AMICUS AI
Citation Codes
Neutral Citations
2022 INSC 957
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 7 of the Insolvency and Bankruptcy Code, 2016
  • Section 9 of the Arbitration & Conciliation Act, 1996
  • Section 9 of the Arbitration Act, Section XXXVIII, Rule 5 of the Civil Procedure Code, 1908 (CPC)
  • Section 9(ii)(b) of the Arbitration Act
  • The Arbitration Act
  • the CPC (Code of Civil Procedure)
  • Section 37 of the Arbitration and Conciliation Act, 1996
  • Section 36 of the Arbitration Act
  • Section 9 of the Act
  • Code of Civil Procedure 1908
  • Order 38 Rule 5 of the Civil Procedure Code, 1908
  • Section 37 of the Arbitration Act read with Section 13 of the Commercial Courts Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 9 of the Arbitration and Conciliation Act, 1996
  • Companies Act, 1956
  • Order 38 Rule 5 of the Code of Civil Procedure
  • Section 62 of the Indian Contract Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Neutral Citations
2022 INSC 957
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 7 of the Insolvency and Bankruptcy Code, 2016
  • Section 9 of the Arbitration & Conciliation Act, 1996
  • Section 9 of the Arbitration Act, Section XXXVIII, Rule 5 of the Civil Procedure Code, 1908 (CPC)
  • Section 9(ii)(b) of the Arbitration Act
  • The Arbitration Act
  • the CPC (Code of Civil Procedure)
  • Section 37 of the Arbitration and Conciliation Act, 1996
  • Section 36 of the Arbitration Act
  • Section 9 of the Act
  • Code of Civil Procedure 1908
  • Order 38 Rule 5 of the Civil Procedure Code, 1908
  • Section 37 of the Arbitration Act read with Section 13 of the Commercial Courts Act
  • Section 5, Subsection 2 of the 1983 Income Tax Act
  • Section 9 of the Arbitration and Conciliation Act, 1996
  • Companies Act, 1956
  • Order 38 Rule 5 of the Code of Civil Procedure
  • Section 62 of the Indian Contract Act
Smart Summary

Factual and Procedural Background

Essar Services India Pvt. Ltd. (“Essar Services”) and Essar House Pvt. Ltd. (“Essar House”) are Essar Group entities that, prior to Essar Steel’s Corporate Insolvency Resolution Process (CIRP), received large, interest-free, refundable security deposits from Essar Steel under separate commercial agreements—viz. a Support Services Agreement (later amended) and a Rental/Business Centre Agreement in respect of the “Essar House” building in Mumbai.

During Essar Steel’s CIRP, a resolution plan submitted by Arcellor Mittal Nippon Steel India Ltd. (“Arcellor”) was approved by the National Company Law Tribunal, the National Company Law Appellate Tribunal and, ultimately, the Supreme Court in Committee of Creditors of Essar Steel India v. Satish Kumar Gupta (2020) 8 SCC 531. After Arcellor took control of Essar Steel in December 2019, it demanded refund of the security deposits—Rs 35.51 crore from Essar House and Rs 47.41 crore from Essar Services.

Essar House and Essar Services refused, claiming to have lawfully set-off or diverted the deposits, at Essar Steel’s instructions, to discharge third-party debts. Arcellor, contending that these sums remained refundable, filed two Section 9 petitions under the Arbitration and Conciliation Act, 1996 before the Bombay High Court. The Single Judge ordered each Essar entity to deposit the respective amounts (or furnish nationalised-bank guarantees). The Division Bench (Commercial Appellate Division) dismissed the ensuing Section 37 appeals on 1 February 2021. Essar House and Essar Services then appealed to the Supreme Court, which delivered the present decision.

Legal Issues Presented

  1. Whether the Bombay High Court was justified, under Section 9 of the Arbitration and Conciliation Act, 1996, in directing Essar House and Essar Services to secure the disputed security-deposit amounts by cash deposit or bank guarantee.
  2. Whether the High Court erred by inadequately applying or disregarding the safeguards of Order XXXVIII Rule 5 of the Code of Civil Procedure, 1908 when granting such interim relief.
  3. Whether Essar House and Essar Services could validly set-off or novate Essar Steel’s refundable security deposits to third parties without Arcellor’s consent during Essar Steel’s CIRP.

Arguments of the Parties

Appellants’ Arguments (Essar House & Essar Services)

  • No monies were due to Arcellor; the deposits had been applied, per Essar Steel’s instructions, toward liquidation of Essar Steel’s liabilities to other creditors.
  • Interim relief under Section 9 must strictly follow the principles of Order XXXVIII Rule 5 CPC; Raman Tech. & Process Engg. Co. v. Solanki Traders (2008) 2 SCC 302 requires proof of an attempt to defeat execution, which was absent.
  • The High Court granted a drastic, discretionary remedy mechanically and without satisfaction of the requisite CPC conditions.

