33 CFR 230.11 : Navigation And Navigable Waters (§ 1.01-1 To Parts 404-499) — (Parts 200-202 To Parts 404-499) — Corps Of Engineers, Department Of The Army, Department Of Defense (Parts 200-202 To Parts 386-399) — Procedures For Implementing Nepa (§ 230.1 To Appendix C To Part 230) — Finding of No Significant Impact (FONSI).

4 Aug 2016

A FONSI shall be prepared for a proposed action, not categorically excluded, for which an EIS will not be prepared. The FONSI will be a brief summary document as noted in 40 CFR 1508.13. In the case of feasibility, continuing authority, or special planning reports and certain planning/engineering reports, the draft FONSI and EA should be included within the draft report and circulated for a minimum 30-day review to concerned agencies, organizations and the interested public (40 CFR 1501.4(e)(2)). In the case of operation and maintenance activities involving the discharge of dredged or fill material requiring a public notice, the notice will indicate the availability of the EA/FONSI. For all other Corps project actions a notice of availability of the FONSI will be sent to concerned agencies, organizations and the interested public (40 CFR 1501.4(e)(1)).

33 CFR 230.11