F. No. DIITIDA/4(31)/2019/Part-IIL(}2-'j-
Government of Tripura
Department of Industries & Commerce
Shilpa Udyog Bhawan, Khejurbagan
NOTIFICATION
WHEREAS, Section 28 of the Tripura Industries (Facilitation) Act, 2018 (Act No.5 of 2019),
empowers the State Government to make Rules to give effect to the provision of the Act and for matters
connected therewith or incidental thereto;
AND WHEREAS, according to Section 28(a) of the Tripura Industries (Facilitation) Act, 2018 (Act No.5 of
2019), draft rules under the Act were published in the Tripura Gazette on 19th November, 2019, inviting
objections and suggestions from all persons likely to be affected thereby wi thin a period of 15 days from the
date of pub I ication of the notification;
AND WHEREAS, the objections and suggestions within the specified time have been duly considered and
the draft rules have accordingly been finalized;
NOW THEREFORE, having regard to that considering all aspects, the State Government publishes the
following Rules namely "Tripura fndustries (Faci li tation) Rules, 2020".
The Tripura Industries (Facilitation) Rules, 2020
CHAPTER-I
PRELIMINARY
1. Short title, extent and commencement:
( I ) These may be called the Tripura Industries (Facilitation) Rules, 2020 and also to be known as Single
Window Approval by All Government Agencies in Tripura (SWAAGAT) Rules, 2020
(2) They shall extend to the whole of the State ofTripura.
(3) They shall come into force on and from the date of their final publication in the Tripura Gazette.
2. Application: These rules shall apply to various clearances required under various enactments for
setting-up of industrial units in the State ofTripura.
3. Definitions:
(1) In these rules unless the context otherwise requires-
(i) "Act" means The Tripura Industries (Facilitation) Act, 2018 (Act No-5 of2019);
(ii) "Combined Application Form" means the form referred to in the rule 7 of these rules;
(iii) "Form of Self-Certification" is the format referred to in the rule 10 of these rules;

F. No. DI/TIDA/4(3l)/2019/Part-I/L1’}2.’}
Government of Tripura
Department of Industries & Commerce
Shilpa Udyog Bhawan, Khejurbagan
NOTIFICATION
Agartala, the 12"“? '2620
WHEREAS, Section 28 of the Tripura Industries (Facilitation) Act, 2018 (Act No.5 of 2019),
empowers the State Government to make Rules to give effect to the provision of the Act and for matters
connected therewith or incidental thereto;
AND WHEREAS, according to Section 28(a) of the Tripura Industries (Facilitation) Act, 2018 (Act No.5 of
2019), draft rules under the Act were published in the Tripura Gazette on 19'h November, 2019, inviting
objections and suggestions from all persons likely to be affected thereby within a period of 15 days from the
date of publication of the notification;
AND WHEREAS, the objections and suggestions within the specified time have been duly considered and
the draft rules have accordingly been finalized;
NOW THEREFORE, having regard to that considering all aspects, the State Government publishes the
following Rules namely “Tripura Industries (Facilitation) Rules, 2020”.
The Tripura Industries (Facilitation) Rules, 2020
CHAPTER - I
PRELIMINARY
1. Short title, extent and commencement:
(1) These may be called the Tripura Industries (Facilitation) Rules, 2020 and also to be known as Single
Window Approval by All Government Agencies in Tripura (SWAAGAT) Rules, 2020
(2) They shall extend to the whole of the State of Tripura.
(3) They shall come into force on and from the date of their final publication in the Tripura Gazette.
2. Application: These rules shall apply to various clearances required under various enactments for
setting-up of industrial units in the State of Tripura.
3. Definitions:
(1) In these rules unless the context otherwise requires-
(i) “Act” means The Tripura Industries (Facilitation) Act, 2018 (Act No-S of 2019);
(ii) “Combined Application Form” means the form referred to in the rule 7 of these rules;
(iii) “Form of Self-Certification” is the format referred to in the rule 10 of these rules;
(iv) “SWAAGAT Application” means the “Combined Application Form” submitted by an
entrepreneur to set up industrial unit in the State for Single Window Approval by All
Government Agencies in Tripura (hereinafter called as SWAAGAT);
(v) “SWAAGAT Approval/Rejection Certificate” is a certificate issued under rule 12 of these
rules;
(vi) “Time Limit” means the number of working days within which a decision has to be taken by
the competent authority from the date of receipt of SWAAGAT application;
and
(vii) “User Charge/Fee” means the amount charged by the Government for processing SWAAGAT
Application.
(2) Words and expressions used and not defined herein but defined in the Act shall have the meaning
assigned to them in the ACT.
CHAPTER-II
FUNCTIONS OF DIFFERENT CLEARANCE COMMITTEES
4. High Level Single Window Clearance Committee:
In exercise of the powers conferred by Section 5(1) & (2) of the Tripura Industries (Facilitation) Act,
2018 (Act No.5 of 2019), the Government hereby specifies the following functions:
(1) The High Level Single Window Clearance Committee (HLSWCC) shall meet at least once
in six months or at any time at Agartala or such other place as the Chairman may specify
from time to time to transact its business.
(2) Eligible proposals received from entrepreneurs at least 21 days prior to the ensuing
HLSWCC meeting shall be placed before the Committee.
(3) The Member-Secretary shall by issuing a meeting notice, convene a meeting HLSWCC
indicating the date, time and place of the meeting. He shall enclose agenda and notes on the
projects highlighting therein the proposal in brief and assistance, support or infrastructure
facilities, which are required by the entrepreneur to the meeting notice for the transaction of
business in the said meeting. He shall send a notice of meeting at least seven days in
advance.
(4) Member-Secretary shall also send communication intimating the date, time and place of the
HLSWCC meeting to the entrepreneurs, whose proposals are included in the agenda.
(5) All the members and invitees of the HLSWCC shall attend the meeting. In case the Principal
Secretary or Secretary or the Head of Department or Chief Executive of a Government
agency is preoccupied with other important engagements or business, he shall depute the
senior most officer to attend the meeting on his behalf with full briefing of the departmental
views.
(6) The HLSWCC shall examine all the proposals placed before it and take appropriate
decisions.
(7) The Member-Secretary of the Committee shall within seven days prepare the proceedings of
the HLSWCC taking into account the departmental opinion or concurrence given by the
Departments in the meeting.
(8) After getting approval from the Chairman of HLSWCC, the Member Secretary shall circulate
the proceedings among all the members. If no comments are received within 15 days of
dispatch of proceedings it shall be presumed that the proceedings are confirmed.
(9) Within 15 days after confirmation of the proceedings of the HLSWCC, the Industries &
Commerce Department, shall take further action to issue Government Order sanctioning
infrastructural assistance and incentives and concessions if any, without any further
consultation with the concerned Departments.
Provided that in case of sectors other than Industries and Commerce, the concerned
Administrative Department of the State Government shall initiate similar action by issuing
Government Orders within fifteen days.
(10) Copies of the order shall be sent to all the field departments and entrepreneurs concerned.
(11) Within thirty days from the date of receipt of the formal Government Order by the
Department concerned, the other departments shall take action for issue of consequential
orders or notifications, as the case may be.
5. State Level Single Window Clearance Committee:
In exercise of the powers conferred by Section 8 of the Tripura Industries (Facilitation) Act, 2018 (Act
No.5 of 2019), the Government hereby specifies the following functions:
(1) The State Level Single Window Clearance Committee (SLSWCC) shall meet at least once in
four months or at any time at Agartala or such other place as the Chairman may specify from
time to time to transact its business.
(2) The Member-Secretary shall issue a meeting notice convening a meeting of the State Level
Single Window Clearance Committee indicating the date, time and place of meeting. He shall
enclose agenda to the meeting notice for transaction of business in the said meeting. He shall
send notice of meeting at least seven days in advance of the meeting. Member-Secretary shall
also send notice intimating the date, time and place of the SLSWCC meeting to the
entrepreneurs, whose proposals are included in the agenda.
(3) He shall place all the proposals received before the Committee for its consideration.
(4) The State Level Single Window Clearance Committee shall examine all the proposals placed
before it and take appropriate decisions.
(5) The Member-Secretary shall prepare proceedings and obtain the approval of the Chairman of
State Level Single Window Clearance Committee within seven days of the meeting.
(6) After the proceedings are approved, the Member-Secretary shall communicate the decision of
the Committee within a period of seven days from the date of such approval to the authorities or
departments concerned and to the entrepreneurs concerned.
6. District Level Single Window Clearance Committee:
In exercise of the powers conferred by Section 11 of the Tripura Industries (Facilitation) Act, 2018 (Act
No.5 of 2019), the Government hereby specifies the following functions:
(1) The District Level Single Window Clearance Committee (DLSWCC) shall meet at least once in
three months or at any time at District Headquarters or such other place or places as the
Chairman may specify to transact business of the Committee.
(2) The Member-Secretary shall issue a meeting notice, convening a meeting of the District Level
Single Window Clearance Committee (DLSWCC) indicating a date, time and place of the
meeting. He shall enclose agenda to the meeting notice for the transaction of the business in the
said meeting. He shall send notice of meeting at least seven days in advance.
(3) He shall place all the proposals received before the Committee for its consideration.
(4) The District Level Single Window Clearance Committee shall examine all the proposals placed
before it and take appropriate decisions.
(5) The Member-Secretary shall prepare proceedings and obtain the approval of the Chairman of
District Level Single Window Clearance Committee within seven days of the meeting.
(6) After the proceedings are approved, the Member-Secretary shall communicate the decision of
the Committee within a period of seven days of such approval to the authorities or department
concerned and to the entrepreneurs concerned.
CHAPTER-III
MISCELLANEOUS
7. Combined Application Form (CAF):-
In exercise of the powers conferred by Section 17 (1) & (2) of the said act the Government hereby
specifies the combined application forms (including online forms) :
(1) The applicant seeking clearances as required for establishment of an industrial unit shall apply
in the Combined Application Form - Establishment (including its online form) for issue of
SWAAGAT Approval Certificate in Schedule-I.
(2) The applicant seeking clearance required for operation of an industrial unit before
commencement of commercial production, shall apply in the Combined Application Form -
Operation (including online form) prescribed in Schedule-II.
(3) The Combined Application (including online form) Form duly filled in shall be submitted by
attaching the relevant enclosures, certificates, attachments, fees, etc., (either manually or online)
(4) The applicant shall furnish self-certification (including in online form) as prescribed in
Schedule-III along with the application at the time of submission of application forms.
(5) The self-certification as prescribed in Schedule-III & III-A to this rule in cases wherein the
proposed activity involves felling only of exempted trees. In cases where both felling of
exempted and non-exempted trees are involved, the provision of self-certification shall not
apply.
(6) There shall be a check list appended to the Combined Application Forms which shall be
completed and signed/certified online by the applicant and scrutinized & accepted by the
authorized representative of the nodal agency.
(7) The authorized representative of the nodal agency/concerned Department shall satisfy himself
/herself that:
(i) The application is in complete shape;
(ii) All relevant and prescribed documents have been enclosed (manual or online);
(iii) The prescribed fees receipts have been paid online or proof enclosed;
(iv) Self-Certification has been done online or furnished by the applicant;
(v) The checklist has been filled correctly (manual or online) and submitted/signed by the
applicant.
(8) The following procedure shall be followed for Processing and Monitoring of the Combined
Application Form (and its equivalent in online format):
(i) The particular of the application for which the acknowledgement is issued is to be
entered online/in the register in a prescribed format as per Schedule-IV.
(ii) The online particulars so entered/Register of applications shall be scrutinized and
approved by the Head of the Nodal Agency.
(iii) The relevant parts of the Combined application form along with enclosures shall be
sent to the competent authorities within three working days from the date of issue of
acknowledgement.
(iv) The competent authority shall process the application and communicate the decision
to the nodal agency within the prescribed time limit as mentioned in the Schedule-
VII.
(v) The competent authority may ask for additional information from the applicant, only
once within three days from receipt of the application and before the expiry of the
time limit, under intimation to the nodal agency.
(vi) The time limit will be applicable from the date the additional information has been
furnished.
(vii) The competent authorities will send their approvals within the time limit to the Nodal
Agencies, which in turn will issue a consolidated SWAAGAT approval certificate to
the applicant along with the competent authority’s approval order.
(viii) In the wake of non-receipt of competent authority’s approval within the prescribed
time limit, the nodal agency shall process to issue SWAAGAT approval certificate
for the said unit, based on the self-certification of the unit holder. For those cases
where the additional information as required by the competent authority from the
applicant is pending, the SWAAGAT approval certificate will be put on hold until the
required information is furnished in complete shape by the applicant to the competent
authority.
(ix) The District Nodal Agency and the State Nodal Agency shall communicate the
approvals and rejections in the format in Schedule-V(A)/V(B) or Schedule
VI(A)/VI(B) as the case may be.
(x) The State Nodal Agency shall ensure there are no delays at any level, either at the
District level Nodal Agency or at the State level. Cases involving delays shall be
placed before High Level Single Window Clearance Committee once in six months.
8. Time limit for issue of clearances:
In accordance of Section 18 of the said Act the State Government hereby specifies the maximum time limit
of thirty days for issue of license/clearance/NOCs/no-objections etc. (Establishment and Operation) from the
date of issue of acknowledgement (including online). The time limits of different Departments/Organization
are specified under Schedule-VII which may be modified from time to time by the State Government by
notification.
9. User Charges/Fees:
In exercise of the powers conferred by Section 17 (3) of the said Act, the applicants shall pay user charges as
processing fees in such manner and at such rate as specified in Schedule-VIII in addition to the existing
fees/charges prescribed for issuance of license/clearance/NOCs/no-objections etc. by each
Department/Organization. These charges are subject to revision by the Government from time to time. The
charges so collected shall be accrued in an account, to be maintained by the Tripura Industrial Development
Corporation (TIDC) Ltd. The fees/charges collected for issuance of license/clearance/NOCs/no-objections
etc. of respective Department/Organization will be transferred online or otherwise to corresponding
Department/Organization. The user charges collected as processing fees will be used for meeting all such
expenses which are required to implement the Act including, inter-alia, recurring expenditure like purchase
of consumables, travel cost with regard to issuance of SWAAGAT approval certificate, conducting pre-
scrutiny meetings, District and State level meetings and other incidental expenses.
10. Self-Certification:
(1) In exercise of the powers conferred by Section 19 (2) of the said act, the Government hereby
specifies the format of “Self-Certification” as per Schedule- III/IIIA for submission by the
applicants at the time of submitting the SWAAGAT application forms to the Nodal Agencies;
(2) Such Self-Certification shall be furnished on a non-judicial stamp paper or through e-stamping
which is to be executed on a Rs. 100/- stamp.
11. SWAAGAT Deemed Approval Certificate :
As per provisions of deemed approval to be provided under Section 20 of the Act, the Government
hereby specifies the format of “Deemed Approval”, which shall in the form of SWAAGAT Deemed
Approval certificate in the format as specified at Schedule-X
12. SW AAGAT Approval/Rejection Certificate:
The Approvals/Rejections granted to the entrepreneurs by the High Level Single Window Clearance
Committee, State Level Single Window Clearance Committee and District Level Single Window
Clearance Committee as referred to in Section 6, 9 and 12 of the Act shall be in the form of SWAAGAT
Approval/Rejection certificate in the format in Schedule V (A)N(B) or Schedule VI(A)Nl(B) as the
case may be.
13. Appeal:
( I) An appeal under Section 23 (1) & (2) ofthe Act shall lie.
(i) to the High Level Single Window Clearance Committee against the decision of the State
Level Single Window Clearance Committee;
(ii) to the State Level Single Window Clearance Committee against the decision of the
District Level Single Window Clearance Committee.
(2) Every appeal sha11 be made in Schedule-IX and sha11 be accompanied by a fee of Rupees five
hundred payable in Demand Draft/Online in favour of M.D., TIDC Ltd. The appeal shall be
presented either in person or by an agent duly authorized.
(3) The appellate Authority shall, after giving a reasonable opportunity of being heard to the
appellant, pass such order, as it deems fit. The orders of the Appellate Authority shall be final.
( 4) Every order passed by the Appellate Authority shall be communicated to the Appellate within
fifteen days from the date of the order.
14. Rationalization of Inspection:
Under the provisions of Section 25 of the Act, for rationalization of Inspections a Central Inspection
System would be functioning under the Single Window Online System when commenced as per the
following manner:
(i) There will be a Centralized Inspection system for conduct of compliance inspections pertaining
to the office of the Labour Commissioner, Chief Inspector of Factories and Boilers, Tripura
State Pollution Control Board, Municipal Authorities once in a year hereinafter referred to as
participating departments.
(ii) It will be an online system functioning as part of the Online SWAAGAT portal
(iii) The scheduling of inspections wi11 be done in an automated manner by the online system.
(iv) The selection of establishments for inspections will be done using computerized risk assessment
and allocation of inspectors will be done under the online system.
(v) The computerized risk assessment will be done as per the risk assessment logic of the
participating departments.
(vi) The Department of Industries & Commerce, Labour, Factories & Boiler Organization, Tripura
State Pollution Control Board (TSPCB) and Municipal authorjties shall take further necessary
action accordingly.
(vii) Same inspector wi11 not inspect the same establishment twice consecutively.
(viii)Betwee~ two i~spections of a unit by different departments, there must be a gap of 3 days for
regular mspect1on. On request and Surprise inspection will not have this mandate.
(BY ORDER OF THE GOVERNO~OF T RA)
1"3 _,..
(Kiran Gitte)
Secretary to the
Government ofTripura