Respondent’s Arguments (Arcellor Mittal Nippon Steel India Ltd.)

  • The purported set-off/novation is a “sham defence”; no documentary proof supports the alleged diversions.
  • Novation or assignment of contractual obligations cannot occur unilaterally; consent of the counter-party (Arcellor) is mandatory (Citibank N.A. v. Standard Chartered Bank, 2004 1 SCC 12; Khardah Co. Ltd. v. Raymon & Co., 1963 3 SCR 183).
  • During CIRP, such set-offs are impermissible without the Resolution Professional’s consent; Section 14 IBC bars enforcement of security interests.
  • Section 9 furnishes wide, equitable powers extending beyond the literal text of CPC provisions; securing the amount in dispute is squarely within those powers.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Raman Tech. & Process Engg. Co. v. Solanki Traders (2008) 2 SCC 302 Attachment before judgment is drastic; requires evidence that the defendant is disposing of assets to defeat a decree. Cited by appellants; Court distinguished it, noting it arose in a CPC suit and does not confine the broad Section 9 jurisdiction.
Citibank N.A. v. Standard Chartered Bank (2004) 1 SCC 12 Novation under Section 62 Contract Act requires agreement of both parties; cannot be unilateral. Relied upon to reject Essar entities’ unilateral set-off/novation defence.
Khardah Co. Ltd. v. Raymon & Co. (India) Pvt. Ltd. (1963) 3 SCR 183 Obligations under a contract are non-assignable without promisee’s consent; such consent results in novation. Supports finding that Essar entities could not shift obligations without Arcellor’s consent.
Committee of Creditors of Essar Steel India v. Satish Kumar Gupta (2020) 8 SCC 531 Approved Arcellor’s resolution plan for Essar Steel. Provides factual backdrop establishing Arcellor’s standing to claim the deposits.
Ajay Singh v. Kal Airways Pvt. Ltd., 2017 SCC OnLine Del 8934 Section 9 grants wide discretionary powers; CPC provisions serve as guidelines, not strait-jackets. Cited to affirm the High Court’s ability to mould relief beyond Order XXXVIII Rule 5 technicalities.
Jagdish Ahuja v. Cupino Ltd. (Bombay HC) Courts under Section 9 are not strictly bound by Order XXXVIII Rule 5; discretion must be exercised judiciously. Used to reinforce the permissibility of ordering security to preserve arbitral efficacy.
Valentine Maritime Ltd. v. Kreuz Subsea Pte. Ltd., 2021 SCC OnLine Bom 75 Chartered High Courts possess inherent equitable powers to grant injunctions beyond statutory confines. Cited to support the breadth of Section 9 relief.
Adhunik Steels Ltd. v. Orissa Manganese & Minerals (P) Ltd., (2007) 7 SCC 125 Basic CPC principles inform but do not rigidly bind Section 9 jurisdiction. Forms part of the jurisprudential chain validating flexible interim remedies.
Deccan Chronicle Holdings Ltd. v. L&T Finance Ltd., 2013 SCC OnLine Bom 1005 Court may secure claims under Section 9 despite encumbered assets; balance between CPC rigour and arbitral efficacy. Quoted by Division Bench; Supreme Court found the reasoning sound.
Srei Infrastructure Finance Ltd. v. Ravi Udyog Pvt. Ltd., A.P. No. 522 of 2008 (Calcutta HC) Technical pleading deficiencies should not defeat meritorious Section 9 relief. Relied upon to justify granting protection despite absence of explicit Order XXXVIII averments.

Court's Reasoning and Analysis

The Supreme Court reiterated that Section 9 confers “wide power” enabling courts to:

  • Secure the amount in dispute in arbitration, and
  • Grant “any interim measure of protection” that appears “just and convenient”.

Key analytical steps:

  1. Prima facie entitlement: It is undisputed that Essar Steel paid security deposits of ~Rs 35 crore and ~Rs 47 crore to the respective appellants; these sums are contractually refundable.
  2. Set-off/novation defence rejected: The appellants’ unilateral diversion of deposits to third-party debts lacks documentary support and, under Citibank and Khardah, cannot bind Arcellor without its consent—particularly during Essar Steel’s CIRP when Section 14 IBC bars such actions.
  3. Order XXXVIII Rule 5 not a strait-jacket: While CPC principles guide Section 9, strict proof of actual asset dissipation is unnecessary; a “strong possibility of diminution” suffices when balancing conveniences.
  4. Equitable necessity: The Division Bench recorded that the appellants were “heavily indebted” and possessed only one encumbered asset, justifying the need to secure Arcellor’s potential award.
  5. No procedural infirmity: The High Court correctly weighed the prima facie case, balance of convenience and urgency; withholding relief merely for want of textbook Order XXXVIII pleadings would “defeat justice”.

