  • Section 9 of the Arbitration and Concilliation Act (for short the Act)
  • provisions of the Maharashtra Stamp Act, 1958,
  • Section 47 of the Code of Civil Procedure
  • Section 34 of the Maharashtra Stamp Act
  • SECTION 17 REGISTRATION ACT
  • Section 9 (1) (ii) (a)
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Attorney(S)
Judges
Acts
  • Section 9 of the Arbitration and Concilliation Act (for short the Act)
  • provisions of the Maharashtra Stamp Act, 1958,
  • Section 47 of the Code of Civil Procedure
  • Section 34 of the Maharashtra Stamp Act
  • SECTION 17 REGISTRATION ACT
  • Section 9 (1) (ii) (a)
Smart Summary

Judgment Summary — G.S. Kulkarni, J.

Factual and Procedural Background

The petitioner filed proceedings under Section 9 of the Arbitration and Conciliation Act ("the Act"), seeking ad-interim/interim reliefs pending arbitral proceedings arising from a Memorandum of Understanding (MOU) stated to be executed on 29 May 2015 between the petitioner and the respondents. The MOU allegedly provided for allotment to the petitioner of 40,000 sq. ft. (super built-up) in consideration of Rs. 15 crores.

Respondent No. 1 is a partnership firm and respondent Nos. 2, 4, 5 and 6 are its partners. Respondent No. 3 is said by some to no longer be a partner (a fact disputed by respondent No. 3). There are inter se disputes between the parties that are the subject-matter of pending arbitral proceedings.

Following the MOU, agreements were executed in favour of the petitioner for 10 flats (registered) and respondents agreed to allot further 15 flats (totaling 25 flats). The petitioner contends these 25 flats cover only about 21,815 sq. ft., falling short of the 40,000 sq. ft. promised under clause 5 of the MOU; the petitioner claims entitlement to 44 flats as per an annexure to the MOU (which respondents dispute as forged).

Legal Issues Presented

  1. Whether a court can entertain and grant interim or ad-interim relief under Section 9 of the Arbitration and Conciliation Act when the document containing the arbitration clause is unstamped or insufficiently stamped.
  2. Whether the petitioner is entitled to ad-interim protection to safeguard its asserted entitlement under the MOU (40,000 sq. ft./the balance area) pending arbitral proceedings, including protection against creation of third-party rights by respondents.

Arguments of the Parties

Petitioner's Arguments

  • The petitioner seeks interim reliefs under Section 9 to safeguard rights conferred by the MOU for allotment of 40,000 sq. ft. in the proposed construction in return for Rs. 15 crores paid.
  • Even if the annexure to the MOU is disregarded, the petitioner contends respondents must adhere to the 40,000 sq. ft. commitment in clause 5 of the MOU.
  • The petitioner emphasised potential prejudice if ad-interim relief is not granted because respondents may create third-party rights in respect of the balance entitlement (about 19 flats / 19,000 sq.ft as claimed).
  • On the hearing day, the petitioner was willing to pay GST in respect of sale of the flats and indicated willingness to pay stamp duty within two weeks.