12.
13.
SWAAGAT Approval/Rejection Certificate:
The Approvals/Rejections granted to the entrepreneurs by the High Level Single Window Clearance
Committee, State Level Single Window Clearance Committee and District Level Single Window
Clearance Committee as referred to in Section 6, 9 and 12 of the Act shall be in the form of SWAAGAT
Approval/Rejection certificate in the format in Schedule V (A)N(B) or Schedule VI(A)/VI(B) as the
case may be.
Appeal:
( 1) An appeal under Section 23 (1) & (2) of the Act shall lie.
(i) to the High Level Single Window Clearance Committee against the decision of the State
Level Single Window Clearance Committee;
(ii) to the State Level Single Window Clearance Committee against the decision of the
District Level Single Window Clearance Committee.
(2) Every appeal shall be made in Schedule-IX and shall be accompanied by a fee of Rupees five
hundred payable in Demand Draft/Online in favour of MD, TIDC Ltd. The appeal shall be
presented either in person or by an agent duly authorized.
(3) The appellate Authority shall, after giving a reasonable opportunity of being heard to the
appellant, pass such order, as it deems fit. The orders of the Appellate Authority shall be final.
(4) Every order passed by the Appellate Authority shall be communicated to the Appellate within
fifteen days from the date of the order.
14. Rationalization of Inspection:
Under the provisions of Section 25 of the Act, for rationalization of Inspections a Central Inspection
System would be fimctioning under the Single Window Online System when commenced as per the
following manner:
(i) There will be a Centralized Inspection system for conduct of compliance inspections pertaining
to the office of the Labour Commissioner, Chief Inspector of Factories and Boilers, Tripura
State Pollution Control Board, Municipal Authorities once in a year hereinafter referred to as
participating departments.
(ii) It will be an online system functioning as part of the Online SWAAGAT portal
(iii) The scheduling of inspections will be done in an automated manner by the online system.
(iv) The selection of establishments for inspections will be done using computerized risk assessment
and allocation of inspectors will be done under the online system.
(v) The computerized risk assessment will be done as per the risk assessment logic of the
participating departments.
(Vi) The Department of Industries & Commerce, Labour, Factories & Boiler Organization, Tripura
State Pollution Control Board (TSPCB) and Municipal authorities shall take further necessary
action accordingly.
(Vii) Same inspector will not inspect the same establishment twice consecutively.
(viii)Between two inspections of a unit by different departments, there must be a gap of 3 days for
regular inspection. On request and Surprise inspection will not have this mandate.
(BY ORDER OF THE GOVERNOR OF TRI RA)
1 “'3 ,,
(Kiran Gitte)
Secretary to the
Government of Tripura
Schedule-I
(see Rule 7)
Combined Application Form
(Establishment)
Company Details
Company Name ___________ _
Company I Correspondence Address
District
Address
Pin No
GP/ Ward/ VC
Habitation/ Area/ Building
Police Station ____________ _
Authorized Representative (Online User Details)
Name
Aadhaar No _____________ _
e-mail ______________ _
Phone
Factory
Constitution of the unit
Sub-division
Land Type
Post Office
Designation
Mobile _______________ _
Alternate No _____________ _
Proposal for
Name of the Occupier _____________________________ _
Address of Occupier
Nature and amount of power to be used
Installed Proposed to be installed ________ _
Reference number and date of approval of the plans of the site
Number Date
Reference number and date of approval of the arrangements, if any, made for disposal of trade
waste and effluents and name of the authority granting the approval
Number Date
License required for how many years

Company Details
Company Name Constitution of the unit
Company / Correspondence Address
District Sub-division
Address
Pin No Land Type
GP/ Ward/ VC Post Office
Habitation/Area/ Building
Police Station
Authorized Representative (Online User Details)
Name Designation
Aadhaar No Mobile
e-mail Alternate No
Phone Proposal for
Proposed Date of Commissioning
Factory
Name of the Occupier
Address of Occupier
Nature and amount of power to be used
Installed Proposed to be installed
Reference number and date of approval of the plans of the site
Number Date
Reference number and date of approval of the arrangements, if any, made for disposal of trade
waste and effluents and name of the authority granting the approval
Number Date
License required for how many years
Industry Unit Details
Unit Address
Post Office
Fax ----------------------------------
Website ____________________________ _
Unit Location
District ______________________________ _
Industrial Estate Panchayat
Estate Name _______ _ Subdivision
Plot No _________ _ Block
Pin No
Police Station __________________________ _
Contact No
Email
Land Type _____________ _
Municipality/ULB
Municipality/ULB
Ward
Gram Panchayat
Planning Area
Land Record Details
Revenue Circle ________________________ _
Revenue Mouza ______________________ _
Plot No :C.S(Sabek) ----------
Classification of Land
Construction Details
Load Bearing Building (Sq.Mtr)
Others Construction
Boundary Wall (Mtr)
Proposal For D New D Existing
Investment Details
Type Amount (In lakhs)
Value of Land as per sale Deed
Value of Building
Value of Plant & Machinery or
Service Equipment
Total Project Cost ------------
(excluding capital investment on pollution control)
Tehsil ----------------------------------
Khatian No (New)
Plot No :R.S
Land Area
RCC Building (Sq. Mtr)
Sanitary Latrine Count
Power Supply Agency at __________ _
the Factory Premises
Employment Details
Type Count
Worker- Men
Worker - Women
Management Staff
Others
Category Industry D Micro/Tiny D Small Total Employment ___ _ D All Family Member
D Medium 0 Large Working Session ------------

Industry Unit Details
Unit Address
Pin No
Post Office Police Station
Fax Contact No
Website Email
Unit Location
District Land Type
Industrial Estate
Estate Name
Plot No
Panchayat
Subdivision
Block
Municipality/ULB
Municipality/ULB
Ward
Planning Area
Gram Panchayat
Land Record Details
Revenue Circle
Revenue Mouza
Plot No :C.S(Sabek)
Classification of Land
Construction Details
Load Bearing Building (Sthr)
Others Construction
Boundary Wall (Mtr)
Proposal For New
Investment Details
Existing
Tehsil
Khatian No (New)
Plot No :R.S
Land Area
RCC Building (Sq. Mtr)
Sanitary Latrine Count
Power Supply Agency at
the Factory Premises
Employment Details
Type
Amount (In lakhs)
Type
Count
Value oi Land as per sale Deed
Worker - Men
Value oi Building
Worker - Women
Value oi Plant & Machinery or
Service Equipment
Management Staff
Total Project Cost
Others
(excluding capital investment on pollutlun control)
Category Industry Microf'i
Medium
ny Small
Large
Total Employment
Working Session
All Family Member
Unit Address
Pin No
Unit Location
Unit Location
Police Station
Land Detials --------------------------------
Industrial Estate D
District _______ _ Estate Name _______ _ Plot No _______ _
Panchayat D
District _______ _ Subdivision Block
Gram Panchayat _______ _
Municipality D
District _______ _ Municipality/ULB Ward
Land Area __________ _ Built up Area (Including Parking Cellars) ______ _
Principal Employer I Owner Details
Name
Father's Name
Residential Address
P.S
Management
Pin
Mobile No -------------- Alternate Mobile No
Tel FAX
AadhaarNo Designation
Email Date of Birth
Photo

