Translate
Text Highlighter

Bookmark

PDF

Share

Report a problem
AMICUS AI
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 11 of the 1894 Act
  • Section 4 of the repealed Land Acquisition Act, 1894
  • Section 48 of the LA Act
  • Amendment Act 68 of 1984
  • The Resettlement Act, 2013
  • Section 6 of the LA Act
  • Section 5-A of the LA Act
  • Section 48 of the repealed LA Act
  • Section 114(1)
  • Section 4 of the said Land Acquisition Act
  • Section 11 of the LA Act
  • Section 11-A of the repealed LA Act
  • Sections 4 and 6 of the LA Act
  • Section 6(1) of the LA Act
  • Explanation 1 to the Act
  • Section 6 of the General Clauses Act, 1897
  • Section 34
  • Section 114(2) of the 2013 Act
  • Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
  • Section 16 or 17(1) of the LA Act
  • Section 24 read with Section 114 of the 2013 Act
  • Section 24(2) of the 2013 Act
Are you a practicing lawyer?
Enhance your digital presence and reach by creating a Casemine profile.
Upload pleading to use the new AI search
Cites
Cited by
Citation Codes
Equivalent Citations
citation codes
Case Number
Disposition
Attorney(S)
Judges
Acts
  • Section 11 of the 1894 Act
  • Section 4 of the repealed Land Acquisition Act, 1894
  • Section 48 of the LA Act
  • Amendment Act 68 of 1984
  • The Resettlement Act, 2013
  • Section 6 of the LA Act
  • Section 5-A of the LA Act
  • Section 48 of the repealed LA Act
  • Section 114(1)
  • Section 4 of the said Land Acquisition Act
  • Section 11 of the LA Act
  • Section 11-A of the repealed LA Act
  • Sections 4 and 6 of the LA Act
  • Section 6(1) of the LA Act
  • Explanation 1 to the Act
  • Section 6 of the General Clauses Act, 1897
  • Section 34
  • Section 114(2) of the 2013 Act
  • Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
  • Section 16 or 17(1) of the LA Act
  • Section 24 read with Section 114 of the 2013 Act
  • Section 24(2) of the 2013 Act
Smart Summary

Factual and Procedural Background

The appellant, a Hindu Undivided Family, purchased 27 bighas of land in Village Bamnauli, Delhi, on 7 June 1984. A farmhouse was constructed pursuant to a duly sanctioned plan and a completion certificate was issued on 6 November 1985.

The Government of NCT of Delhi issued a notification under Section 4 of the Land Acquisition Act, 1894 on 4 November 2004 to acquire 2100 bighas, including the appellant’s land, for “Dwarka Phase II”. A declaration under Section 6 followed on 31 October 2005, and Award No. 1/2007-2008 was passed on 6 August 2007.

The appellant challenged the notifications in W.P.(C) 2161/2006. On 26 March 2010 the Delhi High Court dismissed the petition but directed the parties to maintain status quo pending a representation under Section 48 of the 1894 Act. The appellant’s Special Leave Petition resulted in a Supreme Court order dated 8 November 2010 continuing status quo.

After the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (“2013 Act”) came into force on 1 January 2014, the appellant filed IA No. 4/2014 seeking disposal of the appeal on the ground that the acquisition had lapsed under Section 24(2) of the 2013 Act.

Legal Issues Presented

  1. Whether, in terms of Section 24(2) of the 2013 Act, the acquisition proceedings initiated under the Land Acquisition Act, 1894 lapsed because (a) the award was made more than five years before 1 January 2014, and (b) neither physical possession was taken nor compensation paid.
  2. Whether the existence of status quo orders (which prevented the authorities from taking possession) precludes the appellant from invoking Section 24(2).
  3. Whether earlier Supreme Court decisions (e.g., Pune Municipal Corporation v. Harakchand Misirimal Solanki) correctly interpret Section 24(2), or the matter requires reference to a larger Bench in light of contrary precedents such as Satendra Prasad Jain v. State of U.P.

