All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
Iowa Admin. Code r. 721-45.5 : SECRETARY OF STATE — CORPORATIONS — MECHANICS' NOTICE AND LIEN REGISTRY —45.5 - Posting of preliminary notice
Text
(1)
Posting by subcontractor.
a.
A subcontractor for residential construction who has provided or will provide labor or furnish material for residential construction shall post a preliminary notice to the MNLR, or the subcontractor is not entitled to a lien or remedies provided in Iowa Code chapter 572.
b.
Prior to the posting of a preliminary notice, a notice of commencement of work must be posted on the MNLR. If the general contractor or owner-builder has not posted a notice of commencement of work on the MNLR within ten days of commencement of work on the property, then the subcontractor may post a notice of commencement of work on the MNLR prior to posting the preliminary notice. In order to post a notice of commencement of work on the MNLR, the subcontractor must comply with subrule 45.4(2).
(2)
Contents of preliminary notice.
The information provided by the subcontractor shall, at a minimum, include:
a.
The name of the owner.
b.
The MNLR number.
c.
The name, address and telephone number of the subcontractor furnishing the labor, service, equipment, or material.
d.
The name and address of the person who contracted with the claimant for the furnishing of the labor, service, equipment, or material.
e.
The name of the general contractor or owner-builder under which the claimant is performing or will perform the work.
f.
The address of the property or a description of the location of the property if the property cannot be reasonably identified by an address.
g.
The legal description of the property.
h.
The date the material or materials were first furnished or the labor was first performed.
i.
The tax parcel identification number.
j.
The county in which the building, land, or improvement to be charged with the lien is situated.
k.
The e-mail address of the subcontractor or the e-mail address of another individual or entity designated to receive electronic correspondence on behalf of the subcontractor.
(3)
Preliminary notice owner notice.
At the time that a preliminary notice is posted on the MNLR, the administrator shall mail a written owner notice, as provided in paragraphs 45.4(3)
"a"
and 45.4(3)
"b, "
to the owner's address. An owner-builder shall not receive an owner notice.
(4)
Proof of service of owner notice.
The administrator shall post a proof of service on the MNLR. The subcontractor may obtain a copy by downloading the proof of service from the record of postings by MNLR number.
Iowa Admin. Code r. 721-45.5
ARC 0464C, IAB 11/28/12, effective 1/2/2013
×