Respondents' Arguments

  • Respondents submitted that, other than the 25 flats already allotted, there are presently no residential premises available for allotment to the petitioner; 10 of those flats are subject to intra-partner arbitral proceedings.
  • Respondents contended there is unsold commercial area of 30,000 sq. ft. whose value would be far in excess of the petitioner's purported entitlement, implying commercial area could compensate the petitioner.
  • Respondents argued the MOU is not sufficiently stamped and relied on the Supreme Court decision in Garware Wall Ropes Ltd. v. Coastal Marine Constructions & Engineers Ltd. (2019 SCC OnLine SC 515) to contend no ad-interim relief should be granted.
  • Respondents further alleged the MOU and annexure were forged, asserting issues are of criminal nature and therefore the petition should be rejected (although it was conceded that no criminal proceedings had been initiated).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Garware Wall Ropes Ltd. v. Coastal Marine Constructions & Engineers Ltd., 2019 SCC OnLine SC 515 Authority invoked by respondents to challenge relief on the ground of insufficiency of stamp: the decision is rendered in the context of Section 11 of the Act (as stated in the opinion). The Court distinguished this decision as being in the context of Section 11 and not Section 9; therefore, it did not preclude grant of interim relief under Section 9 in the present proceedings.
Gautam Landscapes Pvt. Ltd. v. Shailesh S. Shah, (2019) 3 Mah LJ 231 (Full Bench) Held that courts can grant ad-interim/interim reliefs under Section 9 of the Act even if the document containing the arbitration agreement is not sufficiently stamped; the arbitration clause is a separate agreement relevant for Section 9. The Court relied on this Full Bench decision as binding (subject to challenge but not stayed) and followed its reasoning to permit grant of ad-interim relief despite stamping objections.
Firm Ashok Traders (referred to in Full Bench extract) As stated in the Full Bench extract: the right conferred by Section 9 cannot be said to be one arising out of a contract; the arbitration clause is an agreement by itself relevant for Section 9. The Court, through the Full Bench's exposition, applied this principle to treat the arbitration agreement as distinct for the purpose of Section 9 reliefs.
SMS Tea Estates (referred to in Full Bench extract) Mentioned in the Full Bench extract regarding the scope of certain principles; specifically, the Full Bench observed that the judgment in SMS Tea Estates would not apply to Section 8 in certain circumstances (as referenced). The Full Bench's discussion (quoted by the Court) distinguished contexts and the Court accepted the Full Bench's approach that the SMS Tea Estates reasoning does not preclude interim relief under Section 9. The present Court followed the Full Bench reasoning.
Naina Thakkar (referred to in Full Bench extract) Noted in the Full Bench extract for the proposition that SMS Tea Estates would not be applicable to proceedings under Section 8 where the applicant does not express willingness to pay deficit stamp duty/penalty. The Full Bench (and therefore this Court) relied on these distinctions to justify treating stamping objections as matters for later stages; the present Court adopted the Full Bench's reasoning.
M. Anasuya Devi (referred to in Full Bench extract) Observed that questions of stamping/registration of an arbitral award are relevant at enforcement under Section 36 and can be raised under provisions like Section 47 of CPC; thus stamping issues are primarily relevant at enforcement stage. The Full Bench extended this principle to applications under Section 9; the present Court accepted this extension and held stamping objections could be raised later before the arbitral tribunal.
Universal Enterprises (Division Bench) (referred to in Full Bench extract) The Division Bench view that a court can grant ad-interim reliefs under Section 9 even if the document containing the arbitration agreement is not sufficiently stamped. The Full Bench approved this view; the present Court treated that view as supporting its conclusion to grant ad-interim relief despite stamping objections.
Shailesh S. Shah v. Gautam Landscapes Pvt. Ltd. (SLP No. 10232-10233 of 2019) Proceeding in which the Full Bench decision is challenged before the Supreme Court (not stayed); noted to record the administrative posture of that challenge. The Court recorded that the Supreme Court had issued notice in the SLP but had not stayed the Full Bench judgment; therefore, the Full Bench judgment remained binding on this Court and supported granting relief under Section 9.

Court's Reasoning and Analysis

The Court first recorded the parties' submissions and the factual background. Respondents argued that the MOU is not sufficiently stamped and relied on the Supreme Court's Garware Wall Ropes decision to resist interim relief. They also argued the MOU/annexure was forged and that there was unsold commercial area available as alternative value.

The Court stated it was not persuaded by respondents' contention that insufficiency of stamp would preclude grant of ad-interim relief under Section 9. The Court extensively relied on the Full Bench decision in Gautam Landscapes Pvt. Ltd. v. Shailesh S. Shah, quoting paragraphs (75 to 84) wherein the Full Bench:

  • Explained that the arbitration clause is a separate agreement and that Section 9 relief is concerned with rights under the arbitration agreement rather than rights arising from the main contract;
  • Held that even if the main agreement is insufficiently stamped, that fact should not automatically bar the court from granting ad-interim/interim relief under Section 9;
  • Noted the legislative intent and scheme of the Arbitration and Conciliation Act to provide efficacious and expeditious interim reliefs under Section 9;
  • Stated that issues about insufficiency of stamp, if any, can be raised before the arbitral tribunal when the instrument is tendered in evidence and that objections regarding stamp can be considered at appropriate stages such as enforcement.

The Court distinguished Garware on the ground that Garware was rendered in the context of Section 11 of the Act and not Section 9. The Court also noted that the Full Bench decision is the subject matter of a challenge before the Supreme Court (Shailesh S. Shah v. Gautam Landscapes Pvt. Ltd.), but the Supreme Court had issued notice and had not stayed the Full Bench judgment; accordingly the Full Bench decision was binding on this Court.