Holding and Implications

Appeals DISMISSED. The Supreme Court upheld the Division Bench’s orders, reaffirming that Essar House Pvt. Ltd. must secure Rs 35.51 crore and Essar Services India Pvt. Ltd. must secure Rs 47.41 crore (by deposit or nationalised-bank guarantee) pending arbitration.

Implications: The decision reinforces the expansive and flexible nature of Section 9 jurisdiction, clarifying that courts may order security even when Order XXXVIII Rule 5 conditions are not strictly proved, provided a strong prima facie case and balancing-of-convenience test are satisfied. While the ruling turns on its facts, it underscores that corporate debtors—and their group entities—cannot unilaterally divert refundable deposits during CIRP without counter-party consent.

To access the original judgment, please Sign In or Subscribe.

    ESSAR HOUSE PRIVATE LIMITED v. ARCELLOR MITTAL NIPPON STEEL INDIA LIMITED

    Indira Banerjee, J.:— Leave granted.

    2. These appeals are against a common judgment and order dated 1 February 2021 passed by a Division Bench (Commercial Appellate Division) of High Court of Judicature at Bombay, dismissing the appeal being Commercial Arbitration Appeal (L) No. 1022 of 2021 filed by the Appellant in the Civil Appeal arising out of SLP (C) No. 3187 of 2021, Essar House Private Limited, hereinafter referred to as “Essar House Private”, under Section 37 of the Arbitration and Conciliation Act, 1996, hereinafter referred to as the “Arbitration Act” and confirming an order dated 10 December 2020 passed by the Commercial Division (Single Bench) of the High Court allowing an application filed by the Respondent-Arcellor Mittal Nippon Steel India Limited, hereinafter referred to as the “Arcellor”, under Section 9 of the Arbitration Act and directing Essar House Private to deposit an amount of Rs. 35.5 crores with the Prothonotary and Senior Master of the High Court or, in the alternative, to furnish bank guarantee of any nationalised bank for the entire amount along with interest thereon.

    3. By the impugned judgment and order, the Division Bench has also dismissed the appeal being Commercial Arbitration Appeal (L) No. 1023 of 2021, filed by the Appellant in the Civil Appeal arising out of SLP (C) No. 3351 of 2021, Essar Services India Private Limited, hereinafter referred to as “Essar Services”, and confirming an order dated 10 December 2020 passed by the Commercial Division (Single Bench) of the High Court, allowing an application by Arcellor against Essar Services and directing Essar Services to deposit Rs. 47.41 crores with the Prothonotary and Senior Master of the High Court or, in the alternative, furnish Bank Guarantee of any nationalised bank for the entire amount along with interest thereon.

    4. Essar Services is engaged in providing services of accounting, account related services, review, research etc. Essar Services is a part of the Essar Group of Companies.

    5. On or about 24 January 2012, Essar Services and Essar Steel India Limited, hereinafter referred to as “Essar Steel” entered into a Support Services Agreement, whereby Essar Services was to provide accounting and other services to Essar Steel.

    6. On 15 May 2014, Essar Services entered into an Amended and Restated Support Services Agreement with Essar Steel. Under Clause 3.2 of the said Amended and Restated Support Services Agreement, Essar Steel was required to deposit a sum of Rs. 73 crores as security deposit. Essar Steel deposited a total sum of Rs. 47.41 crores with Essar Services as security deposit in terms of the Support Services Agreement. Further, Essar Steel had to pay a sum of Rs. 6,38,75,000/-per month to Essar Services on account of charges for the services rendered by Essar Services to Essar Steel.

    7. The Support Services were discontinued for the period from January 2016 to March 2016, but restored after some adjustments/variations in charges, and an inter-corporate arrangement between Essar Steel, Essar Services and Equinox Business Park Private Limited, hereinafter referred to as the “Equinox”.

    8. Essar House Private, a company registered under the Companies Act, 1956, is engaged in the business of dealing in real estate. Essar House Private is the owner of the building Essar House, situated at Keshavrao Khadye Marg, Opposite Race Course, Mahalaxmi, Mumbai-400034.

    9. On or about 1 April 2016, Essar House Private entered into an agreement styled as “Rental Agreement” with Essar Steel, under which the ground floor, Podium and 20 upper floors in Essar House, was let out to Essar Steel on leave and license basis, for a period of 36 months commencing on 1 April 2016, at a monthly rent of Rs. 78,40,000/-. In terms of the aforesaid Rental Agreement, Essar Steel was to pay an amount of Rs. 25.80 crores to Essar House Private as interest free refundable security deposit.

    10. Essar House Private was a group company of Essar Steel until 2019. Many of the group companies have/had credit transactions with HDFC Bank. It is submitted that the lenders of Essar Steel started realising the dues of Essar Steel to lenders from the group companies. Equinox is another group company of Essar Steel. Equinox on the instructions of Essar Steel, made a payment of Rs. 60.95 crores to HDFC bank in discharge of the financial liabilities of Essar Steel to the bank. It appears that HDFC Bank granted a loan of Rs. 26,00,00,000/- (Rupees twenty six crores only) to Marvel Mines and Minerals Private Limited, hereinafter referred to as “Marvel Mines”. The said amount has apparently been appropriated towards dues of the Essar Steel of HDFC Bank.

    11. By an email dated 26 April 2017, Essar Steel acknowledged that HDFC Bank had disbursed a loan of Rs. 26 crores to Marvel Mines, of which Rs. 26 crores had been appropriated towards term loan recoveries.

    12. It is the case of the Appellant that on the instructions of Essar Steel and on behalf of Essar Steel, Equinox made payments to HDFC Bank from time to time in discharge of debts due from Essar Steel to Equinox. As on 31 March 2018, the total dues payable by the Essar Steel to Equinox was Rs. 74,84,39,302/- (Rupees seventy four crores, eighty four lacs, thirty nine thousand, three hundred and two only) inclusive of interest.

    13. On or about 2 August 2017, the Standard Chartered Bank and the State Bank of India jointly filed a petition under Section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC) for initiation of the Corporate Insolvency Resolution Process (CIRP) against Essar Steel in the Ahmedabad Bench of the National Company Law Tribunal (NCLT). On 14 August 2017, Essar House Private filed its claim against Essar Steel with the Resolution Professional appointed for Essar Steel.

    14. On 17 September 2018, Essar Steel entered into an agreement, hereinafter referred to as the “Business Centre Agreement” in terms whereof Essar Steel was allowed to use six floors of the Essar House, i.e., 10, 12, 13, 15, 16 and 17 floor at a monthly rent of Rs. 1,78,80,000/- (Rupees one crore seventy eight lacs and eighty thousand only).

    15. Under the said agreement, Essar Steel was required to make a security deposit of Rs. 35,51,89,875/- (Rupees thirty five crores, fifty one lacs, eighty nine thousand, eight hundred and seventy five only). However, out of Rs. 35,51,89,875/-, the security deposit of Rs. 25,80,00,000/- paid by the Essar Steel under the Rental Agreement was adjusted towards the security deposit payable to Essar House Private under the Business Centre Agreement.

    16. By a letter dated 17 September 2018, Essar Infrastructure Services Private Limited claimed that it had transferred the balance security deposit of Rs. 9,71,89,875/- (Rupees nine crores, seventy one lacs, eighty nine thousand, eight hundred and seventy five only) to Essar House Private.

    17. In the meanwhile, on 16 August 2017, Essar Services filed a proof of claim as an Operational Creditor in respect of unpaid invoices under the Support Services Agreement, with the Resolution Professional of Essar Steel.

    18. Essar Services and Essar Steel mutually reconciled their accounts, in March 2018, acknowledging that Rs. 47,41,00,000/- was paid to Essar Services as security deposit and sum of Rs. 23,21,93,750/- was payable by Essar Steel to Essar Services.

    19. Sometime in 2018-2019, Equinox allegedly assigned its receivable from Essar Steel to one Edwell Infrastructure Hazira Limited, hereinafter referred to as “Edwell”, to whom Essar Steel had owed an aggregate amount of Rs. 88,13,03,623/- inclusive of interest as on November 2019. Later in 2019, the obligation of Essar Services to make payment of Rs. 47.41 crores to Essar Steel was novated to Edwell and it was agreed that payment would be made to Edwell.

    20. Arcellor as resolution applicant submitted a Resolution Plan in respect of Essar Steel. The said Resolution Plan was approved by the Adjudicating Authority (NCLT), Ahmedabad Bench by an order dated 8 March 2019. By an order dated 4 June 2019, the Appellate Tribunal (NCLAT) confirmed the order dated 8 March 2019 of Adjudicating Authority.