Arguments of the Parties

Appellant's Arguments

  • Section 24(2) provides that where an award is five years old and either possession has not been taken or compensation not paid, the acquisition “shall be deemed to have lapsed”.
  • The award (6 August 2007) is more than five years older than the commencement of the 2013 Act.
  • The appellant remains in uninterrupted physical possession and has received no compensation, satisfying both negative conditions in Section 24(2).
  • Relied heavily on Pune Municipal Corporation v. Harakchand Misirimal Solanki, Bharat Kumar, Bimla Devi and Union of India v. Shiv Raj, which interpret Section 24(2) in favour of landowners.

Respondents' Arguments

  • The 2013 Act is prospective; Section 24 read with Section 114 protects concluded actions under the 1894 Act.
  • Once possession is taken under Sections 16 or 17 of the 1894 Act, land vests absolutely in the State; decisions in Satendra Prasad Jain and Senjeevanagar Housing Society were cited.
  • The word “or” in Section 24(2) should be read conjunctively; if either possession has been taken or compensation paid, the acquisition does not lapse, invoking principles from Punjab Produce & Trading Co. v. CIT.
  • Possession could not be taken solely because of court-ordered status quo; allowing the appellant to benefit from its own litigation would defeat the legislative intent.
  • Contended that Pune Municipal Corporation and allied cases overlooked earlier binding precedents and should be referred to a larger Bench.

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Pune Municipal Corpn. v. Harakchand Misirimal Solanki (2014) 3 SCC 183 Interpretation of Section 24(2): acquisition lapses if award is ≥5 years old and possession not taken or compensation not paid; treasury deposit not payment. Relied upon as binding; forms the foundation for declaring lapse.
Bharat Kumar v. State of Haryana (2014) 6 SCC 586 Same interpretation of Section 24(2). Cited to reinforce Pune Municipal principle.
Bimla Devi v. State of Haryana (2014) 6 SCC 583 Same interpretation of Section 24(2). Cited in support of appellant’s case.
Union of India v. Shiv Raj (2014) 6 SCC 564 Same interpretation of Section 24(2). Quoted to buttress lapse argument.
Satendra Prasad Jain v. State of U.P. (1993) 4 SCC 369 Once possession taken, land vests absolutely; Section 11-A does not nullify acquisition. Invoked by respondents; distinguished by the Court as inapplicable where possession never taken.
Senjeevanagar Medical & Health Employees’ Coop. Housing Society v. Mohd. Abdul Wahab (1996) 3 SCC 600 Same vesting principle as above. Relied on by respondents; not accepted as determinative.
Punjab Produce & Trading Co. Ltd. v. CIT (1971) 2 SCC 540 Construction of the disjunctive “or”. Cited by respondents to argue conjunctive reading; Court declined that view.
Sree Balaji Nagar Residential Assn. v. State of T.N. (2015) 3 SCC 353 Period of stay/injunction not excluded from 5-year window under Section 24(2). Applied to reject the argument that status quo orders save the acquisition.
CIT v. Indo-Mercantile Bank Ltd. AIR 1959 SC 713 Function of a proviso in statutory interpretation. Cited to affirm literal reading of Section 24(2).
Madras & Southern Mahratta Railway Co. Ltd. v. Bezwada Municipality (1944) 71 IA 113 Scope of a proviso—cannot cut down clear main enactment. Quoted in support of literal interpretation of Section 24(2).
Rajiv Choudhrie v. Union of India (2010) 116 DRJ 438 Delhi High Court decision dismissing appellant’s writ petition. Referenced as procedural history; not determinative of Supreme Court’s reasoning.

Court's Reasoning and Analysis

The Court identified two statutory pre-conditions in Section 24(2): (i) an award made five years or more before 1 January 2014, and (ii) either physical possession not taken or compensation not paid. It found both conditions satisfied: Award No. 1/2007-2008 was dated 6 August 2007; the appellant retained possession; and no compensation was paid.

