metallurgical or Marine Engineering from a recognised university or equivalent professional qualifications. (2) Physically fit and mentally sound for carrying out tests and examination. |
(1) A minimum experience of 10 years in design, fabrication and stage-wise inspection during fabrication of pressure vessels and equipments operating under pressure. (2) He shall be (2)(a)Conversant with the relevant codes of fabrication and test procedures relating to pressure vessels and their fittings. (b)Conversant with the statutory requirements concerning design and safety of unfired pressure vessels. |
Standard gauges and instruments conforming to national/international standards for test and examination at every stage of fabrication. Either the Inspector shall have these or these shall be available to him. The Inspector shall be responsible for ensuring the quality and accuracy of these gauges and instrument used by him. A documented system to ensure this shall be maintained by the Inspector. |
| 2. |
Rules 18, 19, 33 and 43. |
(1) Degree in Chemical or Mechanical Engineering or Marine Engineering or Metallurgical Engineering or equivalent professional qualifications. (2) Physically fit and mentally sound for carrying out tests and examinations |
(1) A minimum experience of 10 years in (a) Design and fabrication, erection, operation, maintenance and; (b) testing examination and inspection of pressure vessels or equipment operating under pressure. (2) He shall be (a) conversant with the relevant code of practice and test procedures relating to pressure vessels; (b) conversant with statutory requirements concerning safety of unfired pressure vessels installations & transport vehicles. (c) conversant with nondestructive testing techniques as are applicable to pressure vessels. (d) able to identify defects and arrive at a reliable conclusion with regard to the safety of pressure vessels. |
Standard gauges, pumps and gadgets for hydraulic and pneumatic pressure tests, non-destructive tests, equipments for ultrasonic thickness test, ultrasonic flaw detection magnetic particle inspection and any other test that may be required by Chief Controller in specific cases. Either the Competent Person shall have these facilities or these shall be available to him. The Competent Person shall be responsible for ensuring the quality and accuracy of the gauges and equipments and the competence of any person that may be employed for performing a non-destructive test. Competent person intending to carry out the inspection and testing of mobile pressure vessels meant for transportation of flammable or toxic or corrosive gases under Rule 18 and or 19 may have required facilities for carrying out degassing, inspection and testing as stipulated in Appendix IIB at his command. In case, if he does not have his own approved degassing station, he may enter into agreement with owner of approved degassing station to undertake degassing, periodic inspection and testing of mobile pressure vessels meant for transportation of flammable/toxic/corrosive gases |
Note. The constituent members of an organisation shall fulfil the requirements under Column-3 individually and those under Column-4 collectively.
Appendix II-B
[See Rule 2(xxvii)]
Minimum required Facilities at Gas Tanker Degassing Station
(I) LPG, Propane and other Flammable Gases:
(1) Minimum 7500 litre water capacity static pressure vessel to hold compressed gas temporarily covered under licence in Form LS-1A.
(2) Minimum safety distance of 30 metres around the vent stack to release the excess gas. The vent shall be at least 11 metres high & adequately supported and shall be provided with device to prevent reverse flow of the vent gas. The venting of the gases shall be kept to the bare minimum.
(3) Minimum 100 KL Water Storage Tank, connected pumps, piping and fittings, compressor etc with safety inter locks for carrying out the de-pressurising, de-gassing, purging, hydraulic test.
(4) Necessary facilities to carry out the Internal Visual Inspection, NDT and Hydraulic test as per the design code and re-commission/purge the vessel for safe re-filling of the gas for which it is licensed.
(5) Facilities to service/repair, calibrate, test and check the proper functioning of safety valves, excess flow valves, internal type excess flow valve, level gauges, pressure gauges, connected piping, valves and other fittings.
(6) Facilities for cold repair of dents and non pressure parts like baffle plates, replacement of corroded bolts/studs, nuts, gaskets, fitments of internal excess flow valves.
(7) Levelled hard ground, lifting jacks, ramps, proper illumination for the Tanker Parking Area, flammable gas detectors, oxygen content meter, and other safety equipments.
(8) Fire fighting facilities consisting of water monitors and sufficient numbers of DCP type fire extinguishers.
(II) Toxic and or corrosive gases:
(1) Minimum 7,500 litre water capacity static pressure vessel to hold compressed gas temporarily, if required, covered under licence in Form LS-1A.
(2) Direct venting of the gas in to the atmosphere is prohibited.
(3) Facility shall have the arrangement of dedicated water storage tanks for each type of gas, and shall be of adequate capacity to fill water in the mobile pressure vessels for dissolving the water soluble gases and neutralisation of the water used in this process.
(4) Efficient scrubbing and neutralisation system and connected facilities for safe disposal of the contaminated water.
(5) Facilities to service/repair, calibrate, test and check the proper functioning of safety valves, excess flow valves, internal type excess flow valve, level gauges, pressure gauges, connected piping, valves and other fittings.
(6) Facilities for cold repair of dents and non pressure parts like baffle plates, replacement of corroded bolts/studs, nuts, gaskets and fitment of internal excess flow valves.
(7) Leveled hard ground, lifting jacks, ramps, proper illumination for the Tanker Parking Area, flammable and toxic gas detectors, oxygen content meter and other safety equipments.
(8) Fire fighting facilities consisting of water monitors and sufficient numbers of DCP type fire extinguishers.
The approved mobile pressure vessel degassing station shall maintain record pertaining to degassing and purging of pressure vessels and shall issue degassing and or purging certificate in the pro forma prescribed by the Chief Controller and shall be generated online as and when notified by the Chief Controller.
(III) Procedure for obtaining prior approval for degassing station.
(a) Mobile tankers for any flammable, toxic or corrosive gas, before being tested or examined under Rules 18 or 19, shall be degassed to remove hazardous contents so as to ensure safety. Such degassing shall be carried out only at location approved by the Chief Controller either in plants or stations where such tankers are loaded or unloaded or in dedicated degassing station erected with facilities specified in this Appendix and approved by the Chief Controller;
(b) Any person intending to set up a dedicated Mobile tanker degassing station referred in clause (a), shall submit his application to the Chief Controller for obtaining prior approval along with a project report comprising of following information
(i) introduction about his organisation's status and capability to undertake the degassing job;
(ii) particulars of the site location, its accessibility, means of protection to prevent entry of unauthorized persons and its suitability for the specific purpose;
(iii) list of all facilities proposed to be provided including civil, mechanical electrical, degassing, fire fighting, pumps, compressors, communication etc;
(iv) step by step procedure to be followed for degassing and purging for the test and inspection;
(v) nature of deployment of technical manpower for supervision and execution of the job in safe manner;
(vi) four copies each of site, layout, Piping and Instrumentation (P&I), and other required drawing(s);
(vii) HAZOP study and Risk analysis report;
(viii) Three copies of layout drawing for obtaining prior approval under Form LS-1A;
(ix) NOC or consent letter of State Pollution Control Board if already obtained or same can be submitted along with the documents for grant of licence in Form LS-1A; and
(x) A scrutiny fee as specified in clause (B) of the Schedule I for prior approval under Rule 46.
Appendix III
[See Rule 12]
A. Application for recognition as competent person under the Static and Mobile Pressure Vessels (Unfired) Rules, 2016.
[See Rules 18, 19, 33 and 43]
1. Name & full address of the organisation with telephone no. and E-mail:
2. Organisation status (proprietary firm, partnership firm, Government organisation, Public Sector Undertaking, Autonomous body, Company registered under Company Act,):
3. Purpose for which competency is sought (Specify the rules):
4. Whether the organisation has been declared as a competent person under any other status, if so, give details:
5.(i) Set up of the organisation:
(ii) Name & qualification (of constituent members of organisation):
(iii) Experience (of constituent members of organisation with regard to fabrication, installation, maintenance in case of transport vehicles and examination and testing of pressure vessels and various fittings and in other related fields. Please refer to requirements mentioned in Column 4 of Appendix II-A. (Please attach documentary evidence of the experience):
6. Particulars of equipments, gauges etc. available with the Organisation for carrying out the inspection/testing:
7. Details of the procedures followed in carrying out stage by stage inspection/test for certification under different rules:
8. Any other information:
9. Declaration:
I .. hereby, on behalf of ..certify the details furnished above are correct to the best of my knowledge. I undertake to
(i) maintain the facilities is good working order and calibrated periodically;
(ii) to fulfil and abide by all the conditions stipulated in the certificate of competency and instructions issued by the Chief Controller from time to time.
| Place: |
Signature of the Head of the organisation |
| Date: |
Name & Designation Seal of the Institution |
B. Application for recognition as an inspector coming under the purview of Static and Mobile Pressure Vessels (Unfired) Rules, 2016.
[See Rules 6(1) and 13(2)]
1. Name & Full address of the organisation with telephone no. and E-mail:
2. Organisation status (proprietary firm, partnership firm, Government organisation, Public Sector Undertaking, Autonomous body, Company registered under Company Act.):
3. Whether the organisation has been declared as a competent person under any other status, if so, give details:
4.(i) Set up of the organisation:
(ii) Name & qualification of its constituent members:
(iii) Experience of the organisation and constituent members with regard to stage-wise inspection during fabrication of pressure vessels and various fittings and in other related fields. Please refer to requirements mentioned in Column 4 in Appendix IIA. (Please attached documentary evidence of the experience):
5. Particulars of equipments, gauges etc. available with the Organisation for carrying out the inspection/Testing:
6. Details of the procedures followed in carrying out stage by stage inspection/test for certification:
7. Any other information:
8. Declaration:
I ..hereby, on behalf of ..certify the details furnished above are correct to the best of my knowledge. I undertake to fulfil and abide by all the conditions stipulated in the certificate of competency and instructions issued by the Chief Controller from time to time.
| Place: |
Signature of the Head of the organisation |
| Date: |
Name & Designation Seal of the Institution |
C. Application for Grant of certificate of competency to a person for certifying storage installations or transport vehicles owned and operated by the organisation in which he is employed.
1. Name:
2. Date of birth:
3. Name of the organisation:
4. Designation:
5. Educational qualification (Copies of testimonials to be attached):
6. Particulars of professional experience (in chronological order):
| Name of the organisation |
Period of service |
Designation |
Area of responsibilities |
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
7. Membership, if any, of professional bodies:
8. Details of facilities (examination, testing etc.) at his disposal:
9. Purpose for which competency certificate is sought (specify the rules):
10. Whether the applicant has been declared as a competent person under any statute (if so, give details):
11. Any other relevant information:
12. Declaration by the applicant:
I hereby declare that the information furnished above is true. I undertake
(a) that in the event of my leaving the aforesaid organisation, I will promptly inform the Chief Controller;
(b) to fulfil and abide by all the conditions stipulated in the certificate of competency and instruction issued by the Chief Controller from time to time.
| Place: Date: |
Signature of applicant |
I . certify that Shri. .. whose particulars are furnished above, is in our employment and nominate him on behalf of the organisation for the purpose of being declared as a competent person under the rules. I also undertake that I will
(a) notify the Chief Controller in case the competent person leaves our employment;
(b) provide and maintain in good order all facilities at his disposal as mentioned above;
(c) Notify the Chief Controller any change in the facilities.
| Place: Date: |
Signature Name and Designation .. Telephone No. .. Telex No. Official Seal |
SCHEDULE I
(See Rules 4, 6, 11, 12, 35, 46, 49, 50, 53, 54, 60, 61)
A: Licence Forms, Purposes, Licensing Authority and Licence Fees
| Sl. No. |
Form of licence |
Purpose for which granted |
Authority empowered to grant licence |
Licence Fees |
| 1. |
LS-1A |
To store compressed gas in pressure vessels. |
Chief Controller or Controller authorised by him. |
(a) Where the total water capacity of vessels in an installation does not exceed 5,000 litres. Rs 5000. (b) Where the total water capacity of vessels in an installation exceeds 5,000 litres. Rs 5000 litres for the first 5,000 litres and for every additional 1,000 litres or part thereof Rs 2500 subject to a maximum of Rs 50,000. |
| 2. |
LS-1B |
To store and dispense auto-LPG in auto-LPG dispensing station as automotive fuel to motor vehicles. |
Chief Controller or Controller authorised by him. |
Same as the licence in Form LS-1-A. |
| 16[3. |
LS-1C |
To store and dispense Auto LNG in Auto LNG dispensing station as automotive fuel to motor vehicles and/or store LNG in connection with LCNG dispensing. |
Chief Controller or Controller authorised by him. |
Same as the licence in Form LS-1A] |
| 17[4.] |
LS-2 |
To transport in a pressure vessel by vehicle. |
Chief Controller or Controller authorised by him. |
Rs 5000 |
18[B: Fee other than licence fee
| Sl. No. |
Purpose |
Fees (In rupees) |
| 1. |
Approval or renewal of shop approval to manufacture pressure vessel, vapouriser and fittings under Rule 4(3)(i) and (ii). |
5000 per year |
| 2. |
Approval of design drawing of pressure vessel, vapouriser & fittings under Rule 4(3)(iii). |
2500 |
| 3. |
Import of pressure vessel under Rule 4(5). |
5000 |
| 4. |
Repairing of pressure vessel under Rule 6. |
2500 |
| 5. |
Recognition/Revalidation of competent person/inspector under Rule 12. |
5000 per year |
| 6. |
Approval of vehicle mounting drawing for transport of compressed gas under Rule 35(2). |
2000 |
| 7. |
Prior approval of specification and plans of vessels and premises under Rule 46. |
2000 |
| 8. |
Issue of authenticated copy of licence under Rule 49(3). |
1000 |
| 9. |
Prior approval of alternation in the licensed premises under Rule 53(2). |
2000 |
| 10. |
Amendment of licence under Rule 54(1). |
1000 |
| 11. |
Transfer of licence under Rule 54(2). |
1000 |
| 12. |
Issue of new licence in case of death or disability of licensee under Rule 60(2). |
1000 |
| 13. |
Issue of duplicate copy of licence under Rule 61. |
1000 |
| 14. |
Grant/renewal of recognition for installer/operator as mentioned in Schedule II and IV. |
5000 per year.] |
SCHEDULE II
(See Rule 29)
Design, construction, testing and maintenance of dispenser, its pipe connections and installation of auto-LPG dispensing station
(A) Storage capacities Maximum water capacity of individual vessel shall be limited to 20 M3, number of Vessels shall not exceed two in an installation and shall be designed for a pressure of not less than 14.5 Kg/sq. cm.. Not more than two unloading of road tanker shall be undertaken at the dispensing station per day.
(B) The ALDS may be installed in the existing MS/HSD dispensing stations or in separate installations. The installation, operating procedures, inspections, maintenance, training, emergency plan & procedure for Auto LPG dispensing stations shall be prepared and enforced by the operator. The preventive maintenance schedule and periodic inspection of various equipments shall be carried out by the operator and the records shall be maintained. The safety distances between various facilities shall be as per the Table 5 of Rule 22.
(C) The Mobile Tanker unloading for ALDS shall be done using hose with automatic closing arrangement on both ends of the hose (smart hose), so that no release of liquid LPG takes place at the end of unloading. Alternatively, loading arms can be provided. The hose shall not be more than 5.5 m in length and shall conform to recognized Indian or International standard. The unloading shall be undertaken during the lean hours of morning and afternoon with each unloading process not exceeding 60 minutes. Mobile LPG Tanker shall be parked on a hard stand and shall be in drive out position while unloading the product.
(D) Venting of LPG shall not be permitted at the ALDS during unloading operation. During the periodic test under Rule 19, the LPG shall be evacuated into a mobile evacuation vessel. Venting during maintenance & commissioning shall be only under supervision of an officer of the auto LPG operator. These operations shall be conducted only in the normal working hours. Venting for priming a pump shall not be permitted.
(E) Suitable provision shall be available for emergency evacuation of the LPG from the underground vessel into Mobile Evacuation Facility and for periodic inspections.
(F) Cathodic protection The tank shall be provided with cathodic protection. The competent person engaged for certification under Rule 33 shall verify the design, oversee the installation of cathodic protection, witness the pre-commissioning and post commissioning results and based on his observations shall certify the adequacy of such cathodic protection in his certificate.
(G) Nozzles on the vessel Each vessel shall be provided with 2 circular manholes located on top of the vessel having internal diameter 600 mm and 350 mm respectively. The nozzles should be provided for following functions
(i) Two nozzles for installation of safety relief valves.
(ii) One nozzle for installation of mechanical level gauge of Rochester type.
(iii) One nozzle for electronic level gauge.
(iv) One nozzle for installation of level gauge for maximum level alarm or for installation of high level switch.
(v) One nozzle for installation of submersible pump or pump suction in case of above ground pump.
(vi) One nozzle for installation of arrangement for isolating well of submersible pumps.
(vii) One nozzle for liquid inlet from road tanker.
(viii) One nozzle for liquid return line from dispenser and vapour outlet line.
(ix) One nozzle for drainage of water.
(x) Arrangement for installation of pressure gauge may be provided in the vapour return line.
(H) Liquid level measurement Auto LPG tanks should be provided with one mechanical type of level gauge i.e. Rochester gauge and another of a failsafe electronic type. The fail safe electronic gauge should be of a magneto restrictive type. The display as well as power source for the gauge should be installed in a safe area in the sales room, the interconnection between the two being through a suitable zener barrier/galvanic isolation. The maximum level indicator however should be an independent gauge or a level switch and the same should be integrated with a alarm in addition to an automatic tripping arrangement which shuts all ROV's and pumps.
(I) Fire safe valves All valves installed in ALDS including block valves shall be of fire safe type designed to meet the requirements of API 607 or equivalent in this respect. Such valve by its construction or special protection should remain tightly shut off when exposed to fire.
(J) Remote operated valves The remote operated valves should be equipped with an open and closed position indicator and should be of fail safe design, set to close within a maximum of 30 seconds. No manual operation should be possible other than with special tools which shall not be available with the operating personnel.
(K) Auto LPG Storage Installation The underground Auto LPG storage area and above ground piping above it shall be surrounded by a kerb brick wall of minimum 20 cms. thickness and of 30 cms. height. This wall should extend along the entire periphery of the storage area without any break, maintaining a minimum of 3 m. distance from the edge of vertical projection of the underground vessel. Wire fencing shall be laid over this kerb wall so that the combined height of the wall and fencing is not less than 2 m. This fence should be of a sturdy metal meshwork of 50 mm max. mesh, made of wire of at least 2 mm thickness welded in a framework of 50 mm pipes. Two doors should be provided along the fence, each being located on the opposite side of the fencing. The area inside the fence shall be paved with either tiles or concrete. The end of filling pipe leading to the underground vessel should be located at a suitable point just inside the fenced area but accessible from outside in a manner that it is safe from inadvertent damage from vehicles moving outside the fenced area.
(L) Auto LPG dispenser and piping
(i) The type of the dispenser used for dispensing liquefied petroleum gas shall conform to specification and be of a type approved by the Chief Controller.
(ii) The dispenser shall be provided with an excess flow valve, a remote operated shut-off valve and a pipe shear or other suitable provision in that order in the liquid inlet pipe.
(iii) The dispenser shall be installed on a firm foundation with provision of bollards to protect against physical damage.
(iv) A breakaway device with excess flow valves or quick action cut-off valves on both sides of the breakaway device conforming to Underwriters Laboratory, USA, specification number 567 or equivalent shall be provided on the delivery hose so as to prevent spillage of liquefied petroleum gas from both sides of the breakaway point in the event of its breakage.
(v) The dispensing nozzle at the end of the hose shall be of self sealing type and suitable for matching with filler connection of cylinders fitted to vehicles as fuel tanks, as specified in standard or code accepted by the Chief Controller.
(vi) The hose for delivery of auto LPG by the dispenser to motor vehicles shall be suitable for auto LPG. The design pressure of the hose shall be minimum twenty five kilograms per square centimeters with a safety factor of five and shall be tested at one and half times of the design pressure at an interval not exceeding one year. The hose shall be electrically and mechanically continuous.
(vii) The length of the hose connected to the dispenser shall not exceed five meters and fifty centimeters.
(viii) Clearly identified switches and circuit breakers shall be provided at easily accessible location not less than six meters away from the dispenser to cut-off power supply in the event of fire, accident or other emergency. The switches or circuit breakers shall be visible from point of dispensing auto LPG to motor vehicles.
(ix) Every dispensing unit from which auto LPG introduced into the containers fitted to the motor vehicles, shall be equipped with self sealing type fuelling nozzle from which the liquid released on disconnection shall not exceed five millimetres.
(x) All metallic auto LPG piping shall be rated for auto LPG and designed to American Standard ASME-B-31.3 with minimum design pressure of twenty five kilograms per square centimetres with a factor of safety of four. The materials of pipe shall be low carbon or alloy-steel conforming to American Standard SA-333 grade 6, or SA-106 grade B Schedule 40 (for above ground) or Schedule 80 (for underground), or equivalent. The pipeline shall be tested at one and half times of design pressure if hydraulically tested or ten per cent in excess of design pressure, if pneumatically tested. Joints of pipeline above forty millimetres diameter shall be welded or flanged. Threaded or screwed connection shall not be provided except for special fittings like excess flow valve, pump connections up to fifty millimetres diameter. Wherever threaded joints are used, a seal weld shall be provided. All threaded joints and socket weld pipe fittings shall be rated at least 3000 lb to BS 3799 or at pressure class 3000 to ASME B16.5 or equivalent. All flanged joints shall be rated at least class 300 to BS 1560: Part 2 or ASME:B:16.5 or equivalent.
(xi) Piping shall be protected against physical damage, collision or corrosion.
(xii) Entire piping system including the appurtenances shall wherever possible be constructed with welded joints and wherever necessary with flanged joints. The number of flanged joints shall be kept down to a minimum.
(xiii) Piping shall run directly as far as practicable between points with as few restrictions with elbows or bends as possible.
(xiv) Provision shall be made in piping to compensate for expansion, contraction, jarring and vibration. Flexible piping connections shall be introduced into fixed piping systems wherever necessary to compensate for vibration etc. or where a rigid connection is not practical. Flexible connection shall be short not exceeding 500 mm in length and shall be of approved metallic construction suitable for auto LPG and braided on outside with stainless steel wire. The design parameters for flexible piping connections shall be identical to other piping. Non-metallic pipe, tubing or hose shall not be used for permanent connection to storage vessels.
(xv) All gaskets shall be of flexi-metallic type.
(M) Management and Operation of Auto LPG Dispensing Stations The company intends to operate Auto LPG dispensing station shall meet the following criteria for considering recognition by the Chief Controller, it shall
(i) Be a registered company.
(ii) Possess requisite rating under Auto LPG Control Order.
(iii) Possess a background of operating and managing a business activity.
(iv) Have sufficient in-house specialists well conversant with
(a) Knowledge and experience in installation of auto LPG equipments, their operations, maintenance & in training of personnel.
(b) Auto LPG regulations and the hazards associated.
(c) Codes of practice relating to setting up auto LPG stations.
(d) Number of such personnel engaged by the company shall be related to the stations proposed to be put up by the company.
(v) Have professional administration and organization with clear levels of responsibility.
(vi) Take responsibility for the professional skills of its personnel.
(vii) Have a firm arrangement with auto LPG supplier for un-interrupted supply of LPG of Auto LPG specification to the company stations.
(viii) Have a firm arrangement with installer for installation and maintenance of its stations. The period of such arrangement should be specified.
(ix) Have a well laid out policy with regard to selection and management of its dealers or franchisees.
(x) Take responsibility of operations, periodic maintenance and breakdown maintenance in the stations and enters into a legal agreement with its dealers in this respect.
(xi) Take responsibility in selection and training of Managers and operators of Auto LPG dispensing station of its franchisees/dealers and enter into a legal agreement with its dealers in this respect.
19[(MA) Procedure for granting recognition to Auto LPG operator:
(i) Any organisation intending to be recognised as Auto LPG operator shall submit their application giving details of company's credentials with regard to their experience in the field of management and operation of Auto LPG dispensing station to the Chief Controller of Explosives.
(ii) Every such application shall be accompanied by a scrutiny fee as specified in Part B of Schedule I.
(iii) The Chief Controller shall within a period of ninety days from the date of receipt of the application either
(a) prima facie after having satisfied himself with regard to competence and professional ethics, for recognition of the applicant as a Auto LPG dispensing station operator, shall call the applicant along with his technical team for an interview by a team of officers nominated by the Chief Controller for assessing the technical and practical knowledge and capability of the applicant; or
(b) if the applicant does not prima facie meet the requirement for recognition, shall reject the application with reasons; or
(iv)(a) if the applicant in the interview conducted under this rule is found to have adequate knowledge and capability for the recognition applied for, the Chief Controller shall grant the recognition under the rules; or
(b) in case any applicant is not found suitable, the Chief Controller shall reject the application specifying the reasons.
(v) Initially the recognition granted under sub-clause (iv) shall be valid for a period of one year and subsequently, based on performance report, validity of recognition may be renewed for a further period of two years.
(vi) The Chief Controller may revoke or suspend recognition granted to the operator, if the operator does not fulfil the obligations as mentioned in this Schedule.
(vii) The Chief Controller may after giving an opportunity to the operator of being heard, may revoke the recognition
(a) if he has reason to believe that the operator, has violated any condition stipulated in the letter of recognition or has acted in a manner inconsistent with the intent or the purpose of these rules; or
(b) for any other reason to be recorded in writing.]
(N) Emergency Plan Every Auto LPG dispensing station shall have a written emergency plan in place to control the hazards from serious auto LPG leakage or fire. The plan must be drawn in consultation with local authorities i.e. fire services. This plan should contains instructions for emergency shutdown of the station, warning to customers and other people in the surrounding, calls for assistance, usage of fire fighting equipments among others. The plan shall be tested from time to time for evaluation of its adequacy and shall be updated and modified as required.