Unit Address
Unit Location
Pin No
Unit Location
Land Detials
Police Station
Industrial Estate
District
Panchayat
District
Gram Panchayat
Municipality
District
Land Area
Estate Name Plot No
Subdivision Block
Municipality/ULB Ward
Built up Area (Including Parking Cellars)
Management
Principal Employer / Owner Details
Name
Father‘s Name Photo
Residential Address
PS Pin
Mobile No Alternate Mobile No
Tel FAX
Aadhaar No Designation
Email Date of Birth
Social Status Website
Women Entrepreneur D Yes D No Differently Abled D Yes D No
Minority D Yes D No
Manager Details
Name
Father's Name
Mobile
Photo
Residential Address
P.S Pin
AadhaarNo __________________________ ___ Date of Birth
Please Submit Hardcopy of followings (If any)
Signature Authorization document of Owner & Manager D Yes D No
Signature of Occupier of Factory DYes D No
Signature of Manager of Factory D Yes D No
Management
Partner Details I Shareholders I President I Secretary
Sl.
Name Father's Age Sex
Social
Profession
Address
008 Mobile Date of
No. Name Status Permanent No Joining
Board of Directors
Sl. No. Name Permanent Address Mobile No

Social Status
Women Entrepreneur Yes
Manager Details
Name
No
Website
Differently Abled
Minority
Yes
No
Yes
No
Father’s Name
Mobile
Residential Address
P. S
Aadhaar No
Please Submit Hardcopy of followings ( If any )
Signature Authorization document of Owner & Manager
Signature of Occupier of Factory
Yes
No
Signature of Manager of Factory
Yes
No
Pin
Date of Birth
Yes N o
Photo
Management
Partner Details / Shareholders / President I Secretary
SI. Name Father's
No. Name Age
Sex
Social
Status
Profession
Address
Permanent
DOB
Mobile
No
Date 0!
Joining
Boa rd of Directors
Sl. No. Name
Permanent Address
Mobile No
Chief Administrative Head
51. No. Name Permanent Address Mobile No
Line of Activity
List of Raw Materials to be Used
51. No. Name of Raw Material Quanity/Month Unit
Major Raw Material Used -------- D Bamboo D Rubber D Agri & Horticultural produce
D Natural Gas D None of the Above
List of Product & By-products/Finished Products
51. No. Name of Product
Production
Capacity/Month
Avg Production Unit
Month
ATTACHMENTS
General
Self Certification Form
Company Related Attachments
PAN AADHAAR

Chief Administrative Head
Sl. No. Name Permanent Address Mobile No
Line of Activity
List of Raw Materials to be Used
Sl. No. Name of Raw Material QuanityIMonth Unit
Major Raw Material Used — Bamboo Rubber Agri 8. Horticultural produce
Natural Gas None of the Above
List of Product 8. By-productsIFinished Products
5|. No. Name or Product c:pr::i:’$rin:"nm Ava :nrgrdtlaction um
ATTAC H MENTS
General
Self Certification Form
Company Related Attachments
PAN AADHAAR
Udyog Aadhaar GST
Unit Related Attachments
Land Registration Deed ------------------------------
Combined building plan including all floor plans
and combined site plan
Sl. No. File Name
Partnership details (or) Articles of Association (AOA)
Process Flow Chart (Diagram I write-up)
Detail Project Report (DPR)
Bank Details
Name of the Bank---------------------------------
Branch Name --------------- Account Type
Account Holder Name Account Number ------------
IFSC Code

Udyog Aadhaar GST
Unit Related Attachments
Land Registration Deed
Combined building plan including all floor plans
and combined site plan
Sl. No. File Name
Partnership details (or) Articles of Association (AOA)
Process Flow Chart (Diagram / write-up)
Detail Project Report (DPR)
Bank Details
Name of the Bank
Branch Name Account Type
Account Holder Name Account Number
IFSC Code
Common Application Form - Establishment
(Questionnaires}
Factories & Boilers
Enter Manufacturing process
Category of factory
Working Pressure of Boiler in kg/sq. em
Input Heating Surface Area in sq. meter
Capacity < 25 Litre
Do you require steam pipeline erection permission
Length of the pipeline (in Meter)
Do you require IBR Welder Certificate?
Labour
Does your establishment employ 05 or more contract
labour as defined in the Contract Labour (Regulation
and Abolition) Act, 1970?
Does your establishment employ 05 or more Inter-State
migrant workmen as defined in the Inter-state Migrant
Workmen Act, 1979?
Does your establishment fall under the definition of establishment
as per Building and Other Construction Worker
(RE&COS) Act, 1996?
Is the unit involved in Beedi & Cigar manufacturing?
Machinery Type D Power Driven D Non-Power Driven
Is the industry based on plantation?
Area of Plantation (in Ha)
Power
Would you like to apply for power connectivity?
Type of connection required D LT D HT D EHT
Drug Control
Is this unit related to pharmacy unit?
No of Workers
No of Workers
No of Workers
No of Workers
DYes D No
DYes D No
DYes D No
DYes D No
DYes D No
DYes D No
D Yes D No
DYes D No
D Yes D No
DYes 0 No
Page 1/2

Common Application Form - Establishment
(Questionnaires)
Factories & Boilers
Enter Manufacturing process
Category of factory
Working Pressure of Boiler in kg/sq. cm
Input Heating Surface Area in sq. meter
Capacity < 25 Litre Yes No
Do you require steam pipeline erection permission Yes No
Length of the pipeline (in Meter)
Do you require IBR Welder Certificate? Yes No
Labour
Does your establishment employ 05 or more contract Yes No
labour as defined in the Contract Labour (Regulation
and Abolition) Act,1970? No of Workers
Does your establishment employ 05 or more Inter-State Yes No
migrant workmen as defined in the Inter-state Migrant
Workmen Act,1979? No of Workers
Does your establishment fall under the definition of establishment Yes No
as per Building and Other Construction Worker
(RE&COS) Act, 1996? No of Workers
Is the unit involved in Beedi & Cigar manufacturing? Yes No
Machinery Type Power Driven Non-Power Driven No of Workers
Is the industry based on plantation? Yes No
Area of Plantation (in -la)
Power
Would you like to app y for power connectivity? Yes No
Type of connection required LT HT EHT
Drug Control
Is this unit related to pharmacy unit? Yes No
Page 1/2
PWD-DWS
Does the unit require Raw and Drinking water? DYes DNo
Profession Tax
Do you want to apply for a Certificate of Enrolment I Revision of Certificate of Enrolment D Yes D No
under the Tripura Professions, Trades, Callings, and Employment Taxation Act, 1997?
Do you want to apply for a Certificate of Registration I Amendment of Certificate of D Yes D No
Registration under the Tripura Professions, Trades, Callings and
Employment Taxation Act, 1997?
Excise
Is any bottling of alcohol process involved? DYes DNo
Is the unit distillery related? DYes D No
Forest
Is there any need to Fell trees in Proposed Site? DYes D No
Number of trees to be felled (Girth of tree> 30 centimeters) -----------------
Is Carrying Forest produce involved?
Pollution
Do you require Environmental Clearance (EC)?
Category of Industries
Pollution Category D Red D Green D Orange
Legal Metrology
Does the unit intend to manufacture weights, measures, weighing & measuring
instruments?
Electrical Inspectorate
Number of floors of the factory building
Number of shed except multistoried buildings
DYes DNo
DYes D No
DYes DNo
Page 2/2

PWD - DWS
Does the unit require Raw and Drinking water?
Profession Tax
Employment Taxation Act, 1997?
Excise
ls any bottling of alcohol process involved?
Is the unit distillery related?
Forest
Is there any need to Fell trees in Proposed Site?
ls Carrying Forest produce involved?
Pollution
Do you require Environmental Clearance (EC)?
Category of Industries
POIIUtiOH Category Red Green Orange
Legal Metrology
Yes No
Do you want to apply for a Certificate of Enrolment/ Revision of Certificate of Enrolment Yes No
under the Tripura Professions, Trades, Callings, and Employment Taxation Act, 1997?
Do you want to apply for a Certificate of Registration (Amendment of Certificate of Yes No
Registration under the Tripura Professions, Trades, Callings and
Yes No
Yes No
Yes No
Number of trees to be felled (Girth of tree > 30 centimeters) —
Yes No
Yes No
Does the unit intend to manufacture weights, measures, weighing & measuring Yes No
instruments?
Electrical Inspectorate
Number of floors of the factory building
Number of shed except multistoried buildings
Page 2/2
Factory
Name of the Occupier ------------------------------
Address of Occupier
Nature and amount of power to be used
Installed Proposed to be installed
Reference number and date of approval of the plans of the site
Number Date
Reference number and date of approval of the arrangements, if any, made for disposal of trade
waste and effluents and name of the authority granting the approval
Number Date
License required for how many years
Boiler
Boiler Erection Agency I Personnel
Sl. No. Name Mobile No Certificate
IBR Welder Details
Sl. No. Name Mobile No Certificate
BOM of Component ______ _ Certificate of Component ____________ _

Factory
Name of the Occupier
Address of Occupier
Nature and amount of power to be used
Installed Proposed to be installed
Reference number and date of approval of the plans of the site
Number Date
Reference number and date of approval of the arrangements, if any, made for disposal of trade
waste and effluents and name of the authority granting the approval
Number Date
License required for how many years
Boiler
Boiler Erection Agency I Personnel
Sl. No. Name Mobile No Certificate
IBR Welder Details
Sl. No. Name Mobile No Certificate
BOM of Component Certificate of Component
Directorate of Fire Service
Height of the building (in mtrs) -------
Internal staircase count
Width of staircase (in mtrs)
Exit Details
Sl. No Width of Exit (in mtrs)
Open space around the building (in mtrs)
East West -------
Details of Fire Fighting System
Fire Detection System (Automatic)
Sprinklers
Wet Raiser ---------------
C02 Extinguisher -------------
Automatic Fire Suppression System
Fire service inlet: One -4 way ---------
Underground static water tank
capacity (in ltrs)
Fire pumps- Electrical (15 mtrs --------
to 30 mtrs. height)
Height of each floor (in mtrs)
External staircase count
North ------- South-------
Fire Alarm System
DownComer ------------
Foam Extinguisher ----------
DCP Extinguisher
Water Mist Extinguisher
No of yard hydrants----------
Terrace tank capacity (in ltrs) ------
Fire pumps - Diesel
Fire pumps - Electrical (30 mtrsto --------------------------
45 mtrs. height)
Transformer protection measures
Water Mist Trolley mounted -50 ltr. Capacity ----------------------
Fencing
Lightening protection ----------
Other
Soak Pit ----------------
Control Room ------------
Whether the Hydraulic Platform and Fire Tender can be moved all around the building DYes 0 No
Name of nearest Fire Station Distance from Fire Station (in KM)
Is the industry of hazardous nature ... ..... ........ ..... ..... .. .................. ............. ..... ........ ..... ..... .. D Yes D No
Hazardous materials used and stored -------------------------