    21. The Resolution Plan submitted by Arcellor in respect of Essar Steel was approved by this Court in Committee of Creditors of Essar Steel India through Authorised Signatory v. Satish Kumar Gupta (2020) 8 SCC 531

    22. On 27 November 2019, Essar House Private sent an email to Arcellor stating that the Business Centre Agreement as extended was expiring on 30 November 2019 and called upon Arcellor to vacate Essar House by 15 December 2019. On 15 December 2019, Arcellor vacated Essar House. On 16 December 2019, Arcellor took over Essar Steel pursuant to the judgment dated 15 November 2019 of this Court.

    23. By an email dated 11 January 2020, Arcellor called upon the Essar House Private to refund the interest free security deposit amounting to Rs. 35,51,89,875/-. The email was followed by a reminder email dated 19 January 2020 and more emails.

    24. On 17 June 2020, Arcellor sent a legal notice to Essar House Private calling upon the Essar House Private to refund the security deposit to Arcellor within seven days along with interest.

    25. By an email dated 27 June 2020, Essar House Private acknowledged that Essar House Private had received security deposit of Rs. 25,80,00,000/- from Essar Steel, but contended that Essar House Private had taken over loan of Rs. 26 crores due from Essar Steel to Marvel Mines and had adjusted the same against the security deposit kept by Essar Steel with Essar House Private. The balance amount of Rs. 9,71,89,875/- had allegedly been paid by the Essar House Private to Edwell Infrastructure in discharge of debt owed by Essar Steel to Edwell Infrastructure. There was, therefore, no security deposit left to be refunded by the Essar House Private to the Arcellor.

    26. On 17 November 2020, Arcellor filed an application under Section 9 of the Arbitration Act being Commercial Arbitration Petition (L) No. 6602 of 2020 in the Commercial Division of the High Court of Judicature at Bombay seeking orders directing the Essar House Private to deposit Rs. 35,51,89,875/- with the Prothonotary and Senior Master of the High Court. The said application has been allowed by the Single Bench of the High Court. An appeal being Arbitration Appeal (L) No. 1022 of 2021 filed against the order of the Single Bench has been dismissed by the Commercial Appellate Division of the High Court (Division Bench), by the judgment and order impugned.

    27. Arcellor paid Rs. 4,75,06,260 to Essar Services on behalf of Essar Steel in settlement of its claims/dues. However, on 14 July 2020 Arcellor addressed a legal notice to Essar Services for refund of Rs. 47.41 crores. Arcellor filed an application under Section 9 of the Arbitration Act being Commercial Arbitration Petition (L) No. 6607 of 2020 in the Commercial Division of Bombay High Court seeking orders directing Essar Services to deposit Rs. 47,41,00,000/- with the Prothonotary and Senior Master of the High Court.

    28. By an order dated 10 December 2020, the Commercial Division of the Bombay High Court, Single Bench directed Essar Services to deposit Rs. 47.41 crores with the Prothonotary and Senior Master of the High Court. The Essar Services filed Arbitration Appeal No. 1023 of 2021 under Section 37 of the Arbitration Act read with Section 13 of the Commercial Courts Act in the Commercial Appellate Division of the High Court (Division Bench). The appeal has been dismissed by the judgment and order impugned.

    29. Mr. Shyam Divan, learned Senior Counsel appearing on behalf of the Appellants emphatically argued that no amount was due from Essar House Private or from Essar Services to Arcellor. The security deposits of Essar Steel with Essar House Private and Essar Services had at the instructions of Essar Steel, been discharged to liquidate dues of Essar Steel to creditors.

    30. Mr. Shyam Divan further argued that, to grant discretionary interim relief under Section 9 of the Arbitration Act, the Court would have to satisfy itself that the applicant for interim relief, i.e., Arcellor had a bona fide and strong claim and that Essar House Private and/or Essar Services was about to remove or dispose of whole or part of its property with intent to obstruct or delay the execution. Mr. Divan argued that the Court erred in not considering the requisites of Order XXXVIII, Rule 5 of the Civil Procedure Code, 1908 (CPC) for grant of interim relief. In support of his submissions, Mr. Divan cited Raman Tech. & Process Engg. Co. v. Solanki Traders (2008) 2 SCC 302 where this Court held:—

    “5. The power under Order 38 Rule 5 CPC is a drastic and extraordinary power. Such power should not be exercised mechanically or merely for the asking. It should be used sparingly and strictly in accordance with the Rule. The purpose of Order 38 Rule 5 is not to convert an unsecured debt into a secured debt..”

    31. Mr. Neeraj Kishan Kaul, learned Senior Counsel appearing on behalf of the Respondent in the two appeals argued that the defence of the Essar House Private/Essar Services of set off was a sham defence. He argued that Essar House Private/Essar Services had not brought a single document on record to support the assertions made by them. It is well settled that novation of an agreement cannot be brought about by the unilateral action of a party to an agreement. Consent of Arcellor was necessary.

