Structured Summary of the Opinion — Notice of Motion regarding demolition at "Ram Mansion"

Factual and Procedural Background

The petitioners filed a Notice of Motion dated 8 May 2017 seeking urgent interim reliefs restraining Respondent Nos. 1 and 2 (and their agents) from carrying out any demolition, destruction or work inside the first and second floor flats of the building known as "Ram Mansion." Respondent No. 6 is the developer who has commenced pre-demolition preparations after receiving an Intimation of Disapproval ("IOD") from the municipal corporation. Respondent No. 6 has also obtained a MHADA NOC dated 7 July 2016 in relation to redevelopment.

Respondent No. 6 has instituted R.A.E. Suit No. 300/501 of 2011 (a Rent Act Eviction Suit) against the petitioners in the Small Causes Court at Bombay. An appellate court granted an injunction in that suit temporarily restraining the plaintiff (and persons acting on its behalf) from causing damage to the suit premises, including the roof/slab, until final decision of the suit. The eviction suit is in trial and was scheduled further for hearing on 16 June 2017.

The petitioners apprehended that demolition preparations (work commenced around the first week of May 2017) by the developer would damage the premises they occupy on the ground floor. The petitioners had previously been permitted by this court to carry out waterproofing on the terrace above their premises due to leakage. Attempts to negotiate a mutually agreeable order failed: respondent no. 6 offered monetary compensation for temporary relocation (which the petitioners declined).

Respondent No. 6 produced a Schematic Structural Demolition Report dated 17 April 2017 and an Amended Scheme of Demolition dated 11 May 2017 setting out a phased "top down" demolition method, including a proposed dummy floor and other safeguards intended to protect the occupied ground floor premises. The petitioners contested the adequacy and reliability of these reports and argued that IOD and MHADA NOC do not entitle the developer to proceed while the eviction suit and injunction remain pending.

Legal Issues Presented

  1. Whether, at the ad-interim stage, the court should grant the petitioners the blanket injunction restraining the respondents from carrying out any demolition or work in the building occupied in part by the petitioners.
  2. Whether the IOD and the MHADA NOC obtained by Respondent No. 6 permit demolition to proceed despite the pending Rent Act Eviction Suit and the injunction protecting the suit premises (particularly the roof/slab).
  3. Whether the demolition method proposed by Respondent No. 6 (including the "top down" method and the Amended Scheme dated 11 May 2017) is demonstrably adequate to protect the petitioners' occupied ground floor premises and, if not, what interim safeguards or conditions should be imposed.
  4. What interim measures are appropriate in the balance of convenience between the parties pending determination of the underlying lis in the Small Causes Court.

Arguments of the Parties

Petitioners' Arguments (represented by Mr. Joshi)

  • The petitioners sought a complete injunction preventing any demolition activity, removal of construction material, and restoration of any damage (including filling holes in external walls).
  • The IOD and MHADA NOC do not entitle Respondent No. 6 to proceed with demolition while the eviction suit remains pending and injunctive relief protecting the premises has been granted by the appellate court.
  • The IOD contains notes (clauses 19 and 21) which, the petitioners say, limit demolition or construction unless specific tenant-related conditions are satisfied (rehousing/agreements and phased construction plans). Therefore, demolition should not proceed.
  • The structural consultant's report dated 17 April 2017 is unreliable: it reproduces a code of practice (adopted elsewhere) and does not independently assess the suitability of the method for the existing load-bearing stone/brick-and-mortar structure; thus the proposed "top down" method is inappropriate and unsafe for the particular building.
  • The MHADA NOC requires execution of registered agreements for permanent alternative accommodation which have not been entered into with the petitioners, and thus the NOC cannot be acted upon to permit demolition affecting their accommodation.

Respondent No. 6's Arguments (represented by Mr. Samdani)

  • The IOD and the MHADA NOC permit demolition; the IOD expressly allows demolition under its terms and the MHADA NOC (dated 7 July 2016) was obtained in connection with redevelopment under the Development Control Regulation.
  • Respondent No. 6 filed an undertaking (affidavit dated 12 May 2017) to carry out demolition under the guidance of a structural engineer, to strictly abide by the decision of the Small Causes Court and the appellate order, and to ensure that the work will be carried out so as not to damage the petitioners' premises.
  • The Schematic Structural Demolition Report (17 April 2017) and the Amended Scheme (11 May 2017) propose a phased "top down-manual method" with special safety considerations (including erection of a dummy floor, phased completion, and provision for alternate water supply) intended to keep the ground floor premises unaffected.
  • Respondent No. 6 contended that the notes in the IOD (clauses 19 and 21) apply to commencement of new construction after a commencement certificate and do not prevent demolition work; and that the undertaking and technical proposals should allow demolition to proceed.

