Factual and Procedural Background
Judge Egan delivered a judgment on 19 June 2026 in three related proceedings arising from the 1995 competition for the State's second GSM mobile telephone licence. Plaintiff A and Plaintiff B (disappointed tenderers) allege they suffered damage from alleged corrupt interference in the licence competition. Trial was timetabled to commence in Hilary or Whit 2027. The judgment addresses two applications: (1) an application by the State Defendants for the three proceedings to be tried concurrently before the same judge ("trial in tandem") (made with the consent of the parties); and (2) an application by the State Defendants for a modular trial splitting liability (including causation and loss of opportunity) and quantum into separate modules ("module 1" and "module 2"). The modular-trial application is supported by the Individual Defendant and the Third Party and by Plaintiff B; Plaintiff A opposes modularisation.
Legal Issues Presented
- Whether the related proceedings should be tried concurrently before the same judge (trial in tandem).
- Whether the proceedings should be modularised with liability/causation/loss of opportunity determined in a preliminary module and quantum determined in a subsequent module.
- How established case-management principles (including the tests in Cork Plastics, McCann, Donatex and related authorities) apply to an application to split liability and quantum in complex, long-running multi-party litigation.
Arguments of the Parties
State Defendants' Arguments
- Trial in tandem would promote just, expeditious and economical resolution, avoid inconsistent findings, prevent duplication and conserve resources.
- Modular trial (liability/causation/loss of opportunity at module 1; quantum at module 2) would save court time and parties' costs given the overall complexity and likely length of the proceedings.
- Causation and loss of opportunity should be included in module 1 so as to avoid tearing the fabric of the litigation.
Supporters of Modularisation (Individual Defendant, Third Party, Plaintiff B)
- Supported modular trial on grounds of efficiency, likely savings and insulation of parties/defendants from unnecessary quantum hearings.
- Agreed mechanisms to manage risk of delay from intermediate appeals (e.g. deferral of appeals on liability until after quantum in agreed circumstances).
Plaintiff A's Arguments
- Opposes modular trial; contends the court should assess relative durations and costs of modules and argues that a lengthy liability module relative to a shorter quantum module reduces the attractiveness of modularisation.
- Raised concerns about potential prejudice, delay and the need for full testing of quantum to facilitate settlement.
Table of Precedents Cited
| Precedent |
Rule or Principle Cited For |
Application by the Court |
| Kalix v. HSBC Institutional Trust Services (Ireland) Limited [2010] 2 IR 581 |
Leading authority on circumstances for ordering concurrent trial of related proceedings. |
Used as a principal modern authority supporting the court's inherent jurisdiction to order tandem trials to avoid duplication and inconsistent findings. |
| Avoncore Limited & Ors v. Leeson Motors Limited & Ors [2021] IEHC 163 |
Summary of principles from Kalix as applied to case management and concurrent trials. |
Endorsed Kalix principles and applied them in support of ordering trial in tandem where factual overlap is substantial. |
| Noble v. Greenstar Properties Ltd [2024] IEHC 657 |
Recent endorsement/application of principles on concurrent trial. |
Cited as consistent authority supporting in tandem hearing. |
| Ryanair DAC v. Competition and Consumer Protection Commission [2025] IEHC 536 |
Recent endorsement/application of principles on concurrent trial. |
Cited as a supporting recent authority. |
| Cork Plastics (Manufacturing) & Ors v. Ineos Compound UK Limited & Ors [2008] IEHC 93 |
Default position favouring single trial; factors to consider when departing to modular trial. |
Adopted as the starting point for assessing modular trial; court considered relative/absolute lengths and complexity of modules per Cork Plastics guidance. |
| McCann v. Desmond [2010] 4 IR 554 |
Test for modular trial: issues capable of determination in isolation; savings in time/cost; risk of prejudice. |
Applied the McCann test in assessing whether liability module could logically be decided in isolation and whether modularisation risked prejudice. |
| Donatex Ltd v. Dublin Docklands Development Authority [2011] IEHC 538 |
Summarised Cork Plastics and McCann into two broad considerations: logical division into modules and real prejudice. |
Used to consolidate factors and guide the court's analysis of modular trial suitability. |
| Weavering Macro Fixed Income Fund Ltd v. PNC Global Investment Servicing (Europe) Ltd [2012] 4 IR 681 |
Supreme Court intervened to set aside a High Court modular-trial direction where module boundaries were insufficiently clear and liability issues were dispersed. |
Relied on as cautionary authority showing risk where liability issues are split across modules; court distinguished present case because liability was to be fully determined in module 1. |
| Ryanair DAC v. Skyscanner Ltd [2022] IEHC 696 |
Example where modular trial refused because proposed modules were insufficiently distinct and would not render subsequent modules moot. |
Applied as an example of refusal where modular boundaries were unclear; compared and distinguished from present application. |
| Nolan v. Dildar [2020] IEHC 243 |
Refusal of modular trial where interconnection of complex issues made logical division impractical. |
Used to illustrate risk of prejudice and duplication when modules are not clearly definable. |
| Bradley v. Birthistle [2021] IEHC 695 |
Refusal of modular trial in a case where liability, causation and damages evidence was strongly interlinked. |
Applied to show that modularisation must not undermine the ability to determine liability and damages fairly; court ensured loss of opportunity would be in module 1 to avoid that risk. |
| James Elliott Construction Ltd v. Lagan [2016] IEHC 599 |
Modularisation refused where it would deprive defendant of ability to test credibility and clean-hands issues across the whole case. |
Cited to assess whether modular trial would prejudice defendants' capacity to present a full defence; court found no such issue here. |
| Kelly v. Hennessy [1996] 1 ILRM 321 |
Referenced in context of preliminary issue proposals (nervous shock case). |
Used as background when discussing authority where modular trial was refused because evidence overlapped. |
Court's Reasoning and Analysis
Judge Egan addressed the two applications sequentially.
