All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
310 Mass. Reg. 15.212 : DEPARTMENT OF ENVIRONMENTAL PROTECTION — The State Environmental Code, Title 5: Standard Requirements for the Siting, Construction, Inspection, Upgrade and Expansion of On-site Sewage Treatment and Disposal Systems and for the Transport and Disposal of Septage — DESIGN, CONSTRUCTION, REPAIR, AND REPLACEMENT OF ON-SITE SEWAGE DISPOSAL SYSTEMS — Depth to Groundwater
Text
(1)
The minimum vertical separation distance between the bottom of the stone underlying the soil absorption system above the high ground-water elevation shall be
(a)
four feet in soils with a recorded percolation rate of more than two minutes per inch;
(b)
five feet in soils with a recorded percolation rate of two minutes or less per inch.
(2)
For systems with a design flow of 2,000 gpd or greater, the separation from high groundwater as required by
310 CMR 15.212(1)
shall be calculated after adding the effect of groundwater mounding to the high groundwater elevation as determined pursuant to
310 CMR 15.103(3)
.
310 CMR 15.212
Amended by Mass Register Issue 1499, eff. 7/7/2023.
Amended by Mass Register Issue 1501, eff. 7/7/2023.
×