| Name of nonregulatory SIP provision |
Applicable geographic or nonattainment area |
State submittal date/effective date |
EPA approval date |
Explanation |
| High Occupancy Vehicle (HOV) lane on I-85 from Chamblee-Tucker Road to State Road 316. High Occupancy Toll (HOT) lane on I-85 from Chamblee-Tucker Road to State Road 316 |
Atlanta Metropolitan Area |
11/15/93 and amended on 6/17/96 and 2/5/10 |
3/18/99, 4/26/99 and 11/5/09. |
|
| Clean Fuel Vehicles Revolving Loan Program |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| Regional Commute Options Program and HOV Marketing Program |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| HOV lanes on I-75 and I-85 |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| Two Park and Ride Lots: Rockdale County-Sigman at I-20 and Douglas County-Chapel Hill at I-20 |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| MARTA Express Bus routes (15 buses) |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| Signal preemption for MARTA routes #15 and #23 |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| Improve and expand service on MARTA's existing routes in southeast DeKalb County |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| Acquisition of clean fuel buses for MARTA and Cobb County Transit |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| ATMS/Incident Management Program on I-75/I-85 inside I-285 and northern ARC of I-285 between I-75 and I-85 |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| Upgrading, coordination and computerizing intersections |
Atlanta Metropolitan Area |
6/17/96 |
4/26/99. |
|
| [Reserved] |
|
|
|
|
| Atlantic Steel Transportation Control Measure |
Atlanta Metropolitan Area |
3/29/00 |
8/28/00. |
|
| Procedures for Testing and Monitoring Sources of Air Pollutants |
Atlanta Metropolitan Area |
7/31/00 |
7/10/01. |
|
| Enhanced Inspection/Maintenance Test Equipment, Procedures and Specifications |
Atlanta Metropolitan Area |
9/20/00 |
7/10/01. |
|
| Preemption Waiver Request for Low-RVP, Low-Sulfur Gasoline Under Air Quality Control Rule 391-3-1-.02(2)(bbb) |
Atlanta Metropolitan Area |
5/31/00 |
2/22/02. |
|
| Technical Amendment to the Georgia Fuel Waiver Request of May 31, 2000 |
Atlanta Metropolitan Area |
11/9/01 |
2/22/02. |
|
| Georgia's State Implementation Plan for the Atlanta Ozone Nonattainment Area |
Atlanta Metropolitan Area |
7/17/01 |
5/7/02. |
|
| Post-1999 Rate of Progress Plan |
Atlanta Metropolitan Area |
12/24/03 |
7/19/04, 69 FR 42884. |
|
| Severe Area Vehicle Miles Traveled (VMT SIP) for the Atlanta 1-hour severe ozone nonattainment area |
Atlanta 1-hour ozone severe nonattainment area |
6/30/04 |
6/14/05, 70 FR 34358. |
|
| Atlanta 1-hour ozone attainment area 2015 maintenance plan |
Atlanta severe 1-hour ozone maintenance area |
2/1/05 |
6/14/05, 70 FR 34660. |
|
| Attainment Demonstration for the Chattanooga Early Action Area |
Walker and Catoosa Counties |
12/31/04 |
8/26/05, 70 FR 50199. |
|
| Attainment Demonstration for the Lower Savannah-Augusta Early Action Compact Area |
Columbia and Richmond Counties |
12/31/04 |
8/26/05, 70 FR 50195. |
|
| Alternative Fuel Refueling Station/Park and Ride Transportation Center, Project DO-AR-211 is removed |
Douglas County, GA |
9/19/06 |
11/28/06, 71 FR 68743. |
|
| Macon 8-hour Ozone Maintenance Plan |
Macon, GA encompassing a portion of Monroe County |
6/15/07 |
9/19/07, 72 FR 53432. |
|
| Murray County 8-hour Ozone Maintenance Plan |
Murray County |
6/15/07 |
10/16/07, 72 FR 58538. |
|
| Atlanta Early Progress Plan |
Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton counties |
1/12/07 |
2/20/08, 73 FR 9206. |
|
| Rome; 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory |
Floyd County |
10/27/2009 |
1/12/12, 77 FR 1873. |
|
| Chattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory |
Catoosa and Walker Counties |
10/27/09 |
2/8/12; 77 FR 6467. |
|
| 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards |
Georgia |
10/13/2007 |
2/6/2012, 77 FR 5706. |
|
| Atlanta 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory |
Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties |
07/06/2010 |
3/1/2012, 77 FR 12487. |
|
| Macon 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory |
Bibb County and Monroe County |
8/17/2009 |
3/02/12, 77 FR 12724. |
|
| Atlanta 1997 8-Hour Ozone 2002 Base-Year Emissions Inventory |
Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties |
10/21/2009 |
4/24/2012, 77 FR 24399. |
|
| Regional Haze Plan |
Statewide |
2/11/10 |
6/28/12, 77 FR 38501. |
|
| Regional Haze Plan Supplement (including BART and Reasonable Progress emissions limits) |
Statewide |
11/19/10 |