SCHEDULE III
[See Rules 19(4), 21(9), 21(14) and 23(7)]
Underground and Mounded Vessels
(Design, fabrication, installation, operation, maintenance and periodic inspections)
A. Mounded Vessels Installation The Mounded vessel installations are categorised in the following categories:
(a) Category 1 : Up to 100 KL water capacity of each vessel
(b) Category 2 : Above 100 KL and up to 500 KL water capacity of each vessel
(c) Category 3 : Above 500 KL water capacity of each vessel
1. Design code for design and fabrication of the Vessel shall be as per BIS 2825, ASME Section VIII Div. 1 or Div. 2 or PD 5500 or any other standard accepted by the Chief Controller. A single code shall be applied for design, fabrication, inspection and testing. Specific considerations shall be given for internal pressure, internal vacuum and external loading. Design pressure shall be adequate for vapour pressure at 55 deg C plus static head. The design shall also include a minimum corrosion allowance of 1.5mm and stress relieving of complete vessel irrespective of its thickness.
2. In case of LPG, design pressure shall be 14.5 Kg/sq. cm at top of the vessel & temperature of 27 C to + 55 C and the material selection in case of refinery installation shall be suitable for the traces of hydrogen sulphide.
3. The installation shall conform to a recognized Indian or International standard accepted by the Chief Controller. The vessels shall be placed horizontally and the central axis of the vessels shall be parallel to one another and inter distance between the vessels, distance of boundary line of the installation shall be as per the Table 3. A road/clear area of width (See Table A of this schedule) on three sides shall be provided around the mound for moving and firefighting equipment. The facilities like pump house, compressors and firefighting equipments shall be located at a distance from the edge of the vessels as per the Table A of this schedule.
4. The mounded pressure vessels installation shall be done on concrete or compacted sand base foundation. The selection of the type of foundation shall have considerations for sufficient load bearing capacity, depending on the site conditions and the soil mechanics. In case bottom nozzle has been provided for the vessel, an access to the connection, like a tunnel opening of minimum 0.9 m 1.2 m shall be provided. The bottom level of the vessel shall be above the top of the inspection tunnel. The bottom connection shall be an integral part of the vessel, and shall extend beyond the mound, and shall be at least 3 m from the edge of the Vessel. The bottom outlet pipe connection shall have a slope of 1.5 deg at the end of which a remote operated valve shall be provided.
5. The mound shall be of earth, sand or other non-combustible material of a thickness (as per Table A of this schedule) of the cover for the vessel. The cover material shall be free from any abrasive particles that may damage the anti-corrosive coating provided on the vessel. The mound shall provide adequate protection from the thermal radiation, and shall be sufficiently robust to remain in place in the event of jet flame impingement. The mound shall be protected from erosion, caving in from water seepage and provided with a protective hard cover or lining. The mound and the top surface of the mound shall have proper facility to drain the rain water. Reference points for the settlement of the vessel and the foundation shall be provided and monitoring of the settlement if any shall be done on yearly basis.
6. The external surface of the vessels shall be suitably protected from corrosion by providing suitable external coatings and cathodic protection. The design shall conform to NACE RP 169 or any other standard accepted by the Chief Controller. The protected vessel shall be isolated from the unprotected structures and piping. The calculated life of the cathodic protection shall not be less than 15 years, considering coating defect of minimum 30% on vessel surface. The monitoring of the cathodic protection shall be on a yearly basis and records maintained.
7. Vessels shall be provided with fire safe remote operated valves (ROVs) at the first flange on the liquid lines and the closing time shall not exceed 30 seconds. Each vessel shall be provided with minimum two types of level indicators of which one shall be electronic with High level switch and shall indicate a remote display of the level at the fill point, one additional independent high level switch shall be provided for the Category 3 type of the vessel, two safety relief valves (SRVs), pressure and temperature measuring instruments. All the safety fittings and instrumentation shall be provided on a dome or the manhole cover provided on the shell of the vessel. There shall be adequate size of the manhole not less than 600 mm. Category 2 and 3 type of vessel shall have at least two manholes each of size 600 mm provided on the vessel. The outlet of the SRVs may be connected to a flare system where available or vented vertically up into the atmosphere with vent pipe not less than 3 M from the top of the mound.
8. Provision shall be made for Gas leak detection system. Fire fighting facility shall be provided with fire hydrant or monitor (See Table A of this schedule) in addition to the Water sprinklers to provide a water cover to the exposed surfaces of the vessel and pipelines. Such hydrants and monitors shall not be located within the distances specified in Table A from the exposed surface of vessel, fittings and pipelines. In addition minimum 2 Nos. of fire extinguishers of capacity 75 Kgs. and shall be placed in an accessible position to operate.
9. The mounded Vessels installation shall be inspected and certified by an inspector at every important stage of construction, including the design and fabrication of the vessel, foundation, mound covering, cathodic protection, NDT and hydraulic testing of vessels and piping and final certification of safety under Rule 33.
10. The vessel shall be subjected to internal inspection once in 5 years under Rule 19 and shall include the Non-Destructive Tests comprising of ultrasonic thickness measurement check evenly spread over the entire inner surface including both dish ends and the openings, 100% wet fluorescent magnetic particle test of all weld joints, ultrasonic flaw detection of welds not less than 25% of weld seams including all the T-joints of middle circumferential seams and both dish ends weld seams & nozzle joints, liquid penetrant inspection of all the fillet welds, nozzle joints, hardness test randomly on circumferential and longitudinal welds including parent metal and nozzle welds from inside, heat affected zone and the weld beads on all the plates and joints. Alternatively, other established NDT techniques such as acoustic emission testing may be used with prior approval of Chief Controller. The vessel shall be tested pneumatically at a pressure of not more than the design pressure held for 30 minutes.
11. The vessels shall be subject to hydraulic test pressure as per the design code in addition to the above non-destructive tests once in 10 years, or when subjected to any repairs involving hot work. Settlement of the vessel, if any, shall be measured during the first water fill.
12. The safety relief valves shall be inspected and tested under Rule 18 once in a year and the excess flow valves and the remote operated valves shall be inspected and tested once in 5 years during the periodic test under Rule 19.
Table A
Categories for Above Ground Covered with Earth (Mounded) Vessel
| Category No. |
Water Capacity of each vessel (KL) |
Clear Width around Mound (M) |
Distance of facilities such as pump room, vapouriser etc. from the edge of the vessel (M) |
Minimum thickness of the earth cover (M) |
Independent high level gauges requirement |
Minimum numbers and location of Fire Hydrant/M onitor |
Manhole of minimum sizes 600 mm |
| 1. |
Up to 100 KL |
3 |
4.5 |
0.5 |
No |
1 No. 15 M |
1 no. |
| 2. |
Above 100 KL-Up to 500KL |
3.5 |
9 |
0.7 |
Yes |
2 Nos. 15 M |
2 nos. |
| 3. |
Above 500 KL |
3.5 |
15 |
0.7 |
Yes |
As per OISD I50 |
2 nos. |
B. Underground Pressure Vessel Installation for Industrial USE and Auto LPG Dispensing Stations (ALDS)
1. Design code for design and fabrication of the vessel shall be as per BIS-2825, ASME Section VIII Div.1 or Div. 2 or PD 5500 or any other standard accepted by the Chief Controller. A single code shall be applied for design, fabrication, and inspection & testing. Specific considerations shall be given for internal pressure and external loading. Design pressure shall be adequate for vapour pressure at 55 deg C plus static head.
2. The design shall also include a corrosion allowance of 1.5mm and stress relieving of complete vessel irrespective of its thickness.
3. The underground vessels shall be placed within a concrete or brick masonry pit with a distance of 1 mtr between the walls of the pit and the vessel and inter distance between the vessels. Soil cover of at least 500 mm shall be provided over the top surface of the vessel. The vessels shall be installed on a firm RCC foundation and anchored adequately to prevent the floatation of the vessel due to up-lift force of buoyancy in case of a worst scenario of no load of the product and overburden. The designer/fabricator of the vessel shall furnish for prior approval in addition to mechanical design documents and drawings, the civil design drawings and documents and calculations duly vetted by an inspection agency to substantiate that the foundation, securing and anchoring arrangements of the vessel is designed to maximum loading as well as to prevent floatation of the tank considering worst scenario of no load of product and overburden.
4. The external surface of the Vessels shall be suitably protected from corrosion by providing external coatings and cathodic protection. The design shall conform to NACE RP 169 or any other standard acceptable to Chief Controller and shall consider negative cathodic potential of not more than (-) 850 mV and not less than (-) 1200 mV between the vessel surface and the electrolyte, the potential being measured with reference standard copper/copper sulphate reference cell. A minimum polarized shift of (-) 100 milli volts shall be maintained between the native state of the vessel and cathodically protected vessel. The protected vessel shall be isolated from the unprotected structures and piping. The calculated life of the cathodic protection shall not be less than 15 years, considering coating defect of minimum 30% on vessel surface. The monitoring of the cathodic protection shall be done on a yearly basis and records maintained
5. The underground vessels installation shall be undertaken by the recognized installers and inspected and certified by an inspector at every important stage of construction, including the design and fabrication of the vessel, foundation, mound covering, cathodic protection, NDT and hydraulic testing of vessels and piping and final certification of safety under Rule 33.
6. Each storage vessel shall have at least two safety relief valves, two independent level indicating devices of which one shall be electronic with High level switch and shall indicate a remote display of the level at the fill point, suitable arrangement for water draining etc. remote operated valves (ROVs) shall be provided on all liquid and vapour lines connected to the storage vessel that is, filling, discharge, pump by pass and vapour return lines except those of safety relief valves and drain lines and instruments with trappings and those not exceeding 3 mm for liquid and 8 mm for vapour. ROVs shall be operable from LPG unloading area/sales room/control panel and the dispenser operating area. Additional isolation valves shall be provided at shortest distance from ROVs. The ROVs shall have closing time of not more than 30 seconds.
7. Excess flow check valve (EFCV) shall be provided on all the liquid lines (above 3 mm) and vapour lines (above 8 mm) except those of safety relief valves, drain lines and instruments. Closing flow rate of EFCV shall not be more than 20% of the rated flow of the line.
8. Fill point shall be provided with non-return valve and quick shut off isolation valve.
9. Proper arrangement shall be made for earthing and bonding of the road tanker.
10. Vent pipes shall have 3 M height and 6 M away from source of ignition.
11. ALDS with underground and mounded LPG storage vessels shall have two 75 Kg and two 9 Kg DCP fire extinguishers. At ALDS with above ground LPG Vessels, hydrants with minimum water pressure of 7 Kg/sq. cm. shall be provided at convenient location for all round coverage of the storage vessels and handling area, and water sprinklers with spray density of 10 lpm. The fire water shall be preferably diesel driven with capacity to deliver water at rate and pressure specified above. The minimum fire water storage at the premises shall be that needed for fighting fire at least for one hour.
12. The vessel shall be subjected to internal inspection once in 5 years, and shall include the Non Destructive Tests comprising of ultrasonic thickness measurement check evenly spread over the entire inner surface and the openings, 100% wet fluorescent magnetic particle test of all weld joints, ultrasonic flaw detection of all the T-joints, Liquid Penetrant Inspection of all the fillet welds, nozzle joints. The vessel shall be tested pneumatically at a pressure of 1.1 times the design pressure. The pressure shall be held for 30 minutes.
13. The vessels shall be subjected to hydraulic test pressure as per the design code in addition to the above nondestructive tests once in 10 years, or when subject to any repairs involving hot work.
14. The safety relief valves shall be inspected and tested under Rule 18 once in a year and the excess flow valves and the remote operated valves shall be inspected and tested once in 5 years during the period test under Rule 19.
15. The periodic testing under Rule 19 to be conducted for a multi-vessel installation shall be so conducted that both the vessels are tested simultaneously.
16. The underground vessels or aboveground vessels covered by earth mound shall
(i) have the discharge level of the safety relief valves at least 2 meters above the top surface of the vessel, but in any case not less than 3 meters from the ground level;
(ii) be fitted with the necessary piping, fittings, valves and other mounting on top of vessel in such a manner that they can be operated and maintained without disturbing the earth cover. In case of above ground vessel with earth cover (mound), liquid outlet pipe at the bottom may be allowed provided the control valve and emergency valve of this line is just outside the earth cover for the purpose of operation and maintenance from outside.
20[SCHEDULE IV
[See Rule 2(va), 21(15) and 29]
LNG Storage, Handling, Transportation, Operation, Maintenance and Dispensing
These provisions shall apply to the following, namely
(A) The requirements of the design, fabrication and installation and commissioning of LNG storage facility using cryogenic vacuum insulated containers of double wall constructed in accordance with approved pressure vessel codes and the requirements for safe vaporization, transfer and handling.
(B) The requirements of the road transportation of LNG in a cryogenic double walled vacuum insulated pressure vessel for the safe transportation and handling.
(C) Operation, Maintenance and Training.
(D) LCNG stations or Auto LNG dispensing:
Provided that the Chief Controller, may, under exceptional circumstances and for reasons recorded in writing, waive any of the requirements of this Schedule.