Trial in tandem: The court exercised its inherent case-management jurisdiction to order concurrent trials where related proceedings share an identical factual matrix, common witnesses and documents, and overlapping legal issues. Citing Kalix and related authorities, the court found near-complete factual overlap between Plaintiff A and Plaintiff B proceedings, consent to tandem trial from the parties (with only limited reservation by Plaintiff A regarding delay), and concluded tandem hearing would avoid duplication, inconsistent findings, conserve resources, and serve the public interest. The court ordered a single hearing and anticipated further directions on trial modalities and a protocol prepared by the State Defendants.
Modular trial: The court applied established tests (Cork Plastics; McCann; Donatex) and considered the consolidated factors (logical division into modules; overlap of evidence; complexity and likely lengths of modules; savings in court time and costs; insulation of parties; risk of true prejudice; device/tactical use; disruption to pre-trial preparation; and appeal management).
Key findings in relation to modularisation:
- Initial uncertainty about boundaries (notably whether loss of opportunity belonged to liability or quantum) was resolved by the State Defendants' clarification that causation including loss of opportunity would be included in module 1; the court held loss of opportunity must be decided at module 1.
- Overlap of evidence: The court found overlap between liability and causation evidence but that, if both liability and causation/loss of chance are tried in module 1, overlap with quantum would be largely avoided because quantum is forward-looking and largely distinct in time and subject matter. Some experts/factual witnesses might be recalled for quantum, but substantial separation exists.
- Complexity and length: Both liability and quantum modules would be complex and lengthy; the court rejected a rule that modularisation be refused where the liability module is much longer than quantum. The court weighed absolute likely length of the quantum module and concluded even a six-to-eight week quantum hearing — and the risk that it would be unnecessary in 50% of cases — justified modularisation.
- Savings and prejudice: The court concluded modular trial would realistically save time and costs overall. No evidence of "true prejudice" to Plaintiff A was demonstrated; concerns about delay were held to be comparatively modest and manageable through case management measures.
- Appeal risk management: The court accepted that potential intermediate appeals could cause delay but noted case-management steps (including agreement by defendants not to appeal liability before quantum concludes) and other measures (deferring finality of liability orders) could mitigate that risk. The court also addressed locus standi issues in the Plaintiff B proceedings and ordered that Plaintiff B should defer any appeal on locus standi until final resolution unless parties agree otherwise, to avoid holding up the quantum module in related proceedings.
On balance, applying the identified principles and authorities, the court concluded modularisation was appropriate with module 1 to determine liability, causation and loss of opportunity, and module 2 to address quantum.
Holding and Implications
HOLDING: The court granted both applications: (a) ordered the three related proceedings to be tried concurrently before the same judge (trial in tandem); and (b) ordered a modular trial with liability, causation and loss of opportunity to be determined at Module 1 and quantum to be determined at Module 2.
Implications and direct effects:
- A single coordinated hearing will proceed, with directions to be given on sequencing of issues, witnesses, examination order, time division and document exchange; the State Defendants' draft trial protocol will inform those directions.
- The court attached a preliminary schedule dividing issues between Module 1 (preliminary and jurisdictional issues, existence/terms of contract, substantive wrongdoing allegations, State liability, causation and loss of chance, and related tender-process issues) and Module 2 (heads of loss, alternative valuation approaches, quantum-specific issues including methodology, date of assessment, remoteness, counterfactuals, unjust enrichment, interest, tender costs, and interaction between plaintiffs' claims).
- Plaintiff B was ordered to defer any appeal on the locus standi issue at the conclusion of Module 1 until the ultimate resolution of the proceedings unless all parties agree otherwise; parties agreed measures to manage potential appeals so as to minimise delay.
- The decision implements established case-management principles; it applies and reconciles existing authority rather than announcing a new legal principle.