All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
40 C.F.R. § 265.197 : Protection of Environment — ENVIRONMENTAL PROTECTION AGENCY — SOLID WASTES — INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES — TANK SYSTEMS — Closure and post-closure care
Text
(a)
At closure of a tank system, the owner or operator must remove or decontaminate all waste residues, contaminated containment system components (liners, etc.), contaminated soils, and structures and equipment contaminated with waste, and manage them as hazardous waste, unless §
261.3
(d) of this Chapter applies. The closure plan, closure activities, cost estimates for closure, and financial responsibility for tank systems must meet all of the requirements specified in subparts G and H of this part.
(b)
If the owner or operator demonstrates that not all contaminated soils can be practicably removed or decontaminated as required in paragraph (a) of this section, then the owner or operator must close the tank system and perform post-closure care in accordance with the closure and post-closure care requirements that apply to landfills (§
265.310
). In addition, for the purposes of closure, post-closure, and financial responsibility, such a tank system is then considered to be a landfill, and the owner or operator must meet all of the requirements for landfills specified in subparts G and H of this part.
(c)
If an owner or operator has a tank system which does not have secondary containment that meets the requirements of §
265.193
(b) through (f) and which is not exempt from the secondary containment requirements in accordance with §
265.193
(g), then,
(1)
The closure plan for the tank system must include both a plan for complying with paragraph (a) of this section and a contingent plan for complying with paragraph (b) of this section.
(2)
A contingent post-closure plan for complying with paragraph (b) of this section must be prepared and submitted as part of the permit application.
(3)
The cost estimates calculated for closure and post-closure care must reflect the costs of complying with the contingent closure plan and the contingent post-closure plan, if these costs are greater than the costs of complying with the closure plan prepared for the expected closure under paragraph (a) of this section.
(4)
Financial assurance must be based on the cost estimates in paragraph (c)(3) of this section.
(5)
For the purposes of the contingent closure and post-closure plans, such a tank system is considered to be a landfill, and the contingent plans must meet all of the closure, post-closure, and financial responsibility requirements for landfills under subparts G and H of this part.
40 C.F.R. §265.197
51 FR 25479, 7/14/1986, as amended at 71 FR 40275, 7/14/2006
×