All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
30 C.F.R. § 75.312 : Mineral Resources — MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR — COAL MINE SAFETY AND HEALTH — MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES — VENTILATION — Main mine fan examinations and records
Text
(a)
To assure electrical and mechanical reliability of main mine fans, each main mine fan and its associated components, including devices for measuring or recording mine ventilation pressure, shall be examined for proper operation by a trained person designated by the operator. Examinations of main mine fans shall be made at least once each day that the fan operates, unless a fan monitoring system is used. No examination is required on any day when no one, including certified persons, goes underground, except that an examination shall be completed prior to anyone entering the mine.
(b)
(1)
If a main mine fan monitoring system is used, a trained person designated by the operator shall-
(i)
At least once each day review the data provided by the fan monitoring system to assure that the fan and the fan monitoring system are operating properly. No review is required on any day when no one, including certified persons, goes underground, except that a review of the data shall be performed prior to anyone entering the underground portion of the mine. Data reviewed should include the fan pressure, bearing temperature, revolutions per minute, vibration, electric voltage, and amperage; and
(ii)
At least every 7 days-
(A)
Test the monitoring system for proper operation; and
(B)
Examine each main mine fan and its associated components to assure electrical and mechanical reliability of main mine fans.
(2)
If the monitoring system malfunctions, the malfunction shall be corrected, or paragraph (a) of this section shall apply.
(c)
At least every 31 days, the automatic fan signal device for each main mine fan shall be tested by stopping the fan. Only persons necessary to evaluate the effect of the fan stoppage or restart, or to perform maintenance or repair work that cannot otherwise be made while the fan is operating, shall be permitted underground. Notwithstanding the requirement of §75.311(b)(3), underground power may remain energized during this test provided no one, including persons identified in §75.311(b)(1), is underground. If the fan is not restarted within 15 minutes, underground power shall be deenergized and no one shall enter any underground area of the mine until the fan is restarted and an examination of the mine is conducted as described in §75.360(b) through (e) and the mine has been determined to be safe.
(d)
At least every 31 days, the automatic closing doors in multiple main mine fan systems shall be tested by stopping the fan. Only persons necessary to evaluate the effect of the fan stoppage or restart, or to perform maintenance or repair work that cannot otherwise be made while the fan is operating, shall be permitted underground. Notwithstanding the provisions of §75.311, underground power may remain energized during this test provided no one, including persons identified in §75.311(b)(1), is underground. If the fan is not restarted within 15 minutes, underground power shall be deenergized and no one shall enter any underground area of the mine, until the fan is restarted and an examination of the mine is conducted as described in §75.360(b) through (e) and the mine has been determined to be safe.
(e)
Circular main mine fan pressure recording charts shall be changed before the beginning of a second revolution.
(f)
(1)
Certification.
Persons making main mine fan examinations shall certify by initials and date at the fan or another location specified by the operator that the examinations were made. Each certification shall identify the main mine fan examined.
(2)
Persons reviewing data produced by a main mine fan monitoring system shall certify by initials and date on a printed copy of the data from the system that the review was completed. In lieu of certification on a copy of the data, the person reviewing the data may certify electronically that the review was completed. Electronic certification shall be by handwritten initials and date in a computer system so as to be secure and not susceptible to alteration.
(g)
(1)
Recordkeeping.
By the end of the shift on which the examination is made, persons making main mine fan examinations shall record all uncorrected defects that may affect the operation of the fan that are not corrected by the end of that shift. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.
(2)
When a fan monitoring system is used in lieu of the daily fan examination-
(i)
The certified copies of data produced by fan monitoring systems shall be maintained separate from other computer-generated reports or data; and
(ii)
A record shall be made of any fan monitoring system malfunctions, electrical or mechanical deficiencies in the monitoring system and any sudden increase or loss in mine ventilating pressure. The record shall be made by the end of the shift on which the review of the data is completed and shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.
(3)
By the end of the shift on which the monthly test of the automatic fan signal device or the automatic closing doors is completed, persons making these tests shall record the results of the tests. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.
(h)
Retention period.
Records, including records of mine fan pressure and the certified copies of data produced by fan monitoring systems, shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.
30 C.F.R. § 75.312
×