33 CFR 337.10 : Navigation And Navigable Waters (§ 1.01-1 To Parts 404-499) — (Parts 200-202 To Parts 404-499) — Corps Of Engineers, Department Of The Army, Department Of Defense (Parts 200-202 To Parts 386-399) — Practice And Procedure (§ 337.0 To § 337.10) — Supervision of Federal projects.

4 Aug 2016

District engineers should assure that dredged or fill material disposal activities are conducted in conformance with current plans and description of the project as expressed in the SOF or ROD. Conditions and/or limitations required by a state (e.g., water quality certification), as identified through the coordination process, should be included in the project specifications. Contracting officers should assure that contractors are aware of their responsibilities for compliance with the terms and conditions of state certifications and other conditions expressed in the SOF or ROD.

33 CFR 337.10