Smart Summary

Structured Summary of the Opinion

Factual and Procedural Background

The petitioners are a firm/shop operating from Boring Road, Patna (Petitioner No.1 being the firm name and Petitioner No.2 the proprietor). In April 2006 they obtained a three-phase low-tension electric connection from Patna Electric Supply Undertaking (PESU) under consumer category NDS-II for a sanctioned load of 14 KW (Account No. 41801150/346162).

On 28 April 2008 the Board's Special Task Force (STF) inspected the premises and assessed an installed load of 14.836 KW (rounded to 15 KW), alleging an excess load of 1 KW; a bill for additional load of Rs. 6,044/- was served and paid by the petitioners. The inspection report (later produced as Annexure-7) noted five air conditioners of 1.5 tonnes each and treated their cumulative load as 10,000 Watts.

On 9 February 2009 a further STF inspection alleged meter tampering; the report (part of Annexure-C/1) showed total load 14.240 taken to be 15 KW and recorded a substantial reduction in meter recording, leading to allegations of theft under Section 135 of the Electricity Act, 2003. The same five air conditioners were recorded but the per-unit wattage appears inconsistently treated (2500 W each was referenced in the report though total still shown as 10,000 W initially, later adjusted to 12,500 W), producing an assessment basis of 17 KW in subsequent bills.

Consequent to the 9.2.2009 inspection the meter was removed and an FIR was lodged (Buddha Colony Police Station Case No. 27 of 2009), alleging a loss of about Rs. 6,47,666/-. On 10.2.2009 a provisional punitive assessment bill of Rs. 7,08,145/- (with calculation chart, Annexures-3A and 3B) was served. The petitioners filed writ petition CWJC No. 3309 of 2009 challenging the assessment and related actions.

While the writ petition was pending, on 8.4.2009 a similar provisional bill based on a 17 KW assessment was served. The High Court disposed of the writ on 30.4.2009 observing that petitioners had a right to object to the provisional assessment and directed a hearing on 12.5.2009, ordering reconnection on part payment. Despite the direction, the Board took about six months to make a final assessment; the final assessment/order dated 3.11.2009 (Annexures-5 and 5.A) rendered a final punitive assessment under Section 135 demanding Rs. 6,81,441/-, and the petitioners challenged this final assessment.

Meanwhile, provisional assessment figures were being reflected as arrears in monthly bills and delayed payment surcharge was levied. The petitioners contested these actions and the final punitive assessment.

Legal Issues Presented

  1. Whether assessment for unauthorised use of electricity (including alleged theft) can lawfully be made under Section 135 of the Electricity Act, 2003, or must be carried out under Section 126 of the Act (with its provisional/final assessment scheme)?
  2. Whether a consumer aggrieved by a final assessment in a theft/unauthorised-use case has an appellate remedy under Section 127 of the Act (i.e., can such assessments be appealed and on what terms)?
  3. Whether reflecting provisional assessment amounts as arrears in monthly bills and levying delayed payment surcharge before a final assessment is made is permissible?
  4. Whether provisions of the Bihar Electricity Supply Code, 2007 that might be read as denying appeal against an assessment labelled to arise under Section 135 are consistent with the Act, and whether they must be read down if inconsistent?
  5. Whether procedural timelines prescribed by Section 126 (e.g., provisional assessment within seven days, final assessment within the statutory period) were complied with, and the consequences of any delay.

Arguments of the Parties

Petitioners' Arguments

  • Labeling the assessment as a "punitive assessment" under Section 135 deprived the petitioners of remedies available to them (they contended the correct remedy would be to contest the issue in the trial), and this deprivation was arbitrary.
  • The petitioners argued that because of an unexplained enhancement in the load attributed to certain machines (the same five air conditioners), they were wrongly assessed at 17 KW instead of 15 KW, materially increasing liability.
  • They contested the inclusion of provisional assessment figures as arrears in monthly bills and the levying of delayed payment surcharge before any final assessment was lawfully completed.
  • They contended that the period for punitive billing should be limited between successive inspections and should account for weekly closures of the commercial premises, thereby reducing the number of chargeable days.

Board's Arguments (Respondent)

  • The Board's counsel submitted that the assessment was not made in terms of Section 126 of the Act and, therefore, there could be no appeal against the punitive final assessment (i.e., they treated the assessment as falling under Section 135 without recourse to Section 126/127 appeal procedure).

Table of Precedents Cited

Precedent Rule or Principle Cited For Application by the Court
Kamaljeet Singh v. Bihar State Electricity Board, CWJC No. 14213 of 2009 (judgment and order dated 3.12.2009) Affirmation of the principle that assessment in cases of unauthorised use of electricity (including theft) must be governed by Section 126 (provisional and final assessment) and related appellate remedy under Section 127. The Court relied on this earlier decision to reiterate that assessment for unauthorised use/theft cannot be treated otherwise; the present case follows the reasoning of that earlier judgment and the Court "elaborate[s] the same once again" to conclude assessments must be made under Section 126 and are appealable under Section 127.

Court's Reasoning and Analysis

The Court undertook a statutory-analysis-first approach, examining the interplay among Sections 126, 127, 135 and 154 of the Electricity Act, 2003 and the Bihar Electricity Supply Code, 2007 as applied to the facts.

Key points of the Court's step-by-step reasoning (as stated in the opinion):

  1. The Court observed that Section 135 (dealing with theft of electricity) contains provisos (including a proviso about restoration of supply on deposit/payment) but does not itself set out a complete assessment mechanism; rather it refers to assessment being made "in accordance with the provisions of this Act."
  2. The comprehensive statutory scheme for provisional and final assessment is contained in Section 126 (subsections (3), (5) and (6) are particularly relevant). Section 126 provides for provisional assessment, opportunity to object, and final assessment within the prescribed time frame.
  3. Section 127 provides an express appellate remedy: any person aggrieved by a final order under Section 126 may appeal within 30 days to an appellate authority on payment of half the assessed amount. Section 127(4) makes the appellate authority's order final in that quasi-judicial process.
  4. Where criminal proceedings are instituted (as in theft cases), the Special Court (criminal court) has to determine civil liability in money terms under Section 154(5)-(6), and if the consumer had deposited an excess amount, the Special Court can order refund with interest. Thus, an appellate/quasi-judicial determination by the Board is subject to judicial determination in criminal trials.
  5. From this statutory structure the Court concluded that assessments in unauthorised-use/theft situations have to be made under Section 126 (not in some standalone manner under Section 135) and are appealable under Section 127 — petitioners are therefore not without remedy.
  6. The Court identified multiple procedural and substantive deficiencies in the Board's handling of the matter as applied to the petitioners' case:
    • Timing: Section 126 requires provisional assessment within seven days of inspection and final assessment within the period prescribed; here there were two provisional assessments (10.2.2009 and 8.4.2009), and the final assessment was not made until 3.11.2009 — a delay of several months contrary to the Act's timings.
    • Billing practice: Provisional assessment amounts were being reflected as arrears in subsequent monthly bills and attracted delayed payment surcharge — the Court held this practice impermissible. Until a final assessment is made (or the consumer agrees to provisional assessment), such provisional amounts are not legally due and cannot be included in regular bills; accordingly, delayed payment surcharge on those amounts must be excluded.
    • Supply Code inconsistency: Any reading of the Bihar Electricity Supply Code, 2007 that would deny an appeal against an assessment in theft cases labelled under Section 135 is inconsistent with the Act; the Code must be read down to align with the statutory scheme (and the Code itself uses the same annexure template for assessments under Sections 126 and 135, with only a connected load factor distinction).
    • Calculation errors: The Court identified an erroneous method in the punitive calculation where money values were treated and offset incorrectly (the punitive billing should charge the unit difference at punitive rate after discounting units already billed, not compute a money value and reduce earlier payments in the manner the Board used).
    • Inconsistent load assessments: The first STF inspection (28.4.2008) treated five 1.5 tonne ACs as totalling 10,000 W; later assessments treated the same machines as 12,500 W, thereby increasing assessable load from 15 KVA to 17 KVA and materially affecting liability. This inconsistency is a material point to be considered on appeal.
    • Chargeable period: The petitioners argued correctly that the period for punitive billing should be between inspections (here less than 315 days) and should account for mandatory weekly closure of the commercial premises; this affects the number of chargeable days and therefore the assessment.
  7. Given these defects and the statutory scheme, the Court directed that petitioners should raise all objections before the appellate authority under Section 127, which the Court recorded is independent of the Board and should decide the matter in accordance with the Court's observations and the law.
  8. The Court clarified practical points regarding the filing of appeal: petitioners who have paid less than 50% of the punitive bill would need to pay up to the 50% threshold while filing the appeal; if they have already paid more than 50% they would not be required to pay anything further for filing the appeal. The appellate authority is to hear on merits and account for the delay in filing the appeal caused by pendency of the writ petition.

Holding and Implications

Holding: With the observations and directions recorded in the opinion, the writ petition is disposed of.

Direct consequences and practical implications (as stated in the opinion):

  • The Court held that assessments in cases of unauthorised use of electricity, including theft, must be made under Section 126 of the Electricity Act, 2003 (with provisional and final assessment procedures) and are appealable under Section 127; they cannot be treated as outside that scheme simply because Section 135 is involved.
  • The Bihar Electricity Supply Code, 2007 cannot be read to oust the statutory right of appeal or the scheme under Sections 126/127 to the extent it conflicts with the Act; it must be read down to conform with the Act.
  • The Board's practice of including provisional assessment amounts as dues in subsequent monthly bills and levying delayed payment surcharge before final assessment is completed is impermissible; such surcharges must be excluded to that extent.
  • The petitioners were directed to prefer an appeal to the appellate authority under Section 127; that authority is to consider the petitioners' objections and the Court's observations and decide the matter on merits. The Court noted the appellate authority is independent of the Board and should allay any apprehension of bias.
  • The Court identified substantive and procedural calculation errors and factual inconsistencies (for instance, unit-calculation method for punitive billing and inconsistent load assessment for the same machines) which the appellate authority should examine; these errors materially affect liability and chargeable period.
  • The Court recorded the procedural requirement for part-payment to perfect an appeal (bring payment to 50% where required) and that no further filing fee is required if more than 50% of the punitive bill has already been paid; the appellate authority should entertain the appeal notwithstanding delay caused by pendency of the writ petition before this Court.

The opinion does not set aside or remit a specific numeric part of the final assessment in this order; rather it disposes the writ petition with directions that the petitioners' objections be considered by the appellate authority under the statutory scheme described above.

    Zee Saheb Cosmetic Zone Null v. Bihar State Electricity Board

    1. Petitioner No. 1 is the firm name and style of the shop of petitioner No. 2 at Boring Road in the district of Patna. For the purposes of the said shop, in April 2006, an electric connection was taken from Patna Electric Supply Undertaking (PESU), an undertaking of the Bihar State Electricity Board under consumer category NDS-II which was a three phase low tension connection for a sanctioned load of 14 KW under Account No. 41801150/346162. On 28.4.2008, the Special Task Force (STF) of the Board conducted an inspection of the petitioners' premises and, taking into account all load connected, they came to the conclusion that petitioners had an installed load of 14.836 KW which was rounded off to 15 KW and, thus, allegedly had an excess load of 1 KW. Accordingly, petitioners were served with a bill for additional load of Rs. 6,044/- and asked to pay additional amount for load enhancement both of which petitioners paid. It may be noticed here that the said inspection report has been annexed as Annexure-7 to the supplementary affidavit filed on behalf of petitioners after copy of it was served on the counsel for the Board immediately after arguments were concluded on the next day. The inspection Page: 864report shows that there were 5 air conditioners of 1.5 tonnes, the total load of which was taken to be 10 KW (at the rate of 2,000 Watts each).