6/28/12, 77 FR 38501. |
|
| 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards |
Georgia |
7/23/2008 |
10/25/2012, 77 FR 65125 |
With the exception of 110(a)(2)(D)(i). |
| 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards |
Georgia |
10/21/2009 |
10/25/2012, 77 FR 65125 |
With the exception of 110(a)(2)(D)(i). |
| Negative Declaration for Control of VOC Emissions from Reactor Processes and Distillation Operations in Synthetic Organic Chemical Manufacturing Industry (SOCMI) EPA-450/4-91-031, August 1993 |
Atlanta 1997 8-Hour Ozone Nonattainment Area |
10/21/2009 |
09/28/2013. |
|
| Negative Declaration for Control of VOC Emissions from Equipment Leaks from Natural Gas/Gasoline Processing Plants EPA-450/3-83-007, December 1983 |
Atlanta 1997 8-Hour Ozone Nonattainment Area |
10/21/2009 |
09/28/2013. |
|
| Negative Declaration for Control of VOC Leaks from Synthetic Organic Chemical Polymer and Resin Manufacturing Equipment EPA-450/3-83-006, March 1984 |
Atlanta 1997 8-Hour Ozone Nonattainment Area |
10/21/2009 |
09/28/2013. |
|
| Negative Declaration for Control of VOC Emissions from Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industry (SOCMI), EPA-450/3-84-015, December 1984 |
Atlanta 1997 8-Hour Ozone Nonattainment Area |
10/21/2009 |
09/28/2013. |
|
| 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards |
Georgia |
7/23/2008 |
4/12/2013 |
Addressing element 110(a)(2)(D)(i)(II) prong 3 only. |
| 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards |
10/21/2009 |
4/12/2013 |
Addressing element 110(a)(2)(D)(i)(II) prong 3 only. |
| 1997 8-Hour Ozone Reasonable Further Progress Plan for the Atlanta Area |
Atlanta 1997 8-Hour Ozone Nonattainment Area |
10/21/2009 |
11/4/13. |
|
| 1997 8-hour ozone Maintenance Plan for the Atlanta Area |
Atlanta 1997 8-Hour Ozone Nonattainment Area |
4/4/2012 |
12/2/2013 |
|
| 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards |
Georgia |
7/23/2008 |
5/7/2014, 79 FR 26143 |
Addressing prong 4 of section 110(a)(2)(D)(i) only. |
| 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards |
Georgia |
10/21/2009 |
5/7/2014, 79 FR 26143 |
Addressing prong 4 of section 110(a)(2)(D)(i) only. |
| 1997 Annual PM2.5 Maintenance Plan for the Macon Area |
Bibb County and a portion of Monroe County, Macon, Georgia Nonattainment Area |
6/21/12 |
5/13/14, 79 FR 27193 |
|
| 1997 Annual PM2.5 Maintenance Plan for the Rome Area |
Floyd County, Rome, Georgia Area |
6/21/12 |
5/14/2014, 79 FR 27496 |
|
| 1997 Annual PM2.5 Maintenance Plan for the Georgia portion of the Chattanooga TN-GA-AL Area |
Catoosa and Walker Counties |
9/14/12 |
12/19/14, 79 FR 75748 |
|
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS |
Georgia |
5/14/2012 |
3/18/2015, 80 FR 14019 |
Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS |
Georgia |
3/6/2012 |
3/18/2015, 80 FR 14019 |
Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS |
Georgia |
3/25/2013 |
3/18/2015, 80 FR 14019 |
Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
| Offset measures associated with the repeal of Georgia Rules 391-3-1-.02(2)(aaa) and 391-3-1-.02(2)(bbb) and the revision to Georgia Rule 391-3-1-.02(2)(mmm) |
Banks, Barrow, Bartow, Butts, Carroll, Chattooga, Cherokee, Clarke, Clayton, Cobb, Coweta, Dawson, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gordon, Gwinnett, Hall, Haralson, Heard, Henry, Jackson, Jasper, Jones, Lamar, Lumpkin, Madison, Meriwether, Monroe, Morgan, Newton, Oconee, Paulding, Pickens, Pike, Polk, Putnam, Rockdale, Spalding, Troup, Walton and Upson |
May 4, 2014 |
9/1/15, 80 FR 52627 |
Includes the contingency offset measure in the event that the locomotive conversion program cannot be fully completed. |
| Atlanta 2008 8-hour Ozone Marginal Area Requirements |
Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties |
2/6/15 |
8/11/15, 80 FR 48041 |
|
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards |
Georgia |
3/6/2012 |
10/5/15 |
With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
| 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards |
Georgia |
5/14/2012 |
10/9/2015, 80 FR 61109 |
With the exception of sections: 110(a)(2)(C), (D)(i)(II) prong 3 and (J) concerning PSD permitting requirements and 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4) concerning interstate transport requirements. |
| 1997 Annual PM2.5 Maintenance Plan for the Atlanta Area |
Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties |
8/30/12 |
2/24/16, 81 FR 9114 |
|
| 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 National Ambient Air Quality Standard |
Georgia |
10/22/2013 |
4/28/2016, 81 FR 25355 |
With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |