Galliford Try Building Ltd v. Estura Ltd

Smart Summary

Factual and Procedural Background

The Plaintiff contractor ("Company A") was engaged by the Defendant employer ("Company B") under an amended JCT Design and Build Contract 2011 to design and build works at a hotel in Devon. The contract included payment terms compliant with the Housing Grants Construction and Regeneration Act 1996, as amended by the Local Democracy, Economic Development and Construction Act 2009 ("the Act").

Company A submitted Interim Application 60 ("IA 60") claiming approximately £4.075 million. Company B failed to serve either a payment notice or a pay less notice within the contractual timeframes, which under the contract meant the amount claimed became due. An adjudicator decided in favor of Company A, ordering Company B to pay £3,928,227 plus VAT and interest.

Company B resisted summary judgment enforcement of the adjudicator's decision, arguing exceptional circumstances justified refusal. Company B also initiated a second adjudication challenging the value of the works stated in IA 60, which was declined for lack of jurisdiction.

The dispute proceeded to the Technology and Construction Court ("TCC") for summary judgment enforcement of the adjudicator's award and consideration of whether enforcement should be stayed in whole or part due to Company B's financial position and the unusual circumstances of the case.

Legal Issues Presented

  1. Whether summary judgment should be granted to enforce the adjudicator's decision ordering Company B to pay the sum stated in IA 60.
  2. Whether the adjudicator's decision was within jurisdiction and not amenable to challenge on summary judgment.
  3. Whether enforcement of the adjudicator's award should be stayed in whole or in part due to Company B's alleged inability to pay and the risk of manifest injustice.
  4. The scope of an adjudicator's jurisdiction to revisit or revise the value of works stated in an interim payment application once a decision has been made.

Arguments of the Parties

Defendant's Arguments

  • IA 60 was effectively a near-final account with a sum much higher than the original contract value, which Company B contended was incorrect.
  • Company B argued the adjudicator failed to address all relevant questions, particularly the true sum due and whether the sum stated was payable.
  • Company B submitted that the adjudicator's decision was perverse and should not be enforced summarily, relying on recent case law to support the argument that the issue should be resolved at trial.
  • Company B contended the failure to serve payment notices should not permanently bar it from challenging the sum claimed, especially given the exceptional financial circumstances.
  • Company B sought a stay of enforcement pending recovery of damages from its agents or the conclusion of the final account process.
  • Company B claimed it would be unable to pay the adjudicator's award in full without risking insolvency.