Table of Precedents Cited

No precedents were cited in the provided opinion.

Court's Reasoning and Analysis

The court conducted a fact-sensitive assessment focused on the interim stage and the balance of convenience. The court noted these key factual and legal points that guided its reasoning:

  • The eviction suit in the Small Causes Court is pending and an injunction had been granted to prevent damage to the suit premises (including roof/slab) until final decision; neither party had challenged those terms before this court.
  • Respondent No. 6 had obtained an IOD and a MHADA NOC and had provided an undertaking to follow the structural engineer's guidance and to abide by the Small Causes Court's orders. Respondent No. 6 had also produced a schematic demolition report (17 April 2017) and an Amended Scheme (11 May 2017) describing a ten-phase demolition program with proposed protective measures for the ground floor premises.
  • On examination, the court observed that the initial schematic report did not sufficiently address specific measures to isolate and protect the ground floor from demolition operations—particularly because clause G of the demolition sequence contemplated machine demolition of first floor slab from ground level, which could affect the ground floor.
  • The Amended Scheme dated 11 May 2017 attempted to address ground floor protection (e.g., erection of a dummy floor, phased demolition, temporary water storage arrangements), and included a specific proposal to erect a dummy floor about four feet above the first floor level slab and to complete demolition in ten phases. The court set out the content of the phases and noted which phases did or did not appear likely to affect the occupied premises.
  • The court considered the MHADA NOC clauses: clauses 23 and 27 were relevant. Clause 23 requires the NOC-holder to enter into and register permanent alternative accommodation agreements with tenants. Clause 27 provided that occupancy decisions for particular ground floor rooms and outhouses pending in the Small Causes Court would be determined after the Small Causes Court's outcome. The court observed that MHADA's clause 27 indicated MHADA would decide occupancy issues after the Small Causes Court's decision, so the NOC alone did not entitle Respondent No. 6 to proceed to complete demolition affecting those premises.
  • The court weighed the competing considerations: the petitioners' reasonable apprehension of damage to occupied premises and the developer's statutory/intimation approvals and technical proposals. Because the structural report initially lacked adequate specific safeguards for the ground floor, and because the court was not equipped itself to assess technical sufficiency, the court concluded it was necessary to obtain an independent technical certification regarding safety before allowing demolition beyond certain phases.
  • Accordingly, the court framed an ad-interim remedy that preserves the petitioners' protection while allowing controlled demolition activity to proceed up to a limit: it required Respondent No. 6 to obtain an independent certificate from a named technical institution (VJTI) that the proposed phased demolition (including the measures in clause 1(iii) of the amended report) would fully protect the ground floor and occupants if demolition were to proceed beyond Phase 3. The court required provision of the demolition reports to VJTI, filing of affidavits by respondents 5 and 6, and stayed demolition beyond Phase 3 until the certificate is produced and placed before the court.

Holding and Implications

Core Ruling: The court granted ad-interim relief in part and imposed conditional permission and restrictions on demolition activity. Specifically, the court ordered that demolition work shall not proceed beyond Phase 3 until Respondent No. 6 obtains, at its cost, an independent certificate from the Victoria Jubilee Technical Institute (VJTI) that the proposed phase-wise demolition (including the dummy floor in clause 1(iii) of the Amended Scheme dated 11 May 2017) will entirely protect the ground floor premises and occupants from harm. Respondent No. 6 must provide the VJTI with the schematic report (17 April 2017) and the Amended Scheme (11 May 2017) to enable evaluation, place any certificate obtained before the court on the next date, and file affidavits in reply within the specified time.

Implications and immediate consequences:

  • Respondent No. 6 is permitted to carry out demolition work up to and including Phase 3 of the Amended Scheme, but is prohibited from taking any steps in terms of Phase 4 or beyond until the VJTI certificate is obtained and placed before the court.
  • Respondent No. 6 must secure and fund an independent technical opinion/certificate from VJTI and supply VJTI with the technical reports relied upon by the developer for evaluation.
  • Respondent Nos. 5 and 6 must file an affidavit in reply within one week; rejoinder, if any, within one week thereafter. The court granted liberty to apply in the event the certificate is obtained.
  • The court did not grant the blanket injunction sought by the petitioners at the ad-interim stage; instead it applied a conditional, technical safeguard to protect the occupied ground floor premises while allowing limited demolition activity to proceed in the interim.
  • No broader legal precedent was declared by the court in this order; the decision addresses interim management and fact-specific safeguards pending resolution of the underlying eviction proceedings in the Small Causes Court.

All statements in this summary are drawn exclusively from the provided opinion text and do not add or infer facts beyond that document.

    Mehmood Merchant v. Maharashtra Housing & Area Development Authority

    1. By this Notice of Motion, the petitioners seek urgent reliefs in the following terms:

    “(a) That pending the hearing and final disposal of this Writ Petition, this Hon'ble Court be pleased to restrain Respondent Nos. 1 and 2 by themselves and/or their officers, servants, agents and representatives from carrying out any demolition/destruction/work, whatsoever, inside the first and second floor flats of the Building ‘Ram Mansion’.

    (b) That pending the hearing and final disposal of this Notice of Motion, this Hon'ble Court be pleased to restrain Respondent Nos. 1 and 2 by themselves and/or their officers, servants, agents and representatives from carrying out any demolition/destruction/work whatsoever inside the first and second floor flats of the Building ‘Ram Mansion’.

    (c) Ad-interim and interim reliefs in terms of prayer clause (b) above.”

    2. The Notice of Motion is taken out on 8th May, 2017 on the basis of apprehension that some of the demolition work of the building that has been undertaken by the Respondent no. 6 is likely to damage the premises in the occupation of the petitioner who claim as tenants of ground floor premises. Respondent no. 6 is the developer of the property. Respondent no. 6 has commenced pre-demolition preparations at suit property in furtherance of an Intimation of Disapproval (“IOD”) issued to it by the municipal corporation. The respondent no. 6 has filed a Rent Act Eviction Suit being R.A.E Suit No. 300/501 of 2011 against the petitioners in the court of Small Causes Court at Bombay wherein the Appeal Court has granted and an injunction against the respondent no. 6 herein in the following terms:

    “(i)………..

    (ii) The plaintiff or anybody acting on its behalf is hereby temporarily restrained from causing damage in any manner to the suit premises including roof/slab of the suit premises till final decision of the suit.”

    3. The eviction suit is progressing in trial and is part heard and is scheduled to be heard further on 16 June, 2017. In the meantime, it appears that the developers in furtherance of the IOD issued to them by Municipal Corporation have proceeded to prepare for demolition of the building. The apprehension of the petitioner is that if the demolition work is undertaken it may cause harm to the premises of the petitioners. When the work commenced on or about the 1st week of May 2017, the petitioner has pointed out vide an email that the work undertaken should not cause any harm to the premises of the accommodation of the petitioners but she received no response and therefore this Notice of motion was moved before the vacation court.

    4. We had heard the matter at length on 9 May, 2017. Thereafter it was adjourned to 11 May, 2017. In the meantime, parties were requested to consider arriving at a mutually agreeable workable order. As far as respondent no. 6 is concerned, they have also offered to compensate the petitioners with monetarily for temporarily moving out of the ground floor till the demolition of the rest of building (excluding the ground floor flat and two outhouses that the petitioners occupy) is completed. However, this offer was turned down. Mr. Joshi and Mr. Samdani have stated that attempts made to resolve the current impasse have failed.

    5. Mr. Joshi the learned Senior Counsel representing the petitioners therefore seeks a blanket injunction against carrying out any work of whatsoever nature in the said building and to forthwith remove all construction material and paraphernalia. Furthermore they seek restoration of status quo ante by filling up certain holes have been made in the external walls of the building on which the petitioners have apparently carried out some re-plastering work.

    6. It is necessary to recall that the petitioner had earlier approached this court with a grievance that the developers had undertaken some work on the terrace of the building leading to water seeping into the flat on the ground floor and the court permitted the petitioners to carry out water-proofing work on the terrace above their premises so as to prevent any further leakage. This was done pursuant to the report received from the consultant appointed from the panel. The demolition activity is a recent development as aforesaid.

