All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
Iowa Admin. Code r. 761-813.5 : TRANSPORTATION DEPARTMENT —RAILROADS — CLOSE-CLEARANCE WARNING SIGNS ALONG RAILROAD TRACKS —813.5 - Close-clearance dimensions
Text
(1)
Close clearance for tangent track is a location along the railroad track where there is an obstruction that falls within the following dimensions: starting at the centerline of track at top of rail and extending 5 feet both sides horizontally and level therewith, thence upward vertically 15 inches, thence upward diagonally to a point 4 feet above top of rail and 8 feet laterally from centerline of track, thence vertically to a point 20 feet above top of rail, thence diagonally to a point 6 feet from centerline of track and 22 feet above top of rail, thence horizontally to centerline of track. Vertical clearance shall be 18 feet above top of rail at the entrance to and inside buildings. On curved track, clearances on each side of the track centerline shall be increased 1½ inches per degree of curvature. (See Figure 1.)
(2)
Reserved.
Iowa Admin. Code r. 761-813.5
ARC 8202B, IAB 10/7/09, effective 11/11/09
×