1. The order is being passed in continuation of order dated 04.09.2019. The issue for consideration is the mitigation measures for protection of Great Indian Bustard (GIB) — rarest bird, critically endangered species as per Schedule-I to the Wildlife Protection Act, 1972. Though the Ministry of Environment, Forest and Climate Change (MoEF&CC) has taken up a project called “Habitat Improvement of Great Indian Bustard-An Integrated Approach”, wind projects are potential danger to the safety of the bird. Vide order dated 04.04.2019, this Tribunal sought a factual report from the MoEF&CC with regard to the allegation that steps taken are not adequate and there continues to be high mortality of the birds.
2. The matter was considered on 04.09.2019 in the light of report dated 11.07.2019 acknowledging the problem and making recommendations. The Tribunal observed:
“3. The above recommendations need to be acted upon which requires preparation of a time bound action plan.
4. Let a joint Committee comprising Director General, Forest, MoEF&CC, Additional Director General, Forest (Wildlife), MoEF&CC, nominees of Ministry of Power, Ministry of New and Renewable Energy, Central Government and nominees of Energy Departments of Gujarat and Rajasthan prepare a time bound action plan in the matter within two months. The nodal agency for the purpose will bethe Director General, Forest, MoEF&CC and the Additional Director General, Forest (Wildlife), MoEF&CC will be member secretary of the nodal agency. Compliance report be furnished to this Tribunal before the next date by e-mail at judicial-ngt@gov.in.”
3. Learned counsel for the MoEF&CC seeks some more time for furnishing the report. Let the report be filed before the next date on judicial-ngt@gov.in.
List again on 09.04.2020.