43 CFR 11.90 : Public Lands: Interior (§ 1.1 To Parts 10011-10099) — (§ 1.1 To Parts 432-999) — Office Of The Secretary Of The Interior (§ 1.1 To Parts 49-199) — Natural Resource Damage Assessments (§ 11.10 To Appendix Iii To Part 11) — Post-Assessment Phase (§ 11.90 To Appendix Iii To Part 11) — What documentation must the authorized official prepare after completing the assessment?

4 Aug 2016

(a) At the conclusion of an assessment, the authorized official must prepare a Report of Assessment that consists of the Preassessment Screen Determination, the Assessment Plan, and the information specified in paragraphs (b) and (c) of this section as applicable.

(b) When the authorized official has used a type A procedure, the Report of Assessment must include the information specified in subpart D.

(c) When the authorized official has used type B procedures, the Report of Assessment must include all documentation supporting the determinations required in the Injury Determination phase, the Quantification phase, and the Damage Determination phase, and specifically including the test results of any and all methodologies performed in these phases. The preliminary estimate of damages shall be included in the Report of Assessment. The Restoration and Compensation Determination Plan, along with comments received during the public review of that Plan and responses to those comments, shall also be included in the Report of Assessment.

43 CFR 11.90
[51 FR 27725, Aug. 1, 1986, as amended at 59 FR 14287, Mar. 25, 1994; 61 FR 20612, May 7, 1996]