Directorate of Fire Service
Height of the building (in mtrs)
Internal staircase count
Height of each floor (in mtrs)
External staircase count
Width of staircase (in mtrs)
Exit Details
Sl. No Width of Exit (in mtrs)
Open space around the building (in mtrs)
East West
North South
Details of Fire Fighting System
Fire Detection System (Automatic)
Sprinklers —
Wet Raiser—
C02 Extinguisher —
Automatic Fire Suppression System
Fire service inlet: One -4 way
Underground static water tank
capacity (in |trs)
Fire pumps - Electrical (15 mtrs
to 30 mtrs. height)
Fire pumps - Electrical (30 mtrs to
Fire Alarm System
Down Comer
Foam Extinguisher
DCP Extinguisher
Water Mist Extinguisher
No of yard hydrants
Terrace tank capacity (in |trs)
Fire pumps - Diesel
45 mtrs. height)
Transformer protection measures
Water Mist Trolley mounted -50 |tr. Capacity
Fencing —
Lightening protection
Other
Soak Pit —
Control Room —
Whether the Hydraulic Platform and Fire Tender can be moved all around the building Yes
Name of nearest Fire Station
Is the industry of hazardous nature
Hazardous materials used and stored
Distance from Fire Station (in KM)
Yes
No
No
Drug Control
Apply For _________ _ Names of drugs
Details of technical staff employed
Name Qualification Registration No Experi~nce
Registered
Pharmacist
Apply For ---------- Names of drugs
Details of technical staff employed
Name Qualification Registration No Experience
Registered
Pharmacist
Apply For _________ _ Names of drugs
Details of technical staff employed
Name Qualification Registration No Experience
Registered
Pharmacist

Apply For
Details of technical staff employed
Drug Control
Names of drugs
. . . . a . Registered
Name Qualification Reglstfa'm" N0 Experience pharmacist
Apply For Names of drugs
Details of technical staff employed
. . . . . . Registered
Name QUalmcatIon Registration N“ Experience Pharmacist
Apply For Names of drugs
Details of technical staff employed
Name Qualification Registration No Experience Registered
Pharmacist
Labour - Contract Labour
Manager Details
Name ____________________________ ___ Address
Pin Nature of work carried out on the establishment
Details of Contractors and Contract Labour
Name of Type of LIN/PAN Nature of
Maximum
Contract
Sl. No. Address Email Mobile number of
Contractor Contractor Number Work
labour
Valid Till
Total Count of Labour
Contract Labour ISM Worker
Forest
Tree Details in the Proposed Land
Estimated Height
GBH Girth Estimated Volume No of Poles Estimated Species
of Tree
at Breadth of Timber (in CUM) or Branches Firewood/Rootwood/Faggot Height
Boundary Description
North _____ _ South ______ _ East West _____ _

Labour - Contract Labour
Manager Details
Name Address
3in Nature of work carried out on the establishment
Details of Contractors and Contract Labour
Maximum
Name of Type or LIN/FAN Nature of Contract
Sl. N°' Contractor Contractor Number Adda“ Ema" Mobile Work WEE-'0' Valid Till
Total Count of Labour
Contract Labour ISM Worker
Forest
Tree Details in the Proposed Land
. . GBH Girtli t -
Estimated Mei tit Estimated Volume No of Poles Estimated
Species a, Tree 9 3' 5:3? of Timber (in cum 0,. Bunches FirewoodIRootwooleaggot
Boundary Description
North South East West
Legal Metrology
Type of primises ____________ _ Date of establishment of workshop/factory _______ _
Nature of manufacturing activities at present
The types of weights & measures proposed to be manufactured
Type Details
Weights
Measures
Weighing Instrument
Measuring Instrument
The number of persons employed/proposed to be employed
Type Count
Skilled
Semi Skilled
Unskilled
Specialist trained in the line
The monogram or trade mark intended to be imprinted on weights and measures to be manufactured
Details of machinery/tools accessories,owned and
used for manufacturing
Details of foundry/workshop facilities arranged
Facilities of steel casting and hardness testing
of vital parts or other means
Wheather the item(s) proposed to be manufactured will be sold in the state or
outside state or both?
Details of model approval from Government of India
When can you produce for inspection samples of your product for which
licence is desired
D In State D Outside State

Legal Metrology
Type of primises — Date of establishment of workshop/factory
Nature of manufacturing activities at present
The types of weights & measures proposed to be manufactured
Type
Details
Weights
Measures
Weighing Instrument
Measuring Instrument
The number of persons employed/proposed to be employed
Type
Count
Skilled
Semi Skilled
Unskilled
Specialist trained in the line
The monogram or trade mark intended to be imprinted on weights and measures to be manufactured
Details of machinery/tools accessoriespwned and
used for manufacturing
Details of foundry/workshop facilities arranged
Facilities of steel casting and hardness testing
of vital parts or other means
Wheather the item(s) proposed to be manufactured will be sold in the state or
outside state or both?
In State
Outside State
Details of model approval from Government of India
When can you produce for inspection samples of your product for which
licence is desired
Power- LT
District -------
Electrical Sub-Division
Electrical Circle ------- Electrical Division -------
Purpose of Supply
Category of Supply ----------
Total Load applied for (in kW)
Type of Supply ------- From Date ------ To Date
Please indicate whether you want to carry out the works of laying service line and/or
dedicated distribution facility for the electricity supply requisitioned.
Please indicate whether you want to install your own CEA approved meter
Any electricity dues outstanding in license's area of operation in consumer's name
Any electricity dues outstanding for the premises for which connection has been
applied for
Any electricity dues oustanding with the licensee against any firm with which the
consumer is associated as an Owner, Partner, Director, or Managing Director
Requirement of Raw Water
(gallon/day)
Does this unit have a Water Storage?
Type of Storage D Underground
Water
D Over Head
Requirement of Drinking Water
(gallon/day)
DYes D No
DYes D No
DYes D No
DYes D No
DYes D No
DYes D No

Power - LT
District — Electrical Circle — Electrical Division
Electrical Sub-Division — Category of Supply
Purpose of Supply — Total Load applied for (in kW)
Type of Supply — From Date — To Date
Please indicate whether you want to carry out the works of laying service line and/or Yes No
dedicated distribution facility for the electricity supply requisitioned.
Please indicate whether you want to install your own CEA approved meter Yes No
Any electricity dues outstanding in license's area of operation in consumer's name Yes No
Any electricity dues outstanding for the premises for which connection has been Yes No
applied for
Any electricity dues oustanding with the licensee against any firm with which the Yes No
consumer is associated as an Owner, Partner, Director, or Managing Director
Water
Requirement of Raw Water Requirement of Drinking Water
(gallon/day) (gallon/day)
Does this unit have a Water Storage? Yes No
Type of Storage 1 Underground 1 Over Head
Power - HT and EHT
District ------- Electrical Circle ------- Electrical Division -------
Electrical Sub-Division Voltage at which supply is required
(11kv, 33, 66, 110, 132,220 KV)
Type of Supply ------- From Date To Date
Basis for projection of Contract Demand -
Diversity factor assumed
Total Contract Demand applied for (in kW/kVA)
Phasing of Contract Demand required? DYes D No
Contract Demand Details
Contract Demand
(in kVA)
Purpose of Installation----------
Production Capacity
Remarks
Tentative Date of
Requirement
Category of tariff opted for ---------
Category of Industry
Name of the Institution developing industrial premises -------------------
Possession Letter or No-Objection Certificate
Issued by Institution
Number
Whether supply is needed through an independent feeder?
Whether the above unit ever operated at some other place or applied for
connection
If Yes
Date
DYes
DYes
D No
D No
Sanctioned Load ---------- Service Connection No-----------
Arrears of payment----------
If electricity connection for the premises was requested in the past?
If Yes
D Yes D No
Name of the Unit -------------------------------
Service Connection No-------- Arrears of payment
Status of land acquisition ----------------------------
Expected date by which finance will be available
Any electricity dues outstanding in license's area of operation in consumer's name
Any electricity dues outstanding for the premises for which connection has been
applied for
Any electricity dues oustanding with the licensee against any firm with which the
consumer is associated as an Owner, Partner, Director, or Managing Director
D Yes D No
DYes D No
DYes D No

Power - HT and EHT
District — Electrical Circle — Electrical Division
Electrical Sub-Division — Voltage at which supply is required
(11kv, 33. 56. 110, 132, 220 KV)
Type of Supply — From Date — To Date
Basis for projection of Contract Demand -
Diversity factor assumed
Total Contract Demand applied for (in kW/kVA)
3hasing of Contract Demand required? Yes No
Contract Demand Details
Contract Demand Tentative Data of
(in WA) Remarks Requirement
Purpose of Installation — Category of tariff opted for
2roduction Capacity — Category of Industry
Name of the Institution developing industrial premises
Possession Letter or No-Objection Certificate
ssued by Institution
Number — Date
Whether supply is needed through an independent feeder? Yes No
Whether the above unit ever operated at some other place or applied for Yes No
connection
If Yes
Sanctioned Load — Service Connection No
Arrears of payment
If electricity connection for the premises was requested in the past? Yes No
if Yes
Name of the Unit
Service Connection No — Arrears of payment
Status of land acquisition
Expected date by which finance will be available
Any electricity dues outstanding in license's area of operation in consumer's name Yes No
Any electricity dues outstanding for the premises for which connection has been Yes No
applied for
Any electricity dues oustanding with the licensee against any firm with which the Yes No
consumer is associated as an Owner, Partner, Director, or Managing Director
Forest Department
4 Timber selling Depot. if annexed Yes/No
Extent
Survey No
Village
Taluk
5 Nature of ownership ('..J' the right column)
Proprietary Proprietary
Pvt. Company Co-op.Society
Private-public partnership 'Lease'
Public Sector undertaking Others
* (Copies of documents to be attached)
6 Type of unit ('..J' the right column)
Cottage Industry SSI Unit
Medium Scale Industrial unit Large Scale Industrial unit
7 Nature of activity ('..J' the right column)
(a) Primary processing of logs: ie, processing of round logs
Sawing Splint & match box
Veneering/Peeling Others
(b) Secondary Processing of wood (without using round logs)
Carpentry Pressing, drying, etc.
Others

Forest Department
4 Timber selling Depot. if annexed Yes/No
Extent
Survey No
Village
Taluk
5 Nature of ownership (“1 ’ the right column)
Proprietary Proprietary
Pvt Company CoropBuciety
PrivateApublic pannershlp 'Lease'
Publlc Sector undertakmg Others
‘ (Copies of documents to be attached)
6 Type of unit ("I' the right column)
Cottage Industry SSl Unit
Medium Scale Industrial unit Large Scale Industnal unlt
7 Nature of activity (‘V ’ the right column)
(a) Primary processing of logs: ie, processing of round logs
Sawing Splint a. match box
Veneerlng/Peellng Others
(b) Secondary Processing of wood (without using round logs)
Carpentry Pressing. drylng‘ etc.
Others
8 Raw materials used ('--J · the right column)
Rubber wood only Wood from outside Forests.
Wood imported from other countries. Sawn timber/Materials
from other units
Rubber & Other wood
9 Product ('--J ' the right column)
Scant I i ngs/Pian ks Packing case
Veneer/Plywood Splints & Match Box
Furniture
Others
(Specify the Product)
Blockboard
10 a. Whether the applicant is involved in any forest offence Yes/No
b. If Yes, case number
11
Distance from the Reserve Forest boundary to the location of the unit. If much more than 5 km, then
approximate distance is sufficient
Aerial: ....................................... KM Shortest distance by Road ................ .. ......... KM
12 a. Whether the unit is presently functioning or not Yes/No
b. Whether possessing more than one factory/mill/unit in same circle Yes/No
13 If yes
a. Year of starting and
(a)
b. If licensed, No.& Date of licence and
(b)
licensing Authority
* (Copies of documents to be attached)

8 Raw materials used (’11 ' the right column)
Rubberwocd only Wood from outside Forests
Wood imported from other countries. Saw“ “mber/Ma‘ermls
from other units
Rubber & Other wood
9 Product ('11 ' the right column)
Scanllings/Planks Packing case
Veneer/Plywood Splints & Match Box
Fumilure
Others
(Specify the Product)
Blackboard
10 a. Whether the applicant is involved in any forest offence Yes/No
b. If Yes, case number
11 Distance from the Reserve Forest boundary to the location of the unit. If much more than 5 km, then
approximate distance is sufficient
Aerial: .. KM Shortest distance by Road
12 a. Whether the unit is presently functioning or not Yes/No
b. Whether possessing more than one factory/mill/unit in same circle Yes/No
13 If yes
8 Year of stanmg and
(8)
b. if licensed‘ No.& Date of licence and
licensing Authority
(bl
* (Copies of documents to be attached)
14 Details of machinery (specifically machines that convert round logs like saw,peeling machine, or others
Installed
a. Type of machines b. Number c. Capacity in M3 Remarks (machinery details)
(annual)
Existed before Existed after Proposed
30-1 0-2002 30-10-2002 machineries
Band Saw ............. .... HP
Re-saw .............. ..... HP
Peeling Machine ........ ..... HP
Splint making machine .... .. .. HP
Circular Saw . ..... ..... HP
Carving machine .... ....... HP
Other machines ..... ... .... HP
(specify the type)
15 Electricity Connection
Single Phase/Three Phase
Total Connected load KVA
Connected load of machine that convert round logs
Electrical Section/Division
Date of Electric connection
(Attach copies of documents)
16 Whether the unit got S.S.I Registration Yes/No
If 'Yes', year of S.S.I Registration
(Copyof S.S.I Registration Certificate to be attached)

14
Details of machinery (specifically machines that convert round logs like saw,peeling machine, or others
a. Type of machines
b. Number
installed
c. Capacny in M3
(annual)
Remarks (machinery details)
Existed before Existed afler
304 0-2002 30—1 02002
Proposed
machlnenes
Band Saw. ,,
HP
Re-saw . V ..
HP
Peeling Machine ........ HP
Spiinl makmg machine ...... HP
Circular Saw ..... . HP
Carving machine .HP
Othermachlnes .. ,, .. ,HP
(specily the type)
15
Electricity Connection
Single Phase/Three Phase
Total Connected load KVA
Connected load of machine that convert round logs
Electrical Section/Division
Date of Electric connection
(Attach copies of documents)
16
Whether the unit got S.S.l Registration
Yes/No
lf 'Yes', year of S.S.| Registration
(Cupyof S.S.I Registration Certificate to be attached)
17 Annual Consumption and source of Wood (Quantity M3 & Source)
fype Forest Depots Outside Forests Import-Other States Import-Other Countries
Timber other than
Rubber & Palm
Rubber wood
Coconut Palmyrah
Palm wood
Total
18 Number of labourers in the unit
a. Strength of regular employee
b. Strength of daily rated worker
19 Whether the buildings and machines are ready in the case of proposed units.
Whether the unit is mortgaged to Banks/ Financial institutions, etc. If so, details.
If yes, Bank
Loan Amount
Term
Whether the licence fee is attached and
If so, No. and date of challan
Name of Forest Division
Other relevant details** If any (use separate sheet if required)
Source of capital Investment
Whether you have read chapter-viii of the Indian Forest( Tripura Amendment)Act-1984
and rule made there under and undertake to abide by the same.
Signature of the applicant with place and date
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

17
Annual Consumption and source of Wood (Quantity M3 8. Source)
Type
Forest Depots
Outside Forests
lmport~0ther States
Import-Other Countries
Timber other than
Rubber 8. Palm
Rubber wood
Coconut Palmyrah
Palm wood
Total
18 Number of labourers in the unit Yes/No
a. Strength of regular employee
b. Strength of daily rated worker
19 Whether the buildings and machines are ready in the case of proposed units. Yes/No
20 Whether the unit is mortgaged to Banks/ Financial institutions, etc. If so, details. Yes/No
If yes, Bank
Loan Amount
Term
21 Whether the licence fee is attached and
If so, No. and date of challan
Name of Forest Division
22 Other relevant details“ if any ( use separate sheet if required) Yes/No
23 Source of capital Investment Yes/No
24 Whether you have read chapter-viii of the Indian Forest( Tripura Amendment)Aot-1984 Y IN
and rule made there under and undertake to abide by the same. es 0
25 Signature of the applicant with place and date Yes/No
Pollution - Green
Working Season Proposed date of commissioning
Water Consumption (KLD) Kilolitre/Day Wastewater quantity (KLD) Kilo litre/Day
Industrial Domestic Industrial
Waste water discharged through sewage treatment plant/ septic tank to
Place
Final discharge to
Solid Waste Details
Name
Air pollution control devices
Wastewater treatment facility
(Attach additional sheet it required)
Air emission sources
Quantity
Diesel Generator Set Details
Capacity (in KVA)
Pollution - Red I Orange
Domestic
DYes D No
Quantity
Year of No. of working
hour I day
No. of working
day I year
Population residing
commissioning ------- in the Quaters I Colony
Information regarding Water Pollution (Expected water consumption for different uses)
Type of Use Sources of Supply Quantity (M3/day)
Industrial cooling, spraying in mine pits/boiler pits
Domestic Purpose
Processing whereby water gets polluted and the pollutants are
easily biodegradable
Processing whereby water gets polluted and the pollutants are
NOT easily biodegradable
Others

Pollution - Green
Working Season Proposed date of commissioning
“’3‘” °°"5“"'p‘i°" (Km) K"°”"B’D3V Wastewazer quantity (KLD) KilolitreIDay
industrial Domestic Industrial Domestic
Waste water discharged through sewage treatment plant/ septic tank to
Place — Wastewater treatment facility Yes No
(Attach additional sheet if required)
Final discharge to
Solid Waste Details Air emission sources
r
Name Quantity
J
Air pollution control devices Diesel Generator Set Details
Capacity (in KVA) Quantity
k
Pollution - Red I Orange
Year of No ofworking No. ofworking Population residing
commissioning — hour I day — day (year — in the Quaters I Colony
Information regarding Water Pollution (Expected water consumption for different uses)
Type 0' Use Sources 0' Supply Quantity (M3ldayl
industrial wolirlgl spraying in mine pits/boiler pits
Domestic Purpose
Processing whereby water gels polluted and the pollutants are
easily biodegradable
Processing whereby water gels polluted and the pollutants are
NOT easily biodegradable
Others
Information regarding liquid waste discharged
Outlet No Nature Sources of Supply Quantity (M3/day)
Diagram showing liquid waste flow from its place of generation upto final discharge
(attach a copy of Diagram with this form)
Physical Chemical
Parameter Expected Value Parameter
Temperature (C) BOD
pH COD (mg/1)
Colour Heavy Metals (mg/1)
Turbidity (JTU) Toxic Elements (mg/1)
Odour Spent Chemicals
Total Solids (mg/1) Any Other
Total Suspended solids (mg/1)
Total volatile solids (mg/1)
Oil & Grease (mg/1)
Any Other
Place of discharge
Expected Value
Whether facilities available for liquid waste treatment D Yes D No Quantity of liquid waste treated ---------
Quantity of liquid waste treated -------------------------------------
Attach latest 'Diagram' and 'Analysis Report' of recognised laborartory showing quality of liquid waste discharge
(before and after treatment)
Whether water meter at water intake points is installed? DYes D No
Whether energy meter of E.T.P is installed? DYes D No
Whether waste water flow measuring device is installed? DYes D No
Do you need an Environmental Clearance (EC)? DYes D No

information regarding liquid waste discharged
Outlet No Nature
Sources of Supply
Quantity (Mslday)
Place of discharge
Diagram showing liquid waste flow from its place of generation upto final discharge
(attach a copy of Diagram with this form)
Physical Chemical
Parameter Expected Value Parameter Expected Value
Temperature (C) 500
pH COD (mg/l)
Colour Heavy Metals (mg/l)
Turbidity (JTU) Toxic Elements (mg/l)
Odour Spent Chemicals
Total Solids (mg/l)
Any Other
Total Suspended solids (mg/I)
Total volallle solids (mg/ii
Oil & Grease (mg/l)
Any Other
Whether facilities available for liquid waste treatment Yes No Quantity of liquid waste treated
Quantity of liquid waste treated
Attach latest ‘Diagram' and ‘Analysis Report‘ of recognised laborartory showing quality at liquid waste discharge
(before and after treatment)
Whether water meter at water intake points is installed? Yes No
Whether energy meter of E.T.P is installed? Yes No
Whether waste water flow measuring device is installed? Yes No
Do you need an Environmental Clearance (EC)? Yes No
INFORMATION REGARDING AIR POLLUTION
Details of Emission Sources
Capacitv of Fuel <Trpe &
Air Pollution Control Height of stack
Sources of Emission No of Unit Nature m individual Systems proposed from ground level each umt Furnace/boilers to be provided
From Process
Blast/Cupola/Rotary /reservatory I
Induction/Arc/ Other Furnace
Heater
Kiln
Boiler
Others
Diesel Generator Set Details
Capacity (in KVA) Quantity
Height of the DG Room (in mtr) -----------------------------------
Noise pollution control measures
Acoustic enclosure treatment of DG room -----------------------------------
Exhaustmuffler ---------------------------------------------
Emission Details
Stack Fuel Height Particulate S02 Others
Decription of
Flow rate Air pollution Stack No Attached (Nature & Inner Diameter from
Nm3/hr
Matter mg/Nm3 pollutants, control
To Quantity) ground mg/Nm3 If any devices, if any
Top Bottom

INFORMATION REGARDING AIR POLLUTION
Details of Emission Sources
- - l
. Fuel (T p Air Pollution Control .
- - - Capacity at lHeight of stack
Sources of Emission No 01 Unit Nature in I Systems proposed :
93°" "mt Furnace/boilers to be provided from ground level
From Process
B|ast/Cupola/Rotary/reservatory/
Induction/Arc/ Other Furnace
Heater
Kiln
l
Boiler
Others
Diesel Generator Set Details
Capacity (in KVA) Quantity
Height of the stack above DG Room (in mtr)
Height of the DG Room (in mtr)
Noise pollution control measures
Acoustic enclosure treatment of DG room
Exhaust muffler
Emission Details
sr k N itgkh d me: 5 I D ‘ fHeight Flow me aarticulate so: Others 2:121:35?
ac o i: e a ure nner iame or rain atth ollutants,
To ground "“3"" mg/Nm3 mgle3 [if any comml
Quantity)
devices, if any
Top
Bottom
OTHER INFORMATION
Details about Solid waste /Hazardous Waste
Type of waste Descrifltion of waste (Lump Paste/Dust, etc)
Waste from Process
Waste from Effluent
Treatment Plant
Waste from Air pollution
control units
Rejected materials/Scrap
Hazardous Chemicals to be handled (Refer-Manufacture,
Storage and import of Hazardous Chemicals Rules,
1989 (MSIHC)
(Attach separate sheet if necessary)
Name Daily Quantity
Please attach and fil l the below requirements
Pollution Control Management
Specify Environmental Management Plan including Monitoring
Brief Organisational set up
Composition Qty/day
Proposed Treatment and
Disposal method
Maximum quantity of Hazardous Chemicals to be
stored at a time (Refer-Manufacture, Storage and
import of Hazardous Chemicals Rules, 1989 (MSIHC)
(Attach separate sheet if necessary)
Name Daily Quantity
Expenditure to be incurred for implementation of Environmental Management Plan (Capital Investment) Rs.
Write-up and schematic flowsheet of the manufacturing process clearly showing sources of generation
of solid (hazardous and non-hazardous), liquid, and gaseous wastes
Layout plan clearly showing the different outlets for liquid waste discharge

OTHER INFORMATION
Details about Solid waste [Hazardous Waste
Descri tion 0' Waste C ompositi an Qty/day Proposed Treatment and
Type “was“ (Lump Paste/Dust, etc) Diswsa' method
Waste lrorn Process
Waste lrorn Efliuent
Treatment Plant
Waste from Air pollution
control units
Rejected materials/Scrap
Maximum quantity of Hazardous Chemicals to be
stored at a time (Refer-Manufacture, Storage and
import of Hazardous Chemicals Rules, 1989 (MSIHC)
(Attach separate sheet if necessary)
Hazardous Chemicals to be handled (Refer-Manufacture,
Storage and import of Hazardous Chemicals Rules,
1959 (MSIHC)
(Attach separate sheet if necessary)
Name Daily Quantity ‘ Name Daily Quantity
Please attach and fill the below requirements
Pollution Control Management
Specify Enwronmental Management Plan including MOI’Ithl‘ll’lg
Brief Organisational set up
Expenditure to be incurred for implementation of Environmental Management Plan (Capital Investment) Rs.
Write—up and schematic ilowsheet 01 the manufacturing process clearly showing sources of generatlon
of SOltd (hazardous and non-hazardous), liquid, and gaseous wastes
Layout plan clearly showing the different outlets for liquid waste discharge
Profession Tax
If registered under the following Acts
Name of the Act Registration No
The Tripura Value Added Tax Act, 2004
The Central Sales Tax Act, 1956
The Tripura State Goods & Service Tax Act, 2017
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
Annual Gross business (Rs.) Annual turnover of all sales/purchase
Date of commencement of trade ______ _ Total number of employees ____________ _
Monthly average number of workers during the last preceding year in the factory --------------
Slab of salary (Range of Monthly Tax rate No. of employees Code No.
monthly gross income)
Upto Rs.7500.00 Nil 0101
Rs. 7501.00 & above and upto Rs.150.00 0102
Rs.15000.00
Rs.15001 and above Rs.208.00 0103
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
If Co-operative society, Type of society D State Level D District Level