Section I
STORAGE INSTALLATIONS AND HANDLING
A. Installation Design:
(1)(a) For LNG cryogenic pressure vessels storage installation, the minimum safety distances between the vessel and to the nearest building or line of adjoining property shall be in accordance with the distances specified in Table (1) of this Schedule and the maximum aggregate capacity of each such LNG installation shall not exceed 1060m3.
(b) For non-pressurised LNG storage installation, the minimum safety distances specified in NFPA 59-A, may be followed.
(2) The LNG installation shall be designed to withstand the following without loss of structural or functional integrity
(a) The direct effect of wind forces;
(b) Loading due to seismic effect;
(c) Erosive action from a spill;
(d) Effect of the temperature, any thermal gradient, and any other anticipated degradation resulting from sudden or localised contact with LNG.
(3) The structural members of the impoundment system shall be designed and constructed to prevent impairment of the impoundments reliability and structural integrity as a result of the following
(a) Imposed loading from full hydrostatic head of impounded LNG;
(b) Hydro dynamic action from injected material.
(4) Impoundment or dyke areas shall be designed so that all areas drain completely to prevent water collection and drainage pumps and piping may be provided to remove water from collecting in the impoundment area provided where automatically controlled drainage pumps are used they shall be provided with cut off devices that prevent their operation when exposed to LNG temperature.
(5) Compressors, CNG Cascades, Odorizers etc. shall not be located inside the impounding area.
(6) The Ambient vaporizers and remotely heated vaporizers may be located inside impounding area.
(7) The impounding system for LNG storage vessel shall have a minimum volumetric liquid capacity of
(a) maximum liquid capacity of vessel for an impoundment serving a single vessel;
(b) 100% of maximum liquid capacity of the largest vessel serving for more than one vessel.
(8) The height of the impoundment wall shall be adequate to contain spillage of any LNG and the Dyke wall height of 0.6 meter to 1 meter is recommended from the dyke floor level and the height of the foundation of the vessel shall be minimum 0.4 meter or designed in such away to prevent exposure of carbon steel material to the spilled LNG.
(9) No other flammable liquid or storage vessel shall be located within an LNG impounding area.
(10) A clear space of at least 0.9 meters shall be provided for access to all isolation valves serving multiple vessels and the isolation valve of LNG vessel piping shall be as close to outer vessel as possible.
(11) LNG vessels, cold boxes, piping and pipe supports and other cryogenic apparatus installed within dyke shall be designed and constructed in a manner to prevent damage to these structures and equipment due to freezing or frost heaving in the soil.
(12) Adequate flameproof lighting arrangement shall be done for facilities transferring LNG during night.
(13) Electrical grounding and bonding shall be provided.
(14) Layout shall ensure unobstructed access and exit of the consumers and supply vehicles at all times.
(15) Entrance, exit and paving shall be arranged in a manner, so as to minimise the risk of collision.
(16) The operating personnel shall have an unobstructed overall view on the facilities both from the sales room and from the delivery area.
(17) The designated tanker unloading location shall be so located that it does not hinder other traffic and at the same time permits tanker to be in drive out position for allowing it to come out of the premises easily in case of an emergency.
(18) Crash or Impact barriers shall be installed to protect vulnerable equipment against accidents involving vehicle movements.
(19) The storage area which includes the pumps and the related piping shall be suitably segregated from the rest of the premises and located in a manner that it is away from the area frequented by public during their movement within the station and also from the path of vehicles entering and leaving the premises.
Table 1
Distances From Impound Wall and Property Line
| Sl. No. |
Water Capacity of the vessel (m3) |
Minimum distance from edge of impoundment or vessel drainage system to property line |
Minimum distance between storage vessels |
| 1. |
Not above 3.8 |
3 m |
0.5 m |
| 2. |
Above 3.8 but not above 7.6 |
5.0 m |
1 .0 m |
| 3. |
Above 7.6 but not above 56.8 |
8.0 m |
1.5 m |
| 4. |
Above 56.8 but not above 114.0 |
15.0 m |
1.5 m |
| 5. |
Above 114.0 but not above 265.0 |
25.0 m |
1/4 of the sum of the diameters of adjacent vessel (minimum 1.5 m) |
| 6. |
Above 265.0 but not above 379 |
vessel diameter (minimum 30.0 m) |
Table 2
Minimum Distance between vessel and Dyke Wall
| Sl. No. |
Water capacity of vessel (m3) |
Inner edge of the dyke wall and outer shell of the storage vessel or D/2 (whichever is higher) |
| 1. |
Not above 3.8 |
0.5 m |
| 2. |
Above 3.8 but not above 7.6 |
1.0 m |
| 3. |
Above 7.6 but not above 56.8 |
1.5 m |
| 4. |
Above 56.8 but not above 114.0 |
1.5 m |
| 5. |
Above 114.0 but not above 265.0 |
1/4 of the sum of the diameters of adjacent vessels (minimum 1.5 m) |
| 6. |
Above 265.0 but not above 379 |
Table 3
Minimum Distances between Equipments/Items installed outside the Dyke Wall and Outer Edge of Dyke Wall
| Sl. No. |
Equipment/Items |
Dyke wall (Outer Edge) |
| 1. |
Property Line/Fencing |
As per Table 1 of this schedule |
| 2. |
Center of Truck Unloading Platform |
Min. 4.0 m (and also min 9 m from the adjoining boundary/property). The fill point shall observe 9.0 meter safety distance to the adjoining boundary. |
| 3. |
Priority panel |
Outside dyke wall |
| 4. |
CNG Cascade (For LCNG station) |
The safety distance as per Table I A of Gas Cylinders Rules, 2016 from edge of the dyke. The cascade shall be segregated from LNG facility by providing concrete wall up to the height of the cascade. |
| 5. |
On site building/Control room/sales office |
Outside the safety distances as per Table 1 of this schedule. |
| 6. |
LNG and CNG dispensers (if LCNG station) |
Min. 6.0 m (and also min 6.0 m from centre of hard stand). |
| 7. |
Distance between Dispenser Islands |
Min. 6.0 m (and also min 6.0 m from |
(B) LNG Storage Vessel General design requirements:
(a) Foundation:
(1) LNG vessels foundations shall be designed by a qualified engineer and constructed in accordance with recognised structural engineering practices and prior to the start of design and construction of the foundation, a subsurface investigation shall be conducted by a qualified soils engineer to determine the stratigraphy and physical properties of the soils underlying the site.
(2) The design of saddles and legs for the LNG vessel shall include erection load, wind loads and thermal loads.
(3) Foundation and support shall have a fire resistance rating of not less than two hrs.
(4) LNG vessels installed in areas subject to flooding shall be secured to prevent release of LNG or floatation of the vessel in the event of a flood.
(b) Vessel Design:
(1) The vessel meant for storage of LNG including piping between inner and outer vessel shall be designed in accordance with ASME Boiler and Pressure Vessel Code Section VIII Div I/EN13458/ASME: B.31.3, process piping or equivalent code acceptable to Chief Controller.
(2) Design pressure of auto LNG storage vessel shall not exceed 20.0 Kg/cm2.
(3) The inner vessel shall be designed for the most critical combination of loading resulting from internal pressure, liquid heads and the Inner vessel supports system shall be designed for shipping, seismic, and operating loads.
(4) The outer vessel shall be equipped with a relief or other device to release internal pressure and shall have discharge area of at least 0.34 mm2/lit of the water capacity of the inner vessel but not exceeding 2000 cm2 and have pressure setting not exceeding 25 psi.
(5) Thermal barriers shall be provided to prevent outer tank from falling below its design temperature.
(6) Those parts of LNG vessels which come in contact with LNG and all materials used in contact with LNG or cold LNG vapor shall be physically and chemically compatible with LNG and intended for service at 162 C.
(7) All piping that is a part of LNG vessel including all piping internal to the vessel, within void space, and external piping connected to the vessel up to the first circumferential external joint of the piping shall be in accordance with ASME Boiler and Pressure Vessel Code, Section VIII or ASME B 31.3 or equivalent.
(8) LNG vessels shall be designed to accommodate both top and bottom filling unless other positive means are provided to prevent stratification.
(9) Any portion of the outer surface area of an LNG vessel that could accidentally be exposed to low temperatures resulting from the leakage of LNG or cold vapor from flanges, valves etc., shall be intended for such temperatures or protected from the effects of such exposure.
(10) Seismic loads shall be considered in the design of the LNG vessel support systems.
C. Fitments: (1) Each LNG double walled vessel shall have at least 2 numbers of safety relief valves capable of achieving the required relief capacity on standalone basis and shall be sized to relieve the flow capacity determined for the largest single contingency or any reasonable and probable combination of contingencies and shall include conditions resulting from operational upset, vapor displacement and flash vaporization.
(2) Relief devices shall be vented directly to the atmosphere and each safety relief valve for LNG vessel shall be able to be isolated from the vessel for maintenance or other purposes by means of a manual full opening stop valve or a flow diverter valve.
(3)Safety relief valve shall be designed and installed to prevent any accumulation of water, or other foreign matter at its end.
(4) The minimum pressure relieving capacity in kg/hr shall not be less than 3% of the full tank contents in 24 hours.
(5) All liquid connections to the LNG vessel except relief valve and instrumentation connection shall be equipped with automatic fail safe product retention valves.
(6) The automatic shut off valves shall be designed to close on occurrence of any of the following conditions, namely
(i) fire detection;
(ii) uncontrolled flow of LNG from vessel;
(iii) manually and remotely operated.
(7) Such of the automatic shutoff valves that require excessive time to operate during emergency i.e. sizes exceeding 200mm shall be pneumatically operated and also have means of manual operation.
(8) All LNG vessels shall have a device that prevents the vessel from becoming liquid full or from covering the inlet of the relief valve with liquid when the pressure in the vessel reaches the set pressure of relieving device under all conditions.
(9) Every LNG vessel may be provided with one independent high liquid level alarm which may be part of the liquid level gauging devices, however, the high liquid level flow cutoff device shall not be considered as a substitute for the alarm.
(10) Every LNG vessel shall be equipped with at least one liquid level gauging device and the devices shall be designed and installed so that they can be replaced without taking the tank out of operation and the level and pressure shall be visible to the operating personnel during unloading or loading and transfer.
(11) Each LNG vessel shall be equipped with a high liquid level flow cut off device.
(12) Each LNG vessel shall be equipped with pressure gauge connected to the vessel at a point above the maximum intended liquid level.
(13) Instrumentation for storage and vaporization facilities shall be so designed so that if a power or instrument air failure occurs, the system will proceed to a failsafe condition and maintain that condition until the operator takes appropriate action to reactivate or secure the system.
D. Equipment: (1) Pumps and compressors employed in LNG source shall be provided with a pressure relieving device on the discharge to limit the pressure to the maximum safe working pressure of the casing and downstream piping and equipment.
(2) Each pump shall be provided with adequate vent, relief valve, or both that will prevent over-pressuring the pump casing during the maximum possible rate of cool down.
(3) The discharge valve of each vaporizer and the piping components and relief valves installed upstream of each vaporizer outlet valve/spec break flange shall be designed for operation at LNG temperatures.
(4) Two inlet valves shall be provided to isolate an idle, manifolded vaporizer to prevent leakage of LNG into the vaporizer and a safe means of disposing of the LNG or gas that can accumulate between the valves shall be provided in case the vaporizers are of size having inlets more than 50 mm diameter.
(5)(i) The ambient air vaporizers shall be installed inside the containment area.
(ii) Where the heated vaporizer is located 15 meter or more from the heat source, the remote shutoff location shall be at least 15 meter from the vaporizer.
(iii) Where the heated vaporizer is located less than 15 meter from the heat source, it shall have an automatic shut off valve in the LNG liquid line located at least 3 meter from the vaporizer and shall close when either of the following occurs:
(1) Loss of line pressure (excess flow),
(2) The occurrence of a fire is detected by an instrument designed for the purpose and located to detect a fire in the covered area,
(3) Low temperature in the downstream of the vaporizer,
(4) Manual ESD trip;
(iv)(a) Any ambient vaporizer or a heated vaporizer installed within 15 meter of an LNG vessel shall be equipped with an automatic shutoff valve in the LNG liquid line;
(b) The automatic shutoff valve shall be located at least 3 meter from the ambient or heated vaporizer and shall close in either of the following situations, namely
(1) Loss of line pressure (excess flow).
(2) Abnormal temperature sensed in the immediate vicinity of the vaporizer (fire)
(3) Low temperature in the downstream of the vaporizer.
(4) Activation of Emergency Shut Down System (ESD).
(c) If the facility is attended, manual operation of the automatic shutoff valve shall be from a point at least 15 meter from the vaporizer, in addition to the requirement as specified in para (b) above.
(v) The above conditions shall be applicable for LNG vaporizers for purposes other than pressure building coils or LNG to CNG (LCNG) systems.
(6) A distance of minimum 1 meter shall be maintained between vaporizers.
(7) Vaporizers shall be designed, fabricated and inspected as per the requirements of ASME Boiler and Pressure Vessel Code, Section VIII Div. 1 or any other equivalent code acceptable to Chief Controller.
(8) The material of construction of LNG vaporizers is recommended as Austenitic Stainless Steel piping with outer Aluminium fins.