Respondents’ reliance on earlier vesting cases (Satendra Prasad Jain; Senjeevanagar) was distinguished because those decisions presupposed that possession had actually been taken. Here, possession never transferred to the State.

The Court rejected the argument that status quo orders should suspend the five-year period, citing Sree Balaji Nagar, which holds that Section 24(2) deliberately omits any exclusion for litigation-induced delays.

Contentions that Section 24(2) must be read down or referred to a larger Bench were considered untenable; the three-Judge Bench ruling in Pune Municipal Corporation was deemed binding and directly applicable. The Court reaffirmed that deposit of compensation in the treasury does not amount to payment to landowners.

Applying these principles, the Court concluded that the acquisition proceedings concerning the appellant’s land had lapsed by operation of law.

Holding and Implications

HELD: The acquisition proceedings relating to the appellant’s land are deemed to have lapsed under Section 24(2) of the 2013 Act. The interlocutory application and the civil appeal are allowed; the relevant notifications are quashed insofar as they pertain to the appellant’s land. No order as to costs.

Implications: The land reverts to the appellant free from the impugned acquisition. The judgment reinforces the authority of Pune Municipal Corporation and clarifies that court-ordered stays do not toll the five-year period in Section 24(2). No new precedent was set, but existing jurisprudence on Section 24(2) was affirmed.

To access the original judgment, please Sign In or Subscribe.

    Rajiv Chowdhrie Huf v. Union Of India And Others

    V. Gopala Gowda, J.— This IA No. 4 of 2014 in Civil Appeal No. 8785 of 2013 is filed by the appellant seeking for issuing direction and pass an order for disposal of this appeal in terms of Section 24(2) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (in short “the 2013 Act”). The appellant landowner has come to this Court questioning the correctness of the judgment and order dated 26-3-2010 passed by the Division Bench of the High Court of Delhi in Rajiv Choudhrie v. Union of India WP (C) No. 2161 of 2006, (2010) 116 DRJ 438, ILR (2010) 4 Del 273, wherein, the High Court dismissed the said petition.

    2. The brief facts of the case are stated hereunder: the appellant Hindu Undivided Family (for short “HUF”) purchased land comprising of Khasra Nos. 569, 575, 581, 586, 591, 592 (new Khasra Nos. 27/9, 12, 19, 22, 36/2, 9) on 7-6-1984 in all measuring 27 bighas situated in the revenue estate of Village Bamnauli, Tehsil Mehrauli (presently Tehsil Vasant Vihar, Kapashera), New Delhi. On application made by the appellant, Municipal Corporation of Delhi (MCD) vide Sanction Letter No. 972.B/HQ/84 dated 23-1-1985 sanctioned the plan for constructing a farmhouse on part of the said land. In January 1985, the appellant constructed a farmhouse on the aforesaid land, which was in accordance with the plan duly sanctioned. After the completion of the construction, MCD issued a completion certificate dated 6-11-1985 to the appellant.

    3. On 26-11-2004, the Government of National Capital Territory (NCT) issued the Notification dated 4-11-2004 under Section 4 of the repealed Land Acquisition Act, 1894 (for short “the LA Act”) in respect of land area measuring 2100 bighas and 6 biswas in respect of Village Bamnauli, Tehsil Mehrauli. The public purpose mentioned in the notification under Section 4 of the LA Act was for construction of Dwarka, Phase II, the land of the appellant was covered in the said notification. The appellant filed his objections under Section 5-A of the LA Act before the Land Acquisition Collector (for short “LAC”), South West Delhi opposing the proposed acquisition for public purpose.

    4. Thereafter, on 10-11-2005, the declaration Notification under Section 6(1) of the LA Act dated 31-10-2005 was published in the Government Gazette in respect of the land sought to be acquired including the land owned by the appellant.

    5. The appellant filed Writ Petition (Civil) No. 2161 of 2006 before the High Court of Delhi at New Delhi, challenging the legality of the notifications under Sections 4 and 6 of the LA Act. The High Court issued notice and passed an order of “status quo” in respect of the land in question. The other landholders who were similarly situated had also challenged the said two notifications and the High Court upon examining the writ petitions on merits dismissed the same with a direction to the landowners that they were permitted to file a representation to the competent authority under Section 48 of the LA Act, to denotify their land and further held that till such time as their representation for denotification is decided by NCT, the parties are directed to maintain “status quo” as to the nature, title and possession of the land in question. Hence, this appeal.

    6. This Court vide order dated 8-11-2010 SLP (C) CC No. 16471 of 2010 passed an interim order to maintain “status quo” in respect of the possession of the land in question, subsequently the same was made absolute till the disposal of the appeal.

    7. It is the case of the appellant that throughout the proceedings before the High Court as well as this Court, it has been in physical possession of the land involved in this appeal. In fact, the actual physical possession of the land was never taken by the respondents. Furthermore, the appellant was protected by various interim orders of “status quo” both by the High Court as well as this Court with respect to the possession of the land in question.

    8. Mr Chandra Uday Singh, the learned Senior Counsel appearing on behalf of the appellant placed reliance upon Section 24(2) of the 2013 Act to support the plea of the appellant that the land acquisition proceedings initiated under the LA Act would be deemed to have lapsed where an award was made 5 years prior to the commencement of the 2013 Act and physical possession of the land has not been taken or the compensation towards the acquired land was not paid to the appellant. Therefore, the above provision of the 2013 Act provides for lapse of such acquisition proceedings which provision is aptly applicable to the fact situation.

    9. Section 24(2) of the 2013 Act, upon which strong reliance has been placed by the learned Senior Counsel on behalf of the appellant is extracted as under:

    “24. (2) Notwithstanding anything contained in sub-section (1), in case of land acquisition proceedings initiated under the Land Acquisition Act, 1894, where an award under the said Section 11 has been made five years or more prior to the commencement of this Act but the physical possession of the land has not been taken or the compensation has not been paid the said proceedings shall be deemed to have lapsed and the appropriate Government, if it so chooses, shall initiate the proceedings of such land acquisition afresh in accordance with the provisions of this Act:
    Provided that where an award has been made and compensation in respect of a majority of land holdings has not been deposited in the account of the beneficiaries, then, all beneficiaries specified in the notification for acquisition under Section 4 of the said Land Acquisition Act, shall be entitled to compensation in accordance with the provisions of this Act.”

    10. Having regard to the facts narrated above, it is contended by the learned Senior Counsel for the appellant that by virtue of Section 24(2) of the 2013 Act, the land acquisition proceedings in the present case on hand initiated under the LA Act have lapsed for the reason that the award under Section 11 of the LA Act, which was made by the LAC on 6-8-2007 vide Award No. 1 of 2007-2008 more than five years prior to the commencement of the 2013 Act, which has commenced from 1-1-2014 and physical possession of the land in dispute is neither taken nor has the compensation awarded been paid to the appellant in respect of his acquired land.

    11. It has been further contended that the case of the appellant herein is duly covered under the aforesaid provisions of the Act as the appellant has been in continuous possession of the land in question and compensation has not been paid to the appellant while the award was made more than 5 years prior to the commencement of the 2013 Act. Reliance was placed on the three-Judge Bench decision of this Court in Pune Municipal Corpn. v. Harakchand Misirimal Solanki (2014) 3 SCC 183, and the other judgments of this Court in Bharat Kumar v. State of Haryana (2014) 6 SCC 586, Bimla Devi v. State of Haryana (2014) 6 SCC 583 and Union of India v. Shiv Raj (2014) 6 SCC 564, wherein Section 24(2) of the 2013 Act, was examined by this Court at length and held that the land acquisition proceedings initiated under the LA Act are deemed to have lapsed, where the award has been made five years or more prior to the commencement of the 2013 Act and physical possession of the land is not taken or compensation has not been paid to the appellant. It is further contended that the law laid down by this Court in Pune Municipal Corpn. case (2014) 3 SCC 183 and other cases referred to supra, squarely cover the case on hand in favour of the appellant. Therefore, it is prayed by him that the instant appeal be disposed of since the acquisition proceedings of the land have lapsed in terms of Section 24(2) of the 2013 Act.