    2. On 9.2.2009, again an STF inspection was carried out in the petitioners' premises. This time, it was alleged that there was meter tampering. A report was-drawn up which is part of Annexure-C/1 to the counter affidavit of the Board. In the report, it would be seen that the total load was shown to be 14.240 and taken to be 15 KW. In the report, the inspecting authorities are alleged to have tested the meter which showed substantial reduction in meter recording. It was, accordingly, alleged that meter, being tampered, it was a case of theft of electricity in terms of Section. 135 of the Electricity Act, 2003. At this juncture itself, one may note one important aspect of the said, report dated 9.2.2009 Here again, it is clearly noted that there were 5 air conditioners of one and a half tonne each (as found in the earlier inspection dated 28.4.2008). But this time its load was assessed at the rate of 2500 Watts each but as per report, the total load was shown as 10,000 Watts as in the past. This I am faking note of because subsequently, while raising bills, authorities have corrected the figure 10,000 to 12.500 Thus, an enhancement of 2500 Watts was done for the same machines which were found in the earlier report and billed accordingly. As later would be seen, petitioners' contention would be that because of this enhancement, they have been wrongly assessed at 17 KW instead of 15 KW load found. That makes a substantial difference.

    3. Consequent to the said inspection, on 9.2.2009, the meter was removed and Buddha Colony Police Station Case No. 27 of 2009 instituted for an offence punishable under Section 135 of the Act. While lodging the first information report, which is part of Annexure-C/1 to the counter affidavit, it is alleged that because of theft, Board has suffered a loss of about Rs. 6,47,666/-. On 10.2.2009, a provisional assessment bill totalling to Rs. 7,08,145/- is served. Alongwith this, a chart of calculation was also served. The two are Annexures-3A and 3B. This provisional bill is as a matter of punitive assessment as allegedly provided under Section 135 of the Act and includes fixed charge of Rs. 8,160/- and cost of new meter, Rs. 5,000/- alongwith punitive assessment after adjustment of Rs. 6,94,985.18P. Petitioner filed a writ petition before this Court being CWJC No. 3309 of 2009. While the writ petition was pending, on 8.4.2009, petitioners were again served a similar bill with calculation chart being Annexures-3A and 3B respectively based on assessment of load found at 17 KW. The writ petition was finally disposed of by order dated 30.4.2009 (Annexure-4.A) wherein this Court observed that in terms of the Act and the provisions of the Bihar Electricity Supply Code, 2007, petitioners had a right to object to the provisional assess-, ment which had been filed (on or about. 15.4.2009) and petitioners would appear for hearing on 12th May, 2009 when the authorities should make final assessment after considering their objection. It was further ordered that on part payment, as mentioned in the order, the electric line of the petitioners would be connected. It has so been reconnected.-It appears that petitioners' detailed objection, being there filed during pendency of the writ petition and the writ court having directed to hear the matter on 12.5.2009, the matter was taken up but, for some unexplained reason, it took six months for Board to make the final assessment. The bill for final assessment dated 3.11.2009 and the order is annexed as Annexures-5 and 5.A respectively. In the final assessment, a very partial relief has been granted to the petitioners whereby the number of days have been reduced by 50 days and the period Page: 865of consumption has been reduced by half an hour per day otherwise basically the calculation appears to be the same and now, as per final assessment which is said to be under Section 135 of the Act and not under Section 126 of the Act, the total amount payable is demanded at Rs. 6,81,441/-.

    4. It may be noted that in the interregnum, though petitioners were being raised bill on basis of the new meter connected, but the provisional bill amount was shown as arrears and delayed, payment surcharge levied for the outstanding amount which is evident from Annexure-6. This would also be a point to be considered. Petitioners have challenged the aforesaid final assessment.