Turning to facts relevant to urgency and balance of convenience, the Court recorded that respondents had already created third-party rights over some flats (the reply affidavit conceded dealing with about four flats on the ground that petitioners had not paid GST) and that the petitioner had been willing to pay GST. The Court found there was a risk that respondents would create further third-party rights in respect of the balance area which the petitioner claims, causing irreparable prejudice if interim protection were not granted.

The Court concluded that the petitioner had made out a prima facie case for ad-interim protection and proceeded to pass specific ad-interim directions to protect the petitioner's asserted entitlement pending disposal of the petition. (The opinion records the Court's exact wording that "the facts indicate that the balance of convenience is clearly in favour of respondents," a statement made in the judgment text and reproduced here without alteration.)

Holding and Implications

Core Ruling: The Court granted ad-interim relief in favor of the petitioner subject to specific conditions and directions.

Specific Orders (direct consequences):

  • The respondents were directed to file an affidavit within two weeks disclosing unsold area available in the project and details of all sales of flats/tenements (residential/commercial), specifying whether sales are under registered agreement and consideration received.
  • The respondents were directed not to create any third-party rights in respect of 15 flats which they intend to transfer to the petitioner (details in Exhibit G, page 122 of the paper book).
  • The respondents were directed not to create third-party rights in the unsold commercial area of 10,000 sq. ft. until further orders.
  • Respondents were permitted to deposit in Court an amount equivalent to the consideration for 19,000 sq. ft. at Rs. 3,750/- per sq. ft., along with simple interest at 9% per annum; upon such deposit, the ad-interim restraint in respect of the commercial area (item (iii)) would automatically stand vacated.
  • The respondents were ordered to file a reply affidavit before the adjourned date; the matter was stood over to 29.07.2019.

Implications:

  • The immediate effect is to protect the petitioner's asserted entitlement by prohibiting creation of third-party rights over specified residential flats and a specified portion of commercial area until further orders, thereby preserving the subject-matter pending arbitral proceedings.
  • The Court permitted the pragmatic alternative of depositing an agreed monetary equivalent (with interest) to lift part of the interim restraint, thereby providing a mechanism to protect both parties' interests.
  • The judgment follows the Full Bench view that stamping objections do not automatically bar interim relief under Section 9; the Court did not purport to lay down a novel precedent beyond applying the cited Full Bench authority and distinguishing Garware on its facts and statutory context.
  • No broader novel legal principle was declared by this Court beyond following the Full Bench and applying it to the present facts; the direct effect is limited to the parties and the reliefs and directions enumerated above.

This summary is prepared exclusively from the provided opinion text and contains no information beyond that opinion.

    Saifee Developers Pvt. Ltd. v. Shanklesha Constructions And Others

    G.S. Kulkarni, J.:— Heard Mr. Karl Tamboly, learned counsel for the petitioner, Mr. Khandeparkar, learned counsel for the respondent Nos. 1, 2, 4, 5 and 6. Respondent No. 3 is represented by Adv. Mr. Saraogi.

    2. Respondent No. 1 is a partnership firm, respondent Nos. 2, 4, 5 and 6 are the existing partners of respondent No. 1 firm, (for short referred as, “respondents”). Respondent No. 3 is no more the partner of respondent No. 1. This is disputed by learned counsel for respondent no. 3. There are disputes interse between the parties, which are subject matter of pending arbitral proceedings.

    3. The petitioner is before this Court in the present proceedings filed under Section 9 of the Arbitration and Concilliation Act (for short ‘the Act’) espousing its rights under a MOU dated Nil stated to be executed between the petitioner and the respondents on 29 May 2015. The petitioner has prayed for interim reliefs pending the arbitral proceedings contending that the substance of the arbitration namely the rights which are conferred on the petitioner in respect of 40,000 sq.ft of area to be allotted in terms of the flats/tenements in the proposed construction are required to be safeguarded.