(9) Manifold vaporizers shall be provided with both inlet and discharge block valves for each set of vaporizer.
(10) Any ambient vaporizer installed within 15 meters of the LNG vessel shall be equipped with an automatic shutoff valve in the liquid line and this valve shall be located minimum at least 3 meters from the vaporizers and shall close when loss of line pressure occurs or abnormal temperature is sensed in the immediate vicinity of the vaporizer or when low temperature in the vaporizer discharge line occurs.
(11) Each set of vaporizer shall be provided with a safety relief valve(s) sized in accordance with the following requirements, namely
(a) Ambient vaporizers relief valve capacity shall allow discharge equal or greater than 150% of the rated vaporizer natural gas flow capacity without allowing the pressure to rise 10% above the vaporizer maximum allowable working pressure.
(b) Relief valves on heated vaporizers same as sub-clause (a) above, however, it shall be located such that they are not subjected to temperatures exceeding 60 C. during normal operation.
(12) Automation shall be provided to prevent the discharge of either LNG or vaporizer gas into a distribution system at the temperature either above or below the design temperature of the send out system.
(13) Vaporizers shall be provided with outlet temperature monitors.
E. Piping System: (1) All piping system and components shall be designed
(a) To accommodate the effects of thermal cycling fatigue to which the systems shall be subjected.
(b) To provide for expansion and contraction of piping and piping joints due to temperature changes.
(2) Piping material including gaskets and thread compounds shall be compatible throughout the range of temperature to which they are subjected.
(3) The valves provided in the installation shall be of extended bonnet type with packing seals in a position that prevents leakage or malfunction due to freezing.
(4) Shut-off valves shall be provided for all vessel connections except connections for liquid level alarms and connections that are blind flanged or plugged.
(5) All the piping section between the two valves where the liquid may be trapped shall have the thermal relief valve.
(6) Aluminium shall be used only downstream of a product retention valve in vaporizer service.
F. Transfer of LNG: (1) Isolation valves shall be installed so that each transfer system can be isolated at its extremities and where power-operated isolation valves are installed, an analysis shall be made to determine the closure time so that it does not produce a hydraulic shock capable of causing line or equipment failure.
(2) Adequate check valves shall be provided to prevent backflow and shall be located as close as practical to the point of connection to any system from which backflow might occur.
G. Pump and Compressor Control: In addition to a locally mounted device for shutdown of the pump or compressor drive, a readily accessible, remotely located device shall be provided at least 7.5 meters away from the equipment to shut down the pump in an emergency.
H. Tank vehicle unloading facilities: (1) The tank vehicle unloading area shall be of sufficient size to accommodate the vehicles without excessive movement or turning.
(2) Transfer piping, pumps, and compressors shall be located or protected by barriers so that they are safe from damage by vehicle movements.
(3) Isolation valves and bleed connections shall be provided at the unloading manifold for both liquid and vapour return lines so that hoses and arms can be blocked off, drained of liquid, and depressurized before disconnecting and bleeds or vents shall discharge in a safe area.
I. Emergency Shut Down System (ESD System): (1) Each LNG facility shall incorporate an ESD system that when operated isolates or shuts off sources of LNG and shuts down equipment that add or sustain an emergency if continued to operate.
(2) The ESD system shall be of a failsafe design and shall be installed, located, or protected from becoming inoperative during an emergency or failure at the normal control system.
(3) Initiation of the ESD system shall be manual, automatic, or both manual and automatic. Manual actuators shall be located in an area accessible in an emergency and at least 15 meters away from the equipment they serve, and shall be distinctly marked with their designated function.
J. Fire Protection Facilities: (1) Each LNG storage facility shall be provided with flammable gas detectors, which shall activate visual and audible alarms at the plant site and at constantly attended location, if the facility is not attended continuously.
(2) Flammable gas detection system shall activate an audible and a visual alarm at level not higher than 25% of the LEL of the gas being monitored.
(3) Fire detectors shall activate an alarm at the plant site and at a constantly attended location if the plant site is not attended continuously and if determined by an evaluation that it is necessary then fire and gas detectors shall be permitted to activate the ESD system.
(4) A fire water supply and delivery system shall be provided based on the risk analysis. However, as a minimum a fire water storage tank of 10% of LNG storage tank capacity or 5000 liter whichever is higher with pumping facilities and hose reel system away from the LNG storage facility shall be provided for dispersion of LNG vapor cloud in case of leakage or spillage.
(5) Portable or wheeled fire extinguishers of DCP and/or foam type shall be made available at strategic locations and at least 4 such extinguishers of 10 kg. capacity each shall be provided.
(6) Fire extinguishers provided in the LNG installations shall be based on high expansion foam and dry chemical powder.
K. Personal Protection: Every person operating the equipment in the LNG installation shall be equipped with the following personal protective equipment, namely
(i) Suitable goggles for protection of eyes from LNG spray,
(ii) Hand gloves suitable for cryogenic liquid handling,
(iii) Protective apron,
(iv) Safety Shoes.
Section 2
Road Transportation
(A) Design-General Requirements: The safety relief valves provided on the inner vessel of the LNG transport tank shall be sized to meet most stringent condition of simultaneous occurrence of loss of vacuum and external fire and the combined capacity of the safety valves shall be sufficient to limit the pressure in the vessel to the test pressure
(1) The transport vessel shall be designed and constructed as per the ASME Boiler and Pressure Vessel Code Section VIII Div I pressure vessel code, EN13530 or equivalent code approved by Chief Controller and also to meet the requirements of ISO 20421 and the design temperature of the vessel, piping and valves shall be such that it is suitable for requirement sustaining cold shock caused by a loading of liquid Nitrogen into the vessel during its testing and commissioning.
(2) Each vessel shall have adequate insulation that will prevent the vessel pressure from exciting the relief valve set pressure within the specified holding time when the vessel is loaded with LNG at the design condition of
(a) Specified temperature and pressure of the LNG,
(b) The exposure of the vessel to the average ambient temperature of 40 C.
(3) The outer vessel or jacket of the cryogenic vessel for transportation of LNG shall be made of no other material other than steel.
(4) No Aluminium valve or fitting external to the wetted outer vessel shall be installed on LNG transportation vessels and each transportation vessel shall consist of a suitably supported welded inner vessel enclosed within an outer shell with vacuum insulation between the two.
(B) Structural Integrity: (1) The design and construction of each vessel used for transportation of LNG shall be in accordance with ASME Boiler and Pressure Vessel Code Section VIII Div. 1, EN13530 or any other code approved by Chief Controller and the vessel design shall include calculation of stress due to design pressure, the weight of lading, the weight of structure supported by the vessel wall, and the effect of the temperature gradients resulting from lading and ambient temperature extremes.
(2) In order to account for stresses due to impact in an accident, the design calculation of the vessel shell and heads shall include the load resulting from the design pressure in combination with the dynamic pressure resulting from a longitudinal deceleration of 2g. For this loading condition, the stress value used shall not exceed 75% of the yield strength of the material of construction.
(3) The fittings and accessories mounted on the vessel shall be protected in such a way that damage caused by overturning can not impair operational integrity and this protection may take the form of cylindrical profile of the vessel, of strengthening rings, protective canopies or transverse or longitudinal members so shaped that effective protection is given.
(4) The welding of the appurtenances to the vessel wall shall be made of attachment of the mounting pad so that there shall be no adverse effect upon the loading retention integrity of the vessel.
(C) Pressure Relief Devices, Piping, Valves and Fittings: (1) Hoses shall be suitable for the service and shall be designed for a bursting pressure of at least five times working pressure.
(2) If a threaded pipe is used, the pipe and fitting shall be Schedule 80 or higher rating.
(3) Each hose coupling shall be designed for a pressure of at least 120% of the hose design pressure and there shall be no leakage when connected.
(4) Piping shall be protected from damage due to thermal expansion and contraction, jarring and vibration and slip joints shall not be used.
(5) Each valve shall be suitable for the vessel design pressure at the vessel design service temperature.
(6) All fittings shall be rated for the maximum vessel pressure and suitable for the coldest temperature to which they will be subjected in actual service.
(7) When a pressure building coil is used on the vessel, the vapor connection to that coil shall be provided with a valve or check valve as close to the vessel shell as practicable to stop flow in case of damage to the coil and the liquid connection to the coil shall also be provided with a valve.
(8) Each vessel shall be rated for its holding time, the holding time being the time as determined by testing that will elapse from loading until the pressure of the contents, under equilibrium conditions reaches the level of the lowest pressure relief valve setting.
(9) All the discharge lines of relief valves, vent valve, bleed valves etc., shall be connected to a vent stack which shall vent at a safe height.
(10) Bursting discs shall not be used on the LNG transport vessels.
(11) The outer vessel shall be protected by any accidental accumulation of pressure in the annular space by using a relief plate or plug or a bursting disc and the relief device shall function at a pressure not exceeding the internal design pressure of the outer tank, the external design pressure of the inner tank, or 25 psi whichever is less.
(D) Accident Damage Protection: (1) All valves, fittings, pressure relief devices and other accessories to the vessels, which are not isolated from the vessel by closed intervening shut off valves or check valves shall be installed within the motor vehicle framework or within a suitable collision resistant guard or housing and appropriate ventilation, shall be provided and each pressure relief device shall be protected so that in the event of the upset of the vehicle on to a hard surface, the device's opening will not be prevented and its discharge will not be restricted and the threaded end connection safety valves are preferred in stainless steel body construction.
(2) Each protective device or housing and its attachment to the vehicle structure shall be designed to withstand static loading in any direction that it may be loaded as a result of front, rear, side or side wise collision or the overturn of the vehicle and all the valves of tank shall be at rear inside on operation box (cabinet) of suitable size and does not project out of tank diameter and the thickness of cabinet shall be minimum 3mm.
(E) Rear end Protection: (1) Rear end vessel protection devices shall consist of at least one rear bumper designed to protect the transport vessel and piping in the event of a rear end collision and the rear end vessel protection device shall be designed so that it transmits the force of the collision directly to the chassis of the vehicle. The rear end vessel protection device and its attachments to the chassis shall be designed to withstand a load equal to twice the weight of the loaded cargo vessel and attachments, using a safety factor of four based on the tensile strength of the materials used with such load being applied horizontally and parallel to the major axis of the transport vessel.
(2) Every part of the loaded transport vessel and any associated valve, pipe, and enclosure or protected fitting or structure shall be at least 35.5 cm above ground level.
(F) Discharge Control Devices: (1) Each liquid filling and liquid discharge line shall be provided with a shut off valve located as close to the vessel as practicable and unless this valve is manually operable at the valve, the line shall also have a manual shut off valve.
(2) Each liquid filling and liquid discharge line shall be provided with an on vehicle remotely controlled self-closing shutoff valve.
(3) Each control valve shall be of fail-safe design and spring-based.
(4) Each remotely controlled shut off valve shall be provided with on vehicle remote means of automatic closure, both mechanical and thermal.
(5) Each remotely controlled shut off valve shall be provided with on-vehicle remote means automatic closure, both mechanical and thermal. One means may be used to close more than one remotely controlled valve and remote means of automatic closure shall be installed at the ends of the tanker farthest away from the loading or unloading connection area.
(G) Shear Section: Unless the valve is located in a rear cabinet forward of and protected by the bumper, the design and installation of each valve, damage to which could result in loss of liquid or vapor shall incorporate a shear section or breakage groove adjacent to and outboard of the valve and the shear section or breakage groove shall yield or break under strain without damage to the valve that would allow the loss of liquid or vapour.
(H) Supports and Anchoring: In case, the transport tanker vehicle is designed and constructed in such manner that the vessel is not wholly supported by the vehicle frame, the transport vessel shall be supported by external cradles or load rings and the design calculations for the supports and load bearing vessel and the support attachments shall include beam stress, shear stress, torsion stress, bending moment and acceleration stress for the loaded vehicle as a unit, using a safety factor of four based on the tensile strength of the material and static loading that uses the weight of the transport vessel and its attachments when filled to the design weight of the loading. Minimum static loadings shall be maximum of the following individually, namely
(i) Vertically downward of two (2);
(ii) Vertically upward of one and half (1.5);
(iii) Longitudinally of one and half (1.5); and
(iv) Laterally of one and half (1.5).
(I) Gauging Devices:
(a) Liquid level gauging devices: The vessel shall have one liquid level device that provides a continuous level indication ranging from full to empty and that is maintainable or replaceable without taking the vessel out of service
(b) Pressure gauges: Each vessel shall be equipped with a pressure gauge connected to the vessel at a point above the maximum liquid level that has a permanent mark indicating the maximum allowable working pressure of the tanker and the pressure gauge shall be housed in a canopy of the tanker.
Section 3
Operation, Maintenance and Training
A. Each LNG installation shall provide for written operating, maintenance and training procedures. Such procedures shall be drawn based on experience, knowledge of similar facilities.
B. Every installation shall meet the following requirements, namely
(1) Have written procedures covering operation, maintenance and training.
(2) Keep up-to-date drawings of plant equipments.
(3) Have written emergency plan as part of the operations manual.
(4) Shall be in liaison with local authorities like Police, Fire Department, Health Authorities and keep them informed about emergency plans and their role in emergency situations.
(5) Have documents wherein safety related malfunctions are identified and analyzed for the purpose of determining their causes and preventing the possibility of reoccurrence.
C. Operating Procedures Manual: Every installation shall have a written manual of emergency procedures that shall include a types of emergencies that are anticipated and shall include the following procedures, namely
(1) Start up and shut down procedure including initial start up of the LNG facility.
(2) Purging and inerting components.
(3) Cooling down components.
(4) Identify the possibility of abnormal conditions.
(5) Safety precautions requirement to be taken while repairs or maintenance in the installation is being carried out.
(6) Procedures for responding to controllable emergencies including notifying personnel and use of equipments i.e. appropriate to handling of emergency.
(7) Procedure for recognising an uncontrollable emergency and for taking action to ensure that harm to the personnel in the premises and to the public outside is limited.
(8) Procedure for immediate notification of the emergency to the local authorities.
(9) Procedure for coordinating with local authorities in the preparation of any evacuation plan which may be required to protect the public in the event of emergency.
D. Maintenance: (1) Every installation shall have a written procedure based on experience and knowledge of similar facilities and conditions under which the installation shall be maintained.
(2) The procedure shall incorporate the need to carry out periodic inspection, tests on every equipment and system in service to verify that the equipment is maintained in accordance with the equipment manufacturer's recommendations.
(3) The written manual shall set out inspection and maintenance programme for each components forming part of the installation and in addition to fixing a schedule for inspection and tests, the procedure to be followed during repairs so as to ensure safety of persons and property shall also be laid down.
E. Training: Every installation shall be provided with a training plan and the manner in which it will be implemented and maintained and the training manual shall comprise of under mentioned components
(1) Procedure of basic operation to be carried out in the installation in the normal course.
(2) Carrying out of emergency procedures that relate to duties at the installation for each concerned personnel.
(3) The characteristics and potential hazards of LNG during operation and maintenance of the facility, including dangers from frostbite that can result from contact with LNG.
(4) The methods of carrying out duties of maintaining and operating the facility as set out in the manual of operating and maintenance procedures.
(5) The LNG transfer procedure.
(6) Fire prevention, including familiarization with the fire control plan of the installation, fire fighting, the potential causes of fire in a facility, and the types, sizes and likely consequences of a fire in the installation.
(7) Recognising situations in which it is necessary to obtain assistance in order to maintain the security of the facility.
Section 4
LNG or LCNG Dispensing
This section lays down the requirements for Auto LNG dispensing station and LCNG facilities.
(A) General: (1) LNG refueling sites dispensing saturated LNG with personnel in the immediate vicinity shall provide barrier walls or equal protection in order to protect the refuelling operator and vehicle.
(2) All facility piping other than the refuelling hose to the vehicle shall be behind a barrier, which in the case of an equipment or device malfunction deflects the saturated LNG upward.
(3) LNG dispenser shall observe minimum 6 m clear safety distance from the property line.
(B) System Component Qualification: (1) Vehicle Fuelling Dispenser:
(a) The type of the dispenser used for dispensing LNG shall conform to specification and be of a type approved by the Chief Controller.
(b) The dispenser shall be protected from vehicle collision damage.
(c) An ESD shall be provided that includes a shutoff valve for stopping liquid supply and shutting down transfer equipment.
(d) An ESD actuator, distinctly marked for easy recognition with a permanently affixed, legible sign, shall be provided near the dispenser, vehicle unloading facility and in sales/control room.
(e) The maximum delivery pressure at the fuelling nozzle shall not exceed the maximum allowable working pressure of the vehicle fuel tanks.
(f)(i) Hose or arms shall be equipped with a shutoff valve at the fuel end and a breakaway device to minimise release of liquid and vapour in the event that a vehicle pulls away while the hose remain connected.
(ii) Such a device shall be installed and maintained in accordance with the OEM component manufacturer's maintenance/safety instructions.
(iii) A breakaway device shall be arranged to separate using a force not less than 102 kgf and not greater than 125 kgf where applied in any direction that the vehicle would move.
(g) The hose shall be secured to protect it from damage when not in use.
(h)(i) Where a hose or arm of nominal 76 mm diameter or larger is used for liquid transfer or where one of nominal 100 mm diameter or larger is used for vapour transfer, an emergency shutoff valve shall be installed in the piping of the transfer system within 3.1 meter from the nearest end of the hose or arm.
(ii) Where the flow is away from the hose, a check valve shall be permitted to be used as the shutoff valve.
(iii) Where either a liquid or vapour line has two or more legs, an emergency shutoff valve shall be installed either in each leg or in the feed line before the legs.
(i) The OEM manufacturer's instructions shall be posted near the dispenser.
(j) Operating instructions identifying the location and operation of emergency controls shall be posted conspicuously in the facility area.
(k) LNG fuelling facilities transferring LNG during the night shall have permanent, adequate lighting at points of transfer and operation.
(l) The transfer of LNG into vehicular onboard LNG containers shall be performed in accordance with the onboard LNG container and refuelling component OEM manufacturer's instructions.
(2) Vehicle Fuelling Connector:
(a) A fuelling connector and mating vehicle receptacle shall be used for reliable, safe, and secure transfer of LNG or gas vapour to or from the vehicle.
(b) The fuelling connector either shall be equipped with an interlock device that prevents release while the line is open or have self-closing ends that automatically close upon disconnection.
(3) Installation of Emergency Shutdown Equipment (ESD):
(a) ESD shall be provided near to the dispenser, LNG unloading facilities and sales or control room.
(b) Instrumentation for LNG fuelling facilities shall be designed so that, in the event of a power or instrumentation failure, the system goes into a fail-safe condition until the operators either reactivate or shut down the system.
(c) All ESDs shall be manually reset.
Section 5
Non-Fueling facilities in LNG or LCNG Stations
Non fuelling facilities like small convenience stores, service station, ATM, PCO, whenever provided, shall be beyond safety distance mentioned in this schedule. In addition a minimum distance of 10 meter from the LNG/LCNG dispensers shall be maintained and the accessibility to such non fuelling facilities shall not be through operational area. While providing such facilities, factors like degree of congestion in the premises, easy entry and exit of the vehicle coming for refuelling and easy manoeuvrability of LNG road tanker while moving out of the premises in the event of emergency shall also be taken into consideration.
Section 6
Boil Off Gas Management
When LNG station is being set up, the capacity of storage tank may be optimized so as to minimize the BOG venting. For effective BOG management, the operator may use the gas to avoid venting with the approval of the Chief Controller.
Section 7
Recognition of Auto LNG Installer
A. The company intending to install LCNG/Auto LNG dispensing station shall meet the following criteria for considering recognition by the Chief Controller. It shall
(i) be proprietary firm or partnership firm or private limited company or limited company;
(ii) possess adequate tools and machinery to execute installation work;
(iii) possess ISO certification;
(iv) Have sufficient in-house specialists well conversant with
(a) Installation of LCNG or Auto LNG equipments, their operations, maintenance and training of personnel;
(b) LCNG or Auto LNG regulations and the hazards associated;
(c) Codes of practice relating to setting up LCNG or Auto LNG stations;
(d) interpretation of drawing and schemes as far as relevant for the execution of the work;
(v) strength of the personnel engaged by the firm or company shall be in agreement with the number of stations proposed to be installed or maintained;
(vi) have professional administration and organisation with clear levels of responsibility;
(vii) take responsibility for the development of professional skills of its personnel;
(viii) take responsibility of operations, periodic maintenance and breakdown maintenance in the stations and enters into a legal agreement with its dealers in this respect for specific period;
B. Procedure for granting recognition of LCNG or Auto LNG installer:
(i) Any organisation intending to be recognised as LCNG or Auto LNG dispensing station installer shall submit application giving details of their company's credentials with regard to their experience in the field of installation and maintenance of LCNG or Auto LNG dispensing station to the Chief Controller.
(ii) Every application shall be accompanied by a scrutiny fee as specified in Part B of Schedule I.
(iii) The Chief Controller shall within a period of ninety days from the date of receipt of the application either
(a) prima facie after having satisfied himself with regard to competence and professional ethics, for recognition of the applicant as a LCNG/Auto LNG dispensing station installer, as the case may be, shall call the applicant along with his technical team for an interview by a team of officers nominated by Chief Controller for assessing the technical and practical knowledge and capability of the applicant;
or
(b) if the applicant does not prima facie meet the requirement for recognition shall reject the application with reasons; or
(iv)(a) if the applicant in the interview conducted under this rule is found to have adequate knowledge and capability for the recognition applied for, the Chief Controller shall grant the recognition under the rules.
(b) in case any applicant is not found suitable, the Chief Controller shall reject the application specifying the reasons.
(v) initially the recognition granted under clause (iv) shall be valid for a period of one year and subsequently, based on performance report, validity of recognition may be renewed for a further period of two years.
(vi) Chief Controller may revoke or suspend recognition granted to the installer if the installer does not fulfil the obligations as mentioned in this Schedule.
(vii) the Chief Controller may after giving an opportunity to the installer of being heard, may revoke the recognition
(a) if he has reason to believe that the installer, has violated any condition stipulated in the letter of recognition or has acted in a manner inconsistent with the intent or the purpose of these rules; or
(b) for any other reason to be recorded in writing.
Section 8
Emergency Plan
Every LCNG or Auto LNG dispensing station shall have a written emergency plan in place to control the hazards from serious auto LNG leakage or fire and this plan shall contains instructions for emergency shutdown of the station, warning to customers and other people in the surrounding, calls for assistance, usage of fire fighting equipments among others and the plan shall be tested from time to time for evaluation of its adequacy and shall be updated and modified as required.]
Form AS-1
(See Rules 50, 54 and 55)
Application for grant, amendment, transfer or renewal of a licence in Form LS-1A/LS-1B to store compressed gas/Auto LPG in vessel or vessels and dispense Auto LPG in Auto LPG Dispensing Station as automotive fuel to motor vehicles.
Documents listed in the note must be enclosed with this Application
The replies to be given in this column.
1. Name in which licence is required:*
2. Status of applicant (individual/company/partnership/Society):
3. Licensee's complete postal address with pin code
| Phone No. with STD code: Mobile No. Email: |
Fax No. |
4. Location of the premises where compressed gas in vessel(s) is to be stored:
(a) Plot/Survey/Khasra/Gat No.(s):
(b) Town/Village:
(c) Tahsil/Taluka/Mandal:
(d) Police Station:
(e) District and State:
(f) PIN Code:
5. Chemical name and nature of compressed gas proposed to be stored:**
(please state whether flammable, corrosive or toxic or other type)
6. Chemical name of compressed gas already stored in the premises:***
7. (i) Quantity of the compressed gas/Auto LPG proposed to be stored.**(strike out whichever is not applicable):
(ii) Quantity of the compressed gas/Auto LPG already stored in the premises*** (strike out whichever is not applicable):
(iii) Quantity of Petroleum already stored, if any:
8. Particulars of the licence held for the premises under SMPV(U) Rules and Petroleum Rules, if any and full name of the licensee:
I hereby declare that the statements made above have been checked up by me and are true and I undertake to abide by the terms and conditions of the licence which will be granted to me.
Date of Application
Signature & designation of the applicant.
*Where the application is made on behalf of a Company, the name and address of the Company and the name of the Manager or Agent should be given and the application should be signed by him. Every change in the name of the Manager or Agent shall be forthwith intimated to and his specimen signature filed with the licensing authority.
** Applicable for grant of licence.
*** Applicable for amendment, transfer and renewal case
Note:
Documents required to be submitted with Application
Four copies of specifications and plans approved under Rule 46 (Not required for renewal of a licence without Amendment)
Licence together with approved plans and specifications attached thereto (Not required for the First Grant of Licence).
Requisite amount of fee for the grant, renewal, transfer or amendment of licence.
A certificate of safety if required under Rule 33 together with test and inspection certificate and as built design drawing of new vessel duly endorsed by Inspector (in case of installation of new vessel or repair/modification of any vessel)
Form AS-2
(See Rules 50, 54 and 55)
Application for the grant, renewal, transfer or amendment of a licence in Form LS- 2 to transport compressed gas in a vehicle
Documents listed in note must be enclosed with this Application
The replies to be given in this column.
| 1. |
Name in which licence required and full postal address with telephone No., Mobile No. and E-mail |
|
| 2. |
Particulars of the vehicle in which compressed gas is proposed to be transported: |
|
| |
(i) Make and Model |
|
| |
(ii) Engine number |
|
| |
(iii) Chassis number |
|
| |
(iv) Registered number |
|
| |
(v) Date up to which the vehicle is registered |
|
| |
(vi) Name and full postal address of the registered owner |
|
| 3. |
Name of the compressed gas proposed to be transported (Please state whether flammable, corrosive or toxic). |
|
| 4. |
Chemical name of compressed gas to be transported in the vehicle |
|
| 5. |
Water capacity of the pressure vessel and net weight of the compressed gas proposed to be transported. |
|
| 6. |
Number and date of approval of the mounting drawing of the vehicle by the Chief Controller |
|
| 7. |
Does vehicle (described above) fully conform to the requirements laid down in the rules and the mounting drawing approved by the Chief Controller. |
|
| 8. |
Full postal address of the place where the vehicle will be normally stationed. |
|
I/We declare that the particulars given above have been checked up by me/us and are correct. I/We undertake to transport compressed gas in the vehicle particulars of which are given above, in accordance with the provisions of the Indian Explosives Act, 1884 and the Static and Mobile Pressure Vessels (Unfired) Rules, 2016 framed there under and any other law or rule for the time being in force. I/We understand that any contravention of the said Act and the rules framed there under is punishable with imprisonment for a term which may extend to two years, or with fine which may extend to three thousand rupees, or with both.
| Place: |
|
| Date: |
Signature of applicant |
Note:
Documents required to be submitted with this Application
(1) Four copies of drawing approved under Rule 35 and as-built vessel design drawing endorsed by Inspector (required only for grant or transfer or amendment with modifications in vehicle or vessel).
(2) Safety certificate required under Rule 43 along with test and inspection certificate of the vessel in original plus two photocopies (required only for grant or transfer or amendment).
(3) Original valid licence, if the vehicle was previously licensed (required only for renewal, transfer or amendment).
(4) Requisite amount of fee for the grant, renewal, transfer or amendment of licence as per Schedule 1.
(5) Copy of the registration certificate of the vehicle issued under the Motor Vehicles Act, 1988 (59 of 1988) and weighment slip in respect of mobile pressure vessels for transport of compressed gas (required only for grant or transfer of licence).
Form AS-3
[See Rules 4(5)(a) and 50]
Application for the grant of permission to import pressure vessel:
| 1. |
Name in which licence required |
| |
Applicant's calling |
| |
Applicant's full postal address |
| |
Telephone No(s) and E-mail |
| 2. |
Particulars of storage licence held by the applicant under SMPV(U) Rules, 2016 & Gas Cylinders Rules, 2016: |
| |
(i) Number and date of storage licence issued by the Chief Controller/Controller |
| |
(ii) Renewed/valid up to |
| |
(iii) Capacity of storage as per above licence |
| 3. |
Description of the pressure vessel to be imported: |
| |
(i) Number of vessel |
| |
(ii) Specification of vessel |
| |
(iii) Fabricated by |
| |
(iv) Inspected and tested by |
| |
(v) Specification of the safety valves fitted to the vessel including set pressure |
| |
(vi) Design drawing |
| |
(vii) Mounting drawing |
| |
(viii) *Filled with (True chemical name of the gas) |
| |
(ix) *Filling ratio, if filled with a liquefiable gas |
| |
(x) Date of last hydraulic test |
| 4. |
Registration number of vehicle, if applicable |
| 5. |
Name of the port |
| 6. |
Remarks |
| Date of application |
Signature of applicant |
| |
Postal address of the applicant |
Note. 1. Particulars marked with * are not required to be furnished if empty vessel is desired to be imported.
2 Two sets of design calculations, test and inspection certificates (certificate of control) complete in all respects pertaining to vessel including design drawing, duly endorsed by third party inspecting agency and mounting drawing for ISO-container, etc. shall accompany this application.
3. In case vessel is desired to be imported duly filled with gas, filler's certificates in respect of items 3(viii) and (ix) shall be furnished.
4. Copy of RC book.
Form LS-1A
(See Rules 50, 51, 54 and 55)
Licence to Store Compressed Gas in Pressure Vessel or Vessels
Licence No. Fee Rs
Licence is hereby granted to for the storage of compressed gases in the vessels as indicated below in the premises described below and shown in the plan No. .subject to the provision of the Indian Explosives Act, 1884 (4 of 1884) and the rules made there under and to the further conditions of this licence.
| Vessel No. |
Name of Gas |
State of Gas |
Water capacity in cubic meter |
Max. working pressure (kg/cm2) |
Quantity granted in Kgs (liquefied gas) |
| |
|
|
|
|
|
| |
|
|
|
|
|
The licence shall remain in force up to the 30th day of September 20
The ..20 . Chief Controller of Explosives/Controller of Explosives
Description and Location of the Licensed Premises
The licensed premises, the layout boundaries and other particulars of which are shown in the attached approved plan No. . and consists of . vessels for storage of
(a) Flammable/Corrosive/Toxic gases ..
(b) non-toxic Gases .
and situated at
(Plot number) (Name of Street) (Village or Town) (Police Station) District).
Space for Endorsement or Renewals
| The licence shall be renewable without any concession in fee for five years in the absence of contravention of the provision of the Indian Explosives Act, 1884, or the Static and Mobile Pressure Vessels (Unfired) Rules, 2016 framed there under or of the conditions of the licence. |
Date of renewal |
Date of expiry |
Signature and office stamp of the licensing authority |
| |
|
|
|
This licence is liable to be cancelled if the licensed premises are not found conforming to the description and conditions attached hereto and for contravention of any of the rules and conditions under which this licence is granted and the holder of this licence is also punishable under the Act.
Conditions
1. The licensed premises shall conform to the description of location and facilities and to the approved plan, as mentioned on the body of the licence.
2. The licensed premises shall have prominently marked thereon the number of the licence held for it.
3. The emergency telephone numbers of local fire service, police and the principal marketing company or supplier of the compressed gas, and emergency instructions shall be conspicuously displayed in the licensed premises.
4. The licensed premises shall not be used for any purpose other than the purpose for which the licence is granted.
5. The compressed gas shall be stored only in the vessels specified in the licence and shown in the approved plan attached hereto.
6. The storage vessel shall at all times maintain requisite safety distance from any other facility, building, boundary, fencing or protected works as specified in appropriate Table specified in Rule 22.
7. A suitable hard stand for parking of the vehicle during loading or unloading of any compressed gas shall be provided. The following minimum safety distances shall be provided between the centre of the hard stand and the storage vessel or boundary line of installation; as well as between the loading or unloading points and storage vessel or boundary line of installation as specified under item (ii) of sub-rule (5) of Rule 27.
8. All fitments of the vessel shall be maintained in good operating condition.
9. No alteration of the position of the vessel and no replacement of the vessel shall be effected except with the previous sanction, in writing, of the licensing authority as provided in the rules.
10. Every vessel before being repaired or exhumed shall be made free of compressed gas and thoroughly cleaned in a safe manner. When a vessel is opened for cleaning or repairs, no lamp of any description either ordinary or electric, electric cables or fans and no articles, appliances or equipment capable of igniting flammable vapours shall be brought near the vessel.
11. No person shall cause to repair or repair either by the use of fire, welding, hot riveting or brazing any vessel used for the storage of flammable gas unless it has been thoroughly cleaned and gas-freed or otherwise prepared for safely carrying out such hot work and certified in writing, by a competent person, to have been so prepared. Where the vessel has been certified as gas-free, the certificate shall be preserved by the licensee for a period of not less than three months and produced to the licensing authority on demand.
12. No person shall enter any vessel used for the storage of a toxic or corrosive gas unless he is adequately protected by means of protective clothing, gas masks and such other equipments as may be required in the specific case.
13. Compressed gas shall be filled into or removed from the vessel through designated pipes of required specification and through transfer facilities shown in the approved plan.
14. The vessel shall not be filled between the hours of sunset and sunrise, unless adequate lighting of approved type is provided and except in such manner and such other condition or conditions as are specifically endorsed on the licence by the licensing authority.
15. All operations in the licensed premises shall be carried out by persons competent in such operation. Every person managing or employed on or in connection with the licensed premises shall abstain from any act whatsoever which tends to cause fire or explosion and which is not reasonably necessary and to the best of his ability, shall prevent any other person from doing such act.
16. The licensee shall provide for each licensed premises a minimum of two portable foam type or dry chemical type fire extinguishers of 9 kg. capacity each, which shall be kept ready at convenient location for immediate use in the event of any fire in addition to other fire fighting or other mitigating facilities required for flammable or toxic gases..
17. All valves in the premises must be permanently marked in a manner clearly indicating the direction of opening and shutting the valve.
18. Free access to the licensed premises shall be given at all reasonable times to any of the officers specified in Rule 70 and every facility shall be afforded to such officer for ascertaining that the rules and the conditions of this licence are duly observed.
19. If the licensing authority calls upon the holder of a licence by a notice in writing to execute any repairs in the licensed premises which are, in the opinion of such authority, necessary for the safety of the premises, the holder of the licence shall execute the repairs within such period as may be specified in the notice.
20. Every vessel shall be outside any building and shall be supported on well designed calculations.
21. No artificial light capable of igniting flammable vapour shall at any time be present within nine meters of the vehicle and the loading or unloading points during the transfer of the compressed gas and no person engaged in such transfer shall smoke.
22. All electrically equipment such as motors switches, starters used for transfer of liquefied petroleum gas shall be of flameproof construction conforming to IS/IEC 60079-1 to 11 or of a type approved by the Chief Controller.
23. Smoking, naked lights, lamps, source of fire or any other stimulant capable of igniting flammable vapours shall not be allowed inside the premises. Every person managing or employed on or in connection with licensed premises shall abstain from any act whatsoever which tends to cause fire or explosion and which is not reasonably necessary and to the best of his ability, shall prevent any other person from doing such act.
24. Any accident, fire, explosion or untoward incident occurred within the licensed premises shall be immediately reported to the Chief Controller of Explosives, Controller, nearest police station and District Magistrate by quickest mode of communication.
Additional conditions for LNG
(i) Licensee shall
(a) provide for written procedures covering operation and maintenance of the installation and the training of personnel involved in operation and maintenance.
(b) provide for written emergency plan as part of operation manual.
(c) shall remain in liaison with local authorities like Police, Fire Department, Health Authorities to keep them informed about emergency plan.
(d) identify safety related malfunctioning of the equipment and analyze them for preventing their possible reoccurrence.
(ii) The personnel engaged in operation of the installation shall be adequately trained with respect to following
(a) Procedure for basic operation to be carried out in the installation.
(b) Carrying out emergency procedure.
(c) The methods for carrying out duties for maintaining and operating the facilities as set out in the operating and maintenance procedure.
(d) LNG transfer procedure.
(e) Fire prevention including familiarization with the fire control plan.
(f) Recognising situations in which it is necessary to obtain assistance outside to maintain safety of the facility.
(iii) The installation shall be equipped with adequate personnel protective safety equipments like gloves, goggles, apron, etc. and no person shall operate any equipment in the installation without making use of such protective equipment.
(iv) Emergency rescue vehicle shall be provided for installation more than 400 kms from the loading installations.
Form LS-1B
(See Rules 50, 51, 54 and 55)
Licence to Store and Dispense Auto LPG in Auto LPG Dispensing Station as Automotive Fuel to Motor Vehicles.
Licence is hereby granted to ..for storage of auto-LPG in the pressure vessels indicated below in the premises described below and dispensing auto-LPG of as automotive fuel to motor vehicles, subject to the provisions of the Indian Explosive Act, 1884 (4 of 1884) and the rules made there under and to the further conditions of this licence.
| Vessel No. |
Nature of installation (whether underground, mounded or aboveground |
Water capacity in cubic meter |
Quantity of auto LPG granted in Kgs |
| |
|
|
|
| |
|
|
|
The licence shall remain in force up to the 30th day of September 20 .
The .20 Chief Controller of Explosives/Controller of Explosives
Description of Location and Facilities of the Licensed Premises
The licenced premises, the layout, boundaries and other particulars of which are shown in the attached approved plan No. .dated .are situated at (address) and consists(in addition to storage vessels mentioned above) of
(i) .numbers dispensers, make
(ii) there facilities .
Space for Endorsement of Renewals
| The licence shall be renewable without any concession in fee for five years in the absence of contravention of the provisions of the Indian Explosives Act, 1884 or Static and Mobile Pressure Vessels (Unfired) Rules, 2016 framed there under, or of the condition of the licence. |
Date of Renewal |
Date of Expiry |
Signature and Office Stamp of the Licensing Authority |
This licence is liable to be cancelled if the licensed premises are not found conforming to the description and conditions attached hereto and for contravention of any of the rules and conditions of this licence and the holder of this licence is also punishable under the Act.
Conditions
1. The licensed premises shall conform to the description of location and facilities and to the approved plan, as mentioned on the body of the licence.
2. The licensed premises shall be used only for the purpose it is licensed for.
3. Every licensed premises under these rules shall have prominently marked thereon the number of the licence held for it.
4. The emergency telephone numbers of local fire service, police and the principal marketing company or supplier of the compressed gas, and emergency instructions shall be conspicuously displayed in the licensed premises.
5. Auto-LPG shall be stored only in one or more pressure vessels installed aboveground, underground or aboveground covered with earth (mound) as per provisions of these rules.
6. The storage vessel, dispenser, pumps, compressor, piping and other fittings shall be of a design suitable for auto-LPG.
7. Storage vessels shall not be installed within any building or shed.
8. A hard stand for parking the tank-truck for the purpose of unloading auto-LPG into the storage vessels shall be provided as per rules.