    5. The first argument on behalf of petitioners is that by showing punitive assessment as under Section 135 of the Act, the petitioners are deprived of their other remedies to challenge the punitive assessment which could only be done, according to the petitioners, in the trial but till then, they would have to bear with it. This, it was submitted, was arbitrary. The counsel for the Board submitted to the similar effect that the assessment was not in terms of Section 126 of the Act and, as such, there could be no appeal against the said punitive final assessment.

    6. Having heard the parties at length, in my view, both the petitioners and the Board are wrong. This issue has already been decided by this Court in the case of Kamaljeet Singh v. Bihar State Electricity Board in CWJC No. 14213 of 2009 by judgment and order dated 3.12.2009 I may only elaborate the same once again. In my view, the assessment in case of unauthorised, use of electricity which includes theft of electricity is specifically provided under Section 126 of the Act. In clear terms, Section 135(1-A) of the Act provides in its third proviso as follows:

    “135. Theft of electricity. …………….

    “(1-A)……. …….

    Provided also that the licensee or supplier, as the case may be, on deposit or payment of the assessed amount or electricity charges in accordance with the provisions of this Act, shall, without prejudice to the obligation to lodge the complaint as referred to in the second proviso to this clause, restore the supply line of electricity within forty-eight hours of such deposit or payment.”

    7. From this provision, of Section 135 of the Act, it would be seen that it, by itself, does not provide for assessment but provides for assessment in accordance with provisions of this Act and the comprehensive provision for assessment is contained in Section 126 of the Act and, in particular, sub-sections (5) and (6) thereof. Section 126 of the Act deals with provisional assessment and then provides for final assessment within 30 days of provisional assessment by virtue of subsection (3) of Section 126. Then we have Section 127 which provides that any person aggrieved by final order, made under Section 126 of the Act, may, within 30 days, appeal to the appellate authority as may be prescribed on payment of half of the assessed amount. Thus seen, in every case of unauthorized user of electricity which includes theft, notwithstanding Section 135 of the Act, assessment has to be made under Section 126 which is appealable to the appellate authority under Section 127 of the Act.

    8. Here, I may note one another aspect. Section 127 of the Act provides that the order of the appellate authority would be final. Though Section 127(4) makes such an order of the appellate authority final, it must be kept in mind that this is a determination in a quasi judicial-proceedings of liability but when we refer to Page: 866provisions of Section 154(5) of the Act, it would be seen that once a criminal case, is lodged then it would be the Special Court, which is the Criminal Court, which has to determine the civil liability against the consumer in terms of money for theft of energy and sub-section (6) of Section 154 provides that if a consumer had de posited any amount in excess of the calculation as made by the Special Court, the same shall be refunded alongwith interest. Thus, it would be seen that so far as authorities are concerned, the determination made by them is final in the quasi judicial proceedings as before them. That is subject to a judicial determination in theft cases upon evidence in a trial by Special Criminal Court whose finding would supersede that of the authorities under the Board. This is the scheme and, as such, in all matters of assessment of unauthorized user of electricity including theft assessment has to be made in terms of Section 126 of the Act and the same is appealable in terms of Section 127 of the Act which order would ultimately be subject to determination by the Special Criminal Court in terms of Section 154(6) of the Act. Thus, the petitioners are not remediless against the final assessment.

    9. At this stage, I may note one fact. If we refer to Section 126 of the Act, it would be clear that within 7 days of the inspection, provisional assessment has to be made. The consumer has then to be given an opportunity to file objection and in terms of Section 126(3), final assessments have to be passed, the facts of present case would show that first a provisional assessment is done on 10.2.2009 then on 8.4.2009 again, a provisional assessment is done. Petitioners filed objection on or about 15.4.2009 and then for six months, Board goes into deep slumber for some unexplained reason to pass the final order of assessment on 3.11.2009 and serves the final bill on 10.11.2009, all contrary to the provisions of the Act.