    7. At the hearing of this application the respondent no. 6 opposed grant of any relief on the basis of IOD as already been granted and consent of MHADA has already been obtained. Mr. Samdani, the learned Senior Counsel for the respondent no. 6 referred to the provision of IOD which according to him in no uncertain terms permits the demolition of the structure. He also submitted that the MHADA had issued NOC dated 7 July 2016 to the respondent no. 6 in relation to re-development of the property under D.C Regulation under section 33(7) and in view of this permission having been received there is no impediment with the proceeding of the demolition work. Mr. Samdani has also filed before us on 12 instant an undertaking by way of affidavit whereby the Respondent no. 6 undertakes to carry out demolition whatsoever under the guidance of structural engineer and to the effect that they would strictly abide by the decision of the judgment of the Small Causes Court and the order dated 16.7.2016 passed by the appellate court. They have undertaken that the work will be carried out in a manner such that there will be no damage to the premises of the petitioner. Armed with the aforesaid IOD, Mhada NOC and relying on the said undertaking, it is submitted that the demolition must be allowed to proceed.

    8. Respondent no. 6 also relies upon Schematic Structural Demolition Report issued to respondent no. 6 on 17 April, 2017 by M/s. Profiles, Structural Consultants setting out the manner of demolition of the building. Mr. Samdani, the learned Senior Counsel drew our attention to the contents of the report and in particular clause 4 on page 3 special safety considerations. He also made a reference to the “Top down-Manual method” proposed to be adopted as set out in page 7 and submitted that the methods proposes to be adopted which will ensure that the ground floor premises remain unaffected. He also sought to rely upon certain diagrams which are annexed to the report. However, on going through the report we find that there is no specific information on how ground floor would be isolated from the entire demolition exercise proposed to be undertaken and in particularly so in view of the provisions of clause (G) forming part of the demolition sequence in the Top down method. Clause G) states as follows.

    “G) If site conditions permit, the first floor slab directly above the ground floor may be partly demolished by machine sitting on ground level and mounted with demolition accessories.”

    (Emphasis supplied)

    9. It is therefore clear that what is in contemplation when the demolition work is undertaken is that part of the first floor slab above the ground floor may be demolished by machines which are positioned at the ground level. When we drew Mr. Samdani's attention to this proposal, in the post lunch session he relied upon a further report specially in relation to the safeguards to be adopted to protect the ground floor. In this respect a further report dated 11 May, 2017 was shown to us which provides for an amended scheme of demolition of the building titled as follows:

    “Amended Scheme of Demolition of Ram Mansion (Mitha Lodge) on plot bearing C.S No. 2/358 & 2A/358 situated at 61, Lady Laxmibai Jagmohandas Marg (Nepean Sea Road and L.D Ruparel Marg, Mumbai 400 006 with provision for protecting the occupied premises on the portion of ground floor in the building Ram Mansion and simultaneously demolish the remaining dilapidated structure.”

    10. Thus the said Amended Scheme dated 11 May, 2017 focuses on the scheme of demolition to be adopted keeping in mind the need to protect the entire ground floor premises. In this amended scheme for demolition it is proposed in clause 1(iii) to erect a dummy floor to protect against falling debris by using M.S beams and sheets and at a height of around 4 feet above the portion of the first floor level slab, the intention being to protect the roof of the ground floor premises from any falling debris at the first floor level which would be the likely result of Top down demolition proposed to be undertaken. The demolition work is to be proposed to be completed in 10 phases. The proposed demolition also takes into accounts provision for providing alternate means of water supply by erecting on stilts, in a suitable place at ground level a Water storage tank so as to ensure that the supply to the ground floor is not discontinued except for short duration that would be required for reconnecting the relocated supply lines from the original over head position to the new position. It is therefore proposed that before the demolition is undertaken water tank would be erected on the ground floor which would ensure continuous water supply to the ground floor. It is proposed that the overhead tank would be removed only after making the newly erected tank operational. Subject to a disclaimer in the main report, the aforesaid consultants have opined in the amended report that if the above procedure is followed it would ensure compete safety of the accommodation premises on the ground floor.