Profession Tax
If registered under the following Acts
Name of the Act
Registration No
The Tripura Value Added Tax Act, 2004
The Central Sales Tax Act, 1956
The Tripura State Goods & Service Tax Act, 2017
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
Annual Gross business (Rs.) — Annual turnover of all sales/purchase
Date of commencement of trade — Total number of employees
Monthly average number of workers during the last preceding year in the factory
Slab 0f salary (Bangs of Monthly Tax rate No. of employees Coda ND.
monthly gross Income)
Uptn Rs.7500.00 Nil 0101
Rs. 7501.00 & above and upto
Rs.15000.00 RS.150.00 0102
Rs.15001 and above Rs.208.00 0103
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
If Comparative society, Type of society State Level
District Level
Urban
Building Category
Building Storey
D Load Bearing Building D RCC Building
Name of Planner ------------
Plot Details
Plot Area as per parcha (Sq. meter)
Plot Area as per Site (Sq. meter)
Construction Details
Plinth Area (Sq. Meter)
Boundary wall runn ing (Meter)
Height of Building (Meter)
Floor area ratio
Side Space
Front (meter)
Rear (meter)
Grade of Planer
Plot Area as per Deed
Land mark
Floor Area (Sq. Meter)
Sanitary Latrine Plan (per unit)
Ground Coverage (Sq. Meter)
Side1 (meter) ------------
Side2 (meter) ------------

Building Category
Building Storey
Urban
Load Bearing Building
RCC Building
Name of Planner —
Plot Details
Plot Area as per parcha (Sq‘ meter)
Plot Area as per Site (Sq. meter) —
Construction Details
Plinth Area (Sq. Meter)
Boundary wall running (Meter)
Height of Building (Meter) —
Floor area ratio
Side Space
Front (meter)
Rear (meter)
Grade of Planer
Plot Area as per Deed
Land mark
Floor Area (Sq. Meter)
Sanitary Latrine Plan (per unit)
Ground Coverage (Sq. Meter)
Side1 (meter)
SideZ (meter)
Schedule-II
(see Rule 7)
Combined Application Form
(Operation)
CFO Questions
Do you need Electrical Installation Certificate?
Do you need license from Drug Control Authority?
Do you use boilers in your Industry?
Do you require Steam Pipeline Registration?
Does your establishment fall under the definition of Establ ishment Under
Shops & Establishment Act, 1988?
No of Workers Date of Commencement of business
Do you operate Motor Vehicle? D Yes DNo
Maximum number of workers proposed to be employed
on any one day during the year
Category of Factory
No of Workers
DYes DNo
DYes DNo
DYes DNo
DYes DNo
DYes D No
Number of workers to be ordinarily
employed in the factory.
Motive Power (HP) _______ _
Do you want to apply for Certificate of Enrolment I Revision of Certificate
of Enrolment under the Tripura Professions, Trades, Callings and Employment
Taxation Act, 1997?
Do you want to apply for Certificate of Registration I Revision of Certificate of
Registration under the Tripura Professions, Trades, Callings and
Employment Act, 1997?
Environment Clearance Number( If any)
DYes D No
DYes D No

CFO Questions
Do you need Electrical Installation Certificate?
Do you need license from Drug Control Authority?
Do you use boilers in your Industry?
Do you require Steam Pipeline Registration?
Does your establishment fall under the definition of Establishment Under
Shops & Establishment Act,1988?
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No ofWorkers — Date ofCommencementofbusiness —
Do you operate Motor Vehicle? Yes No No of Workers —
Maximum number of workers proposec to be employed
on any one day during the year
Category of Factory
Number of workers to be ordinarily — Motive Power (HP) —
employed in the factory,
Do you want to apply for Certificate of Enrolment/ Revision of Certificate
of Enrolment underthe Tripura Professions, Trades, Callings and Employment
Taxation Act, 1997'?
Do you want to apply for Certificate of Registration / Revision of Certificate of
Registration under the Tripura Professions, Trades, Callings and
Employment Act, 1997?
Environment Clearance Number(lf any)
Yes
Yes
No
No
Requirement of Raw Water
(gallon/day)
Does this unit have a Water Storage?
Water
Requirement of Drinking Water
(gallon/day)
DYes 0 No
Type of Storage D Underground D Over Head
Boiler
Boiler Erection Agency I Personnel
Sl. No. Name Mobile No Certificate
IBR Welder Details
Sl. No. Name Mobile No Certificate
BOM of Component ______ _ Certificate of Component ------------
Drug Control
Apply For _________ _ Names of drugs
Details of technical staff employed
Name Qualification Registration No Experience
Registered
Pharmacist

Water
Requirement of Raw Water Requirement of Drinking Water
(gallon/day) (gallon/day)
Does this unit have a Water Storage? Yes
Type of Storage Underground Over Head
Boiler
Boiler Erection Agency I Personnel
Sl. No. Name Mobile No Certificate
IBR Welder Details
Slt No Name Mobile No Certificate
BOM of Component Certificate of Component
Drug Control
Apply For Names of drugs
Details of technical staff employed
Registered
. . . - , E '
Name Qualification Registration ”‘3 xpenence Pharmacist
Apply For ---------- Names of drugs
Details of technical staff employed
Name Qualification Registration No Experience
Registered
Pharmacist
Apply For _________ _ Names of drugs
Details of technical staff employed
Name Qualification Registration No Experience
Registered
Pharmacist
Labour - Contract Labour
Manager Details
Name ______________________________ __ Address
Pin Nature of work carried out on the establishment
Details of Contractors and Contract Labour
Name of Type of LIN/PAN Nature of
Maximum
Contract
Sl. No. Address Email Mobile number of
Contractor Contractor Number Work
labour
Valid Till
Total Count of Labour
Contract Labour ISM Worker

Apply For — Names of drugs
Details of technical staff employed
' . ‘ _ _ . Registered
E
Name Qualification Registration No xpenence Pharmacist
Apply For Names of drugs
Details of technical staff employed
. . i . , . Registered
E
Name Qualification Registration No xpenence Pharmacist
Labour - Contract Labour
Manager Details
Name Address
Pin Nature of work carried out on he establishment
Details of Contractors and Contract Labour
Maximum
Name of Type of LIN/PAN . . Nature of COMP“!
Sl. No. Contractor Contractor Number Address Ema" Mablle Work "133?er Valid Ti"
Total Count of Labour
Contract Labour ISM Worker
Pollution - Green
Working Season Proposed date of commissioning
Water Consumption (KLD) Kilolitre/Day Wastewater quantity (KLD) Kilolitre/Day
Industrial Domestic Industrial
Waste water discharged through sewage treatment plant/ septic tank to
Place
Final discharge to
Solid Waste Details
Name
Air pollution control devices
Wastewater treatment facility
(Attach additional sheet if required)
Air emission sources
Quantity
Diesel Generator Set Details
Capacity (in KVA)
Pollution - Red I Orange
Domestic
0 Yes 0 No
Quantity
Year of
commissioning
No. of working
hour I day
No. of working
day I year
Population residing
in the Quaters I Colony
Information regarding Water Pollution (Expected water consumption for different uses)
Type of Use Sources of Supply Quantity (M3/day)
Industrial cooling, spraying in mine pits/boiler pits
Domestic Purpose
Processing whereby water gets polluted and the pollutants are
easily biodegradable
Processing whereby water gets polluted and the pollutants are
NOT easily biodegradable
Others

Pollution - Green
Working Season Proposed date of commissioning
Water Consumption (KLD) KilolitreIDay Wastewater “3an (mm Kilolimmay
Industrial Domestic Industrial Domestic
Waste water discharged through sewage treatment plant] septic tank to
Place — Wastewater treatment facility Yes No
(Attach additional sheet If required)
Final discharge to
Solid Waste Details Air emission sources
‘ r
Name Quantity
Air pollution control devices Diesel Generator Set Details
1 Capacity (in KVA) Quantity
—)
Pollution - Red I Orange
Vear of No. of working No. oiworklng Population residing
commissmnlng — hour/day 7 day / year 7 in the Quaters / Colony
Information regarding Water Pollution (Expected water consumption for different uses)
Type of Use Sources of Supply Quantity (MS/day)
Industrlal cooling. spraying in mine pits/boiler plls
Domestic Purpose
Processing whereby water gets polluted and the pollutants are
easily biodegradable
Processing whereby water gets polluted and the pollutants are
NOT easily biodegradable
Others
Information regarding liquid waste discharged
Outlet No Nature Sources of Supply Quantity (M3/day)
Diagram showing liquid waste flow from its place of generation upto final discharge
(attach a copy of Diagram with this form)
Physical Chemical
Parameter Expected Value Parameter
Temperature (C) BOD
pH COD (mg/1)
Colour Heavy Metals (mg/1)
Turbidity (JTU) Toxic Elements (mg/1)
Odour Spent Chemicals
Total Solids (mg/1) Any Other
Total Suspended solids (mg/1)
Total volatile solids (mg/1)
Oil & Grease (mg/1)
Any Other
Place of discharge
Expected Value
Whether facilities available for liquid waste treatment D Yes D No Quantity of liquid waste treated ________ _
Quantity of liquid waste treated -------------------------------------
Attach latest 'Diagram' and 'Analysis Report' of recognised laborartory showing quality of liquid waste discharge
(before and after treatment)
Whether water meter at water intake points is installed? DYes D No
Whether energy meter of E.T.P is installed? DYes D No
Whether waste water flow measuring device is installed? DYes D No
Do you need an Environmental Clearance (EC)? DYes D No

Information regarding liquid waste discharged
Outlet No Nature
Sources of Supply
Quantity (MB/day)
Place of discharge
Diagram showing liquid waste flow from its place of generation upto tinal discharge
(attach a copy of Diagram with this form)
Physical Chemical
Parameter Expected Value Parameter Expected Value
Temperature (C) BOD
PH ‘ COD (mg/l)
Calour ‘ Heavy Metals (mg/l)
Turbidity (JTU) Tuxle Elements (mg/l)
Odour Spent Chemlcals
Total Solids (mg/l) Any Other
Total Suspended solids (mg/l)
Total volatlle solids (mg/l)
Oil & Grease (mg/l)
Any Other
Whether facilitles available for liquid waste treatment Yes No Quantity of liquid waste treated
Quantity of liquid waste treated
Attach latest ‘Diagram‘ and ‘Analysis Report of recognised laborartory showing quality of liquid waste discharge
(before and aftertreatment)
Whether water meter at water intake points is installed? Yes No
Whether energy meter of ETP is installed? Yes No
Whether waste water flow measuring (Same is installed? Yes No
Do you need an Environmental Clearance (EC)? Yes No
INFORMATION REGARDING AIR POLLUTION
Details of Emission Sources
Capacity of Fuel (Tr pe &
Air Pollution Control Height of stack
Sources of Emission No of Unit each unit Nature m individual Systems proposed from ground level Furnace/boilers to be provided
From Process
Blast/Cupola/Rotary/reservatory/
Induction/Arc/ Other Furnace
Heater
Kiln
Boiler
Others
Diesel Generator Set Details
Capacity (in KVA) Quantity
Height of the DG Room (in mtr) -----------------------------------
Noise pollution control measures
Acoustic enclosure treatment of DG room ---------------------------------
Exhaust muffler ------------------------------------------
Emission Details
Stack Fuel Height Particulate Others
Oecription of
Flow rate S02 Air pollution Stack No Attached (Nature & Inner Diameter from
Nm3/hr
Matter mg/Nm3 pollutants, control
To Quantity) ground mg/Nm3 If any devices, if any
Top Bottom