Plaintiff's Arguments

  • Company A argued the adjudicator's decision was within jurisdiction and binding, and errors made by the adjudicator cannot be challenged on summary judgment absent breach of natural justice.
  • There is no precedent for staying enforcement of an adjudicator's decision simply because it might be wrong.
  • Company A emphasized the robust policy of enforcing adjudicators' decisions promptly to maintain cash flow and certainty in construction contracts.
  • Company A disputed Company B's financial evidence and argued Company B's failure to comply with contractual notice provisions should not be condoned.
  • Company A submitted that enforcement should proceed, but was prepared to consider limited stay conditions given the exceptional circumstances.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Bouygues (UK) Ltd v Dahl-Jensen (UK) Ltd [2000] BLR 49 An adjudicator’s decision within jurisdiction is binding even if erroneous, absent breach of natural justice. Court confirmed adjudicator’s decision was unassailable on summary judgment as no breach of natural justice was alleged.
ISG Construction Ltd v Seevic College [2014] EWHC 4007 (TCC) Failure to serve payment notices means employer is deemed to have agreed the sum stated in the interim application; employer cannot reopen valuation at same interim application date. Court applied ISG v Seevic to hold Company B bound by sum stated in IA 60 and unable to challenge adjudicator’s award on this basis.
Harding v Paice [2014] EWHC 3824 (TCC) Failure to serve pay less notice does not permanently bar employer from challenging final account; distinction between interim and final payments. Court distinguished Harding v Paice from current case due to difference between interim payment regime and final account provisions.
Watkin Jones and Son Ltd v Lidl UK GmbH [2002] EWHC 183 (TCC) Adjudicator may have jurisdiction to revise interim payment applications under wide arbitration clause. Court held no such wide arbitration clause existed here; adjudicator lacked jurisdiction to revise IA 60 valuation.
VHE Construction plc v RBSTB Trust Co Ltd [2000] BLR 187 Second adjudicator can revise interim payment application value if contract/arbitration clause permits. Court found no inconsistency with current case where no such clause exists.
Rupert Morgan Building Services (LLC) Ltd v Jervis [2004] 1 WLR 1867 Interim certificates are provisional; errors can be corrected in subsequent certificates; cash-flow protection for contractor. Court relied on Rupert Morgan to confirm employer cannot withhold payment without notice and can recover overpayment later.
Interserve Industrial Services Ltd v Cleveland Bridge [2006] EWHC 741 (TCC) Parties must comply with adjudicators’ decisions in order made, even if later decisions supersede earlier ones. Court acknowledged that enforcement of first decision can be overtaken by subsequent adjudicator decisions.
Hillview Industrial Developments (UK) Ltd v Botes Building Ltd [2006] EWHC 1365 (TCC) Stay of enforcement of adjudicator’s decision may be granted in cases of manifest injustice. Court applied principle to consider fairness and possible stay of enforcement due to Company B’s financial position.
Wimbledon Construction Company 2000 Ltd v Vago [2005] BLR 374 Principles governing grant of stay where claimant may be unable to repay judgment sum. Court noted distinction as Company B did not allege inability of Company A to repay if judgment overturned.
M V Yorke Motors v Edwards [1982] 1 All ER 1024 Defendant must provide proper evidence of inability to comply with financial conditions imposed for leave to defend. Court held Company B’s bare assertion of inability to pay was insufficient without proper evidence.
Geoffrey Osborne Ltd v Atkins Rail Ltd [2010] BLR 363 Part 8 proceedings can be used to seek declarations about sums due under interim applications. Court noted Company B could have brought Part 8 proceedings to challenge amount stated in IA 60.

Court's Reasoning and Analysis

The court first confirmed that the adjudicator’s decision was within jurisdiction and binding, as the adjudication concerned the single question of the sum stated as due in IA 60. There was no allegation of breach of natural justice, and errors in adjudicator decisions are not grounds to resist summary judgment enforcement.

The court applied the ruling in ISG v Seevic that failure to serve payment or pay less notices means the employer is deemed to have agreed the sum stated in the interim application, preventing a second adjudication on the same valuation date. The adjudicator’s role is limited to the question referred, and the contract’s payment provisions do not allow re-opening the valuation once decided.

Company B’s argument that this approach leaves it without effective remedy was acknowledged, particularly given the high amount claimed in IA 60 and that IA 60 was near the final interim application. The court noted that while the employer may challenge subsequent interim applications or the final account, it cannot do so for the same valuation date under the contract and Act.

The court recognized the practical difficulties for Company B, including its limited financial resources and the risk of insolvency if forced to pay in full immediately. The court considered the policy of enforcing adjudicators’ decisions promptly to preserve cash flow and certainty but also the need to avoid manifest injustice in exceptional cases.

On balance, the court found no defence to summary judgment but exercised its discretion to stay enforcement of part of the judgment to mitigate potential irreparable prejudice to Company B. The stay was limited and conditional to preserve Company A’s incentives to complete the works and submit the final account.

Holding and Implications

The court granted summary judgment in favor of Company A for the sum awarded by the adjudicator: £3,928,227.04 plus VAT (to be assessed), together with interest as awarded and accruing daily.

However, the court ordered a partial stay of enforcement of the judgment above £1.5 million, subject to conditions designed to balance the interests of both parties. The stay was imposed due to Company B’s financial position and the exceptional circumstances, but the court emphasized this is a rare and exceptional course of action.

The conditions include Company A issuing a VAT invoice for the stay amount and the requirement that Company A must have served its Final Statement at least 28 days before applying to vary or lift the stay unless fresh material financial information arises.

This decision enforces the adjudicator’s award while recognizing the risk of manifest injustice to the employer in exceptional cases, without undermining the fundamental policy of prompt enforcement of adjudicators’ decisions under the Act. No new precedent altering the general approach to adjudication enforcement was established.

To access the original judgment, please Sign In or Subscribe.

Galliford Try Building Ltd v Estura Ltd

Contains public sector information licensed under the Open Justice Licence v1.0.