    11. On behalf of petitioner, Mr. Joshi has contested this position and submitted that the respondent is not entitled to undertake any demolition of any part of the building since according to them the IOD and the MHADA consent are of no avail since the eviction suit is pending in the court of Small Causes Court and the appellate court has confirmed the aforesaid injunction. It is common ground that the aforesaid prohibition holds good as neither the petitioner nor the respondent no. 6 has called the same in question. The suit is thus proceeding as directed and expedited by this court by previous orders.

    12. Mr. Joshi, therefore submits that pending this petition no work whatsoever should be permitted to be carried down and as prayed for in the motion. The respondent should be directed to stop work and remove the material from the premise and restore status quo ante. He further submitted that the report of the structural consultant is nothing but a reproduction of methods of demolition adopted from providing code of practice which according to me is followed in Hong Kong since long and there is no mention in the structural report which does not constitute an independent assessment of the work to be carried out and therefore, not reliable. He further pointed out that the work proposed to be undertaken contemplates demolition of the work and code of practice demolition of the building that has been relied upon and reproduced by structural consultant will not be appropriate in view of the fact that the building a load bearing construction and the procedure sought to be adopted is only for reinforced cement concrete structures hence unsuitable in the facts at hand.

    13. We find that it refers only in dealing with the methods of demolition and does not make any specific mention about load bearing the walls that constitute the present structure which is admittedly of stone, brick and mortar. In any event the draft code practice relied upon by the petitioners also seem to have been followed by practitioners as set out in clause 4.1

    14. Mr. Joshi further points out that the IOD by itself does not entitle the respondent no. 6 to proceed with complete demolition as proposed. He invited our attention to the notes appearing on page 7 of the IOD and in particular clause 19 and 21 which are as follows:

    “19. No work should be started unless the existing structures proposed to be demolished are demolished.

    21. If it is proposed to demolish the existing structures be negotiations with the tenant, under the circumstances, the work as per approved plans should not be taken up in hand unless the City Engineer is satisfied with the following:—

    i. Specific plans in respect of evicting or rehousing the existing tenants on hour stating their number and the areas in occupation of each.

    ii. Specifically signed agreement between you and the existing tenants that they are willing to avail or the alternative accommodation in the proposed structure at standard rent.

    iii. Plans showing the phased programme of constructions has to be duly approved by this office before starting the work so as not to contravene at any stage of construction, the Development control Rules regarding open spaces, light and ventilation of existing structure.”

    15. Relying on the aforesaid provisions, the learned counsel submits that it is impermissible to proceed with the demolition work. As far as the NOC of MHADA is concerned, Mr. Joshi pointed out that clause 23 provides for respondent no. 6 as NOC holder to execute enter into & duly registered the agreement for Permanent Alternative Accommodation with all the tenants/occupants and that in the instant case when the building was acquired by respondent no. 6 it was vacant except for the ground floor premises. The other 3 flats were vacant. No such agreement has been entered into by petitioner and therefore NOC cannot be acted upon by the Respondent no. 6. For the aforesaid reason also Mr. Joshi submitted that it would not be proper to permit the respondent no. 6 to proceed with the demolition of the building as proposed.

    16. As against this, Mr. Samdani pointed out that notes in the IOD and in particular clause 19 and 21 dealt with a situation when actual construction is undertaken after obtaining commencement certificate and does not in any manner prevent them from undertaking the demolition work. He submitted that especially in view of the undertaking given by the respondent by and on behalf of the respondent no. 6 to protect the structure there should be no difficulty in rest of the building being demolished.

    17. Having heard counsel at length, at this stage we have no reason to consider grant of all the reliefs sought in this motion at this ad-interim stage. Perusal of the affidavit in support of notice of motion and additional affidavit dated 8 May, 2017 and the earlier orders passed by this court reveal that several attempts have been made by the parties to arrive at mutually acceptable settlement. Alternate premises have been offered from time to time as permanent alternate accommodation. However, this has not fructified. By an email dated 3 rd May, 2017 addressed on behalf of respondent. The Petitioner sought information of the nature of work being carried out and also called upon the Respondent no. 6 to ensure that the work carried out on the flats of the respondent and the building should not harm or damage the flat in accommodation of the petitioner. This is the prime consideration that the petitioners have as on date. Today there is no challenge of any of the terms of the IOD or NOC that the respondent no. 6 has secured. Respondent no. 6 has in its affidavit dated 12 May, 2017 undertaken to abide by the requirements of the structural engineer and strictly abide by the orders of the Small Causes Court and is undertaking to this court to undertake the demolition work as detailed in paragraph 5.