9. The facilities and equipments of the licensed premises shall meet the safety distance requirements as specified in Table-5 of Rule 22.
10. Auto-LPG shall be dispensed only into those containers of motor vehicles, which are approved by the Chief Controller, and have passed the periodic statutory tests under Gas Cylinders Rules, conducted by a testing station recognised by the Chief Controller.
11. The dispenser used for dispensing auto-LPG shall conform to Schedule-II and a specification approved by the Chief Controller.
12. Pump used for pumping auto-LPG shall be of either centrifugal, submersible or positive displacement type. Positive displacement pump shall be provided with bye-pass to prevent over-pressure.
13. Hazardous area classification for the dispenser shall be as under
(a) Entire space within the dispenser enclosure cabinet and forty six centimetres horizontally from the exterior of enclosure cabinet and up to an elevation of one hundred and twenty one centimetres above dispenser base and the entire pit or open space beneath the dispenser shall be zone-2.
(b) Up to forty six centimetres vertically above the surrounding ground level and horizontally beyond forty six centimetres up to six meters on all sides of the dispenser enclosure cabinet shall be zone-1.
14. All piping and fittings shall conform to Schedule-II.
15. No person shall enter or cause to repair or repair either by the use of fire, welding, hot riveting or brazing any vessel used for the storage of flammable gas unless it has been thoroughly cleaned and gas-freed or otherwise prepared for safely carrying out such hot work and certified in writing, by a competent person.
16. The operation of the licensed premises shall be under the supervision of a person having knowledge of the equipments used in the premises and trained in handling compressed gas, and other operators shall be conversant with the hazards associated with the compressed gas and fire fighting operations.
17. Auto-LPG shall not be filled into or removed from the vessel except by means of transfer facilities shown in the approved plan attached to the licence.
18. Smoking, naked lights, lamps, source of fire or any other stimulant capable of igniting flammable vapours shall not be allowed inside the premises. Every person managing or employed on or in connection with licensed premises shall abstain from any act whatsoever which tends to cause fire or explosion and which is not reasonably necessary and to the best of his ability, shall prevent any other person from doing such act.
19. The vessel shall not be filled between the hours of sunset and sunrise.
20. All electrically equipment such as motors switches, starters, etc, used for transfer of liquefied petroleum gas shall be of flameproof construction conforming to IS/IEC 60079-1 to 11 or of a type approved by Chief Controller.
21. At least two numbers of nine kilograms capacity dry chemical type fire-extinguishers shall be provided near the tank-truck unloading area and one number similar extinguisher shall be provided near each dispenser and transfer pump location. In addition, fire fighting facilities specified in Rule 26 shall be provided.
22. During the period of unloading of liquefied petroleum gas from tank-truck to the storage vessels dispensing operation to vehicles shall not be carried out.
23. The emergency telephone numbers of local fire service, police and the principal marketing company, and emergency instructions shall be conspicuously displayed in the licensed premises.
24. All valves on the vessel and pipelines in the premises must be permanently marked in a manner clearly indicating the direction of opening and closing.
25. Free access to the licensed premises shall be given at all reasonable times to any of the officers specified in Rule 70 and every facility shall be afforded to such officer for ascertaining that the rules and the conditions of this licence are duly observed.
26. If the licensing authority calls upon the holder of a licence by a notice in writing to execute any repairs in the licensed premises which are, in the opinion of such authority, necessary for the safety of the premises, the holder of the licence shall execute the repairs within such period as may be specified in the notice.
27. Any accident, fire, explosion or untoward incident occurred within the licensed premises shall be immediately reported to the Chief Controller of Explosives, Controller, nearest police station and District Magistrate by quickest mode of communication.
21[Form LS-1C
(See Rules 50, 51, 54 and 55)
Licence to Store and Dispense Auto LNG in Auto LNG Dispensing Station as Automotive Fuel to Motor Vehicles
Licence No : .. Fee Rs.
Licence is hereby granted to for storage of Auto LNG in the cryogenic pressure vessels indicated below in the premises described below and dispensing of Auto LNG/LCNG as automotive fuel to motor vehicles, subject to the provisions of the Indian Explosive Act, 1884 (4 of 1884) and the rules made there under and to the further conditions of this licence.
| Vessel No. |
Water capacity in cubic meter |
Quantity of auto-LNG granted in Kgs |
| |
|
|
The licence shall remain in force up to the 30th day of September 20
The 20Chief Controller of Explosives/Controller of Explosives
Description of Location and Facilities of the Licensed Premises
The licenced premises, the layout, boundaries and other particulars of which are shown in the attached approved plan No. ..dated ..are situated at (address) and consists (in addition to storage vessels mentioned above) of
(i) .numbers dispensers, make .
(ii) other facilities .
Space for Endorsement of Renewals
| The licence shall be renewable without any concession in fee for five years in the absence of contravention of the provisions of the Indian Explosives Act, 1884 or Static and Mobile Pressure Vessels (Unfired) Rules, 2016 framed there under, or of the condition of the licence. |
Date of Renewal |
Date of Expiry |
Signature and Office Stamp of the Licensing Authority |
This licence is liable to be cancelled if the licensed premises are not found conforming to the description and conditions attached hereto and for contravention of any of the rules and conditions of this licence and the holder of this licence is also punishable under the Act.
Conditions
1. The licensed premises shall conform to the description of location and facilities and to the approved plan, as mentioned on the body of the licence.
2. The licensed premises shall be used only for the purpose it is licensed for.
3. Every licensed premises under these rules shall have prominently marked thereon the number of the licence held for it.
4. The emergency telephone numbers of local fire service, police and the principal marketing company or supplier of the compressed gas, and emergency instructions shall be conspicuously displayed in the licensed premises.
5. Auto LNG shall be stored only in one or more pressure vessels installed aboveground, as per provisions of these rules.
6. The storage vessel, pumps, dispenser, piping and other fittings shall be of a design suitable for Auto LNG.
7. Storage vessels shall not be installed within any building or shed.
8. A hard stand for parking the tank-truck for the purpose of unloading Auto LNG into the storage vessels shall be provided as per rules.
9. The facilities and equipments of the licensed premises shall meet the safety distance requirements as specified in Schedule IV.
10. Auto LNG shall be dispensed only into those containers of motor vehicles, which are approved by the Chief Controller, and have passed the periodic statutory tests under Gas Cylinders Rules, conducted by a testing station recognised by the Chief Controller.
11. The dispenser used for dispensing Auto LNG shall conform to Schedule IV and a specification approved by the Chief Controller.
12. All piping and fittings shall conform to Schedule IV.
13. No person shall enter or cause to repair or repair either by the use of fire, welding, hot riveting or brazing any vessel used for the storage of flammable gas unless it has been thoroughly cleaned and gas-freed or otherwise prepared for safely carrying out such hot work and certified in writing, by a competent person.
14. The operation of the licensed premises shall be under the supervision of a person having knowledge of the equipments used in the premises and trained in handling compressed gas, and other operators shall be conversant with the hazards associated with the LNG, compressed gas and fire fighting operations.
15. Auto LNG shall not be filled into or removed from the vessel except by means of transfer facilities shown in the approved plan attached to the licence.
16. Smoking, naked lights, lamps, source of fire or any other stimulant capable of igniting flammable vapours shall not be allowed inside the premises and every person managing or employed on or in connection with licensed premises shall abstain from any act whatsoever which tends to cause fire or explosion and which is not reasonably necessary and to the best of his ability, shall prevent any other person from doing such act.
17. The vessel shall not be filled between the hours of sunset and sunrise without written permission from the chief controller.
18. All electrically equipment such as motors switches, starters, etc. used for transfer of LNG shall be of flameproof construction conforming to IS/IEC 60079-1 to 11 or of a type approved by Chief Controller.
19. At least two numbers of nine kilograms capacity dry chemical type fire-extinguishers shall be provided near the tank-truck unloading area and one number similar extinguisher shall be provided near each dispenser and transfer pump location. In addition, fire fighting facilities specified in Schedule IV shall be provided.
20. During the period of unloading of LNG from tank-truck to the storage vessels dispensing operation to the vehicles shall not be carried out.
21. The emergency telephone numbers of local fire service, police and the principal marketing company, and emergency instructions shall be conspicuously displayed in the licensed premises.
22. All valves on the vessel and pipelines in the premises shall be permanently marked in a manner clearly indicating the direction of opening and closing.
23. Free access to the licensed premises shall be given at all reasonable times to any of the officers specified in Rule 70 and every facility shall be afforded to such officer for ascertaining that the rules and the conditions of this licence are duly observed.
24. If the licensing authority calls upon the holder of a licence by a notice in writing to execute any repairs in the licensed premises which are, in the opinion of such authority, necessary for the safety of the premises, the holder of the licence shall execute the repairs within such period as may be specified in the notice.
25. Any accident, fire, explosion or untoward incident occurred within the licensed premises shall be immediately reported to the Chief Controller, Controller, nearest police station and District Magistrate by quickest mode of communication.]
Form LS-2
(See Rules 50, 51, 54 and 55)
Licence to Transport Compressed Gas in a Pressure Vessel by a Vehicle
Licence is hereby granted to .. to transport compressed gas by the vehicle as described below subject to the provisions of the Indian Explosives Act, 1884 (4 of 1884) and the rules made there under and to the further conditions of this licence.
This licence will remain valid up to the (one or more, maximum five years from date of grant)
| Date of Issue: |
Chief Controller of Explosives/Controller of Explosives |
Description of the Vehicle
Make and Model Engine Number
Chassis Number Registration Number
Name of the registered owner Chemical name of the compressed gas to be carried in the Vehicle Authorised carrying capacity of the vehicle .
Endorsement of Renewals
Date of Renewal Date of Expiry
Signature and office Stamp of the Licencing authority
This licence is liable to be cancelled if the licensed vehicle is not found conforming to the requirements of Chapters II and IV of the Static and Mobile Pressure Vessels (Unfired) Rules, 2016, or for the contravention of any of the said rules and conditions under which this licence is granted and the holder of this licence is also punishable under the Act.
Conditions
1. The licence or its authenticated copy shall at all times be kept in the licensed vehicle and produced on demand by an officer specified in Rule 70.
2. Only responsible persons who are conversant with the conditions of this licence shall be employed for driving the licensed vehicle or attending to it.
3. The licensed vehicle shall be constantly attended to by a responsible person and by at least two persons while it is transporting compressed gas:
Provided that the licensed vehicle may, if empty, be kept unattended in a place approved for the purpose, in writing, by the Chief Controller or Controller.
4. The licensed vehicle shall at all times carry
(a) at least two portable fire extinguishers of capacity not less than 9 litres and suitable for extinguishing chemical fires;
(b) a strong flexible cable for electrical bonding in case of vehicle used for transportation of flammable compressed gas; the cable shall be at least 5 metres long and shall have at each end a suitable clamp or clip.
5. The licensed vehicle shall not be loaded or unloaded except in a place which is approved within the premises licensed for the purpose under the rules by the Chief Controller or Controller or when the fitments including vessel becomes leaky, defective or otherwise insecure.
Provided that the licensed vehicle may be unloaded at any other place with all the precautions and under adequate supervision if such unloading is necessitated by an accident or break down.
6. No vehicle shall discharge any compressed gas directly, into any process vessel in operation.
7. The licensed vehicle shall not be loaded if any of the fitments including vessel becomes leaky, defective or otherwise insecure.
8. Before compressed gas is loaded into or unloaded from the licensed vehicle
(a) its engine shall be stopped and the battery shall be isolated by a proper switch or otherwise;
(b) its wheels shall be secured by brakes or by scotching;
(c) its chassis shall be electrically bonded by a cable with the pipe into or from which it is to be loaded or unloaded, in case of vehicle used for transportation of flammable compressed gas;
(d) the correct filling or discharge pipe connections are made at both ends;
(e) a responsible person shall be in attendance and remain so until loading or unloading is over and the vehicle has been sealed.
9. Except when called upon by traffic signals or required by the licensing authority or any other officer entrusted with the job of enforcing the rules, the licensed vehicle shall not stop on any road, congested area or a place which is not a place situated within the premises licensed under the rules for the loading and unloading of vehicle.
10. No smoking and no fire or artificial light or any article capable of igniting flammable vapour shall be allowed on the licensed vehicle used for the transportation of any flammable gas.
11. The licensed vehicle shall not be used for carrying passengers.
12. No alteration in the licensed vehicle or its safety fittings shall be carried out without previous sanction in writing of the licensing authority. Such alteration so sanctioned shall be endorsed on the licence by an amendment.
13. Free access to the licensed premises shall be given at all reasonable times to any of the officers specified in Rule 70 and every facility shall be afforded to such officer for ascertaining that the rules and the conditions of this licence are duly observed.
14. If the licensing authority calls upon the holder of a licence by a notice in writing to execute any repairs in the licensed premises which are, in the opinion of such authority, necessary for the safety of the premises, the holder of the licence shall execute the repairs within such period as may be specified in the notice.
15. Any accident, fire, explosion or untoward incident occurred within the licensed premises shall be immediately reported to the Chief Controller, Controller, nearest police station and District Magistrate by quickest mode of communication.