INFORMATION REGARDING AIR POLLUTION
Details of Emission Sources
' , Fuel (T Air Pollution Control iI-l , ht , m k
Sources oi Emission No of Unit Capaclty 0' Nature In I Systems proposed l 8'9 o s 6
“Ch "mt Furnace/boners to be provided ,Irclm ground level
From Process
BIastJCupola/Rotary/reservatory/
Induction/Arc/ Other Furnace
Heater
Kiln
Boiler
Others
Diesel Generator Set Details
Capacity (in KVA) Quantity
Height of the stack above DG Room (in mtr)
Height of the DG Room (in mtr)
Nolse pollution control measures
Acoustic enclosure treatment of D6 room
Exhaust muffler
Emission Details
V i I ‘Decrlption oi
Stack Fuel Helgtlt Parilculate Others - -
Stack No Attached (Nature 8. Inner Diameter from Emmi?“ Matter 331%,“; pollutants, éiiligimm"
To Quantlty) ground '“ " mil/“m3 If any devices, lfany
Top Bottom
OTHER INFORMATION
Details about Solid waste /Hazardous Waste
Type of waste DescriWion of waste (Lump Paste/Dust, etc)
Waste from Process
Waste from Effluent
Treatment Plant
Waste from Air pollution
control units
Rejected materials/Scrap
Hazardous Chemicals to be handled (Refer-Manufacture,
Storage and import of Hazardous Chemicals Rules,
1989 (MSIHC)
(Attach separate sheet if necessary)
Name Daily Quantity
. . 1 Please attach and fill the below requirements
Pollution Control Management
Specify Environmental Management Plan including Monitoring
Brief Organisational set up
Composition Qty/day
Proposed Treatment and
Disposal method
Maximum quantity of Hazardous Chemicals to be
stored at a time (Refer-Manufacture, Storage and
import of Hazardous Chemicals Rules, 1989 (MSIHC)
(Attach separate sheet if necessary)
Name Daily Quantity
Expenditure to be incurred for implementation of Environmental Management Plan (Capital Investment) Rs.
Write-up and schematic flowsheet of the manufacturing process clearly showing sources of generation
of solid (hazardous and non-hazardous), liquid, and gaseous wastes
Layout plan clearly showing the different outlets for liquid waste discharge

OTHER INFORMATION
Details about Solid waste [Hazardous Waste
Descri tion of waste
Type 0' waste (Lump Paste/Dust, etc)
Waste from Process
Proposed Treatment and
Composition Disposal method
Qtylday
Waste from Effluent
Treatment Plant
Waste from Air pollution
control LII'IllS
‘ Rejected materials/Scrap
Hazardous Chemicals to be handled (Refer-Manufacture,
Storage and import of Hazardous Chemicals Rules,
1989 (MSIHC)
(Attach separate sheet if necessary)
Maximum quantity of Hazardous Chemicals to be
stored at a time (Refer-Manufacture, Storage and
import of Hazardous Chemicals Rules, 1989 (MSIHC)
(Attach separate sheet if necessary)
Name Daily Quantity
Name Daily Quantity
Please attach and fill the below requirements
Pollution Control Management
Specify Environmental Management Plan including Monitoring
Brief Organisational setup
Expenditure to be incurred for implementation of Environmental Management Plan (Capital Investment) Rs
Write-up and schematic flowsheet oftne manulacluring process clearly showmg sources of generation
of solid (hazardous and non-hazardous). liquid, and gaseous wastes
Layout plan clearly showmg the different outlets for liquid waste discharge
Profession Tax
If registered under the following Acts
Name of the Act Registration No
The Tripura Value Added Tax Act, 2004
The Central Sales Tax Act, 1956
The Tripura State Goods & Service Tax Act, 2017
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
Annual Gross business (Rs.) Annual turnover of all sales/purchase
Date of commencement of trade ______ _ Total number of employees ___________ _
Monthly average number of workers during the last preceding year in the factory
Slab of salary (Range of Monthly Tax rate No. of employees Code No.
monthly gross income)
Upto Rs.7500.00 Nil 0101
Rs. 7501.00 & above and upto Rs.150.00 0102
Rs.15000.00
Rs.15001 and above Rs.208.00 0103
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
If Co-operative society, Type of society 0 State Level D District Level

Profession Tax
If registered under the following Acts
Name of the Act
Registration No
The Tripura Value Added Tax Act. 2004
The Central Sales Tax Act. 1956
The Tripura State Goods 8. Service Tax Act. 2017
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
Annual Gross business (Rs) Annual turnover of all sales/purchase
Date of commencement at trade Total number of employees
Monthly average number of workers during the last preceding year in the factory
Slab 0‘ salary (Nange 0f Monthly Tax rate No. of employees Code No.
monthly gross Income)
Upto Rs.7500.00 Nil 0101
Rs. 7501.00 & above and upto
Rs.15000.00 Rs.150.00 0102
Rs.15001 and above Rs.208.00 0103
Names and Addresses of other places of work, if any in Tripura
Name Address Pin
If (In-operative society, Type of society
State Level
District Level
Factory
Name of the Occupier ------------------------------
Address of Occupier
Nature and amount of power to be used
Installed Proposed to be installed ________ _
Reference number and date of approval of the plans of the site
Number Date
Reference number and date of approval of the arrangements, if any, made for disposal of trade
waste and effluents and name of the authority granting the approval
Number Date
License required for how many years