    18. Mr. Samdani, confirms that the undertaking includes the obligation to ensure that the water-proofing work is done even of the floor of the second floor which consists of the roof of the ground floor premises. However, even taking these undertaking into consideration, we find that the report of the structural consultant dated 17.4.2017, when it was first issued, had not taken into consideration the express requirement of protecting the ground floor structure. However, on 11 May, 2017 an amended scheme of demolition has been provided to the respondent no. 6 which sets out phase wise proposed demolition. The petitioners have opposed these methods as well. According to them, no demolition work at all can be carried out.

    19. In the circumstances we required to consider the balance of convenience in the given set of facts. The MHADA NOC dated 7 July, 2016 in its very first clause provides that all occupants of the old building shall be re-accommodated in the redeveloped building. Each occupant shall be rehabilitated and given in the equivalent carpet area as occupied by him for residential purpose in the old building subject to the minimum carpet area. However, it is admitted by Mr. Samdani on instructions today that the respondent no. 6 has not offered permanent alternate accommodation to the petitioners in the redeveloped building till date. What has been stated across the bar is that respondent no. 6 has sought the consent of the petitioners to the proposed redevelopment scheme but the petitioners had declined to consent. This having been said we also considered the fact that MHADA has in clause 27 of the NOC observed as follows:

    “27. Since, regarding occupancy of Room No. 2, at Ground Floor & Room No. 1 & 3 at Ground floor (Out house) is already pending in Small Causes Court. After outcome of Court decision, accordingly decision will be taken.”

    20. From the aforesaid NOC it is clear that the MHADA is no way concerned as to when the demolition has to commence since they have clearly provided in clause 27 that after the outcome of the proceeding in the Small Cause Court, a decision will be taken relating to the occupancy of Room No. 2, at Ground Floor and the outhouses being Room No. 1 & 3, at ground floor. Thus the NOC by itself does not entitle the petitioner to undertake and complete the demolition work of the building and the fate of the ground floor premises as set out in clause 27 will be dealt with by MHADA only after Small Cause Court decides the lis.

    21. In the meanwhile, having considered the aforesaid set of circumstances and the proposed phase wise demolition, we are of the view that it will not be appropriate to restrain the respondent no. 6 as sought in Notice of Motion at this stage inasmuch as the proposed scheme of demolition envisages 10 phases as follows:

    “Phase 1: In this phase the canopy in the open space on the north side of the plot will be removed firstly by dismantling the roofing material and thereafter members supporting the roof shall be removed. The canopy is not at all attached to the premises, which is occupied, as the occupied premises is on the south side of the existing building.

    This phasing is more particularly shown in the plan attached at page 17 of the main report.

    Phase 2: In this phase, slopping roofing material above the second floor level shall be removed firstly by dismantling the roofing material and thereafter members supporting the roof shall be removed. This phasing is more particularly shown in the plan attached at page 18 of the main report.

    Phase 3: In this phase, slopping roofing material above the second floor level at north east corner shall be removed firstly by dismantling the roofing material and thereafter members supporting the roof shall be removed. This phasing is more particularly shown in the plan attached at page 18 of the main report.

    Phase 4: In this phase, roof of the second floor level shall be removed as per the following steps:

    (a) Remove water proofing material over terrace area;

    (b) Remove parapet wall;

    (c) Remove flooring and bedding material below flooring;

    (d) Remove ladi supporting the floor;

    (e) Remove beams supporting joists.

    This phasing is more particularly shown in the plan attached at page 19 of the main report.

    Phase 5: In this phase, to remove second floor level slabs and part walls above first floor level consisting of following steps:

    (a) Dismantle internal doors/windows above second floor level;

    (b) Dismantle internal non-load bearing walls above second floor;

    (c) Remove water proofing over open terrace area;

    (d) Dismantle external walls above second floor (including parapet wall at open terrace area);

    (e) Remove 2nd floor level flooring and bedding material below flooring (including open terrace area);

    (f) Remove ladi (supporting the second floor level flooring);

    (g) Dismantle joists supporting ladi of second floor level; (h) Dismantle beams supporting joists of second floor level. This phase is more particularly explained on the Plan attached at page 20 of the main report.