    12. On the other hand, it has been contended by the learned counsel for the respondents that the 2013 Act is prospective in operation by virtue of Section 24 read with Section 114 of the 2013 Act. As provided under Section 24, the effect of Section 6 of the General Clauses Act, 1897, the actions taken by the respondents in acquiring the land in dispute and passing an award have been saved. By reading the above provisions of the two sections, it is clear that the legislature wanted to protect and save the acquisition proceedings initiated under the repealed LA Act, particularly where either possession of the acquired land has not been taken or compensation has not been paid to the landowners. It is further submitted that the 2013 Act never intended to destroy the entire acquisition proceedings in acquiring the land for the public purpose under the repealed LA Act, 1894. It is well-settled position of law that the proceedings initiated and culminated under the repealed 1894 Act are not to be disturbed by applying the interpretation of the provisions of Section 24(2) of the 2013 Act made by this Court in the abovereferred cases. By operation of the provisions of Section 16 or 17(1) of the LA Act as the case may be, once the possession of the acquired land is taken by the respondents, the land will be vested in the State Government which is absolutely free from all encumbrances. Thereafter, it is not open even for the State Government to denotify and restore the land to the landowner in exercise of its power under Section 48 of the repealed LA Act as it is not permissible in law. In Satendra Prasad Jain v. State of U.P (1993) 4 SCC 369 and Senjeevanagar Medical and Health Employees' Coop. Housing Society v. Mohd. Abdul Wahab (1996) 3 SCC 600, (1996) 2 SCR 308, this Court has held that once possession is taken by the Land Acquisition Collector in exercise of its statutory power under Sections 16 or 17(1) of the repealed LA Act, 1894, the land vests with the State Government, free from all encumbrances, even if no compensation has been awarded under Section 11 of the repealed LA Act within two years, that is, the statutory period prescribed under the repealed LA Act for passing an award. In the aforesaid cases, this Court has also held that Section 11-A of the repealed LA Act is not applicable (which is analogous to Section 24 of the 2013 Act) and further held that in such circumstances, the only consequence provided under the repealed LA Act is payment of interest under Section 34 in respect of the acquired land. Therefore, he submits that the acquisition of land cannot be deemed to have lapsed under Section 24(2) of the 2013 Act, in view of the law laid down in the above cases referred to supra. It is contended by the learned counsel on behalf of the respondents that the abovesaid judgments were not brought to the notice of this Court while disposing of Pune Municipal Corpn. case (2014) 3 SCC 183 and other cases referred to supra which are strongly relied on behalf of the appellant and therefore the legal question in this regard requires to be referred to a larger Bench of this Court.

    13. Further, it is contended by the respondents that by a careful reading of Section 24(2) of the 2013 Act, it would show that the proceedings initiated under the LA Act shall be deemed to have lapsed, if the two conditions as mentioned below are not satisfied by the appellant. They are:

    (i) An award under Section 11 of the 1894 Act should have been made five years or more prior to the commencement of 2013 Act;
    (ii) Whether physical possession had not been taken or the compensation has not been paid.