    32. In Citibank N.A. v. Standard Chartered Bank (2004) 1 SCC 12 cited by Mr. Kaul, this Court held:—

    “47. Novatio, rescission or alteration of a contract under Section 62 of the Indian Contract Act can only be done with the agreement of both the parties of a contract. Both the parties have to agree to substitute the original contract with a new contract or rescind or alter. It cannot be done unilaterally…”

    33. In any case, obligations under a contract cannot be assigned, without consent of the counterparty, as laid down by this Court in Khardah Company Ltd. v. Raymon & Co. (India) Pvt. Ltd. (1963) 3 SCR 183:—

    “… An assignment of a contract might result by transfer either of the rights or of the obligations thereunder. But there is a well-recognised distinction between these two classes of assignments. As a rule obligations under a contract cannot be assigned except with the consent of the promisee, and when such consent is given, it is really a novation resulting in substitution of liabilities…”

    34. In any case, novation of contract or set off is not allowed in respect of a corporate entity undergoing CIRP without the consent of the Resolution Professional. Section 14 of the IBC bars action to foreclose, recover or enforce any security interest created by a Corporate Debtor undergoing CIRP.

    35. Admittedly, the CIRP of Essar Steel commenced on 2 August 2017 when the Resolution Professional took over the management of the affairs of Essar Steel under the IBC.

    36. Even if any prior inter se arrangement existed between the parties, Essar Services could not have adjusted the security deposit payable to Essar Steel under the amended agreement against the alleged dues of Essar Steel to a third party during the CIRP.

    37. Mr. Shyam Divan argued that while deciding a Section 9 application filed under the provisions of the Arbitration Act, the principles of the CPC are to be strictly followed. The principles enunciated by this Court in Raman Tech. & Process Engg. Co. (supra) were required to be followed in letter and spirit.

    38. In this case, however, the High Court has taken note of the pleadings for invoking the principles of Order 38 Rule 5 CPC and observed:—

    “31. In our view, the paragraphs of the aforesaid pleadings of the respondent in arbitration petition filed under section 9 filed by the respondent were sufficient to secure the claim of the respondent under section 9 of the Arbitration Act and to invoke the principles of Order 38 Rule 5 of the Code of Civil Procedure even if it is strictly made applicable to the facts of this case.”

    39. In deciding a petition under Section 9 of the Arbitration Act, the Court cannot ignore the basic principles of the CPC. At the same time, the power Court to grant relief is not curtailed by the rigours of every procedural provision in the CPC. In exercise of its powers to grant interim relief under Section 9 of the Arbitration Act, the Court is not strictly bound by the provisions of the CPC.

    40. While it is true that the power under Section 9 of the Arbitration Act should not ordinarily be exercised ignoring the basic principles of procedural law as laid down in the CPC, the technicalities of CPC cannot prevent the Court from securing the ends of justice. It is well settled that procedural safeguards, meant to advance the cause of justice cannot be interpreted in such manner, as would defeat justice.

    41. Section 9 of the Arbitration Act provides that a party may apply to a Court for an interim measure or protection inter alia to (i) secure the amount in dispute in the arbitration; or (ii) such other interim measure of protection as may appear to the Court to be just and convenient, and the Court shall have the same power for making orders as it has for the purpose of, and in relation to, any proceedings before it.

    42. As argued by Mr. Kaul, besides the specific power of securing the amount in dispute, the Courts have been empowered to pass any interim measure of protection, keeping in view the purpose of the proceedings before it. The said provision confers a residuary power on the Court to pass such other interim measures of protection as may appear to be just and convenient.

    43. Many High Courts have also proceeded on the principle that the powers of a Court under Section 9 of the Arbitration Act are wider than the powers under the provisions of the CPC.

    44. In Ajay Singh v. Kal Airways Private Limited 2017 SCC OnLine Del 8934 the Delhi High Court correctly held:

    “…Section 9 grants wide powers to the courts in fashioning an appropriate interim order, is apparent from its text. Nevertheless, what the authorities stress is that the exercise of such power should be principled, premised on some known guidelines - therefore, the analogy of Orders 38 and 39. Equally, the court should not find itself unduly bound by the text of those provisions rather it is to follow the underlying principles…”

    45. In Jagdish Ahuja v. Cupino Limited 2020 SCC OnLine Bom 849, the Bombay High Court correctly summarised the law in Paragraph 6 extracted hereinbelow:—