    Phase 6: In this phase, following steps shall be adopted:

    (a) Dismantle internal doors/windows above second floor level;

    (b) Dismantle internal walls keeping 1.5 height above first floor;

    (c) Dismantle external walls keeping 1.5 height above first floor;

    This phase is more particularly explained on the Plan attached at page 21 of the main report.

    Phase 7: This phase is preponed and to be done before commencement of demolition work.

    Phase 8: In this phase, the first floor portion which is not above the occupants' premises on ground floor shall be demolished as per following steps:

    (a) Erection of structural steel column to support first floor beam as shown. (Marked as C1);

    (b) Dismantle internal doors/windows above first floor;

    (c) Dismantle internal walls above first floor;

    (d) Dismantle external walls above first floor;

    (e) Remove first floor level flooring and bedding material bellow flooring;

    (f) Remove ladi (supporting first floor flooring);

    (g) Dismantle joists supporting ladi of first floor level; (h) Dismantle beams supporting joists of first floor level This phase is more particularly explained on the Plan attached at page 21 of the main report.

    Phase 9: In this phase, ground floor portion excluding occupants' premises shall be dismantled/demolished as under:

    (a) Dismantle internal doors/windows above ground floor;

    (b) Dismantle internal walls above ground floor;

    (c) Dismantle external walls above ground floor.

    This phase is more particularly explained on the Plan attached at page 22 of the main report.

    Phase 10: In this phase, outhouse structures on the southern side of the plot which are independent from the main structure shall be demolished.

    This phase is more particularly explained on the Plan attached at page 23 of the main report.

    22. The first phase as reproduced above deals with removal of canopy of the premises in the open space on the north side of the plot which is not at attached to the suit of the premises in accommodation of the petitioners. Phase two as well three does not in any way appear to us to affect the petitioners premises nor does phase three It is only in phase 4 that the roof of the second floor level will be subject matter of the proposed demolition. The proposal in clause 1 sub paragraph (iii) to erect a dummy floor to protect against falling debris by using M.S beams and sheets and at a height of around 4 feet above the portion of the first floor level slab to protect the roof of the occupied premises is our view, is an attempt to protect the ground floor premises from the effect of any falling debris. However, we are not equipped to ascertain the correctness of the aforesaid procedure and it is necessary to ensure complete safety of the premises occupied on the ground floor and inhabited. In the circumstances, we are of the view that the respondent no. 6 should obtain certificate from an independent body unconnected with the Respondent no. 6's project of re-development to certify that the method of demolition proposed will with all certainty safeguard the ground floor premises from damage and protect the occupants in all respect.

    23. To this end and as an ad-interim measure, we pass the following order:

    a) Respondent no. 6 at their cost shall seek and obtain an independent opinion and certificate from the Victoria Jubilee Technical Institute, Wadala, Mumbai that the proposed phase wise demolition of the building ‘Ram Mansion’ situated at 61, Lady Laxmibai Jagmohandas Marg (Nepean Sea Road and L.D Ruparel Marg,) Mumbai 400 006 and from phase four proposed (including erection of a dummy floor as proposed in clause 1(iii) of the amended report dated 11 May, 2017) will protect the ground floor premises and its occupants entirely from any harm in the event of demolition being undertaken beyond phase 3.

    b) The Respondent no. 6 shall provide to the VJTI the Schematic Structural Demolition Report issued to respondent no. 6 on 17 April, 2017 by M/s. Profiles, Structural Consultants report dated 17 April 2017 and the Amended Scheme of Demolition of Ram Mansion to enable evaluation.

    b) In the event such a certificate is obtained the same shall be placed before this court on the next date.

    c) In the meanwhile, the respondent nos. 5 and 6 shall file their Affidavit in reply within a period of one week from today. Rejoinder if any be filed within one week thereafter.

    e) Liberty to apply in the event of respondent no. 6 obtains certificate from the VJTI.

    f) In the meantime, demolition work shall not proceed beyond Phase 3(Three). No steps will be taken in terms of Phase 4 (Four)

    24. All concerned to act on an authenticated copy of these minutes.