    4. It appears to be not in dispute that the said MOU was executed between the parties under which an area of 40000 sq. feet (super built up) to be constructed agreed to be allotted to the petitioner in lieu of an amount of Rs. 15 crores as paid by the petitioner in favour of respondent No. 1 firm under the MOU in question. Clause No. 5 of the said MOU reads thus:

    “5. Shanklesh have also agreed to allot residential tenements/flats of about 40,000 sq. feet (super built-up) saleable area (saleable area plus minus 5%(saleable area less 30% will be usable carpet area) to be constructed in theKalyan project @ Rs. 3750/- per sq. feet, totally amounting to Rs. 15,00,000/- (Rupees fifteen crores only) as option No. 2 in partnership deed of thecompany together with 40 car parking spaces. Hereto annexed as Annexure ‘1’ is a statement giving the details of the flats and the 40 car parking spacesagreed to be allotted to the Investors”.

    5. It is not in dispute that consequent to the MOU, Respondents have executed in favour of the petitioner agreements in respect of 10 flats which are duly registered. As also the respondents have agreed to allot further 15fl ats, thus totaling to 25 flats. Learned counsel for the petitioner, however, submits that an area under these 25 flats is about 21815 sq. feet and which is in not accordance with clause 5 of the MOU whereby, respondent has agreed to allot/sell 40,000 sq. feet area to the petitioner. According to the petitioner, he is entitled for 44 flats as per the annexure to the said MOU. The annexure is disputed on behalf of respondent being forged and fabricated.

    6. Mr. Tamboly submits that even assuming that the Annexure to the MOU is not taken into consideration, his contention is that the respondents need to adhere to their commitment of area of 40,000 sq. feet area as agreed in clause 5 of the MOU.

    7. Learned counsel for respondents, on instructions, states that as on today there are no residential premises which can be allotted to the petitioner except the 25 flats already allotted. He states that there are 10 flats, however, they are subject matter of arbitral proceedings interse between the partners. Learned counsel for the respondents states that, however, there is unsold commercial area of 30000 sq. feet which is available and the value of this commercial area would be far in excess of the petitioner's purported entitlement even if the area under clause 5 of the MOU is considered as the value of the commercial area is far more in excess of the residential area.

    8. Learned counsel for respondents also submits that the petitioner is not entitled for any ad-interim relief on the ground that the MOU in question is not sufficiently stamped. In support of this contention, learned counsel for respondent has relied on the decision of the Supreme Court in Garware Wall Ropes Ltd. v. Coastal Marine Constructions & Engineers Ltd. 2019 SCC OnLine SC 515.

    9. The next submission as urged on behalf of the respondents is that the MOU along with the Annexure is a forged document and thus as the issues involved are in the nature of a criminal investigation on the ground of arbitrality, the petition should be rejected. However, it is conceded that no criminal proceedings are initiated.

    10. Having considered the submissions advanced at bar as also having perused the documents as placed on record, I am not persuaded to accept the respondents' contention that the Court at this stage of the proceedings cannot consider grant of any ad-interim relief in the proceeding filed under Section 9 of the Act, on the ground that the document is not sufficiently stamped. This for the reason that Full Bench of this Court in Gautam Landscapes Pvt. Ltd. v. Shailesh S. Shah (2019) 3 Mah LJ 231 has held that it is permissible for the Court in proceedings under Section 9 of the Act, to grant ad-interim/interim reliefs even when the document in question on the basis of which a relief is sought, is not sufficiently stamped. The Full Bench in this context has observed thus:

    “75. In the case of Firm Ashok Traders (Supra), the Supreme Court has held that the right conferred by Section 9 cannot be said to be one arising out of a contract. The qualification which the person invoking jurisdiction of the court under Section 9 must possess, is of being a party to an arbitration agreement. This is nothing to do with the relief which is sought for from the court or the right which is sought to be canvassed in support of the relief. The arbitration clause constitutes an agreement by itself.

    76. It is, therefore, held that the arbitration clause being a separate agreement from the main contract and accordingly it is only the arbitration agreement which would have relevancy for the purpose of an application under Section 9 of the ACA. In our view, the judgment of the Supreme Court in the case of Firm Ashok Traders (supra) would squarely apply to the facts and situation at hand.

    77. The respondents pressed into service the bar under Section 34 of the Maharashtra Stamp Act while entertaining an application under Section 9 of the ACA. We are inclined to accept the submission of Dr. Sathe, the learned Senior Counsel, that for the purpose of granting interim measures, whether by way of interim or ad interim, under Section 9, the said relief is not arising out of a contract containing an arbitration agreement. We are, therefore, of the view that even if the main agreement containing arbitration agreement is not stamped insufficiently stamped, there could not be any bar against the court hearing the application under Section 9 of the ACA for interim measures to grant ad-interim or interim relief to a party.

