All
All
Parallel
Title
Appellant
Respondent
Lawyer
Parallel Search is an AI-driven legal research functionality that uses natural language understanding to find conceptually relevant case law, even without exact keyword matches.
Hi, I'm AMICUS. Your GPT powered virtual legal assistant.
Let's chat.
Log in
Sign Up
Select Country
India
UK
&
Ireland
AMICUS AI
CaseIQ
Keyword Research
Parallel Search
Browse
Commentaries
Columns
My Project
New chat
Federal
U.S. Supreme Court
Federal Circuit
1st Circuit
2d Circuit
3d Circuit
4th Circuit
5th Circuit
6th Circuit
7th Circuit
8th Circuit
9th Circuit
10th Circuit
11th Circuit
Court of Appeals for the D.C. Circuit
Board of Immigration Appeals
Special Courts
Bankruptcy
State
Alabama
Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Guam
Hawaii
Iowa
Idaho
Illinois
Indiana
Kansas
Kentucky
Louisiana
Massachusetts
Maryland
Maine
Michigan
Minnesota
Missouri
Mississippi
Montana
Nebraska
North Carolina
North Dakota
New Hampshire
New Jersey
Northern Mariana Islands
New Mexico
Nevada
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Puerto Rico
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Virginia
Vermont
Washington
Wisconsin
West Virginia
Wyoming
30 C.F.R. § 816.46 : Mineral Resources — OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR — PERMANENT PROGRAM PERFORMANCE STANDARDS — PERMANENT PROGRAM PERFORMANCE STANDARDS-SURFACE MINING ACTIVITIES — What requirements apply to siltation structures?
Text
(a)
Scope.
For the purpose of this section only, the phrase "disturb the land surface" does not include those areas-
(1)
In which the only surface mining activities consist of diversions, siltation structures, or roads that are designed, constructed, and maintained in accordance with this part; and
(2)
For which you do not plan to otherwise disturb the land surface upgradient of the diversion, siltation structure, or road.
(b)
General requirements.
(1)
When siltation structures will be used to achieve the requirements of §816.45 of this part, you must construct those structures before beginning any surface mining activities that will disturb the land surface.
(2)
Upon completion of construction of a siltation structure, a qualified registered professional engineer, or, in any state that authorizes land surveyors to prepare and certify plans in accordance with §780.25(a) of this chapter, a qualified registered professional land surveyor, must certify that the structure has been constructed as designed and as approved in the reclamation plan in the permit.
(3)
Any siltation structure that impounds water must be designed, constructed and maintained in accordance with §816.49 of this chapter.
(4)
You must maintain siltation structures until removal is authorized by the regulatory authority and the disturbed area has been stabilized and revegetated.
(5)
(i)
When a siltation structure is removed, you must regrade the land upon which the structure was located and revegetate the land in accordance with the reclamation plan and §§816.111 and 816.116 of this chapter.
(ii)
Paragraph (b)(5)(i) of this section does not apply to sedimentation ponds approved by the regulatory authority for retention as permanent impoundments under §816.49(b) of this part if the maintenance requirements of §800.42(c)(5) of this chapter are met.
(c)
Sedimentation ponds.
(1)
When used, sedimentation ponds must-
(i)
Be located as near as possible to the disturbed area and outside perennial or intermittent stream channels unless approved by the regulatory authority in the permit in accordance with §§780.28 and
816.57
(c) of this chapter.
(ii)
Be designed, constructed, and maintained to-
(A)
Provide adequate sediment storage volume.
(B)
Provide adequate detention time to allow the effluent from the ponds to meet applicable effluent limitations.
(C)
Contain or treat the 10-year, 24-hour precipitation event ("design event") unless a lesser design event is approved by the regulatory authority based on terrain, climate, other site-specific conditions, and a demonstration that the effluent limitations referenced in §816.42 of this part will be met.
(D)
Provide a nonclogging dewatering device adequate to maintain the detention time required under paragraph (c)(1)(ii)(B) of this section.
(E)
Minimize short circuiting to the extent possible.
(F)
Provide periodic sediment removal sufficient to maintain adequate volume for the design event.
(G)
Ensure against excessive settlement.
(H)
Be free of sod, large roots, frozen soil, and acid-forming or toxic-forming materials.
(I)
Be compacted properly.
(2)
Spillways.
A sedimentation pond must include either a combination of principal and emergency spillways or a single spillway configured as specified in §816.49(a)(9) of this part.
(d)
Other treatment facilities.
(1)
You must design other treatment facilities to treat the 10-year, 24-hour precipitation event unless the regulatory authority approves a lesser design event based upon terrain, climate, other site-specific conditions, and a demonstration that the effluent limitations referenced in §816.42 of this part will be met.
(2)
You must design other treatment facilities in accordance with the applicable requirements of paragraph (c) of this section.
(e)
Exemptions.
The regulatory authority may grant an exemption from the requirements of this section if-
(1)
The disturbed drainage area within the total disturbed area is small; and
(2)
You demonstrate that neither siltation structures nor alternate sediment control measures are necessary for drainage from the disturbed drainage area to comply with §816.42 of this part.
30 C.F.R. § 816.46
48 FR 44051, 9/26/1983, as amended at 53 FR 43605, 10/27/1988; 59 FR 53029, 10/20/1994; 75 FR 60275, 9/29/2010; 81 FR 93392, 1/19/2017
×