    “6. As far as Section 9 of the Act is concerned, it cannot be said that this court, while considering a relief thereunder, is strictly bound by the provisions of Order 38 Rule 5. As held by our Courts, the scope of Section 9 of the Act is very broad; the court has a discretion to grant thereunder a wide range of interim measures of protection “as may appear to the court to be just and convenient”, though such discretion has to be exercised judiciously and not arbitrarily. The court is, no doubt, guided by the principles which civil courts ordinarily employ for considering interim relief, particularly, Order 39 Rules 1 and 2 and Order 38 Rule 5; the court, however, is not unduly bound by their texts. As this court held in Nimbus Communications Limited v. Board of Control for Cricket in India (Per D.Y. Chandrachud J, as the learned Judge then was), the court, whilst exercising power under Section 9, “must have due regard to the underlying purpose of the conferment of the power under the court which is to promote the efficacy of arbitration as a form of dispute resolution.” The learned Judge further observed as follows:

    “Just as on the one hand the exercise of the power under Section 9 cannot be carried out in an uncharted territory ignoring the basic principles of procedural law contained in the Code of Civil Procedure 1908, the rigors of every procedural provision in the Code of Civil Procedure 1908 cannot be put into place to defeat the grant of relief which would subserve the paramount interests of justice. A balance has to be drawn between the two considerations in the facts of each case.”

    46. In Valentine Maritime Ltd. v. Kreuz Subsea Pte. Ltd. 2021 SCC OnLine Bom 75, the High Court held:—

    “88. …It is now a well settled legal position, that at least with respect to Chartered High Courts, the power to grant temporary injunctions are not confined to the statutory provisions alone. The Chartered High Courts had an inherent power under the general equity jurisdiction to grant temporary injunctions independently of the provisions of the Civil Procedure Code, 1908…”

    xxxxxxxxx

    93. Insofar as judgment of Supreme Court in case of Raman Tech. & Process Engg. Co. (supra) relied upon by Mr. Narichania, learned senior counsel for the VML is concerned, it is held by the Hon'ble Supreme Court that merely having a just or valid claim or a prima facie case, will not entitle the plaintiff to an order of attachment before judgment, unless he also establishes that the defendant is attempting to remove or dispose of his assets with the intention of defeating the decree that may be passed. The Hon'ble Supreme Court has further held that the purpose of Order 38 Rule 5 is not to convert an unsecured debt into a secured debt. The said judgment of the Hon'ble Supreme Court was not in respect of the powers of court under section 9 of the Arbitration and Conciliation Act, 1996 but was in respect of power under Order 38 Rule 5 of the Civil Procedure Code, 1908 in a suit. Even otherwise, the said judgment is distinguishable in the facts of this case.

    xxxxxxxxx

    95. Insofar as judgment of this Court delivered by the Division Bench of this court in case of Nimbus Communications Limited v. Board of Control for Cricket in India (supra) relied upon by the learned senior counsel for the VML is concerned, this Court adverted to the judgment of Hon'ble Supreme Court in case of Adhunik Steels Ltd. v. Orissa Manganese and Minerals (P) Ltd., (2007) 7 SCC 125 and held that in view of the decision of the Supreme Court in case of Adhunik Steels Ltd., (supra) the view of the Division Bench in case of National Shipping Company of Saudi Arabia (supra) that the exercise of power under section 9(ii)(b) is not controlled by the provisions of the Civil Procedure Code, 1908 cannot stand. This court in the said judgment of Nimbus Communications Limited (supra) held that the exercise of the power under section 9 of the Arbitration Act cannot be totally independent of the basic principles governing grant of interim injunction by the civil Court, at the same time, the Court when it decides the petition under section 9, must have due regard to the underlying purpose of the conferment of the power upon the Court which is to promote the efficacy of arbitration as a form of dispute resolution.

    96. This court held that just as on the one hand the exercise of the power under Section 9 cannot be carried out in an uncharted territory ignoring the basic principles of procedural law contained in the Civil Procedure Code, 1908, the rigors of every procedural provision in the Civil Procedure Code, 1908 cannot be put into place to defeat the grant of relief which would sub-serve the paramount interests of justice. A balance has to be drawn between the two considerations in the facts of each case. The principles laid down in the Civil Procedure Code, 1908 for the grant of interlocutory remedies must furnish a guide to the Court when it determines an application under Section 9 of the Arbitration and Conciliation Act, 1996. The underlying basis of Order 38 Rule 5 therefore has to be borne in mind while deciding an application under Section 9(ii)(b) of the Arbitration Act.