    A perusal of the provision of Section 24(2) of the Act reveals that it is in two parts. The first part relates to a positive state of affairs, namely, the existence of award for more than five years on the commencement of the new Act, whereas, the second part lays down two negative conditions. Thus, the word “or” has been used to express an alternative of the terms/conditions enumerated therein. Therefore, if either of the two negative conditions which are found to be mentioned in Section 24(2) remains unfulfilled by the respondents, the acquisition proceedings in respect of the land be held to be not lapsed, is the legal contention urged on behalf of the respondents by placing reliance upon the decision of this Court in Punjab Produce and Trading Co. Ltd. v. CIT (1971) 2 SCC 540, AIR 1971 SC 2471. Neither was the said legal issue considered nor was the law laid down in the aforesaid judgment brought to the notice of this Court at the time of hearing of Pune Municipal Corpn. (2014) 3 SCC 183 and other cases referred to supra and thus have not been considered by this Court while disposing of the cases on which reliance has been placed by the appellant as they have to be referred to the larger Bench for its reconsideration is the submission of the learned Senior Counsel on behalf of NCT. Further, it is contended that if the above provisions are read in this manner, then it will be in harmony with the LA Act.

    14. Further, it is contended that the appellant had filed writ petition in this Court when this Court was pleased to grant SLP (C) CC No. 16471 of 2010 “status quo” in respect of the land in question. Although the High Court has dismissed the writ petition on 26-3-2010 WP (C) No. 2161 of 2006, (2010) 116 DRJ 438, ILR (2010) 4 Del 273 but extended the interim order of “status quo” regarding the possession of the land till the representation filed by the appellant for release of the land under Section 48 of the LA Act was decided by the competent authority of NCT. When the appellant challenged the said order before this Court by way of special leave petition, this Court directed SLP (C) CC No. 16471 of 2010 the parties to maintain “status quo” in respect of the land in question resultantly on the strength of the interim order passed by the High Court as well as by this Court the possession of the land could not be taken by the respondents and the same remained with the appellant. In the teeth of the aforesaid fact that the appellant continued to be in possession of the land in question only due to interim order of “status quo” passed in their favour is not proper for the appellant to turn around and contend now at this stage that physical possession of the land has not been taken by the respondents and therefore, the acquisition proceedings of the land are lapsed.

    15. We have carefully gone through the factual and rival legal contentions urged on behalf of both the parties in the backdrop of the case laws cited above. On examining the facts and circumstances of the case on hand, it is an undisputed fact that the award was made 5 years prior to the date of commencement of the Resettlement Act, 2013 i.e on 6-8-2007 vide Award No. 1 of 2007-2008 and either physical possession of the land should have been taken or compensation been paid to the appellant in respect of his acquired land. Therefore, the acquisition proceedings of the land of the appellant are lapsed in view of Section 24(2) of the 2013 Act, which provision has been rightly interpreted by this Court by a three-Judge Bench decision in Pune Municipal Corpn. (2014) 3 SCC 183 and other cases referred to supra, the relevant paras of the aforesaid case are extracted hereunder:

    “20. … it is clear that the award pertaining to the subject land has been made by the Special Land Acquisition Officer more than five years prior to the commencement of the 2013 Act. It is also admitted position that compensation so awarded has neither been paid to the landowners/ persons interested nor deposited in the court. The deposit of compensation amount in the Government treasury is of no avail and cannot be held to be equivalent to compensation paid to the landowners/persons interested. We have, therefore, no hesitation in holding that the subject land acquisition proceedings shall be deemed to have lapsed under Section 24(2) of the 2013 Act.
    21. The argument on behalf of the Corporation that the subject land acquisition proceedings have been concluded in all respects under the 1894 Act and that they are not affected at all in view of Section 114(2) of the 2013 Act, has no merit at all, and is noted to be rejected. Section 114(1) of the 2013 Act repeals the 1894 Act. Sub-section (2) of Section 114, however, makes Section 6 of the General Clauses Act, 1897 applicable with regard to the effect of repeal but this is subject to the provisions in the 2013 Act. Under Section 24(2) land acquisition proceedings initiated under the 1894 Act, by legal fiction, are deemed to have lapsed where award has been made five years or more prior to the commencement of the 2013 Act and possession of the land is not taken or compensation has not been paid. The legal fiction under Section 24(2) comes into operation as soon as conditions stated therein are satisfied. The applicability of Section 6 of the General Clauses Act being subject to Section 24(2), there is no merit in the contention of the Corporation.”

