40 CFR 63.11214 : Protection Of Environment (§ 1.1 To Parts 1851-1899) — (§ 63.8980 To Appendix E To Part 63) — Environmental Protection Agency (Continued) (§ 63.8980 To Appendix E To Part 63) — Air Programs (Continued) (§ 63.8980 To Appendix E To Part 63) — National Emission Standards For Hazardous Air Pollutants For Source Categories (Continued) (§ 63.8980 To Appendix E To Part 63) — National Emission Standards For Hazardous Air Pollutants For Industrial, Commercial, And Institutional Boilers Area Sources (§ 63.11193 To § 63.11237) — Initial Compliance Requirements (§ 63.11210 To § 63.11214) — How do I demonstrate initial compliance with the work practice standard, emission reduction measures, and management practice?

4 Aug 2016

(a) If you own or operate an existing or new coal-fired boiler with a heat input capacity of less than 10 million Btu per hour, you must conduct a performance tune-up according to § 63.11223(b) and you must submit a signed statement in the Notification of Compliance Status report that indicates that you conducted a tune-up of the boiler.

(b) If you own or operate an existing or new biomass-fired boiler or an existing or new oil-fired boiler, you must conduct a performance tune-up according to § 63.11223(b) and you must submit a signed statement in the Notification of Compliance Status report that indicates that you conducted a tune-up of the boiler.

(c) If you own or operate an existing affected boiler with a heat input capacity of 10 million Btu per hour or greater, you must submit a signed certification in the Notification of Compliance Status report that an energy assessment of the boiler and its energy use systems was completed according to Table 2 to this subpart and is an accurate depiction of your facility.

(d) If you own or operate a boiler subject to emission limits in Table 1 of this subpart, you must minimize the boiler's startup and shutdown periods following the manufacturer's recommended procedures, if available. If manufacturer's recommended procedures are not available, you must follow recommended procedures for a unit of similar design for which manufacturer's recommended procedures are available. You must submit a signed statement in the Notification of Compliance Status report that indicates that you conducted startups and shutdowns according to the manufacturer's recommended procedures or procedures specified for a boiler of similar design if manufacturer's recommended procedures are not available.