    xxxxxxxxx

    104. The Division Bench of this court in case of Deccan Chronicle Holdings Limited v. L & T Finance Ltd., 2013 SCC OnLine Bom 1005 after adverting to the judgment of Supreme Court in case of Adhunik Steel Ltd. (supra), judgment of the Division Bench of this court in case of Nimbus Communications Ltd. (supra) held that the rigors of every procedural provision of the Code of Civil Procedure cannot be put into place to defeat the grant of relief which would sub-serve the paramount interests of the justice. The object of preserving the efficacy of arbitration as an effective form of dispute resolution must be duly fulfilled. This would necessarily mean that in deciding an application under Section 9, the Court would while bearing in mind the fundamental principles underlying the provisions of the Code of Civil Procedure, at the same time, have the discretion to mould the relief in appropriate cases to secure the ends of justice and to preserve the sanctity of the arbitral process. The Division Bench of this Court in the said judgment did not interfere with the order passed by the learned Single Judge directing the parties to furnish security so as to secure the claim of the original petitioner in arbitration by applying principles of Order 38 Rule 5 of the Code of Civil Procedure. …”

    47. In Srei Infrastructure Finance Limited v. Ravi Udyog Pvt. Ltd. A.P. No. 522 of 2008, the Calcutta High Court, speaking through one of us (Indira Banerjee, J.), as Judge of that Court, said:—

    “An application under section 9 of the Arbitration & Conciliation Act, 1996 for interim relief is not to be judged as per the standards of a plaint in a suit. If the relevant facts pleaded, read with the documents annexed to the petition, warrant the grant of interim relief, interim relief ought not to be refused by recourse to technicalities…”

    48. Section 9 of the Arbitration Act confers wide power on the Court to pass orders securing the amount in dispute in arbitration, whether before the commencement of the arbitral proceedings, during the arbitral proceedings or at any time after making of the arbitral award, but before its enforcement in accordance with Section 36 of the Arbitration Act. All that the Court is required to see is, whether the applicant for interim measure has a good prima facie case, whether the balance of convenience is in favour of interim relief as prayed for being granted and whether the applicant has approached the court with reasonable expedition.

    49. If a strong prima facie case is made out and the balance of convenience is in favour of interim relief being granted, the Court exercising power under Section 9 of the Arbitration Act should not withhold relief on the mere technicality of absence of averments, incorporating the grounds for attachment before judgment under Order 38 Rule 5 of the CPC.

    50. Proof of actual attempts to deal with, remove or dispose of the property with a view to defeat or delay the realisation of an impending Arbitral Award is not imperative for grant of relief under Section 9 of the Arbitration Act. A strong possibility of diminution of assets would suffice. To assess the balance of convenience, the Court is required to examine and weigh the consequences of refusal of interim relief to the applicant for interim relief in case of success in the proceedings, against the consequence of grant of the interim relief to the opponent in case the proceedings should ultimately fail.

    51. It is not in dispute that a sum of about Rs. 35 crores odd was paid by Essar Steel to Essar House Private and Rs. 47 crores odd to Essar Services, being the appellants in the respective appeals, by way of security deposit which is a refundable security deposit. Prima facie, the refundable security deposit is not being released to Arcellor on the purported ground of a convoluted series of internal arrangements between group companies for diversion of the security deposits towards liquidation of alleged dues of Essar Steel to third parties.

    52. The Division Bench considered this contention of the Appellant and rightly held:—

    “33. The affidavit of disclosure filed by the appellant on 21st January, 2021 annexed at Ex.B also clearly indicates that the appellant was heavily indebted and did not have asset other than the asset disclosed in the affidavit in reply.

    xxxxxxxxx

    39. There is no substance in the submission made by the learned counsel for the appellant that since the appellant had already disclosed in the reply to the petition under section 9 that there was only one asset in the hands of the appellant and the same was also mortgaged, learned single Judge could not have passed an order of deposit or to furnish a bank guarantee in lieu of the order of deposit under section 9 of the Arbitration Act. In our view, the Court has ample power under Section 9 to secure the claim of the applicant in arbitration. Merely because the appellant has disclosed before the learned Single Judge that it does not have any asset other than one asset and that also is fully encumbered, that does not preclude the Court under Section 9 of the Arbitration Act to pass an equitable order by securing the claim of the applicant in arbitration by directing the opponent to deposit such amount to furnish a bank guarantee once having rendered a prima-facie finding that the applicant would have good chances of succeeding in the arbitration and if the claim made by the applicant is not secured, he would not be able to enjoy fruits of the arbitral award on its execution.

    xxxxxxxxx

    43. If the Court is required to dismiss the petition under section 9 of the Arbitration Act on the ground that the opponent has no assets at all or the assets of the opponent are fully encumbered, it will be against the principles of equitable justice required to be exercised by the Court while exercising powers under section 9 of the Arbitration Act so as to secure the claim of the applicant in the arbitral proceedings though he may have prima-facie good chances of succeeding in arbitration.”

    53. We find no infirmity in the well-reasoned judgment and order of the Division Bench. The appeals are, accordingly, dismissed.