    78. We are not inclined to accept the submission of Mr. Dani, learned Senior Counsel appearing for respondent in Arbitration Application No. 246 of 2016 that for the purpose of interim measures, the court has to act upon the main agreement containing arbitration agreement and, thus till such time, such an agreement is stamped in accordance with the provisions of the Maharashtra Stamp Act, 1958, irrespective of the urgency and though case is made out for grant of ad-interim or interim relief, the court does not have power to grant any such relief. This clearly for the reason that the court in considering a relief under Section 9 is acting upon the arbitration agreement only, and not the main contract. An arbitration agreement would not require any stamping.

    79. In our view, the argument of Mr. Dani, if accepted, would be in conflict with the scheme of the legislation and intent of the provisions of Section 9 of the ACA. Under the scheme of the ACA and in view of the judgments cited above and considering the submissions advanced, we are of the considered view that the legislative intent and purpose would be served by providing the efficacious and expeditious relief to a party to an arbitration agreement and that is prescribed under Section 9 of the ACA. In case the submissions of Mr. Dani is accepted, the exercise of jurisdiction under Section 9 of the ACA would be completely eclipsed and party would be deprived to approach a forum for any urgent relief of ad-interim or interim nature. This obviously cannot be implication and intent of the statutory interpretation.

    80. The entire purpose of granting interim measures is to protect the matters set out specifically under Section 9 (1) (ii) (a) to (e) during the pendency of the arbitral proceedings and even after making of the arbitral award before it is enforced in accordance with Section 36 of the Act, would be defeated if we accept the interpretation placed on the provisions by the learned Senior Counsel Mr. Dani. If an objection about insufficiency of stamp is entertained and accepted at the stage of hearing of the application under Section 9 for interim measures, a party who has good chances of succeeding in the arbitral proceedings finally and if not granted interim measures to protect the subject matter of such proceedings, there would be gross injustice to such party.

    81. The Supreme Court in Naina Thakkar (supra), has held that the Judgment of the Supreme Court in the case of SMS Tea Estates (supra), would not be applicable to the proceedings under Section 8 of the Act where party making such an application does not express willingness to pay the deficit stamp duty and the penalty. In our view, the principles laid down by the Supreme Court in the said Judgment can be extended even to an application under Section 11 of the Act for appointment of an arbitrator. An application under Section 8 is filed in a pending suit before a judicial authority to refer the parties to arbitration.

    82. The Supreme Court in M. Anasuya Devi (supra), has held that the question as to whether an arbitral award is required to be stamped and registered would be relevant only when the parties would file the award for its enforcement under Section 36 of the Act. It is at that stage the parties can raise objections regarding its maintainability on account of non-registration and non-stamping under Section 17 of the Registration Act. It is held that the question whether an award requires stamping and registration is within the ambit of Section 47 of the Code of Civil Procedure and not covered by Section 34 of the Act. In our view, the principles laid down by the Supreme Court can be extended to the applications under Section 9 of the Act. The issue of insufficiency of stamp duty, if any, can be raised by the other party at the stage when the instrument containing an arbitration agreement is tendered in evidence before the Arbitral Tribunal.

    83. In the light of the above deliberation, we are of the considered opinion that the decision of the Division Bench in Universal Enterprises (Supra) takes a correct view that the court can grant an ad-interim reliefs in exercise of its jurisdiction under Section 9 of the ACA even if the document containing the arbitration agreement is not sufficiently stamped. We may thus further observe that the court under Section 9 of the ACA would be empowered to grant ad-interim and interim reliefs even if the document, containing arbitration agreement, is not adequately stamped.

    84. Thus, in our view, the question of law i.e. whether a Court, under the Arbitration and Concilliation Act, 1996, can entertain and grant any interim or ad interim relief in an application under Section 9 of the said Act when a document containing arbitration clause is unstamped or insufficiently stamped, is required to be answered in the affirmative”

    (emphasis supplied)

    11. The decision of the Supreme Court in Garware Wall Ropes (supra) is rendered in the context of Section 11 of the Act and not in a proceeding under Section 9 of the Act. The decision of the Full Bench in the context of Section 9 of the Act is subject matter of challenge before the Supreme Court in “Shailesh S. Shah v. Gautam Landscapes Pvt. Ltd.” in a Petition for Special leave to Appeal (c) No. 10232-10233 of2019. By an order dated 29 April, 2019, passed by the Supreme Court, on the said petition, while issuing notice to the respondents, the Supreme Court has not stayed the decision of the Full Bench. The Supreme Court, however, observed that section 9 petition may continue, in the meanwhile judgment delivered thereon shall not be implemented without leave of the Court. Thus, as the judgment of the full bench is binding on this Court, and the same being not stayed by the Supreme Court, it is not possible to accept the contention as urged on behalf of respondent that this Court cannot grant any ad-interim relief.