Factory
Name of the Occupier
Address of Occupier
Nature and amount of power to be used
Installed Proposed to be installed
Reference number and date of approval of the plans of the site
Number Date
Reference number and date of approval of the arrangements, if any, made for disposal of trade
waste and effluents and name of the authority granting the approval
Number Date
License required for how many years
Schedule-III
(see Rule 7 (4))
SELF CERTIFICATION
TO BE SUBMITTED ALONG WITH COMBINED APPLICATION FORM
(Under Tripura Industries (Facilitation) Act, Act No. 5 of 2019)
(To be executed on a non-judicial stamp paper of Rs. 100/-)
I S/o. Aged years, Residing at
who is the ________ (Designation) of
M/s._ _, hereby give the following
undertaking :
Entry Level :
1. Our firm / Company is proposing to set up a project at
DISTRICT, to manufacture / to provide services as mentioned
below.
(i)
(ii)
2. We certify that the particulars furnished in the Combined Application Form are true, correct
and complete to the best of our knowledge and undertake to adhere to the declarations made
there under.
3. We hereby specifically confirm that we are fully aware of the Acts / Rules / Regulations of each
department from which approvals/clearances are requested and undertake to strictly comply
with all the provisions of Acts / Rules / Regulations as applicable to our industry.
4. We also hereby categorically certify that in the event of our Firm / Company failing to comply
with the requirements / conditions of the Acts / Rules / Regulations or any conditions that may
be required to be fulfilled by any authority in connection with our present application, the same
shall result in withdrawal / cancellation of the clearances and further will make us liable for legal
action as specified under the respective Acts / Rules / Regulations and our Firm / Company shall
be made directly liable for penal action as proposed under Section 27 of Tripura Industries
(Facilitation) Act, Act No. 5 of 2019 and any other Law in force also if the particulars furnished
are found to be false / incorrect or incomplete and on our failure to adhere to the declarations
made.
5. We also certify that we take complete responsibility and liability against any losses to personal or
public property caused due to wrong certification by our firm / company and further confirm
that the same shall be liable to be borne by our firm / company unconditionally
6. We hereby certify that our proposed site / industry do not fall in any of the banned / restricted
area / category as notified by both the Central & State Governments.
7. We hereby certify that our proposed site complies with the citing guidelines of the TSPCB.
8. That the unit is not located in the vicinity of Oil/Gas Pipeline.
9. The site is not located within 500 mts distance from the boundary of Defence Area/ Military
Airport.
10. The site is not falling within 30 mts from the Railway boundary line.
11. The site is not falling within 100 mts from Heritage Sites
Proprietor/ Managing Partner/ Managing Director
Place: M/s.
Date Name .........................................................
Designation ..............................................
Schedule – III (A)
(see Rule 7 (5))
Format for Self-Certification (Applicable only if felling of exempted trees is involved)
I, Sri ………. S/O ………….Aged………. R/O…….. (Address) hereby state the details of trees in my premises
that I intend to cut for the --------------------------purpose.
2. Category of Premises:
a) Residential
b) Institutional
c) Commercial
d) Agriculture
e) Industrial
f) Others-specify
3. Area of the premises:
4. Number of trees existing in the premises:
5. No. of trees and species proposed to be felled:
S.no Species Number of trees to be cut Age of tree
6. In case, the applicant cannot take up replantation activities, then details of payment made to the
department towards cost of raising seedlings and their maintenance as per rules.
Details of DD / Payment receipt / Online payment details:
7. I hereby certify that the species and other details of trees as disclosed above are correct to the best
of my knowledge and other information furnished above is true and correct.
I undertake that I shall take up replantation in lieu of the trees proposed to be felled as per rule
Name of the applicant
Signature
Schedule – IV
(See Rule 7(8)(i))
REGISTER OF APPLICATIONS
(or online)
Sl.N
o.
Name &
Addres
s of the
Promote
r/
Compa
ny
Applicati
on No.
Name of
the
Compet
ent
Authorit
y
Date of
Acknowledge
ment By
Nodal Agency
Date of
receipt
by
Compet
ent
Authorit
y
Date of
Receipt
of
decision
of
Compet
ent
Authorit
y
Date of
Communi
cation of
Decision
Type of
Decision
communicated
A/R/DA
(A-Accepted,
R-Rejected,
DA- Deemed
Approval
Date of
reference
for review
1 2 3 4 5 6 7 8 9 10
Schedule-V(A)
(see Rule 12)
APPROVAL NO: DATED:
Government of Tripura
O/O. General Manager
District Industries Centre,_________
Directorate of Industries & Commerce
SWAAGAT APPROVAL CERTIFICATE
It is to certify that M/s. having its Registered
Office address at and proposing to
setup industry at
location for the line of activity has
been accorded following approvals under The “Tripura Industries
(Facilitation) Act, 2018” :
Sl Approval Valid Till
1.
2.
3.
4.
The unit is hereby accorded permission to establish/operate the
unit in the above said premises. This approval is issued in accordance of
the approval granted by the District Level Single Window Clearance
Committee as per powers vested at Section 12 of Tripura Industries
(Facilitation) Act, 2018, Government of Tripura.
Place :
Date :
GENERAL MANAGER DISTRICT MAGISTRATE
AND COLLECTOR
DIC,____ DISTRICT _________ DISTRICT
Schedule-V(B)
(see Rule 12)
APPROVAL NO: DATED:
Government of Tripura
Directorate of Industries & Commerce
Shilpa Udyog Bhawan
Khejurbagan, Agartala
SWAAGAT APPROVAL CERTIFICATE
It is to certify that M/s. having its Registered
Office address at and proposing to
setup industry at
location for the line of activity has
been accorded following approvals under The “Tripura Industries
(Facilitation) Act, 2018” :
Sl Approval Valid Till
1.
2.
3.
4.
The unit is hereby accorded permission to establish/operate the
unit in the above said premises. This approval is issued in accordance of
the approval granted by the High Level Single Window Clearance
Committee/ State Level Single Window Clearance Committee as per
powers vested at Section 6/ Section 9 of Tripura Industries (Facilitation)
Act, 2018, Government of Tripura.
Place :
Date :
Director
Industries & Commerce
Schedule-VI(A)
(see Rule 12)
NO: DATED:
Government of Tripura
O/O. General Manager
District Industries Centre,__________
Directorate of Industries & Commerce
SWAAGAT REJECTION CERTIFICATE
The Proposal of M/S ____________________________________ having its Registered
office address at ________________________________and proposing to setup
industry at _______________________location for the line of activity
________________ has been rejected for the following clearance:
Sl Particulars Reason
1.
2.
3.
4.
The unit is hereby informed that if you contradict with the decision of
the Competent Authority, you may represent to the Secretary in-
Charge, I&C Department, Government of Tripura as per Section 23 of
the “Tripura Industries (Facilitation) Act, 2018” :
.
GENERAL MANAGER DISTRICT MAGISTRATE
AND COLLECTOR
DIC, _ DISTRICT _________ DISTRICT
Schedule-VI(B)
(see Rule 12)
NO: DATED:
Government of Tripura
Directorate of Industries & Commerce
Shilpa Udyog Bhawan
Khejurbagan, Agartala
SWAAGAT REJECTION CERTIFICATE
The Proposal of M/S ____________________________________ having its Registered
office address at ________________________________and proposing to setup
industry at _______________________location for the line of activity
________________ has been rejected for the following clearance:
Sl Particulars Reason
1.
2.
3.
4.
The unit is hereby informed that if you contradict with the decision of
the Competent Authority, you may represent to the Secretary in-
Charge, I&C Department, Government of Tripura as per Section 23 of
the “Tripura Industries (Facilitation) Act, 2018” :
.
Place :
Date:
Director
Industries & Commerce
Schedule- VII
(See Rule 8)
TIME FRAME – ESTABLISHMENT
(CFE – Consent for Establishment)
Sl
Approval Stage Department Time Limits
1. a) CFE – Green Category CFE TSPCB 21 days
b) CFE – Orange Category CFE TSPCB 21 days
c) CFE – Red Category CFE TSPCB 21 days
2. Power Feasibility & Estimate
a. LT connection
CFE TSECL • 7 days where RoW
not required
• 15 days where RoW
required
b. HT Connection CFE
3. Factory Plans Approval CFE Factories Department 21 days
4. Land and Plot Allotment CFE TIDC 14 days
5. Change of Land use CFE Revenue 30 days
6. Industrial Building Plan Approval CFE AMC/ULB/TIDC 28 days
7. Provisional FIRE NOC CFE Fire Services Department 14 days
8. Feasibility of Water Supply CFE PWD (DWS) 14 days
9. Water Connection CFE PWD (DWS) 14 days
10. Application for Excise LoI CFE Excise Department 25 days
11. Firm Registration CFE Industries & Commerce 7 days
12. Registration of principal employer's
establishment under provision of The
Contracts Labour) Regulation and
Abolition) Act, 1970
CFE Labour Department 30 days
13. License for contractors under provision of
The Contracts Labour (Regulation and
Abolition) Act, 1970
CFE Labour Department 30 days
14. Registration under The Building and Other
Construction Workers (Regulation of
Employment and Conditions of Service)
Act, 1996
CFE Labour Department 30 days
15. Registration of Establishment under Inter
State Migrants Workmen (RE&CS)
Act,1979
CFE Labour Department 30 days
16. Licence for Contractor under Inter-State
Migrant Workmen(Regulation of
Employment and Condition of Service)
Act,1979
CFE Labour Department 30 days
17. Non-exempted Tree Felling CFE Forest Department 30 days
18. Cooperative Society Registration CFE Cooperative Society 30 days
19. Application for License CFE Legal Metrology 21 days
20. Approval of drawing plan CFE Electrical Inspectorate 10 days
21. Boiler Registration CFE Factories & Boilers 30 days
22. Electrical Connection CFE TSECL 7 days
23. License for wood based industry CFE Forest 30 days
TIME LIMITS FOR OPERATION
(CFO – Consent for Operation)
SL
No
Clearance Stage Department Time Limits
1. a) CFO – Green Category CFO TSPCB 10 days
b) CFO – Orange Category CFO TSPCB 15 days
c) CFO – Red Category CFO TSPCB 21 days
2. Factory Registration & License CFO Factories & Boilers
Department
30 days
3. Fire Occupancy Certificate CFO Fire Services Department 21 days
4. Electrical Clearance of equipment’s for
charging
CFO Electrical Inspectorate 18 days
5. Boiler Registration CFO Factories & Boilers 30 days
6. Drug License CFO Drugs Control
30 days
7. Administration under Hazardous Waste CFO TSPCB 21 days
8. CFO for renewal CFO TSPCB 7 days
9. Registration under Shops and
Establishments Act
CFO Labour Department 30 days
10. Renewal of Registration under Shops and
Establishments Act
CFO Labour Department 30 days
11. Registration of Establishment under the
Inter State Migrants Workmen (RE&CS)
Act, 1979
CFO Labour Department
30 days
12. License for Contractor under Inter-State
Migrant Workmen (Regulation of
Employment and Condition of Service)
Act,1979
CFO Labour Department 30 days
13. Registration under the Legal Metrology
Act, 2009
CFO Legal Metrology 21 days
14. Renewal of Consent for
Operation (under Water Act 1974 and
Air Act 1981) by TSPCB
CFO Pollution Control Board Green - 7 days;
Orange – 21 days;
Red – 30 days
15. Renewal of factory License CFO Factories & Boilers 15 days
16. Renewal of Boilers License CFO Factories & Boilers 7 days
17. Approval of License CFO Excise 25 days
18. Issue of License CFO
5 days
19. Registration for Professional Tax –
Form-I (within 90 days of becoming
liable to pay professional tax)
CFO Tax 30 days
20. Enrolment for Professional Tax – Form-
III (within 90 days of becoming liable to
pay professional tax)
CFO Tax 30 days
Schedule – VIII
(See Rule 9)
USER CHARGES
S.No.
Project Cost
(Land+Building+Plant & M/c.) Processing Fees (Rs.)
Establishment Operation
1 Nil to Rs.25 Lakhs 500 500
2 Above Rs.25 Lakhs and upto Rs.1.00 Crore 2000 2000
3 Above Rs.1.00 Crore and upto Rs.5.00 Crore 5000 5000
4 Above Rs.5.00 Crore and upto Rs.10.00 Crore 7500 7500
5 Above Rs.10.00 Crore and upto Rs.25.00
Crore
10000 10000
6 Above Rs.25.00 Crore and upto Rs.50.00
Crore
15000 15000
7
Above Rs.50.00 Crore and upto
Rs.100.00 Crore
20000 20000
8 Rs.100.00 Crore and above 25000 25000
NODAL OFFICE FOR SUBMISSION OF COMBINED APPLICATION FORMS
TILL ONLINE MODE IS FUNCTIONAL
1 For Projects whose investment on Plant &
M/c is upto Rs.3.00 Crore
GM, DIC,
Concerned District
2 For Projects whose investment on Plant &
M/c is above Rs.3.00 Crore
SWAAGAT Cell, Tripura
Industrial Development
Corporation, Shilpa Nigam
Bhawan, Khejurbagan,
Agartala.
Note :
1. Processing Fee including Departmental charges/fees to be paid in the form of
Crossed Demand Draft drawn from any Nationalized Bank favouring
"Managing Director, Tripura Industrial Development Corporation".
2. Once the Online portal is made functional, the date of which will be notified by the
Department, fee submission will be accepted only in the online mode specified in
the online portal.
3. Establishment means clearances sought by the applicant as required for
establishment of an industrial unit for issue of SWAAGAT Approval Certificate as
per Schedule-I.
4. Operation means clearances sought by the applicant as required for making
operational an industrial unit for issue of SWAAGAT Approval Certificate as per
Schedule-II.
Schedule-IX
(See Rule 13(2))
To
Form of Appeal
1) Name & Address of the Unit
2) Location of the Unit
3) Line of Activity
4) Project Cost (in lakhs)
5) Employment
6) Application No./ID
7) Particulars of Clearance
rejected by the Competent
Authority
8) Reasons for
rejection/Modification suggested,
if any by Competent Authority
9) Details of Fees paid for appeal
(DD/Online) in favour of M.D.,
TIDC Ltd.
10) Brief Details of appeal
Place:
Date:
Signature
Name of the applicant:
Contact No. :
Schedule-X
(See Rule 11)
DEEMED APPROVAL NO: DATED:
Government of Tripura
Directorate of Industries & Commerce
Shilpa Udyog Bhawan
Khejurbagan, Agartala
SWAAGAT DEEMED APPROVAL
M/S ________________________________________________________________,
having its registered Office address at ___________________________________ and
proposing to setup industry at : ______________________________, for the line of
activity “___________________________” has applied for
______________________________ approval through the SWAAGAT Application
under the “The Tripura Industries (Facilitation) Act, 2018 (Act No-5 of 2019)” on
Date :____________. The ______________ Department/Organization has not raised
any query for issuance of the approval till date.
As per Schedule VII of the Tripura Industries (Facilitation) Rules, 2020 the
above said approval should have been issued by Date :_____________
As per Section 20 and in exercise of powers vested under Section 20 (4) of
the “The Tripura Industries (Facilitation) Act, 2018 (Act No-5 of 2019)” the
following deemed approval is issued:
Sl Name of the approval Approval no. Date Valid till
1.
The above deemed approval is issued as per self-certification executed by
the unit while filing the SWAAGAT Application under the “The Tripura Industries
(Facilitation) Act, 2018 (Act No-5 of 2019)”. If any deviations are noticed by the
department in accordance with the self-certification the unit is liable to be
penalized as per the concerned department rules.
Place:
Date:
Director
Industries & Commerce
- Image_113
- Image_113
- SWAAGAT_Rule - For Government Press
- CAF-Establishment 23122019-1
- Organization 23122019-1.pdf (p.1-6)
- 01-Company Details.pdf (p.1)
- 02-Industry Details.pdf (p.2)
- 03-unit location & Management.pdf (p.3)
- 04-management.pdf (p.4)
- 05-Line of Activity & attachment.pdf (p.5)
- 06-Bank Details.pdf (p.6)
- CFE-Question 23122019 -1.pdf (p.7-8)
- 01-CAF-Establishment -Questionnaires.pdf (p.1)
- 02-CAF-Establishment -Questionnaires.pdf (p.2)
- CFE-Department 23122019 - 1.pdf (p.9-25)
- 19-Factory.pdf (p.1)
- Directorate of Fire Service.pdf (p.2)
- Drug control.pdf (p.3)
- Labour - Contract Labour.pdf (p.4)
- legal metrology.pdf (p.5)
- Power LT.pdf (p.6)
- Power - HT and EHT.pdf (p.7)
- 01-Forest-Department.pdf (p.8)
- 02-Forest-Department.pdf (p.9)
- 03-Forest-Department.pdf (p.10)
- 04-Forest-Department.pdf (p.11)
- Green.pdf (p.12)
- Red_Orange- part1.pdf (p.13)
- Red_Orange- part2.pdf (p.14)
- Red_Orange- part3.pdf (p.15)
- Profession Tax.pdf (p.16)
- Urban.pdf (p.17)
- CAF-Operation 23122019-1
- 01-CFO-Question.pdf (p.1)
- CFO-Department 23122019 - 1.pdf (p.2-9)
- 01-Department.pdf (p.1)
- 02-Department.pdf (p.2)
- 03-Department.pdf (p.3)
- 04-Department.pdf (p.4)
- 05-Department.pdf (p.5)
- 06-Department.pdf (p.6)
- 07-Department.pdf (p.7)
- 08-Department.pdf (p.8)
- SWAAGAT_Rule_Ver_8 Revised
- SELF CERTIFICATION
- REGISTER OF APPLICATIONS
- Schedule-V(A)
- O/O. General Manager
- District Industries Centre,_________
- SWAAGAT APPROVAL CERTIFICATE
- Schedule-V(B)
- SWAAGAT APPROVAL CERTIFICATE
- Schedule-VI(A)
- O/O. General Manager
- District Industries Centre,__________
- SWAAGAT REJECTION CERTIFICATE
- Schedule-VI(B)
- SWAAGAT REJECTION CERTIFICATE
- Schedule – VIII
- (See Rule 9)
- Note :
- 1. Processing Fee including Departmental charges/fees to be paid in the form of Crossed Demand Draft drawn from any Nationalized Bank favouring "Managing Director, Tripura Industrial Development Corporation".
- (See Rule 13(2))
- (See Rule 11)
- SWAAGAT DEEMED APPROVAL