    10. Another important aspect here is as petitioners have brought but that in between provisional assessment and final assessment, the provisional assessment figures are shown as dues in the bills of every month and delayed payment surcharge levied. This clearly is impermissible. Till a final assessment is done, unless petitioners themselves agree to accept the provisional assessment, there are no dues on basis of any other punitive assessment. The said amount cannot be included in the bills of subsequent month till final assessment is done. To that extent, the delayed, payment surcharge would have to be excluded.

    11. Another misconception that has been carried even to the Bihar Electricity Supply Code, 2007 appears to be that it indirectly provides that as against an assessment made with reference to Section 135 of the Act, in case of theft, there is no appeal. That is clearly contrary to the provisions of the Act and to that extent, the Supply Code cannot be given effect to and must be read down. Even, as per the Supply Code, it would be seen that the assessment both in case of Sections 135 and 126 of the Act has to be made as per the same Annexure-7 to the Supply Code. The only difference is that in matters of theft, it provides the connected load factor as one in cases of direct theft. Otherwise there is no difference.

    12. Another fallacy in the calculation, which is noticeable, is with regard to the relief of amount given while making punitive assessment. From the calculations appended in support of punitive assessment, it would be seen that first, the total deemed consumed unit are calculated. From that instead of subtracting the units already billed in the period, what is done is a money value of the punitive units are then calculated at twice the rate and from that the money value paid earlier is reduced This is wrong for punitive billing is at twice the rate of normal billing the Page: 867relief is to the extent it is billed and, thus, the punitive billing would be for units not billed. Thus, in all such cases, it is only the unit difiference between units punitively billed as reduced by units already billed and this difference would be charged at the punitive rate and not otherwise as has been done. Then again it is not explainable as has been noticed earlier in the judgment that when the first inspection was carried out on 28.4.2008 by the STF, they took the cumulative load of the 5 air conditioners of 1.5 tonnes to be 10000 Watts but now the same 5 air conditioners of 1.5 tonnes, are assessed to be 12500 Watts. This, by itself, has en hanced the calculatable load from 15 KVA to 17 KVA obviously materially affecting the liability.

    13. Petitioners then point out that the last inspection of STF being on 28.4.2008, the period of punitive billing had to be as between that period and the next inspection dated 9.2.2009 which is less than 315 days as calculated. It is the further submitted that the number of days would further get reduced because, admittedly, the premises supplied is a shop, a commercial establishment which has a mandatory weekly closure. That has to be given credence to and cannot be ignored.

    14. In my view, now that the final assessment has been done, though belatedly, petitioners must raise all their objections before the appellate authority in terms of Section 127 of the Act who would hear the parties and decide the matter in accordance with the observations made in this order and in accordance with law. Court is informed that the appellate authority is a person independent of Board and, thus, petitioners should not have any apprehension of bias of any type in this regard.

    15. Before parting, I must notice one other aspect as well. While, lodging the first information report on basis of the punitive calculation, it is alleged that the punitive calculation amount, the provisional assessment was the loss caused to the Board. This is a complete misnomer and wrong. It is not even an assumed loss caused to the Board for the simple reason that even if the punitive units are deemed to be consumptions then in normal event, Board, could charge as per tariff and that would be exactly half of the amount as reduced by units already consumed because punitive billing is done at an assumed twice the rate. That surely cannot be the loss. Thus found, the petitioners must now prefer an appeal to the appellate au thority who would entertain the same and consider all objections that are raised by the petitioners and decide the matter ac cordingly. By now, petitioners have already paid a substantial amount of the punitive bill. If they have not paid 50% thereof, they would make up the deficiency while filing the appeal but would not be required to pay any thing for filing the appeal if they have paid more than 50% of the punitive bill. The appellate authority would decide the case on merit as the delay in filing appeal is because of pendency of this writ petition before this Court.

    16. With these observations and directions, the writ petition stands disposed of.