All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
25 Pa. Code § 78a.59c : ENVIRONMENTAL PROTECTION — DEPARTMENT OF ENVIRONMENTAL PROTECTION — Protection Of Natural Resources — LAND RESOURCES — UNCONVENTIONAL WELLS — ENVIRONMENTAL PROTECTION PERFORMANCE STANDARDS — Centralized impoundments
Text
(a)
An operator using a centralized impoundment as of October 8, 2016, shall close the centralized impoundment in accordance with this section or obtain a permit in accordance with Subpart D, Article IX (relating to residual waste management). The closure plan shall be submitted electronically to the Department through its web site for review and approval no later than April 8, 2017. The operator shall properly close the centralized impoundment in accordance with the approved plan or obtain a permit in accordance with Subpart D, Article IX no later than October 8, 2019.
(b)
The closure plan must provide for the following:
(1)
Removal of any impermeable membrane, concrete and earthen liner so that water movement to subsoils is achieved.
(2)
Restoration of the site to approximate original conditions, including preconstruction contours, and backfilling the impoundment to above finished grade to allow for settlement of fill and so the impoundment will no longer impound water.
(3)
A plan for the removal of equipment, structures, wastes and related material from the facility.
(4)
An estimate of when final closure will occur, including an explanation of the basis for the estimate.
(5)
A description of the steps necessary for closure of the facility.
(6)
A narrative description, including a schedule of measures that are proposed to be carried out in preparation for closure and after closure at the facility, including measures relating to the following:
(i)
Water quality monitoring including, but not limited to, analyses of samples from the monitoring wells that were installed at the time of the construction of the centralized impoundment.
(ii)
A soil sampling plan that explains how the operator will analyze the soil beneath the impoundment's liners. Analysis shall be based on a grid pattern or other method approved by the Department. Any spills or leaks detected shall be reported and remediated in accordance with § 78a.66 (relating to reporting and remediating spills and releases) prior to impoundment closure.
(iii)
Compliance with Chapter 102 (relating to erosion and sediment control) including erosion and sediment control and PCSM.
(iv)
Access control, including maintenance of access control.
(v)
The name, address and telephone number at which the operator may be reached.
25 Pa. Code § 78a.59c
Adopted by Pennsylvania Bulletin, Vol 46, No. 41. October 8, 2016, effective 10/8/2016
×