    16. Further, with regard to the legal contention that physical possession of the land could not have been taken by the respondents in view of the interim order of “status quo” passed by this Court. This Court in Sree Balaji Nagar Residential Assn. v. State of T.N (2015) 3 SCC 353, held that Section 24(2) of the 2013 Act does not exclude any period during which the land acquisition proceedings might have remained stayed on account of stay or injunction granted by any court. It was conclusively held that the legislature has consciously omitted to extend the period of five years indicated in Section 24(2) of the 2013 Act for grant of relief in favour of landowners even if the proceedings had been delayed on account of an order of stay or injunction granted by a court of law or for any reason. Thus, the said period has to be excluded as provided under the amended proviso to Section 6 of the LA Act by way of an amendment by the legislature to the above Section 6 through Amendment Act 68 of 1984, to add Explanation 1 to the Act, for the purpose of excluding the period, when the proceedings suffered stay by an order of the court, in the context of limitation provided for publishing the declaration notification under Section 6(1) of the Act. The Explanation to Section 11-A, which was added by Amendment Act 68 of 1984 was to a similar effect. This Court in the above case has examined this legal contention and held that the legislature in its wisdom made the period of five years under Section 24(2) of the Resettlement Act, 2013, absolute and unaffected by any delay in the proceedings on account of any order of stay by a court of law. The plain wordings used by the legislature under the provisions of Section 24(2) are made very clear and do not create any ambiguity or conflict. In such a situation, the Court is not required to depart from the literal rule of interpretation, as held by this Court in CIT v. Indo-Mercantile Bank Ltd. AIR 1959 SC 713 as under: (AIR p. 718, para 10)

    “10. Lord Macmillan in Madras & Southern Mahratta Railway Co. Ltd. v. Bezwada Municipality (1943-44) 71 IA 113, (1944) 57 LW 422 laid down the sphere of a proviso as follows: (IA p. 122)
    ‘… The proper function of a proviso is to except and deal with a case which would otherwise fall within the general language of the main enactment, and its effect is confined to that case. Where, as in the present case, the language of the main enactment is clear and unambiguous, a proviso can have no repercussion on the interpretation of the main enactment, so as to exclude from it, by implication what clearly falls within its express terms.’
    The territory of a proviso therefore is to carve out an exception to the main enactment and exclude something which otherwise would have been within the section. It has to operate in the same field and if the language of the main enactment is clear it cannot be used for the purpose of interpreting the main enactment or to exclude by implication what the enactment clearly says unless the words of the proviso are such that that is its necessary effect.”

    17. Upon examining the aforesaid decisions with reference to the facts and circumstances of the case on hand, we are of the view that physical possession of the land belonging to the appellant has neither been taken by the respondents nor compensation paid to him in respect of the land acquired even though more than five years have lapsed since the award was passed on 6-8-2007, when the 2013 Act came into force. Therefore, the conditions mentioned in Section 24(2) of the 2013 Act are satisfied in this case for allowing the plea of the appellant that the land acquisition proceedings are deemed to have lapsed in terms of Section 24(2) of the 2013 Act. The said legal principle laid down by this Court in Pune Municipal Corpn. (2014) 3 SCC 183 and other cases referred to supra with regard to the interpretation of Section 24(2) of the 2013 Act is applicable with all fours to the fact situation in respect of the land covered in this appeal for granting the relief as prayed by the appellant in the application.

    18. In view of the aforesaid findings and reasons recorded by us, the acquisition proceedings in respect of the appellant's land have lapsed. The prayer made in this interlocutory application is allowed in the above terms and consequently, the civil appeal is also allowed by quashing the acquisition proceeding notification insofar as the land of the appellant is concerned. There shall be no order as to costs.