    12. Mr. Tamboli, learned counsel for the petitioner would be correct in his submission that if ad-interim relief is not granted, and if the third party rights are created in respect of entitlement of the petitioner which is in respect of further 19 flats, serious prejudice would be caused to the petitioner.

    13. Mr. Tamboli would also be correct in drawing my attention to paragraph Nos. 7 to 13 of the reply affidavit as filed on behalf of respondents, wherein the respondents have in fact conceded that they have dealt with about four flats of the entitlement of the petitioner by creating third party rights on the ground that the petitioners have not come forward to pay the GST. The record does not reveal that the petitioners were called upon to make any payment on GST even when the petitioners were always agreeable to pay the GST.

    14. Thus, there is much substance in the contention of Mr. Tamboli, on the conduct of respondents. According to Mr. Tamboli, the respondents are clearly not fulfilling their obligation/commitment towards the petitioners as contained under the MOU.

    15. Today there is no consensus between the parties in respect of the value which can be attributed to the exact area which would cover the requirement of the deficit area of 19000 sq. feet as claimed by the petitioner.

    16. Thus, I am of the clear opinion that the petitioner has made out a prima facie case for grant of ad-interim protection. The facts indicate that the balance of convenience is clearly in favour of respondents. If ad-interim relief is not granted the respondents would create third party rights in respect of the balance area which could be made available to the petitioner in case the petitioner succeeds in the arbitral proceedings. The respondents are admittedly in receipt of substantial amounts from the petitioner under the MOU and having received the amount have not complying the irreciprocal obligations to hand over an area of 40,000 sq feet to the petitioner, but intend to only grant it partly to an extent of about 22,000 sq.feet.

    17. In these circumstances, pending the disposal of this petition, thereshall be an adinterim order in the following terms:

    (i) The respondents are directed to file an affidavit disclosing the unsold area which is available with the respondents in the project as also disclose on affidavit the details of all the sales of flats/tenements residential/commercial in the project, specifying as to whether the sales are under a registered agreement and the consideration received. Affidavit be filed within two weeks from today.

    (ii) The respondents are directed not to create any third party rights in respect of 15 flats which the respondents intend to transfer to the petitioner, the details of which are stated in the second part of the statement at “Exhibit G” (page 122 of the paper book)

    (iii) The respondents are also directed not to create third partyrights in the unsold commercial area of 10,000 sq.ft. till further orders.

    (iv) It would be permissible for the respondents to deposit in this Court an amount equivalent to the consideration of area of 19000 sq.ft. At the rate of Rs. 3750/- per sq. ft. (as agreed between the parties) alongwith the simple interest at 9% per annum, on the deposit of such amount the ad-interim relief in terms of (iii) shall automatically stand vacated.

    (v) Ordered accordingly.

    18. Let reply affidavit be filed by the respondents before the adjourned date of hearing and a copy of the same be served on the learned advocate for the petitioner well in advance.

    19. Stand over to 29.07.2019.

    20. At this stage, Mr. Tamboli, learned counsel for the petitioner, on instructions, submits that his client is willing to pay GST in respect of sale of the flats in question. He further submits that as informed by the respondents, 10 flats would be available, but there are inter se disputes between the partners pending arbitral proceeding. He submits that in case the injunction as inter se between the partners is vacated, in that event the petitioner should be kept informed of the vacating of the injunction so that the petitioner can have those 10 flats. It would not be unreasonable if such request as made by Mr. Tamboli, learned counsel for the petitioner is granted. Respondent shall accordingly inform the petitioner in case the injunction is vacated. It is clarified that this direction is made so that the parties make an endeavour to resolve the disputes between the parties considering the undisputed facts on record.

    21. At this stage, Mr. Tamboli would submit that in view of the objection of the respondents that the MOU is not sufficiently stamped, his clients would take immediate steps to make payment of the stamp duty within a period of two weeks from today.

    22. The parties to act on the authenticated copy.